REVISION 15 February 1,1996 INSERVICE TESTING PROGRAM CALLAWAY NUCLEAR PLANT i
Prepared by                                          Qualified Reviewer 0-    m 2///'14                        #          2_      ' 1/ff)t, Chris J. D#ner                                    74a47er C. Wink IST Engineer                                        IST Engineer Backup Supervisor Review i                                                      2-64G l                                                /
l                              David S. Hollabaugh Supervising Engineer-Performance /ISI                        )
l 9605290066 960201 PDR  ADOCK 050004G3                                                                      i 1
P                  PDR
[
 
TABLE OF CONTENTS INTRODUCTION 1.0  INSERVICE TESTING OF PUMPS                                        PAGES i        1.1          General Description                                    1 l
1.2.          Inservice Testing Program For Pumps                    2 1.3          ReliefRequests For Pump Testing                        6 2.0  INSERVICE TESTING OF VALVES l                                                                                        \
2.1            General Description                                    3          I c                                                                                        l
!      2.2            Inservice Testing Program For Valves                  71 2.3            Relief Requests or Test Deferral Justifi$5tions l                      For Valve Testing                                    60          I l                                                                                        l l
i i
I i
I
!                                                        i t
 
l l
l INTRODUCTION i
i  The Second 10-Year Inservice Testing Program for Callaway Plant was developed in
,  compliance with the niles and regulations of 10CFR 50.55a and ASME Boiler and Pressure Vessel Code Section XI 1989 Edition. No Code Cases were utilized in developing Callaway's Inservice Testing Program.
l Where ASME XI requirements were determined to be impractical, a relief request has been developed. These relief requests are included in Sections 1.3 and 2.3 of this
!  document.
1 This submittal of the Inservice Testing Program for pumps and valves will remain in i- effect through the next 10 year inservice inspection interval ending December 19, l  2004.
l t
l
                                              .e=.~?
l l
l l
l l
l ii i                                                                ~
1 1
 
4 SECTION 1.0 INSERVICE TESTING OF PUMPS
____I
 
a l
l l
r 1
4 i
1 l
1 l
I 1
SECTION 1.1          ,
1 GENERAL DESCRIPTION l
l 1
1 I
4 1
 
SECTION 1.1 - GENERAL DESCRIPTION Pumps in the IST Program are tested per the requirements of ASME/ ANSI OM-1987 Edition 1988 Addenda Part 6 except as indicated by the referenced relief requests.
Section 1.2 contains the IST Program for pumps with the following information given:
PUMP NUMBER                  lists the pump identification number as shown on the P&ID's PUMP NAME                    gives the noun name for the pump ISI CLASS                    classification of the pump per ISI requirements P&TD                          drawing and location of pump TEST PARAMETERS              indicates the required test parameters per OM-6 Table 2 RELTEF REOUESTS              lists the applicable relief requests for the pump TEST FREOUENCY                lists the test frequency for the pumps M - Monthly Q - Quarterly RF - Refueling Outage                                          i CS - Cold Shutdown                                            ;
10 - Once every 10 years l
Page1 l
i
 
l-
* l l
l l
SECTION 1.2 INSERVICE TESTING 1
PROGRAM FOR PUMPS i
I f
4 i
 
i CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM                                                                                                                                                    ;
PUMP                                PUMP                              ISI        P&lD                        TEST PARAMETERS (2)                                                                          RELIEF                      TEST NUMBER                                NAME                            CLASS                      SPEED (1)      A PRESS FLOW VIBRATION                                                            REQUEST 3                          FREQUENCY        r PAL 01A        MOTOR DRIVEN AUXILIARY                                  3      M-22AL01                    N/A        YES                                      YES                        YES              RR#P05                    M FEEDWATER PUMP A                                                          E-4
[
PALOIB          MOTOR DRIVEN AUXILIARY                                  3    M-22AL01                      N/A        YES                                      YES                        YES              RR#POS                    M            f
,                  FEEDWATER PUMP B                                                          G-4 PALO2          TURBINE DRIVEN AUXILIARY                                3    M-22AL01                      YES        YES                                      YES                        YES              RR#POS                      M FEEDWATER PUMP                                                            B-4 PBG02A          CVCS BORIC ACID TRANSFER PUMP A                          3    M-22BG05                      N/A        YES                                      YES                        YES              RR#P09
* Q/CS B4                                                                                                                                                              i PBG02B          CVCS BORIC ACID TRANSFER PUMP B                          3    M-22BG05                      N/A        YES                                      YES                        YES              RR#P09                                    [
Q/CS A4                                                                                                                                                              i PBG05A          CENTRIFUGAL CHARGING PUMP A                              2    M-22BG03                      N/A        YES                                      YES                        YES              RR#P03                    Q/RF C-5                                                                                                                  RR#P06                                    !
PBG05B          CENTRIFUGAL CHARGING PUMP B                              2    M-22BG03                      N/A        YES                                      YES                        YES              RR#P03                    Q/RF B-5                                                                                                                  RR#P06                                    <
PEF 01A          ESSENTIAL SERVICE WATER PUMP A                          3    M-U2EF01                      N/A        YES                                      YES                        YES                                          Q G4                                                                                                                                                              !
PEF 01B        ESSENTIAL SERVICE WATER PUMP B                          3    M-U2EF01                      N/A        YES                                      YES                        YES Q
C4 PEG 01A          COMPONENT COOLING WATER PUMP A                          3    M-22EG01                      N/A        YES                                      YES                        YES
                                                                                                      '                                                                                                                                        Q G-4 PEG 01B          COMPONENT' OOLING WATER PUMP B                          3    M-22EG01                      N/A        YES                                      YES                        YES                                          Q D-l PEG 01C          COMPONENT COOi ING WATER PUMP C                          3    M-22EG01                      N/A        YES                                      YES                        YES                                          Q E-4                                                                                                                                                              ,
4 a
e Page1
 
1 CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM f
PUMP                                                PUMP                                                                                                                                                                    ISI                  P&ID                        TEST PARAMETERS (2)          RELIEF      TEST NUMBER                                                NAME                                                                                                                                                        CLASS                                          SPEED (1) A PRESS FLOW              VIBRATION REQUESTS  FREQUENCY            ;
PEG 01D      COMPONENT COOLING WATER PUMP D                                                                                                                                                                                      3              M-22EG01        N/A                YES  YES        YES                  Q B-4                                                                                    .
PEJ01A      RESIDUALlEAT REMOVAL PUMP A                                                                                                                                                                                          2                M-22EJ01        N/A                YES  YES        YES    RR#P01        Q G4 PEJ01B      RESIDUALIEAT REMOVAL PUMP B                                                                                                                                                                                          2                M-22EJ01        N/A                YES  YES        YES    RR# Pol      Q              '
C4 PEM01A        SAFETY INECTION PUMP A                                                                                                                                                                                                2              M-22EMOI        N/A                YES  YES        YES                  Q
.                                                                                                                                                                                                                                                                E4 PEM01B        SAFETY INECTION PUMP B                                                                                                                                                                                                2              M-22EM01        N/A                YES  YES        .YES                  Q              ,
D4                                                                                    ;
PEN 01A      CONTAINMENT SPRAY PUMP A                                                                                                                                                                                              2              M-22EN01        N/A                YES  YES        YES                  Q G4                                                                                    i PEN 01B      CONTAINMENT SPRAY PUMP B                                                                                                                                                                                              2              M-22EN01        N/A                YES  YES        YES                  Q              ,
B4 M-22JE01        N/A                YES  YES        NO      RR#P02      Q/10            i PE01A        EMERGENCY FUEL OILTRANSFER                                                                                                                                                                                            3 PUMP A                                                                                                                                                                                                                                  E-7 PE01B        EMERGENCY FUEL OIL TRANSFER                                                                                                                                                                                          3              M-22E01      [N/A                YES  YES        NO      RR#P02      Q/10 PUMP B                                                                                                                                                                                                                                  A-7        -
(1) For pumps that have N/A for ' Speed' the pump is directly coupled to a constant speed motor.
(2) The test parameter ' Discharge Pressure' was not included in this table as none of the pumps in the IST Program are p'ositive displacement pumps.
t
                                                                                                                                                                                                                                                                                                                                                      ,i Page 2
 
l 1
i 1
SECTION 1.3 l              . . . . ,
RELIEF REQUESTS FOR i
PUMP TESTING        !
i l
 
\
l l                                      RELIEF REQUEST #P01 l
l l
SYSTEM:                    Residual Heat Removal System COMPONENT:                PEJ01 A and PEJ01B CLASS:                    2 FUNCTION:                  To provide low head safety injection and residual heat removal.              ,
l TEST REQUIREMENT:          The full-scale range of each analog instrument shall not be greater than three times the reference value. Instrument accuracy shall be within the limits of Table 1. Station instmments meeting these requirements shall be acceptable.
BASIS FOR RELIEF:          Pump discharge pressure is compared to pump suction pressure to determine pump differential pressure.          Reference values for discharge pressure for these pumps are between 200 psig and 300 psig. This would require a discharge pressure gauge of 0-600 psig maximum. The accuracy required for this gauge would be 2% of 600 psig which is      12 psig. The permanent discharge pressure gauges we have installed are 0-700 psig with a tolerance less than i 12 psig. Although the permanent instruments are above the                '
maximum range limits they are within the accuracy requirements and are therefore suitable for the test.
ALTERNATE TESTING: Use permanently installed discharge pressure gauges.                              ,
l l
i I
i l
Page1                                                      I
 
l RELIEF REQUEST #P02 l
SYSTEM:            Emergency Fuel Oil System                                            :
1 COMPONENT:          PJE01 A and PJE01B CLASS:              3 FUNCTION:            To provide fuel oil to the standby diesel generators l
; TEST REQUIREMENT:    Measure vibration, differential pressure (dp), and pump flow (Q).
BASIS FOR RELIEF:    Diesel generator fuel oil transfer pumps are submersible pumps.
Vibration cannot be measured on the submersible pumps.
i ALTERNATE TESTING: Pump differential pressure and flow measurement will be made quarterly. The pump will be disassembled and the bearings inspected once every 10 years. If the bearing condition is in question, the bearing-will-be repaired or replaced prior to re-installing the bearing.
;                                                                                          l i
e l
Page 2 1                                                                                          \
 
__ _. m      . . _ _ . _ . _ . _ . _        _ _ _.__._._..._ ___ . . __                                    . _ . _ _
1 i                                                                                                                              .
L                                              RELIEF REQUEST #P03 SYSTEM:                        Chemical and Volume Control System l          COMPONENT:                    PBG05A and PBG05B
                                                                                                                              +
CLASS:                        2
;          FUNCTION:                      To provide high head safety injection to the reactor.
TEST REQUIREMENT:              The resistance of the system shall be varied until either the                        I measured differential pressure or the measured flowrate equals the corresponding reference value.                                                      i l          BASIS FOR RELIEF:              Refer to Generic Letter 89-04, Sedion 9. Technical Specification 4.5.2.f.1 states "Each ECCS Subsystem shall be demonstrated                          '
;                                        OPERABLE by verifying that each centrifugal charging pump l                                        develops a discharge pressure greater than or equal to 2400 psig on L                                        recirculation flow when tested pursuant to Specification 4.0.5."                    ,
l                                        Testing of these pumps is performed on the fixed resistance mini-flow path (2500 psid,60 gpm). At this flow rate, the pump curve                      j for these pumps is relatively flat (25 psid/60 gpm). Flow rate                      l changes of150% would result in less than 1% change in pump                          !
l differential pressure.. . Based.on this, it is not warranted to install additional instrumentation to ensure flow is maintained at the same point (12% accuracy) for each quarterly test. Adequate flow is                      ,
verified for protection of the pumps by monitoring discharge pipe                    !
l                                        temperature changes. To further verify pump performance and
!                                        monitor degradation, additional tests will be run, on a refueling                    ;
frequency, at or above the design flow point for the pumps. Pump                    l flowrate, differential pressure, and vibration will be monitored.- The              j flow measurement to be performed during these outages will be                        l l                                        done utilizing an alternate flow path which is only available during                l l                                        outage conditions and has installed flow instrumentation. This flow                  l l                                        instrumentation meets the requirements of OM Part 6, Section 4.6.
ALTERNATE TESTING: Pump differential pressure and vibration will be measured and                                    ,
trended quarterly. A second set of reference values will be established at or above the pumps' design flow point. Pump                          ;
differential pressure, flowrate, and vibration will be measured on a                :
refueling frequency and trended against this second set of reference values.                                                                              ,
1 I
4 I
l Page 3
 
i RELIEF REQUEST #P05 SYSTEM:              Auxiliary Feedwater System COMPONENT:            PALOl A, PALOlB, and PALO2                                          i CLASS:                3 i
FUNCTION:            Provide a means to remove reactor decay heat when the principal heat sinks are unavailable.                                          .
l TEST REQUIREMENT:    The full-scale range of each instmment shall be three times the      l reference value or less. Instrument accuracy shall be within the limits of Table 1. Station instruments meeting these requirements shall be acceptable.                                                  I BASIS FOR RELIEF:    Pump suction pressure is compared to pump discharge pressure to determine pump diffeiential pressure. Reference values for suction pressures for these pumps are about 15 psig. This would require suction pressure gauges of 0-45 psig maximum. The accuracy required for these gauges would be 2% of 45 psig which is i 0.9 psig. The permanent suction pressure gauges we have installed are 0-60 psig      0.5 psig. Although the permanent instruments are above the maximum range limits, they are within the accuracy requirements and are therefore suitable for the test.
ALTERNATE TESTING: Use permanently installed suction pressure gauges.
i l
l l
Page 4
 
RELIEF REQUEST #P06 l
l l
l SYSTEM:              Chemical and Volume Control System l
COMPONENT:            PBG05A and PBG05B                                                  .
l l        CLASS:                2                                                                  l i
FUNCTION:            To provide high head safety injection to the reactor.              l l
TEST REQUIREMENT:    The full-scale range of each instmment shall be three times the    i reference value or less. Instrument accuracy shall be within limits l                              ofTable 1. Station instruments meeting these requirements shall be  l acceptable.
BASIS FOR RELIEF:    Reference values for suction pressures for these pumps are between  i 30 psig and 40 psig. This would require suction pressure gauges of 0-90 psig maximum. The accuracy required for this gauge would be 2% of 90 psig which is il.8 psig. The permanent suction pressure gauges - we have installed are 0-150 psig il.0 psig.
Although the permanent instruments are above the maximum range limits, they are within-the accuracy requirements and are therefore suitable for the test.
ALTERNATE TESTING: Use permanently installed suction pressure gauges.
l e
i Page5 I
 
l RELIEF REQUEST #P09                                            ;
l SYSTEM:                Chemical and Volume Control System 1
1 COMPONENT:            PBG02A and PBG02B CLASS:                3 l                      FUNCTION:              To provide emergency boration.
l l                      TEST REQUIREMENT:      The resistance of the system shall be varied until either the j                            -
measured differential pressure or the measured flowrate equals the l                                            corresponding reference value.
l
;                      BASIS FOR RELIEF:      See Generic Letter 89-04, Section 9. Quarterly testing of these
!                                            pumps is performed on the fixed resistance mini-flow path (112 psig,15 gpm). At this flowrate, the pump curve for these pumps is relatively flat (8 psid/42 gpm). Flowrate changes ofi 25% would result in less than a 1% change in pump differential pressure. Based on this, it is not warranted to install additional instrumentation to ensure flow is maintained at the same point (i 2% accuracy) for each quarterly test. .-To further verify pump performance ud l
monitor degradation, an additional test will be mn, on a cold l                                            shutdown frequency, at or above the design flow point for the pumps. Pump differential pressure, flowrate, and vibration will be monitored. The flow measurement to be performed during these l                                              outages will be donc utilizing an alternate flow path which is only j                                            available during outage conditions and has installed flow instmmentation. This flow instrumentation meets the requirements l                                              of OM Part 6, Section 4.6.
i ALTERNATE TESTING: Pump differential pressure and vibration will be measured and trended quarterly. A second set of reference values will be established at or above the pump design flow point. Pump differential pressure, flowrate, and vibration will be measured on a cold shutdown frequency and trended against this second set of
                                            . reference values.
l l
l l
                                                                                        ~
1 l
{
Page 6
 
SECTION 2.0 INSERVICE TESTING OF VALVES l
I i
i
 
SECTION 2.1 GENERAL DESCRIPTION 1
 
SECTION 2.1 - GENERAL DESCRIPTION Valves in the IST Program are tested per the requirements of ASME/ ANSI OM-1987 Edition 1988 Addenda Part 10 except as indicated by the referenced relief requests.
Section 2,2 contains the IST Program for valves sorted by drawing number with the following information given:
VALVE NUMBER lists the valve identification number as shown on the P&ID's DESCRIPTION gives the noun name for the valve COOR valve location on drawing ACT lists the type of valve actuator MO    motor operated SO    solenoid operated AO    air operated HO    hydraulic operated SA    selfactuated MA    manual operated VIN TYP_E GT    gate valve GB    globe valve CK    check valve RV    reliefvalve BF    butterfly valve DI    diaphragm valve VIN CAT indicates the category assigned to the valve based on the definitions given in section 1.4 of OM-10 VIN SIZE lists the nominal pipe size of the valve in inches Page1
 
l TESTS PERF / FREOUENCY                    lists the tests that will be performed to fulfill the requirements of OM-10 followed by a "/" and then the                      ,
frequency at which the test will be performed.                            !
_ TEST PERF                                                  FREOUENCY                                                l FS      full stroke exercise valve to safety                Q- Quarterly                                            l position                                            CS-    Cold Shutdown PS      partial stroke exercise valve                        RF-    Refueling Ouiage.
LT      leak-rate test valve to Section XI                  RV - # OM schedule for relief valve test requirements                                        # = (5) for 5 year frequency LJ      leak-rate test valve to Appendix J                  # = (10) for 10 year frequency requirements FT      observe the fail safe operation of the              SD- Disassemble, inspect and manually valve                                                        exercise one valve from specified group each refueling outage.
PI      verify the valve remote position indication RV      safety and relief valve test SFTY POS lists the safety position of the valve - (0) pen or (C)losed ACTIVE OR PASSIVE valve categorization based on definitions given in                                                ,
section 1.3 of OM-10 l  RR OR TST DEF JUST. lists the applicable Relief Requests, Cold Shutdown Justifications, or Refueling Justifications in Section 2.3 of the IST Program.
NOTES gives any additionalinformation on valve NOTE:
: 1.      GTHZ0006, 7, 8, 9 are passive valves during normal power operations; however, these valves become active during refueling operations. These valves will be tested per OM-10 requirements as active components during refueling operations.
l  2.      Listed below are the check valve groups established to verify the full stroke capability of check valves using a sampling plan as discussed in NUREG-1482 Section 4.1.2 and established in RFR-16455A:
A. EP8818A and EP8818B B. BB8948A and BB8948B C. EP8818C and EP8818D D. BB8948C and BB8948D E. EJ8841 A, EJ8841B, BB8949B and BB8949C F. EMV0001 and EMV0002 G. EMV0003 and EMV0004                                  .
H. EPV0010, EPV0020, EPV0030, and EPV0040 I. BB8949A and BB8949D J. BBV0001, BBV0022, BBV0040, and BBV0059 Page 2 i
 
i l
l l
l 3. APV0033 is not an ASME Code valve; therefore, it is not required to be in the IST l    Program but it is listed in the IST Program since it is tested during the Auxiliary i i    Feedwater pump surveillances (RFR 15787B).                                          ;
l l                                                                                        I l                                                                                        i 1
l i
i i
l 6
l i.
l l
5 l
l l
l l
I 3
Page 3 1
1 l
 
x s.-a-    _ -
l I
l SECTION 2.2 l
INSERVICE TESTING PROGRAM FOR VALVES l
                                          )
                                        +
            =
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB)
DRAWING M-22AB01 VALVE                                              DESCRIPTION                                            COOR  ACT. VLV VLV                      VLV  TESTS  SFTY ACTIVE  RR OR13T NOTES NUMBER                                                                                                                  TYPE CAT.                      SIZE  PERF/  POS      OR  DEFJUST.
(in) FREQ.        PASSIVE ABPV0001 SG A MS TO ATMS PORV                                                                                G-3  AO      GB  B                          8  FS/CS    O/C ACTI'E    AB-1 FT/CS PI/RF ABPV0002 SG B MS TO ATMS PORV                                                                                D-3  AO    GB  B                          8  FS/CS    O/C ACTIVE    AB-1 FT/CS                                ,
PI/RF ABPV0003 SG C MS TO ATMS PORV                                                                                D-6  AO    GB  B                          8  FS/CS    O/C ACTIVE    AB-1 FT/CS PI/RF ABPV0004 SG D MS TO ATMS PORV                                                                                G4  AO    GB  B                          8  FS/CS    O/C ACTIVE    AB-1 FT/CS Pl/RF-ABV0007  SG D MS PORV MAN ISO                                                                                G-6  MA      GT  B                          10  FS/CS    O/C ACTIVE    AB-3 ABV0018  SG A MS PORV MAN ISO                                                                                G-3  MA      GT  B                          10  FS/CS    O/C ACTIVE    AB-3 ABV0029  SG C MS PORV MAN ISO                                                                                C-6  MA      GT  B                          10  FS/CS    O/C ACTIVE    AB-3          -
ABV0040  SG B MS PORV MAN ISO                                                                                C-2  MA    GT  B                          10  FS/CS    O/C ACTIVE    AB-3 O
Page1
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB)
DRAWING M-22AB02 VALVE                                                                                                    DESCRIPTION            COOR                                  ACT.            VLV        VLV          VLV        TESTS    SFTY          ACTIVE  RR OR TST                      NOTES NUMBER                                                                                                                                                                                  TYPE        CAT.          SIZE        PERF/    POS            OR    DEFJUST.
(in)      FREQ.                  PASSIVE ABHV0005                                                                    TDAFP STM SPLY FROM MS LOOP 2                                    D-4                              AO        GB                    B    4        FS/Q      O            ACTIVE FT/Q Pl/RF ABilV0005                                                                    TDAFP STM SPLY FROM MS LOOP 3                                      C-4                            AO        GB                    B    4        FS/Q      O            ACTIVE FT/Q PI/RF -
ABHV00ll                                                                    SG D MSIV                                                        11-3                            AO        GT                    B  28        FS/CS      C            ACTIVE    AB-2 PI/RF ABHV0012                                                                    SG D MS LOOP 4 ABHV0011 BYP ISO IIV                                C-4                            AO        GB                    B    2        PI/RF    C            PASSIVE ABilV0014                                                                    SG A MSIV                                                          F-3                            AO        GT                    B  28        FS/CS      C            ACTIVE    AB-2
                                                                                                                                                                                                    .                                  PI/RF ABHV0015                                                                    SG A MS LOOP 1 ABHV0014 BYP ISO HV                                  F-3                            AO        GB                    B  .2          PI/RF    C            PASSIVE ABilV0017                                                                    SG B MSIV                                                        D-3                              AO        GT                    B    28        FS/CS      C            ACTIVE    AB-2 PI/RF ABHV0018                                                                      SG B MS LOOP 2 ABHV0017 BYP ISO IIV                              D-3                              AO        GB                    B    2        PI/RF    C            PASSIVE ABHV0020                                                                      SG C MSIV                                  -                      C-3                            AO        GT                    B    28        FS/CS      C            ACTIVE    AB-2 PI/RF ADHV0021                                                                      SG C MS LOOP 3 ABHV0020 BYP ISO IIV                              C-3                            AO        GB                    B    2        Pl/RF    C            PASSIVE ABHV0048                                                                      MS LOOP 2 WARMUP STM SPLY TO TDAFP                              D-4                              AO        GB                    B    1        FS/Q      C            ACTIVE ISO HV                                                                                                                                            FT/Q PI/RF Page 2
_ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _                                                _ _ _ _ _ _ .                                            _ _ _ - .                                .                              - _ _ _ .                  .__ __ - _-_-_~
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB)                                                                                                                                                                                                                                                                                                                              ;
DRAWING M-22AB02 VALVE                                                  DESCRIPTION                                                                                                    COOR                        ACT. VLV        VLV  VLV                    TESTS      SFTY                  ACTIVE  RR OR TST                NOTES                :
NUMBER                                                                                                                                                                                                      TYPE        CAT. SIZE                      PERF/          POS                OR    DEFJUST.
(in)                    FREQ.                            PASSIVE i
ABIIV0049          MS LOOP 3 WARMUP STM SPLY TO TDAFP                                                                                                                                  C-4                  AO    GB          B      1                      FS/Q                    C    ACTIVE ISOIIV                                                                                                                                                                                                                                    FT/Q                                                                                    i Pl/RF                                                                                  j ABLV0007          MS LOOP 3 LO PNT DRN LCV                                                                                                                                            B-4                  AO    GB          B    2                      FS/Q                    C      ACTIVE                                                  t FT/Q                                                                                    i PI/RF ABLV0008          MS LOOP 2 LO PNT DRN LCV                                                                                                                                            D-5                  AO    GB          B    2                      FS/Q                    C      ACTIVE FT/Q                                                                                    !
PI/RF                                                                                  !
ABLV0009          MS LOOP 1 LO PNT DRN LCV                                                                                                                                            E-4                  AO    GB          B    2                      FS/Q                    C      ACTIVE
                                                                                                                                                                                                                                  .                                      FT/Q                                                                                    [
s                                      PI/RF                                                                                  [
ABLV0010          MS LOOP 4 LO PNT DRN LCV                                                                                                                                          G-4                  AO    GB          B    2                      FS/Q                    C      ACTIVE FT/Q PI/RF 2
ABV0045            MS LOOP 4 SFrY RLF                                                                                                                                                H-7                  SA    RV          C    6                RV/RV-5            O/C              ACTIVE t
ABV0046            MS LOOP 4 SFrY RLF                                                                                                                                                11-7                  SA    RV          C    6                RV/RV-5            O/C              ACTIVE                                                  i ABV0047            MS LOOP 4 SFTY RLF                                                                                                                                                II-6                  SA    RV          C    6                RV/RV-5            O/C                ACTIVE .
ABV0048            MS LOOP 4 SFTY RLF                                                                                                                                                11-5                  SA    RV          C    6                RV/RV-5            O/C                ACTIVE i
ABV0049            MS LOOP 4 SFTY RLF                                                                                                                                                11-5                  SA    RV          C    6                RV/RV-5            O/C                ACTIVE Page 3
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB)
DRAWING M-22AB02                                                                                                                                                                                                                                                                                                    -
VALVE                                  DESCRIPTION                                                                                              COOR                            ACT.                        VLV      VLV  VLV    TESTS  SI'TY ACTIVE                RR OR TST                    NOTES  ,
NUMBER                                                                                                                                                                                                          TYPE        CAT. SIZE  PERF/  POS    OR                  DEFJUST.
(in)  FREQ.        PASSIVE ABV0055                  MS LOOP 1 SFTY RLF                                                                                                                    F-7                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABV0056                  MS LOOP 1 SFTY RLF                                                                                                                    F-7                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABV0057                  MS LOOP 1 SFTY RLF                                                                                                                    F-6                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABV0058                  MS LOOP 1 SFTY RLF                                                                                                                    F-5                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABV0059                  MS LOOP 1 SFTY RLF                                                                                                                    F-5                          SA                          RV      C      6  RV/RV-5  O/C  ACTIVE ABV0065                  MS LOOP 2 SFTY RLF                                                                                                                    D-7                          SA                          RV      C      6  RV/RV-5  O/C  ACTIVE                                                      ,
ABV0066                  MS LOOP 2 SFTY RLF                                                                                                                    D-7                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABV0067                  MS LOOP 2 SFTY RLF                                                                                                                    D-6                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABVCD63                  MS LOOP 2 SFTY RLF                                                                                                                    D-5                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABV0069                MS LOOP 2 SFTY RLF                                                                                                                    D-5                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABV0075                MS LOOP 3 SFTY RLF                                                                                                                    C-7                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE ABV0076                MS LOOP 3 SFTY RLF                                                                                                                    C-7                            SA                        RV      C      6  RV/RV-5  O/C  ACTIVE Page 4
 
L CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB) i DRAWING M-22AB02 VALVE                                                                                                                DESCRIPTION                                          COOR    ACT.                  VLV    VLV    VLV                    TESTS                              SFTY      ACTIVE  RR OR13T                NOTES NUMBER                                                                                                                                                                                                    TYPE  CAT. SIZE                    PERF/                              POS          OR    DEFJUST.
(in)                  FREQ.                                          PASSIVE ABV0077          MS LOOP 3 SFTY RLF                                                                                                                                            C-6    SA                    RV    C        6                RV/RV-5                                  O/C      ACTIVE ABV0078          MS LOOP 3 SFTY RET                                                                                                                                            C-5    SA                    RV    C        6                RV/RV-5                                  O/C      ACTIVE ABV0079          MS LOOP 3 SFTY RLF                                                                                                                                            C-5    SA                    RV    C        6                RV/RV-5                                  O/C      ACTIVE                                                    j ABV0085        TDAFP STM SPLY FROM MS LOOP 2 MAN                                                                                                                              D-4    MA                    GT    B        [          ,
FS/CS                              O/C      ACTIVE                AB-3 ISO                                                                                                                                                                                                                  p MA                    GT    B        4        i FS/CS                                        O/C      ACTIVE                AB-3                              i ABV0087          TDAFP STM SPLY FROM MS LOOP 3 MAN                                                                                                                            C-4 ISO                                                                                                                                                                                                                                                                                                                                    !
4 9
b Page 5
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM FEEDWATER SYSTEM'(AE)
DRAWING M-22AE02 VALVE                                      DESCRIPTION                                      COOR                              ACT.                                                VLV                                              VLV                    VLV  TESTS  SFTY ACTIVE  RR OR TST NOTES NUMBER                                                                                                                                                                          TYPE                                                CAT.                    SIZE  PERF/  POS  OR    DEFJUST.
(in) FREQ.      PASSIVE AEFV0039              SG A FW SPLY ISO FV                                                        G-3                                  AO                                                GT                                                  B                14  FS/CS    C  ACTIVE    AE-4 FT/CS PI/RF AEFV0040              SG B FW SPLY ISO FV                                                        C-3                                  AO                                                GT                                                  B                14  FS/CS    C  ACTIVE    AE-4 FT/CS PI/RF AEFV0041              SG C FW SPLY ISO FV                                                        C-6                                  AO                                                GT                                                  B                14  FS/CS    C  ACTIVE    AE-4 FT/CS                                ,
Pl/RF AEFV0042              SG D FV! SPLY ISO FV                                                      G-6                                  AO                                                GT                                                  B                14  FS/CS    C  ACTIVE    AE-4 FT/CS
                                                                                                                                                                                                  ,                                                                  PI/RF AEFV0043              SG A FW CIEM INJ FV                                                        G-4                                  AO                                                G,B                                                  B                1  PI/RF  C  PASSIVE i
AEFV0044              SG B FW CIEM INJ FV                                                        C-4                                  AO                                                GB                                                    B                l  PI/RF  C  PASSIVE AEFV0045              SG C FW CIEM INJ FV                                                        C-7                                  AO                                                GB                                                    B                1  PI/RF  C  PASSIVE AEFV0046              SG D FW CIEM INJ FV                                                        G-7                                  AO                                                GB                                                    B                1  PI/RF  C  PASSIVE AEV0120                SG B FW SPLY CIECK                                                        C-4                                    SA                                              CK                                                    C                14  FS/RF    C  ACTIVE    AE-1 AEV0121                SG A FW SPLY CHECK                                                        F-4                                    SA                                              CK                                                    C                14  FS/RF    C  ACTIVE    AE-1 Page 6
_ _ _ _ _ _ _ _ _ _-                  _=___-____ __ ______-_______-__-__ ___________ _ -_______-__ - - -- _ _____ - - - ___-______,
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM
,        FEEDWATER SYSTEM (AE)
DRAWING M-22AE02                                                                                                                                                                                                                                                                                                                t VALVE                                                                    DESCRIPTION                                    COOR  ACT.            VLV  VLV        VLV    TESTS                                            SFTY '                  ACTIVE        RR ORTST                    NOTES                    ;
NUMBER                                                                                                                                              TYPE CAT.        SIZE    PERF/                                                POS                      OR        DEF JUST.                                            i (in)  FREQ.                                                                    PASSIVE                                                              ;
AEV0122                                  SG D FW SPLY CIECK                                                                        F-7  SA              CK  C            14    FS/RF                                                          C        ACTIVE          AE-1
,      AEV0123                                  SG C FW SPLY CIECK                                                                        C-7  SA              CK  C            14    FS/RF                                                          C        ACTIVE          AE-1                                                ,
AEV0124                                  SG B AUX FW SPLY CIECK                                                                    C-3  SA              CK  C            4    FS/CS                                                          O        ACTIVE          AE-3                                                ,
AEV0125                                  SG A AUX FW SPLY CIECK                                                                    F-3  SA              CK  C            4    FS/CS                                                          O        ACTIVE          AE-3 AEV0126                                  SG D AUX FW SPLY CHECK                                                                    F-6  SA              CK  C            4    FS/CS                                                          O        ACTIVE          AE-3 AEV0127                                  SG C AUX FW SPLY CIECK                                                                    C-6  SA              CK  C            4    FS/CS                                                          O        ACTIVE          AE-3                                                ;
1 6
i Page 7
_ - - - . -_ -                                                      -_              . -_-_- _- _ - _ __-- - -            - ~ _ _ _ --        - - . _ .      -    ---__,                                      .                            .- . , _ - -        -.                    . -            . - . - .
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM i
AUXILIARY FEEDWATER SYSTEM (AL)                                                                                                                                                                                                                                                        :
DRAWING M-22AL01                                                                                                                                                                                                                                                                      ;
l 1
VALVE                                  DESCRIPTION                                                                                              COOR                            ACT.                        VLV                  VLV  VLV  TESTS  SFTY  ACTIVE  RR OR  NOTES  ;
NUMBER                                                                                                                                                                                                      TYPE                    CAT. SIZE  PERF/  POS      OR    TST DEF (in) FREQ.        PASSIVE  JUST.          ;
ALIIV0005    MDAFP B TO S/G D IIV                                                                                                                        H-6                          MO                          GB                  B      4  FS/Q  C/O  ACTIVE PI/RF ALilV0006    TDAFP TO S/G D HV                                                                                                                          G-6                          AO                          GB                  B      4  FS/Q  C/O  ACTIVE                  f FT/Q                                j ALHV0007    MDAFP B TO S/G A IIV                                                                                                                        F-6                          MO                          GB                  B      4  F      C/O  ACiIVE PI/RF ALilV0008    TDAFP TO S/G A IIV                                                                                                                          E-6                          AO                          GB                  B      4  FS/Q  C/O  ACTIVE                  l FT/Q                                  l PI/RF ALHV0009    MDAFP TO S/G B HV                                                                                                                          D-6                          MO                          GB  '
B      4  FS/Q  C/O  ACTIVE Pl/RF ALIIV0010    TDAFP TO S/G B liv                                                                                                                          D-6                            AO                        GB                  B      4  FS/Q  C/O  ACrlVE                  t FT/Q PI/RF                                i ALIIV0011    MDAFP TO S/G C liv                                                                                                                          C-6                          MO                          GB                  B      4  FS/Q  C/O  ACTIVE                  i PI/RF                                ;
ALHV0012    TD AFP TO S/G C HV                                                                                                                          B-6                            AO                        GB                  B      4  FS/Q  C/O  ACTIVE FT/Q PI/RF ALHV0030    ESW TO MD AFP B HV                                                                                                                          F-3                          MO                          BF                B      6  FS/Q    O  ACTIVE PI/RF I
ALHV0031    ESWTO MD AFP A HV                                                                                                                          E-3                          MO                          BF                B      6  FS/Q    O  ACTIVE PI/RF ALHV0032    ESW TO TD AFP HV                                                                                                                            C-3                          MO                          BF                B      8  FS/Q    O  ACTIVE PI/RF Fage 8
 
.        .__ .m          _.                                    ._ _ _ _ _ ._                  _ . _    . _ . . . . . . _ . . _ _                                                                  . _ . . _ _ _ . _ . . _ . .__ _ ._._. . ._. _ ._. ,_ _
I CALLAWAY NUCLEAR PLANT                                                                                                                                                                                            :
INSERVICE TEST PROGRAM                                                                                                                                                                                            i AUXILIARY FEEDWATER SYSTEM (AL)
DRAWING M-22AL01                                                                                                                                                                                                                                                                                                      i I
i VALVE                                    DESCRIPTION                                            COOR            ACT.                      VLV                                          VLV      VLV              TESTS                  SFTY-  ACTIVE                                      RR OR  NOTES  I NUMBER                                                                                                                                  TYPE                                              CAT. SIZE              PERF/                    POS      OR                                    TST DEF            i (in)            FREQ.                          PASSIVE                                        JUST.
t ALHV0033    ESW TO TD AFP HV                                                                        B-3            MO                                BF                                    B            8              FS/Q                      O  ACTIVE Pl/RF                                                                                      !
ALilV0034    CST TO MD AFP B llV                                                                    H-3            MO                              GT                                      B            8              FS/Q                      C  ACFIVE PI/RF ALHV0035    CST TO MD AFP A HV                                                                      D-3            MO                              GT                                      B            8              FS/Q                      C  ACTIVE PI/RF ALilV0036    CSTTO TDAFP llV                                                                        B-3            MO                              GT                                      B          10              FS/Q                      C  ACTIVE PI/RF ALV0001      CST TO TD AFP CIECK VLV                                                                B-4              SA                            CK                                      C          10              FS/CS                    O/C  ACTIVE                                        AL-1 PS/Q.
ALV0002      CST TO MD AFP A CIECK VLV                                                              D-4              SA                              CK                                      C            8              FS/CS                      O  ACrlVE                                        AL-1          l PS/Q ALV0003      CSTTO MD AFP B CIECK VLV                                                                H-4              SA                              CK                                      C            8              FS/CS                      O  ACTIVE                                        AL-1          i PS/Q ALV0006      ESW TO MD AFP B CIECK VLV                                                              F-4              SA                              CK                                      C          6                FS/Q ,                    O  ACTIVE                                                      l ALV0009      ESW TO MD AFP A CIECK VLV                                                              E-4              SA                              CK                                      C          6                FS/Q                      O  ACTIVE ALV0012      ESW TO TD AFP CHK VLV                                                                  C-4              SA                            CK                                      C            8              FS/Q                      O  ACTIVE ALV0015      ESW TO TD AFP CIECK VLV                                                                B-4              SA                              CK                                      C            8              FS/Q                      O  ACTIVE                                                      r ALV0029      MD AFP B DISCH TO CST CIECK VLV                                                        G-5              SA                            CK                                      C            2              FS/Q                      O  ACTIVE Page 9
 
F k
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM b
AUXILIARY FEEDWATER SYSTEM (AL)
DRAWING M-22AL01 VALVE                                                  DESCRIPTION                                                                                                              COOR  ACT.                                VLV                                        VLV                            VLV                            TESTS  SITY ACTIVE    RR OR  NOTES        r NUMBER                                                                                                                                                                                                                      TYPE                                          CAT.                          SIZE                            PERF/    POS  OR      TST DEF                ;
(in)                        FREQ.        PASSIVE      JUST.
ALV0030              MD AFP B DISCli CIECK VLV                                                                                                                                              H-5  SA                                        CK                                        C                                6                        FS/CS    O/C ACTIVE      AL-1 ALV0033              MDAFP B TO S/G A ClECK VLV                                                                                                                                            F-7  SA                                        CK                                        C                                4                        FS/CS    O  ACTIVE      AL-1 i
ALV0036              MDAFP B TO S/G D CIECK VLV                                                                                                                                            H-7  SA                                        CK                                        C                                4                        FS/CS    O  ACTIVE      AL-1 1
ALV0041              MD AFP A DISCH TO CST CIECK VLV                                                                                                                                        F-5  SA                                        CK                                        C                                2                        FS/Q    O  ACTIVE ALV0042              MD AFP A DISCH CIECK VLV                                                                                                                                            - D-5  SA                                        CK                                        C                                6                        FS/CS    O/C ACTIVE      AL-1 ALV0045              MDAFP A TO S/G C CHECK VLV                                                                                                                                            C-7  SA                                      CK                                        C                                4                        FS/CS    O  ACTIVE      AL-1
                                                                                                                                                                                                                                                                                                                                                                                                                  .j ALV0048              MDAFP A TO S/G B CIECK VLV                                                                                                                                            D-7  SA                                        CK                                        C                                4                        FS/CS    O  ACTIVE      AL-1
                                                                                                                                                                                                                                                                                                                                                                                                                      !i ALV0053              TD AFP DISCH TO CST CIECK VLV                                                                                                                                          B-5  SA                                      CK                                        C                                3                        FS/Q    O  ACTIVE ALV0054              TD AFP DISCH CHECK VLV                                                                                                                                                B-5  SA                                        CK                                        C                                8                        FS/CS    O/C ACTIVE      AL-1 ALV0057              TDAFP TO S/G A CHECK VLV                                                                                                                                              E-7  SA                                      CK                                        C                                4                        FS/CS    O  ACTIVE      AL-1 ALV0062              TDAFP TO S/G D CIECK VLV                                                                                                                                              G-7  SA                                      CK                                        C                                4                        FS/CS    O  ACTIVE      AL-1.
                                                                                                                                                                                                                                                                                                                                                                                                                  ~
Page 10 1
n  v          .,e-m-
 
l CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM AUXILIARY FEEDWATER SYSTEM (AL)
DRAWING M-22AL01 VALVE                                            DESCRIPTION      COOR  A C T. VLV                                    VLV                                            VLV            TESTS              SFTY                                                      ACTIVE  RR OR  NOTES NUMBER                                                                            TYPE                                CAT.                                          SIZE            PERF/                    POS                                                    OR    TST DEF (in)      FREQ.                                                                        PASSIVE  JUST.
t i
ALV0067      TDAFP TO S/G B CHECK VLV                                      D-7  SA      CK                                              C                                                4 FS/CS                            O                                          ACTIVE    AL-1 ALV0072      TDAFP TO S/G C CHECK VLV                                      B-7  SA      CK                                              C                                                4 FS/CS                            O                                          ACTIVE    AL-1 b
                                                                                                        -Page11
 
CALLAWAY NUCLEAR PLANT                                                                                                                                                                                        .
INSERVICE TEST PROGRAM i
CONDENSATE STORAGE AND TRANSFER SYSTEM (AP)-
DRAWING M-22AP01 VALVE                    DESCRIPTION                        COOR          ACT.          VLV                                VLV                              VLV                                TESTS      SFTY ACTIVE                        RR OR  NOTES NUMBER                                                                                  TYPE                                CAT.                              SIZE                                  PERF/    POS          OR                  TST DEF (in)                            FREQ.          PASSIVE                        JUST.
APV0033  AFP TO CST CHECK                                        F-4          SA              CK                                    C                                  3                              FS/Q    O  ACTIVE                                  3 i
i
[
l
                                                                                                                                            .                                                                                                                                                                        i
[
I Page 12
_ _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ - .            _--________ - -          _ _ _ _ _ _ _          _      -                                                                                                              __.                          .  -- _ . _ _ _ _ _ _ _ = _ _ _            _ _ _ _ _ _ _ _
 
CALLAWAY NUCLEAR PLANT                                                                                                                                                        ~
INSERVICE TEST PROGRAM REACTOR COOLANT SYSTEM (BB)
DRAWING M-22BB01                                                                                                                                                                                                                                                                        ,
VALVE                                                                              DESCRIPTION COOR  ACT. VLV                  VLV  VLV    TESTS                                                    SFTY                                    ACTIVE  RR OR    NOTES NUMBER                                                                                                            TYPE                  CAT. SIZE    PERF/                                                        POS                                  OR    TST DEF            .
(in)  FREQ.                                                                                            PASSIVE  JUST.            [
BB8378A                                        RCS LOOP 1 COLD LEG CVCS REGEN HX                          E-4  SA      CK                    C    3      FS/RF                                                                C                      ACTIVE  BB-12            i CHG LINE DNSTR                                                                                                                                                                                                                        i BB8378B                                        RCS LOOP 1 COLD LEG CVCS REGEN IIX                        E-4  SA      CK                    C    -3      FS/RF                                                                C                      ACTIVE  BB-12 CilG LINE UPSTRM CIECK t
BB8379A                                        RCS LOOP 4 COLD LEG CVCS REGEN IIX                        E-7  SA      CK                    C    3      FS/RF                                                                C                      ACTIVE  BB-12 CIIG LINE DNSTRM CIECK                                                                                                                                                                                                                  ,
BB8379B                                        RCS LOOP 4 COLD LEG CVCS REGEN HX                          E-7  SA      CK                    C    3      FS/RF                                                                C                      ACTIVE  BB-12            i CIIG LINE UPSTR BB8948A                                        RCS LOOP 1 COLD LEG SI ACC CIECK                          E-4  SA      CK                    A,C    10      FS/RF -                                                      O/C                            ACTIVE    BB-1      2      !
LT/RF                                                                                                                      ,
BB8948B                                        RCS LOOP 2 COLD LEG St ACC CIECK                          D-4  SA      CK                    A,C    10      FS/RF                                                        O/C                            ACTIVE    BB-1      2 LT/RF                                                                                                                      t BB8948C                                        RCS LOOP 3 COLD LEG SI ACC CHECK                          C-6  SA      CK                    A,C    10      FS/RF                                                        O/C                            ACTIVE    BB-1      2 LT/RF BBS948D                                        RCS LOOP 4 COLD LEG SI ACC CIECK                          E-6  SA      CK                    A,C    10      FS/RF                                                        O/C                            ACTIVE    BB-1      2 LT/RF                                                                                                                      ,
BB8949A                                        RCS LOOP 1 IlOT LEG SI PMPS CIECK                        E-5  SA      CK                    A,C    6      FS/RF                                                        O/C                              ACTIVE  BB-2      2 LT/RF BB8749B                                        RCS LOOP 2 HOT LEG SI/RHR PMPS CIECK                      C-5  SA      CK                    A,C    6      FS/CS                                                        O/C                            ACTIVE    BB-3      2        ,
LT/RF i
Page 13
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                          _                  _ _ _          .      __                                        .                                          _-              __. ~    _.
 
