| issue date = 03/22/2005
| issue date = 03/22/2005
| title = Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures
| title = Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures
| author name = Demers G A, McTigue J W
| author name = Demers G, Mctigue J
| author affiliation = Environmental Resources Management, Inc
| author affiliation = Environmental Resources Management, Inc
| addressee name = Hall D
| addressee name = Hall D
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:Environmental Resources Management 399 Bovlston Street, 6"h Floor Boston, MA 02116 (617) 646-7800 (617) 267-6447 (fax)http://vwww.erm.com 22 March 2005  
{{#Wiki_filter:Environmental Resources Management 399 Bovlston Street, 6 "hFloor Boston, MA 02116 (617) 646-7800 (617) 267-6447 (fax) http://vwww.erm.com 22 March 2005


==Reference:==
==Reference:==
BYR-2005-019 Mr. Daniel Hall, Section Chief Solid Waste Management Massachusetts Department of Environmental Protection Western Regional Office                                                        ERMCI 436 Dwight Street Springfield, MA 01103 RE:        Revised Beneficial Use Determination for Structures Yankee Nuclear Power Station, Rowe, MA


BYR-2005-019 Mr. Daniel Hall, Section Chief Solid Waste Management Massachusetts Department of Environmental Protection Western Regional Office 436 Dwight Street Springfield, MA 01103 ERMCI RE: Revised Beneficial Use Determination for Structures Yankee Nuclear Power Station, Rowe, MA
==Dear Mr. Hall:==


==Dear Mr. Hall:==
Environmental Resources Management (ERM), on behalf of Yankee Atomic Electric Company (YAEC), is pleased to submit a revised Beneficial Use Determination (BUD) for Structures at the Yankee Nuclear Power Station (YNPS) in Rowe, Massachusetts.
Environmental Resources Management (ERM), on behalf of Yankee Atomic Electric Company (YAEC), is pleased to submit a revised Beneficial Use Determination (BUD)for Structures at the Yankee Nuclear Power Station (YNPS) in Rowe, Massachusetts.
This submittal replaces the BUD for Structures application dated on 22 September 2004.
This submittal replaces the BUD for Structures application dated on 22 September 2004.The revised BUD application is intended to allow concrete slabs and foundations to remain in-place, to allow concrete and asphalt to be processed and used for site grading, and to allow inactive subsurface utility lines to remain in-place.
The revised BUD application is intended to allow concrete slabs and foundations to remain in-place, to allow concrete and asphalt to be processed and used for site grading, and to allow inactive subsurface utility lines to remain in-place. As discussed with the Department, this submittal is being made with the same transmittal and application forms as the original submittal.
As discussed with the Department, this submittal is being made with the same transmittal and application forms as the original submittal.
We appreciate your support of this project. Should you have questions or require additional information, please contact Mr. Kenneth W. Dow, Environmental Manager, at (413) 424-2245.
We appreciate your support of this project. Should you have questions or require additional information, please contact Mr. Kenneth W. Dow, Environmental Manager, at (413) 424-2245.Sincerely, V John W. McTigue, P.G., LSP Principal-in -Charge Gregg A- Manaers, P.E., LSP Project Manager  
Sincerely, V John W. McTigue, P.G., LSP                 Gregg A-Manaers, P.E., LSP Principal-in -Charge                      Project Manager


==Enclosures:==
==Enclosures:==
Revised Beneficial Use Determination Application (2 copies)


Revised Beneficial Use Determination Application (2 copies)
Mr. Daniel Hall                                                         Environmental 22 March 2005                                                           Resources Management
Mr. Daniel Hall Environmental 22 March 2005 Resources  


