ML20247N494

From kanterella
Jump to navigation Jump to search

Informs of Completion of Installation of AMSAC Mods for Plant.Amsac Placed in Operation on 890516.No Significant Problems Encountered
ML20247N494
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/25/1989
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-89-062, CON-NRC-89-62 TAC-59128, VPNPD-89-306, NUDOCS 8906050374
Download: ML20247N494 (1)


Text

.. --

,.,r Y

lHsconsin Electnc eom cower 231 W. MICHIGAN, P.O. BOX 2046, MILWAUKEE, WI 53201 (414) 221-2345 r

VPNPD-89-306 NRC-09-062 e

May 25, 1989 L

t U.'S.

NUCLEAR REGULATORY COMMISSION Document Control Desk Mail Station P1-137 Washington, D. C.

20555

. Attention: Mr. Warren Swenson, Project Manager Project Directorate III-3 Gentlemen:

p DOCKET 50-266 INSTALLATION OF AMSAC MODIFICATIONS (TAC 59128)

POINT BEACH NUCLEAR PLANT, UNIT 1 p

This is to inform you, as requested in your letter dated April 5, 1989, that we have completed installation of the AMSAC modifications-for Point Beach Nuclear Plant, Unit 1.

The AMSAC was placed in operation on Unit 1 at the end of the spring refueling outage on'May 16, 1989.

No significant problems were encountered in the installation or' testing of the system.

The Point Beach, Unit 2, AMSAC installation remains scheduled for the fall refueling. outage.

Very truly yours, k.

& L W. Fy C. W. Fay l

Vice President 1

Nuclear Power Copies to NRC Regional Administrator, Region III NRC Resident Inspector l'