NORTMEAST UTILfflES o,n,,,io,,,c.,
s,.,si,,,,.8,.,,n. conn,,,,,,,
'l '
P o BoK 270 5 **
J
- w% w w i m.c-a, H ARTF oRD. CONNECTICUT 061410270 w.
m o.e..
.a u...
g (203) 665 6000 Re: 10CFR50.71(a)
February 11, 1991 W 1-132 U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Reference:
Facility Operatin License No. NPF 49 Docket No. 50-4
Dear Sir:
In accordance with reporting, requirements of technical specifications Section 6.9.1.5, the Millstone Nuclear Power Station. Unit 3 Monthly Operatmg Report 9102 covering opera.
tion for the month of January is hereby forwarded.
Also enclosed is a correction to the December Monthly Operating, Report 9101. Reactor reserve Shutoown Hours are corrected to 7.4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> far the month mstead o hours. The outage in question occurred on the last day of the month and a final determina.
tion had not been made prior to report submittal.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY
/
lte cxu Stephen E. Scace Director, Millstone Station Attachment cc: T.T. Martin, Region I Administrator W.J. Raymond, Senior Resident inspector, Millstone Unit %s.1,2 & 3 J.F. Williams, NRC Project Manager, Millstone Unit %. 3 l