==Reference:==
==Reference:==
BYR 2005-019 Page 2 cc:    J. Hickman, NRC, Special Project Manager, NMSS J. Wray, Inspector, NRC Region I (w/o enclosure)
R. Gallagher, MA DPH D. Howland, Massachusetts Department of Environmental Protection M. Rosenstein, EPA, Region I W. Perlman, Franklin Regional Planning Board T. Hutcheson, Franklin Regional Planning Board L. Dunlavy, Franklin Regional Council of Government P. Sloan, Franklin Regional Council of Government D. Katz, CAN Rowe Board of Health M. Fischer, USGen New England, Inc.
Public Repository at Greenfield Community College


BYR 2005-019 Management Page 2 cc: J. Hickman, NRC, Special Project Manager, NMSS J. Wray, Inspector, NRC Region I (w/o enclosure)
Application for Beneficial Use Determination for Structures Yankee Nuclear Power Station
R. Gallagher, MA DPH D. Howland, Massachusetts Department of Environmental Protection M. Rosenstein, EPA, Region I W. Perlman, Franklin Regional Planning Board T. Hutcheson, Franklin Regional Planning Board L. Dunlavy, Franklin Regional Council of Government P. Sloan, Franklin Regional Council of Government D. Katz, CAN Rowe Board of Health M. Fischer, USGen New England, Inc.Public Repository at Greenfield Community College
                    --Noey LKEIiE                          Site Closure Project Rowe, Massachusetts 22 March 2005 ERM 399 Boylston St.
--Noey LKEI iE Application for Beneficial Use Determination for Structures Yankee Nuclear Power Station Site Closure Project Rowe, Massachusetts 22 March 2005 ERM 399 Boylston St.Boston, MA 02116 (617) 267-8377 ERM Delivering sustainable solutions in a more competitive world C: 0 MUD y  
Boston, MA 02116 (617) 267-8377 Delivering sustainablesolutions in a more competitive world                           ERM C: 0       MUD y


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
1


1
==1.1 BACKGROUND==
 
1 1.2  PURPOSE AND SCOPE                                                          1 2.0 GENERAL INFORMATION                                                              3 2.1  GENERAL DESCRIPTION                                                        3 2.1.1  Planned Re-Use of Structures                                        3 2.1.2  Utility Lines to Remain In-Place                                    8 2.1.3  Processed Concreteand Asphalt                                      12 2.1.4  End-State                                                          12 2.2  INDUSTRIAL PROCESSES                                                      13 2.3  QUANTITY                                                                  13 3.0 CHEMICAL, PHYSICAL, AND BIOLOGICAL PROPERTIES                                  15 3.1  CHEMICAL PROPERTIES                                                        15 3.1.1  Overview                                                            15 3.1.2  Radiological Characterization                                      15 3.1.3  Non-Radiological Characterization                                  16 3.2  PHYSICAL PROPERTIES                                                        16 3.2.1  Size                                                                16 3.2.2  Density                                                            17 3.2.3  Percent Solids                                                      17 3.2.4  Liquid Content                                                      17 3.3  BIOLOGICAL PROPERTIES                                                      17 4.0 PROPOSEDHANDLING METHODS AND UTILIZATION                                        18 4.1  PROPOSEDHANDLING                                                          18 4.2  PROPOSED UTILIZATION                                                      18 4.2.1  General Description                                                18 4.2.2  Locations Where Material is to be Used                              18 4.2.3  Health and Environmental Impacts                                    19 ERM                                          YANKEE
==1.1 BACKGROUND==
                                                          ........... 28054 3/22/05
__,w I


