ML20065H594: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:'# ..
{{#Wiki_filter:}}
c ABB Docket 52-002                                                April 12,1994 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
 
==Subject:==
ABB Combustion Engineering Topical Report CENPD-210, Revision 7A '
 
==Dear Sirs:==
 
Pursuant to the requirements of Section 1.3 of the subject report and 10CFR50.55 (f) (3),' the purpose of this letter is to inform the U.S. Nuclear Regulatory Commission of a change in the
        - organizational alignment of ABB Combustion Engineering Nuclear Fuel, which has become part of ABB Combustion Engineering Nuclear Operations. These changes modify the structure shown in Figure 11-2 of CENPD-210, Revision 7A, and our letter LD-92-108 dated October 16,1992.
These changes do not reduce any of the previously accepted commitments.
The authority for the establishment of the quality assurance program for fuel operations rests with the President, Nuclear Operations, who has assigned this function to the Vice President, Total Quality. The Vice President, Total Quality is responsible for preparing and maintaining a quality assurance program which meets 10CFR50, Appendix B, and other recognized nuclear quality standards. Quality assurance functions remain independent of organizations charged primarily--
with cost and schedule considerations.
Quality control activities remain located within fuel manufacturing and engineering but report          ,
functionally to the Vice President, Total Quality. _Stop work authority is delegated by the Vice President, Total Quality to quality control personnel and is independent of all other line management.
i i
Figure 1, attached, outlines the new organization and supersedes Figure 11-2 of CENPD-210, Revision 7A, and letter LD-92-108.
If there are any questions regarding the above, please feel free to contact me at (301 )881-7040.'
Very truly yours, COMBUSTION ENGINEERING, INC.
                                                                              <        ee Charles B. Brinkman r
Director, Nuclear Systems Licensing cc:      G. Zech (NRC)
T. Wambach (NRC)
D.E. Allen ABB Combustion Engineering Nuclear Power
                                    +            .
                                                                            -    A
                                                                          "##""                                f 9404150063 940412                  -
EEE$$$"
{DR ADOCK 05200002      PDR
 
          ,                                    COMBUSTION ENGINEERING NUCLEAR OPERATIONS QUALITY ASSURANCE / QUALITY CONTROL FUNCTIONS i
ABB CE NUCLEAR OPERATIONS, FUEL ACTIVITIES                                    -
TOTAL QUALITY
* Quality Assur.nce
!                                                                Requirements
* Independent Audits
* Root Cause Evaluation
* Stop Work Authority
* Quahty Plann6n0
              ' Ouelity Proceduees                                            ~
                                                                                  ~
im . coon                                                                                                    ,
FUEL OPERATIONS
              * "O l,',''"das                            QUALITY                                            MANUFACTURING Auentino                            COORDINATORS                                            (FACTORIES)
_                          (SUPPLY MANAGEMENT) j
* Teelning Si Cortlhcehon el        'g                            -"
inspection Personnel            a
* Certinc.ation of Product                                                                    ,
              ' 8 top Week Authortty FUEL OPERATIONS (MECHANICAL DESIGN) ou.iny P,oc.du,.s Auditlog                                OUALITY l            a >w n. cord.                              ENGINEER
* troo Woth Authoetty ENGINEERING OPERATIONS (ANALYSIS)
(DEVELOPMENT) ne r.,nco,,                                            FIGURE 1 41 N l
n=
s,  .. . .
___ _ - w}}

Revision as of 23:03, 30 March 2020

Informs NRC of Change in Organizational Alignment of Abb C-E Nuclear Fuels,Which Has Become Part of Abb C-E Nuclear Operations.Changes Modify Structure Shown in Figure II-2 of TR CENPD-210,Rev 7A.New Organization Reflected in Encl
ML20065H594
Person / Time
Site: 05200002
Issue date: 04/12/1994
From: Brinkman C
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY, ASEA BROWN BOVERI, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9404150063
Download: ML20065H594 (2)


Text