ML20067E548: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:_-          . _ _ _
NORTMEAST UTILfflES                                                o ,n,,,io,,,c.,  s,  .,si,,,,.8,.,,n. conn,,,,,,,
                              ',                  5 **
                                          'l ',                                            P o BoK 270 g            w. m o.e. .  .a u...                                        H ARTF oRD. CONNECTICUT 061410270
                      '    J **w% w w i m .c- a, (203) 665 6000 Re: 10CFR50.71(a)
February 11, 1991 U.S. Nuclear Regulatory Commission                                                    W 1-132 Document Control Desk Washington, D.C. 20555
 
==Reference:==
Facility Operatin License No. NPF 49 Docket No. 50-4
 
==Dear Sir:==
 
In accordance with reporting, requirements of technical specifications Section 6.9.1.5, the Millstone Nuclear Power Station . Unit 3 Monthly Operatmg Report 9102 covering opera.
tion for the month of January is hereby forwarded.
9101. Reactor Also reserveenclosed Shutoown Hours  is aare  correction      to hours corrected to 7.4 the December far the month msteadMonthly    o      Operating, Report hours. The outage in question occurred on the last day of the month and a final determina.
tion had not been made prior to report submittal.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
                                                                                    / StephenlteE. Scace    cxu Director, Millstone Station Attachment cc: T.T. Martin, Region I Administrator W.J. Raymond, Senior Resident inspector, Millstone Unit %s.1,2 & 3 J.F. Williams, NRC Project Manager, Millstone Unit %. 3 l
l                9102150112 910211                                                                                              i
;                PDR    ADOCK 05000423 a                        eDR                                                                                [}}

Latest revision as of 19:02, 28 August 2020

Forwards Monthly Operating Rept for Jan 1991 for Millstone Unit 3 & Revised Monthly Operating Rept for Dec 1990 for Millstone Unit 3
ML20067E548
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/11/1991
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20067E549 List:
References
MP-91-132, NUDOCS 9102150112
Download: ML20067E548 (1)


Text

_- . _ _ _

NORTMEAST UTILfflES o ,n,,,io,,,c., s, .,si,,,,.8,.,,n. conn,,,,,,,

', 5 **

'l ', P o BoK 270 g w. m o.e. . .a u... H ARTF oRD. CONNECTICUT 061410270

' J **w% w w i m .c- a, (203) 665 6000 Re: 10CFR50.71(a)

February 11, 1991 U.S. Nuclear Regulatory Commission W 1-132 Document Control Desk Washington, D.C. 20555

Reference:

Facility Operatin License No. NPF 49 Docket No. 50-4

Dear Sir:

In accordance with reporting, requirements of technical specifications Section 6.9.1.5, the Millstone Nuclear Power Station . Unit 3 Monthly Operatmg Report 9102 covering opera.

tion for the month of January is hereby forwarded.

9101. Reactor Also reserveenclosed Shutoown Hours is aare correction to hours corrected to 7.4 the December far the month msteadMonthly o Operating, Report hours. The outage in question occurred on the last day of the month and a final determina.

tion had not been made prior to report submittal.

Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY

/ StephenlteE. Scace cxu Director, Millstone Station Attachment cc: T.T. Martin, Region I Administrator W.J. Raymond, Senior Resident inspector, Millstone Unit %s.1,2 & 3 J.F. Williams, NRC Project Manager, Millstone Unit %. 3 l

l 9102150112 910211 i

PDR ADOCK 05000423 a eDR [