1 1.2 PURPOSE AND SCOPE 1 2.0 GENERAL INFORMATION 3 2.1 GENERAL DESCRIPTION 3 2.1.1 Planned Re-Use of Structures 3 2.1.2 Utility Lines to Remain In-Place 8 2.1.3 Processed Concrete and Asphalt 12 2.1.4 End-State 12 2.2 INDUSTRIAL PROCESSES 13 2.3 QUANTITY 13 3.0 CHEMICAL, PHYSICAL, AND BIOLOGICAL PROPERTIES 15 3.1 CHEMICAL PROPERTIES 15 3.1.1 Overview 15 3.1.2 Radiological Characterization 15 3.1.3 Non-Radiological Characterization 16 3.2 PHYSICAL PROPERTIES 16 3.2.1 Size 16 3.2.2 Density 17 3.2.3 Percent Solids 17 3.2.4 Liquid Content 17 3.3 BIOLOGICAL PROPERTIES 17 4.0 PROPOSED HANDLING METHODS AND UTILIZATION 18 4.1 PROPOSED HANDLING 18 4.2 PROPOSED UTILIZATION 18 4.2.1 General Description 18 4.2.2 Locations Where Material is to be Used 18 4.2.3 Health and Environmental Impacts 19 ERM YANKEE 28054 3/22/05 I...........
I I  
__,w I I  


==5.0 REFERENCES==
==5.0 REFERENCES==
21 I
U U
U U
I U
ERM      YANKEE 28054 3/22/05 II


21 I U U U U I U ERM II YANKEE 28054 3/22/05 TABLES Table I Summary of Structures to be Reused FIGURES Figure 1 Figure 2 Figure 3 Site Locus Map Foundations and Utility Lines to Remain Anticipated Limits of BUD Materials APPENDICES Appendix A Transmittal and Application Forms Appendix B Human Health Risk Assessment -BUD for Concrete ERM III YANKEE 28054 3/22/05  
TABLES Table I   Summary of Structures to be Reused FIGURES Figure1    Site Locus Map Figure2    Foundationsand Utility Lines to Remain Figure3    Anticipated Limits of BUD Materials APPENDICES Appendix A Transmittal and Application Forms Appendix B Human Health Risk Assessment   -BUD for Concrete ERM                                                 YANKEE 28054 3/22/05 III


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
Line 56: Line 66:
==1.1 BACKGROUND==
==1.1 BACKGROUND==