I CALLAWAY NUCLEAR PLANT                                                                                                                                                                  ;
INSERVICE TEST PROGRAM t
REACTOR COOLANT SYSTEM (BB)
DRAWING M-22BB01 VALVE                                                        DESCRIPTION                    COOR          ACT.                                    VLV VLV  VLV                            TESTS                  SFTY ACTIVE  RR OR                                    NOTES  '
NUMBER                                                                                                                                            TYPE  CAT. SIZE                              PERF/                POS    OR    TST DEF (in)                            FREQ.                      PASSIVE  JUST.                                            t BB8949C                RCS LOOP 3 IlOT LEG SI/RIIR PMPS CIECK                                      C-6          SA                                    CK  A,C    6                                FS/CS                O/C ACTIVE    BB-3                                      2    1 LT/RF BB8949D                RCS LOOP 4 IIOT LEG St PMPS CIIECK                                          G-6          SA                                    CK  A,C    6                                FS/RF                O/C ACTIVE    BB-2                                      2    [
LT/RF                                                                              i BBPV8702A            RCS LOOP 1 IIOT LEG TO RHR PMPS PCV                                          E-4          MO                                    GT  A      12                              FS/CS                O/C ACTIVE    BB4                                              !
ISO                                                                                                                                                                            PI/RF                                                                              ;
LT/RF BBPV8702B            RCS LOOP 4 IIOT LEG TO RIIR PMPS PCV                                        II-6        MO                                    GT  A      12                              FS/CS                O/C ACTIVE    BB4 ISO                                                                                                                                                                            Pl/RF LT/RF                                                                                ,
8BV0001              RCS LOOP 1 COLD LEG St BIT CIIECK                                            D-5          SA                                    CK  A,C  1.50                                FS/RF                O/C ACTIVE    BB-4                                      2 s
LT/RF BBV0022              RCS LOOP 2 COLD LEG St BIT CIECK                                            D-4            SA                                    CK  A,C  1.50                                FS/RF                O/C ACTIVE    BB-4                                      2 LT/RF BBV0040              RCS LOOP 3 COLD LEG SI BIT CIECK                                            D-6          SA                                    CK  A,C  1.50                                FS/RF              O/C  ACTIVE    BB-4                                      2 LT/RF BBV0059              RCS LOOP 4 COLD LEG SI BIT CHECK                                            E-6          SA                                    CK  A,C  1.50                                FS/RF              O/C  ACTIVE    BB-4                                      2      ,
LT/RF t
Page 14
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR COOLANT SYSTEM (BB)
DRAWING M-22BB02 VALVE                                                                      DESCRIPTION                                                                            COOR    ACT.              VLV    VLV  VLV    TESTS  SFTY        ACTIVE                                        RR OR                    NOTES NUMBER                                                                                                                                                                                      TYPE      CAT. SIZE    PERF/  I'OS                            OR                        TST DEF (in)  FREQ.            PASSIVE                                          JUST.
BB8010A                                        RCS PZR SFTY RLF A                                                                                                                H-7    SA                  RV  C    6  RV/RV-5  O/C          ACTIVE BB8010B                                        RCS PZR SFTY RLF B                                                                                                                11-6  SA                  RV  C    6  RV/RV-5  O/C          ACrlVE BB8010C                                        RCS PZR SFTY RLF C                                                                                                                H-5    SA                  RV  C l 6    RV/RV-5  O/C          ACTIVE BBHV8000A                                      RCS PZR OUT PWROPER RLFIIV                                                                                                        E-7    MO                  GT  B    3      FS/Q  O/C          ACTIVE Pl/Q BBHV8000B                                      RCS PZR OlJr PWR OPER RLF HV                                                                                                      E-7    MO                  GT  B    3      FS/Q  O/C          ACrlVE PI/Q                                                                                              ,
BBHV8026                                        RCS PRT N2/ SERV GAS SPLY DNSTRM ISO                                                                                              E-3    AO                ?DI  A      1    FS/Q    C          ACTIVE HV                                                                                                                                                        '.                  FT/Q
                                                                                                                                                                                                          ;                    PI/RF LJ/RF BDlIV8027                                      RCS PRT N2/ SERV GAS SPLY UPSTRM ISO                                                                                              E-3    AO                  DI  A      1    FS/Q    C          ACTIVE IIV                                                                                                                                                                          FT/Q PI/RF LJ/RF BBIIV8157A                                    PRTTO EX LTDN HX PROT A ISO HV                                                                                                    E-l    SO                GB  B      1    FS/Q  O/C        ACTIVE                                                                          j PI/Q FT/Q BBHV8157B                                      PRT TO EX LTDN HX PROT B ISO HV                                                                                                  D-2    SO                GB  B    1      FS/Q  O/C        ACTIVE PI/Q FT/Q l
Page 15
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR COOLANT SYSTEM (BB)
DRAWING M-22BB02 VALVE                                                    DESCRIPTION                                                                  COOR    ACT.                VLV                    VLV                                    VLV          TESTS                    SFfY                                    ACTIVE                                          RR OR                      NOTES NUMBER                                                                                                                                                            TYPE                    CAT.                                    SIZE          PERF/                        POS                                            OR                                TST DEF (in)    FREQ.                                                            PASSIVE                                              JUST.
BBPCV0455A                          RCS PRESSURIZER POWER OPERATED                                                                        E-7    SO                  GB                          B                                          3  FS/CS                        O/C                                  ACTIVE                                            BB-10 RELIEF VALVE                                                                                                                                                                                                  FT/CS Pl/RF BBPCV0456A                          RCS PRESSURIZER POWER OPERATED                                                                        E-8    SO                  GB                          B                                            3 FS/CS                        O/C                                  ACrlVE                                            BB-10 RELIEF VALVE                                                                                                                                                                                                  FT/CS PI/RF 6
1 Page 16
 
CALLAWAY NUCLEAR PLANT                                                                                                                        ,
INSERVICE TEST PROGRAM REACTOR COOLANT SYSTEM (BB)
DRAWING M-22BB03                                                                                                                                                                                                                                                                                                                                i VALVE                                                                                              DESCRIPTION                                                      COOR              ACT.              VLV                              VLV  VLV      TESTS            SFTY ACTIVE  RR OR    NOTES NUMBER                                                                                                                                                                                                            TYPE                                CAT. SIZE      PERF/            POS    OR    TST DEF (in)    FREQ.                  PASSIVE  JUST.
BBHV0013                                                                                              RCP A THRM BAR COOL COIL COOL WrR                                                                  C-2              MO                GT                              B    3        FS/RF            C    ACrlVE  BB-8            i OUTIIV                                                                                                                                                                                  Pl/RF                                          i BBilV0014                                                                                              RCP B THRM BAR COOL COIL COOL WTR                                                                  C-2              MO                GT                              B    3        FS/RF            C  ACTIVE    BB-8 OUT HV                                                                                                                                                                                  PI/RF BBHV00'.5                                                                                              RCP C THRM BAR COOL COIL COOL WrR                                                                  C-2              MO                GT                              B    3        FS/RF            C  ACTIVE    BB-8 OUT HV                                                                                                                                                                                  PI/RF BBHV0016                                                                                                RCP D THRM BAR COOL COIL COOL WrR                                                                  C-2              MO                GT                              B    3        FS/RF            C  ACrlVE    BB-8            .
OUT HV                                                                                                                                                                                  PI/RF BBHV8141 A                                                                                              RCP A SEAL # 1 SEAL WTR OUTISO HV                                                                  D-3              AO                GB                              B  0.75      PI/RF            O  PASSIVE BBHV8141B                                                                                              RCP B SEAL # 1 SEAL WTR OUT ISO IIV                                                                D-3              AO              lGB                                B  0.75      PI/RF            O  PASSIVE a                                                                                                l BBHV8141C                                                                                              RCP C SEAL # 1 SEAL WIR OlffISO HV                                                                D-3              AO              'GB                                B  0.75      PI/RF            O  PASSIVE                  '
t BBHV814ID                                                                                              RCP D SEAL # 1 SEAL WrR OLTTISO HV                                                                D-3              AO                GB                              B  0.75      PI/RF            O  PASSIVE BBHV8351A                                                                                              RCP A SEAL WrR SPLY ISO HV                                                                        C-5              MO                GB                              A    2        PI/RF            O  PASSIVE uiRF BBIIV8351B                                                                                            RCP B SEAL WrR SPLY ISO IIV                                                                        C-5              MO                GB                              A    2        PI/RF            O  PASSIVE U/RF                                            I BBHV8351C                                                                                            RCP C SEAL WrR SPLY ISO HV                                                                        C-5              MO                GB                                A    2        Pl/RF            O  PASSIVE LJ/RF                                            !
                                                                                                                                                                                                                                                                                                                                                                                <-        [
                                                                                                                                                                                                                                                                                                                                                                                          'i Page 17
 
t CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM i
REACTOR COOLANT SYSTEM (BB)
DRAWING M-22BB03 VALVE                                        DESCRIPTION                                                                  COOR            ACT. VLV                      VLV                                  VLV                                TESTS                                                                  SFTY  ACTIVE                                                    RR OR  NOTES NUMBER                                                                                                                                                TYPE                    CAT.                              SIZE                                  PERF/                                                                POS      OR                                                    TST DEF (in)                          FREQ.                                                                        PASSIVE                                                  JUST.                ,
BBilV8351D                RCP D SEAL WTR SPLY ISOIIV                                                                          C-5              MO        GB                      A                                        2                                PI/RF                                                            O    PASSIVE U/RF.
BBV0ll8                    RCP A SEAL WTR SPLY ISO BBVol19                                                                    C-5              SA        CK                    - A,C                                    1.50                                FS/RF                                                              C    ACTIVE                                                    BB-7 UPSTRM CIECK U/RF BBV0120                    RCP A SEAL WTR SPLY ISO BBV0119                                                                    C-4              SA        CK                      C                                        2                              FS/RF                                                              C    ACrlVE                                                    BB-13 DNSTRM CIECK BBV0121                    RCP A SEAL WTR SPLY CIECK                                                                          C-4              SA        CK                      C                                        2                              FS/RF                                                              C    ACTIVE                                                    BB-13 BBV0122                    CCW TO RCP A TIERMAL BARRIER SPLY                                                                  C-4              SA    .CK                        C                                        2                              FS/RF.                                                              C    ACTIVE                                                    BB-11 CK VLV BBV0148                    RCP B SEAL WTR SPLY ISO BBV0149                                                                    C-5              SA        CK                      A,C                                      1.50                              FS/RF-                                                              C    ACTIVE                                                    BB-7 UPSTRM CIECK                                                                                                                s'                                                                                                    U/RF                                                                                                                                                    ,
BBVuv0                      RCP B SEAL WTR SPLY ISO BBV0149                                                                    C-4              SA        CK                      C                                        2                                FS/RF                                                              C    ACTIVE                                                  BB-13 DNSTRM CIECK BBV0151                      RCP B SEAL WrR SPLY CIECK                                                                          C-4              SA        CK                      C                                        2                                FS/RF                                                              C    ACrlVE                                                  BB-13 BBV0152                    CCW TO RCP B TIERMAL BARRIER SPLY                                                                  C-4              SA        CK                      C                                        2                                FS/RF                                                              C    ACrlVE                                                  BB-11 CK VLV BBV0178                      RCP C SEAL WTR SPLY ISO BBV0179                                                                    C-5              SA        CK                      A,C                                      1.50                              FS/RF                                                              C    ACTIVE                                                    BB-7 UPSTRM CIECK                                                                                                                                                                                                                      U/RF BBV0180                      RCP C SEAL WTR SPLY ISO BBV0179                                                                  C-4              SA        CK                      C                                        2                                FS/RF                                                              C    ACTIVE                                                    BB-13 DNSTRM CIECK                                                                                                                                                                                                                                                                                          j Page 18
 
t CALLAWAY NUCLEARPLANT                                                                                                                                                        6
                                                                                                                  - INSERVICE TEST PROGRAM I
REACTOR COOLANT SYSTEM (BB)                                                                                                                                                                                                                                                      ,
DRAWING M-22BB03 VALVE                                                                          DESCRIPTION          COOR  ACT.        VLV          VLV    VLV      TESTS    SFTY                                AcitVE      RR OR                                  NOTES                '
NUMBER                                                                                                                TYPE          CAT. SIZE      PERF/    POS                                      OR    'IST DEF (in)    FREQ.                                      PASSIVE        JUST.
BBV0181                            RCP C SEAL WTR SPLY CIECK                                            C-4  SA            CK            C    2      FS/RF    C                                    ACTIVE    BB-13 i
BBV0182                            CCW TO RCP C TIERMAL BARRIER SPLY-                                  C-4  SA            CK            C    2      FS/RF    C                                    ACTIVE    BB-11 CK VLV BBV0208                            RCP D SEAL WTR SPLY ISO BBV0209                                      C-5  SA              CK          A,C  1.50      FS/RF    C                                    ACTIVE      BB-7 UPSTRM CIECK                                                                                                          LI/RF                                                                                                                  !
.              DBV0210                            RCP D SEAL WIR SPLY 150 BBV0209                                      C-4  SA              CK            C    2      FS/RF    C                                      ACTIVE    BB-13                                                      j DNSTRM CIECK BBV0211                            RCP D SEAL WTR SPLY CIECK                                            C-4  SA              CK            C    2      FS/RF    C                                      ACTIVE    BB-13 BBV0212                            CCW TO RCP D TIERMAL BARRIER SPLY                                    C-4  SA          lCK              C    2      FS/RF    C                                      ACTIVE    BB-11                                                      i CK vtv                                                                                    .
BBV0474                            CCW TO RCP A TIERMAL BARRIER SPLY                                    C-4  SA              CK            C  1.50      FS/RF    C                                      ACTIVE    BB-11 CK VLV BBV0476                            CCW TO RCP B TIERMAL BARRIER SPLY                                    C-4  SA              CK          -C  1.50      FS/RF    C                                      ACTIVE    BB-11 CK VLV                                                                                                                                                                                                                                        ,
BBV0479                            CCW TO RCP C TIERMAL BARRIER SPLY                                  C-4  SA              CK          C  1.50      FS/RF    C                                      ACTIVE    BB-11                                                        +
CK VLV BBV0480                            CCW TO RCP D TIERMAL BARRIER SPLY                                  C-4  SA              CK          C  1.50      FS/RF    C                                      ACTIVE    BB-11                                                        -
CK VLV Page 19
 
I i
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM                                                                                                                                                                                                                        ,
REACTOR COOLANT SYSTEM (BB)                                                                                                                                                                                                                                                                                                                                l DRAWING M-22BB04 VALVE                                          DESCRIPTION                                                    COOR                        ACT.                                VLV                                VLV                  VLV  TESTS          SFTY                            ACTIVE                                RR OR  NOTES  ,
TYPE                                CAT.                  SIZE  PERF/              POS                                  OR                          TST DEF        '
NUMBER                                                                                                                                                                                                                                                                                                                                                ,
(in) FREQ.                                          PASSIVE                                JUST.
t BBHV8001A  RCS RV HEAD VENT PROT A UPSTRM HV                                                                                F-4                    SO                                GB                                    B                1  FS/CS              O/C                          ACTIVE                                BB-5 FT/CS PI/RF                                                                                                ;
BBHV8001B  RCS RVIEAD VENT PROT B UPSTRM HV                                                                                F-4                    SO                                GB                                    B                1  FS/CS              O/C                          ACTIVE                                BB-5 FT/CS                                                                                                  ,
PI/RF
* BBHV8002A  RCS RVIEAD VENT PROT A UPSTRM llV                                                                                F-3                    SO                                GB                                    B                1  FS/CS              O/C                          ACrlVE                                BB-5 FT/CS                                                                                                  ,
PI/RF BBHV8002B  RCS RV FEAD VENT PROT B UPSTRM HV                                                                                F-3                    SO                                GB                                    B                1  FS/CS              O/C                          ACTIVE                                BB-5            ,
FT/CS l                                    PI/RF
                                      +
i E
Page 20
 
i I
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM L
CHEMICAL AND VOLUhm CONTROL SYSTEM (BG)
DRAWING M-22BG01                                                                                                                                                                                                                                                      [
VALVE                                  DESCRIPTION                COOR        ACT.            VLV  VLV      VLV        TESTS        SFTY      ACTIVE                                                            RR OR -    NOTES                              i NUMBER                                                                                          TYPE CAT. SIZE        PERF/          POS                  OR                                                  TST DEF (in)      FREQ.                  PASSIVE                                                            JUST.                                        i BG8381                        CCP A & B TO REGEN HX CIECK                    F-4  SA              CK A,C        3        FS/RF          C        ACTIVE                                                            BG-1                                          .
U/RF
* BGHV8100                      SEAL WTR RTN OUTER CTMTISO                    D-2  MO              GB  A          2        FS/RF          C        ACTIVE                                                            BG-2                                          i PI/RF U/RF BGilV8112                      SEAL WTR RTN INNER CTMTISO                    D-2  MO              GB  A          2        FS/RF          C        ACTIVE                                                            BG-2 PI/RF U/RF                                                                                                                                    ,
BGHV8152                      CVCS LTDN SYS OUT CTMTISO IIV                  F-2  AO              GB  A          3        FS/CS          C        ACTIVE                                                            BG-3 FT/CS                                                                                                                                    [
t PI/RF U/RF                                                                                                                                    :
BGHVS153A                      RCS TO CVCS EX LTDN HX DNSTRM ISO              D-7  SO              GB  B          1        FS/Q          O        ACTIVE PROT A HV                                                                                      PI/RF BGHV8153B                      RCS TO CVCS EX LTDN HX DNSTRM ISO              D-7  SO              'GB  B          1        FS/Q          O        ACTIVE PROT B HV                                                                                      PI/RF                                                                                                                                    j BGHV8154A                      RCS TO CVCS EX LTDN HX UPSTRM ISO              D-8  SO              GB  B          1          FS/Q          O        ACTIVE                                                                                                          i PROT A IIV                                                                                    PI/RF                                                                                                                                    :
BGHV8154B                      RCS TO CVCS EX LTDNllX UPSTRM ISO            .D-8  SO              GB  B          1          FS/Q          O        ACTIVE PROT B HV                                                                                      PI/RF                                                                                                                                    ,
BGHV8160                        CVCS LTDN SYS INNER CTMT ISO IIV              F-3  AO              GB  A          3        FS/CS          C        ACTIVE                                                            BG-3                                          i FT/CS Pl/RF LJ/RF BGV0135                        SEAL WTR RTN INNER CTMT BGHV8112              D-3  SA              CK  A      0.75        U/RF          C      PASSIVE DRN CIECK                                                                                                                                                                                                                              ,
t Page 21 i
 
1 CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CHEMICAL AND VOLUME CONTROL SYSTEM (BG)                                                                                                                                                                                                                                                                                                ;
DRAWING M-22BG03 3
VALVE                                                                                        DESCRIPTION                                                                                                COOR                          ACT.        VLV    VLV VLV  TESTS  SFTY ACTIVE  RR OR  NOTES NUMBER                                                                                                                                                                                                                                                  TYPE      CAT. SIZE  PERF/  POS    OR    TST DEF          :
(in) FREQ.      PASSIVE  JUST.
BG8481A                                                                      CVCS CCP A DISCH CHECK                                                                                                                                  C-4                          SA        CK    C    4  FS/RF. O/C ACrlVE    BG-4            ;
r PS/Q 13G8481B                                                                          CVCS CCP B DISCH CIECK                                                                                                                                  B-4                          SA        CK    C    4  FS/RF  O/C ACTIVE    BG-4            +
PS/Q BG8497                                                                        CVCS NCP DISCH CIECK                                                                                                                                    E-4                          SA        CK    C    3  FS/Q    C  ACTIVE                  j BG8546A                                                                      RWST TO CCP A SUCT CIECK                                                                                                                                C-7                          SA        CK    C    8  FS/RF  O/C  ACTIVE  BG-5            [
BG8546B                                                                      RWST TO CCP B SUCT CIECK                                                                                                                                B-7                          SA        CK    C    8  FS/RF  O/C  ACTIVE  BG-5 BGHV8105                                                                      CVCS CHARGING HDRTO REGEN IlX                                                                                                                            E-2                          MO      lGT      A    3  FS/CS  C  ACTIVE  BG4            j OUTER CTMTISO VLV                                                                                                                                                                              -
PI/CS                                -
                                                                                                                                                                                                                                                                                                              !                  LJ/RF BGHV8106                                                                      CVCS CHARGING HDRTO REGEN llX                                                                                                                            E-2                          MO        GT    B    3  FS/CS  C  ACTIVE  BG-6            i c3U11IR CTMTISO VLV                                                                                                                                                                                                PI/CS BGHV8110                                                                      A CCP DISCH MINIFLOW TO SEAL WrR HX                                                                                                                      E-3                          MO-        GB    B    2  FS/Q  O/C  ACTIVE
                                                                                                            . ISO                                                                                                                                                                                                                Pl/RF BGHV8111                                                                      CCP B DISCH MINIFLOW ISO VLV                                                                                                                              E-4                          MO        GB    B    2    FS/Q  O/C  ACTIVE Pl/RF BGHV8357A                                                                    CVCS CCP A DISCH TO RCP SEALS                                                                                                                            C-4                          MO        GB    B    1    FS/Q  O/C  ACTIVE THROTTLE VLV                                                                                                                                                                                                      PI/RF                                ,
BGHV8357B                                                                    CVCS CCP B DISCH TO RCP SEALS                                                                                                                            B-4                          MO        GB    B    1  FS/Q  O/C  ACTIVE THROTILE VLV                                                                                                                                                                                                      Pl/RF t
Page 22
  . _ _ _ . _ _ _ _ _ _ . _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _                                                                                                                                                              -___                          .-  _      v -
 
        . ~ . - _ _ _ _ _ - .                _    ._          _        _    ___      _ _ _ .          . _ _ _ .                            _. __. _. _ _ _ _ - _ - _ _ _ _ _        _ ____ __ _ _    __ __ __ - ___
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CIEMICAL AND VOLUNE CONTROL SYSTEM (BG)
DRAWING M-22BG03 VALVE                                    DESCRIPTION                COOR      ACT.              VLV          VLV            VLV              TESTS  SFTY                  ACTIVE      RR OR            NOTES NUMBER                                                                                            TYPE          CAT.          SIZE              PERF/  POS                          OR TST DEF                                I (in)          FREQ.                    PASSIVE        JUST.
BGLCVoll2B                      CVCS VCT OUT UPSTRM ISO                  F-6      MO                GT            B                    4          FS/CS    C                  ACTIVE      BG-7 PURF                                                                          -
BGLCVO112C                      CVCS VCT OUT DNSTRM ISO                  F-6      MO                GT            B                    4          FS/CS    C                    ACTIVE    BG-7 PI/RF BGV0091                        CCP A DISCIITO SEAL WIR HX CIECK          E-4      SA                CK            C                    2          FS/Q    O                  ACTIVE BGV0095                        CCP B DISCH TO SEAL WrR HX CIECK          E-4      SA                CK            C                    2          FS/Q l O                    ACrlVE BGV0589                        CCP B DISCH TO SEAL WrRINJ FLTRS HDR      B-4      SA                CK            C                    2          FS/Q    O                  ACTIVE CIECK BGV0590                        CCP A DISCH TO SEAL WIRINJ FLTRS HDR      C-4      SA                CK            C                    2          FS/Q    O                  ACTIVE CIECK                                                                                                                                                                                              l BGV0605                        CCP B DISCH BGFCV0121 UPSTEAM CHECK      B-3      SA                CK            C                    3          FS/Q    C                  ACTIVE BGV0606                        CCP A DISCH BGFCV0121 UPSTEAM            D-3      SA              .CK            C                    3          FS/Q    C                  ACTIVE ClECK                                                              '
                                                      \                                                                                                                                                                          f
[
i O
Page 23
 
l
                                                                                  - CALLAWAY NUCLEAR PLANT                                                                                                                                                '-
INSERVICE TEST PROGRAM
                                                                                                                                                                                                                                                          ~
v l                                  CHEMICAL AND VOLUME CONTROL SYSTEM (BG)
DRAWING M-22BG05                                                                                                                                                                                                        ,
I                                                                                                                      f
.                                                                                                                                                                                                                                                          t l                                      VALVE              DESCRIPTION                COOR  ACT. VLV  VLV  VLV          TESTS              SFTY                                  ACTIVE                                                RR OR  NOTES    }
NUMBER                                                      TYPE  CAT. SIZE          PERF/                POS                                          OR                                        TST DEF (in)        FREQ.                                                  PASStVE                                                JUST.
i BGIIV8104 EMERG BORATE TO CCP A & B IIDRISO IIV    A-4  MO      G2  B        2        FS/Q                      O                            ACrlVE PI/RF.
BGV0147  CVCS BA XFR PMP A DISCII CIECK            B4  SA      CK  C          3      FS/CS                      O                            ACTIVE                                                BG-8 BGV0155  CVCS BA XFR PMP A DISCIITO BAT A          B4  SA        CK  C    0.75          FS/Q                      O                            ACTIVE                                                                ,
CIECK                                                                                                                                                                                                        '
BGV0165  CVCS BA XFR PMP B DISCII CIECK            A4  SA        CK  C          3      FS/CS                      O                            ACrlVE                                                BG-8            ,
BGV0167  CVCS BA XFR PMP B DISCH TO BAT B          B4  SA        CK  C_  0.75          FS/Q                      O                              ACTIVE                                                                {'
CIECK BGV0174  CVCS EMERG BORATE TO CCP A & B HDR '      A-4  SA      lCK  C          3      FS/CS                      O                              ACTIVE                                              BG-8              .
CIECK                                                  -                                                                                                                                                        :
I i
l-i e
Page 24 i
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR MAKEUP WATER SYSTEM (BL)
DRAWING M-22BL01 VALVE                      DESCRIPTION                                                                              COOR        ACT. VLV  VLV  VLV        TESTS  SFTY  ACTIVE  RR OR  I NOTES NUMBER                                                                                                                                  TYPE  CAT. SIZE      PERF/    POS    OR    TST DEF (in)      FREQ.        PASSIVE  JUST.
DL8046          RX M/U WIR SPLY INNER CTMT CIIECK                                                                            B-3  SA      CK  A,C    3      FS/PE    C  ACTIVE    BL-1 U/RF -
BLHV8047        RX M/U WTR OUTER CTMT HV ISO                                                                                B-4  SO        DI  A      3        FS/Q    C  ACTIVE FT/Q PI/RF U/RF e
Page 25
 
CALLAWAY NUCLEAR PLANT
;                                                                                                            INSERVICE TEST PROGRAM STEAM GENERATOR BLOWDOWN SYSTEM (BM)
DRAWING M-22BM01 VALVE                            DESCRIPTION                                                      COOR                                  ACT. VLV                                VLV  VLV  TESTS  SFTY ACTIVE                                    RR OR                NOTES NUMBER                                                                                                                                          TYPE                                CAT. SIZE  PERF/  POS      OR                                TST DEF (in) FREQ.      PASSIVE                                    JUST.
BMIIV0001  SG A B/D ISO VLV                                                                                      F-5                          AO      GB                                B      4  FS/Q    C  ACTIVE FT/Q PI/RF Bh01V0002  SG B B/D ISO VLV                                                                                      E-5                          AO      GB                                B      4  FS/Q    C  ACTIVE FT/Q PI/RF BMIIV0003  SG C B/D ISO VLV                                                                                      C-5                          AO      GB                                B      4  FS/Q    C  ACTIVE FT/Q PI/RF
.            BMHV0004  SG D B/D ISO VLV                                                                                    A-5                          AO      GB                                B      4  FS/Q    C  ACTIVE FT/Q PI/RF BMIIV0019  SG A B/D NUC SAMP SYS UP LINE ISO CTRL                                                              G-7                          SO      ,GB                                B      I  FS/Q. C  ACTIVE VLV                                                                                                                                                                                      PI/RF i            BMIIV0020  SG B B/D NUC SAMP SYS UP LINE ISO CTRL                                                                E-7                          SO    .,GB                                B      1  FS/Q    C  ACTIVE VLV                                                                                                                                                                                      PI/RF BMllV0021 SG C B/D NUC SAMP SYS UP LINEISO CTRL                                                                D-7                          SO      GB                                B      1  FS/Q    C  ACTIVE VLV                                                                                                                                                                                      PI/RF BMIIV0022 SG D B/D NUC SAMP SYS UP LINEISO CIRL                                                                B-7                          SO      GB                                B      1  FS/Q    C  ACTIVE VLV                                                                                                                                                                                      PI/RF BMHV0035  SG A B/D NUC SAMP SYS LWR LINE ISO                                                                  G-7                          SO      GB                                B      1  FS/Q,  C  ACTIVE CTRL VLV                                                                                                                                                                                FT/Q PI/RF BMHV0036  SG B B/D NUC SAMP SYS LWR LINE ISO                                                                    E-7                          SO      GB                                B      1  FS/Q    C  ACTIVE CTRL VLV                                                                                                                                                                                FT/Q l                                                                                                                                                                                                                Pl/RF Page 26
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM STEAM GENERATOR BLOWDOWN SYSTEM (BM)
DRAWING M-22BM01 VALVE                                                            DESCRIPTION              COOR        ACT.        VLV                                            VLV  VLV                                TESTS                      SFTY ACTIVE  RR OR          NOTES NUMBER                                                                                                          TYPE                                                CAT. SIZE                                PERF/                      POS  OR    TST DEF (in)                              FREQ.                          PASSIVE  JUST.
BMI{V0037          SG C B/D NUC SAMP SYS LWR LINE ISO                                          C-7          SO              GB                                        B      1                                        FS/Q                C  ACTIVE 4                                CTRL VLV                                                                                                                                                                                            FT/Q PI/RF BMI{V0038          SG D B/D NUC SAMP SYS LWR LINE ISO                                          B-7          SO              GB                                        B      1                                      FS/Q                  C  ACrlVE CTRL VLV                                                                                                                                                                                            FT/Q
!                                                                                                                                                                                                                                  PI/RF                                -
BMIIV0065          SG A B/D NUC SAMP SYS LINE ISO UPSTRM                                      G-6          SO              GB                                        B      1                                      FS/Q                  C  ACTIVE
:                                IIV                                                                                                                                                                                              FT/Q PI/RF BhDIV0066          SG B B/D NUC SAMP SYS LINE ISO UPSTRM                                      E-6          SO              GB                                        B      1                                      FS/Q                  C  ACTIVE HV                                                                                                                                                                                                FT/Q PI/RF BMIIV0067          SG C B/D NUC SAMP SYS LINE ISO UPSTRM                                      C-6          SO        .GB B      1                                      FS/Q                  C  ACTIVE i
IIV                                                                                                s                                                                                            FT/Q Pl/RF BMIIV0068          SG D B/D NUC SAMP SYS LINE ISO UPSTRM                                      B-6          SO          'GB                                            B      1                                      FS/Q                  C  ACTIVE IIV                                                                                                                                                                                              FT/Q PI/RF BMV0045            SG DRN PMPS SUCTIIDRINNER CTMTISO                                          A-4        MA              GT                                        A    3                                    LJ/RF                    C  PASSIVE BMV0046            SG DRN PMPS SUCT HDR OlITER CTMTISO                                        A-3        MA              GT                                        A    3                                    LJ/RF                    C  PASSIVE i
1
;                                                                                                                                                                                                                                                                                            i
                                                                                                                                                                                                                                                                                            *I Page 27 l
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM                                                                                                                        ;
BORATED REFUELING WATER                                                                                                                                                                                                                                                  ;
STORAGE SYSTEM (BN) i DRAWING M-22BN01 VALVE                                                                                        DESCRIPTION      COOR  ACT. VLV      VLV  VLV      TESTS          SFTY          ACTIVE                            RR OR                          NOTF5 NUMBER                                                                                                                        TYPE      CAT. SIZE    PERF/          POS                                OR            TST DEF (in)    FREQ.                      PASSIVE                              JUST.
BNHCV8800A                                                RWST TO RFP DNSTRM HV                                              E-5  AO      GB      B      3      FS/Q            C              ACTIVE                                                                  ;
IT/Q                                                                                                    '
PI/RF BNHCV88008                                                RWST TO RFP UPSTRM HV                                              E-5  AO      GB      B      3      FS/Q            C              ACTIVE IT/Q PI/RF BNHV0003                                                  RWST TO CTMT SPRY PMP B HV                                        C-3  MO      GT      B    12      FS/Q          C/O            ACTIVE PI/RF BNilV0004                                                RWST TO CTMT SPRY PMP A HV                                        A-3  MO      GT      B    12      FS/Q          CX)            ACTIVE PI/RF BNilV8806A                                                S1 PMP A SUCT FROM RWST ISO                                        B-5  MO    . GT      B      8      FS/Q          C/O            ACTIVE l                        PI/RF BtSIV8806B                                                St PMP B SUCT FROM RWSTISO                                        E-3  MO    ,GT      B      8      FS/Q          C/O              ACTIVE PI/RF l
BNilV8812A                                                RWSTTO RHR PMP A SUCT ISO VLV                                      B-3  MO      GT      B    14      FS/Q          C/O              ACTIVE PI/RF                                                                                                    l BNilV8812B                                          ,
RWST TO RHR PMP B SUCTISO VLV                                    D-3  MO      GT      B    14      FS/Q          C/O              ACTIVE PI/RF                                                                                                    ,
BNilV8813                                                SI PMPS MINIFLOW TO RWSTISO VLV                                  B-7  MO      GB      B      2      FS/CS          C              ACTIVE                          BN-2 PI/RF BNLCV0ll2D                                                CCP A SUCT FROM RWSTISO VLV                                      A-5  MO      GT      B      8      FS/CS          O/C              ACTIVE                          BN-1                                    ,
PI/RF BNLCV0112E                                                CCP B SUCT FROM RWSTISO VLV                                      E-3  MO      GT      B      8      FS/CS          O/C              AC:IVE                          BN-1                                    l PI/RF t
Page 28
 
CALLAWAY NUCLEAR PLANT                                                                                                                                  ;
INSERVICE TEST PROGRAM FUEL POOL COOLING AND CLEANUP (EC)
DRAWING M-22EC01 VALVE                                        DESCRIPTION                      COOR  ACT. VLV              VLV      VLV        TESTS          SFTY      ACTIVE                                RR OR              NOTES  t NUMBER                                                                                          TYPE            CAT.        SIZE        PERF/          POS                            OR                TST DEF (in)      FREQ.                    PASSIVE                                  JUST.
ECHV0011    FUEL POOL HX A SHELL SIDE CCW OUT                                      H-5    MO        BT                  B      12        FS/Q            O/C        ACnVE ISO                                                                                                                            PI/RF                                                                                        j EC:IV0012  FUEL POOL HX B SHELL SIDE CCW OUT                                      F-5    MO        BT                  B      12        FS/Q            O/C        ACRVE ISO                                                                                                                            PI/RF                                                                                        i i
t P
                                                                                                                                        ~
I Page 29
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM FUEL POOL COOLING AND CLEANUP (EC)
DRAWING M-22EC02                                                                                                                                                                                                                                                                                                  i I
VALVE                                                    DESCRIPTION                                                      COOR                                  ACT. VLV        VLV            VLV              TESTS        SFTY          ACTIVE  RR OR                          NOTES NUMBER                                                                                                                                                                      TYPE        CAT.          SIZE              PERF/            POS          OR    TST DEF (in)            FREQ.                        PASSIVE  JUST.
ECV0083                              FUEL POOL CLEAN-UP DEMIN TO REFUEL                                                                    C-6                              MA      GT        A                6              U/RF                C      PASSIVE POOL OUTER CTMTISO ECV0084                              FUEL POOL CLN/U DEMIN TO RFP INNER                                                                    C-5                              MA      GT        A                6              U/RF                C      PASSIVE CTMTISO ECV0087                              RFP TO SFP INNER CTMT ISO                                                                              D-7                              MA      GT        A                6              U/RF                C      PASSIVE i
ECV0088                              REFUEL POOL TO SFP OUTER CTMTISO                                                                      D-7                              MA      GT        A                6              U/RF                C      PASSIVE ECV0095                              FUEL POOL SKIMMER PUMP SUCT INNER                                                                      B-5                              MA      GT        A                6              U/RF                C      PASSIVE CTMTISO ECVCD96                              REFUEL POOL SKIMMER PMP SUCT OUTER                                                                    B-5                              MA    ! GT.        A                6              U/RF                C      PASSIVE CFMTISO                                                                                                                                        .
                                                                                                                                                                                                ~
[
i I
Page 30 t
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ESSENTIAL SERVICE WATER SYSTEM (EF)
DRAWING M-22EF01 4
VALVE                                                                                          DESCRIPTION                          COOR                                    ACT.                                                              VLV                                      VLV  VLV  TESTS    SFrY ACTIVE  RR OR  NOTES NUMBER                                                                                                                                                                                                                                        TYPE                                          CAT. SIZE  PERF/    POS    OR    TST DEF (in) FREQ.        PASSIVE  JUST.
EFilV0023                                              SERV WrR/ESW TRN A XCON HV                                                                F-7                                          MO                                                                BF                                B    30  FS/Q    C  ACrlVE PI/RF EFHV0024                                              SERV WIR ESW TRN B XCON HV                                                                E-7                                          MO                                                                BF                                B    30  FS/Q    C  ACTIVE PI/RF EFHV0025                                              SERV WTR/ESW TRN A XCON HV                                                                F-7                                          MO                                                                  BF                              B    30  FS/Q    C  ACTIVE Pl/RF EFHV0026                                              SERV WTR ESW TRN B XCON HV                                                                E-7                                          MO                                                                  BF                              B    30  FS/Q    C  ACTIVE PI/RF EFHV0044                                              ESW TRN B TO SERV AIR CMPSR B ISO                                                          B-7                                            AO                                                              GB                                B      2  FS/Q    C  ACrlVE FT/Q
                                                                                                                                                                                                                                                                            .                                                  PI/RF EFV0076                                                ESW TRN B FROM SERV AIR CMPSR                                                              B-6                                              SA                                                      -CK C    2.50  FS/Q    C  ACTIVE CHECK VLV 4
Page 31
 
1 CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ESSENTIAL SERVICE WATER SYSTEM (EF)
DRAWING M-22EF02 VALVE              DESCRIPTION                                COOR  ACT. VLV  VLV  VLV  TESTS  SFIT ACTIVE  RR OR  NOTES NUMBER                                                                        TYPE  CAT. SIZE  PERFI  POS    OR    TST DEF (in) FREQ.      PASSIVE  JUST.
EFHV0031    ESW TRN A TO CTMT AIR CLRS OUTER                        G-7  MO      BF  A    14  FS/Q  O/C ACTIVE CTMT HV                                                                                PI/RF U/RF j EFHV0032    ESW TRN B TO CTMT AIR CLRS OUTER                        B-7  MO      BF  A    14  FS/Q  O/C ACTIVE CTMT HV                                                                                PI/RF U/RF EFliV0033  ESW TRN A TO CTMT AIR CLRS INNER                        G-7  MO      BF  A    14  FS/Q  O/C ACTIVE CINT HV                                                                                PI/RF U/RF j EFHV0034    ESW TRN B TO CTMT AIR CLRS INNER                        B-7  MO      BF  A    14  FS/Q  O/C ACTIVE CnlT HV                                                                                PI/RF U/RF EFHV0037    ESW TRN A TO UHS liv                                    G-2  MO    ;BF  B    30  FS/Q    O  ACTIVE PI/RF EFIIV0038  ESW TRN B TO UHS HV                                      C-2  MO      BF  B    30  FS/Q    O  ACTIVE PI/RF EFHV0039    ESW TRN A TO SERV WTRUPSTRM HV                          F-2  MO      BF  B    30  FS/Q    C  ACTIVE PI/RF EFHV0040    ESW TRN B TO SERV WTR UPSTRM HV                          D-2  MO      BF  B    30  FS/Q    C  ACTIVE PI/RF EFHV0041    ESW TRN A TO SERV WTR DNSTRM HV                          E-2  MO      BF  B    30  FS/Q    C  ACTIVE PI/RF EFliV0042  ESW TRN B TO SERV WTR DNSTRM HV                          D-2  MO      BF  B    30  FS/Q    C  ACTIVE PI/RF EFliV0043  ESW TRN A TO SERV AIR CMPSR A ISO                        E-7  AO      GB  B      2  FS/Q    C  ACTIVE FT/Q PI/RF Page 32
 
L CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ESSENTIAL SERVICE WATER SYSTEM (EF)
DRAWING M-22EF02 VALVE                                                                                      DESCRIPTION                                            COOR  ACT. VLV                                                    VLV                            VLV            TESTS  SFTY    ACTIVE      RR OR NOTES NUMBER                                                                                                                                                              TYPE                                                  CAT.                            SIZE            PERF/  POS      OR      TST DEF (in)          FREQ.          PASSIVE    JUST.
i EFHV0045                                                  ESW TRN A FROM CTMT AIR CLRS INNER                                                                      G4    MO        BF                                                              A                    14            FS/Q    O/C  ACTIVE CTMT HV                                                                                                                                                                                                                      PI/RF U/RF                                  ;
EFHV0046                                                  ESW TRN B FROM CBiT AIR CLRS INNER                                                                      B4    MO        BF                                                              A                    14            FS/Q    O/C  ACTIVE CTMT HV                                                                                                                                                                                                                      PI/RF U/RF EFHV0047                                                  ESW TRN A FROM CTMT AIR CLRS BYP ISO                                                                    G4    MO        BF                                                              A                    10            FS/Q        C ACTIVE                  l IIV                                                                                                                                                                                                                          PI/RF                                  l LJ/RF                                  i EFHV0048                                                  ESW TRN B FROM CTMT AIR CLRS BYP ISO                                                                    C4    MO        BF                                                              A                    10            FS/Q        C ACTIVE                  !
;                                                                        HV                                                                                                                                                                                                                            PI/RF U/RF                                  ;
EFHV0049                                                  ESW TRN A FROM CTMT AIR CLRS OUTER                                                                      G4    MO    ;BF                                                                  A                  14            FS/Q . O/C  ACTIVE CTMTIIV                                                                                                                                                                                                                      Pl/RF                                  -
E U/RF EFHV0050                                                ESW TRN B FROM CTMT AIR CLRS OUTER                                                                      B4    MO        BF                                                                A                  14            FS/Q    O/C    ACTIVE CatT HV                                                                                                                                                                                                                      PI/RF                                  t U/RF EFHV0051                                                ESW TRN KTO CCW HX A HV                                                                                  G-4  MO        BF                                                                B                  24            FS/Q        O ACTIVE Pl/RF EFHV0052                                                ESW'IRN B TO CCW HX B HV                                                                                C-4  MO        BF                                                                B                  24            FS/Q        O ACTIVE PI/RF                                  !
EFHV0059                                                ESW TRN A FROM CCWIIX A HV                                                                              G-3  MO        BF                                                                B                  24            FS/Q        C ACTIVE PI/RF EFHV0060                                                  ESW TRN B FROM CCW HX A HV                                                                              C-3  MO        BF                                                                B                  24            FS/Q        C ACTIVE                  :
PI/RF Page 33
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ESSENTIAL SERVICE WATER SYSTEM (EF)
DRAWING M-22EF02 VALVE                                                            DESCRIPTION                                                                                                          COOR  ACT. ' VLV  VLV            VLV  TESTS                                SFTY ACTIVE  RR OR                    NOTES NUMBER                                                                                                                                                                                              TYPE  CAT.          SIZE  PERF/                                POS    OR    TST DEF (in) FREQ.                                    PASSIVE  JUST.
EFV0046      ESW TRN A FROM SERV AIR CMPSR                                                                                                                                                E-6  SA      CK  C            2.50    FS/Q                                C  ACTIVE CIIECK VALVE l
Page 34
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM                                                                                                                                                                                                                    l ESSENTIAL SERVICE WATER SYSTEM (EF)                                                                                                                                  '
)                    DRAWING M-U2EF01 VALVE                                                                                                                            DESCRIPTION                          COOR l ACT. VLV            VLV                                              VLV                                              TESTS    SFTY                            ACTIVE                                      RR OR  NOTES  ,
NUMBER                                                                                                                                                                                TYPE          CAT.                                              SIZE                                                PERF/  POS                                                  OR                      TST DEF (in)                                            FREQ.                                PASSIVE                                        JUST.
EFHV0065                                                        ESW UHS COOL-TWR TRN A BYP llV                                                                              B-6    MO        BF                    B                                              30                                          FS,Q    O/C                              ACTIVE                                                    !
PI/RF                                                                                              !
EFilV0066                                                      ESW UllS COOL-TWR TRN B BYP HV                                                                              B-3    MO        BF                    B                                              30                                          FS/Q    O/C                              ACTIVE PI/RF EFIIV0097                                                      ESW PMP A DISCIIRECIRC llV                                                                                  F-6    MO        GT                    B                                                  3                                        FS/Q    C                              ACTIVE PI/RF EFHV0098                                                        ESW PMP B DISCil RECIRC IIV                                                                                D-6    MO        GT                    B                                                  3                                        FS/Q    C                              ACTIVE PI/RF EFPDV0019                                                      ESW S-C STR A DRN DP CTRL VLV                                                                              F-4    MO        GT                    B                                                  3                                        FS/Q    O/C                              ACTIVE PI/RF EFPDV0020                                                      ESW S-C STR B DRN DP CTRL VLV                                                                              D-4    MO      tGT                    B                                                  3                                        FS/Q    O/C                              ACTIVE
                                                                                                                                                                                                              '.                                                                                                                  PI/RF '
EFV0001                                                        ESW PMP A DISCH CHECK                                                                                      G-5    SA    4CK                      C                                              30                                          FS/Q    O                              ACTIVE EFV0004                                                        ESW PMP B DISCH CHECK                                                                                      D-5    SA        CK                    C                                              30                                          FS/Q    O                                ACTIVE I
Page 35
 
i CALLAWAY NUCLEAR PLANT                                                                                                                                                  :
INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG)
DRAWING M-22EG01 t
DESCRIPTION                                                                  COOR  ACT.                                              VLV                                                VLV  VLV    TESTS    SFTY  At,anVE    RR OR  NOTES VALVE
* NUMBER                                                                                                                                                                                        TYPE                                                  CAT. SIZE    PERF/    POS      OR      *IST DEF (in)  FREQ.          PASSIVE    JUST.
l EGHV0011                                  ESW TO CCW TRN A UPSTRM HV                                                                          F-8      MO                                                GB                                                B  1.50    FS/Q      O  ACTIVE PI/RF EGilV0012                                ESW TO CCW TRN B UPSTRM IIV                                                                          C      MO                                                  GB                                              B  1.50    FS/Q'      O  ACTIVE PI/RF EGHV0013                                  ESW TO CCW TRN A DNSTRM HV                                                                          F-7      MO                                                  GB                                              B  1.50    FS/Q      O  ACTIVE                  [
PI/RF                                  :
EGHV0014                                ESW TO CCW TRN B DNSTRM HV                                                                          C-7      MO                                                  GB                                              B  1.50    FS/Q      O    ACTIVE Pl/RF                                  ;
EGHV0015                                CCW'IRN A SPLY/RTN ISO HV                                                                            D4        MO                                                  BF                                              B  18    FS/Q      O/C  ACTIVE
'                                                                                                                                                                                                                                                                                        PI/RF EGHV0016                                CCW TRN B SPLY/RTN ISO HV                                                                            D4        MO                                          !BF                                                    B  18    FS/Q      O/C  ACITVE
                                                                                                                                                                                                                      ',                                                                PI/RF                                    ;
EGRV0009                                CCW SRG TK A VENT CTRL VLV                                                                          G4          AO                                                GB                                              B    2    FS/Q      C    ACTIVE FT/Q PI/RF                                    !
EGRV0010                                CCW SRG TK B VENT CTRL VLV                                                                          C4          AO                                                GB                                              B    2    FS/Q      C    ACTIVE FT/Q PI/RF EGV0003                                CCW PMP A DISCH CHECK                                                                                G-3          SA                                              CK                                              C  20    FS/Q      O/C  ACTIVE t
EGV0007                                CCW PMP C DISCH CHECK                                                                                E-3          SA                                              CK                                              C  20    FS/Q      O/C  ACTIVE                  i EGV0012                                CCW PMP B DISCH CIIECK                                                                              D-3          SA                                              CK                                              C  20    FS/Q      O/C-  AwiVE Page 36
__        _ _ _ _ _ . . _ _ _ _ _ _ _ _                          m                  _ _ _ _ _ _                  ___ _ _ _ _ _ _ _ _ _                              _ _ _ _ _ _ _                                                                                _          v              -    ,.
 
