| #REDIRECT [[IR 05000325/2003008]] | | {{Adams |
| | | number = ML042160062 |
| | | issue date = 08/02/2004 |
| | | title = IR 05000324-03-008, Notification of Brunswick, Unit 2, Supplemental Inspection During Week of 08/23/2004 |
| | | author name = Fredrickson P |
| | | author affiliation = NRC/RGN-II/DRP/RPB4 |
| | | addressee name = Gannon C |
| | | addressee affiliation = Carolina Power & Light Co |
| | | docket = 05000324 |
| | | license number = DPR-062 |
| | | contact person = |
| | | document report number = IR-03-008 |
| | | document type = Inspection Report, Letter |
| | | page count = 5 |
| | }} |
| | |
| | {{IR-Nav| site = 05000324 | year = 2003 | report number = 008 }} |
| | |
| | =Text= |
| | {{#Wiki_filter:ust 2, 2004 |
| | |
| | ==SUBJECT:== |
| | NOTIFICATION OF BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 SUPPLEMENTAL INSPECTION - NRC INSPECTION REPORT 50-325/2003-08 AND 50-324/2003-08 |
| | |
| | ==Dear Mr. Gannon:== |
| | In a Final Significance Determination letter, dated June 2, 2004, from Mr. Loren Plisco, the Region II Deputy Regional Administrator, you were informed that the NRC had concluded that the final significance determination of a Brunswick Steam Electric Plant Unit 2 finding associated with an emergency diesel generator jacket water cooling system leak, had been characterized as White (i.e., an issue of low to moderate safety significance, which may require additional NRC inspection). Also in this letter you were informed that, because Brunswick Unit 2 plant performance for this issue had been determined to be in the increased regulatory response band, we would use the NRC Action Matrix to determine the most appropriate NRC response for the finding, and notify you by separate correspondence of our determination. |
| | |
| | The purpose of this letter is to notify you that we plan to conduct a Supplemental Inspection of Brunswick Unit 2 during the week of August 23, 2004. The inspection will be conducted by Mr. |
| | |
| | Bob Hagar, the Senior Resident Inspector at the H. B. Robinson Nuclear Plant. In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the inspection will be conducted using NRC Inspection Procedure 95001, Inspection For One Or Two White Inputs In A Strategic Performance Area. |
| | |
| | Discussions between Mr. Eugene DiPaolo of my staff and Mr. Steve Tabor of your staff have taken place to allow for scheduling conflicts and personnel availability to be resolved in advance of this inspection. Thank you for your cooperation in this matter. If you have any questions regarding the inspection, please contact Mr. Hagar at (843) 383-4571 or me at (404) |
| | 562-4530. |
| | |
| | CP&L 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | |
| | Sincerely, |
| | /RA/ |
| | Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-324 License No: DPR-62 cc: (See page 3) |
| | |
| | CP&L 3 cc: |
| | W. G. Noll, Director Site Operations Margaret A. Force Brunswick Steam Electric Plant Assistant Attorney General Carolina Power & Light Company State of North Carolina Electronic Mail Distribution Electronic Mail Distribution David H. Hinds, Plant Manager Jo. A. Sanford, Chair Brunswick Steam Electric Plant North Carolina Utilities Commission Carolina Power & Light Company c/o Sam Watson, Staff Attorney Electronic Mail Distribution Electronic Mail Distribution James W. Holt, Manager Robert P. Gruber Performance Evaluation and Executive Director Regulatory Affairs PEB 7 Public Staff NCUC Carolina Power & Light Company 4326 Mail Service Center Electronic Mail Distribution Raleigh, NC 27699-4326 Edward T. O'Neil, Manager Public Service Commission Site Support Services State of South Carolina Brunswick Steam Electric Plant P. O. Box 11649 Carolina Power & Light Company Columbia, SC 29211 Electronic Mail Distribution David R. Sandifer, Chairperson Leonard R. Beller, Supervisor Brunswick County Board of Commissioners Licensing/Regulatory Programs P. O. Box 249 Brunswick Steam Electric Plant Bolivia, NC 28422 Carolina Power & Light Company Electronic Mail Distribution Warren Lee, Director New Hanover County Department of William D. Johnson Emergency Management Vice President & Corporate Secretary P. O. Box 1525 Carolina Power & Light Company Wilmington, NC 28402-1525 Electronic Mail Distribution Distribution w/encl: (See page 4) |
| | John H. O'Neill, Jr. |
| | |
| | Shaw, Pittman, Potts & Trowbridge 2300 N Street NW Washington, DC 20037-1128 Beverly O. Hall, Section Chief Division of Radiation Protection N. C. Department of Environment and Natural Resources Electronic Mail Distribution |
| | |
| | Distribution w/encl: |
| | B. Mozafari, NRR L. Slack, RII EICS RIDSRIDSNRRDIPMLIPB R. Hagar, RII PUBLIC OFFICE DRP/RII SIGNATURE PEF NAME PFredrickson:as DATE 08/02/2004 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC YES NO OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML042160062.wpd |
| | }} |