The Yankee Atomic Electric Company (YAEC) is in the process of decommissioning and closing the Yankee Nuclear Power Station (YNPS)located in Rowe, Massachusetts (see Figure 1). YNPS began operations in 1960 and operated safely and successfully for 31 years. In February 1992, the YAEC Board of Directors decided it was in the best economic interest of electric customers to cease operations permanently at YNPS and decommission the plant. YAEC intends to complete the majority of decommissioning and physical site closure activities at the site by mid-2005 and to restore the site to environmental quality standards that will enable future unrestricted use of the site, where feasible.The site is located at 49 Yankee Road in the northwestern Massachusetts Town of Rowe, adjacent to the Vermont border (Figure 1). The site consists of an approximately 1,800-acre property owned by YAEC (see Figure 1) and portions of an adjacent property to the west owned by USGen New England, Inc. (USGen NE). The site abuts the eastern shore of the Deerfield River and Sherman Reservoir, adjacent to Sherman Dam, one of several dams along the Deerfield River used for hydroelectric power generation.
The Yankee Atomic Electric Company (YAEC) is in the process of decommissioning and closing the Yankee Nuclear Power Station (YNPS) located in Rowe, Massachusetts (see Figure 1). YNPS began operations in 1960 and operated safely and successfully for 31 years. In February 1992, the YAEC Board of Directors decided it was in the best economic interest of electric customers to cease operations permanently at YNPS and decommission the plant. YAEC intends to complete the majority of decommissioning and physical site closure activities at the site by mid-2005 and to restore the site to environmental quality standards that will enable future unrestricted use of the site, where feasible.
This revised application for a Beneficial Use Determination (BUD) -Major was developed by YAEC, with the assistance of Environmental Resources Management (ERM) and Gradient Corporation (Gradient), to support the site closure project. Copies were originally provided to the Massachusetts Department of Environmental Protection (DEP or Department) in September 2004. This revised application replaces the September 2004 version based on the Department's and the Massachusetts Department of Public Health's (DPH's) review and comment of the previous application and discussions with YAEC regarding planned demolition activities.
The site is located at 49 Yankee Road in the northwestern Massachusetts Town of Rowe, adjacent to the Vermont border (Figure 1). The site consists of an approximately 1,800-acre property owned by YAEC (see Figure 1) and portions of an adjacent property to the west owned by USGen New England, Inc. (USGen NE). The site abuts the eastern shore of the Deerfield River and Sherman Reservoir, adjacent to Sherman Dam, one of several dams along the Deerfield River used for hydroelectric power generation.
The original Transmittal Forms (BWP SW 13, W050861) are included in Appendix A.1.2 PURPOSE AND SCOPE The purpose of the BUD application is to provide the Department, DPH and other regulatory and non-regulatory stakeholders with ERM 1 YANKEE 28054 3/22/05 documentation necessary to review and approve the proposed rationale, plans and procedures to beneficially reuse processed concrete and asphalt and to leave building slabs, foundations and utility lines in-place.
This revised application for a Beneficial Use Determination (BUD) - Major was developed by YAEC, with the assistance of Environmental Resources Management (ERM) and Gradient Corporation (Gradient), to support the site closure project. Copies were originally provided to the Massachusetts Department of Environmental Protection (DEP or Department) in September 2004. This revised application replaces the September 2004 version based on the Department's and the Massachusetts Department of Public Health's (DPH's) review and comment of the previous application and discussions with YAEC regarding planned demolition activities. The original Transmittal Forms (BWP SW 13, W050861) are included in Appendix A.
This application was prepared consistent with available Department guidance for a BUD application and includes a description of the solid waste material to be beneficially used, estimated quantities, physical and chemical properties and proposed handling methods to ensure that beneficial reuse of materials on site poses no significant adverse effects to public health, safety, or the environment (MA DEP, 2004). This application also relies on the restoration of site topography by re-grading with at least 36 inches of soil over any non-native materials that are left on site under the BUD.This BUD application does not address the management of soil in the Southeast Construction Fill Area (SCFA). A separate BUD application, along with a Corrective Action Design, both dated 4 November 2004, were submitted to address the removal of the SCFA and the reuse of soils from the SCFA for site regrading.
1.2 PURPOSE AND SCOPE The purpose of the BUD application is to provide the Department, DPH and other regulatory and non-regulatory stakeholders with ERM                                                         YANKEE 28054 3/22/05 1
A BUD approval for the SCFA was issued by the Department on 23 December 2004.ERM YANKEE 28054 3/22/05 Z


===2.0 GENERAL===
documentation necessary to review and approve the proposed rationale, plans and procedures to beneficially reuse processed concrete and asphalt and to leave building slabs, foundations and utility lines in-place. This application was prepared consistent with available Department guidance for a BUD application and includes a description of the solid waste material to be beneficially used, estimated quantities, physical and chemical properties and proposed handling methods to ensure that beneficial reuse of materials on site poses no significant adverse effects to public health, safety, or the environment (MA DEP, 2004). This application also relies on the restoration of site topography by re-grading with at least 36 inches of soil over any non-native materials that are left on site under the BUD.
INFORMATION
This BUD application does not address the management of soil in the Southeast Construction Fill Area (SCFA). A separate BUD application, along with a Corrective Action Design, both dated 4 November 2004, were submitted to address the removal of the SCFA and the reuse of soils from the SCFA for site regrading. A BUD approval for the SCFA was issued by the Department on 23 December 2004.
ERM                                                          YANKEE 28054 3/22/05 Z


