Notice of Violation from Insp on 820323-0503
ML20054F792
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 05/26/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20054F791 List:
References
50-443-82-03, 50-443-82-3, 50-444-82-03, 50-444-82-3, NUDOCS 8206170332
Download: ML20054F792 (2)


Text

.

APPENDIX A NOTICE OF VIOLATION Public Service Company of Ned Hampshire Docket Nos. 50-443 & 50-444 Seabrook Units 1 and 2 License Nos. CPPR-135 & CPPR-136 As a result of the inspection conducted March 23-May 3,1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982), the following vio-lations were identified:

A.

10 CFR 50, Appendix B, Criterion X and the Seabrook Station PSAR require that a program for inspection of activities affecting quality be established.

The Seabrook Station FSAR endorses USNRC Regulatory Guide 1.30 (Revision 0) and requires that safety-related systems comply with IEEE-336-1971, which itself includes raceways as part of Class IE systems requiring an inspection program to verify physical integrity.

Contrary to the above, as of March 28, 1982 no program of inspection to verify the physical integrity of installed Class IE cable tray (a raceway) had been established.

Defects were located in installed tray without evidence that they would have been identified by the licensee program, since no site inspection criteria exist for the documentation and resolution of such de-ficiencies.

This is a Severity Level V Violation (Supplement II) applicable to Docket Nos. 50-443 and 50-444.

B.

10 CFR 50, Appendix B, Criterion X and the Seabrook Station PSAR require that conformance to drawing details of activities affecting quality be verified by inspection of those activities.

Details for the proper erection of a pipe support (833-SG-6) and conduit supports (eg: 4244) are provided in the following documents, respectively:

Pullman Hanger Drawing 8':3-SG-06 (Revision 3A) l UE&C Engineering Change Authorization 03/1067F, sketch of surface mounted strut details I

Contrary to the above, as of April 23, 1982 QC inspection of pipe support 833-SG-6 had failed to identify several items (eg: weld length, member loca-l tion and configuration, modification details) in nonconformance with the hanger drawing.

QC inspection of several conduit supports (eg: 4244) typified by ECA 03/1067F had failed to identify the installation of nonconforming washers causing a visible deformation in part of the detailed strut connections.

This is a Severity Level IV Violation (Supplement II) applicable to Docket No. 50-443.

1 Pursuant to the provisions of 10 CFR 2.201, Public Service Company of New Hampshire is hereby required to submit to this office within thirty days of the date of this Hotice, a written statement or explanation in reply, including:

(1) the corrective 8206170332 820526 l

PDR ADOCK 05000 0

Appendix A 2

steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affirmation.

Where good cause is shown, consideration will be given to extending your response time.

- -j Date ti rd Y. Starostecki, Director Di ion of Project and President Programs 0