ML20204A024: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:.
a..
* APPENDIX A                                                  ,
NOTICE OF VIOLATION Public Service Company of New Hampshire                Docket No. 50-443 Seabrook Unit 1                                        License No. CPPR-135 As a result of the inspection conducted on February 3 - March 31, 1986 and in ac-cordance with the NRC Enfcrcement Policy (10 CFR 2, Appendix C) published in the Federal Register on March 9, 1984 (49 FR 8583) the following violation was iden-tified:
10 CFR 50, Appendix B, Criterion III and the Seabrook Station FSAR, Section 17.1.1.3 require that measures be established to assure that applicable regu-latory requirements and the design basis for safety-related structures, sys-tems, and components are correctly translated into specifications, drawings, procedures and instructions. FSAR Section 6.2.3 states that the Containment Enclosure Emergency Cleanup System "is capable of reducing the containment enclosure pressure to negative 0.25 inches (w.g.)" and of " processing the atmosphere of the containment enclosure space." It further states that the containment boundary welds of the main steam, feedwater and steam generator blowdown lines are included within the containment enclosure. UE&C Specifi-cation 236-11 states, in part, that the Containment Enclosure Emergency Ex-haust Units " serve to exhaust radioactively-contaminated air from the con-tainment enclosure area during emergency conditions and to remove particulate material and radioactive iodine gas from the air prior to it being exhausted to the atmosphere."' UE&C Drawings F-805052 & 101453 and Foreign Prints 18032
;                  & 18033 (P. O. 12-04/5) identify pressure seal plates in both the East and West Main Steam and Feedwater Chases as extensions of the containment enclo-sure.
1 Contrary to the above, as of February 3, 1986, no design document translated the requirement that the air space behind the pressure seal plate be made part of the containment enclosure. This design failure resulted in the construc-tion of a space within the containment enclosure (as defined by the above UE&C Drawings and Foreign Prints), which would not be reduced to a negative 0.25 inches (w.g.) pressure during emergency conditions and which would not be vented through the Containment Enclosure Emergency Exhaust Units. Thus, the inspector observed on February 19, 1986 the installation of the pressure seal plates in both steam and feedwater chases with no provision for venting the air space behind them so that their atmosphere would be processed by the Containment Enclosure Emergency Air Handling System.
This is a Severity Level IV Violation (Supplement II).
Pursuant to the provisions of 10 CFR 2.201, Public Service Company of New Hampshire is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the corrective steps which have been taken and the results 4
achieved; (2) the corrective steps which will be taken to avoid further violations;              '
and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
B605090282 860429 PDR    ADOCK 05000443 G                  PDR}}

Latest revision as of 01:14, 31 December 2020

Notice of Violation from Insp on 860203-0331
ML20204A024
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/29/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20204A019 List:
References
50-443-86-12, NUDOCS 8605090282
Download: ML20204A024 (1)


Text

.

a..

  • APPENDIX A ,

NOTICE OF VIOLATION Public Service Company of New Hampshire Docket No. 50-443 Seabrook Unit 1 License No. CPPR-135 As a result of the inspection conducted on February 3 - March 31, 1986 and in ac-cordance with the NRC Enfcrcement Policy (10 CFR 2, Appendix C) published in the Federal Register on March 9, 1984 (49 FR 8583) the following violation was iden-tified:

10 CFR 50, Appendix B, Criterion III and the Seabrook Station FSAR, Section 17.1.1.3 require that measures be established to assure that applicable regu-latory requirements and the design basis for safety-related structures, sys-tems, and components are correctly translated into specifications, drawings, procedures and instructions. FSAR Section 6.2.3 states that the Containment Enclosure Emergency Cleanup System "is capable of reducing the containment enclosure pressure to negative 0.25 inches (w.g.)" and of " processing the atmosphere of the containment enclosure space." It further states that the containment boundary welds of the main steam, feedwater and steam generator blowdown lines are included within the containment enclosure. UE&C Specifi-cation 236-11 states, in part, that the Containment Enclosure Emergency Ex-haust Units " serve to exhaust radioactively-contaminated air from the con-tainment enclosure area during emergency conditions and to remove particulate material and radioactive iodine gas from the air prior to it being exhausted to the atmosphere."' UE&C Drawings F-805052 & 101453 and Foreign Prints 18032

& 18033 (P. O. 12-04/5) identify pressure seal plates in both the East and West Main Steam and Feedwater Chases as extensions of the containment enclo-sure.

1 Contrary to the above, as of February 3, 1986, no design document translated the requirement that the air space behind the pressure seal plate be made part of the containment enclosure. This design failure resulted in the construc-tion of a space within the containment enclosure (as defined by the above UE&C Drawings and Foreign Prints), which would not be reduced to a negative 0.25 inches (w.g.) pressure during emergency conditions and which would not be vented through the Containment Enclosure Emergency Exhaust Units. Thus, the inspector observed on February 19, 1986 the installation of the pressure seal plates in both steam and feedwater chases with no provision for venting the air space behind them so that their atmosphere would be processed by the Containment Enclosure Emergency Air Handling System.

This is a Severity Level IV Violation (Supplement II).

Pursuant to the provisions of 10 CFR 2.201, Public Service Company of New Hampshire is hereby required to submit to this office within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the corrective steps which have been taken and the results 4

achieved; (2) the corrective steps which will be taken to avoid further violations; '

and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

B605090282 860429 PDR ADOCK 05000443 G PDR