===2.1 GENERAL===
2.0  GENERAL INFORMATION 2.1   GENERAL DESCRIPTION 2.1.1 Planned Re-Use of Structures Unless otherwise noted below, all building structures at the site will be demolished and the debris removed from the site, including floor slabs and foundations. A summary of those structures intended to remain at the site is provided in Table 1. Figure 2 shows what structures will remain in-place. A building-by-building is provided below (note that underground utilities are addressed in Section 2.1.2):
DESCRIPTION
* Office Building - This building will remain intact and is not subject to the BUD.
* Gatehouse - These buildings will remain intact and is not subject to the BUD.
* Interim Spent Fuel Storage Installation (ISFSI) - This radiological waste storage pad will remain intact and is not subject to the BUD..
* Meteorological Tower - This tower will remain intact and is not subject to the BUD.
      " Turbine Building and Auxiliary Building - The majority of the slab will remain in place with the exception of portions that will be removed to facilitate final site grading. Foundations will remain in place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 1,400 cubic yards.
      " Office attached to Turbine Building - This slab will be removed to facilitate final site grading. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with Turbine Building estimate.
      "  Service Building - The majority of this slab will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. Foundations will remain in-place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance ERM                                                          YANKEE 28054 3/22/05 I


====2.1.1 Planned====
with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 550 cubic yards.
Re-Use of Structures Unless otherwise noted below, all building structures at the site will be demolished and the debris removed from the site, including floor slabs and foundations.
" Service Building Annex - The majority of the slab will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. Foundations will remain in-place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with Service Building estimate.
A summary of those structures intended to remain at the site is provided in Table 1. Figure 2 shows what structures will remain in-place.
* North Decon Room - All remaining portions of the slab and foundations will remain in place. Material to remain on-site: included with Service Building
A building-by-building is provided below (note that underground utilities are addressed in Section 2.1.2):* Office Building -This building will remain intact and is not subject to the BUD.* Gatehouse
* Stores Warehouse - The majority of the slab will remain in place with the exception of portions that will be removed to facilitate final site grading. Foundations will remain in-place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 350 cubic yards.
-These buildings will remain intact and is not subject to the BUD.* Interim Spent Fuel Storage Installation (ISFSI) -This radiological waste storage pad will remain intact and is not subject to the BUD..* Meteorological Tower -This tower will remain intact and is not subject to the BUD." Turbine Building and Auxiliary Building -The majority of the slab will remain in place with the exception of portions that will be removed to facilitate final site grading. Foundations will remain in place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 1,400 cubic yards." Office attached to Turbine Building -This slab will be removed to facilitate final site grading. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with Turbine Building estimate." Service Building -The majority of this slab will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. Foundations will remain in-place.
* Tank Farm Moat & Gas Drum Decay Area - All remaining portions of the structures will remain in place. Material to remain on-site: 400 cubic yards.
The removed concrete will be processed and monitored for reuse as beneficial fill in accordance ERM YANKEE 28054 3/22/05 I with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 550 cubic yards." Service Building Annex -The majority of the slab will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. Foundations will remain in-place.
* Ion Exchange Pit (IX Pit) - Will be removed in its entirety with the exception of the south wall, which will remain to support final site grading. All removed concrete will be shipped off site for disposal.
The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with Service Building estimate.* North Decon Room -All remaining portions of the slab and foundations will remain in place. Material to remain on-site: included with Service Building* Stores Warehouse
Material to remain on-site: 200 cubic yards.
-The majority of the slab will remain in place with the exception of portions that will be removed to facilitate final site grading. Foundations will remain in-place.
* Safety Injection/ Diesel Generator (SI/DG) Building - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 60 cubic yards.
The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 350 cubic yards.* Tank Farm Moat & Gas Drum Decay Area -All remaining portions of the structures will remain in place. Material to remain on-site: 400 cubic yards.* Ion Exchange Pit (IX Pit) -Will be removed in its entirety with the exception of the south wall, which will remain to support final site grading. All removed concrete will be shipped off site for disposal.Material to remain on-site: 200 cubic yards.* Safety Injection/
" New Fuel Vault - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none
Diesel Generator (SI/DG) Building -All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 60 cubic yards." New Fuel Vault -Will be removed in its entirety.
* Spent Fuel Pit - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none.
All removed concrete will be shipped off site for disposal.
* New and Old SI Tank Base - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 30 cubic yards.
Material to remain on-site: none* Spent Fuel Pit -Will be removed in its entirety.
ERM                                                            YANKEE 28054 3/22/05 4
All removed concrete will be shipped off site for disposal.
 