Latest revision as of 00:47, 17 March 2020
|
---|
Category:Inspection Report
MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 IR 05000324/20210032021-11-10010 November 2021 Team Electric Plant; Integrated Inspection Report 05000324/2021003 and 05000325/2021003 IR 05000324/20210102021-10-22022 October 2021 Temporary Instruction 2515/193 Inspection Report 05000324/2021010 and 05000325/2021010 IR 05000324/20214012021-09-28028 September 2021 Security Baseline Inspection Report 05000324/2021401 and 05000325/2021401 IR 05000324/20210052021-08-26026 August 2021 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2021005 and 05000325/2021005) IR 05000324/20210122021-08-24024 August 2021 Biennial Probleem Identification and Resolution Inspection Report 05000324/2021012 and 05000325/2021012 IR 05000324/20210022021-08-11011 August 2021 Integrated Inspected Report 05000324/2021002 and 05000325/2021002 IR 05000324/20214022021-06-16016 June 2021 Material Control and Accounting Program Inspection Report 05000324/2021402 and 05000325/2021402 (OUO Removed) IR 05000324/20213642021-06-11011 June 2021 Exam Approval Letter 05000348/2021-301 and 05000324/2021-364 IR 05000324/20210112021-06-0202 June 2021 Design Basis Assurance Inspection (Programs) Inspection Report 05000324/2021011 and 05000325/2021011 IR 05000324/20210012021-05-14014 May 2021 Integrated Inspection Report 05000324/2021001 and 05000325/2021001 IR 05000324/20200062021-03-0303 March 2021 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Reports 05000325/2020006 and 05000324/2020006 IR 05000324/20200042021-02-0505 February 2021 Integrated Inspection Report 05000324/2020004 and 05000325/2020004; 07200006/2020002 IR 05000324/20203012021-01-22022 January 2021 NRC Operator License Examination Report 05000325/2020301 and 05000324/2020301 IR 05000324/20200032020-11-0606 November 2020 Integrated Inspection Report 05000324/2020003 and 05000325/2020003 IR 05000324/20204012020-10-30030 October 2020 Security Baseline Inspection Report 05000324/2020401 and 05000325/2020401 IR 05000324/20204032020-10-14014 October 2020 Bruswick Steam Electric Plant - Review of Power Reactor Target Sets Report 05000324-2020403 and 05000325-2020403 IR 05000324/20200052020-08-24024 August 2020 Updated Inspection Plan for Brunswick Steam Electric Plant Units 1 and 2, NRC Inspection Report 05000325/2020005 and 05000324/2020005 IR 05000324/20200022020-08-11011 August 2020 Integrated Inspection Report 05000324/2020002 and 05000325/2020002 IR 05000324/20200112020-06-24024 June 2020 U. S. Nuclear Regulatory Commission Evaluation of Changes, Tests, and Experiments Report 05000324/2020011 and 05000325/2020011 IR 05000324/20200012020-05-12012 May 2020 Integrated Inspection Report Report 05000324/2020001 and 05000325/2020001 IR 05000324/20200102020-04-0606 April 2020 NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000324/2020010 and 05000325/2020010) IR 05000324/20190062020-03-0303 March 2020 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 - NRC Inspection Reports 05000325/2019006 and 05000324/2019006 IR 05000324/20190042020-02-11011 February 2020 NRC Inspection Report 05000324/2019004 and 05000325/2019004; 07200006/2019002 IR 05000324/20194122019-11-22022 November 2019 U.S. Nuclear Regulatory Commission Security Inspection Report 05000325/2019412 and 05000324/2019412 IR 05000324/20190122019-11-20020 November 2019 NRC Temporary Instruction 2515/194 Inspection Associated with NRC Bulletin 2012-01, IR 05000325/2019012 & 05000324/2019012 IR 05000324/20190032019-11-0707 November 2019 Integrated Inspection Report - 05000324/2019003 and 05000325/2019003 IR 05000324/20190112019-10-16016 October 2019 Design Basis Assurance Inspection (Teams) Inspection Report 05000324/2019011 and 05000325/2019011 2023-08-04
[Table view] Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023 NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25
[Table view] |
Text
ust 2, 2004
SUBJECT:
NOTIFICATION OF BRUNSWICK STEAM ELECTRIC PLANT UNIT 2 SUPPLEMENTAL INSPECTION - NRC INSPECTION REPORT 50-325/2003-08 AND 50-324/2003-08
Dear Mr. Gannon:
In a Final Significance Determination letter, dated June 2, 2004, from Mr. Loren Plisco, the Region II Deputy Regional Administrator, you were informed that the NRC had concluded that the final significance determination of a Brunswick Steam Electric Plant Unit 2 finding associated with an emergency diesel generator jacket water cooling system leak, had been characterized as White (i.e., an issue of low to moderate safety significance, which may require additional NRC inspection). Also in this letter you were informed that, because Brunswick Unit 2 plant performance for this issue had been determined to be in the increased regulatory response band, we would use the NRC Action Matrix to determine the most appropriate NRC response for the finding, and notify you by separate correspondence of our determination.