CALLAWAY NUCLEAR PLANT                                                                    .
INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG)
DRAWING M-22EG01 VALVE                                                                                                              DESCRIPTION                                                                                                                                    COOR        ACT. VLV  VLV  VLV        TESTS SFTY ACTIVE    RROR  NOTES NUMBER                                                                                                                                                                                                                                                                                        TYPE  CAT. SIZE      PERF/  POS  OR    . TST DEF (in)      FREQ.      PASSIVE    JUST.
I EGV0016                                                                                      CCW PMP D DISCH CHECK                                                                                                                                                                                        C-3  SA        CK  C    20        FS/Q  O/C ACTIVE EGV0130                                                                                      CCW TRN A SPLY/RTN CIECK                                                                                                                                                                                      D-6  SA        CK  C    18        FS/Q  O  ACTIVE                  ,
EGVO131                                                                                      CCW TRN B SPLY/RTN CHECK                                                                                                                                                                                  . D-6    SA        CK  C    18-      FS/Q  O  ACTIVE a
I i
6 L
Page 37                                                        ;
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG)
DRAWING M-22EG02 VALVE                                  DESCRIPTION                                                                  COOR                                            ACT.                VLV  VLV        VLV    TESTS              SFTY ACTIVE            RR OR  NOTES NUMBER                                                                                                                                                                                  TYPE  CAT.      SI?.E  PERF/              POS    OR          TST DEF (ir) FREQ.                    PASSIVE            JUST.
EGHV0053  CCW TRN A SPLY ISO HV                                                                                          G-5                                              MO                BF  B            18  FS/Q                O/C ACTIVE PI/RF EGHV0054  CCW TRN B SPLY ISO HV                                                                                            F-5                                            MO                BF  B            18  FS/Q                O/C ACTIVE Pl/RF EGilV0072  CCW TO PASS UPSTRM ISO IIV                                                                                      G-2                                              MO              GT  B            2  FS/Q                C  ACTIVE PI/RF EGHV0073  CCW TO PASS DNSTRM ISO HV                                                                                      G-2                                              MO                GT  B            2  FS/Q                C  ACTIVE PI/RF EGHV0074  CCW FROM PASS UPSTRM ISOIIV                                                                                    G-1                                              MO                GT  B            2  FS/Q                C  ACTIVE PI/RF EGIIV0075  CCW FROM PASS DNSTRM ISO HV                                                                                    G-1                                              MO              'GT  B            2  FS/Q                C  ACTIVE
                                                                                                                                                                                                      '.                      PI/RF EGIIV0101  CCW TO RHR HX A ISO                                                                                            G-4                                              MO                BF  B            18  FS/Q                O/C ACrlVE Pl/RF EGilV0102  CCW TO RHR HX B ISO                                                                                            C-4                                              MO                BF  B            18  FS/Q                O/C ACTIVE PI/RF EGTV0029  CCWIlX A CCW BYP TV                                                                                            G4                                                AO              BF  B            20  FS/Q                C  ACTIVE FT/Q PI/RF EGTV0030  CCW HX B CCW BYP TV                                                                                            C4                                                AO              BF  B            20  FS/Q                C  ACTIVE FT/Q PI/RF Page 38
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG)
DRAWING M-22EG03 VALVE                      DESCRIPTION                                                                                                            COOR  ACT. VLV    VLV  VLV  TESTS  SFIT ACTIVE  RR OR      NOTES NUMBER                                                                                                                                                                TYPE    CAT. SIZE  PERF/    POS  OR    TST DEF (in) FREQ.        PASSIVE  JUST.
EGHV0058                                        CCW TO CTMT OUTERISO HV                                                                                                            H-5  MO      GT    A    12  FS/Q    O/C ACTIVE PI/RF U/RF EGHV0059                                      CCW FROM CTMT OUTERISO VLV                                                                                                        C-5  MO      GT    A    12  FS/Q    O/C  ACTIVE PI/RF.
U/RF EGHV0060                                      CCW FROM CTMT OUTERISO VLV                                                                                                        B-5  MO      GT    A    12  FS/Q    O/C  ACTIVE PI/RF U/RF EGIIV0061                                      CCW FROM RCP THRM BAROUTER CFMT                                                                                                    C .MO      GT    A      4  FS/Q    O/C  ACTIVE ISO                                                                                                                                                                PI/RF U/RF EGHV0062                                      CCW FROM RCS IN CTMTISO HV                                                                                                        B-4  MO    ;GT    A      4  FS/Q    O/C  ACTIVE                                  -
* i PI/RF                                                '
2                  U/RF EGHV0069A                                    CCW TO RW PROT A SPLY ISO HV                                                                                                      F-8  AO      BF    B      14  FS/Q    C  ACTIVE Fr/Q PI/RF EGHV0069B -                                  CCW FROM RW PROT A RTN ISO HV                                                                                                      F-6  AO      BF    B      14  FS/Q    C  ACTIVE FT/Q PI/RF                                                :
l EGHV0070A                                  CCW TO RW PROT B SPLY ISO HV                                                                                                      F-8  AO      BF    B      14  FS/Q    C  ACTIVE FT/Q                                                  ,
Pl/RF EGHV0070B                                  CCW FROM RW PROT B RTN ISOIIV                                                                                                      F-6  AO      BF    B    14  FS/Q    C  ACTIVE                                  l' FT/Q
                                                                                                                                                                                                                      ,            P!/RF Page 39
 
i CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG) '
DRAWING M-22EG03                                                                                                                                                                                                                                                                            ;
VALVE                                          DESCRIPTION                                        COOR    ACT.                              VLV        VLV    VLV                TESTS                      SFTY                                              At t tVE  RR OR  NOTES NUMBER                                                                                                                                  TYPE            CAT. SIZE                PERF/                          POS                                              OR    TST DEF        ,
(in)              FREQ.                                                                        PASSIVE    JUST.      {
r EGHV0127      CCW TO CTMT BYP ISO HV                                                                G-5    MO                                  GT          A    12                U/RF                                  C                                    PASSIVE Pl/RF                                                                                                ;
EGHV0130      CCW FROM RCS CTMT EGHV0060 BYP ISO                                                    B-5    MO                                  GT          A    12                U/RF                                  C                                    PASSIVE HV                                                                                                                                                                      PI/RF EGHV0131      CCW FROM CTMT EGHV0059 BYP ISO                                                        C-5    MO                                  GT            A  12                U/RF                                  C                                    PASSIVE                ;
l PI/RF EGHV0132      CCW FROM RCS CIMF EGHV0062 BYP ISO                                                    B-4    MO                                  GT            A    4                U/RF                                  C                                    PASSIVE HV                                                                                                                                                                      PI/RF EGHV0133      CCW FROM RCP THRM BAR EGHV0061 BYP                                                    C-5    MO                                  GT            A    4                U/RF                                  C                                    PASSIVE ISO                                                                                                                                                                      PI/RF EGV0204        CCW TO RCS IN CIMT CHECK                                                              H-4    SA                                ?CK          A,C    12                FS/RF                                  C                                    ACTIVE    EG-01 I
                                                                                                                                                                  .                                      U/RF s
i I
I i
t l
Page 40
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM RESIDUAL HEAT REMOVAL SYSTEM (EJ)
DRAWING M-22EJ01 VALVE                                                          DESCRIPTION                                              COOR    ACT. VLV    VLV  VLV  TESTS                                        SFTY                ACTIVE            RR OR -                NOTES NUMBER                                                                                                                                  TYPE    CAT. SIZE    PERF/                                          POS                      OR      TST DEF (in)  FREQ.                                                            PASSIVE          JUST.
EJ8708A        RHR PUMP A SUCT PRESS RLF                                                                                    F-7      SA      RV      C    3  RV/RV-                                            O/C            ACTIVE 10 EJ8708B        RHR PUMP B SUCT PRESS RLF                                                                                    C-7      SA      RV      C    3  RV/RV-                                            O/C            ACrlVE
>                                                                                                                                                                                                            10 EJ8730A        RHRIIX A OlJrLET CIIECK VLV                                                                                  G-4      SA      CK      C    10    FS/CS                                            O/C            ACTIVE            EJ-10 PS/Q EJ8730B        RIIR HX B OUTLET CHECK VLV                                                                                    C-4      SA      CK      C    10    FS/CS                                            O/C            ACTIVE            EJ-10 PS/Q EJ8841A        RHR TRNS SIS HOT LEG LOOP 2 RECIRC                                                                            E-2      SA      CK    A,C    6    FS/CS                                            O/C            ACTIVE            EJ-l                      2 SPLY HDR CIECK                                                                                                                                    LT/RF EJ8841B        RilR TRNS SIS HOT LEG LOOP 3 RECIRC                                                                          D-2      SA    !CK      A,C    6    FS/CS                                            O/C              ACrlVE          EJ-l                      2 SPLY llDR CIECK                                                                                                              '.                  LT/RF EJ8958A        RIIR PUMP A SUCT FROM RWST CllECK                                                                            F-6      SA        CK    C    14    FS/RF                                            O/C              ACrlVE          EJ-8 VLV                                                                                                                                                PS/Q 4                                      E18958B        RHR PUMP B SUCT FROM RWST CIECK                                                                              B-6      SA        CK    C    14    FS/RF                                            O/C            ACTIVE            EJ-8 VLV                                                                                                                                                PS/Q EJ8969A        RHR TRN A CHARGING PUMPS SPLY HDR                                                                            G-3      SA        CK    C    8    FS/RF                                                  O        ACTIVE          EJ-9 CIECK VLV EJ8969B        RHRN B CHARGING PUMPS SPLY HDR                                                                                A-4      SA        CK    C    8    FS/RF                                                  O        ACTIVE            EJ-2 CIECK VLV EJFCV0610      A RHR PMP MINI FLOW RECIRC FLOW                                                                              II-6    MO        GT    B    3    FS/Q                                            O/C            ACrlVE CTRL VLV                                                                                                                                          PI/RF Page 41
_                                        _.                      ~_ _ . _ . _ . _      ___ ___ __________  -
 
l CALLAWAY NUCLEAR PLANT                                                                                                                                                                                        !
INSERVICE TEST PROGRAM l  RESIDUAL IIEAT REMOVAL SYSTEM (EJ) i  DRAWING M-22EJ01                                                                                                                                                                                                                                                                                                                            ,
l                                                                                                                                                                                                                                                                                                                                              I
!      VALVE                                                        DESCRIPTION                                                                        COOR                          ACT. VLV  VLV        VLV      TESTS                                          SFTY                      ACTIVE  RR OR          NOTES NUMBER                                                                                                                                                                                  TYPE  CAT.      SIZE      PERF/                                              POS                  OR    TST DEF                              ;
(in)    FREQ.                                                                  PASSIVE  JUST.                              .
l l  EJFCV0611                        B RHR PMP MINI FLOW RECIRC FLOW                                                                                                A-5                MO        GT  B            3      FS/Q                                                  O/C              ACTIVE CTRL VLV                                                                                                                                                                              PI/RF                                                                                                                ,
ERICV8825                        RIIRTRN A&B SIS IlOT LEG RECIRC SIS                                                                                            E-2                AO        GB  B        0.75      FS/Q                                                        C        ACTIVE                                        '
i                                    TEST LINE ISO                                                                                                                                                                        FT/Q PI/RF l
EJIICV8890A                      RHRTRN A ACC INJ SIS TEST LINE ISO                                                                                              F-2              AO        GB  B        0,75      FS/Q                                                        C        ACTIVE i                                                                                                                                                                                                                          FT/Q                                                                                                                  ,
Pl/RF ERICV8890B                        RHRTRN B ACC INJ SIS TEST LINE ISO                                                                                              C-2                AO        GB  B        0.75      FS/Q                                                        C          ACTIVE                                        [
FT/Q Pl/RF.
EJHV0023                          CTMT RECIRC SUMP A TO PASS UPSTRM                                                                                                E-7              SO    ]GB    A.            I      FS/Q                                                        C          ACTIVE
* ISO                                                                                                                                                      ',                          PI/RF -
                                                                                                          ~
ERIV0024                          CTMT RECIRC SUMP B TO PASS UPSTPM                                                                                              D4                SO      :GB  A            1      LJ/RF                                                        C          ACTIVE                                        ,
ISO EJHV0025                          CTMT RECIRC SUMP A TO PASS DNSTRM                                                                                                E-7              SO        GB  A            1      FS/Q                                                        C          ACTIVE ISO                                                                                                                                                                                  PI/RF ERIV0026                        -
CTMT RECIRC SUMP B TO PASS DNSTRM                                                                                                D-6              SO        GB  A            1      LJ/RF                                                        C          ACTIVE                                        l ISO                                                                                                                                                                                                                                                                                                        l EJIIV8701 A                        RHR PUMP A SUCTISO                                                                                                                F-8            MO        GT  A            12      FS/CS                                                  O/C              ACTIVE        EJ-3 PI/RF LT.RF ERIV8701B                          RIIR PUMP B SUCTISO                                                                                                              B-8              MO        GT  A            12      FS/CS                                                  O/C              ACTIVE        EJ-3 PI/RF LT/RF ERIV8716A                          RHR TRN A SI SYS HOT LEG RECIRCISO                                                                                              E-4              MO        GT  B            10      FS/CS                                                  O/C            ACTIVE        EJ-7 (3.0.3)                                                                                                                                                                              Pl/RF Page 42
 
i CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM                                                                                                                                                                        '
RESIDUAL IIEAT REMOVAL SYSTEM (EJ)
DRAWING M-22EJ01 VALVE                                                      DESCRIPTION                                                              COOR      ACT.                                      VLV                    VLV  VLV  TESTS  SFTY                        ACTIVE                                        RR OR  NOTES NUMBER                                                                                                                                                                                TYPE                      CAT. SIZE  PERF/  POS                                              OR                      TST DEF      l (in) FREQ.                            PASSIVE                                        JUST.
I I
EJHV8716B                                                  RHRTRN B SI SYS HOT LEG RECIRC ISO                                                              D4    MO                                            GT                B      10  FS/CS  O/C                          ACTIVE                                      EJ-7 (3.0.3)                                                                                                                                                                            PI/RF EJHV8804A                                                  RHR TRN A CHARGING PUMPS SPLY ISO                                                                G4    MO                                            GT                B      8  FS/CS    O                          ACTIVE                                      EJ4 PI/RF EJHV88048                                                  RHRTRN B CHARGING PUMPS SPLY ISO                                                                A4    MO                                            GT                B-      8  FS/CS    O                          ACTIVE                                      EJ4 PI/RF EJIIV8809A                                                RHR TRN A ACC INJ SPLY ISO (3.0.3)                                                                G-3  MO                                            GT                B      10  FS/CS    C                          ACTIVE                                      EJ-5 PI/RF EJHV8809B                                                  RHR TRN B ACC INJ SPLY ISO (3.0.3)                                                                C-3  MO                                            GT                B      10  FS/CS    C                          ACTIVE                                      EJ-5        <
Pl/RF                                                                                        ,
EJIIV8811 A                                                CFMT RECIRC SUMP A TO RHR PUMP A                                                                  E-7  MO                                      'GT                    B      I4  FS/CS  O/C                          ACTIVE                                      EJ4 SUCTISO                                                                                                                                        '.                                  PI/RF
;              EJHV8811B                                                  CFMT RECIRC SUMP B TO RHR PUMP A                                                                  D-7  MO                                            GT                B      14  FS/CS  O/C                          ACTIVE                                      EJ4 SUCTISO                                                                                                                                                                            PI/RF EJHV8840                                                  RHRTRAIN A & B SI SYS IIOT LEG RECIRC                                                            E-3  MO                                            GT                B      10  FS/CS    O                          ACTIVE                                      EJ-5 ISO (3.0.3)                                                                                                                                                                        PI/RF F
Page 43
 
i 6
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM -
HIGH PRESSURE COOLANT INJECTION SYSTEM (EM)
DRAWING M-22EMO1 VALVE                                          DESCRIPTION                                                                                                        COOR                  ACT.                    VLV VLV  VLV TEST SFTY                                                ACTIVE i    RR OR    NOTES .
NUMBER                                                                                                                                                                                                            TYPE  CAT. SIZE                                S                  POS  OR        TST DEF        I (in)                      PERF/                            PASSIVE      JUST.          [
FREQ EM8922A    St PMP A DISCH CIECK                                                                                                                                        E-5                      SA                  CK    C      4                    FSIRF                        O/C ACTIVE        EM-1 EM8922B    St PMP B DISCH CHECK                                                                                                                                        D-5                      SA                  CK    C      4                    FS/RF - O/C                      ACTIVE        EM-1 i
EM8926A    St PMPS SUCT CHECK A                                                                                                                                        E-7                        SA                  CK    C      8                    FS/RF                        O/C ACTIVE        EM-5 PS/Q EM8926B    SI PMPS SUCT CIECK B                                                                                                                                        D-7                        SA                  CK    C      8                    FS/RF                        O/C ACTIVE        EM-5          !
PS/Q                                                      j c                EMilV88J2A  St PMP A DISCH TO HOT LEG INJ ISO (3.0.3)                                                                                                                    E-4                      MO                    GT    B      4                        FS/Q                      O  ACrlVE                      i PI/RF                                                        j
;                EMiiV8802B  SI PMP B DISCH TO HOT LEG INJ ISO (3.0.3)                                                                                                                    D-4                      MO                  GT    B        4                      FS/Q                      O  ACrlVE PI/RF                                                      j EMHV8807A  RHRIIX A TO SI PMPS SUCT DNSTRM ISO                                                                                                                          G-7                      MO                f GT    B      6                        FS/Q                      O  ACTIVE                      [
VLV A                                                                                                                                                                                                    0                                      Pl/RF                                                        !
EMIIV8807B  RHR HX A TO St PMPS SUCTDNSTRM ISO                                                                                                                          F-7                      MO                  GT    B      6                        FS/Q                      O  ACTIVE                    ['
VLV B                                                                                                                                                                                                                                          PI/RF ENGIV8814A  SI PMP A RECIRC TO RWSTISO                                                                                                                                  B-6                      MO                  GB    B  1.50                        FS/Q                      C  ACTIVE Pl/RF EM11V8814B  St PMP B RECIRC TO RWSTISO                                                                                                                                  B-5                      MO                  GB    B  1.50                        FS/Q                      C  ACTIVE PI/RF EMHV8821A    St PMP A DISCH TO COLD LEG INJ ISO                                                                                                                          E-4                      MO                  GT    B        4                      FS/Q                      C  ACrlVE Pl/RF                                                      e EEDIV8821B  S1 PMP B DISCH TO COLD LEG INJ ISO                                                                                                                          D-4                      MO                  GT    B        4                      FS/Q                      C  ACrlVE PI/RF i
I i
Page 44                                                                                                          i
 
                                                                                        .      - .    . ~ . ~ - -    . . ~ = . . _ . . -
k' CALLAWAY NUCLEAR PLANT                                                                      ;
INSERVICE TEST PROGRAM i
HIGH PRESSURE COOLANT INJECTION SYSTEM (EM)                                                                                              '
DRAWING M-22EM01 VALVE              DESCRIPTION              COOR  ACT. VLV  VLV  VLV  TESTS    SFTY    At:1VE          RR OR            NOTES [
NUMBER                                                      TYPE  CAT. SIZE  PERF/    POS        OR          TST DEF (in) FREQ.            PASSIVE          JUST.
t EhulV8823  SI/ACC INJ TEST LINE ISO HV            C-4  AO      GB  B  0.75  FS/Q      C      ' ACTIVE                                j FT/Q PI/RF                                                    !
EMIIV8824  St PMP B DISCH TEST LINE ISO IIV      D-3  AO      GB  B  0.75  FS/Q      C      ' ACTIVE Fr/Q Pl/RF ENDIV8835  SI PMPS DISCH TO COLD LEG INJ ISO      B-4  MO      GT  B      4  FS/CS    C      ACrlVE          EM-7 (3.0.3)                                                              Pl/RF EMHV8871  SI SYS IN CTMTTEST LINE ISO IIV        G-5  AO      GB  A  0.75  FS/Q      C      ACTIVE FT/Q PI/RF u/RF EMilV8881  St PMP A DISCilTEST LINE ISO HV        G-4  AO    ,' GB  B    0.75  FSiQ    C      ACTIVE FT/Q                                                      t PI/RF EMllV8888  ACC TKS FILL LINE FROM St PMPS ISO    F4    AO        GB  A      1    FSQ      C      ACTIVE
* FT/Q Pl/RF LJ/RF                                                    f EMIIV8923A RWST TO St PMP A SUCT ISO HV          F-7  MO        GT  B      8  PI/RF    O/C    PASSIVE                                  ,
EhnlV8923B RWSTTO St PMP B SUCTISO IIV            D-7  MO        GT  B      8  PI/RF    O/C    PASSIVE                                  ,
EhulV8964  SI SYS OUT CTMT TEST LINE ISO          G4    AO        GB  A    0.75  FS/Q    C      ACTIVE FT/Q PI/RF LJ/RF Page 45
 
CALLAWAY NUCLEAR PLANT                                                                                                                                                                                                                  '
INSERVICE TEST PROGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM (EM)                                                                                                                                                                                                                                                                                                                        l DRAWING M-22EM01 i
VALVE                                                    DESCRIPTION                                                                          COOR        ACT.      VLV                            VLV                                                VLV                                          TESTS                    SFTY  ACTIVE  RR OR    NOTES NUMBER                                                                                                                                                                TYPE                          CAT.                                                SIZE                                            PERF/                    POS    OR    TST DEF (in)                                      FREQ.                          PASSIVE  JUST.          ;
I EMV0001    SI PMP A DISCllTO HOT LEG LOOP 2                                                                                                        F-3        SA        CK                                A,C                                                        2                                    FS/RF                  O/C  ACTIVE    EM-2      2 UPSTRM CIECK                                                                                                                                                                                                                                                                                      LT/RF EMV0002    SI PMP A DISCH TOIIOT LEG LOOP 3                                                                                                        E-3        SA        CK                                A,C                                                        2                                    FS/RF                  O/C ; ACTIVE    EM-2      2  ;
UPSTRM CIECK                                                                                                                                                                                                                                                                                      LT/RF i
EMV0003    SI PMP B DISCH TO HOT LEG LOOP 1                                                                                                        D-3        SA        CK                                A,C                                                        2                                    FS/RF                  O/C  ACTIVE    EM-2      2 UPSTRM CIECK                                                                                                                                                                                                                                                                                      LT/RF EMV0004    SI PMP B DISCIITO HOT LEG LOOP 4                                                                                                        C-3        SA        CK                                A,C                                                        2                                    FS/RF                  O/C  ACTIVE    EM-2      2 UPSTRM CHECK                                                                                                                                                                                                                                                                                    LT/RF                                                  ,
EMV0005    SI PMP A DISCH TO RWST ClECK                                                                                                            A-6        SA        CK                                          C                                          1.50                                          FS/Q                  O    ACTIVE EMV0006    S1 PMPS ACC TKS FILL LINE CIECK                                                                                                          F-6        SA    ' CK A,C                                                        1                                    LJ/RF                  C    PASSIVE
                                                                                                                                                                              ',                                                                                                                                                                                            i EMV0007    SI PMP B DISCH TO RWST CHECK                                                                                                            A-5        SA        CK                                        C                                          1.50                                          FS/Q                  O    ACTIVE i
i i
Page 46
 
CALLAWAY NUCLEAR PLANT                                                                                                                                                                    -
INSERVICE TEST PROGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM (EM) 3 DRAWING M-22EM02 DESCRIPTION                                    COOR  ACT,                                  VLV  VLV  VLV  TESTS                  SFTY    At ItVE                                      RROR                                  NOTES VALVE TYPE      CAT. SIZE  PERF/                  POS                OR                              TST DEF NUMBER (in) FREQ.                          PASSIVE                                      JUST.
D-3  SA                                      CK  A,C    3  FS/RF                  O/C      ACTIVE                                      EM-3 EM8815        BIT CVCS OUT C11ECK LT/RF                                                                                                                  t BIT OlJTTO COLD LEGS ISO A                                                            D-4  MO                                      Gr  A,C    4  FS/Q                        O  ACTIVE EMIIV8801A PI/RF BIT OUT TO COLD LEGS ISO B                                                            D-4  MO                                      GT  B    4    FS/Q                      O    ACTIVE EMilV8801B PI/RF                                                                                                                  l BIT SPLY FROM CCP A ISO                                                              C-7  MO                                      GT  B    4    FS/Q                      O    ACTIVE Eh0lV8803A PI/RF BIT SPLY FROM CCP B ISO                                                              A-7  MO                                      GT  B    4    FS/Q                      O    ACTIVE                                                                                !
EMilV8803B PI/RF BIT 01TT UPSTRM TEST LINE ISOIIV                                                      C-4  AO                                . GB      B  0.75  FS/Q                      C    ACTIVE EMilV8843 FT/Q PI/RF f
l r
l 4
Page 47
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM
      - CONTAINMENT SPRAY SYSTEM @N)                                                                                                                                                                                                                                                            ,
DRAWING M-22EN01                                                                                                                                                                                                                                                                          j i
l VALVE                                                                DESCRIPTION                                    COOR                                      ACT.      VLV VLV  VLV    TESTS    SFTY    ACTIVE                      RR OR                            NOTES [
NUMBER                                                                                                                                                                    TYPE  CAT. SIZE    PERF/    POS      OR                        TST DEF (in)  FREQ.            PASSIVE                      JUST.
t ENHV0001          CINT RECIRC SMP TO CTMT SPRY PMP A                                                                            G-7                                  MO        GT  B      12    FS/CS    O'C    ACTIVE                        EN-4 HV                                                                                                                                                                              PI/RF                                                                                ,
ENHV0006          CTMT SPRY PMP A DISCH HV                                                                                        G-4                                  MO        GT  B      10    FS/Q      O  ,  ACTIVE                                                              !
PI/RF ENilV0007        CINT RECIRC SMP TO CFMT SPRY PMP B                                                                              B-7                                  MO        GT  B      12    FS/CS    O/C    ACrlVE                        EN-4 HV                                                                                                                                                                              PI/RF ENHV0012          CTMT SPRY PMP B DISCII HV                                                                                      B-4                                  MO        GT  B      10    FS/Q      O    ACTIVE PI/RF                                                                                  ;
G-7                                  SA        CK  C      12    FS/SD      O    ACTIVE                        EN-1                                    !
ENV0002          CTMT SPRY ISO VLV ENCAP A OUT CIECK ENV0003          RWST TO CTMT SPRY PMP A CIECK                                                                                  G-7                                  SA    s  CK  C      12    FS/SD      O    ACTIVE                        EN-2 PS/Q ENV0004          CFMT SPRY PMP A DISCil CIECK                                                                                    G-5                                  SA      ' CK  C      10    FS/SD. O    ACrlVE                        EN-5 PS/Q ENV0008          CFMT SPRY ISO VLV ENCAP B OUT CIECK                                                                              B-7                                SA        CK  C      12    FS/SD      O    ACTIVE                        EN-1 ENV0009          RWST TO CTMT SPRAY PMP B CIECK                                                                                  B-7                                SA        CK  C      12    FS/SD      0      ACTIVE                      EN-2 PS/Q ENV0010          CTMT SPRY PMP B DISCH CHECK                                                                                      B-5                                SA        CK  C      10    FS/SD,    O      ACrlVE                      EN-5 PS/Q t
Page 48
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CONTAINMENT SPRAY SYSTEM (EN)                                                      '
DRAWING M-22EN01 VALVE                          DESCRIPTION                  COOR  ACT. VLV    VLV    VLV    TESTS                SETY                          ACTIVE                              RR OR  NOTES NUMBER                                                                      TYPE    CAT. SIZE    PERF/                    POS                                OR                        IST DEF (in)  FREQ.                                              PASSIVE                              JUST.
ENV0013                                                          G-4  SA        CK    C      10    FS/SD                    O/C                        ACTIVE                              EN-3 CTMT SPRY Ph,fP A DISCH IN CTMT CIECK ENV0017                CTMT SPRY PMP B DISCIIIN CTMT CIECK      B-4  SA        CK    C      10    FS/SD                    O/C                        ACTIVE                              EN-3          r r
3 1
s 4
i i
Page 49
 
CALLAWAY NUCLEAR PLANT
,                                                                                                                                                                                                                      INSERVICE TEST PROGRAM ACCUMULATOR SAFETY INJECTION SYSTEM (EP)
  ,          DRAWING M-22EP01 VALVE                DESCRIPTION                                                                                                                                                                          COOR    ACT. VLV      VLV    VLV    TESTS      SFTY  ACTIVE  RR OR  NOTES NUMBER                                                                                                                                                                                                                      TYPE      CAT. SIZE    PERF/      POS    OR    TST DEF (in)  FREQ.            PASSIVE  JUST.
EP8818A            RHR PMPS TO RCS COLD LEG LOOP 1                                                                                                                                                                    G-3    SA        CK    A,C      6    FS/CS      O/C  ACTIVE    EP-1    2 CIECK                                                                                                                                                                                                                                      LT/RF EP8818B          RHF PMPS TO RCS COLD LEG LOOP 2                                                                                                                                                                    F-3    SA        CK      A,C      6    FS/CS      O/C  ACTIVE    EP-1    2 CHECK                                                                                                                                                                                                                                      LT/RF EP8818C          RHR PMPS TO RCS COLD LEG LOOP 3                                                                                                                                                                    D-3    SA        CK      A,C      6    FS/CS      O/C  ACTIVE    EP-1    2 CIECK                                                                                                                                                                                                                                      LT/RF EP8818D          PJIR PMPS TO RCS COLD LEG LOOP 4                                                                                                                                                                    C-3    SA        CK      A,C      6    FS/CS      O/C  ACTIVE    EP-1    2 CIECK                                                                                                                                                                                                                                      LT/RF EP8956A          St ACC TK A OUT UPSTRM CHECK                                                                                                                                                                        G4      SA        CK      A,C    10    FS/SD      O/C  ACTIVE    EP-2 LT/RF                                  -
t 1
ACTIVE    EP-2          ;
EP8956B          St ACC TK B OUT UPSTRM CIECK                                                                                                                                                                        E4      SA    ;CK        A,C    10    FS/SD      O/C LT/RF                                  f EP8956C          St ACC TK C OLTr UPSTRM CHECK                                                                                                                                                                      C4      SA    'CK        A,C    10    FS/SD      O/C  ACTIVE  EP-2 LT/RF EP8956D          St ACC TK D OUT UPSTRM CIECK                                                                                                                                                                        B4      SA        CK      A,C      10    FS/SD      O/C  ACrlVE  EP-2 LT/RF EPHV8808A        SI ACC TK A OLTF ISO                                                                                                                                                                                G-5    MO        GT      B      10    FS/CS O/C  ACTIVE  EP-5          !
                                                                                                                                                                                                                                                                  .            P:/RF EPHV8808B        SI ACCTK B OUTISO                                                                                                                                                                                  E-5 .
* MO ' UT            B      10      PI/RF      O  PASSIVE                a EPHV8808C        St ACC TK C OUTISO                                                                                                                                                                                  C-5    MO        GT      B      10      Pl/RF      O  PASSIVE I
Page 50                                                                l
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ACCUMULATOR SAFETY INJECTION SYSTEM (EP) -
DRAWING M-22EP01 VALVE                                          DESCRIPTION                                                                                                                              COOR                        ACT.      VLV VLV                    VLV  TESTS            SFTY        ACTIVE                                                      RR OR                                NOTES NUMBER                                                                                                                                                                                                                          TYPE CAT.                    SIZE  PERF/              POS              OR                                                  TST DEF (in) FREQ.                          PASSIVE                                                    JUST.
EPHV8808D  SI ACCTK D OUTISO                                                                                                                                                                B-5                          MO        GT  B                      10  FS/CS              O/C        ACFIVE                                                      EP-5 PI/RF EPHV8880    SI ACC TKS N2 SPLY HV                                                                                                                                                            A4                          AO        GB  A                        1  FS/Q              C          ACTIVE FT/Q PI/RF LI/RF EPHV8950A  SI ACC TK A VENT HV                                                                                                                                                              H-7                          SO        GB  B                        1  FS/CS              O          ACTIVE                                                      EP4 PI/RF EPHV8950B  SI ACC TK B VENT HV                                                                                                                                                              F-8                          SO        GB  B                        1  FS/CS              O          ACTIVE                                                      EP4 PI/RF EPHV8950C  St ACC TK B VENT HV                                                                                                                                                              F-7                          SO    ., GB  B                        1  FS/CS              O          ACTIVE                                                      EP4 s                                    PI/RF EPHV8950D  SI ACC TK C VENT HV                                                                                                                                                              O-8                          SO    J GB    B                        1  FS/CS              O          ACTIVE                                                      EP4 4
rURF EPHV8950E  SI ACC TK C VENT HV                                                                                                                                                              D-7                          SO        GB  B                        1  FS/CS              O          ^CTIVE                                                      EP4 PI/RF EPHV8950F  SI ACC TK D VENT HV                                                                                                                                                              C-8                          SO        GB  B                        1  FS/CS              O          ACTIVE                                                      EP4 FI/RF EPV0010    SI PMPS TO RCS COLD LEG LOOP 1 CHECK                                                                                                                                            G-3                          SA        CK  A,C                      2  FS/RF            O/C        ACTIVE                                                      EP-3                                                2 LT/RF EPV0020    SI PMPS TO RCS COLD LEG LOOP 2 CHECK                                                                                                                                            F-3                          SA        CK  A,C                      2  FS/RF            O/C        ACTIVE                                                      EP-3                                                2 LT/RF i
Page 51
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ACCUMULATOR SAFETY INJECTION SYSTEM (EP)
DRAWING M-22EP01 VALVE                DESCRIPTION                COOR      ACT.      VLV  VLV      VLV  TESTS  SFTY ACrlVE  RR OR  NOTES NUMBER                                                                TYPE    CAT. SIZE  PERF/  POS    OR    TST DEF (in) FREQ.      PASSIVE  JUST.
EPV0030    SI PMPS TO RCS COLD LEG LOOP 3 CHECK    D-3        SA        CK  A,C        2  FS/RF  O/C ACrlVE    EP-3    2 LT/RF EPV0040    SI PMPS TO RCS COLD LEG LOOP 4 CHECK    C-3        SA        CK  A,C        2  FS/RF  O/C ACTIVE    EP-3    2 LT/RF EPV0046    SI ACC TKS N2 SPLY CHECK                A-5        SA        CK  A,C        1  LJ/RF  C  PASSIVE                j l
                                                                                          .                                                          I
                                                                                          .                                                          l
:                                                          I l
l l
l Page 52
                                                                                                                                                    .i
 
    - _ _ _ . ~ . . . . _ - - - - _ _ _ _ _ _ _ - - - - - - - - - _ - _ _ - - - - _ _ - . _ - - - - _ _ _ _ _ - _ - _ - - - - - - - - _ _ - _ -
i.
I CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM AUXILIARY TURBINES -
AUXILIARY FEEDWATER PUMP TURBINE SYSTEM (FC)
DRAWING M-22FC02 VALVE                                            DESCRIPTION                          -
COOR  ACF. VLV  VLV              VLV  TESTS                                              SFTY                                                          ACTIVE  RR OR  NOTES  [
NUMBER                                                                                                    TYPE  CAT.            SIZE  PERF/                                                      POS                                                      OR    TST DEF        ;
(in) FREQ.                                                                                                              PASSIVE  JUST.
I FCFV0310                AFP TURB STMLINE DRN FLOW VLV                                                      D-7  AO        GB  B                  I  FS/Q                                                                C                                            ACTIVE FT/Q PI/RF FCHV0312                AFP TURB MECH TRIP /THROTllV                                                      F-5  MO        GT  B                  4  FS/Q                                                                O                                            ACTIVE Pl/RF                                                                                                                                    i FCV0001                MS LOOP 2 TO AFP TURB UPSTRM CIECK                                                G4    SA        CK  C                  4  FS/CS                                                      O/C                                                  ACTIVE    FC-1 FS/SD                                                                                                                                    ,
PS/Q -
FCV0002                MS LOOP 3 TO AFPTURD UPSTRM ClECK                                                  G4    SA        CK  C                  4  FS/CS                                                      O/C                                                  ACTIVE    FC-1
                                                                                                                                                                  ,                            FS/SD s                              PS/Q FCV0024                MS LOOP 2 TO AFPTURB DNSTRM CHECK                                                  G4    SA      , CK  C                  4  FS/CS                                                        O/C                                                  ACTIVE    FC-1 FS/SD                                                                                                                                    i PS/Q FCV0025              MS LOOP 3 TO AFP TURB DNSTRM CHECK                                                G4    SA        CK  C                  4  FS/CS                                                        O/C                                                  ACTIVE  FC-1 FS/SD PS/Q                                                                                                                                    ;
t Page 53
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CONTAINMENT HYDROGEN CONTROL SYSTEM (GS)
DRAWING M-22GS01 1
l VALVE                                                                                                                          DESCRIPTION                                                                            COOR                            ACT.                  VLV  VLV  VLV                      TESTS        SFTY    At,a VE                  RELIEF                    NOTES  l NUMBER                                                                                                                                                                                                                                                                          TYPE  CAT. SIZE                      PERF/        POS          OR            REQUEST                              i (in)                    FREQ.              PASSIVE                                                    !
GSHV0003                                                                        H2 ANALYZER B SPLY OIRERCTMTISO                                                                                                                                E4                            SO                GT    A          1                      FS/Q    O/C    ACTIVE IIV                                                                                                                                                                                                                                                    FT/Q PI/RF                                                                      ^
U/RF GSilV0004                                                                      H2 ANLZ B SPLY IN CIMT ISO IIV                                                                                                                                  E4                            SO                GT    A          1                      FS/Q      O/C    ACTIVE                                                  !
FT/Q                                                                      [
PI/RF U/RF                                                                        !
GSHV0005                                                                      H2 ANALYZERB SPLYINNERCTMTISO                                                                                                                                  D-5                            SO                GT    A          1                      FS/Q      O/C    ACTIVE ilV                                                                                                                                                                                                                                                      FT/Q                                                                      ;
PI/RF U/RF                                                                        !
GSHV0008                                                                      H2 ANALYZER B RTN OUTER CIMTISO                                                                                                                                B4                            SO              GT    A          I                    FS/Q    , O/C    ACTIVE                                                  ;
FT/Q                                                                      i ilV Pl/RF                                                                      5 U/RF                                                                        ;
GSHV0009                                                                      H2 ANLZ B RTN IN CTMTISO HV                                                                                                                                    B4                            SO              GT    A          I                    FS/Q      O/C    ACTIVE                                                  q IT/Q PI/RF U/RF GSHV0012                                                                      H2 ANALYZER A SPLY OUTERCTMTISO                                                                                                                                E-4                          SO              GT    A          1                      FS/Q    O/C    ACrlVE HV                                                                                                                                                                                                                                                    FT/Q PI/RF                                                                      ,
U/RF GSHV0013                                                                      H2 ANLZ A SPLY IN CTMTISO HV                                                                                                                                    E-5                          SO              GT    A          I                    FS/Q    O/C    ACTIVE FT/Q PI/RF U/RF t
Page 54 i
_ _ _ . _ _ _ . _ . . _ . . . - . _        _ .._-.c    . - .... ._ . . ~ . . . . . . _ _ _ _ . .
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CONTAINMENT HYDROGEN CONTROL SYSTEM (GS)
DRAWING M-22GS01 VALVE                                DESCRIPTION                                                                                                              COOR  ACT. VLV                  VLV          VLV  TESTS  SFTY At;11VE  RR OR  NOTES NUMBER                                                                                                                                                                        TYPE                  CAT.          SIZE  PERF/  POS    OR    TST DEF (in) FREQ.      PASSIVE  JUST.
GSHV0014  H2 ANLZ A SPLY IN CTMTISOllV                                                                                                                            D-5  SO      GT                          A        I  FS/Q  O/C ACTIVE FT/Q PI/RF U/RF GSilV0017  112 ANALYZER A RTN OITTER Cn1TISO                                                                                                                        B-4  SO      GT                          A        1  FS/Q  O/C ACTIVE HV                                                                                                                                                                                                                FT/Q PI/RF U/RF
                                                                                                                                        ~~
GSIIV0018  112 ANLZ A RTN IN CTMTISO HV                                                                                                                            B-5  SO      GT                          A        I  FS/Q  O/C ACTIVE FT/Q PI/RF U/RF GSIIV0020  112 PURGE IN CTMT150 IIV                                                                                                                                F-5  MO    ' BF                          A        6  FS/Q  O/C ACTIVE PI/RF U/RF GSHV0021  H2 PURGE OUTER CTMT ISO HV                                                                                                                              F-4  MO      BF                          A        6  FS/Q  O/C ACTIVE PI/RF U/RF GSHV0031    CTMT ATMS MON SPLY IN CTMTISO HV                                                                                                                        D-4  SO      GT                          A        I  FS/Q    C  ACTIVE FT/Q PI/RF U/RF GSHV0032    CTMT ATMS MON SPLY OITFER CTMTISO                                                                                                                      D-3  SO      GT                          A        1  FS/Q    C  ACTIVE HV                                                                                                                                                                                                              FT/Q PI/RF U/RF Page 55
                    -                                                  _                  _ _ _ _ . -                                    _ __ _ __ _ _ __ _ _ __                      . _ _ _ _ _ _ _ _ _ . _ _ _ _ _                _                _    ~ . . . . _ _
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CONTAINMENT HYDROGEN CONTROL SYSTEM (GS)
DRAWING M-22GS01 VALVE                                                    DESCRIPTION                                                      COOR    ACT.            VLV  VLV                    VLV    TESTS        SFTY Au nVE  RR OR  NOTES NUMBER                                                                                                                                            TYPE    CAT.                  SIZE    PERF/        POS    OR    TST DEF (in)    FREQ.            PASSIVE  JUST.
GSHV0033                                                CIMF ATMS MON RTN OUTER CTMTISO                                              C-4    SO              GT      A                    I      FS/Q        C  ACTIVE IIV                                                                                                                                        FT/Q PI/RF U/RF GSilV0034                                              CTMT ATMS MON RTN IN CTMTISO HV                                              C-4    SO              GT        A                    I      FS/Q        C  ACTIVE FT/Q PI/RF U/RF GSHV0036                                                CFMT ATMS MON SPLY IN CTMTISO HV                                            D-6    SO              GT        A                    I      FS/Q        C  ACTIVE YTIQ
'                                                                                                                                                                                                                PI/RF U/RF GSHV0037                                                CFMT ATMS MON SPLY OUTER CTMTISO                                            D-7    SO            :GT        A                    1      FS/Q        C  ACTIVE IIV FT/Q 2                                        PI/RF U/RF GSHV0038                                                CFMT ATMS MON RTN OUTER CTMTISO                                              C-6    SO              GT        A                  1      FS/Q        C  ACTIVE HV                                                                                                                                          FT/Q PI/RF U/RF GSIIV0039                                              CTMT ATMS MON RTN IN CTMTISO HV                                              C-6    SO              GT        A                  I      FS/Q        C  ACTIVE FT/Q PI/RF U/RF Page 56
_ _ - _ _ - _ _ _ - _ . - _            __-_-_ mum __ ._ . __.m__.___ s.--._..____a-ma._ _ _ _ _ _    -
_  _ - - - - _ _ _ _ _ .      +n-r    e-e -
* CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM                                                                                                                                                                                                                                                              !
i CONTAINMENTPURGE SYSTEM (GT)
DRAWING M-22GT01 3
k VALVE                                                                        DESCRIPTION                                                                                                                                                    COOR                                                    ACT.                                                VLV                                        VLV                        VLV          TESTS  SFTY        ACTIVE          RR OR    NOTES TYPE                                            CAT.                      SIZE          PERFI  POS            OR          TST DEF .
NUMBER (in)        FREQ.              PASSIVE          JUST.
GTIIZ0004                  CTMT MINI PURGE AIR SPLY OUTER CTMT                                                                                                                                                                                          D-4                                                  SO                                                BF                                          A                        18        FS/Q  C          ACTIVE                                          i DMPR                                                                                                                                                                                                                                                                                                                                                                                                                  FT/Q PI/RF U/RF GTIIZ0005                    CTMT MINI PURGE AIR SPLY INNER CTMT                                                                                                                                                                                          A-5                                                  SO                                                BF                                          A                        18        FS/Q  C          ACTIVE                                          ,
UPSTRM DMPR                                                                                                                                                                                                                                                                                                                                                                                                          FT/Q PI/RF U/RF C        'AS*^ cms GT11Z0006                    CTMT S/D PURGE AIR SPLY OUIER CTMT                                                                                                                                                                                          C-4                                                  SO                                                BF                                          A                        36        PI/RF                                                  y Active DMPR                                                                                                                                                                                                                                                                                                                                                                                                                  FS/Q                                                              ,
Act,ve i                                        i FT/Q U/RF            PAssivarAcitvs PA5StVE/ACHVE GTH20007                    CTMT S/D PURGE AIR SPLY INNER CTMT DMPR                                                                                                                                                                                      C-5                                                  SO                                                BF                                        A                        36        P!/RF  C                                              g
                                                                                                                                                                                                                                                                                                                                                            ,                                                                                          p3jg                Active                                          L Active s                                                                                            FT/Q U/RF            rAssrvstArnt
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                ~
C        P^58" !.rivs                          y GTIIZ0008                    CTMT S/D PURGE EXilINNER CTMT DMPR                                                                                                                                                                                            C-6                                                  SO                                                BF                                        A                        36        PI/RF pq                  ~ . ave AC'8''                                        l FTQ U/RF            PASSIVE / ACTIVE A                        36        P1/RF  C        FAEWACME                              g G11120009                    CTMT S/D PURGE EXII OUTER CTMT DMPR                                                                                                                                                                                          C-7                                                  SO                                                BF                                                                                                                                                1 p3fg                Active                                        !
Active FT/Q U/RF            rassrvvacmt CTMT MINI PURGE EXil INNER CTMT DNSTRM                                                                                                                                                                                        A-6                                                  SO                                                BF                                          A                        18        FS/Q    C          AC11VE GTHZ0011 DMPR                                                                                                                                                                                                                                                                                                                                                                                                                  FT/Q                                                              !
PI/RF U/RF GllIZ0012                    CTMT MINI PURGE EXilOUTER CTMT DMPR                                                                                                                                                                                            A-7                                                  SO                                              BF                                          A                        18        FS/Q    C          ACTIVE FT/Q PI/RF Page 57
 