Material to remain on-site: none.* New and Old SI Tank Base -All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 30 cubic yards.ERM 4 YANKEE 28054 3/22/05 Tank 39 Base Primary Water Tank -All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 40 cubic yards." Demin Water Tank Slab -All remaining portions of the structures will remain in place. Material to remain on-site: 15 cubic yards.* Fuel Transfer Enclosure (South Decon Room) -Will be removed in its entirety.
Tank 39 Base Primary Water Tank - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 40 cubic yards.
All removed concrete will be shipped off site for disposal.Material to remain on-site: none.* Vapor Container/Reactor Support Structure (VC/RSS) -The RSS is a massive concrete structure.
" Demin Water Tank Slab - All remaining portions of the structures will remain in place. Material to remain on-site: 15 cubic yards.
Following extensive characterization and abatement, demolition has begun on the RSS. Much of the original above grade structure will be stockpiled for reuse on-site. All remaining portions of the structural foundations will remain in place.The stockpiled concrete from the RSS will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 1,700 from the in-place materials plus 7,000 cubic yards of processed concrete.* Compactor Building -All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 85 cubic yards.* Waste Disposal Building -All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 135 cubic yards.* Potentially Contaminated Area (PCA) Warehouse
* Fuel Transfer Enclosure (South Decon Room) - Will be removed in its entirety. All removed concrete will be shipped off site for disposal.
-The majority of the slab and foundations will remain in place with the exception of those areas that will be removed to access subsurface radiological concerns.The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 610 cubic yards.* PCA #1 (Old PCA) -The majority of the slab and foundation will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with PCA Warehouse estimate." PCA #2 (New PCA) -All remaining portions of the slab and foundation will remain in place. Material to remain on-site: included with PCA Warehouse estimate.ERM YANKEE 28054 3/22/05 Z)
Material to remain on-site: none.
* Fire Water Tank Slab -All remaining portions of the structure's slab will remain in place. Material to remain on-site: 60 cubic yards.* Fire Water Pump House -All remaining portions of the slab and foundation will remain in place. Material to remain on-site: 65 cubic yards." Safe Shutdown Building -All remaining portions of the slab and foundation will remain in place. Material to remain on-site: 200 cubic yards." Circulating Water Discharge Structure (Seal Pit) -Following demolition activities to meet current local, state and federal permits for the Seal Pit, all remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 300 cubic yards." Circulating Water Intake (Screenwell House) -Following demolition activities to meet current local, state and federal permits for the Screenwell House, all remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 1,350 cubic yards.* Primary Auxiliary Building (PAB) -The majority of the lower slab and foundations will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. The lower level south foundation wall will remain to assist in final site grading. In addition, following extensive characterization and abatement, much of the original above grade structure has been demolished and is being stored in a stockpile on-site. The stockpiled and other removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 700 cubic yards from the in-place materials plus 1,200 cubic yards from the above grade stockpile.
* Vapor Container/Reactor Support Structure (VC/RSS) - The RSS is a massive concrete structure. Following extensive characterization and abatement, demolition has begun on the RSS. Much of the original above grade structure will be stockpiled for reuse on-site. All remaining portions of the structural foundations will remain in place.
* Rad Lab Sump Pit -Will be removed in its entirety.
The stockpiled concrete from the RSS will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 1,700 from the in-place materials plus 7,000 cubic yards of processed concrete.
All removed concrete will be shipped off site for disposal.
* Compactor Building - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 85 cubic yards.
Material to remain on-site: none." Fuel Oil Transfer Pump House -Will be removed in its entirety.
* Waste Disposal Building - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 135 cubic yards.
All removed concrete will be shipped off site for disposal.
* Potentially Contaminated Area (PCA) Warehouse - The majority of the slab and foundations will remain in place with the exception of those areas that will be removed to access subsurface radiological concerns.