The purpose of this letter is to notify you that we plan to conduct a Supplemental Inspection of Brunswick Unit 2 during the week of August 23, 2004. The inspection will be conducted by Mr.
Bob Hagar, the Senior Resident Inspector at the H. B. Robinson Nuclear Plant. In accordance with NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program, the inspection will be conducted using NRC Inspection Procedure 95001, Inspection For One Or Two White Inputs In A Strategic Performance Area.
Discussions between Mr. Eugene DiPaolo of my staff and Mr. Steve Tabor of your staff have taken place to allow for scheduling conflicts and personnel availability to be resolved in advance of this inspection. Thank you for your cooperation in this matter. If you have any questions regarding the inspection, please contact Mr. Hagar at (843) 383-4571 or me at (404)
562-4530.
CP&L 2 In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room (PDR) or from the NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Paul E. Fredrickson, Chief Reactor Projects Branch 4 Division of Reactor Projects Docket No.: 50-324 License No: DPR-62 cc: (See page 3)
CP&L 3 cc:
W. G. Noll, Director Site Operations Margaret A. Force Brunswick Steam Electric Plant Assistant Attorney General Carolina Power & Light Company State of North Carolina Electronic Mail Distribution Electronic Mail Distribution David H. Hinds, Plant Manager Jo. A. Sanford, Chair Brunswick Steam Electric Plant North Carolina Utilities Commission Carolina Power & Light Company c/o Sam Watson, Staff Attorney Electronic Mail Distribution Electronic Mail Distribution James W. Holt, Manager Robert P. Gruber Performance Evaluation and Executive Director Regulatory Affairs PEB 7 Public Staff NCUC Carolina Power & Light Company 4326 Mail Service Center Electronic Mail Distribution Raleigh, NC 27699-4326 Edward T. O'Neil, Manager Public Service Commission Site Support Services State of South Carolina Brunswick Steam Electric Plant P. O. Box 11649 Carolina Power & Light Company Columbia, SC 29211 Electronic Mail Distribution David R. Sandifer, Chairperson Leonard R. Beller, Supervisor Brunswick County Board of Commissioners Licensing/Regulatory Programs P. O. Box 249 Brunswick Steam Electric Plant Bolivia, NC 28422 Carolina Power & Light Company Electronic Mail Distribution Warren Lee, Director New Hanover County Department of William D. Johnson Emergency Management Vice President & Corporate Secretary P. O. Box 1525 Carolina Power & Light Company Wilmington, NC 28402-1525 Electronic Mail Distribution Distribution w/encl: (See page 4)
John H. O'Neill, Jr.
Shaw, Pittman, Potts & Trowbridge 2300 N Street NW Washington, DC 20037-1128 Beverly O. Hall, Section Chief Division of Radiation Protection N. C. Department of Environment and Natural Resources Electronic Mail Distribution
Distribution w/encl:
B. Mozafari, NRR L. Slack, RII EICS RIDSRIDSNRRDIPMLIPB R. Hagar, RII PUBLIC OFFICE DRP/RII SIGNATURE PEF NAME PFredrickson:as DATE 08/02/2004 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO PUBLIC YES NO OFFICIAL RECORD COPY DOCUMENT NAME: E:\Filenet\ML042160062.wpd