                                                                                          ~
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM LIQUID RADWASTE SYSTEM (HB)
DRAWING M-22HB01 VALVE              DESCLPTION                                                                            COOR                                    ACT.                                VLV                                  VLV                              VLV    TESTS          SFTY ACTIVE          RR OR          NOTES NUMBER                                                                                                                                                                                    TYPE                                  CAT.                              SIZE    PERF/          POS    OR          TST DEF (in) FREQ.              PASSIVE          JUST.
HBilV7126                        RCDTTO GRW CMPSRIN CFMTIIV                                                                                G-6                                  AO                                    DI                                    A                          0.75    FS/Q            C  ACTIVE FT/Q PI/RF U/RF HBlIV7136                        RCDT HX OUTllDR OUTER CTMT HV                                                                            F-3                                  AO                                    DI                                    A                              3  FS/Q            C  ACTIVE FTIQ PI/RF U/RF IIBilV7150                      RCDT OlTTTO GRW SYS OUTER CTMT HV                                                                        G-5                                    AO                                  DI                                    A                            0.75  FS/Q            C  ACriVE FT/Q PI/RF U/RF HBilV7176                      RCDT HX OUT HDRIN CTMTISOIIV                                                                              F-3                                  AO
* DI                                          A                            3  FS/Q            C  ACTIVE
:                                                                                FTIQ PI/RF U/RF 4
Page 58
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM DECONTAMINATION SYTEM (HD)
DRAWING M-22HD01 VALVE                                DESCRIPTION                  COOR          ACT. VLV  VLV          VLV                TESTS                    SFTY At a nVE                  RR OR                                              NOTES NUMBER                                                                                    TYPE  CAT.          SIZE                PERF/                  POS          OR              TST DEF (in)              FREQ.                        PASSIVE                  JUST.
HDV0016                RX IEAD DECON AUX STM SPLY OLTTER                          B-7  MA      GB            A    2                    U/RF                  C  PASSIVE CTMTISO HDV0017                RXIEAD DCON AUX STEAM SPLY IN                              B-7  MA      GB            A    2                    U/RF                  C  PASSIVE CTMTISO Page 59
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM l
EMERGENCY FUEL OIL SYSTEM DRAWING M-22JE01                                                                                                                                                                                                                                  :
COOR  ACT. VLV                                                            VLV                                                          VLV      TESTS  SFTY ACTIVE  RR OR  NOTES VALVE                                      DESCRIPTION TYPE                                                          CAT.                                                          SIZE      PERF/  POS    OR    TST DEF NUMBER (in)  FREQ.        PASSIVE  JUST.
EMERG F.O. DAY TK A IN CIECK                                        H-5    SA          CK                                                                      C                                                    2    FS/Q    O  ACTIVE JEVC385 ENERG F.O. DAY TK B IN CIECK                                        D-5    SA          CK                                                                      C                                                    2    FS/Q    0  ACTIVE JEV0036 r
t a
e L
t Page 60
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPRESSED AIRSYSTEM(KA)
DRAWING M-22KA01 VALVE                                DESCRIPTION                                                    COOR                                                    ACT.                VLV                VLV      VLV  TESTS    SFTY                                          ACTIVE    RROR  NOTES NUMBER                                                                                                                                                                        TYPE                  CAT.      SIZE  PERF/    POS                                              OR    TST DEF (in) FREQ.                                                  PASSIVE  JUST.
KAFV0029              RX BLD INST AIR SPLY FLOW CTRL VLV                                                            B-1                                                AO              GB                        A    2  FS/CS      C                                          ACTIVE    KA-1 FT/CS PI/RF U/RF KAV0204                RX BLD INST AIR SPLY CIIECK                                                                  B-1                                                  SA            CK                  A,C      1.50 FS/RF      C                                          ACrlVE    KA-2 U/RF Page 6I
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPRESSED AIR SYSTEM (KA)
! DRAWING M-22KA02 VALVE              DESCRIPTION                            COOR                    ACT. VLV  VLV  VLV        TESTS          SFTY                      ACTIVE                                                        RR OR    NOTF5 NUMBER                                                                                      TYPE  CAT. SIZE        PERF/            POS                                          OR                                      TST DEF (in)      FREQ.                                  PASSIVE                                                        JUST.
KAV0039    RX BLD SERV AIRIIDR SPLY CIIECK                                D-6          SA        CK  A      4        U/RF            C                      PASSIVE KAV0ll8    RX BLD SERV AIRIIDR SPLY OUTER CTMT                            D-6          MA        GB  A      4        U/RF            C                      PASSIVE ISO                                                                                                                                                                                                                      j 6
e Page 62
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPRESSED AIRSYSTEM(KA)
DRAWING M-22KA05 DESCRIPTION                                COOR  ACT. VLV          VLV                  VLV                      TESTS  SFTY AL.IaVE                    RR OR                                              NOTES VALVE NUMBER                                                                                                                                                      TYPE          CAT.                SIZE                      PERF/  POS    OR                  ,
TST DEF (in)                  FREQ.      PASSIVE                    JUST.
KAV0648                                SG A AFW CTRI1MS ATMS RELIEF VLVS                                                                        G-6  SA        CK        A                    0.75                    LT/RF    C  PASSIVF.                                                                            l N2 SPLY ACC IN KAV0649                                SG C AFW CFRIlMS ATMS RELIEF VLVS                                                                        F-5  SA        CK        A                    0.75                  LT/RF    C  PASSIVE N2 SPLY ACCIN KAV0650                                SG B AFW CTRI1MS ATMS RELIEF VLVS                                                                        D-6  SA        CK        A                    0.75                  LT/RF    C  PASSIVE N2 SPLY ACC IN KAV0651                                SG D AFW CTRUMS ATMS RELIEF VLVS                                                                          B-5  SA        CK        A                    0.75                    LT/RF  C  PASSIVE N2 SPLY ACC IN t
Page 63
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM FIRE PROTECTION SYSTEM (KC)
DRAWING M-22KC02 DESCRIPTION                      COOR  ACT. VLV  VLV    VLV  TESTS  SFTY      ACTIVE                RR OR    NOTES VALVE TYPE  CAT. SIZE  PERF/    POS      OR                  TST DEF NUMBER (in) FREQ.            PASSIVE                JUST.
A        4  U!RF          C PASSIVE                                      's KCilV0253              F-PROT LOOP TO RX BLD OUTER CTMT              B-6    MO        GT DNSTRM ISO FIRE PROT LOOP TO RX BLD IN CTMT              B-6    SA        CK  A        4  U/RF          C PASSIVE lCCV0478 CHECK                                            ..
I I
1 Page 64 t_________.._._ _ _ _ _ _ _ ______ _ _      __      _ _ _ _ _ _ _ _ _ _  __                .        _.
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM STANDBY DIESEL GENERATOR SYSTEM (KJ)
DRAWING M-22KJ02 DESCRIPTION                    COOR  ACT. VLV  VLV  VLV  TESTS      SFTY  At. a nt'E  RR OR    NOTES VALVE TYPE  CAT. SIZE  PERF/          POS    OR      TST DEF NUMBER (in) FREQ.              PASSIVE    JUST.
DG A STARTING AIR SPLY PRESS CIRL                    F-3  SO        SV  B  0.375  FS/Q          O  ACTIVE      KJ-l KJPV0001A VLV A                                                                                PI/RF .                                      ,
DG A STARTING AIR SPLY PRESS CTRL                    F-3  SO        SV  B  0.375  FS/Q          O  ACTIVE      KJ-l KJPV0001B VLV B                                                                                PI/RF DG STARTING AIR TK A AIR SPLY CIECK                  C-2  SA        CK  C  0.75  FS/Q          C  ACTIVE KJV0711A DG STARTING AIR TK B AIR SPLY CIECK                  D-5  SA        CK  C  0.75  FS/Q          C  ACIIVE KJV0712A 4
l L
i i
Page 65
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM STANDBY DIESEL GENERATOR SYSTEM (KJ)
DRAWING M-22KJ05                                                                                                                                                                                                                                                                                                                                                          r i
VALVE                                                          DESCRIPTION                                                                      COOR                                      ACT. VLV                VLV  VLV                            TESTS                                                            SFTY        ACTIVE      RR OR  NOTES    i NUMBER                                                                                                                                                                                            TYPE                  CAT. SIZE                              PERFI                                                          POS            OR      TST DEF          '
(in)                            FREQ.                                                                      PASSIVE    JUST.
KJPV0101A                DG B STARTING AIR SPLY PRESS CTRL                                                                                                        F-3                          SO      SV                  B  0.375                                    FS/Q                                                    O          ACTIVE      KJ-l          ,
VLV A                                                                                                                                                                                                                                          Pl/RF                                                                                            >
KJPV0101B                DG B STARTING AIR SPLY PRESS CTRL                                                                                                        F-3                          SO      SV                  B  o.375                                    FS/Q                                                    O          ACTIVE      KJ-l VLV B                                                                                                                                                                                                                                          PI/RF -
KJV0711B                DG STARTING AIRTK C AIR SPLY CIECK                                                                                                      B-2                          SA      CK                  C  0.75                                      FS/Q                                                    C          ACTIVE KJV0712B                DG STARTING AIRTK D AIR SPLY CllECK                                                                                                    D-5                          SA      CK                  C  0.75                                      FS/Q                                                    C          ACTIVE
                                                                                                                                                                                                                                                                                                                                                                                      ?
E a
4 i
Page 66 t
 
. ... . . . . _ _ _                                                    m_                      _ . . _ . - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - -
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR BUILDING AND HOT MACHINE SHOP FLOOR AND EQUIPMENT DRAIN SYSTEM (LF)
DRAWING M-22LF03 VALVE                                                                                                                                              DESCRIPTION                      COOR  ACT.      VLV VLV  VLV                TESTS  SFTY A t.n V E      RR OR  NOTES NUMBER                                                                                                                                                                                            TYPE  CAT. SIZE                PERF/  POS    OR        TST DEF (in)              FREQ.      PASSIVE        JUST.
LFIIV0105                                                                      DRW SMPS DISCHIIDR DNSTRM llV                                                                                  C-5  MO        GA  B      6                FS/Q    C  ACTIVE PI/RF LFilV0106                                                                      DRW SMPS DISCH HDR UPSTRMllV                                                                                    C-5  MO        GA  B      6                FS/Q    C  AUIIVE PI/RF 5
Page 67
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR BUILDING AND HOT MACHINE SHOP FLOOR AND EQUIPMENT DRAIN SYSTEM (LF)
DRAWING M-22LF09 VLV      VLV                      VLV                  TESTS  SFTY ActnVE        RR OR      NOTES VALVE                                                                                      DESCRIPTION                                                                                                                                        COOR  ACT.
TYPE        CAT.                    SIZE                  PERF/  POS    OR        TST DEF NUMBER                                                                                                                                                                                                                                                                                                                              PASSIVE      JUST.
(in)              FREQ.
i F-2  MO        GA            A                        6              FS/Q    C  ACTIVE LFFV0095                          CTMT NORM SMP PMPS DISCH HDR CTMT PI/RF FV U/RF                                      ,
F-2    AO      GL            A                        6              FS/Q    C  ACTIVE
'                  LFFV0096                          CTMT NORM SMP PMPS DISCH HDR AUX 11LD FCV FT/Q PI/RF U/RF l
Page 68
 
s CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM
; NUCLEAR SAMPLING SYSTEM (SJ)
; DRAWING M-22SJ01 VALVE                                      DESCRIPTION                                                                                                    COOR ACT. VLV VLV  VLV                      TESTS  SFTY        AtuvE    RR OR    NOTES NUMBER                                                                                                                                                                    TYPE CAT. SIZE                    PERF/    POS          OR    TST DEF (in)                    FREQ.              PASSIVE  JUST.
SJHV0012            PZR VAPOR SAMPIN CTMTISOIIV                                                                                                                F-7  SO      -GB  A      1                      FS/Q          C  ACTIVE FTQ PI/RF U/RF SJilV0013            PZR VAPOR SAMP OUT CFMTISO HV                                                                                                              E-7  SO      GB  A      1                      FS/Q          C  ACTIVE FT/Q Pl/RF U/RF SJHV0018            ACC SAMP IN CTMT ISO HV                                                                                                                    F-3  SO      GB  A      1                      FS/Q          C  ACTIVE FT/Q PI/RF                                      ,
U/RF                                        i SJHV0019            ACC SAMP OUT CFMTISO HV                                                                                                                    E-3  SO
* GB  A      1                      FS/Q          C  ACTIVE FT/Q PI/RF                                      $
U/RF                                        t l
i Page 69
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM NUCLEAR SAMPLING SYSTEM (SJ)
DRAWING M-22SJ04 DESCRIPTION              COOR                                          ACT.          VLV VLV  VLV  TESTS            SFTY                          ACTIVE                                          RR OR  NOTES VALVE NUMBER                                                                                                    TYPE  CAT. SIZE  PERF/              POS                                OR                                  13T DEF (in) FREQ.                                        PASSIVE                                            JUST.
SJHV0005    PASS HOT LEG 1 SAMP IN CTMT DNSTRM      F-7                                                SO      GL  A      1  FS/Q                    C                      ACTIVE ISO HV                                                                                                            FTA2 PI/RF U/RF SJHV0006    PASS HOT LEG 1 SAMP OUT CIMTISO TRN    F-6                                                SO      GL  A      1  FS/Q                    C                      ACTIVE AHV                                                                                                                FT/Q-PI/RF U/RF SJHV0127    PASS IIOT LEG 1 SAMP OUT CTMTISO TRN    F-6                                                SO      GL  A      1  FS/Q                    C                      ACTIVE BHV                                                                                                                FT/Q PI/RF U/RF SJHV0128    PASS PZR & RCS SAMP IN CTMTISO HV      H-6                                                SO      GL  A      1  FS/Q                    C                      ACrlVE
                                                                                                              ,'                FT/Q PI/RF LJ/RF SJHV0129    PASS PZR & RCS SAMP OUT CTMTISO TRN    H-5                                                SO      GL  A      1  FS/Q                    C                      ACTIVE BHV                                                                                                                FT/Q PI/RF U/RF SJHVO130    PASS PZR & RCS SAMP OUT CTMTISO TRN    G-5                                                SO      GL  A      1  FS/Q                    C                      ACTIVE A HV                                                                                                              FT/Q PI/RF U/RF SJHV0131    PASS TO RCDT OlTT CIMTISO PROT A HV    B-6                                                SO      GL  A      1  FS/Q                    C                      ACTIVE FT/Q PI/RF U/RF Page 70
 
CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM NUCLEAR SAMPLING SYSTEM (SJ)
DRAWING M-22SJ04 VALVE                                          DESCRIPTION                                                        COOR ACT.          VLV      VLV    VLV  TESTS      SFTY      AtanVE          RR OR NOTES NUMBER                                                                                                                              TYPE        CAT. SIZE  PERF/        POS      OR        TST DEF (in) FREQ.                PASSIVE        JUST.
SJHV0132      PASS TO RCDT OUT CTMTISO PROT B HV                                                                        A-6  SO            GL        A        1  FS/Q              C ACTIVE FT)Q Pl/RF U/RF SJV0lli      l PASS TO RCDT IN CTMT GECK                                                                                A-7  SA            CK        A,C      1  U/RF              C ACTIVE Page 71
__._m.__ _ _ _ _ _ _ _ _ _ _ __ . - . . _ . _ . _ _ . _ _ _ _ _ . _ . _ _ _ _ _ _  _ _ _ _ _ _ _ _        _ _ _ _        _ _ _      __        - , _- -- __ _ ,          , . - -        __ _ , _ _ _ _ --
 
l SECTION 2.3 l
l        RELIEF REQUESTS l                OR l  TEST DEFERRAL JUSTIFICATIONS FOR VALVE TESTING l
l i
1
 
AB-01 COLD SHUTDOWN JUSTIFICATION VALVE:                ABPV00001, 2, 3, 4 CATEGORY:            B CLASS:                2 FUNCTION:            Steam generator power operated reliet valve.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function, stroke time, and verify fall safe actuation every 3 months.
BASIS FOR RELIEF:    Exercising (full or partial stroke) th6se valves during power operation would cause a decrease in pressure in the respective main steam header. This would introduce a severe transient in the main steam header which is unacceptable from an operational viewpoint.
ALTERNATE TESTING:    Valve will be exercised (full stroke) to the position required to fulfill its function, stroke timed and fait safe actuation verified during cold shutdown.                  . . . .
l l
1 I
T Page1
 
AB-02 '
COLD SHUTDOWN JUSTIFICATION VALVE:                ABHV0011,14,17,20 CATEGORY:            B CLASS:                2 FUNCTION:            Main steam isolation valves TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function, stroke time, and verify fait safe actuation every 3 months.
BASIS FOR RELIEF:    Closure (full stroke) of these valves during power operation would introduce a severe transient in the main steam lines which is unacceptable from an operational viewpoint. Testing by isolating each main steam header is also possible but would cause a power reduction which is also unacceptable from an operational viewpoint. Partial stroke exercising these valves is also impracticable because 'even a part-stroke exercise increases the risk of a valve closure when the unit is generating power' per NUREG-1482 Section 4.2.4, ALTERNATE TESTING:    This valve will be exercised (full stroke) to the position required to fulfill its function, stroke timed, and fall safe actuation verified at cold l
shutdown.
l l
  }
e Page 2
 
l l
AB-03 l                                                                                                      i l
REFUELING IUSTIFICATION VALVE:                ABV0007,18, 29, 40, ABV0085,87 CATEGORY:            B CLASS:                2 FUNCTION:              Remain open in the absence of a steam generator tube rupture. To be manually closed following a steam generator tube rupture to mitigate offsite radiological dose.
TEST REQUIREMENT:    The subject valves are manual valves that do not have remote position indication; therefore, the only required test is to manually stroke the valves closed. This is impracticable to perform on a quarterly basis as      ,
no trendable data is obtained with this test so no value is gained by stroking the valves quarterly - the direction of the OM committee at this    ,
time is to stroke manual valves no more than on a cold shutdown frequency. Additionally, since the probability of these valves falling is so low, they are not even niodbled in Callaway's PRA. Also, closing ABV0085 or ABV0087 makes the Turbine Driven Auxiliary Feedwater Pump inoperable, causing entry into a T.S. LCO, incurring additional safety system unavailability.
ALTERNATE TESTING:    These valves will be stroked to the closed position during refueling outages, i
l l
                                                                      ~
l Page 3
 
AE-01 REFUELING JUSTIFICATION VALVE:            AEV0120,121,122,123 CATEGORY:          C CLASS:            2 FUNCTION:          Close to prevent blowdown of steam generators following Feedwater Pipe Rupture.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  Exercising these valves (full or partial stroke) during power operation would require isolation of Feedwater to the steam generator which would result in a severe transient in the steam generator, possibly causing a unit trip.
l ALTERNATE TESTING:  Each valve of this group will be tested at refueling to prove valve I
closure capabilities.        .
I i
l I
!                                                                                                l i
1 Page 4
 
AE-03 Cold Shutdown Tustification VALVE:            AEV0124,125,126,127 CATEGORY:          C CLASS:            2 FUNCTION:          Open to pass flow from motor driven and turbine driven auxiliary feedwater pumps to steam generators.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  Exercising these valves (full or partial stroke) would result in feeding cold water into the steam generators. This is not desirable during power operation since flow through these valves would unnecessarily thermally shock the steam generator feedwater nozzles.
I ALTERNATE TESTING:  Exercise check valve (full stroke) to the position required to fulfill its function at cold shutdown. ,,
i I
I 1
t Page5
 
AE-04 COLD SHUTDOWN TUSTIFICATION VALVE:                AEFV0039,40,41,42 CATEGORY:            B CLASS:                2 FUNCTION:            Isolates main feedwater piping from the steam generators upon receipt of a feedwater isolation signal.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function, stroke time, and verify fail safe actuation every 3 months.
BASIS FOR RELIEF:    Closing (full stroke) these valves during power operation is considered impractical from an operating viewpoint.          Closure would isolate feedwater to the steam generator which may result in a severe transient in the steam generator, possible causing a unit trip. Partial stroke exercising these valves is also impracticable because 'even a part-            i I
stroke exercise increases the risk of a valve closure when the unit is generating power' as stated in NUREG-1?B2 Sectic9 4.2.4 for the Main Steam isolation ValvesTbdt th!: same justification appiies for these          ,
valves as well.                                                                l 1
  - ALTERNATETESTING:    Valve will be exercised (full stroke) to the position required to fulfill hs  l j
function, stroke timed, and fait safe actuation verified at cold shutdown.
i f
I l
I i
Page 6
 
i l
l l                                        AL-01 i
COLD SHUTDOWN JUSTIFICATION l
VALVE:                ALV0001, V0002, V0003, V0030, V0033*, V0036*, V0042, V0045*,
V0048*, V0054, V0057*, V0062*, V0067*, V0072 l
                          - Class 2 CATEGORY:            C CLASS:                2 and 3 FUNCTION:            Opens on flow from the auxiliary feedwater pumps to provide flow to the Steam Generators. ALV0030, 42, 54 close to prevent reverse flow through parallel pumps.
TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Exercising these valves open (full or partial stroke) would result in feeding cold water into the steam generators. This is not desirable during power operation since flow through these valves would unnecessarily thermally ~sho'ck the steam generator feedwater nozzles, in regards to closure testing of ALV0030, 42, 54, per NUREG-1482 response to question group 24, 'If a valve performs a safety function in both the open and closed positions, however, the code requires that the valve be exercised to the open position and then verified to close'. As discussed above, since ALV0030,42,54 are exercised open only on a cold shutdown frequency, the closure test of these valves will be performed on a cold shutdown frequency as well.
ALTERNATE TESTING-    Exercise check valve (full stroke) to the positions required to fulfill its function at cold shutdown.
l l
l I
Page 7                                                    :
 
BB-01 REFUELING TUSTIFICATION VALVE:            BB8948A, B, C, D CATEGORY:          A, C CLASS:              1 FUNCTION:          Opens on flow from the cold leg accumulators, safety injection pumps or residual heat removal pumps to provide flow to the reactor coolant system cold legs.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  These valves cannot be full or partial stroke exercised during power operations since safety injection pump discharge pressure cannot overcome reactor coolant system pressure.
ALTERNATE TESTING:  Exercise check valve (full stroke) to the position required to fulfill its function at refueling.  ,
i i
l i
Page 8 l
0
 
BB-02 REFUELING IUSTIFICATION VALVE:            BB8949A, D CATEGORY:          A, C CLASS:              1 FUNCTION:          These vaives open to provide hot leg recirculation flow from the safety injection pumps.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  Valves cannot be full or partial stroke exercised during power operation since the only flow path discharges into the resefor ene!:nt system.
Safety injection pump discharge pressure cannot overcome reactor coolant system pressure. During cold shutdown these valves cannot be full or partial stroke exercised since this could result in a low temperature overpressurization of the reactor coolant system.
                                                      ~
ALTERNATE TESTING:  Exercise check valve (full' stroke) to the position required to fulfill its function at refueling.
G Page 9
 
l BB-03                                                        ,
COLD SHUTDOWN JUSTIFICATION l
l  VALVE:                        BB8949B, C CATEGORY:                      A, C t
!  CLASS:                        1 i
l  FUNCTION:                      Open on flow from the residual heat removal pumps to the reactor coolant hot legs.
TEST REQUIREMENT:              Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:              Valves cannot be full or partial stroke exercised during power operation since the only flowpath discharges into the reactor coolant system.
Residual Heat Removal Pur.ip Discharge Pr9ssure or Safety injection Pump Discharge Pressure cannot overcome reactor coolant system pressure.
ALTERNATE TESTING:            Exercise check valve (' full'st'roke) to the position required to fulfill its function at cold shutdown.
l l
l Page 10
 
BB-04
:                    REFUELING TUSTIFICATION l
l VALVE:              BBV0001, 22, 40, 59 CATEGORY:          C CLASS:              1 FUNCTION:          These valves open on flow from the Centrifugal Charging Pumps.
TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Exercising these valves (full or partial stroke) would require using a centrifugal charging pump to provide flow which would result in injection of borated water into the Reactor Coclant System thereby causing a power decrease and thermal shock to the reactor coolant piping. During cold shutdowns exercising (full or partial stroke) this valve could result in a low temperature overpressurization of the reactor coolant system.
ALTERNATE TESTING:  Exercise check valve (full stroke) to the position required to fulfill its function at refueling.                                                          ,
1 l
l                                                                                                      l l
l l
l l
l l
l
,                                                                                                      l J
Page 11
 
1 l
l l                                                  BB-05 i
1 COLD SHUTDOWN JUSTIFICATION l                                                                                                                I l
BBHV8001 A, B, and BBHV8002A, B                                                  !
VALVE:
COMPONENT:            B                                                                                l i        CLASS:                2 FUNCTION:            High Point Vents on the RCS                                                      i l
TEST REQUIREMENT:    Exercise valve to the position required to fulfill its function every 3 months.
I l        BASIS FOR RELIEF:    if stroked (full or partial stroke) during plant operation, failure of a valve
!                              in the open position would put the reactor in a potential small break LOCA sliuation. Stroking one of these valves open would result in              l relying on one valve for RCS pressure boundary. Also, no matter what i                              sequence of testing is used exercising these valves would result in            -
venting out some RCS water directly to the containment atmosphere.            i This would necessitate installation of a vent rig to control the effluent,    e l                              The vent is not accessible for installation of a vent rig due to radiation l                              concems during operatio'ni ' '                                                l ALTERNATE TESTING:    Valves will be exercised and stroke timed during cold shutdown.
l l                                                                                                              :
d i
l
* l
:                                                                                                              t i
I i
Page 12
 
BB-06 COLD SHUTDOWN TUSTIFICATION 1
VALVE:                    BBPV8702A, B CATEGORY:                  A CLASS:                    1 FUNCTION:                  Valves open to provide suction to Residual Heat Removal Pumps during normal unit cooldown.
TEST REQUIREMENT:          Exercise valve (full stroke) to the position required to fulfill its function    i and stroke time every 3 months.
BASIS FOR RELIEF:          These valves have an interlock which prevents their opening (full or partial stroke) when Reactor Coolant System pressure is above approximately 360 PSIG to prevent over-pressurization of the RHR                i system.                                                                          l ALTERNATE TESTING:        Valve will be exercised (full stroke) to the position required to fulfill its    ,
function and stroke timed during cold shutdown.
I f
I l
Page 13
 
                  .-      . . .  .-..                  .. _ _ _ . . _ - - - - ~ .
t k
t BB-07 REFUELING TUSTIFICATION VALVE:                BBV0118,148,178,208 CATECORY:              A, C CLASS:                2 FUNCTION:              Provides containment isolation.
TEST REQUIREMENT:      Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:      Closure testing (full or partial stroke) requires isolation of RCP seal injection which could cause RCP seal failure and a subsequent LOCA.
ALTERNATE TESTING:      Exercise check valve (full stroke) to the position required to fulfill its function at refueling.
I e
Page 14
 
BB-08 l                                                                                                                    i REFUELING TUSTIFICATION                                                                :
1 l                                                        .
VALVE:                    BBHV0013,14,15,16 CATEGORY:                  B CLASS:                    3                                                                                    i FUNCTION:                  Isolates flow to the reactor coolant pump thermal barriers.
TEST REQUIREMENT:          Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.
BASIS FOR RELIEF:          Failure of this valve in the closed position (full or partial stroke) during testing would inhibit flow to the reactor coolant pump thermal barriers.
This could result in unit shutdown and possible damage to the reactor                i coolant pump seals and pump radial bearings.
l ALTERNATE TESTING:        Valve will be exercised (full stroke) to the position required to fulfill its        ,
function and stroke timed during reactor refueling outages.
:,.,                                                      i i
l i
l l
l l
                                                                                .                                    1 I
l Page 15
 
i I
I BB-10 1
COLD SHUTDOWN IUSTIFICATION i
VALVE:                BBPCV0455A,456A                                                              l CATEGORY:            B CLASS:                1 FUNCTION:            Pressurizer Power Operated Relief Valve TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.
BASIS FOR RELIEF:    The PORVs, BBPCV0455A and BBPCV0456A, should not be opened l                      (full or partial stroke) during normal operation. If they are opened, it could cause depressurization of the RCS and too rapid of a pressure transient. If the PORV block valves are closed, there is not enough
!                      pressure to open the PORVs.
l
! ALTERNATE TESTING:    Valve will be exercised (full stroke) to the position required to fulfill its function and stroke time,d,during cold shutdown.
l i
;                                                                                                    i l
l Page 16 I
 
BB-11                                                      l I
REFUELING TUSTIFICATION i VALVE:                      BBV0122,152,182,212 BBV0474,476,479,480 CATEGORY:                    C CLASS:                      3 FUNCTION:                    Close on reverse flow to isolate flow during Reactor Coolant Pump Thermal Barrier Cooling Coil rupture accident.
TEST REQUIREMENT:            Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:            Testing these check valves in the safety-related closed direction (full or partial stroke) requires isolating cooling water to the Reactor Coolant Pumps' (RCP) Thermal Barrier Cooling Coils and Motor Coolers. This function is required when the RCPs are operating. Loss of RCP seal        e injection without Thermal Barrier Coolant would cause catastrophic RCP      ,
l                              seal failure and a subsequent,Small Break Loss of Coolant Accident.          )
Loss of RCP motor cooling would result in catastrophic motor failure which would cause a loss of forced RCS flow. The cooling water to the RCPs is provided by a common header, therefore testing cannot be performed until all four RCPs are off, which does not occur except during reactor refueling outages.
ALTERNATE TESTING:          Valves will be exercised (full stroke) to their safety-related closed position during reactor refueling outages.
s Page 17
 
BB-12 REFUELING TUSTIFICATION VALVE:            BB8378A, B BB8379A, B CATEGORY:          C CLASS:            1 FUNCTION:          Close to maintain RCS pressure boundary TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its safety-related function every 3 months.
BASIS FOR RELIEF:  Testing these check valves in the safety-related directiori Gull or partial stroke) requires access to the valves and isolation et the normal or attemate charging paths. The normal charging pats is in continuous operation with the attemate charging line as a backup. These valves are located behind the bioshield and entry behind the bioshield during power operation would cause unnecessary radiation exposure and would not support ALARA. Furthermore, in order to reduce high area radiation levels check valves BBV0001, 22, 40, and 59 must be flushed to eliminate crud traps. As stated in Refueling Justification #BB-04 it is not desirable to flow (full or partial stroke) through BBV0001,22,40, or 59 during cold shutdowns due to low temperature overpressurization concems.
ALTERNATE TESTING: Valves will be exercised (full stroke) to their safety-related closed position during reactor refueling outages.
l Page 18
 
I l
BB-13                                                        l l
REFUELING JUSTIFICATION                                                      j i
VALVE:                  B BV0120,121,150,151,180,181, 210, 211 CATEGORY:              C CLASS:                  1 FUNCTION:              Close to maintain RCS pressure boundary TEST REQUIREMENT:      Exercise check valve (full stroke) to the position required to fulfill its safety-related function every 3 months.
B ASIS FOR RELIEF:      Testing these check valves in the safety-related direction (full or partial stroke) requires isolation of RCP seal injection which could cause RCP seal failure and a subsequent LOCA.
ALTERNATE TESTING:      Valves will be exercised (full stroke) to their safety-related closed position during reactor refueling outages.
i I
l i
i Page 19
 
BG-01 REFUELING TUSTIFICATION
!    VALVE:                BG8381 CATEGORY:            A, C CLASS:                2 FUNCTION:            Provides containment isolation.
TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Testing this valve closed (full or partial stroke) would require isolation of charging flow to the RCS which is undesirable from a plant operational perspective.
l    ALTERNATE TESTING:    Exercise check valve (full stroke) to the position required to fulfill its function at refueling.
l l
l l                                                                          .
l Page 20 l
t
 
BG-02 REFUELING TUSTIFICATION VALVE:            BGHV8112,8100 CATEGORY:          A CLASS:            2 FUNCTION:          These valves isolate the retum flow path from the reactor coolant pump seal water supply.
TEST REQUIREMENT:  Exercise valve (full stroke) to the position required to fulfill its function and s%e time every 3 months.
BASIS FOR RELIEF:  Closure of one of these valves (full or partial stroke) durir.g power operation would inhibit seal water flow across the reactor coolant pump      l seats. This could result in damage to the pump seals and consequently        !
I cause a LOCA.
ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its j function and stroke time,d during reactor refueling outages.
l I
i t
Page 21
 
B C-03 COLD SHUTDOWN TUSTIFICATION VALVE:                BGHV8160,8152 CATEGORY:            A CLASS:                2 FUNCTION:            Provides containment isolation.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.
BASIS FOR RELIEF:    Failure of this valve in the closed position during testing (full or partial stroke) would result in loss of pressurizer level control and could result in plant shutdown.
ALTERNATE TESTING:    Valve will be exercisea (full stroke) to the position required to fulfill its function and stroke timed during cold shutdown.
l l
l l
L t
Page 22
 
l                                            BG-04 REFUELING TUSTIFICATION VALVE:            BG8481 A, B CATEGORY:          C CLASS:            2 FUNCTION:          Open to provide flow from the centrifugal charging pumps to the normal charging line or boron injection header and close to prevent flow through parallel pump.
TEST REQUIREMENT:  Exercise check valve (full stroke) the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  Valves cannot be exercised open (full stroke) during power operation.
The only full flow flowpath is through the Boron injection header into the  j reactor coolant system. This would cause an increase in reactor coolant      1 system boron inventory and possibly cause plant shutdown. Valves            l cannot be exercised open (full stroke) during cold shutdown since this      !
could result in a cold overpressurization of the reactor coolant system.    !
In regards to closure testing'of these valves, per NUREG-1482 response      l to question group #24, 'If a valve performs a safety function in both the open and closed positions; however, the Code requires that the valve be exercised to the open position and then verified to close'. As discussed above, since these valves are exercised full open only on a reactor refueling frequency the closure test of these valves will be performed on a reactor refueling frequency as well.
ALTERNATE TESTING:  Exercise check valve open (partial stroke) quarterly during plant operation. Exercise check valve (full stroke) to the position required to fulfill its function at refueling.
l i
I l
Page 23
 
1 l
l BG-05                                                            )
l REFUELING IUSTIFICATION I
VALVE:            BG8546A, B CATEGORY:          C i          CLASS:            2 FUNCTION:          Valve opens on flow from the refueling water storage tank to suction of the centrifugal charging pumps and closes to prevent back flow to the RWST.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
I          BASIS FOR RELIEF:  Valve cannot be full or partial stroke exercised open during power i                              operation as this would increase the reactor coolant system boron inventory and possibly-cause plant shutdown. This valve cannot be L
i                              exercised open during cold shutdown since this could result in a cold l-                            over-pressurization of the reactor coolant system. In regards to closure l                              testing of these valves, per NUREG-1482 response to question group
                              #24, 'If a valve perforrn's s' safety function in both the open and closed -
positions; however, the Code requires that the valve be exercised to the open position and then verified to close'. As discussed above, since these valves are exercised full open only on a reactor ' refueling frequency, the closure test of these valves will be performed on a                ,
reactor refueling frequency as well.
          - ALTERNATETESTING:  Exercise check valve to the positions required to fulfill its function at refueling.
l l
1 i
l l
i e
l Page 24
 
BG-06 COLD SHUTDOWN TUSTIFICATION VALVE:                BGHV8105,8106 CATEGORY:            B CLASS:                2 FUNCTION:            Valves close to isolate the charging line to the Reactor Coolant System upon receipt of a safety injection signal.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.
BASIS FOR RELIEF:    Closure (full or partial stroke) of one of these valves during power operation would isolate charging flow to the Reactor Coolant System.
This could result in loss of pressurizer level control and cause plant shutdown.
ALTERNATE TESTING:    Valve will be exercised (full stroke) to the position required to fulfill its function and stroke timed during cold shutdown.
                                                ,e= p * *A l
l l
l l
                                                                                                      )
1 I
l i
Page 25
 
BG-07 COLD SHUTDOWN TUSTIFICATION VALVE:                BGLCV01128, C CATEGORY:            B CLASS:                2 FUNCTION:            Valves close to isolate the volume control tank (normal charging supply) upon receipt of a safety injection signal.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.
BASIS FOR RELIEF:    Closure (full or partial stroke) of one of these valves during normal unit operation would isolate the normal suction for the charging pumps.
Altemate suction paths would result in increasing the reactor coolant system boron inventory and could result in plant shutdown.
ALTERNATE TESTING:    Valve will be exercised (full stroke) to the position required to fulfill its function and stroke time,d during cold shutdown.
Page 26
 
BG-08                                                  i COLD SHUTDOWN TUSTIFICATION l                                                                                                      i VALVE:                  BGV0147,165,174                                                              !
                                                                                                        \
! CATEGORY:                C CLASS:                  3 l
l FUNCTION:                Open to provide emergency boration flowpath.                                l l                                                                                                      )
TEST REQUIREMENT:        Exercise check valve (full stroke) to the position required to fulfill its  ,
function every 3 months.
BASIS FOR RELIEF:        Exercising these valves (full or partial stroke) requires substantial boration of the Reactor Coolant System which is unacceptable from an        !
operational viewpoint. This boration would cause unwanted negative          '
reactivity addition and result in reactor power fluctuations.
ALTERNATE TESTING:      Exercise check valves (full stroke) to position required to fulfill the      )
function at cold shutdown.,  ,  ,
l l
1 1
l i
l Page 27 l
l l
 
BL-01 REFUELING IUSTIFICATION VALVE:            BL8046 CATEGORY:          A, C CLASS:            2 FUNCTION:          Provides containment isolation.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its ;
function every 3 months.
BASIS FOR RELIEF:  System design does not provide any indication for verifying valve closure (full or partial stroke) upon flow reversal and would require a    1 Containment entry at power.
ALTERNATE TESTING:  Exercise check valve (full stroke) to the position required to fulfill its function at refueling.
:    ,                                          )
e l
I Page 28
 
                .. . . -  -        - - - - _ - . . ~
BN-01 COLD SHUTDOWN TUSTIFICATION l
VALVE:                  BNLCV0112D, E CATEGORY:              B CLASS:                  2 FUNCTION:              Open to provide flowpath from RWST to Centrifugal Charging Pumps
;                        upon Safety injection Signal or VCT low-low signal.
l l TEST REQUIREMENT:      Exercise valve (full stroke) to the position required to fulfill its function i                        and stroke time every 3 months.
BASIS FOR RELIEF:      Failure of these valves in the open position (full or partial stroke) would result in introduction of borated water into the RCS, resulting in possible
;                        unit shutdown.
; ALTERNATE TESTING:      Valve will be exercised (full stroke) to the position required to fulfill its function and stroke timed during cold sNtdowr.
l l
l Page 29
 
    .-.  -  .    .            .                - - - - -                  - -        . _ _ _    _ ~ . .
l BN-02 l                    COLD SHUTDOWN TUSTIFICATION l
VALVE:                BNHV8813 CATEGORY:              B l CLASS:                2 FUNCTION:              Valve is normally open to provide miniflow path to the refueling water storage tank.
TEST REQUIREMENT:      Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.
BASIS FOR RELIEF:      Failure of this valve in the closed position (full or partial stroke) during testing would result in loss of miniflow path for both trains of safety injection pumps which renders both Si pumps inoperable. This would result in pump damage due to dead heading the safety injection pumps in the event of a safety injection signal with reactor coolant pressure above safety - injection pump discharge pressure.                Additionally, BNHV8813 is a T.S. 3.0.3 valve.
ALTERNATE TESTING:    Valve will be exercised (full stroke) to the position required to fulfill its function and stroke time'd during cold shutdown.
l l
i l
l Page 30
 
l EG-01 REFUELING TUSTIFICATION 1
l VALVE:            EGV0204 CATEGORY:          A, C CLASS:            2 FUNCTION:          Valve closes to provide containment isolation.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function once every 3 months.
BASIS FOR RELIEF:  Testing this valve for closure (full or partial stroke) during normal plant operation would require isolation of flow to the RCP's and thermal barrier
                                                                      ~
cooling coils which could result in damage to the RCP seals and pump radial bearings and a subsequent LOCA.
ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling.
l l
I i
i Page 31
 
