Responds to Questions Raised During 890411 Telcon Re Mod on Existing Circuits in Order to Incorporate Approved ATWS Mitigating Sys Actuation Circuitry (Amsac).Circuits Will Not Be Modified as Result of Approved AMSAC Installation
ML20245A288
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/13/1989
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-044 TAC-59128, TAC-59129, VPNPD-89-219, NUDOCS 8904250127
Download: ML20245A288 (2)


Text

.L- "h '

, -. j - .. .

?

< 1 i

(

WNSCORSin Electnc La come 231 W. MICHIGAN. P.o. BOX 2046, MILWAUKEE, W153201 (414)221-2345 i

VPNPD-89-219 NRC-89-044 April 13, 1989 U. S. NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station F1-137 Washington, D. C. 20555 Gentlemen:

DOCKETS 50-266 AND 50-301 ATWS RULE (10 CFR 50.62) TACS 59128 AND 59129 POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2

-This letter is in response to the questions you raised during our telephone conversation on April 11, 1989, regarding the modification on existing circuits in order to incorporate the

- approved ATWS mitigating system actuation circuitry (AMSAC).

. Implementation of.the NRC-approved AMSAC design for Point Beach Nuclear Plant, Units 1 and 2, entails incorporating the power-based enabling and time-delay functions into existing circuitry. Point Beach Nuclear Plant presently has a design feature that performs a portion of the AMSAC function. The existing. circuitry associated with this feature trips the turbine and starts the motor-driven auxiliary feedwater pumps whenever both main feedwater pump motor breakers open. This existing circuit, however, has no time-delay or power-based enable function. Additionally, no credit is taken for its action in the safety analyses. This circuit is the only existing auxiliary feedwater initiation circuit which will be altered in order to install the AMSAC circuitry in accordance with our previously submitted design based on WCAP-10858 as approved by the NRC.

The Point Beach safety analyses assume auxiliary feedwater initiation as a result of low-low steam generator level, undervoltage on the 4 kV buses, or a safety injection signal. q The existing circuits associated with these features will not be modified as a result of our approved AMSAC installation.

4 AO

' 5 g g42 g 05000266 890413 P

PDC

, 3 " 44v

;i . . -

NRC Documents: Control Desk' April 13, 1989 Page:2 Please contact us'if.youLhave any addditional questions concerning our.AMSAC implementation.

Very.truly yours, pi '7 '

C. W. Fa

/ Vice President L

Nuclear Power Copies to'NRC Regional Administrator, Region III NRC. Resident Inspector i