ET-01
(
COLD SHUTDOWN TUSTIFICATION VALVE:                EJ8841A,B CATEGORY:            A, C l  CLASS:                1 FUNCTION:            Open on flow from the residual heat removal pumps to the reactor coclant hot legs.
TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Valves cannot be full or partial stroke exercised during power operation since the only flowpath discharges into the reactor coolant system.
Residual Heat Removal Pump Discharge Pressure or Safety injection Pump Discharge Pressure cannot overcome reactor coolant system pressure, f  ALTERNATE TESTING:    Exercise check valve (full stroke) to the position required to fulfill its function at cold shutdown.
1 i
l j
l r
Page 32
 
ET-02 REFUELING TUSTIFICATION VALVE:              EJ8969B CATEGORY:            C CLASS:              2 FUNCTION:            Opens to provide suction to the safety injection pumps from Residual Heat Removal Pump B discharge during the recirculation phase following Safety injection actuations.
TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Valve cannot be full or partial stroke exercised during power operation since the only full flow flowpath discharges into the Reactor Coolant System. Safety injection pump discharge pressure cannot overcome Reactor Coolant System pressure.
Valve cannot be full or partial stroke exercised during cold shutdown since this could result in a cold over pressurization of the Reactor Coolant System.
ALTERNATE TESTING:    Exercise check valve (full stroke) to the position required to fulfill its function at rafueling.
l l
l l
Page 33
 
i l
i ET-03                                                        :
COLD SHUTDOWN TUSTIFICATION                                                      ;
I 1
VALVE:                EJHV8701 A, B CATEGORY:            A CLASS:                1 FUNCTION:            Valves open to provide suction to Residual Heat Removal Pump A during normai unit cooldown.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.                                              1 I
BASIS FOR RELIEF:    These valves have an interlock which prevents their opening (full or partial stroke) when Reactor Coolant System pressure is above approximately 360 psig to prevent over-pressurization of the RHR system.
ALTERNATE TESTING:    Valve will be exercised (full stroke) to the position required to fulfill its function and stroke timed during cold shutdown.                              l i
1
                                                    .. ..                                                j l
t l
l l
l l
l I
t m
(
l l                                            Page 34
 
ET-04 COLD SHUTDOWN JUSTIFICATION VALVE:                EJHV8804A, B CATEGORY:            B
                                      ~
CLASS:                2 FUNCTION:            Valves open to provide flowpath from discharge of the RHR pumps to l                      the suction of the Safety injection and Centrifugal Charging Pumps.
l TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function    l and stroke time every 3 months.
l BASIS FOR RELIEF:    Valves cannot be opened (full or partial stroke) during operation due to control interlocks with other ECCS valves. EJHV8804A & B are interlocked with EMHV8814A & B as well as BNHV8813. The latter l
valves are safety injection miniflow isolation valves which must be closed in order to open the 8804 valves which makes the Safety injection Pumps inoperable. If a SI would occur during testing, the SI pumps could be damaged due to a " dead headed" condition (i.e. loss of required miniflow).
ALTERNATE TESTING:    Valves will be exercised (full stroke) and stroke timed during cold shutdown.
l l
l l
I 1
i l
1 l                                                                    -
l Page 35
 
            -. =    ..    .    - - - -      -    _-
EI-05 COLD SHUTDOWN TUSTIFICATION VALVE:                  EJHV8840 and EJHV8809A, B CATEGORY:              B CLASS:                  2 FUNCTION:              Valves would be cycled to put the RHR system in hot leg recirc mode during post accident conditions.
TEST REQUIREMENT:      Exercise valves (full stroke) to the position required to fulfill its function ,
and stroke time every 3 months.
BASIS FOR RELIEF:      Valves have power removed during plant operation to prevent mispositioning these valves (full or partial stroke) which would result in entry into Technical Specification 3.0.3.                                      l ALTERNATE TESTING:      Valves will be exercised (full stroke) and stroke timed during cold shutdown.
I I
l I
i I
i l
l l
l l
Page 36 l
 
ET-06                                                ;
l COLD SHUTDOWN TUSTIFICATION VALVE:                  EJHV8811 A, B CATEGORY:                B CLASS-                  2 l
i FUNCTION:                Provides containment isolation. Opens to provide flow path from l                          containment recirculation sump to suction of RHR pump.
TEST REQUIREMENT:        E>ercise valve (full stroke) to the position required to fulfill its function I
an1 strr,ke time every 3 months.
; BASIS FOR RELIEF:        Opening valve (full or partial stroke) during operation would drain the RHR suction header into the containment sump rendering the RHR                ,
i                          pumps inoperable. Current procedures isolate and drain the suction            l l                          header prior to stroking. This requires significant time. An attemative is    '
l                          to allow the water to go into the sumps which then would require
;                          removal to decrease containment humidity. Another concem is the additional risk of not getting the system fully vented. Requirements currently exist requiring ECCS systems be versted monthly due to problems encountered. The adddonal risks encountered and amount of time to perform testing ~ do'not justify the small amount of additional assurance gained by the testing.
ALTERNATE TESTING:      Valves will be exercised (full stroke) and stroke timed during cold i                          shutdown when the proper precautions may be taken without impacting l                          operation.
i i
i                                                                                                        1
(                                                  Page 37 l
 
l EI-07 l
COLD SHUTDOWN TUSTIFICATION VALVE:                EJHV8716A, B
! CATEGORY:            B l CLASS:                2 1
FUNCTION:            Provide Low Head Safety injection / Residual Heat Removal train separation for recirculation of fluid to cold legs of Reactor Coolant System (RCS).
TEST REQUIREMENT:    Exere!se valves (full stroke) to the position required to fulfill its function and stroke time every three months.
BASIS FOR RELIEF:    Closing either EJHV8716A or EJHV8716B (full or partial stroke) isolates each Residual Heat Removal (RHR) pump from two RCS cold legs.
This renders both trains of Emergency Core Cooling System (ECCS) l                      inoperable, which is in violation of Technical Specifications during I
operation. If either EJHV8716A or B is failed in a closed position,2 of
;                      the 4 cold leg injection pathways are isolated from the assumed single operating RHR pump. Additionally, these valves are T.S. 3.0.3 valves.
l ALTERNATE TESTING:    Valves will be exercised'(full stroke) and stroke-timed at cold shutdown.
l l
                                                                                                        )
I l
1 Page 38 l
 
ET-08 REFUELING TUSTIFICATION
, VALVE:            EJ8958A,B l
l CATEGORY:          C I
l CLASS:            2 l
FUNCTION:          Cpen to provide flow from the Refueling Water Storage Tank to the suction of the Residual Heat Removal pumps and close to prevent back flow to the RWST.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
l BASIS FOR RELIEF:  These valves cannot be full stroke exercised during power operations
,                    since the full flow path discharges into the Reactor Coolant System.
Residual heat removal pump discharge pressure cannot overcome Reactor Coolant System pressure during full power operations.
l
!                    EJ-8958A and EJ-8958B cannot be full stroke exercised during cold          1 shutdown due to insufficient expansion volume for injection during cold i                    shutdown.
                                              ~ . .
ALTERNATE TESTING: Exercise check valves (partial stroke) every 3 months. Exercise check valves (full stroke) to the position required to fulfill its function at refueling.
1                                                                                              l
!                                                                                              i i
l                                                              .
I Page 39
 
1 ET-09 REFUELING IUSTIFICATION VALVE:                  EJ8969A CATEGORY:              C CLASS:                  2 FUNCTION:              Opens to provide suction to the Centrifugal Charging Pumps from Residual Heat Removal Pump A discharDe during the recirculation phase following safety injection actuation.
TEST REQUIREMENT:      Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:      The valve cannot be full stroke exercised during power operation since the CCPs do not full-flow into the RCS during normal operation. Partial stroke exercising would require starting up the RHR pump, aligning it to the RWST, opening EJ-HV-8804A (See Cold Shutdown Justification
                                    #EJ-04), and as a result, boration of the RCS with 2000 ppm water. This is undesirable from a plant operational perspective.
Valve cannot be full or partial stroke exercised during cold shutdown since this could result'in 'a ' cold over pressurization of the Reactor Coolant System.
ALTERNATE TESTING:      Exercise check valve (full stroke) to the position required to fulfill its function at refueling, f
F I
l 4                                                                                                              [
Page 40                                                ,
 
ET-10 COLD SHUTDOWN TUSTIFICATION                                                        ,
VALVE:                EJ8730A, B                                                                      .
c CATEGORY:            C CLASS:                2 FUNCTION:            Open to provide flow from residual heat removal pumps to the Reactor Coolant System and close to prevent reverse flow through the RHR pump in the opposite train.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    These valves cannot be full stroke exercised during power operations since the full flow path discharges into the Reactor Coolant System.
Residual heat removal pump discharge pressure cannot overcome                    '
Reactor Coolant System pressure during full power operations.
ALTERNATE TESTING:    Exercise check valves (partial stroke) every 3 months. Exercise check valves (full stroke) to the position required to fulfill its function at cold shutdown.                                                                        i 1
i l
l l
}
i 1
4 Page 41 l
 
EM-01 REFUELING IUSTIFICATION VALVE:            EM8922A, B CATEGORY:          C CLASS:            2 FUNCTION:          Opens on flow from the Safety injection pumps to the reactor coolant cold legs or hot legs and closes to prevent reverse flow through the opposite train Safety injection pump.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  Valves cannot be full or partial stroke exercised open during power operation since the only flowpath discharges into the reactor coolant system. Safety injection pump discharge pressure cannot overcome reactor coolant system pressure. During cold shutdown these valves cannot be full or partial stroke exercised open since this could result in a low temperature overpressurization of the reactor coolant system. In regards to closure testing of these valves, per NUREG-1482 response to      ,
question group #24, 'If a valve performs a safety function in both the        !
open and closed positions; however, the Code requires that the valve be exercised to the open position and then verified to close'. As discussed above, since these valves are exercised full open only on a reactor refueling frequency, the closure test of these valves will be performed on a reactor refueling frequency as well.
ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling.
i Page 42 l
 
EM-02 REFUELING TUSTIFICATION VALVE:              EMV0001, 2, 3, 4 CATEGORY:            A, C CLASS:                1 FUNCTION:            These valves open to provide hot leg recirculation flow from the safety injection pumps.
TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Valves cannot be full or partial stroke exercised during power operation since the only flow path discharges into the reactor coolant system.      1 I
Safety injection pump discharge pressure cannot overcome reactor
                    ~
coolant system pressure. During cold shutdown these valves cannot be full or partial stroke exercised since this could result in a low temperature overpressurization of the reactor coolant system.
i ALTERNATE TESTING:    Exercise check valve (full stroke) to the position required to fulfill its i function at refueling.  ,, , ,
I l
i i
l Page 43 i
 
l                                        EM-03 REFUELING IUSTIFICATION i
l    VALVE:            EM8815 l    CATEGORY:          C l
CLASS:            2 1
FUNCTION:          Opens on flow from the Centrifugal Charging Pumps.
l    TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  Using a Centrifugal Charging Pump to provide flow (full or partial stroke) would result in injecting borated water into the Reactor Coolant System through the cold leg injection lines. This would result in a decrease in reactor power and thermal shock to the reactor coolant piping. During cold shutdowns exercising this valve (full or partial stroke) could result in a low temperature overpressurization of the reactor coolant system.
ALTERNATE TESTING:  Exercise check valve (full stroke) to the position required to fulfill its function at refueling.
Page 44 l
 
EM-05 REFUELING TUSTIFICATION VALVE:              EM8926A, B CATEGORY:          C CLASS:              2 Open on flow from the Refueling Water Storage Tank to the suction of FUNCTION:
the Safety injection Pumps and closes to prevent backleakage to the RWST.
TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Valves cannot be full stroke exercised open during power operation since the only full flow path discharges into the reactor coolant system.
Safety injection pump discharge pressure cannot overcome reactor coolant system pressure. During cold shutdown these valves cannot be            ;
full stroke exercised open since this could result in a low temperature overpressurization of the reactor coolant system. In regards to closure testing of these valves, per NUREG-1482 response to question group
                      #24, 'If a valve performs a safety function in both the open and closed        ,
positions; however, the Code requires that the valve be exercised to the        l open position and then verified to close'. As discussed above, since these valves are exercised full open only on a reactor refueling                ,
frequency, the closure test of these valves will be performed on a              i reactor refueling frequency as well.
1 ALTERNATE TESTING:    Exercise check valve open (partial stroke) every 3 months. Exercise check valve (full stroke) to the positions required to fulfill its function at  I refueling.
l 4
l l
1 l
Page 45
 
1
                                                                                                    \
EM-07                                                        l I
COLD SHUTDOWN TUSTIFICATION l
VALVE:                EMHV8835                                                                      I CATEGORY:            B CLASS:                2 FUNCTION:            Provide isolation between the Safety injection Pumps discharge and the        l Reactor Coolant System Cold Legs.                                            !
l TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.
B ASIS FOR RELIEF:    Valve must remain open (cannot be full or part stroke exercised) to satisfy the flowpath from the Safety injection Pumps to the Reactor Coolant System per T.S. 3.0.3.
ALTERNATE TESTING:    Valve will be exercised (full stroke) and stroke timed during cold shutdown outages.
l 1
l Page 46
 
EN-01 RELIEF REQUEST VALVE:              ENV0002,8 CATEGORY:          C CLASS:              2 FUNCTION:          Valves open to provide flow from the Containment Sump to the Containment Spray Pumps.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  These valves cannot be full or partial stroke exercised since the only full flowpath is from the Containment Sump which is normally dry. Also, testing would require spraying containment which would result in damage to lagging, non EQ electrical equipment, etc.
ALTERNATE TESTING:  ENV0002 and ENV0008 are Walworth Company Model 12-N-376-SP, 12" stainless steel check valves installed in a horizontal orientation that have the same service conditions as they are corresponding valves in the 'A' and 'B' trains of th,e Co,ntainment Spray System.
A different valve of this group will be disassernbled, inspected, and manually full stroked at each refueling until the entire group has been tested, if the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked during the same refuel outage.
l Page 47
 
EN-02 RELIEF REQUEST VALVE:            ENV0003,9 CATEGORY:          C CLASS:            2                                                                          ,
FUNCTION:          Valves open to provide flow from the refueling water storage tank to the spray headers.
TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:  These valves cannot be full stroke exercised since the only full flow flowpath is to the spray headers which would result in spraying containment resulting in damage to lagging, non EQ electrical equipment, etc.
ALTERNATE TESTING: ENV0003 and ENV0009 are Walworth Company Model 12-N-376-SP, 12" stainless steel check valves installed in a horizontal orientation that have the same service conditions as they are ccrresponding valves in the 'A' and 'B' trains of the Containment Spray System.
Exercise check valve (partial stroke) every 3 months. A different valve of this group will be disassembled, inspected, and manually full stroked at each refueling, until the entire group has been tested, if the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked during the same refuel outage.
l l
o Page 48
 
EN-03 RELIEF REQUEST VALVE:                      ENV0013,17 CATEGORY:                  C CLASS:                      2 FUNCTION:                  Opens on flow from the Containment Spray Pump to the containment spray headers.
TEST REQUIREMENT:          Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:          To full or partial stroke these valves, flow from the containment spray pump would have to be initiated. This would result in spraying water
                              'hrough the spray nozzles into containment resulting in damage to lagging, non EQ electrical equipn ent, etc.
ALTERNATE TESTING:          ENV0013 and ENV0017 are Walworth Company Model 10-N-376-SP, 10" stainless steel check valves installed in a horizontal orientation that have the same service conditions as they are corresponding valves in the 'A' and 'B' trains of the Containment Spray System.
A different valve of this group will be disassembled, inspected and          I manually full stroked at each refueling, until the entire group has been tested. If the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked during the same refuel outage.
l I
4 l
Page 49
 
EN-04                                                          :
COLD SHUTDOWN TUSTIFICATION VALVE:                ENHV0001,7 CATEGORY:            B CLASS:                2                                                                                ,
FUNCTION:            Provides containment isolation. Opens to provide flow path from containment recirculation sump to suction of the Containment Spray
_              Pumps.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.
BASIS FOR RELIEF:    Opening valve (full or partial stroke) during operation would run the risk of draining the Containment Spray Pumps suction headers into the containment sump which could cause severe damage to '.he pumps and render them inoperable. Refueling Water Storage Tank must be isolated to prevent flooding containment should the single check valve not hold when these valves are stroked open. Current procedures isolate and drain the suction header prior to stroking. This requires significant time. An altemative is to allow the water to go into the sumps which then would require removal to decrease containment humidity.
Another concem is the additional risk of not getting the system fully vented. Requirements currently exist requiring ECCS systems be
!                          vented monthly due to problems which were encountered.                      The  l additional risks encountered and amount of time to perform testing do            ;
not justify the small amount of additional assurance gained by the testag.
I ALTERNATE TESTING:    Valves will be exercised (full stroke) and stroke timed during cold
;                          shutdown when the proper precautions may be taken without impacting operation.
4 Page 50 l                                                                              __.
 
EN-05 RELIEF REQUEST VALVE:            ENV0004,10 CATEGORY:          C
! CLASS:            2 FUNCTION:          Valves open to provide flow from the refueling water storage tank to the spray headers.
; TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
; BASIS FOR RELIEF:  These valves cannot be full stroke exercised since the only full flow I                    flowpath is to the spray headers which would result in spraying containment resulting in damage to lagging, non EQ electrical equipment, etc.
l ALTERNATE TESTING: ENV0004 and ENV0010 are Walworth Company 10-N-2376-S,10" stainless steel check valves installed in a horizontal orientation that have the same service conditions as they are corresponding valves in the 'A' and 'B' trains of the Containment Spray System.
Exercise check velve (partial stroke) every 3 months. A different valve i                    of this group will be disassembled, inspected, and manually full stroked at each refueling, until the entire group has been tested. If the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked at the same outage.
l l
t l
Page 51
 
EP-01 COLD SHUTDOWN TUSTIFICATION l
VALVE:                EP8818A, B, C, D CATEGORY:            A, C CLASS:                1 FUNCTION:            Valves open on cold leg injection flow from the residual heat removal      l pumps.                                                                    j TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Valves cannot be full or partial stroke exercised during power operation since the only flow path discharges into the reactor coolant system.
Residual Heat Removal Pump Discharge Pressure cannot overcome              j reactor coolant system pressure,                                          j ALTERNATE TESTING:    Exercise check valve (full stroke) to the position required to fulfill its function at cold shutdown.
l i
i Page $2
 
EP-02 RELIEF REQUEST I
l
      - VALVE:            EP8956A B, C, D CATEGORY:          A, C CLASS:            1 FUNCTION:          Opens on flow from the cold leg accumulators to provide flow to the        l reactor coolant system cold legs.                                          1 TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.                                                  l BASIS FOR RELIEF:  These valves cannot be full or part stroke exercised during power operation since cold leg accumulator pressure cannot overcome reactor      .
coolant system pressure. During cold shutdown exercising these valves      l (full or partial stroke) could result in a low temperature                J overpressurizat;on of the reactor coolant system.                        ;
ALTERNATE TESTING:  EP8956A, B, C, D are Westinghouse Electric Corporation Model              l 10001CG990000DO,10" stainless steel check valves installed in a          l i                          horizontal orientation that have the same service conditions as they are  j corresponding valves in'lo~ ops A, B, C, D of the Accumulator Safety injection System.
A different valve of this group will be disassembled, inspected, and manually stroked at each refueling, until the entire group has been tested. If the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked at the same refuel outage.                                                                  1 l
!                                                                                                    l l                                                                                                      l
                                                                                                      )
I l
l 6
4 i
Page 53
 
EP-03 REFUELING IUSTIFICATION                                                      l l
VALVE:                EPV0010, 20, 30, 40 CATEGORY:            A, C CLASS:                1 FUNCTION:            Valves open on cold leg injection flow from the safety injection pumps.
TEST REQUIREMENT:    Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:    Valves cannot be full or partial stroke exercised during power operation since the only flowpath discharges into the reactor coolant system.
Safety injection Pump Discharge Pressure cannot overcome reactor coolant system pressure. During cold shutdown these valves cannot be full or partial stroke exercised since this could result in a low temperature overpressurization of the reactor coolant system.
ALTERNATE TESTING: ** Exercise check valve (full stroke) to the position required to fulfill its function at refueling.
1 l
l l
r l
l Page 54 1
 
!                                                                                                      1 l                                                                                                      l 1
l l                                        EP-04                                                          i COLD SHUTDOWN TUSTIFICATION l
VALVE:                EPHV6950A, B, C, D, E, F CATEGORY:            B CLASS:                2 FUNCTION:            Valves are provided to depressurize the accumulator tanks during                !
emergency cold shutdown conditions.                                            )
l TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function every 3 months.                                                                )
l BASIS FOR RELIEF:    Opening valve (full or partial stroke) during plant operation could render      ;
an accumulator inoperable. The Technical Specification action                  ;
statement may not allow adequate time to test and restore an accumulator. Additionally, if one valve were to fall, insufficient time is allowed for repair and therefore the plant would be required to shut down.
ALTERNATE TESTING:    Valves will be exercised (full stroke) and stroke timed at cold shutdown.
                                                  .,. .                                                j l
l I
i i
I Page 55
 
(
l EP-05 COLD SHUTDOWN TUSTIFICATION l
VALVE:                EPHV8808A, D CATEGORY:            B l  CLASS:                2 i
FUNCTION:            Valves are provided to isolate the accumulator tanks during certain          '
emergency cold shutdown conditions.
l'        -                                                                                            s l  TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function l                        every three months.
B ASIS FOR RELIEF:    See NUREG-1482, Section 3.1.1-1 (cannot full or partial stroke).
ALTERNATE TESTING:    Valves will be exercised (full stroke) and stroke timed at cold shutdown.
i l
l l
l l
i l
l l
I I
I l                                        Page 56
 
  .-  .    . . - . - - .--            - - - . - - - - . - _ - - - ~ .                      .-      . .-
FC-01 i
RELIEF REQUEST VALVE:                FCV0001, 2, 24, 25 CATEGORY:              C CLASS:                3 FUNCTION:              Valves open to provide steam flow to the Turbine Driven Auxiliary Feedwater Pump. Valves close to provide redundant steam line separation.
TEST REQUIREMENT:      Exercise check valves (full stroke open and closed) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF:      Valves cannot be full stroke opened during power operation since this would require full flow of cool water from the turbine driven auxiliary feedwater pump to the steam generators. This is undesirable since this would unnecessarily thermally shock steam generator feedwater nozzles.
These valves cannot be full or partial stroke tested closed since there are no lines coming off between the two valves on a line to allow for pressurization and depressurization.
ALTERNATE TESTING:    Check valves will be partial stroke tested open quarterly Valves will be full stroke exercised open at cold shutdown frequency. Valves will be tested for closure capability by disassembling, inspecting, and manually full stroking a different valve of this group at each refueling.
FCV0001, FCV0002, FCV0024, and FCV0025 are Velan Valve Corporation 4" pressure seal swing carbon steel check valves installed in a horizontal orientation that have the same service conditions as they are corresponding valves in main steam loops 2 and 3 supply to the turbine of the Turbine Driven Auxiliary Feedwater Pump.
A different valve of this group will be disassembled, inspected, and manually full stroked at each refueling, until the entire group has been tested. If the full -stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked at the same outage.
l
)
i l'
Page 57
 
l l
l l
KA-01                                                            1 l                    COLD SHUTDOWN TUSTIFICATION l
l VALVE:                KAFV0029 CATEGORY:            A l CLASS:                2 I                                                                                                    .
FUNCTION:            Valve closes to provide containment isolation.
TEST REQUIREMENT:    Exercise valve (full stroke) to the position required to fulfill its function l                      and stroke time every 3 months.
BASIS FOR RELIEF:    Failure of this valve in the closed direction or stroking this valve (full or      i partial stroke) during normal plant operation would interrupt the instrument air supply to valves and equipment necessary for system control and operation (i.e. loss of the normal letdown path and loss of pressurizer spray). These losses would put the plant in an off-normal situation and possibly cause a reactor trip.
1 ALTERNATE TESTING:    Valve will be exercised (full stroke) to the position required to fulfill its      '
function, stroke time tested, and fail-safe tested during cold shutdown.
l 1
i e
i 1
l l
l l
I i
l Page 58
 
l                                                KA-02 l
i REFUELING TUSTIFICATION VALVE:            KAV0204 CATEGORY:          A, C CLASS:            2 l
FUNCTION:          Provides containment isolation.
;            TEST REQUIREMENT:  Exercise check valve (full stroke) to the position required to fulfill its
!                              function every 3 months.
BASIS FOR RELIEF:  System design does not provide any indication for verifying valve I                                closure (full or partial stroke) upon flow reversal. Also see Cold Shutdown Justification KA-01 for not exercising valve during normal plant operation.
ALTERNATE TESTING:  Exercise check valve (full stroke) to the position required to fulfill its function at refueling,
[
l l
Page 59
 
l i
l l
l KI-01 RELIEF REQUEST l
l l  VALVE:            KJPV0001 A&B,0101 A&B
!  CATEGORY:          B 1
CLASS:            3 FUNCTION:          Valves open to provide starting air to the emergency diesel generator.
TEST REQUIREMENT:  Exercise valves (full stroke) to the position required to fulfill its function and stroke time every 3 months.
BASIS FOR RELIEF:  These are totally enclosed solenoid valves. The valves are controlled          '
l                      by the start stop switch for the diesel. Therefore, stroke time for the l                      valves (full or partial stroke) themselves cannot be measured. Valve stroke time,affects diesel start time. Diesel start time will be used to monitor valve performance. Maximum stroke time of 12 seconds will be used since this is the limit for diesel start time. Since both valves l                      actuate when the diesel is started, changes in starting air tank pressures will be monitored to ensure approximately equal pressure decreases to verify both valves actuated properly.
ALTERNATE TESTING: Diesel starting times and 's tarting air tank pressure changes will be measured.
I                                                                                                      l
!                                                                                                      1 l
l I
Page 60}}

Latest revision as of 10:54, 13 July 2020

Rev 15 of IST Program for Callaway Nuclear Plant
ML20117H706
Person / Time
Site: Callaway Ameren icon.png
Issue date: 02/06/1996
From: Derner C
UNION ELECTRIC CO.
To:
Shared Package
ML20117H686 List:
References
NUDOCS 9605290066
Download: ML20117H706 (120)


Text

,

REVISION 15 February 1,1996 INSERVICE TESTING PROGRAM CALLAWAY NUCLEAR PLANT i

Prepared by Qualified Reviewer 0- m 2///'14 # 2_ ' 1/ff)t, Chris J. D#ner 74a47er C. Wink IST Engineer IST Engineer Backup Supervisor Review i 2-64G l /

l David S. Hollabaugh Supervising Engineer-Performance /ISI )

l 9605290066 960201 PDR ADOCK 050004G3 i 1

P PDR

[

TABLE OF CONTENTS INTRODUCTION 1.0 INSERVICE TESTING OF PUMPS PAGES i 1.1 General Description 1 l

1.2. Inservice Testing Program For Pumps 2 1.3 ReliefRequests For Pump Testing 6 2.0 INSERVICE TESTING OF VALVES l \

2.1 General Description 3 I c l

! 2.2 Inservice Testing Program For Valves 71 2.3 Relief Requests or Test Deferral Justifi$5tions l For Valve Testing 60 I l l l

i i

I i

I

! i t

l l

l INTRODUCTION i

i The Second 10-Year Inservice Testing Program for Callaway Plant was developed in

, compliance with the niles and regulations of 10CFR 50.55a and ASME Boiler and Pressure Vessel Code Section XI 1989 Edition. No Code Cases were utilized in developing Callaway's Inservice Testing Program.

l Where ASME XI requirements were determined to be impractical, a relief request has been developed. These relief requests are included in Sections 1.3 and 2.3 of this

! document.

1 This submittal of the Inservice Testing Program for pumps and valves will remain in i- effect through the next 10 year inservice inspection interval ending December 19, l 2004.

l t

l

.e=.~?

l l

l l

l l

l ii i ~

1 1

4 SECTION 1.0 INSERVICE TESTING OF PUMPS

____I

a l

l l

r 1

4 i

1 l

1 l

I 1

SECTION 1.1 ,

1 GENERAL DESCRIPTION l

l 1

1 I

4 1

SECTION 1.1 - GENERAL DESCRIPTION Pumps in the IST Program are tested per the requirements of ASME/ ANSI OM-1987 Edition 1988 Addenda Part 6 except as indicated by the referenced relief requests.

Section 1.2 contains the IST Program for pumps with the following information given:

PUMP NUMBER lists the pump identification number as shown on the P&ID's PUMP NAME gives the noun name for the pump ISI CLASS classification of the pump per ISI requirements P&TD drawing and location of pump TEST PARAMETERS indicates the required test parameters per OM-6 Table 2 RELTEF REOUESTS lists the applicable relief requests for the pump TEST FREOUENCY lists the test frequency for the pumps M - Monthly Q - Quarterly RF - Refueling Outage i CS - Cold Shutdown  ;

10 - Once every 10 years l

Page1 l

i

l-

  • l l

l l

SECTION 1.2 INSERVICE TESTING 1

PROGRAM FOR PUMPS i

I f

4 i

i CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM  ;

PUMP PUMP ISI P&lD TEST PARAMETERS (2) RELIEF TEST NUMBER NAME CLASS SPEED (1) A PRESS FLOW VIBRATION REQUEST 3 FREQUENCY r PAL 01A MOTOR DRIVEN AUXILIARY 3 M-22AL01 N/A YES YES YES RR#P05 M FEEDWATER PUMP A E-4

[

PALOIB MOTOR DRIVEN AUXILIARY 3 M-22AL01 N/A YES YES YES RR#POS M f

, FEEDWATER PUMP B G-4 PALO2 TURBINE DRIVEN AUXILIARY 3 M-22AL01 YES YES YES YES RR#POS M FEEDWATER PUMP B-4 PBG02A CVCS BORIC ACID TRANSFER PUMP A 3 M-22BG05 N/A YES YES YES RR#P09

  • Q/CS B4 i PBG02B CVCS BORIC ACID TRANSFER PUMP B 3 M-22BG05 N/A YES YES YES RR#P09 [

Q/CS A4 i PBG05A CENTRIFUGAL CHARGING PUMP A 2 M-22BG03 N/A YES YES YES RR#P03 Q/RF C-5 RR#P06  !

PBG05B CENTRIFUGAL CHARGING PUMP B 2 M-22BG03 N/A YES YES YES RR#P03 Q/RF B-5 RR#P06 <

PEF 01A ESSENTIAL SERVICE WATER PUMP A 3 M-U2EF01 N/A YES YES YES Q G4  !

PEF 01B ESSENTIAL SERVICE WATER PUMP B 3 M-U2EF01 N/A YES YES YES Q

C4 PEG 01A COMPONENT COOLING WATER PUMP A 3 M-22EG01 N/A YES YES YES

' Q G-4 PEG 01B COMPONENT' OOLING WATER PUMP B 3 M-22EG01 N/A YES YES YES Q D-l PEG 01C COMPONENT COOi ING WATER PUMP C 3 M-22EG01 N/A YES YES YES Q E-4 ,

4 a

e Page1

1 CALLAWAY NUCLEAR PLANT INSERVICE TESTING PROGRAM f

PUMP PUMP ISI P&ID TEST PARAMETERS (2) RELIEF TEST NUMBER NAME CLASS SPEED (1) A PRESS FLOW VIBRATION REQUESTS FREQUENCY  ;

PEG 01D COMPONENT COOLING WATER PUMP D 3 M-22EG01 N/A YES YES YES Q B-4 .

PEJ01A RESIDUALlEAT REMOVAL PUMP A 2 M-22EJ01 N/A YES YES YES RR#P01 Q G4 PEJ01B RESIDUALIEAT REMOVAL PUMP B 2 M-22EJ01 N/A YES YES YES RR# Pol Q '

C4 PEM01A SAFETY INECTION PUMP A 2 M-22EMOI N/A YES YES YES Q

. E4 PEM01B SAFETY INECTION PUMP B 2 M-22EM01 N/A YES YES .YES Q ,

D4  ;

PEN 01A CONTAINMENT SPRAY PUMP A 2 M-22EN01 N/A YES YES YES Q G4 i PEN 01B CONTAINMENT SPRAY PUMP B 2 M-22EN01 N/A YES YES YES Q ,

B4 M-22JE01 N/A YES YES NO RR#P02 Q/10 i PE01A EMERGENCY FUEL OILTRANSFER 3 PUMP A E-7 PE01B EMERGENCY FUEL OIL TRANSFER 3 M-22E01 [N/A YES YES NO RR#P02 Q/10 PUMP B A-7 -

(1) For pumps that have N/A for ' Speed' the pump is directly coupled to a constant speed motor.

(2) The test parameter ' Discharge Pressure' was not included in this table as none of the pumps in the IST Program are p'ositive displacement pumps.

t

,i Page 2

l 1

i 1

SECTION 1.3 l . . . . ,

RELIEF REQUESTS FOR i

PUMP TESTING  !

i l

\

l l RELIEF REQUEST #P01 l

l l

SYSTEM: Residual Heat Removal System COMPONENT: PEJ01 A and PEJ01B CLASS: 2 FUNCTION: To provide low head safety injection and residual heat removal. ,

l TEST REQUIREMENT: The full-scale range of each analog instrument shall not be greater than three times the reference value. Instrument accuracy shall be within the limits of Table 1. Station instmments meeting these requirements shall be acceptable.

BASIS FOR RELIEF: Pump discharge pressure is compared to pump suction pressure to determine pump differential pressure. Reference values for discharge pressure for these pumps are between 200 psig and 300 psig. This would require a discharge pressure gauge of 0-600 psig maximum. The accuracy required for this gauge would be 2% of 600 psig which is 12 psig. The permanent discharge pressure gauges we have installed are 0-700 psig with a tolerance less than i 12 psig. Although the permanent instruments are above the '

maximum range limits they are within the accuracy requirements and are therefore suitable for the test.

ALTERNATE TESTING: Use permanently installed discharge pressure gauges. ,

l l

i I

i l

Page1 I

l RELIEF REQUEST #P02 l

SYSTEM: Emergency Fuel Oil System  :

1 COMPONENT: PJE01 A and PJE01B CLASS: 3 FUNCTION: To provide fuel oil to the standby diesel generators l

TEST REQUIREMENT
Measure vibration, differential pressure (dp), and pump flow (Q).

BASIS FOR RELIEF: Diesel generator fuel oil transfer pumps are submersible pumps.

Vibration cannot be measured on the submersible pumps.

i ALTERNATE TESTING: Pump differential pressure and flow measurement will be made quarterly. The pump will be disassembled and the bearings inspected once every 10 years. If the bearing condition is in question, the bearing-will-be repaired or replaced prior to re-installing the bearing.

l i

e l

Page 2 1 \

__ _. m . . _ _ . _ . _ . _ . _ _ _ _.__._._..._ ___ . . __ . _ . _ _

1 i .

L RELIEF REQUEST #P03 SYSTEM: Chemical and Volume Control System l COMPONENT: PBG05A and PBG05B

+

CLASS: 2

FUNCTION
To provide high head safety injection to the reactor.

TEST REQUIREMENT: The resistance of the system shall be varied until either the I measured differential pressure or the measured flowrate equals the corresponding reference value. i l BASIS FOR RELIEF: Refer to Generic Letter 89-04, Sedion 9. Technical Specification 4.5.2.f.1 states "Each ECCS Subsystem shall be demonstrated '

OPERABLE by verifying that each centrifugal charging pump l develops a discharge pressure greater than or equal to 2400 psig on L recirculation flow when tested pursuant to Specification 4.0.5." ,

l Testing of these pumps is performed on the fixed resistance mini-flow path (2500 psid,60 gpm). At this flow rate, the pump curve j for these pumps is relatively flat (25 psid/60 gpm). Flow rate l changes of150% would result in less than 1% change in pump  !

l differential pressure.. . Based.on this, it is not warranted to install additional instrumentation to ensure flow is maintained at the same point (12% accuracy) for each quarterly test. Adequate flow is ,

verified for protection of the pumps by monitoring discharge pipe  !

l temperature changes. To further verify pump performance and

! monitor degradation, additional tests will be run, on a refueling  ;

frequency, at or above the design flow point for the pumps. Pump l flowrate, differential pressure, and vibration will be monitored.- The j flow measurement to be performed during these outages will be l l done utilizing an alternate flow path which is only available during l l outage conditions and has installed flow instrumentation. This flow l l instrumentation meets the requirements of OM Part 6, Section 4.6.

ALTERNATE TESTING: Pump differential pressure and vibration will be measured and ,

trended quarterly. A second set of reference values will be established at or above the pumps' design flow point. Pump  ;

differential pressure, flowrate, and vibration will be measured on a  :

refueling frequency and trended against this second set of reference values. ,

1 I

4 I

l Page 3

i RELIEF REQUEST #P05 SYSTEM: Auxiliary Feedwater System COMPONENT: PALOl A, PALOlB, and PALO2 i CLASS: 3 i

FUNCTION: Provide a means to remove reactor decay heat when the principal heat sinks are unavailable. .

l TEST REQUIREMENT: The full-scale range of each instmment shall be three times the l reference value or less. Instrument accuracy shall be within the limits of Table 1. Station instruments meeting these requirements shall be acceptable. I BASIS FOR RELIEF: Pump suction pressure is compared to pump discharge pressure to determine pump diffeiential pressure. Reference values for suction pressures for these pumps are about 15 psig. This would require suction pressure gauges of 0-45 psig maximum. The accuracy required for these gauges would be 2% of 45 psig which is i 0.9 psig. The permanent suction pressure gauges we have installed are 0-60 psig 0.5 psig. Although the permanent instruments are above the maximum range limits, they are within the accuracy requirements and are therefore suitable for the test.

ALTERNATE TESTING: Use permanently installed suction pressure gauges.

i l

l l

Page 4

RELIEF REQUEST #P06 l

l l

l SYSTEM: Chemical and Volume Control System l

COMPONENT: PBG05A and PBG05B .

l l CLASS: 2 l i

FUNCTION: To provide high head safety injection to the reactor. l l

TEST REQUIREMENT: The full-scale range of each instmment shall be three times the i reference value or less. Instrument accuracy shall be within limits l ofTable 1. Station instruments meeting these requirements shall be l acceptable.

BASIS FOR RELIEF: Reference values for suction pressures for these pumps are between i 30 psig and 40 psig. This would require suction pressure gauges of 0-90 psig maximum. The accuracy required for this gauge would be 2% of 90 psig which is il.8 psig. The permanent suction pressure gauges - we have installed are 0-150 psig il.0 psig.

Although the permanent instruments are above the maximum range limits, they are within-the accuracy requirements and are therefore suitable for the test.

ALTERNATE TESTING: Use permanently installed suction pressure gauges.

l e

i Page5 I

l RELIEF REQUEST #P09  ;

l SYSTEM: Chemical and Volume Control System 1

1 COMPONENT: PBG02A and PBG02B CLASS: 3 l FUNCTION: To provide emergency boration.

l l TEST REQUIREMENT: The resistance of the system shall be varied until either the j -

measured differential pressure or the measured flowrate equals the l corresponding reference value.

l

BASIS FOR RELIEF
See Generic Letter 89-04, Section 9. Quarterly testing of these

! pumps is performed on the fixed resistance mini-flow path (112 psig,15 gpm). At this flowrate, the pump curve for these pumps is relatively flat (8 psid/42 gpm). Flowrate changes ofi 25% would result in less than a 1% change in pump differential pressure. Based on this, it is not warranted to install additional instrumentation to ensure flow is maintained at the same point (i 2% accuracy) for each quarterly test. .-To further verify pump performance ud l

monitor degradation, an additional test will be mn, on a cold l shutdown frequency, at or above the design flow point for the pumps. Pump differential pressure, flowrate, and vibration will be monitored. The flow measurement to be performed during these l outages will be donc utilizing an alternate flow path which is only j available during outage conditions and has installed flow instmmentation. This flow instrumentation meets the requirements l of OM Part 6, Section 4.6.

i ALTERNATE TESTING: Pump differential pressure and vibration will be measured and trended quarterly. A second set of reference values will be established at or above the pump design flow point. Pump differential pressure, flowrate, and vibration will be measured on a cold shutdown frequency and trended against this second set of

. reference values.

l l

l l

~

1 l

{

Page 6

SECTION 2.0 INSERVICE TESTING OF VALVES l

I i

i

SECTION 2.1 GENERAL DESCRIPTION 1

SECTION 2.1 - GENERAL DESCRIPTION Valves in the IST Program are tested per the requirements of ASME/ ANSI OM-1987 Edition 1988 Addenda Part 10 except as indicated by the referenced relief requests.

Section 2,2 contains the IST Program for valves sorted by drawing number with the following information given:

VALVE NUMBER lists the valve identification number as shown on the P&ID's DESCRIPTION gives the noun name for the valve COOR valve location on drawing ACT lists the type of valve actuator MO motor operated SO solenoid operated AO air operated HO hydraulic operated SA selfactuated MA manual operated VIN TYP_E GT gate valve GB globe valve CK check valve RV reliefvalve BF butterfly valve DI diaphragm valve VIN CAT indicates the category assigned to the valve based on the definitions given in section 1.4 of OM-10 VIN SIZE lists the nominal pipe size of the valve in inches Page1

l TESTS PERF / FREOUENCY lists the tests that will be performed to fulfill the requirements of OM-10 followed by a "/" and then the ,

frequency at which the test will be performed.  !

_ TEST PERF FREOUENCY l FS full stroke exercise valve to safety Q- Quarterly l position CS- Cold Shutdown PS partial stroke exercise valve RF- Refueling Ouiage.

LT leak-rate test valve to Section XI RV - # OM schedule for relief valve test requirements # = (5) for 5 year frequency LJ leak-rate test valve to Appendix J # = (10) for 10 year frequency requirements FT observe the fail safe operation of the SD- Disassemble, inspect and manually valve exercise one valve from specified group each refueling outage.

PI verify the valve remote position indication RV safety and relief valve test SFTY POS lists the safety position of the valve - (0) pen or (C)losed ACTIVE OR PASSIVE valve categorization based on definitions given in ,

section 1.3 of OM-10 l RR OR TST DEF JUST. lists the applicable Relief Requests, Cold Shutdown Justifications, or Refueling Justifications in Section 2.3 of the IST Program.

NOTES gives any additionalinformation on valve NOTE:

1. GTHZ0006, 7, 8, 9 are passive valves during normal power operations; however, these valves become active during refueling operations. These valves will be tested per OM-10 requirements as active components during refueling operations.

l 2. Listed below are the check valve groups established to verify the full stroke capability of check valves using a sampling plan as discussed in NUREG-1482 Section 4.1.2 and established in RFR-16455A:

A. EP8818A and EP8818B B. BB8948A and BB8948B C. EP8818C and EP8818D D. BB8948C and BB8948D E. EJ8841 A, EJ8841B, BB8949B and BB8949C F. EMV0001 and EMV0002 G. EMV0003 and EMV0004 .

H. EPV0010, EPV0020, EPV0030, and EPV0040 I. BB8949A and BB8949D J. BBV0001, BBV0022, BBV0040, and BBV0059 Page 2 i

i l

l l

l 3. APV0033 is not an ASME Code valve; therefore, it is not required to be in the IST l Program but it is listed in the IST Program since it is tested during the Auxiliary i i Feedwater pump surveillances (RFR 15787B).  ;

l l I l i 1

l i

i i

l 6

l i.

l l

5 l

l l

l l

I 3

Page 3 1

1 l

x s.-a- _ -

l I

l SECTION 2.2 l

INSERVICE TESTING PROGRAM FOR VALVES l

)

+

=

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB)

DRAWING M-22AB01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR13T NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR DEFJUST.

(in) FREQ. PASSIVE ABPV0001 SG A MS TO ATMS PORV G-3 AO GB B 8 FS/CS O/C ACTI'E AB-1 FT/CS PI/RF ABPV0002 SG B MS TO ATMS PORV D-3 AO GB B 8 FS/CS O/C ACTIVE AB-1 FT/CS ,

PI/RF ABPV0003 SG C MS TO ATMS PORV D-6 AO GB B 8 FS/CS O/C ACTIVE AB-1 FT/CS PI/RF ABPV0004 SG D MS TO ATMS PORV G4 AO GB B 8 FS/CS O/C ACTIVE AB-1 FT/CS Pl/RF-ABV0007 SG D MS PORV MAN ISO G-6 MA GT B 10 FS/CS O/C ACTIVE AB-3 ABV0018 SG A MS PORV MAN ISO G-3 MA GT B 10 FS/CS O/C ACTIVE AB-3 ABV0029 SG C MS PORV MAN ISO C-6 MA GT B 10 FS/CS O/C ACTIVE AB-3 -

ABV0040 SG B MS PORV MAN ISO C-2 MA GT B 10 FS/CS O/C ACTIVE AB-3 O

Page1

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB)

DRAWING M-22AB02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR TST NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR DEFJUST.

(in) FREQ. PASSIVE ABHV0005 TDAFP STM SPLY FROM MS LOOP 2 D-4 AO GB B 4 FS/Q O ACTIVE FT/Q Pl/RF ABilV0005 TDAFP STM SPLY FROM MS LOOP 3 C-4 AO GB B 4 FS/Q O ACTIVE FT/Q PI/RF -

ABHV00ll SG D MSIV 11-3 AO GT B 28 FS/CS C ACTIVE AB-2 PI/RF ABHV0012 SG D MS LOOP 4 ABHV0011 BYP ISO IIV C-4 AO GB B 2 PI/RF C PASSIVE ABilV0014 SG A MSIV F-3 AO GT B 28 FS/CS C ACTIVE AB-2

. PI/RF ABHV0015 SG A MS LOOP 1 ABHV0014 BYP ISO HV F-3 AO GB B .2 PI/RF C PASSIVE ABilV0017 SG B MSIV D-3 AO GT B 28 FS/CS C ACTIVE AB-2 PI/RF ABHV0018 SG B MS LOOP 2 ABHV0017 BYP ISO IIV D-3 AO GB B 2 PI/RF C PASSIVE ABHV0020 SG C MSIV - C-3 AO GT B 28 FS/CS C ACTIVE AB-2 PI/RF ADHV0021 SG C MS LOOP 3 ABHV0020 BYP ISO IIV C-3 AO GB B 2 Pl/RF C PASSIVE ABHV0048 MS LOOP 2 WARMUP STM SPLY TO TDAFP D-4 AO GB B 1 FS/Q C ACTIVE ISO HV FT/Q PI/RF Page 2

_ - _ - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ _ _ _ . _ _ _ - . . - _ _ _ . .__ __ - _-_-_~

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB)  ;

DRAWING M-22AB02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR TST NOTES  :

NUMBER TYPE CAT. SIZE PERF/ POS OR DEFJUST.

(in) FREQ. PASSIVE i

ABIIV0049 MS LOOP 3 WARMUP STM SPLY TO TDAFP C-4 AO GB B 1 FS/Q C ACTIVE ISOIIV FT/Q i Pl/RF j ABLV0007 MS LOOP 3 LO PNT DRN LCV B-4 AO GB B 2 FS/Q C ACTIVE t FT/Q i PI/RF ABLV0008 MS LOOP 2 LO PNT DRN LCV D-5 AO GB B 2 FS/Q C ACTIVE FT/Q  !

PI/RF  !

ABLV0009 MS LOOP 1 LO PNT DRN LCV E-4 AO GB B 2 FS/Q C ACTIVE

. FT/Q [

s PI/RF [

ABLV0010 MS LOOP 4 LO PNT DRN LCV G-4 AO GB B 2 FS/Q C ACTIVE FT/Q PI/RF 2

ABV0045 MS LOOP 4 SFrY RLF H-7 SA RV C 6 RV/RV-5 O/C ACTIVE t

ABV0046 MS LOOP 4 SFrY RLF 11-7 SA RV C 6 RV/RV-5 O/C ACTIVE i ABV0047 MS LOOP 4 SFTY RLF II-6 SA RV C 6 RV/RV-5 O/C ACTIVE .

ABV0048 MS LOOP 4 SFTY RLF 11-5 SA RV C 6 RV/RV-5 O/C ACTIVE i

ABV0049 MS LOOP 4 SFTY RLF 11-5 SA RV C 6 RV/RV-5 O/C ACTIVE Page 3

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB)

DRAWING M-22AB02 -

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SI'TY ACTIVE RR OR TST NOTES ,

NUMBER TYPE CAT. SIZE PERF/ POS OR DEFJUST.

(in) FREQ. PASSIVE ABV0055 MS LOOP 1 SFTY RLF F-7 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0056 MS LOOP 1 SFTY RLF F-7 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0057 MS LOOP 1 SFTY RLF F-6 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0058 MS LOOP 1 SFTY RLF F-5 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0059 MS LOOP 1 SFTY RLF F-5 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0065 MS LOOP 2 SFTY RLF D-7 SA RV C 6 RV/RV-5 O/C ACTIVE ,

ABV0066 MS LOOP 2 SFTY RLF D-7 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0067 MS LOOP 2 SFTY RLF D-6 SA RV C 6 RV/RV-5 O/C ACTIVE ABVCD63 MS LOOP 2 SFTY RLF D-5 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0069 MS LOOP 2 SFTY RLF D-5 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0075 MS LOOP 3 SFTY RLF C-7 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0076 MS LOOP 3 SFTY RLF C-7 SA RV C 6 RV/RV-5 O/C ACTIVE Page 4

L CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM MAIN STEAM SYSTEM (AB) i DRAWING M-22AB02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR13T NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR DEFJUST.

(in) FREQ. PASSIVE ABV0077 MS LOOP 3 SFTY RLF C-6 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0078 MS LOOP 3 SFTY RET C-5 SA RV C 6 RV/RV-5 O/C ACTIVE ABV0079 MS LOOP 3 SFTY RLF C-5 SA RV C 6 RV/RV-5 O/C ACTIVE j ABV0085 TDAFP STM SPLY FROM MS LOOP 2 MAN D-4 MA GT B [ ,

FS/CS O/C ACTIVE AB-3 ISO p MA GT B 4 i FS/CS O/C ACTIVE AB-3 i ABV0087 TDAFP STM SPLY FROM MS LOOP 3 MAN C-4 ISO  !

4 9

b Page 5

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM FEEDWATER SYSTEM'(AE)

DRAWING M-22AE02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR TST NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR DEFJUST.

(in) FREQ. PASSIVE AEFV0039 SG A FW SPLY ISO FV G-3 AO GT B 14 FS/CS C ACTIVE AE-4 FT/CS PI/RF AEFV0040 SG B FW SPLY ISO FV C-3 AO GT B 14 FS/CS C ACTIVE AE-4 FT/CS PI/RF AEFV0041 SG C FW SPLY ISO FV C-6 AO GT B 14 FS/CS C ACTIVE AE-4 FT/CS ,

Pl/RF AEFV0042 SG D FV! SPLY ISO FV G-6 AO GT B 14 FS/CS C ACTIVE AE-4 FT/CS

, PI/RF AEFV0043 SG A FW CIEM INJ FV G-4 AO G,B B 1 PI/RF C PASSIVE i

AEFV0044 SG B FW CIEM INJ FV C-4 AO GB B l PI/RF C PASSIVE AEFV0045 SG C FW CIEM INJ FV C-7 AO GB B 1 PI/RF C PASSIVE AEFV0046 SG D FW CIEM INJ FV G-7 AO GB B 1 PI/RF C PASSIVE AEV0120 SG B FW SPLY CIECK C-4 SA CK C 14 FS/RF C ACTIVE AE-1 AEV0121 SG A FW SPLY CHECK F-4 SA CK C 14 FS/RF C ACTIVE AE-1 Page 6

_ _ _ _ _ _ _ _ _ _- _=___-____ __ ______-_______-__-__ ___________ _ -_______-__ - - -- _ _____ - - - ___-______,

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM

, FEEDWATER SYSTEM (AE)

DRAWING M-22AE02 t VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ' ACTIVE RR ORTST NOTES  ;

NUMBER TYPE CAT. SIZE PERF/ POS OR DEF JUST. i (in) FREQ. PASSIVE  ;

AEV0122 SG D FW SPLY CIECK F-7 SA CK C 14 FS/RF C ACTIVE AE-1

, AEV0123 SG C FW SPLY CIECK C-7 SA CK C 14 FS/RF C ACTIVE AE-1 ,

AEV0124 SG B AUX FW SPLY CIECK C-3 SA CK C 4 FS/CS O ACTIVE AE-3 ,

AEV0125 SG A AUX FW SPLY CIECK F-3 SA CK C 4 FS/CS O ACTIVE AE-3 AEV0126 SG D AUX FW SPLY CHECK F-6 SA CK C 4 FS/CS O ACTIVE AE-3 AEV0127 SG C AUX FW SPLY CIECK C-6 SA CK C 4 FS/CS O ACTIVE AE-3  ;

1 6

i Page 7

_ - - - . -_ - -_ . -_-_- _- _ - _ __-- - - - ~ _ _ _ -- - - . _ . - ---__, . .- . , _ - - -. . - . - . - .

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM i

AUXILIARY FEEDWATER SYSTEM (AL)  :

DRAWING M-22AL01  ;

l 1

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES  ;

NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.  ;

ALIIV0005 MDAFP B TO S/G D IIV H-6 MO GB B 4 FS/Q C/O ACTIVE PI/RF ALilV0006 TDAFP TO S/G D HV G-6 AO GB B 4 FS/Q C/O ACTIVE f FT/Q j ALHV0007 MDAFP B TO S/G A IIV F-6 MO GB B 4 F C/O ACiIVE PI/RF ALilV0008 TDAFP TO S/G A IIV E-6 AO GB B 4 FS/Q C/O ACTIVE l FT/Q l PI/RF ALHV0009 MDAFP TO S/G B HV D-6 MO GB '

B 4 FS/Q C/O ACTIVE Pl/RF ALIIV0010 TDAFP TO S/G B liv D-6 AO GB B 4 FS/Q C/O ACrlVE t FT/Q PI/RF i ALIIV0011 MDAFP TO S/G C liv C-6 MO GB B 4 FS/Q C/O ACTIVE i PI/RF  ;

ALHV0012 TD AFP TO S/G C HV B-6 AO GB B 4 FS/Q C/O ACTIVE FT/Q PI/RF ALHV0030 ESW TO MD AFP B HV F-3 MO BF B 6 FS/Q O ACTIVE PI/RF I

ALHV0031 ESWTO MD AFP A HV E-3 MO BF B 6 FS/Q O ACTIVE PI/RF ALHV0032 ESW TO TD AFP HV C-3 MO BF B 8 FS/Q O ACTIVE PI/RF Fage 8

. .__ .m _. ._ _ _ _ _ ._ _ . _ . _ . . . . . . _ . . _ _ . _ . . _ _ _ . _ . . _ . .__ _ ._._. . ._. _ ._. ,_ _

I CALLAWAY NUCLEAR PLANT  :

INSERVICE TEST PROGRAM i AUXILIARY FEEDWATER SYSTEM (AL)

DRAWING M-22AL01 i I

i VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY- ACTIVE RR OR NOTES I NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF i (in) FREQ. PASSIVE JUST.

t ALHV0033 ESW TO TD AFP HV B-3 MO BF B 8 FS/Q O ACTIVE Pl/RF  !

ALilV0034 CST TO MD AFP B llV H-3 MO GT B 8 FS/Q C ACFIVE PI/RF ALHV0035 CST TO MD AFP A HV D-3 MO GT B 8 FS/Q C ACTIVE PI/RF ALilV0036 CSTTO TDAFP llV B-3 MO GT B 10 FS/Q C ACTIVE PI/RF ALV0001 CST TO TD AFP CIECK VLV B-4 SA CK C 10 FS/CS O/C ACTIVE AL-1 PS/Q.

ALV0002 CST TO MD AFP A CIECK VLV D-4 SA CK C 8 FS/CS O ACrlVE AL-1 l PS/Q ALV0003 CSTTO MD AFP B CIECK VLV H-4 SA CK C 8 FS/CS O ACTIVE AL-1 i PS/Q ALV0006 ESW TO MD AFP B CIECK VLV F-4 SA CK C 6 FS/Q , O ACTIVE l ALV0009 ESW TO MD AFP A CIECK VLV E-4 SA CK C 6 FS/Q O ACTIVE ALV0012 ESW TO TD AFP CHK VLV C-4 SA CK C 8 FS/Q O ACTIVE ALV0015 ESW TO TD AFP CIECK VLV B-4 SA CK C 8 FS/Q O ACTIVE r ALV0029 MD AFP B DISCH TO CST CIECK VLV G-5 SA CK C 2 FS/Q O ACTIVE Page 9

F k

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM b

AUXILIARY FEEDWATER SYSTEM (AL)

DRAWING M-22AL01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SITY ACTIVE RR OR NOTES r NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF  ;

(in) FREQ. PASSIVE JUST.

ALV0030 MD AFP B DISCli CIECK VLV H-5 SA CK C 6 FS/CS O/C ACTIVE AL-1 ALV0033 MDAFP B TO S/G A ClECK VLV F-7 SA CK C 4 FS/CS O ACTIVE AL-1 i

ALV0036 MDAFP B TO S/G D CIECK VLV H-7 SA CK C 4 FS/CS O ACTIVE AL-1 1

ALV0041 MD AFP A DISCH TO CST CIECK VLV F-5 SA CK C 2 FS/Q O ACTIVE ALV0042 MD AFP A DISCH CIECK VLV - D-5 SA CK C 6 FS/CS O/C ACTIVE AL-1 ALV0045 MDAFP A TO S/G C CHECK VLV C-7 SA CK C 4 FS/CS O ACTIVE AL-1

.j ALV0048 MDAFP A TO S/G B CIECK VLV D-7 SA CK C 4 FS/CS O ACTIVE AL-1

!i ALV0053 TD AFP DISCH TO CST CIECK VLV B-5 SA CK C 3 FS/Q O ACTIVE ALV0054 TD AFP DISCH CHECK VLV B-5 SA CK C 8 FS/CS O/C ACTIVE AL-1 ALV0057 TDAFP TO S/G A CHECK VLV E-7 SA CK C 4 FS/CS O ACTIVE AL-1 ALV0062 TDAFP TO S/G D CIECK VLV G-7 SA CK C 4 FS/CS O ACTIVE AL-1.

~

Page 10 1

n v .,e-m-

l CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM AUXILIARY FEEDWATER SYSTEM (AL)

DRAWING M-22AL01 VALVE DESCRIPTION COOR A C T. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

t i

ALV0067 TDAFP TO S/G B CHECK VLV D-7 SA CK C 4 FS/CS O ACTIVE AL-1 ALV0072 TDAFP TO S/G C CHECK VLV B-7 SA CK C 4 FS/CS O ACTIVE AL-1 b

-Page11

CALLAWAY NUCLEAR PLANT .

INSERVICE TEST PROGRAM i

CONDENSATE STORAGE AND TRANSFER SYSTEM (AP)-

DRAWING M-22AP01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

APV0033 AFP TO CST CHECK F-4 SA CK C 3 FS/Q O ACTIVE 3 i

i

[

l

. i

[

I Page 12

_ _ - _ _ - _ _ _ _ _ _ _ _ - _ _ _ - . _--________ - - _ _ _ _ _ _ _ _ - __. . -- _ . _ _ _ _ _ _ _ = _ _ _ _ _ _ _ _ _ _ _

CALLAWAY NUCLEAR PLANT ~

INSERVICE TEST PROGRAM REACTOR COOLANT SYSTEM (BB)

DRAWING M-22BB01 ,

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF .

(in) FREQ. PASSIVE JUST. [

BB8378A RCS LOOP 1 COLD LEG CVCS REGEN HX E-4 SA CK C 3 FS/RF C ACTIVE BB-12 i CHG LINE DNSTR i BB8378B RCS LOOP 1 COLD LEG CVCS REGEN IIX E-4 SA CK C -3 FS/RF C ACTIVE BB-12 CilG LINE UPSTRM CIECK t

BB8379A RCS LOOP 4 COLD LEG CVCS REGEN IIX E-7 SA CK C 3 FS/RF C ACTIVE BB-12 CIIG LINE DNSTRM CIECK ,

BB8379B RCS LOOP 4 COLD LEG CVCS REGEN HX E-7 SA CK C 3 FS/RF C ACTIVE BB-12 i CIIG LINE UPSTR BB8948A RCS LOOP 1 COLD LEG SI ACC CIECK E-4 SA CK A,C 10 FS/RF - O/C ACTIVE BB-1 2  !

LT/RF ,

BB8948B RCS LOOP 2 COLD LEG St ACC CIECK D-4 SA CK A,C 10 FS/RF O/C ACTIVE BB-1 2 LT/RF t BB8948C RCS LOOP 3 COLD LEG SI ACC CHECK C-6 SA CK A,C 10 FS/RF O/C ACTIVE BB-1 2 LT/RF BBS948D RCS LOOP 4 COLD LEG SI ACC CIECK E-6 SA CK A,C 10 FS/RF O/C ACTIVE BB-1 2 LT/RF ,

BB8949A RCS LOOP 1 IlOT LEG SI PMPS CIECK E-5 SA CK A,C 6 FS/RF O/C ACTIVE BB-2 2 LT/RF BB8749B RCS LOOP 2 HOT LEG SI/RHR PMPS CIECK C-5 SA CK A,C 6 FS/CS O/C ACTIVE BB-3 2 ,

LT/RF i

Page 13

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . __ . _- __. ~ _.

I CALLAWAY NUCLEAR PLANT  ;

INSERVICE TEST PROGRAM t

REACTOR COOLANT SYSTEM (BB)

DRAWING M-22BB01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES '

NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST. t BB8949C RCS LOOP 3 IlOT LEG SI/RIIR PMPS CIECK C-6 SA CK A,C 6 FS/CS O/C ACTIVE BB-3 2 1 LT/RF BB8949D RCS LOOP 4 IIOT LEG St PMPS CIIECK G-6 SA CK A,C 6 FS/RF O/C ACTIVE BB-2 2 [

LT/RF i BBPV8702A RCS LOOP 1 IIOT LEG TO RHR PMPS PCV E-4 MO GT A 12 FS/CS O/C ACTIVE BB4  !

ISO PI/RF  ;

LT/RF BBPV8702B RCS LOOP 4 IIOT LEG TO RIIR PMPS PCV II-6 MO GT A 12 FS/CS O/C ACTIVE BB4 ISO Pl/RF LT/RF ,

8BV0001 RCS LOOP 1 COLD LEG St BIT CIIECK D-5 SA CK A,C 1.50 FS/RF O/C ACTIVE BB-4 2 s

LT/RF BBV0022 RCS LOOP 2 COLD LEG St BIT CIECK D-4 SA CK A,C 1.50 FS/RF O/C ACTIVE BB-4 2 LT/RF BBV0040 RCS LOOP 3 COLD LEG SI BIT CIECK D-6 SA CK A,C 1.50 FS/RF O/C ACTIVE BB-4 2 LT/RF BBV0059 RCS LOOP 4 COLD LEG SI BIT CHECK E-6 SA CK A,C 1.50 FS/RF O/C ACTIVE BB-4 2 ,

LT/RF t

Page 14

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR COOLANT SYSTEM (BB)

DRAWING M-22BB02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ I'OS OR TST DEF (in) FREQ. PASSIVE JUST.

BB8010A RCS PZR SFTY RLF A H-7 SA RV C 6 RV/RV-5 O/C ACTIVE BB8010B RCS PZR SFTY RLF B 11-6 SA RV C 6 RV/RV-5 O/C ACrlVE BB8010C RCS PZR SFTY RLF C H-5 SA RV C l 6 RV/RV-5 O/C ACTIVE BBHV8000A RCS PZR OUT PWROPER RLFIIV E-7 MO GT B 3 FS/Q O/C ACTIVE Pl/Q BBHV8000B RCS PZR OlJr PWR OPER RLF HV E-7 MO GT B 3 FS/Q O/C ACrlVE PI/Q ,

BBHV8026 RCS PRT N2/ SERV GAS SPLY DNSTRM ISO E-3 AO ?DI A 1 FS/Q C ACTIVE HV '. FT/Q

PI/RF LJ/RF BDlIV8027 RCS PRT N2/ SERV GAS SPLY UPSTRM ISO E-3 AO DI A 1 FS/Q C ACTIVE IIV FT/Q PI/RF LJ/RF BBIIV8157A PRTTO EX LTDN HX PROT A ISO HV E-l SO GB B 1 FS/Q O/C ACTIVE j PI/Q FT/Q BBHV8157B PRT TO EX LTDN HX PROT B ISO HV D-2 SO GB B 1 FS/Q O/C ACTIVE PI/Q FT/Q l

Page 15

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR COOLANT SYSTEM (BB)

DRAWING M-22BB02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFfY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

BBPCV0455A RCS PRESSURIZER POWER OPERATED E-7 SO GB B 3 FS/CS O/C ACTIVE BB-10 RELIEF VALVE FT/CS Pl/RF BBPCV0456A RCS PRESSURIZER POWER OPERATED E-8 SO GB B 3 FS/CS O/C ACrlVE BB-10 RELIEF VALVE FT/CS PI/RF 6

1 Page 16

CALLAWAY NUCLEAR PLANT ,

INSERVICE TEST PROGRAM REACTOR COOLANT SYSTEM (BB)

DRAWING M-22BB03 i VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

BBHV0013 RCP A THRM BAR COOL COIL COOL WrR C-2 MO GT B 3 FS/RF C ACrlVE BB-8 i OUTIIV Pl/RF i BBilV0014 RCP B THRM BAR COOL COIL COOL WTR C-2 MO GT B 3 FS/RF C ACTIVE BB-8 OUT HV PI/RF BBHV00'.5 RCP C THRM BAR COOL COIL COOL WrR C-2 MO GT B 3 FS/RF C ACTIVE BB-8 OUT HV PI/RF BBHV0016 RCP D THRM BAR COOL COIL COOL WrR C-2 MO GT B 3 FS/RF C ACrlVE BB-8 .

OUT HV PI/RF BBHV8141 A RCP A SEAL # 1 SEAL WTR OUTISO HV D-3 AO GB B 0.75 PI/RF O PASSIVE BBHV8141B RCP B SEAL # 1 SEAL WTR OUT ISO IIV D-3 AO lGB B 0.75 PI/RF O PASSIVE a l BBHV8141C RCP C SEAL # 1 SEAL WIR OlffISO HV D-3 AO 'GB B 0.75 PI/RF O PASSIVE '

t BBHV814ID RCP D SEAL # 1 SEAL WrR OLTTISO HV D-3 AO GB B 0.75 PI/RF O PASSIVE BBHV8351A RCP A SEAL WrR SPLY ISO HV C-5 MO GB A 2 PI/RF O PASSIVE uiRF BBIIV8351B RCP B SEAL WrR SPLY ISO IIV C-5 MO GB A 2 PI/RF O PASSIVE U/RF I BBHV8351C RCP C SEAL WrR SPLY ISO HV C-5 MO GB A 2 Pl/RF O PASSIVE LJ/RF  !

<- [

'i Page 17

t CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM i

REACTOR COOLANT SYSTEM (BB)

DRAWING M-22BB03 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST. ,

BBilV8351D RCP D SEAL WTR SPLY ISOIIV C-5 MO GB A 2 PI/RF O PASSIVE U/RF.

BBV0ll8 RCP A SEAL WTR SPLY ISO BBVol19 C-5 SA CK - A,C 1.50 FS/RF C ACTIVE BB-7 UPSTRM CIECK U/RF BBV0120 RCP A SEAL WTR SPLY ISO BBV0119 C-4 SA CK C 2 FS/RF C ACrlVE BB-13 DNSTRM CIECK BBV0121 RCP A SEAL WTR SPLY CIECK C-4 SA CK C 2 FS/RF C ACTIVE BB-13 BBV0122 CCW TO RCP A TIERMAL BARRIER SPLY C-4 SA .CK C 2 FS/RF. C ACTIVE BB-11 CK VLV BBV0148 RCP B SEAL WTR SPLY ISO BBV0149 C-5 SA CK A,C 1.50 FS/RF- C ACTIVE BB-7 UPSTRM CIECK s' U/RF ,

BBVuv0 RCP B SEAL WTR SPLY ISO BBV0149 C-4 SA CK C 2 FS/RF C ACTIVE BB-13 DNSTRM CIECK BBV0151 RCP B SEAL WrR SPLY CIECK C-4 SA CK C 2 FS/RF C ACrlVE BB-13 BBV0152 CCW TO RCP B TIERMAL BARRIER SPLY C-4 SA CK C 2 FS/RF C ACrlVE BB-11 CK VLV BBV0178 RCP C SEAL WTR SPLY ISO BBV0179 C-5 SA CK A,C 1.50 FS/RF C ACTIVE BB-7 UPSTRM CIECK U/RF BBV0180 RCP C SEAL WTR SPLY ISO BBV0179 C-4 SA CK C 2 FS/RF C ACTIVE BB-13 DNSTRM CIECK j Page 18

t CALLAWAY NUCLEARPLANT 6

- INSERVICE TEST PROGRAM I

REACTOR COOLANT SYSTEM (BB) ,

DRAWING M-22BB03 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY AcitVE RR OR NOTES '

NUMBER TYPE CAT. SIZE PERF/ POS OR 'IST DEF (in) FREQ. PASSIVE JUST.

BBV0181 RCP C SEAL WTR SPLY CIECK C-4 SA CK C 2 FS/RF C ACTIVE BB-13 i

BBV0182 CCW TO RCP C TIERMAL BARRIER SPLY- C-4 SA CK C 2 FS/RF C ACTIVE BB-11 CK VLV BBV0208 RCP D SEAL WTR SPLY ISO BBV0209 C-5 SA CK A,C 1.50 FS/RF C ACTIVE BB-7 UPSTRM CIECK LI/RF  !

. DBV0210 RCP D SEAL WIR SPLY 150 BBV0209 C-4 SA CK C 2 FS/RF C ACTIVE BB-13 j DNSTRM CIECK BBV0211 RCP D SEAL WTR SPLY CIECK C-4 SA CK C 2 FS/RF C ACTIVE BB-13 BBV0212 CCW TO RCP D TIERMAL BARRIER SPLY C-4 SA lCK C 2 FS/RF C ACTIVE BB-11 i CK vtv .

BBV0474 CCW TO RCP A TIERMAL BARRIER SPLY C-4 SA CK C 1.50 FS/RF C ACTIVE BB-11 CK VLV BBV0476 CCW TO RCP B TIERMAL BARRIER SPLY C-4 SA CK -C 1.50 FS/RF C ACTIVE BB-11 CK VLV ,

BBV0479 CCW TO RCP C TIERMAL BARRIER SPLY C-4 SA CK C 1.50 FS/RF C ACTIVE BB-11 +

CK VLV BBV0480 CCW TO RCP D TIERMAL BARRIER SPLY C-4 SA CK C 1.50 FS/RF C ACTIVE BB-11 -

CK VLV Page 19

I i

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ,

REACTOR COOLANT SYSTEM (BB) l DRAWING M-22BB04 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES ,

TYPE CAT. SIZE PERF/ POS OR TST DEF '

NUMBER ,

(in) FREQ. PASSIVE JUST.

t BBHV8001A RCS RV HEAD VENT PROT A UPSTRM HV F-4 SO GB B 1 FS/CS O/C ACTIVE BB-5 FT/CS PI/RF  ;

BBHV8001B RCS RVIEAD VENT PROT B UPSTRM HV F-4 SO GB B 1 FS/CS O/C ACTIVE BB-5 FT/CS ,

PI/RF

  • BBHV8002A RCS RVIEAD VENT PROT A UPSTRM llV F-3 SO GB B 1 FS/CS O/C ACrlVE BB-5 FT/CS ,

PI/RF BBHV8002B RCS RV FEAD VENT PROT B UPSTRM HV F-3 SO GB B 1 FS/CS O/C ACTIVE BB-5 ,

FT/CS l PI/RF

+

i E

Page 20

i I

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM L

CHEMICAL AND VOLUhm CONTROL SYSTEM (BG)

DRAWING M-22BG01 [

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR - NOTES i NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST. i BG8381 CCP A & B TO REGEN HX CIECK F-4 SA CK A,C 3 FS/RF C ACTIVE BG-1 .

U/RF

  • BGHV8100 SEAL WTR RTN OUTER CTMTISO D-2 MO GB A 2 FS/RF C ACTIVE BG-2 i PI/RF U/RF BGilV8112 SEAL WTR RTN INNER CTMTISO D-2 MO GB A 2 FS/RF C ACTIVE BG-2 PI/RF U/RF ,

BGHV8152 CVCS LTDN SYS OUT CTMTISO IIV F-2 AO GB A 3 FS/CS C ACTIVE BG-3 FT/CS [

t PI/RF U/RF  :

BGHVS153A RCS TO CVCS EX LTDN HX DNSTRM ISO D-7 SO GB B 1 FS/Q O ACTIVE PROT A HV PI/RF BGHV8153B RCS TO CVCS EX LTDN HX DNSTRM ISO D-7 SO 'GB B 1 FS/Q O ACTIVE PROT B HV PI/RF j BGHV8154A RCS TO CVCS EX LTDN HX UPSTRM ISO D-8 SO GB B 1 FS/Q O ACTIVE i PROT A IIV PI/RF  :

BGHV8154B RCS TO CVCS EX LTDNllX UPSTRM ISO .D-8 SO GB B 1 FS/Q O ACTIVE PROT B HV PI/RF ,

BGHV8160 CVCS LTDN SYS INNER CTMT ISO IIV F-3 AO GB A 3 FS/CS C ACTIVE BG-3 i FT/CS Pl/RF LJ/RF BGV0135 SEAL WTR RTN INNER CTMT BGHV8112 D-3 SA CK A 0.75 U/RF C PASSIVE DRN CIECK ,

t Page 21 i

1 CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CHEMICAL AND VOLUME CONTROL SYSTEM (BG)  ;

DRAWING M-22BG03 3

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF  :

(in) FREQ. PASSIVE JUST.

BG8481A CVCS CCP A DISCH CHECK C-4 SA CK C 4 FS/RF. O/C ACrlVE BG-4  ;

r PS/Q 13G8481B CVCS CCP B DISCH CIECK B-4 SA CK C 4 FS/RF O/C ACTIVE BG-4 +

PS/Q BG8497 CVCS NCP DISCH CIECK E-4 SA CK C 3 FS/Q C ACTIVE j BG8546A RWST TO CCP A SUCT CIECK C-7 SA CK C 8 FS/RF O/C ACTIVE BG-5 [

BG8546B RWST TO CCP B SUCT CIECK B-7 SA CK C 8 FS/RF O/C ACTIVE BG-5 BGHV8105 CVCS CHARGING HDRTO REGEN IlX E-2 MO lGT A 3 FS/CS C ACTIVE BG4 j OUTER CTMTISO VLV -

PI/CS -

! LJ/RF BGHV8106 CVCS CHARGING HDRTO REGEN llX E-2 MO GT B 3 FS/CS C ACTIVE BG-6 i c3U11IR CTMTISO VLV PI/CS BGHV8110 A CCP DISCH MINIFLOW TO SEAL WrR HX E-3 MO- GB B 2 FS/Q O/C ACTIVE

. ISO Pl/RF BGHV8111 CCP B DISCH MINIFLOW ISO VLV E-4 MO GB B 2 FS/Q O/C ACTIVE Pl/RF BGHV8357A CVCS CCP A DISCH TO RCP SEALS C-4 MO GB B 1 FS/Q O/C ACTIVE THROTTLE VLV PI/RF ,

BGHV8357B CVCS CCP B DISCH TO RCP SEALS B-4 MO GB B 1 FS/Q O/C ACTIVE THROTILE VLV Pl/RF t

Page 22

. _ _ _ . _ _ _ _ _ _ . _ . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ . _ _ . _ _ _ _ _ _ _ _ -___ .- _ v -

. ~ . - _ _ _ _ _ - . _ ._ _ _ ___ _ _ _ . . _ _ _ . _. __. _. _ _ _ _ - _ - _ _ _ _ _ _ ____ __ _ _ __ __ __ - ___

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CIEMICAL AND VOLUNE CONTROL SYSTEM (BG)

DRAWING M-22BG03 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF I (in) FREQ. PASSIVE JUST.

BGLCVoll2B CVCS VCT OUT UPSTRM ISO F-6 MO GT B 4 FS/CS C ACTIVE BG-7 PURF -

BGLCVO112C CVCS VCT OUT DNSTRM ISO F-6 MO GT B 4 FS/CS C ACTIVE BG-7 PI/RF BGV0091 CCP A DISCIITO SEAL WIR HX CIECK E-4 SA CK C 2 FS/Q O ACTIVE BGV0095 CCP B DISCH TO SEAL WrR HX CIECK E-4 SA CK C 2 FS/Q l O ACrlVE BGV0589 CCP B DISCH TO SEAL WrRINJ FLTRS HDR B-4 SA CK C 2 FS/Q O ACTIVE CIECK BGV0590 CCP A DISCH TO SEAL WIRINJ FLTRS HDR C-4 SA CK C 2 FS/Q O ACTIVE CIECK l BGV0605 CCP B DISCH BGFCV0121 UPSTEAM CHECK B-3 SA CK C 3 FS/Q C ACTIVE BGV0606 CCP A DISCH BGFCV0121 UPSTEAM D-3 SA .CK C 3 FS/Q C ACTIVE ClECK '

\ f

[

i O

Page 23

l

- CALLAWAY NUCLEAR PLANT '-

INSERVICE TEST PROGRAM

~

v l CHEMICAL AND VOLUME CONTROL SYSTEM (BG)

DRAWING M-22BG05 ,

I f

. t l VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES }

NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASStVE JUST.

i BGIIV8104 EMERG BORATE TO CCP A & B IIDRISO IIV A-4 MO G2 B 2 FS/Q O ACrlVE PI/RF.

BGV0147 CVCS BA XFR PMP A DISCII CIECK B4 SA CK C 3 FS/CS O ACTIVE BG-8 BGV0155 CVCS BA XFR PMP A DISCIITO BAT A B4 SA CK C 0.75 FS/Q O ACTIVE ,

CIECK '

BGV0165 CVCS BA XFR PMP B DISCII CIECK A4 SA CK C 3 FS/CS O ACrlVE BG-8 ,

BGV0167 CVCS BA XFR PMP B DISCH TO BAT B B4 SA CK C_ 0.75 FS/Q O ACTIVE {'

CIECK BGV0174 CVCS EMERG BORATE TO CCP A & B HDR ' A-4 SA lCK C 3 FS/CS O ACTIVE BG-8 .

CIECK -  :

I i

l-i e

Page 24 i

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR MAKEUP WATER SYSTEM (BL)

DRAWING M-22BL01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR I NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

DL8046 RX M/U WIR SPLY INNER CTMT CIIECK B-3 SA CK A,C 3 FS/PE C ACTIVE BL-1 U/RF -

BLHV8047 RX M/U WTR OUTER CTMT HV ISO B-4 SO DI A 3 FS/Q C ACTIVE FT/Q PI/RF U/RF e

Page 25

CALLAWAY NUCLEAR PLANT

INSERVICE TEST PROGRAM STEAM GENERATOR BLOWDOWN SYSTEM (BM)

DRAWING M-22BM01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

BMIIV0001 SG A B/D ISO VLV F-5 AO GB B 4 FS/Q C ACTIVE FT/Q PI/RF Bh01V0002 SG B B/D ISO VLV E-5 AO GB B 4 FS/Q C ACTIVE FT/Q PI/RF BMIIV0003 SG C B/D ISO VLV C-5 AO GB B 4 FS/Q C ACTIVE FT/Q PI/RF

. BMHV0004 SG D B/D ISO VLV A-5 AO GB B 4 FS/Q C ACTIVE FT/Q PI/RF BMIIV0019 SG A B/D NUC SAMP SYS UP LINE ISO CTRL G-7 SO ,GB B I FS/Q. C ACTIVE VLV PI/RF i BMIIV0020 SG B B/D NUC SAMP SYS UP LINE ISO CTRL E-7 SO .,GB B 1 FS/Q C ACTIVE VLV PI/RF BMllV0021 SG C B/D NUC SAMP SYS UP LINEISO CTRL D-7 SO GB B 1 FS/Q C ACTIVE VLV PI/RF BMIIV0022 SG D B/D NUC SAMP SYS UP LINEISO CIRL B-7 SO GB B 1 FS/Q C ACTIVE VLV PI/RF BMHV0035 SG A B/D NUC SAMP SYS LWR LINE ISO G-7 SO GB B 1 FS/Q, C ACTIVE CTRL VLV FT/Q PI/RF BMHV0036 SG B B/D NUC SAMP SYS LWR LINE ISO E-7 SO GB B 1 FS/Q C ACTIVE CTRL VLV FT/Q l Pl/RF Page 26

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM STEAM GENERATOR BLOWDOWN SYSTEM (BM)

DRAWING M-22BM01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

BMI{V0037 SG C B/D NUC SAMP SYS LWR LINE ISO C-7 SO GB B 1 FS/Q C ACTIVE 4 CTRL VLV FT/Q PI/RF BMI{V0038 SG D B/D NUC SAMP SYS LWR LINE ISO B-7 SO GB B 1 FS/Q C ACrlVE CTRL VLV FT/Q

! PI/RF -

BMIIV0065 SG A B/D NUC SAMP SYS LINE ISO UPSTRM G-6 SO GB B 1 FS/Q C ACTIVE

IIV FT/Q PI/RF BhDIV0066 SG B B/D NUC SAMP SYS LINE ISO UPSTRM E-6 SO GB B 1 FS/Q C ACTIVE HV FT/Q PI/RF BMIIV0067 SG C B/D NUC SAMP SYS LINE ISO UPSTRM C-6 SO .GB B 1 FS/Q C ACTIVE i

IIV s FT/Q Pl/RF BMIIV0068 SG D B/D NUC SAMP SYS LINE ISO UPSTRM B-6 SO 'GB B 1 FS/Q C ACTIVE IIV FT/Q PI/RF BMV0045 SG DRN PMPS SUCTIIDRINNER CTMTISO A-4 MA GT A 3 LJ/RF C PASSIVE BMV0046 SG DRN PMPS SUCT HDR OlITER CTMTISO A-3 MA GT A 3 LJ/RF C PASSIVE i

1

i
  • I Page 27 l

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM  ;

BORATED REFUELING WATER  ;

STORAGE SYSTEM (BN) i DRAWING M-22BN01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTF5 NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

BNHCV8800A RWST TO RFP DNSTRM HV E-5 AO GB B 3 FS/Q C ACTIVE  ;

IT/Q '

PI/RF BNHCV88008 RWST TO RFP UPSTRM HV E-5 AO GB B 3 FS/Q C ACTIVE IT/Q PI/RF BNHV0003 RWST TO CTMT SPRY PMP B HV C-3 MO GT B 12 FS/Q C/O ACTIVE PI/RF BNilV0004 RWST TO CTMT SPRY PMP A HV A-3 MO GT B 12 FS/Q CX) ACTIVE PI/RF BNilV8806A S1 PMP A SUCT FROM RWST ISO B-5 MO . GT B 8 FS/Q C/O ACTIVE l PI/RF BtSIV8806B St PMP B SUCT FROM RWSTISO E-3 MO ,GT B 8 FS/Q C/O ACTIVE PI/RF l

BNilV8812A RWSTTO RHR PMP A SUCT ISO VLV B-3 MO GT B 14 FS/Q C/O ACTIVE PI/RF l BNilV8812B ,

RWST TO RHR PMP B SUCTISO VLV D-3 MO GT B 14 FS/Q C/O ACTIVE PI/RF ,

BNilV8813 SI PMPS MINIFLOW TO RWSTISO VLV B-7 MO GB B 2 FS/CS C ACTIVE BN-2 PI/RF BNLCV0ll2D CCP A SUCT FROM RWSTISO VLV A-5 MO GT B 8 FS/CS O/C ACTIVE BN-1 ,

PI/RF BNLCV0112E CCP B SUCT FROM RWSTISO VLV E-3 MO GT B 8 FS/CS O/C AC:IVE BN-1 l PI/RF t

Page 28

CALLAWAY NUCLEAR PLANT  ;

INSERVICE TEST PROGRAM FUEL POOL COOLING AND CLEANUP (EC)

DRAWING M-22EC01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES t NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

ECHV0011 FUEL POOL HX A SHELL SIDE CCW OUT H-5 MO BT B 12 FS/Q O/C ACnVE ISO PI/RF j EC:IV0012 FUEL POOL HX B SHELL SIDE CCW OUT F-5 MO BT B 12 FS/Q O/C ACRVE ISO PI/RF i i

t P

~

I Page 29

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM FUEL POOL COOLING AND CLEANUP (EC)

DRAWING M-22EC02 i I

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

ECV0083 FUEL POOL CLEAN-UP DEMIN TO REFUEL C-6 MA GT A 6 U/RF C PASSIVE POOL OUTER CTMTISO ECV0084 FUEL POOL CLN/U DEMIN TO RFP INNER C-5 MA GT A 6 U/RF C PASSIVE CTMTISO ECV0087 RFP TO SFP INNER CTMT ISO D-7 MA GT A 6 U/RF C PASSIVE i

ECV0088 REFUEL POOL TO SFP OUTER CTMTISO D-7 MA GT A 6 U/RF C PASSIVE ECV0095 FUEL POOL SKIMMER PUMP SUCT INNER B-5 MA GT A 6 U/RF C PASSIVE CTMTISO ECVCD96 REFUEL POOL SKIMMER PMP SUCT OUTER B-5 MA  ! GT. A 6 U/RF C PASSIVE CFMTISO .

~

[

i I

Page 30 t

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ESSENTIAL SERVICE WATER SYSTEM (EF)

DRAWING M-22EF01 4

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFrY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

EFilV0023 SERV WrR/ESW TRN A XCON HV F-7 MO BF B 30 FS/Q C ACrlVE PI/RF EFHV0024 SERV WIR ESW TRN B XCON HV E-7 MO BF B 30 FS/Q C ACTIVE PI/RF EFHV0025 SERV WTR/ESW TRN A XCON HV F-7 MO BF B 30 FS/Q C ACTIVE Pl/RF EFHV0026 SERV WTR ESW TRN B XCON HV E-7 MO BF B 30 FS/Q C ACTIVE PI/RF EFHV0044 ESW TRN B TO SERV AIR CMPSR B ISO B-7 AO GB B 2 FS/Q C ACrlVE FT/Q

. PI/RF EFV0076 ESW TRN B FROM SERV AIR CMPSR B-6 SA -CK C 2.50 FS/Q C ACTIVE CHECK VLV 4

Page 31

1 CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ESSENTIAL SERVICE WATER SYSTEM (EF)

DRAWING M-22EF02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFIT ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERFI POS OR TST DEF (in) FREQ. PASSIVE JUST.

EFHV0031 ESW TRN A TO CTMT AIR CLRS OUTER G-7 MO BF A 14 FS/Q O/C ACTIVE CTMT HV PI/RF U/RF j EFHV0032 ESW TRN B TO CTMT AIR CLRS OUTER B-7 MO BF A 14 FS/Q O/C ACTIVE CTMT HV PI/RF U/RF EFliV0033 ESW TRN A TO CTMT AIR CLRS INNER G-7 MO BF A 14 FS/Q O/C ACTIVE CINT HV PI/RF U/RF j EFHV0034 ESW TRN B TO CTMT AIR CLRS INNER B-7 MO BF A 14 FS/Q O/C ACTIVE CnlT HV PI/RF U/RF EFHV0037 ESW TRN A TO UHS liv G-2 MO ;BF B 30 FS/Q O ACTIVE PI/RF EFIIV0038 ESW TRN B TO UHS HV C-2 MO BF B 30 FS/Q O ACTIVE PI/RF EFHV0039 ESW TRN A TO SERV WTRUPSTRM HV F-2 MO BF B 30 FS/Q C ACTIVE PI/RF EFHV0040 ESW TRN B TO SERV WTR UPSTRM HV D-2 MO BF B 30 FS/Q C ACTIVE PI/RF EFHV0041 ESW TRN A TO SERV WTR DNSTRM HV E-2 MO BF B 30 FS/Q C ACTIVE PI/RF EFliV0042 ESW TRN B TO SERV WTR DNSTRM HV D-2 MO BF B 30 FS/Q C ACTIVE PI/RF EFliV0043 ESW TRN A TO SERV AIR CMPSR A ISO E-7 AO GB B 2 FS/Q C ACTIVE FT/Q PI/RF Page 32

L CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ESSENTIAL SERVICE WATER SYSTEM (EF)

DRAWING M-22EF02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

i EFHV0045 ESW TRN A FROM CTMT AIR CLRS INNER G4 MO BF A 14 FS/Q O/C ACTIVE CTMT HV PI/RF U/RF  ;

EFHV0046 ESW TRN B FROM CBiT AIR CLRS INNER B4 MO BF A 14 FS/Q O/C ACTIVE CTMT HV PI/RF U/RF EFHV0047 ESW TRN A FROM CTMT AIR CLRS BYP ISO G4 MO BF A 10 FS/Q C ACTIVE l IIV PI/RF l LJ/RF i EFHV0048 ESW TRN B FROM CTMT AIR CLRS BYP ISO C4 MO BF A 10 FS/Q C ACTIVE  !

HV PI/RF U/RF  ;

EFHV0049 ESW TRN A FROM CTMT AIR CLRS OUTER G4 MO ;BF A 14 FS/Q . O/C ACTIVE CTMTIIV Pl/RF -

E U/RF EFHV0050 ESW TRN B FROM CTMT AIR CLRS OUTER B4 MO BF A 14 FS/Q O/C ACTIVE CatT HV PI/RF t U/RF EFHV0051 ESW TRN KTO CCW HX A HV G-4 MO BF B 24 FS/Q O ACTIVE Pl/RF EFHV0052 ESW'IRN B TO CCW HX B HV C-4 MO BF B 24 FS/Q O ACTIVE PI/RF  !

EFHV0059 ESW TRN A FROM CCWIIX A HV G-3 MO BF B 24 FS/Q C ACTIVE PI/RF EFHV0060 ESW TRN B FROM CCW HX A HV C-3 MO BF B 24 FS/Q C ACTIVE  :

PI/RF Page 33

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ESSENTIAL SERVICE WATER SYSTEM (EF)

DRAWING M-22EF02 VALVE DESCRIPTION COOR ACT. ' VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

EFV0046 ESW TRN A FROM SERV AIR CMPSR E-6 SA CK C 2.50 FS/Q C ACTIVE CIIECK VALVE l

Page 34

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM l ESSENTIAL SERVICE WATER SYSTEM (EF) '

) DRAWING M-U2EF01 VALVE DESCRIPTION COOR l ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES ,

NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

EFHV0065 ESW UHS COOL-TWR TRN A BYP llV B-6 MO BF B 30 FS,Q O/C ACTIVE  !

PI/RF  !

EFilV0066 ESW UllS COOL-TWR TRN B BYP HV B-3 MO BF B 30 FS/Q O/C ACTIVE PI/RF EFIIV0097 ESW PMP A DISCIIRECIRC llV F-6 MO GT B 3 FS/Q C ACTIVE PI/RF EFHV0098 ESW PMP B DISCil RECIRC IIV D-6 MO GT B 3 FS/Q C ACTIVE PI/RF EFPDV0019 ESW S-C STR A DRN DP CTRL VLV F-4 MO GT B 3 FS/Q O/C ACTIVE PI/RF EFPDV0020 ESW S-C STR B DRN DP CTRL VLV D-4 MO tGT B 3 FS/Q O/C ACTIVE

'. PI/RF '

EFV0001 ESW PMP A DISCH CHECK G-5 SA 4CK C 30 FS/Q O ACTIVE EFV0004 ESW PMP B DISCH CHECK D-5 SA CK C 30 FS/Q O ACTIVE I

Page 35

i CALLAWAY NUCLEAR PLANT  :

INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG)

DRAWING M-22EG01 t

DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY At,anVE RR OR NOTES VALVE

  • NUMBER TYPE CAT. SIZE PERF/ POS OR *IST DEF (in) FREQ. PASSIVE JUST.

l EGHV0011 ESW TO CCW TRN A UPSTRM HV F-8 MO GB B 1.50 FS/Q O ACTIVE PI/RF EGilV0012 ESW TO CCW TRN B UPSTRM IIV C MO GB B 1.50 FS/Q' O ACTIVE PI/RF EGHV0013 ESW TO CCW TRN A DNSTRM HV F-7 MO GB B 1.50 FS/Q O ACTIVE [

PI/RF  :

EGHV0014 ESW TO CCW TRN B DNSTRM HV C-7 MO GB B 1.50 FS/Q O ACTIVE Pl/RF  ;

EGHV0015 CCW'IRN A SPLY/RTN ISO HV D4 MO BF B 18 FS/Q O/C ACTIVE

' PI/RF EGHV0016 CCW TRN B SPLY/RTN ISO HV D4 MO !BF B 18 FS/Q O/C ACITVE

', PI/RF  ;

EGRV0009 CCW SRG TK A VENT CTRL VLV G4 AO GB B 2 FS/Q C ACTIVE FT/Q PI/RF  !

EGRV0010 CCW SRG TK B VENT CTRL VLV C4 AO GB B 2 FS/Q C ACTIVE FT/Q PI/RF EGV0003 CCW PMP A DISCH CHECK G-3 SA CK C 20 FS/Q O/C ACTIVE t

EGV0007 CCW PMP C DISCH CHECK E-3 SA CK C 20 FS/Q O/C ACTIVE i EGV0012 CCW PMP B DISCH CIIECK D-3 SA CK C 20 FS/Q O/C- AwiVE Page 36

__ _ _ _ _ _ . . _ _ _ _ _ _ _ _ m _ _ _ _ _ _ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ v - ,.

CALLAWAY NUCLEAR PLANT .

INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG)

DRAWING M-22EG01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RROR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR . TST DEF (in) FREQ. PASSIVE JUST.

I EGV0016 CCW PMP D DISCH CHECK C-3 SA CK C 20 FS/Q O/C ACTIVE EGV0130 CCW TRN A SPLY/RTN CIECK D-6 SA CK C 18 FS/Q O ACTIVE ,

EGVO131 CCW TRN B SPLY/RTN CHECK . D-6 SA CK C 18- FS/Q O ACTIVE a

I i

6 L

Page 37  ;

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG)

DRAWING M-22EG02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SI?.E PERF/ POS OR TST DEF (ir) FREQ. PASSIVE JUST.

EGHV0053 CCW TRN A SPLY ISO HV G-5 MO BF B 18 FS/Q O/C ACTIVE PI/RF EGHV0054 CCW TRN B SPLY ISO HV F-5 MO BF B 18 FS/Q O/C ACTIVE Pl/RF EGilV0072 CCW TO PASS UPSTRM ISO IIV G-2 MO GT B 2 FS/Q C ACTIVE PI/RF EGHV0073 CCW TO PASS DNSTRM ISO HV G-2 MO GT B 2 FS/Q C ACTIVE PI/RF EGHV0074 CCW FROM PASS UPSTRM ISOIIV G-1 MO GT B 2 FS/Q C ACTIVE PI/RF EGIIV0075 CCW FROM PASS DNSTRM ISO HV G-1 MO 'GT B 2 FS/Q C ACTIVE

'. PI/RF EGIIV0101 CCW TO RHR HX A ISO G-4 MO BF B 18 FS/Q O/C ACrlVE Pl/RF EGilV0102 CCW TO RHR HX B ISO C-4 MO BF B 18 FS/Q O/C ACTIVE PI/RF EGTV0029 CCWIlX A CCW BYP TV G4 AO BF B 20 FS/Q C ACTIVE FT/Q PI/RF EGTV0030 CCW HX B CCW BYP TV C4 AO BF B 20 FS/Q C ACTIVE FT/Q PI/RF Page 38

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG)

DRAWING M-22EG03 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFIT ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

EGHV0058 CCW TO CTMT OUTERISO HV H-5 MO GT A 12 FS/Q O/C ACTIVE PI/RF U/RF EGHV0059 CCW FROM CTMT OUTERISO VLV C-5 MO GT A 12 FS/Q O/C ACTIVE PI/RF.

U/RF EGHV0060 CCW FROM CTMT OUTERISO VLV B-5 MO GT A 12 FS/Q O/C ACTIVE PI/RF U/RF EGIIV0061 CCW FROM RCP THRM BAROUTER CFMT C .MO GT A 4 FS/Q O/C ACTIVE ISO PI/RF U/RF EGHV0062 CCW FROM RCS IN CTMTISO HV B-4 MO ;GT A 4 FS/Q O/C ACTIVE -

  • i PI/RF '

2 U/RF EGHV0069A CCW TO RW PROT A SPLY ISO HV F-8 AO BF B 14 FS/Q C ACTIVE Fr/Q PI/RF EGHV0069B - CCW FROM RW PROT A RTN ISO HV F-6 AO BF B 14 FS/Q C ACTIVE FT/Q PI/RF  :

l EGHV0070A CCW TO RW PROT B SPLY ISO HV F-8 AO BF B 14 FS/Q C ACTIVE FT/Q ,

Pl/RF EGHV0070B CCW FROM RW PROT B RTN ISOIIV F-6 AO BF B 14 FS/Q C ACTIVE l' FT/Q

, P!/RF Page 39

i CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPONENT COOLING WATER SYSTEM (EG) '

DRAWING M-22EG03  ;

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY At t tVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF ,

(in) FREQ. PASSIVE JUST. {

r EGHV0127 CCW TO CTMT BYP ISO HV G-5 MO GT A 12 U/RF C PASSIVE Pl/RF  ;

EGHV0130 CCW FROM RCS CTMT EGHV0060 BYP ISO B-5 MO GT A 12 U/RF C PASSIVE HV PI/RF EGHV0131 CCW FROM CTMT EGHV0059 BYP ISO C-5 MO GT A 12 U/RF C PASSIVE  ;

l PI/RF EGHV0132 CCW FROM RCS CIMF EGHV0062 BYP ISO B-4 MO GT A 4 U/RF C PASSIVE HV PI/RF EGHV0133 CCW FROM RCP THRM BAR EGHV0061 BYP C-5 MO GT A 4 U/RF C PASSIVE ISO PI/RF EGV0204 CCW TO RCS IN CIMT CHECK H-4 SA ?CK A,C 12 FS/RF C ACTIVE EG-01 I

. U/RF s

i I

I i

t l

Page 40

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM RESIDUAL HEAT REMOVAL SYSTEM (EJ)

DRAWING M-22EJ01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR - NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

EJ8708A RHR PUMP A SUCT PRESS RLF F-7 SA RV C 3 RV/RV- O/C ACTIVE 10 EJ8708B RHR PUMP B SUCT PRESS RLF C-7 SA RV C 3 RV/RV- O/C ACrlVE

> 10 EJ8730A RHRIIX A OlJrLET CIIECK VLV G-4 SA CK C 10 FS/CS O/C ACTIVE EJ-10 PS/Q EJ8730B RIIR HX B OUTLET CHECK VLV C-4 SA CK C 10 FS/CS O/C ACTIVE EJ-10 PS/Q EJ8841A RHR TRNS SIS HOT LEG LOOP 2 RECIRC E-2 SA CK A,C 6 FS/CS O/C ACTIVE EJ-l 2 SPLY HDR CIECK LT/RF EJ8841B RilR TRNS SIS HOT LEG LOOP 3 RECIRC D-2 SA !CK A,C 6 FS/CS O/C ACrlVE EJ-l 2 SPLY llDR CIECK '. LT/RF EJ8958A RIIR PUMP A SUCT FROM RWST CllECK F-6 SA CK C 14 FS/RF O/C ACrlVE EJ-8 VLV PS/Q 4 E18958B RHR PUMP B SUCT FROM RWST CIECK B-6 SA CK C 14 FS/RF O/C ACTIVE EJ-8 VLV PS/Q EJ8969A RHR TRN A CHARGING PUMPS SPLY HDR G-3 SA CK C 8 FS/RF O ACTIVE EJ-9 CIECK VLV EJ8969B RHRN B CHARGING PUMPS SPLY HDR A-4 SA CK C 8 FS/RF O ACTIVE EJ-2 CIECK VLV EJFCV0610 A RHR PMP MINI FLOW RECIRC FLOW II-6 MO GT B 3 FS/Q O/C ACrlVE CTRL VLV PI/RF Page 41

_ _. ~_ _ . _ . _ . _ ___ ___ __________ -

l CALLAWAY NUCLEAR PLANT  !

INSERVICE TEST PROGRAM l RESIDUAL IIEAT REMOVAL SYSTEM (EJ) i DRAWING M-22EJ01 ,

l I

! VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF  ;

(in) FREQ. PASSIVE JUST. .

l l EJFCV0611 B RHR PMP MINI FLOW RECIRC FLOW A-5 MO GT B 3 FS/Q O/C ACTIVE CTRL VLV PI/RF ,

ERICV8825 RIIRTRN A&B SIS IlOT LEG RECIRC SIS E-2 AO GB B 0.75 FS/Q C ACTIVE '

i TEST LINE ISO FT/Q PI/RF l

EJIICV8890A RHRTRN A ACC INJ SIS TEST LINE ISO F-2 AO GB B 0,75 FS/Q C ACTIVE i FT/Q ,

Pl/RF ERICV8890B RHRTRN B ACC INJ SIS TEST LINE ISO C-2 AO GB B 0.75 FS/Q C ACTIVE [

FT/Q Pl/RF.

EJHV0023 CTMT RECIRC SUMP A TO PASS UPSTRM E-7 SO ]GB A. I FS/Q C ACTIVE

~

ERIV0024 CTMT RECIRC SUMP B TO PASS UPSTPM D4 SO :GB A 1 LJ/RF C ACTIVE ,

ISO EJHV0025 CTMT RECIRC SUMP A TO PASS DNSTRM E-7 SO GB A 1 FS/Q C ACTIVE ISO PI/RF ERIV0026 -

CTMT RECIRC SUMP B TO PASS DNSTRM D-6 SO GB A 1 LJ/RF C ACTIVE l ISO l EJIIV8701 A RHR PUMP A SUCTISO F-8 MO GT A 12 FS/CS O/C ACTIVE EJ-3 PI/RF LT.RF ERIV8701B RIIR PUMP B SUCTISO B-8 MO GT A 12 FS/CS O/C ACTIVE EJ-3 PI/RF LT/RF ERIV8716A RHR TRN A SI SYS HOT LEG RECIRCISO E-4 MO GT B 10 FS/CS O/C ACTIVE EJ-7 (3.0.3) Pl/RF Page 42

i CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM '

RESIDUAL IIEAT REMOVAL SYSTEM (EJ)

DRAWING M-22EJ01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF l (in) FREQ. PASSIVE JUST.

I I

EJHV8716B RHRTRN B SI SYS HOT LEG RECIRC ISO D4 MO GT B 10 FS/CS O/C ACTIVE EJ-7 (3.0.3) PI/RF EJHV8804A RHR TRN A CHARGING PUMPS SPLY ISO G4 MO GT B 8 FS/CS O ACTIVE EJ4 PI/RF EJHV88048 RHRTRN B CHARGING PUMPS SPLY ISO A4 MO GT B- 8 FS/CS O ACTIVE EJ4 PI/RF EJIIV8809A RHR TRN A ACC INJ SPLY ISO (3.0.3) G-3 MO GT B 10 FS/CS C ACTIVE EJ-5 PI/RF EJHV8809B RHR TRN B ACC INJ SPLY ISO (3.0.3) C-3 MO GT B 10 FS/CS C ACTIVE EJ-5 <

Pl/RF ,

EJIIV8811 A CFMT RECIRC SUMP A TO RHR PUMP A E-7 MO 'GT B I4 FS/CS O/C ACTIVE EJ4 SUCTISO '. PI/RF

EJHV8811B CFMT RECIRC SUMP B TO RHR PUMP A D-7 MO GT B 14 FS/CS O/C ACTIVE EJ4 SUCTISO PI/RF EJHV8840 RHRTRAIN A & B SI SYS IIOT LEG RECIRC E-3 MO GT B 10 FS/CS O ACTIVE EJ-5 ISO (3.0.3) PI/RF F

Page 43

i 6

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM -

HIGH PRESSURE COOLANT INJECTION SYSTEM (EM)

DRAWING M-22EMO1 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TEST SFTY ACTIVE i RR OR NOTES .

NUMBER TYPE CAT. SIZE S POS OR TST DEF I (in) PERF/ PASSIVE JUST. [

FREQ EM8922A St PMP A DISCH CIECK E-5 SA CK C 4 FSIRF O/C ACTIVE EM-1 EM8922B St PMP B DISCH CHECK D-5 SA CK C 4 FS/RF - O/C ACTIVE EM-1 i

EM8926A St PMPS SUCT CHECK A E-7 SA CK C 8 FS/RF O/C ACTIVE EM-5 PS/Q EM8926B SI PMPS SUCT CIECK B D-7 SA CK C 8 FS/RF O/C ACTIVE EM-5  !

PS/Q j c EMilV88J2A St PMP A DISCH TO HOT LEG INJ ISO (3.0.3) E-4 MO GT B 4 FS/Q O ACrlVE i PI/RF j

EMiiV8802B SI PMP B DISCH TO HOT LEG INJ ISO (3.0.3) D-4 MO GT B 4 FS/Q O ACrlVE PI/RF j EMHV8807A RHRIIX A TO SI PMPS SUCT DNSTRM ISO G-7 MO f GT B 6 FS/Q O ACTIVE [

VLV A 0 Pl/RF  !

EMIIV8807B RHR HX A TO St PMPS SUCTDNSTRM ISO F-7 MO GT B 6 FS/Q O ACTIVE ['

VLV B PI/RF ENGIV8814A SI PMP A RECIRC TO RWSTISO B-6 MO GB B 1.50 FS/Q C ACTIVE Pl/RF EM11V8814B St PMP B RECIRC TO RWSTISO B-5 MO GB B 1.50 FS/Q C ACTIVE PI/RF EMHV8821A St PMP A DISCH TO COLD LEG INJ ISO E-4 MO GT B 4 FS/Q C ACrlVE Pl/RF e EEDIV8821B S1 PMP B DISCH TO COLD LEG INJ ISO D-4 MO GT B 4 FS/Q C ACrlVE PI/RF i

I i

Page 44 i

. - . . ~ . ~ - - . . ~ = . . _ . . -

k' CALLAWAY NUCLEAR PLANT  ;

INSERVICE TEST PROGRAM i

HIGH PRESSURE COOLANT INJECTION SYSTEM (EM) '

DRAWING M-22EM01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY At:1VE RR OR NOTES [

NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

t EhulV8823 SI/ACC INJ TEST LINE ISO HV C-4 AO GB B 0.75 FS/Q C ' ACTIVE j FT/Q PI/RF  !

EMIIV8824 St PMP B DISCH TEST LINE ISO IIV D-3 AO GB B 0.75 FS/Q C ' ACTIVE Fr/Q Pl/RF ENDIV8835 SI PMPS DISCH TO COLD LEG INJ ISO B-4 MO GT B 4 FS/CS C ACrlVE EM-7 (3.0.3) Pl/RF EMHV8871 SI SYS IN CTMTTEST LINE ISO IIV G-5 AO GB A 0.75 FS/Q C ACTIVE FT/Q PI/RF u/RF EMilV8881 St PMP A DISCilTEST LINE ISO HV G-4 AO ,' GB B 0.75 FSiQ C ACTIVE FT/Q t PI/RF EMllV8888 ACC TKS FILL LINE FROM St PMPS ISO F4 AO GB A 1 FSQ C ACTIVE

  • FT/Q Pl/RF LJ/RF f EMIIV8923A RWST TO St PMP A SUCT ISO HV F-7 MO GT B 8 PI/RF O/C PASSIVE ,

EhnlV8923B RWSTTO St PMP B SUCTISO IIV D-7 MO GT B 8 PI/RF O/C PASSIVE ,

EhulV8964 SI SYS OUT CTMT TEST LINE ISO G4 AO GB A 0.75 FS/Q C ACTIVE FT/Q PI/RF LJ/RF Page 45

CALLAWAY NUCLEAR PLANT '

INSERVICE TEST PROGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM (EM) l DRAWING M-22EM01 i

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.  ;

I EMV0001 SI PMP A DISCllTO HOT LEG LOOP 2 F-3 SA CK A,C 2 FS/RF O/C ACTIVE EM-2 2 UPSTRM CIECK LT/RF EMV0002 SI PMP A DISCH TOIIOT LEG LOOP 3 E-3 SA CK A,C 2 FS/RF O/C ; ACTIVE EM-2 2  ;

UPSTRM CIECK LT/RF i

EMV0003 SI PMP B DISCH TO HOT LEG LOOP 1 D-3 SA CK A,C 2 FS/RF O/C ACTIVE EM-2 2 UPSTRM CIECK LT/RF EMV0004 SI PMP B DISCIITO HOT LEG LOOP 4 C-3 SA CK A,C 2 FS/RF O/C ACTIVE EM-2 2 UPSTRM CHECK LT/RF ,

EMV0005 SI PMP A DISCH TO RWST ClECK A-6 SA CK C 1.50 FS/Q O ACTIVE EMV0006 S1 PMPS ACC TKS FILL LINE CIECK F-6 SA ' CK A,C 1 LJ/RF C PASSIVE

', i EMV0007 SI PMP B DISCH TO RWST CHECK A-5 SA CK C 1.50 FS/Q O ACTIVE i

i i

Page 46

CALLAWAY NUCLEAR PLANT -

INSERVICE TEST PROGRAM HIGH PRESSURE COOLANT INJECTION SYSTEM (EM) 3 DRAWING M-22EM02 DESCRIPTION COOR ACT, VLV VLV VLV TESTS SFTY At ItVE RROR NOTES VALVE TYPE CAT. SIZE PERF/ POS OR TST DEF NUMBER (in) FREQ. PASSIVE JUST.

D-3 SA CK A,C 3 FS/RF O/C ACTIVE EM-3 EM8815 BIT CVCS OUT C11ECK LT/RF t BIT OlJTTO COLD LEGS ISO A D-4 MO Gr A,C 4 FS/Q O ACTIVE EMIIV8801A PI/RF BIT OUT TO COLD LEGS ISO B D-4 MO GT B 4 FS/Q O ACTIVE EMilV8801B PI/RF l BIT SPLY FROM CCP A ISO C-7 MO GT B 4 FS/Q O ACTIVE Eh0lV8803A PI/RF BIT SPLY FROM CCP B ISO A-7 MO GT B 4 FS/Q O ACTIVE  !

EMilV8803B PI/RF BIT 01TT UPSTRM TEST LINE ISOIIV C-4 AO . GB B 0.75 FS/Q C ACTIVE EMilV8843 FT/Q PI/RF f

l r

l 4

Page 47

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM

- CONTAINMENT SPRAY SYSTEM @N) ,

DRAWING M-22EN01 j i

l VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES [

NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

t ENHV0001 CINT RECIRC SMP TO CTMT SPRY PMP A G-7 MO GT B 12 FS/CS O'C ACTIVE EN-4 HV PI/RF ,

ENHV0006 CTMT SPRY PMP A DISCH HV G-4 MO GT B 10 FS/Q O , ACTIVE  !

PI/RF ENilV0007 CINT RECIRC SMP TO CFMT SPRY PMP B B-7 MO GT B 12 FS/CS O/C ACrlVE EN-4 HV PI/RF ENHV0012 CTMT SPRY PMP B DISCII HV B-4 MO GT B 10 FS/Q O ACTIVE PI/RF  ;

G-7 SA CK C 12 FS/SD O ACTIVE EN-1  !

ENV0002 CTMT SPRY ISO VLV ENCAP A OUT CIECK ENV0003 RWST TO CTMT SPRY PMP A CIECK G-7 SA s CK C 12 FS/SD O ACTIVE EN-2 PS/Q ENV0004 CFMT SPRY PMP A DISCil CIECK G-5 SA ' CK C 10 FS/SD. O ACrlVE EN-5 PS/Q ENV0008 CFMT SPRY ISO VLV ENCAP B OUT CIECK B-7 SA CK C 12 FS/SD O ACTIVE EN-1 ENV0009 RWST TO CTMT SPRAY PMP B CIECK B-7 SA CK C 12 FS/SD 0 ACTIVE EN-2 PS/Q ENV0010 CTMT SPRY PMP B DISCH CHECK B-5 SA CK C 10 FS/SD, O ACrlVE EN-5 PS/Q t

Page 48

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CONTAINMENT SPRAY SYSTEM (EN) '

DRAWING M-22EN01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SETY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR IST DEF (in) FREQ. PASSIVE JUST.

ENV0013 G-4 SA CK C 10 FS/SD O/C ACTIVE EN-3 CTMT SPRY Ph,fP A DISCH IN CTMT CIECK ENV0017 CTMT SPRY PMP B DISCIIIN CTMT CIECK B-4 SA CK C 10 FS/SD O/C ACTIVE EN-3 r r

3 1

s 4

i i

Page 49

CALLAWAY NUCLEAR PLANT

, INSERVICE TEST PROGRAM ACCUMULATOR SAFETY INJECTION SYSTEM (EP)

, DRAWING M-22EP01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

EP8818A RHR PMPS TO RCS COLD LEG LOOP 1 G-3 SA CK A,C 6 FS/CS O/C ACTIVE EP-1 2 CIECK LT/RF EP8818B RHF PMPS TO RCS COLD LEG LOOP 2 F-3 SA CK A,C 6 FS/CS O/C ACTIVE EP-1 2 CHECK LT/RF EP8818C RHR PMPS TO RCS COLD LEG LOOP 3 D-3 SA CK A,C 6 FS/CS O/C ACTIVE EP-1 2 CIECK LT/RF EP8818D PJIR PMPS TO RCS COLD LEG LOOP 4 C-3 SA CK A,C 6 FS/CS O/C ACTIVE EP-1 2 CIECK LT/RF EP8956A St ACC TK A OUT UPSTRM CHECK G4 SA CK A,C 10 FS/SD O/C ACTIVE EP-2 LT/RF -

t 1

ACTIVE EP-2  ;

EP8956B St ACC TK B OUT UPSTRM CIECK E4 SA ;CK A,C 10 FS/SD O/C LT/RF f EP8956C St ACC TK C OLTr UPSTRM CHECK C4 SA 'CK A,C 10 FS/SD O/C ACTIVE EP-2 LT/RF EP8956D St ACC TK D OUT UPSTRM CIECK B4 SA CK A,C 10 FS/SD O/C ACrlVE EP-2 LT/RF EPHV8808A SI ACC TK A OLTF ISO G-5 MO GT B 10 FS/CS O/C ACTIVE EP-5  !

. P:/RF EPHV8808B SI ACCTK B OUTISO E-5 .

  • MO ' UT B 10 PI/RF O PASSIVE a EPHV8808C St ACC TK C OUTISO C-5 MO GT B 10 Pl/RF O PASSIVE I

Page 50 l

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ACCUMULATOR SAFETY INJECTION SYSTEM (EP) -

DRAWING M-22EP01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

EPHV8808D SI ACCTK D OUTISO B-5 MO GT B 10 FS/CS O/C ACFIVE EP-5 PI/RF EPHV8880 SI ACC TKS N2 SPLY HV A4 AO GB A 1 FS/Q C ACTIVE FT/Q PI/RF LI/RF EPHV8950A SI ACC TK A VENT HV H-7 SO GB B 1 FS/CS O ACTIVE EP4 PI/RF EPHV8950B SI ACC TK B VENT HV F-8 SO GB B 1 FS/CS O ACTIVE EP4 PI/RF EPHV8950C St ACC TK B VENT HV F-7 SO ., GB B 1 FS/CS O ACTIVE EP4 s PI/RF EPHV8950D SI ACC TK C VENT HV O-8 SO J GB B 1 FS/CS O ACTIVE EP4 4

rURF EPHV8950E SI ACC TK C VENT HV D-7 SO GB B 1 FS/CS O ^CTIVE EP4 PI/RF EPHV8950F SI ACC TK D VENT HV C-8 SO GB B 1 FS/CS O ACTIVE EP4 FI/RF EPV0010 SI PMPS TO RCS COLD LEG LOOP 1 CHECK G-3 SA CK A,C 2 FS/RF O/C ACTIVE EP-3 2 LT/RF EPV0020 SI PMPS TO RCS COLD LEG LOOP 2 CHECK F-3 SA CK A,C 2 FS/RF O/C ACTIVE EP-3 2 LT/RF i

Page 51

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM ACCUMULATOR SAFETY INJECTION SYSTEM (EP)

DRAWING M-22EP01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACrlVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

EPV0030 SI PMPS TO RCS COLD LEG LOOP 3 CHECK D-3 SA CK A,C 2 FS/RF O/C ACrlVE EP-3 2 LT/RF EPV0040 SI PMPS TO RCS COLD LEG LOOP 4 CHECK C-3 SA CK A,C 2 FS/RF O/C ACTIVE EP-3 2 LT/RF EPV0046 SI ACC TKS N2 SPLY CHECK A-5 SA CK A,C 1 LJ/RF C PASSIVE j l

. I

. l

I l

l l

l Page 52

.i

- _ _ _ . ~ . . . . _ - - - - _ _ _ _ _ _ _ - - - - - - - - - _ - _ _ - - - - _ _ - . _ - - - - _ _ _ _ _ - _ - _ - - - - - - - - _ _ - _ -

i.

I CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM AUXILIARY TURBINES -

AUXILIARY FEEDWATER PUMP TURBINE SYSTEM (FC)

DRAWING M-22FC02 VALVE DESCRIPTION -

COOR ACF. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES [

NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF  ;

(in) FREQ. PASSIVE JUST.

I FCFV0310 AFP TURB STMLINE DRN FLOW VLV D-7 AO GB B I FS/Q C ACTIVE FT/Q PI/RF FCHV0312 AFP TURB MECH TRIP /THROTllV F-5 MO GT B 4 FS/Q O ACTIVE Pl/RF i FCV0001 MS LOOP 2 TO AFP TURB UPSTRM CIECK G4 SA CK C 4 FS/CS O/C ACTIVE FC-1 FS/SD ,

PS/Q -

FCV0002 MS LOOP 3 TO AFPTURD UPSTRM ClECK G4 SA CK C 4 FS/CS O/C ACTIVE FC-1

, FS/SD s PS/Q FCV0024 MS LOOP 2 TO AFPTURB DNSTRM CHECK G4 SA , CK C 4 FS/CS O/C ACTIVE FC-1 FS/SD i PS/Q FCV0025 MS LOOP 3 TO AFP TURB DNSTRM CHECK G4 SA CK C 4 FS/CS O/C ACTIVE FC-1 FS/SD PS/Q  ;

t Page 53

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CONTAINMENT HYDROGEN CONTROL SYSTEM (GS)

DRAWING M-22GS01 1

l VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY At,a VE RELIEF NOTES l NUMBER TYPE CAT. SIZE PERF/ POS OR REQUEST i (in) FREQ. PASSIVE  !

GSHV0003 H2 ANALYZER B SPLY OIRERCTMTISO E4 SO GT A 1 FS/Q O/C ACTIVE IIV FT/Q PI/RF ^

U/RF GSilV0004 H2 ANLZ B SPLY IN CIMT ISO IIV E4 SO GT A 1 FS/Q O/C ACTIVE  !

FT/Q [

PI/RF U/RF  !

GSHV0005 H2 ANALYZERB SPLYINNERCTMTISO D-5 SO GT A 1 FS/Q O/C ACTIVE ilV FT/Q  ;

PI/RF U/RF  !

GSHV0008 H2 ANALYZER B RTN OUTER CIMTISO B4 SO GT A I FS/Q , O/C ACTIVE  ;

FT/Q i ilV Pl/RF 5 U/RF  ;

GSHV0009 H2 ANLZ B RTN IN CTMTISO HV B4 SO GT A I FS/Q O/C ACTIVE q IT/Q PI/RF U/RF GSHV0012 H2 ANALYZER A SPLY OUTERCTMTISO E-4 SO GT A 1 FS/Q O/C ACrlVE HV FT/Q PI/RF ,

U/RF GSHV0013 H2 ANLZ A SPLY IN CTMTISO HV E-5 SO GT A I FS/Q O/C ACTIVE FT/Q PI/RF U/RF t

Page 54 i

_ _ _ . _ _ _ . _ . . _ . . . - . _ _ .._-.c . - .... ._ . . ~ . . . . . . _ _ _ _ . .

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CONTAINMENT HYDROGEN CONTROL SYSTEM (GS)

DRAWING M-22GS01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY At;11VE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

GSHV0014 H2 ANLZ A SPLY IN CTMTISOllV D-5 SO GT A I FS/Q O/C ACTIVE FT/Q PI/RF U/RF GSilV0017 112 ANALYZER A RTN OITTER Cn1TISO B-4 SO GT A 1 FS/Q O/C ACTIVE HV FT/Q PI/RF U/RF

~~

GSIIV0018 112 ANLZ A RTN IN CTMTISO HV B-5 SO GT A I FS/Q O/C ACTIVE FT/Q PI/RF U/RF GSIIV0020 112 PURGE IN CTMT150 IIV F-5 MO ' BF A 6 FS/Q O/C ACTIVE PI/RF U/RF GSHV0021 H2 PURGE OUTER CTMT ISO HV F-4 MO BF A 6 FS/Q O/C ACTIVE PI/RF U/RF GSHV0031 CTMT ATMS MON SPLY IN CTMTISO HV D-4 SO GT A I FS/Q C ACTIVE FT/Q PI/RF U/RF GSHV0032 CTMT ATMS MON SPLY OITFER CTMTISO D-3 SO GT A 1 FS/Q C ACTIVE HV FT/Q PI/RF U/RF Page 55

- _ _ _ _ _ . - _ __ _ __ _ _ __ _ _ __ . _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ ~ . . . . _ _

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM CONTAINMENT HYDROGEN CONTROL SYSTEM (GS)

DRAWING M-22GS01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY Au nVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

GSHV0033 CIMF ATMS MON RTN OUTER CTMTISO C-4 SO GT A I FS/Q C ACTIVE IIV FT/Q PI/RF U/RF GSilV0034 CTMT ATMS MON RTN IN CTMTISO HV C-4 SO GT A I FS/Q C ACTIVE FT/Q PI/RF U/RF GSHV0036 CFMT ATMS MON SPLY IN CTMTISO HV D-6 SO GT A I FS/Q C ACTIVE YTIQ

' PI/RF U/RF GSHV0037 CFMT ATMS MON SPLY OUTER CTMTISO D-7 SO :GT A 1 FS/Q C ACTIVE IIV FT/Q 2 PI/RF U/RF GSHV0038 CFMT ATMS MON RTN OUTER CTMTISO C-6 SO GT A 1 FS/Q C ACTIVE HV FT/Q PI/RF U/RF GSIIV0039 CTMT ATMS MON RTN IN CTMTISO HV C-6 SO GT A I FS/Q C ACTIVE FT/Q PI/RF U/RF Page 56

_ _ - _ _ - _ _ _ - _ . - _ __-_-_ mum __ ._ . __.m__.___ s.--._..____a-ma._ _ _ _ _ _ -

_ _ - - - - _ _ _ _ _ . +n-r e-e -

  • CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM  !

i CONTAINMENTPURGE SYSTEM (GT)

DRAWING M-22GT01 3

k VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES TYPE CAT. SIZE PERFI POS OR TST DEF .

NUMBER (in) FREQ. PASSIVE JUST.

GTIIZ0004 CTMT MINI PURGE AIR SPLY OUTER CTMT D-4 SO BF A 18 FS/Q C ACTIVE i DMPR FT/Q PI/RF U/RF GTIIZ0005 CTMT MINI PURGE AIR SPLY INNER CTMT A-5 SO BF A 18 FS/Q C ACTIVE ,

UPSTRM DMPR FT/Q PI/RF U/RF C 'AS*^ cms GT11Z0006 CTMT S/D PURGE AIR SPLY OUIER CTMT C-4 SO BF A 36 PI/RF y Active DMPR FS/Q ,

Act,ve i i FT/Q U/RF PAssivarAcitvs PA5StVE/ACHVE GTH20007 CTMT S/D PURGE AIR SPLY INNER CTMT DMPR C-5 SO BF A 36 P!/RF C g

, p3jg Active L Active s FT/Q U/RF rAssrvstArnt

~

C P^58" !.rivs y GTIIZ0008 CTMT S/D PURGE EXilINNER CTMT DMPR C-6 SO BF A 36 PI/RF pq ~ . ave AC'8 l FTQ U/RF PASSIVE / ACTIVE A 36 P1/RF C FAEWACME g G11120009 CTMT S/D PURGE EXII OUTER CTMT DMPR C-7 SO BF 1 p3fg Active  !

Active FT/Q U/RF rassrvvacmt CTMT MINI PURGE EXil INNER CTMT DNSTRM A-6 SO BF A 18 FS/Q C AC11VE GTHZ0011 DMPR FT/Q  !

PI/RF U/RF GllIZ0012 CTMT MINI PURGE EXilOUTER CTMT DMPR A-7 SO BF A 18 FS/Q C ACTIVE FT/Q PI/RF Page 57

~

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM LIQUID RADWASTE SYSTEM (HB)

DRAWING M-22HB01 VALVE DESCLPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

HBilV7126 RCDTTO GRW CMPSRIN CFMTIIV G-6 AO DI A 0.75 FS/Q C ACTIVE FT/Q PI/RF U/RF HBlIV7136 RCDT HX OUTllDR OUTER CTMT HV F-3 AO DI A 3 FS/Q C ACTIVE FTIQ PI/RF U/RF IIBilV7150 RCDT OlTTTO GRW SYS OUTER CTMT HV G-5 AO DI A 0.75 FS/Q C ACriVE FT/Q PI/RF U/RF HBilV7176 RCDT HX OUT HDRIN CTMTISOIIV F-3 AO

  • DI A 3 FS/Q C ACTIVE
FTIQ PI/RF U/RF 4

Page 58

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM DECONTAMINATION SYTEM (HD)

DRAWING M-22HD01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY At a nVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

HDV0016 RX IEAD DECON AUX STM SPLY OLTTER B-7 MA GB A 2 U/RF C PASSIVE CTMTISO HDV0017 RXIEAD DCON AUX STEAM SPLY IN B-7 MA GB A 2 U/RF C PASSIVE CTMTISO Page 59

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM l

EMERGENCY FUEL OIL SYSTEM DRAWING M-22JE01  :

COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES VALVE DESCRIPTION TYPE CAT. SIZE PERF/ POS OR TST DEF NUMBER (in) FREQ. PASSIVE JUST.

EMERG F.O. DAY TK A IN CIECK H-5 SA CK C 2 FS/Q O ACTIVE JEVC385 ENERG F.O. DAY TK B IN CIECK D-5 SA CK C 2 FS/Q 0 ACTIVE JEV0036 r

t a

e L

t Page 60

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPRESSED AIRSYSTEM(KA)

DRAWING M-22KA01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RROR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

KAFV0029 RX BLD INST AIR SPLY FLOW CTRL VLV B-1 AO GB A 2 FS/CS C ACTIVE KA-1 FT/CS PI/RF U/RF KAV0204 RX BLD INST AIR SPLY CIIECK B-1 SA CK A,C 1.50 FS/RF C ACrlVE KA-2 U/RF Page 6I

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPRESSED AIR SYSTEM (KA)

! DRAWING M-22KA02 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTF5 NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

KAV0039 RX BLD SERV AIRIIDR SPLY CIIECK D-6 SA CK A 4 U/RF C PASSIVE KAV0ll8 RX BLD SERV AIRIIDR SPLY OUTER CTMT D-6 MA GB A 4 U/RF C PASSIVE ISO j 6

e Page 62

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM COMPRESSED AIRSYSTEM(KA)

DRAWING M-22KA05 DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY AL.IaVE RR OR NOTES VALVE NUMBER TYPE CAT. SIZE PERF/ POS OR ,

TST DEF (in) FREQ. PASSIVE JUST.

KAV0648 SG A AFW CTRI1MS ATMS RELIEF VLVS G-6 SA CK A 0.75 LT/RF C PASSIVF. l N2 SPLY ACC IN KAV0649 SG C AFW CFRIlMS ATMS RELIEF VLVS F-5 SA CK A 0.75 LT/RF C PASSIVE N2 SPLY ACCIN KAV0650 SG B AFW CTRI1MS ATMS RELIEF VLVS D-6 SA CK A 0.75 LT/RF C PASSIVE N2 SPLY ACC IN KAV0651 SG D AFW CTRUMS ATMS RELIEF VLVS B-5 SA CK A 0.75 LT/RF C PASSIVE N2 SPLY ACC IN t

Page 63

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM FIRE PROTECTION SYSTEM (KC)

DRAWING M-22KC02 DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES VALVE TYPE CAT. SIZE PERF/ POS OR TST DEF NUMBER (in) FREQ. PASSIVE JUST.

A 4 U!RF C PASSIVE 's KCilV0253 F-PROT LOOP TO RX BLD OUTER CTMT B-6 MO GT DNSTRM ISO FIRE PROT LOOP TO RX BLD IN CTMT B-6 SA CK A 4 U/RF C PASSIVE lCCV0478 CHECK ..

I I

1 Page 64 t_________.._._ _ _ _ _ _ _ ______ _ _ __ _ _ _ _ _ _ _ _ _ _ __ . _.

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM STANDBY DIESEL GENERATOR SYSTEM (KJ)

DRAWING M-22KJ02 DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY At. a nt'E RR OR NOTES VALVE TYPE CAT. SIZE PERF/ POS OR TST DEF NUMBER (in) FREQ. PASSIVE JUST.

DG A STARTING AIR SPLY PRESS CIRL F-3 SO SV B 0.375 FS/Q O ACTIVE KJ-l KJPV0001A VLV A PI/RF . ,

DG A STARTING AIR SPLY PRESS CTRL F-3 SO SV B 0.375 FS/Q O ACTIVE KJ-l KJPV0001B VLV B PI/RF DG STARTING AIR TK A AIR SPLY CIECK C-2 SA CK C 0.75 FS/Q C ACTIVE KJV0711A DG STARTING AIR TK B AIR SPLY CIECK D-5 SA CK C 0.75 FS/Q C ACIIVE KJV0712A 4

l L

i i

Page 65

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM STANDBY DIESEL GENERATOR SYSTEM (KJ)

DRAWING M-22KJ05 r i

VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES i NUMBER TYPE CAT. SIZE PERFI POS OR TST DEF '

(in) FREQ. PASSIVE JUST.

KJPV0101A DG B STARTING AIR SPLY PRESS CTRL F-3 SO SV B 0.375 FS/Q O ACTIVE KJ-l ,

VLV A Pl/RF >

KJPV0101B DG B STARTING AIR SPLY PRESS CTRL F-3 SO SV B o.375 FS/Q O ACTIVE KJ-l VLV B PI/RF -

KJV0711B DG STARTING AIRTK C AIR SPLY CIECK B-2 SA CK C 0.75 FS/Q C ACTIVE KJV0712B DG STARTING AIRTK D AIR SPLY CllECK D-5 SA CK C 0.75 FS/Q C ACTIVE

?

E a

4 i

Page 66 t

. ... . . . . _ _ _ m_ _ . . _ . - _ - - - - - - - - - - - - - - - - - - - - - - - - - - - _ - - - - - - - - - - - - - - - - -

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR BUILDING AND HOT MACHINE SHOP FLOOR AND EQUIPMENT DRAIN SYSTEM (LF)

DRAWING M-22LF03 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY A t.n V E RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

LFIIV0105 DRW SMPS DISCHIIDR DNSTRM llV C-5 MO GA B 6 FS/Q C ACTIVE PI/RF LFilV0106 DRW SMPS DISCH HDR UPSTRMllV C-5 MO GA B 6 FS/Q C AUIIVE PI/RF 5

Page 67

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM REACTOR BUILDING AND HOT MACHINE SHOP FLOOR AND EQUIPMENT DRAIN SYSTEM (LF)

DRAWING M-22LF09 VLV VLV VLV TESTS SFTY ActnVE RR OR NOTES VALVE DESCRIPTION COOR ACT.

TYPE CAT. SIZE PERF/ POS OR TST DEF NUMBER PASSIVE JUST.

(in) FREQ.

i F-2 MO GA A 6 FS/Q C ACTIVE LFFV0095 CTMT NORM SMP PMPS DISCH HDR CTMT PI/RF FV U/RF ,

F-2 AO GL A 6 FS/Q C ACTIVE

' LFFV0096 CTMT NORM SMP PMPS DISCH HDR AUX 11LD FCV FT/Q PI/RF U/RF l

Page 68

s CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM

NUCLEAR SAMPLING SYSTEM (SJ)
DRAWING M-22SJ01 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY AtuvE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

SJHV0012 PZR VAPOR SAMPIN CTMTISOIIV F-7 SO -GB A 1 FS/Q C ACTIVE FTQ PI/RF U/RF SJilV0013 PZR VAPOR SAMP OUT CFMTISO HV E-7 SO GB A 1 FS/Q C ACTIVE FT/Q Pl/RF U/RF SJHV0018 ACC SAMP IN CTMT ISO HV F-3 SO GB A 1 FS/Q C ACTIVE FT/Q PI/RF ,

U/RF i SJHV0019 ACC SAMP OUT CFMTISO HV E-3 SO

  • GB A 1 FS/Q C ACTIVE FT/Q PI/RF $

U/RF t l

i Page 69

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM NUCLEAR SAMPLING SYSTEM (SJ)

DRAWING M-22SJ04 DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY ACTIVE RR OR NOTES VALVE NUMBER TYPE CAT. SIZE PERF/ POS OR 13T DEF (in) FREQ. PASSIVE JUST.

SJHV0005 PASS HOT LEG 1 SAMP IN CTMT DNSTRM F-7 SO GL A 1 FS/Q C ACTIVE ISO HV FTA2 PI/RF U/RF SJHV0006 PASS HOT LEG 1 SAMP OUT CIMTISO TRN F-6 SO GL A 1 FS/Q C ACTIVE AHV FT/Q-PI/RF U/RF SJHV0127 PASS IIOT LEG 1 SAMP OUT CTMTISO TRN F-6 SO GL A 1 FS/Q C ACTIVE BHV FT/Q PI/RF U/RF SJHV0128 PASS PZR & RCS SAMP IN CTMTISO HV H-6 SO GL A 1 FS/Q C ACrlVE

,' FT/Q PI/RF LJ/RF SJHV0129 PASS PZR & RCS SAMP OUT CTMTISO TRN H-5 SO GL A 1 FS/Q C ACTIVE BHV FT/Q PI/RF U/RF SJHVO130 PASS PZR & RCS SAMP OUT CTMTISO TRN G-5 SO GL A 1 FS/Q C ACTIVE A HV FT/Q PI/RF U/RF SJHV0131 PASS TO RCDT OlTT CIMTISO PROT A HV B-6 SO GL A 1 FS/Q C ACTIVE FT/Q PI/RF U/RF Page 70

CALLAWAY NUCLEAR PLANT INSERVICE TEST PROGRAM NUCLEAR SAMPLING SYSTEM (SJ)

DRAWING M-22SJ04 VALVE DESCRIPTION COOR ACT. VLV VLV VLV TESTS SFTY AtanVE RR OR NOTES NUMBER TYPE CAT. SIZE PERF/ POS OR TST DEF (in) FREQ. PASSIVE JUST.

SJHV0132 PASS TO RCDT OUT CTMTISO PROT B HV A-6 SO GL A 1 FS/Q C ACTIVE FT)Q Pl/RF U/RF SJV0lli l PASS TO RCDT IN CTMT GECK A-7 SA CK A,C 1 U/RF C ACTIVE Page 71

__._m.__ _ _ _ _ _ _ _ _ _ _ __ . - . . _ . _ . _ _ . _ _ _ _ _ . _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __ - , _- -- __ _ , , . - - __ _ , _ _ _ _ --

l SECTION 2.3 l

l RELIEF REQUESTS l OR l TEST DEFERRAL JUSTIFICATIONS FOR VALVE TESTING l

l i

1

AB-01 COLD SHUTDOWN JUSTIFICATION VALVE: ABPV00001, 2, 3, 4 CATEGORY: B CLASS: 2 FUNCTION: Steam generator power operated reliet valve.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function, stroke time, and verify fall safe actuation every 3 months.

BASIS FOR RELIEF: Exercising (full or partial stroke) th6se valves during power operation would cause a decrease in pressure in the respective main steam header. This would introduce a severe transient in the main steam header which is unacceptable from an operational viewpoint.

ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its function, stroke timed and fait safe actuation verified during cold shutdown. . . . .

l l

1 I

T Page1

AB-02 '

COLD SHUTDOWN JUSTIFICATION VALVE: ABHV0011,14,17,20 CATEGORY: B CLASS: 2 FUNCTION: Main steam isolation valves TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function, stroke time, and verify fait safe actuation every 3 months.

BASIS FOR RELIEF: Closure (full stroke) of these valves during power operation would introduce a severe transient in the main steam lines which is unacceptable from an operational viewpoint. Testing by isolating each main steam header is also possible but would cause a power reduction which is also unacceptable from an operational viewpoint. Partial stroke exercising these valves is also impracticable because 'even a part-stroke exercise increases the risk of a valve closure when the unit is generating power' per NUREG-1482 Section 4.2.4, ALTERNATE TESTING: This valve will be exercised (full stroke) to the position required to fulfill its function, stroke timed, and fall safe actuation verified at cold l

shutdown.

l l

}

e Page 2

l l

AB-03 l i l

REFUELING IUSTIFICATION VALVE: ABV0007,18, 29, 40, ABV0085,87 CATEGORY: B CLASS: 2 FUNCTION: Remain open in the absence of a steam generator tube rupture. To be manually closed following a steam generator tube rupture to mitigate offsite radiological dose.

TEST REQUIREMENT: The subject valves are manual valves that do not have remote position indication; therefore, the only required test is to manually stroke the valves closed. This is impracticable to perform on a quarterly basis as ,

no trendable data is obtained with this test so no value is gained by stroking the valves quarterly - the direction of the OM committee at this ,

time is to stroke manual valves no more than on a cold shutdown frequency. Additionally, since the probability of these valves falling is so low, they are not even niodbled in Callaway's PRA. Also, closing ABV0085 or ABV0087 makes the Turbine Driven Auxiliary Feedwater Pump inoperable, causing entry into a T.S. LCO, incurring additional safety system unavailability.

ALTERNATE TESTING: These valves will be stroked to the closed position during refueling outages, i

l l

~

l Page 3

AE-01 REFUELING JUSTIFICATION VALVE: AEV0120,121,122,123 CATEGORY: C CLASS: 2 FUNCTION: Close to prevent blowdown of steam generators following Feedwater Pipe Rupture.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Exercising these valves (full or partial stroke) during power operation would require isolation of Feedwater to the steam generator which would result in a severe transient in the steam generator, possibly causing a unit trip.

l ALTERNATE TESTING: Each valve of this group will be tested at refueling to prove valve I

closure capabilities. .

I i

l I

! l i

1 Page 4

AE-03 Cold Shutdown Tustification VALVE: AEV0124,125,126,127 CATEGORY: C CLASS: 2 FUNCTION: Open to pass flow from motor driven and turbine driven auxiliary feedwater pumps to steam generators.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Exercising these valves (full or partial stroke) would result in feeding cold water into the steam generators. This is not desirable during power operation since flow through these valves would unnecessarily thermally shock the steam generator feedwater nozzles.

I ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at cold shutdown. ,,

i I

I 1

t Page5

AE-04 COLD SHUTDOWN TUSTIFICATION VALVE: AEFV0039,40,41,42 CATEGORY: B CLASS: 2 FUNCTION: Isolates main feedwater piping from the steam generators upon receipt of a feedwater isolation signal.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function, stroke time, and verify fail safe actuation every 3 months.

BASIS FOR RELIEF: Closing (full stroke) these valves during power operation is considered impractical from an operating viewpoint. Closure would isolate feedwater to the steam generator which may result in a severe transient in the steam generator, possible causing a unit trip. Partial stroke exercising these valves is also impracticable because 'even a part- i I

stroke exercise increases the risk of a valve closure when the unit is generating power' as stated in NUREG-1?B2 Sectic9 4.2.4 for the Main Steam isolation ValvesTbdt th!: same justification appiies for these ,

valves as well. l 1

- ALTERNATETESTING: Valve will be exercised (full stroke) to the position required to fulfill hs l j

function, stroke timed, and fait safe actuation verified at cold shutdown.

i f

I l

I i

Page 6

i l

l l AL-01 i

COLD SHUTDOWN JUSTIFICATION l

VALVE: ALV0001, V0002, V0003, V0030, V0033*, V0036*, V0042, V0045*,

V0048*, V0054, V0057*, V0062*, V0067*, V0072 l

- Class 2 CATEGORY: C CLASS: 2 and 3 FUNCTION: Opens on flow from the auxiliary feedwater pumps to provide flow to the Steam Generators. ALV0030, 42, 54 close to prevent reverse flow through parallel pumps.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Exercising these valves open (full or partial stroke) would result in feeding cold water into the steam generators. This is not desirable during power operation since flow through these valves would unnecessarily thermally ~sho'ck the steam generator feedwater nozzles, in regards to closure testing of ALV0030, 42, 54, per NUREG-1482 response to question group 24, 'If a valve performs a safety function in both the open and closed positions, however, the code requires that the valve be exercised to the open position and then verified to close'. As discussed above, since ALV0030,42,54 are exercised open only on a cold shutdown frequency, the closure test of these valves will be performed on a cold shutdown frequency as well.

ALTERNATE TESTING- Exercise check valve (full stroke) to the positions required to fulfill its function at cold shutdown.

l l

l I

Page 7  :

BB-01 REFUELING TUSTIFICATION VALVE: BB8948A, B, C, D CATEGORY: A, C CLASS: 1 FUNCTION: Opens on flow from the cold leg accumulators, safety injection pumps or residual heat removal pumps to provide flow to the reactor coolant system cold legs.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: These valves cannot be full or partial stroke exercised during power operations since safety injection pump discharge pressure cannot overcome reactor coolant system pressure.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling. ,

i i

l i

Page 8 l

0

BB-02 REFUELING IUSTIFICATION VALVE: BB8949A, D CATEGORY: A, C CLASS: 1 FUNCTION: These vaives open to provide hot leg recirculation flow from the safety injection pumps.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full or partial stroke exercised during power operation since the only flow path discharges into the resefor ene!:nt system.

Safety injection pump discharge pressure cannot overcome reactor coolant system pressure. During cold shutdown these valves cannot be full or partial stroke exercised since this could result in a low temperature overpressurization of the reactor coolant system.

~

ALTERNATE TESTING: Exercise check valve (full' stroke) to the position required to fulfill its function at refueling.

G Page 9

l BB-03 ,

COLD SHUTDOWN JUSTIFICATION l

l VALVE: BB8949B, C CATEGORY: A, C t

! CLASS: 1 i

l FUNCTION: Open on flow from the residual heat removal pumps to the reactor coolant hot legs.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full or partial stroke exercised during power operation since the only flowpath discharges into the reactor coolant system.

Residual Heat Removal Pur.ip Discharge Pr9ssure or Safety injection Pump Discharge Pressure cannot overcome reactor coolant system pressure.

ALTERNATE TESTING: Exercise check valve (' full'st'roke) to the position required to fulfill its function at cold shutdown.

l l

l Page 10

BB-04

REFUELING TUSTIFICATION l

l VALVE: BBV0001, 22, 40, 59 CATEGORY: C CLASS: 1 FUNCTION: These valves open on flow from the Centrifugal Charging Pumps.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Exercising these valves (full or partial stroke) would require using a centrifugal charging pump to provide flow which would result in injection of borated water into the Reactor Coclant System thereby causing a power decrease and thermal shock to the reactor coolant piping. During cold shutdowns exercising (full or partial stroke) this valve could result in a low temperature overpressurization of the reactor coolant system.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling. ,

1 l

l l l

l l

l l

l l

l

, l J

Page 11

1 l

l l BB-05 i

1 COLD SHUTDOWN JUSTIFICATION l I l

BBHV8001 A, B, and BBHV8002A, B  !

VALVE:

COMPONENT: B l i CLASS: 2 FUNCTION: High Point Vents on the RCS i l

TEST REQUIREMENT: Exercise valve to the position required to fulfill its function every 3 months.

I l BASIS FOR RELIEF: if stroked (full or partial stroke) during plant operation, failure of a valve

! in the open position would put the reactor in a potential small break LOCA sliuation. Stroking one of these valves open would result in l relying on one valve for RCS pressure boundary. Also, no matter what i sequence of testing is used exercising these valves would result in -

venting out some RCS water directly to the containment atmosphere. i This would necessitate installation of a vent rig to control the effluent, e l The vent is not accessible for installation of a vent rig due to radiation l concems during operatio'ni ' ' l ALTERNATE TESTING: Valves will be exercised and stroke timed during cold shutdown.

l l  :

d i

l

  • l
t i

I i

Page 12

BB-06 COLD SHUTDOWN TUSTIFICATION 1

VALVE: BBPV8702A, B CATEGORY: A CLASS: 1 FUNCTION: Valves open to provide suction to Residual Heat Removal Pumps during normal unit cooldown.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function i and stroke time every 3 months.

BASIS FOR RELIEF: These valves have an interlock which prevents their opening (full or partial stroke) when Reactor Coolant System pressure is above approximately 360 PSIG to prevent over-pressurization of the RHR i system. l ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its ,

function and stroke timed during cold shutdown.

I f

I l

Page 13

.- . . . .-.. .. _ _ _ . . _ - - - - ~ .

t k

t BB-07 REFUELING TUSTIFICATION VALVE: BBV0118,148,178,208 CATECORY: A, C CLASS: 2 FUNCTION: Provides containment isolation.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Closure testing (full or partial stroke) requires isolation of RCP seal injection which could cause RCP seal failure and a subsequent LOCA.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling.

I e

Page 14

BB-08 l i REFUELING TUSTIFICATION  :

1 l .

VALVE: BBHV0013,14,15,16 CATEGORY: B CLASS: 3 i FUNCTION: Isolates flow to the reactor coolant pump thermal barriers.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.

BASIS FOR RELIEF: Failure of this valve in the closed position (full or partial stroke) during testing would inhibit flow to the reactor coolant pump thermal barriers.

This could result in unit shutdown and possible damage to the reactor i coolant pump seals and pump radial bearings.

l ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its ,

function and stroke timed during reactor refueling outages.

,., i i

l i

l l

l l

. 1 I

l Page 15

i I

I BB-10 1

COLD SHUTDOWN IUSTIFICATION i

VALVE: BBPCV0455A,456A l CATEGORY: B CLASS: 1 FUNCTION: Pressurizer Power Operated Relief Valve TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.

BASIS FOR RELIEF: The PORVs, BBPCV0455A and BBPCV0456A, should not be opened l (full or partial stroke) during normal operation. If they are opened, it could cause depressurization of the RCS and too rapid of a pressure transient. If the PORV block valves are closed, there is not enough

! pressure to open the PORVs.

l

! ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its function and stroke time,d,during cold shutdown.

l i

i l

l Page 16 I

BB-11 l I

REFUELING TUSTIFICATION i VALVE: BBV0122,152,182,212 BBV0474,476,479,480 CATEGORY: C CLASS: 3 FUNCTION: Close on reverse flow to isolate flow during Reactor Coolant Pump Thermal Barrier Cooling Coil rupture accident.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Testing these check valves in the safety-related closed direction (full or partial stroke) requires isolating cooling water to the Reactor Coolant Pumps' (RCP) Thermal Barrier Cooling Coils and Motor Coolers. This function is required when the RCPs are operating. Loss of RCP seal e injection without Thermal Barrier Coolant would cause catastrophic RCP ,

l seal failure and a subsequent,Small Break Loss of Coolant Accident. )

Loss of RCP motor cooling would result in catastrophic motor failure which would cause a loss of forced RCS flow. The cooling water to the RCPs is provided by a common header, therefore testing cannot be performed until all four RCPs are off, which does not occur except during reactor refueling outages.

ALTERNATE TESTING: Valves will be exercised (full stroke) to their safety-related closed position during reactor refueling outages.

s Page 17

BB-12 REFUELING TUSTIFICATION VALVE: BB8378A, B BB8379A, B CATEGORY: C CLASS: 1 FUNCTION: Close to maintain RCS pressure boundary TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its safety-related function every 3 months.

BASIS FOR RELIEF: Testing these check valves in the safety-related directiori Gull or partial stroke) requires access to the valves and isolation et the normal or attemate charging paths. The normal charging pats is in continuous operation with the attemate charging line as a backup. These valves are located behind the bioshield and entry behind the bioshield during power operation would cause unnecessary radiation exposure and would not support ALARA. Furthermore, in order to reduce high area radiation levels check valves BBV0001, 22, 40, and 59 must be flushed to eliminate crud traps. As stated in Refueling Justification #BB-04 it is not desirable to flow (full or partial stroke) through BBV0001,22,40, or 59 during cold shutdowns due to low temperature overpressurization concems.

ALTERNATE TESTING: Valves will be exercised (full stroke) to their safety-related closed position during reactor refueling outages.

l Page 18

I l

BB-13 l l

REFUELING JUSTIFICATION j i

VALVE: B BV0120,121,150,151,180,181, 210, 211 CATEGORY: C CLASS: 1 FUNCTION: Close to maintain RCS pressure boundary TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its safety-related function every 3 months.

B ASIS FOR RELIEF: Testing these check valves in the safety-related direction (full or partial stroke) requires isolation of RCP seal injection which could cause RCP seal failure and a subsequent LOCA.

ALTERNATE TESTING: Valves will be exercised (full stroke) to their safety-related closed position during reactor refueling outages.

i I

l i

i Page 19

BG-01 REFUELING TUSTIFICATION

! VALVE: BG8381 CATEGORY: A, C CLASS: 2 FUNCTION: Provides containment isolation.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Testing this valve closed (full or partial stroke) would require isolation of charging flow to the RCS which is undesirable from a plant operational perspective.

l ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling.

l l

l l .

l Page 20 l

t

BG-02 REFUELING TUSTIFICATION VALVE: BGHV8112,8100 CATEGORY: A CLASS: 2 FUNCTION: These valves isolate the retum flow path from the reactor coolant pump seal water supply.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and s%e time every 3 months.

BASIS FOR RELIEF: Closure of one of these valves (full or partial stroke) durir.g power operation would inhibit seal water flow across the reactor coolant pump l seats. This could result in damage to the pump seals and consequently  !

I cause a LOCA.

ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its j function and stroke time,d during reactor refueling outages.

l I

i t

Page 21

B C-03 COLD SHUTDOWN TUSTIFICATION VALVE: BGHV8160,8152 CATEGORY: A CLASS: 2 FUNCTION: Provides containment isolation.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.

BASIS FOR RELIEF: Failure of this valve in the closed position during testing (full or partial stroke) would result in loss of pressurizer level control and could result in plant shutdown.

ALTERNATE TESTING: Valve will be exercisea (full stroke) to the position required to fulfill its function and stroke timed during cold shutdown.

l l

l l

L t

Page 22

l BG-04 REFUELING TUSTIFICATION VALVE: BG8481 A, B CATEGORY: C CLASS: 2 FUNCTION: Open to provide flow from the centrifugal charging pumps to the normal charging line or boron injection header and close to prevent flow through parallel pump.

TEST REQUIREMENT: Exercise check valve (full stroke) the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be exercised open (full stroke) during power operation.

The only full flow flowpath is through the Boron injection header into the j reactor coolant system. This would cause an increase in reactor coolant 1 system boron inventory and possibly cause plant shutdown. Valves l cannot be exercised open (full stroke) during cold shutdown since this  !

could result in a cold overpressurization of the reactor coolant system.  !

In regards to closure testing'of these valves, per NUREG-1482 response l to question group #24, 'If a valve performs a safety function in both the open and closed positions; however, the Code requires that the valve be exercised to the open position and then verified to close'. As discussed above, since these valves are exercised full open only on a reactor refueling frequency the closure test of these valves will be performed on a reactor refueling frequency as well.

ALTERNATE TESTING: Exercise check valve open (partial stroke) quarterly during plant operation. Exercise check valve (full stroke) to the position required to fulfill its function at refueling.

l i

I l

Page 23

1 l

l BG-05 )

l REFUELING IUSTIFICATION I

VALVE: BG8546A, B CATEGORY: C i CLASS: 2 FUNCTION: Valve opens on flow from the refueling water storage tank to suction of the centrifugal charging pumps and closes to prevent back flow to the RWST.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

I BASIS FOR RELIEF: Valve cannot be full or partial stroke exercised open during power i operation as this would increase the reactor coolant system boron inventory and possibly-cause plant shutdown. This valve cannot be L

i exercised open during cold shutdown since this could result in a cold l- over-pressurization of the reactor coolant system. In regards to closure l testing of these valves, per NUREG-1482 response to question group

  1. 24, 'If a valve perforrn's s' safety function in both the open and closed -

positions; however, the Code requires that the valve be exercised to the open position and then verified to close'. As discussed above, since these valves are exercised full open only on a reactor ' refueling frequency, the closure test of these valves will be performed on a ,

reactor refueling frequency as well.

- ALTERNATETESTING: Exercise check valve to the positions required to fulfill its function at refueling.

l l

1 i

l l

i e

l Page 24

BG-06 COLD SHUTDOWN TUSTIFICATION VALVE: BGHV8105,8106 CATEGORY: B CLASS: 2 FUNCTION: Valves close to isolate the charging line to the Reactor Coolant System upon receipt of a safety injection signal.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.

BASIS FOR RELIEF: Closure (full or partial stroke) of one of these valves during power operation would isolate charging flow to the Reactor Coolant System.

This could result in loss of pressurizer level control and cause plant shutdown.

ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its function and stroke timed during cold shutdown.

,e= p * *A l

l l

l l

)

1 I

l i

Page 25

BG-07 COLD SHUTDOWN TUSTIFICATION VALVE: BGLCV01128, C CATEGORY: B CLASS: 2 FUNCTION: Valves close to isolate the volume control tank (normal charging supply) upon receipt of a safety injection signal.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.

BASIS FOR RELIEF: Closure (full or partial stroke) of one of these valves during normal unit operation would isolate the normal suction for the charging pumps.

Altemate suction paths would result in increasing the reactor coolant system boron inventory and could result in plant shutdown.

ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its function and stroke time,d during cold shutdown.

Page 26

BG-08 i COLD SHUTDOWN TUSTIFICATION l i VALVE: BGV0147,165,174  !

\

! CATEGORY: C CLASS: 3 l

l FUNCTION: Open to provide emergency boration flowpath. l l )

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its ,

function every 3 months.

BASIS FOR RELIEF: Exercising these valves (full or partial stroke) requires substantial boration of the Reactor Coolant System which is unacceptable from an  !

operational viewpoint. This boration would cause unwanted negative '

reactivity addition and result in reactor power fluctuations.

ALTERNATE TESTING: Exercise check valves (full stroke) to position required to fulfill the )

function at cold shutdown., , ,

l l

1 1

l i

l Page 27 l

l l

BL-01 REFUELING IUSTIFICATION VALVE: BL8046 CATEGORY: A, C CLASS: 2 FUNCTION: Provides containment isolation.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its ;

function every 3 months.

BASIS FOR RELIEF: System design does not provide any indication for verifying valve closure (full or partial stroke) upon flow reversal and would require a 1 Containment entry at power.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling.

, )

e l

I Page 28

.. . . - - - - - - _ - . . ~

BN-01 COLD SHUTDOWN TUSTIFICATION l

VALVE: BNLCV0112D, E CATEGORY: B CLASS: 2 FUNCTION: Open to provide flowpath from RWST to Centrifugal Charging Pumps

upon Safety injection Signal or VCT low-low signal.

l l TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function i and stroke time every 3 months.

BASIS FOR RELIEF: Failure of these valves in the open position (full or partial stroke) would result in introduction of borated water into the RCS, resulting in possible

unit shutdown.
ALTERNATE TESTING
Valve will be exercised (full stroke) to the position required to fulfill its function and stroke timed during cold sNtdowr.

l l

l Page 29

.-. - . . . - - - - - - - . _ _ _ _ ~ . .

l BN-02 l COLD SHUTDOWN TUSTIFICATION l

VALVE: BNHV8813 CATEGORY: B l CLASS: 2 FUNCTION: Valve is normally open to provide miniflow path to the refueling water storage tank.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.

BASIS FOR RELIEF: Failure of this valve in the closed position (full or partial stroke) during testing would result in loss of miniflow path for both trains of safety injection pumps which renders both Si pumps inoperable. This would result in pump damage due to dead heading the safety injection pumps in the event of a safety injection signal with reactor coolant pressure above safety - injection pump discharge pressure. Additionally, BNHV8813 is a T.S. 3.0.3 valve.

ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its function and stroke time'd during cold shutdown.

l l

i l

l Page 30

l EG-01 REFUELING TUSTIFICATION 1

l VALVE: EGV0204 CATEGORY: A, C CLASS: 2 FUNCTION: Valve closes to provide containment isolation.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function once every 3 months.

BASIS FOR RELIEF: Testing this valve for closure (full or partial stroke) during normal plant operation would require isolation of flow to the RCP's and thermal barrier

~

cooling coils which could result in damage to the RCP seals and pump radial bearings and a subsequent LOCA.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling.

l l

I i

i Page 31

ET-01

(

COLD SHUTDOWN TUSTIFICATION VALVE: EJ8841A,B CATEGORY: A, C l CLASS: 1 FUNCTION: Open on flow from the residual heat removal pumps to the reactor coclant hot legs.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full or partial stroke exercised during power operation since the only flowpath discharges into the reactor coolant system.

Residual Heat Removal Pump Discharge Pressure or Safety injection Pump Discharge Pressure cannot overcome reactor coolant system pressure, f ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at cold shutdown.

1 i

l j

l r

Page 32

ET-02 REFUELING TUSTIFICATION VALVE: EJ8969B CATEGORY: C CLASS: 2 FUNCTION: Opens to provide suction to the safety injection pumps from Residual Heat Removal Pump B discharge during the recirculation phase following Safety injection actuations.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valve cannot be full or partial stroke exercised during power operation since the only full flow flowpath discharges into the Reactor Coolant System. Safety injection pump discharge pressure cannot overcome Reactor Coolant System pressure.

Valve cannot be full or partial stroke exercised during cold shutdown since this could result in a cold over pressurization of the Reactor Coolant System.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at rafueling.

l l

l l

Page 33

i l

i ET-03  :

COLD SHUTDOWN TUSTIFICATION  ;

I 1

VALVE: EJHV8701 A, B CATEGORY: A CLASS: 1 FUNCTION: Valves open to provide suction to Residual Heat Removal Pump A during normai unit cooldown.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months. 1 I

BASIS FOR RELIEF: These valves have an interlock which prevents their opening (full or partial stroke) when Reactor Coolant System pressure is above approximately 360 psig to prevent over-pressurization of the RHR system.

ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its function and stroke timed during cold shutdown. l i

1

.. .. j l

t l

l l

l l

l I

t m

(

l l Page 34

ET-04 COLD SHUTDOWN JUSTIFICATION VALVE: EJHV8804A, B CATEGORY: B

~

CLASS: 2 FUNCTION: Valves open to provide flowpath from discharge of the RHR pumps to l the suction of the Safety injection and Centrifugal Charging Pumps.

l TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function l and stroke time every 3 months.

l BASIS FOR RELIEF: Valves cannot be opened (full or partial stroke) during operation due to control interlocks with other ECCS valves. EJHV8804A & B are interlocked with EMHV8814A & B as well as BNHV8813. The latter l

valves are safety injection miniflow isolation valves which must be closed in order to open the 8804 valves which makes the Safety injection Pumps inoperable. If a SI would occur during testing, the SI pumps could be damaged due to a " dead headed" condition (i.e. loss of required miniflow).

ALTERNATE TESTING: Valves will be exercised (full stroke) and stroke timed during cold shutdown.

l l

l l

I 1

i l

1 l -

l Page 35

-. = .. . - - - - - _-

EI-05 COLD SHUTDOWN TUSTIFICATION VALVE: EJHV8840 and EJHV8809A, B CATEGORY: B CLASS: 2 FUNCTION: Valves would be cycled to put the RHR system in hot leg recirc mode during post accident conditions.

TEST REQUIREMENT: Exercise valves (full stroke) to the position required to fulfill its function ,

and stroke time every 3 months.

BASIS FOR RELIEF: Valves have power removed during plant operation to prevent mispositioning these valves (full or partial stroke) which would result in entry into Technical Specification 3.0.3. l ALTERNATE TESTING: Valves will be exercised (full stroke) and stroke timed during cold shutdown.

I I

l I

i I

i l

l l

l l

Page 36 l

ET-06  ;

l COLD SHUTDOWN TUSTIFICATION VALVE: EJHV8811 A, B CATEGORY: B CLASS- 2 l

i FUNCTION: Provides containment isolation. Opens to provide flow path from l containment recirculation sump to suction of RHR pump.

TEST REQUIREMENT: E>ercise valve (full stroke) to the position required to fulfill its function I

an1 strr,ke time every 3 months.

BASIS FOR RELIEF
Opening valve (full or partial stroke) during operation would drain the RHR suction header into the containment sump rendering the RHR ,

i pumps inoperable. Current procedures isolate and drain the suction l l header prior to stroking. This requires significant time. An attemative is '

l to allow the water to go into the sumps which then would require

removal to decrease containment humidity. Another concem is the additional risk of not getting the system fully vented. Requirements currently exist requiring ECCS systems be versted monthly due to problems encountered. The adddonal risks encountered and amount of time to perform testing ~ do'not justify the small amount of additional assurance gained by the testing.

ALTERNATE TESTING: Valves will be exercised (full stroke) and stroke timed during cold i shutdown when the proper precautions may be taken without impacting l operation.

i i

i 1

( Page 37 l

l EI-07 l

COLD SHUTDOWN TUSTIFICATION VALVE: EJHV8716A, B

! CATEGORY: B l CLASS: 2 1

FUNCTION: Provide Low Head Safety injection / Residual Heat Removal train separation for recirculation of fluid to cold legs of Reactor Coolant System (RCS).

TEST REQUIREMENT: Exere!se valves (full stroke) to the position required to fulfill its function and stroke time every three months.

BASIS FOR RELIEF: Closing either EJHV8716A or EJHV8716B (full or partial stroke) isolates each Residual Heat Removal (RHR) pump from two RCS cold legs.

This renders both trains of Emergency Core Cooling System (ECCS) l inoperable, which is in violation of Technical Specifications during I

operation. If either EJHV8716A or B is failed in a closed position,2 of

the 4 cold leg injection pathways are isolated from the assumed single operating RHR pump. Additionally, these valves are T.S. 3.0.3 valves.

l ALTERNATE TESTING: Valves will be exercised'(full stroke) and stroke-timed at cold shutdown.

l l

)

I l

1 Page 38 l

ET-08 REFUELING TUSTIFICATION

, VALVE: EJ8958A,B l

l CATEGORY: C I

l CLASS: 2 l

FUNCTION: Cpen to provide flow from the Refueling Water Storage Tank to the suction of the Residual Heat Removal pumps and close to prevent back flow to the RWST.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

l BASIS FOR RELIEF: These valves cannot be full stroke exercised during power operations

, since the full flow path discharges into the Reactor Coolant System.

Residual heat removal pump discharge pressure cannot overcome Reactor Coolant System pressure during full power operations.

l

! EJ-8958A and EJ-8958B cannot be full stroke exercised during cold 1 shutdown due to insufficient expansion volume for injection during cold i shutdown.

~ . .

ALTERNATE TESTING: Exercise check valves (partial stroke) every 3 months. Exercise check valves (full stroke) to the position required to fulfill its function at refueling.

1 l

! i i

l .

I Page 39

1 ET-09 REFUELING IUSTIFICATION VALVE: EJ8969A CATEGORY: C CLASS: 2 FUNCTION: Opens to provide suction to the Centrifugal Charging Pumps from Residual Heat Removal Pump A discharDe during the recirculation phase following safety injection actuation.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: The valve cannot be full stroke exercised during power operation since the CCPs do not full-flow into the RCS during normal operation. Partial stroke exercising would require starting up the RHR pump, aligning it to the RWST, opening EJ-HV-8804A (See Cold Shutdown Justification

  1. EJ-04), and as a result, boration of the RCS with 2000 ppm water. This is undesirable from a plant operational perspective.

Valve cannot be full or partial stroke exercised during cold shutdown since this could result'in 'a ' cold over pressurization of the Reactor Coolant System.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling, f

F I

l 4 [

Page 40 ,

ET-10 COLD SHUTDOWN TUSTIFICATION ,

VALVE: EJ8730A, B .

c CATEGORY: C CLASS: 2 FUNCTION: Open to provide flow from residual heat removal pumps to the Reactor Coolant System and close to prevent reverse flow through the RHR pump in the opposite train.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: These valves cannot be full stroke exercised during power operations since the full flow path discharges into the Reactor Coolant System.

Residual heat removal pump discharge pressure cannot overcome '

Reactor Coolant System pressure during full power operations.

ALTERNATE TESTING: Exercise check valves (partial stroke) every 3 months. Exercise check valves (full stroke) to the position required to fulfill its function at cold shutdown. i 1

i l

l l

}

i 1

4 Page 41 l

EM-01 REFUELING IUSTIFICATION VALVE: EM8922A, B CATEGORY: C CLASS: 2 FUNCTION: Opens on flow from the Safety injection pumps to the reactor coolant cold legs or hot legs and closes to prevent reverse flow through the opposite train Safety injection pump.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full or partial stroke exercised open during power operation since the only flowpath discharges into the reactor coolant system. Safety injection pump discharge pressure cannot overcome reactor coolant system pressure. During cold shutdown these valves cannot be full or partial stroke exercised open since this could result in a low temperature overpressurization of the reactor coolant system. In regards to closure testing of these valves, per NUREG-1482 response to ,

question group #24, 'If a valve performs a safety function in both the  !

open and closed positions; however, the Code requires that the valve be exercised to the open position and then verified to close'. As discussed above, since these valves are exercised full open only on a reactor refueling frequency, the closure test of these valves will be performed on a reactor refueling frequency as well.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling.

i Page 42 l

EM-02 REFUELING TUSTIFICATION VALVE: EMV0001, 2, 3, 4 CATEGORY: A, C CLASS: 1 FUNCTION: These valves open to provide hot leg recirculation flow from the safety injection pumps.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full or partial stroke exercised during power operation since the only flow path discharges into the reactor coolant system. 1 I

Safety injection pump discharge pressure cannot overcome reactor

~

coolant system pressure. During cold shutdown these valves cannot be full or partial stroke exercised since this could result in a low temperature overpressurization of the reactor coolant system.

i ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its i function at refueling. ,, , ,

I l

i i

l Page 43 i

l EM-03 REFUELING IUSTIFICATION i

l VALVE: EM8815 l CATEGORY: C l

CLASS: 2 1

FUNCTION: Opens on flow from the Centrifugal Charging Pumps.

l TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Using a Centrifugal Charging Pump to provide flow (full or partial stroke) would result in injecting borated water into the Reactor Coolant System through the cold leg injection lines. This would result in a decrease in reactor power and thermal shock to the reactor coolant piping. During cold shutdowns exercising this valve (full or partial stroke) could result in a low temperature overpressurization of the reactor coolant system.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling.

Page 44 l

EM-05 REFUELING TUSTIFICATION VALVE: EM8926A, B CATEGORY: C CLASS: 2 Open on flow from the Refueling Water Storage Tank to the suction of FUNCTION:

the Safety injection Pumps and closes to prevent backleakage to the RWST.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full stroke exercised open during power operation since the only full flow path discharges into the reactor coolant system.

Safety injection pump discharge pressure cannot overcome reactor coolant system pressure. During cold shutdown these valves cannot be  ;

full stroke exercised open since this could result in a low temperature overpressurization of the reactor coolant system. In regards to closure testing of these valves, per NUREG-1482 response to question group

  1. 24, 'If a valve performs a safety function in both the open and closed ,

positions; however, the Code requires that the valve be exercised to the l open position and then verified to close'. As discussed above, since these valves are exercised full open only on a reactor refueling ,

frequency, the closure test of these valves will be performed on a i reactor refueling frequency as well.

1 ALTERNATE TESTING: Exercise check valve open (partial stroke) every 3 months. Exercise check valve (full stroke) to the positions required to fulfill its function at I refueling.

l 4

l l

1 l

Page 45

1

\

EM-07 l I

COLD SHUTDOWN TUSTIFICATION l

VALVE: EMHV8835 I CATEGORY: B CLASS: 2 FUNCTION: Provide isolation between the Safety injection Pumps discharge and the l Reactor Coolant System Cold Legs.  !

l TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.

B ASIS FOR RELIEF: Valve must remain open (cannot be full or part stroke exercised) to satisfy the flowpath from the Safety injection Pumps to the Reactor Coolant System per T.S. 3.0.3.

ALTERNATE TESTING: Valve will be exercised (full stroke) and stroke timed during cold shutdown outages.

l 1

l Page 46

EN-01 RELIEF REQUEST VALVE: ENV0002,8 CATEGORY: C CLASS: 2 FUNCTION: Valves open to provide flow from the Containment Sump to the Containment Spray Pumps.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: These valves cannot be full or partial stroke exercised since the only full flowpath is from the Containment Sump which is normally dry. Also, testing would require spraying containment which would result in damage to lagging, non EQ electrical equipment, etc.

ALTERNATE TESTING: ENV0002 and ENV0008 are Walworth Company Model 12-N-376-SP, 12" stainless steel check valves installed in a horizontal orientation that have the same service conditions as they are corresponding valves in the 'A' and 'B' trains of th,e Co,ntainment Spray System.

A different valve of this group will be disassernbled, inspected, and manually full stroked at each refueling until the entire group has been tested, if the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked during the same refuel outage.

l Page 47

EN-02 RELIEF REQUEST VALVE: ENV0003,9 CATEGORY: C CLASS: 2 ,

FUNCTION: Valves open to provide flow from the refueling water storage tank to the spray headers.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: These valves cannot be full stroke exercised since the only full flow flowpath is to the spray headers which would result in spraying containment resulting in damage to lagging, non EQ electrical equipment, etc.

ALTERNATE TESTING: ENV0003 and ENV0009 are Walworth Company Model 12-N-376-SP, 12" stainless steel check valves installed in a horizontal orientation that have the same service conditions as they are ccrresponding valves in the 'A' and 'B' trains of the Containment Spray System.

Exercise check valve (partial stroke) every 3 months. A different valve of this group will be disassembled, inspected, and manually full stroked at each refueling, until the entire group has been tested, if the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked during the same refuel outage.

l l

o Page 48

EN-03 RELIEF REQUEST VALVE: ENV0013,17 CATEGORY: C CLASS: 2 FUNCTION: Opens on flow from the Containment Spray Pump to the containment spray headers.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: To full or partial stroke these valves, flow from the containment spray pump would have to be initiated. This would result in spraying water

'hrough the spray nozzles into containment resulting in damage to lagging, non EQ electrical equipn ent, etc.

ALTERNATE TESTING: ENV0013 and ENV0017 are Walworth Company Model 10-N-376-SP, 10" stainless steel check valves installed in a horizontal orientation that have the same service conditions as they are corresponding valves in the 'A' and 'B' trains of the Containment Spray System.

A different valve of this group will be disassembled, inspected and I manually full stroked at each refueling, until the entire group has been tested. If the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked during the same refuel outage.

l I

4 l

Page 49

EN-04  :

COLD SHUTDOWN TUSTIFICATION VALVE: ENHV0001,7 CATEGORY: B CLASS: 2 ,

FUNCTION: Provides containment isolation. Opens to provide flow path from containment recirculation sump to suction of the Containment Spray

_ Pumps.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function and stroke time every 3 months.

BASIS FOR RELIEF: Opening valve (full or partial stroke) during operation would run the risk of draining the Containment Spray Pumps suction headers into the containment sump which could cause severe damage to '.he pumps and render them inoperable. Refueling Water Storage Tank must be isolated to prevent flooding containment should the single check valve not hold when these valves are stroked open. Current procedures isolate and drain the suction header prior to stroking. This requires significant time. An altemative is to allow the water to go into the sumps which then would require removal to decrease containment humidity.

Another concem is the additional risk of not getting the system fully vented. Requirements currently exist requiring ECCS systems be

! vented monthly due to problems which were encountered. The l additional risks encountered and amount of time to perform testing do  ;

not justify the small amount of additional assurance gained by the testag.

I ALTERNATE TESTING: Valves will be exercised (full stroke) and stroke timed during cold

shutdown when the proper precautions may be taken without impacting operation.

4 Page 50 l __.

EN-05 RELIEF REQUEST VALVE: ENV0004,10 CATEGORY: C

! CLASS: 2 FUNCTION: Valves open to provide flow from the refueling water storage tank to the spray headers.

TEST REQUIREMENT
Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.
BASIS FOR RELIEF
These valves cannot be full stroke exercised since the only full flow I flowpath is to the spray headers which would result in spraying containment resulting in damage to lagging, non EQ electrical equipment, etc.

l ALTERNATE TESTING: ENV0004 and ENV0010 are Walworth Company 10-N-2376-S,10" stainless steel check valves installed in a horizontal orientation that have the same service conditions as they are corresponding valves in the 'A' and 'B' trains of the Containment Spray System.

Exercise check velve (partial stroke) every 3 months. A different valve i of this group will be disassembled, inspected, and manually full stroked at each refueling, until the entire group has been tested. If the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked at the same outage.

l l

t l

Page 51

EP-01 COLD SHUTDOWN TUSTIFICATION l

VALVE: EP8818A, B, C, D CATEGORY: A, C CLASS: 1 FUNCTION: Valves open on cold leg injection flow from the residual heat removal l pumps. j TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full or partial stroke exercised during power operation since the only flow path discharges into the reactor coolant system.

Residual Heat Removal Pump Discharge Pressure cannot overcome j reactor coolant system pressure, j ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at cold shutdown.

l i

i Page $2

EP-02 RELIEF REQUEST I

l

- VALVE: EP8956A B, C, D CATEGORY: A, C CLASS: 1 FUNCTION: Opens on flow from the cold leg accumulators to provide flow to the l reactor coolant system cold legs. 1 TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months. l BASIS FOR RELIEF: These valves cannot be full or part stroke exercised during power operation since cold leg accumulator pressure cannot overcome reactor .

coolant system pressure. During cold shutdown exercising these valves l (full or partial stroke) could result in a low temperature J overpressurizat;on of the reactor coolant system.  ;

ALTERNATE TESTING: EP8956A, B, C, D are Westinghouse Electric Corporation Model l 10001CG990000DO,10" stainless steel check valves installed in a l i horizontal orientation that have the same service conditions as they are j corresponding valves in'lo~ ops A, B, C, D of the Accumulator Safety injection System.

A different valve of this group will be disassembled, inspected, and manually stroked at each refueling, until the entire group has been tested. If the full-stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked at the same refuel outage. 1 l

! l l l

)

I l

l 6

4 i

Page 53

EP-03 REFUELING IUSTIFICATION l l

VALVE: EPV0010, 20, 30, 40 CATEGORY: A, C CLASS: 1 FUNCTION: Valves open on cold leg injection flow from the safety injection pumps.

TEST REQUIREMENT: Exercise check valve (full stroke) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full or partial stroke exercised during power operation since the only flowpath discharges into the reactor coolant system.

Safety injection Pump Discharge Pressure cannot overcome reactor coolant system pressure. During cold shutdown these valves cannot be full or partial stroke exercised since this could result in a low temperature overpressurization of the reactor coolant system.

ALTERNATE TESTING: ** Exercise check valve (full stroke) to the position required to fulfill its function at refueling.

1 l

l l

r l

l Page 54 1

! 1 l l 1

l l EP-04 i COLD SHUTDOWN TUSTIFICATION l

VALVE: EPHV6950A, B, C, D, E, F CATEGORY: B CLASS: 2 FUNCTION: Valves are provided to depressurize the accumulator tanks during  !

emergency cold shutdown conditions. )

l TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function every 3 months. )

l BASIS FOR RELIEF: Opening valve (full or partial stroke) during plant operation could render  ;

an accumulator inoperable. The Technical Specification action  ;

statement may not allow adequate time to test and restore an accumulator. Additionally, if one valve were to fall, insufficient time is allowed for repair and therefore the plant would be required to shut down.

ALTERNATE TESTING: Valves will be exercised (full stroke) and stroke timed at cold shutdown.

.,. . j l

l I

i i

I Page 55

(

l EP-05 COLD SHUTDOWN TUSTIFICATION l

VALVE: EPHV8808A, D CATEGORY: B l CLASS: 2 i

FUNCTION: Valves are provided to isolate the accumulator tanks during certain '

emergency cold shutdown conditions.

l' - s l TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function l every three months.

B ASIS FOR RELIEF: See NUREG-1482, Section 3.1.1-1 (cannot full or partial stroke).

ALTERNATE TESTING: Valves will be exercised (full stroke) and stroke timed at cold shutdown.

i l

l l

l l

i l

l l

I I

I l Page 56

.- . . . - . - - .-- - - - . - - - - . - _ - - - ~ . .- . .-

FC-01 i

RELIEF REQUEST VALVE: FCV0001, 2, 24, 25 CATEGORY: C CLASS: 3 FUNCTION: Valves open to provide steam flow to the Turbine Driven Auxiliary Feedwater Pump. Valves close to provide redundant steam line separation.

TEST REQUIREMENT: Exercise check valves (full stroke open and closed) to the position required to fulfill its function every 3 months.

BASIS FOR RELIEF: Valves cannot be full stroke opened during power operation since this would require full flow of cool water from the turbine driven auxiliary feedwater pump to the steam generators. This is undesirable since this would unnecessarily thermally shock steam generator feedwater nozzles.

These valves cannot be full or partial stroke tested closed since there are no lines coming off between the two valves on a line to allow for pressurization and depressurization.

ALTERNATE TESTING: Check valves will be partial stroke tested open quarterly Valves will be full stroke exercised open at cold shutdown frequency. Valves will be tested for closure capability by disassembling, inspecting, and manually full stroking a different valve of this group at each refueling.

FCV0001, FCV0002, FCV0024, and FCV0025 are Velan Valve Corporation 4" pressure seal swing carbon steel check valves installed in a horizontal orientation that have the same service conditions as they are corresponding valves in main steam loops 2 and 3 supply to the turbine of the Turbine Driven Auxiliary Feedwater Pump.

A different valve of this group will be disassembled, inspected, and manually full stroked at each refueling, until the entire group has been tested. If the full -stroke capability of the disassembled valve is in question, the remainder of the valves in this group will also be disassembled, inspected, and manually full stroked at the same outage.

l

)

i l'

Page 57

l l

l l

KA-01 1 l COLD SHUTDOWN TUSTIFICATION l

l VALVE: KAFV0029 CATEGORY: A l CLASS: 2 I .

FUNCTION: Valve closes to provide containment isolation.

TEST REQUIREMENT: Exercise valve (full stroke) to the position required to fulfill its function l and stroke time every 3 months.

BASIS FOR RELIEF: Failure of this valve in the closed direction or stroking this valve (full or i partial stroke) during normal plant operation would interrupt the instrument air supply to valves and equipment necessary for system control and operation (i.e. loss of the normal letdown path and loss of pressurizer spray). These losses would put the plant in an off-normal situation and possibly cause a reactor trip.

1 ALTERNATE TESTING: Valve will be exercised (full stroke) to the position required to fulfill its '

function, stroke time tested, and fail-safe tested during cold shutdown.

l 1

i e

i 1

l l

l l

I i

l Page 58

l KA-02 l

i REFUELING TUSTIFICATION VALVE: KAV0204 CATEGORY: A, C CLASS: 2 l

FUNCTION: Provides containment isolation.

TEST REQUIREMENT
Exercise check valve (full stroke) to the position required to fulfill its

! function every 3 months.

BASIS FOR RELIEF: System design does not provide any indication for verifying valve I closure (full or partial stroke) upon flow reversal. Also see Cold Shutdown Justification KA-01 for not exercising valve during normal plant operation.

ALTERNATE TESTING: Exercise check valve (full stroke) to the position required to fulfill its function at refueling,

[

l l

Page 59

l i

l l

l KI-01 RELIEF REQUEST l

l l VALVE: KJPV0001 A&B,0101 A&B

! CATEGORY: B 1

CLASS: 3 FUNCTION: Valves open to provide starting air to the emergency diesel generator.

TEST REQUIREMENT: Exercise valves (full stroke) to the position required to fulfill its function and stroke time every 3 months.

BASIS FOR RELIEF: These are totally enclosed solenoid valves. The valves are controlled '

l by the start stop switch for the diesel. Therefore, stroke time for the l valves (full or partial stroke) themselves cannot be measured. Valve stroke time,affects diesel start time. Diesel start time will be used to monitor valve performance. Maximum stroke time of 12 seconds will be used since this is the limit for diesel start time. Since both valves l actuate when the diesel is started, changes in starting air tank pressures will be monitored to ensure approximately equal pressure decreases to verify both valves actuated properly.

ALTERNATE TESTING: Diesel starting times and 's tarting air tank pressure changes will be measured.

I l

! 1 l

l I

Page 60