Material to remain oh-site: none.* Fuel Transfer Chute -Will be removed in its entirety.
The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 610 cubic yards.
All removed concrete will be shipped off site for disposal.
* PCA #1 (Old PCA) - The majority of the slab and foundation will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with PCA Warehouse estimate.
Material to remain on-site: none.* Elevator Shaft -Will be removed in its entirety.
" PCA #2 (New PCA) - All remaining portions of the slab and foundation will remain in place. Material to remain on-site: included with PCA Warehouse estimate.
All removed concrete will be shipped off site for disposal.
ERM                                                            YANKEE 28054 3/22/05 Z)
Material to remain on-site: none.ERM ,- YANKEE 28054 3/22/05 U
* Fire Water Tank Slab - All remaining portions of the structure's slab will remain in place. Material to remain on-site: 60 cubic yards.
* Yard Crane Supports -All remaining portions will remain in place.Material to remain on-site: 40 cubic yards.The building foundations proposed to remain on-site consist primarily of concrete reinforced with steel and concrete masonry units (i.e., cinder blocks). Subsurface concrete structures proposed to remain (e.g., slabs and sumps) will be perforated as necessary to allow infiltration of storm water and/or flow of groundwater through the foundations/structures.
* Fire Water Pump House - All remaining portions of the slab and foundation will remain in place. Material to remain on-site: 65 cubic yards.
" Safe Shutdown Building - All remaining portions of the slab and foundation will remain in place. Material to remain on-site: 200 cubic yards.
" Circulating Water Discharge Structure (Seal Pit) - Following demolition activities to meet current local, state and federal permits for the Seal Pit, all remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 300 cubic yards.
" Circulating Water Intake (Screenwell House) - Following demolition activities to meet current local, state and federal permits for the Screenwell House, all remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 1,350 cubic yards.
* Primary Auxiliary Building (PAB) - The majority of the lower slab and foundations will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. The lower level south foundation wall will remain to assist in final site grading. In addition, following extensive characterization and abatement, much of the original above grade structure has been demolished and is being stored in a stockpile on-site. The stockpiled and other removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 700 cubic yards from the in-place materials plus 1,200 cubic yards from the above grade stockpile.
* Rad Lab Sump Pit - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none.
" Fuel Oil Transfer Pump House - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain oh-site: none.
* Fuel Transfer Chute - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none.
* Elevator Shaft - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none.
ERM                                      ,-                   YANKEE 28054 3/22/05 U
* Yard Crane Supports - All remaining portions will remain in place.
Material to remain on-site: 40 cubic yards.
The building foundations proposed to remain on-site consist primarily of concrete reinforced with steel and concrete masonry units (i.e., cinder blocks). Subsurface concrete structures proposed to remain (e.g., slabs and sumps) will be perforated as necessary to allow infiltration of storm water and/or flow of groundwater through the foundations/structures.
Building surfaces were characterized for paint containing polychlorinated biphenyls (PCBs) and other hazardous constituents prior to demolition.
Building surfaces were characterized for paint containing polychlorinated biphenyls (PCBs) and other hazardous constituents prior to demolition.
On-going abatement of PCB-containing paint at concentrations of 50 mg/kg or greater of PCBs has been conducted under specific United States Environmental Protection Agency (US EPA) approved work plans developed in accordance with the Alternative Method of Disposal Authorization (AMDA), issued by the US EPA under Section 6(e)(1) under the Toxic Substance Control Act (TSCA) and the PCB regulations (40 CFR 761).The concrete foundations remaining in the subsurface are undergoing visual inspection, where accessible, to determine if any coatings are present. Any paint remaining on subsurface materials proposed to be left in-place (except spray paint incidental to demolition) will be tested to confirm that PCBs are not present in the paint. Any paint found to contain PCBs will be removed from the surface of the concrete prior to.reuse under the BUD. Any non-PCB paint to remain on concrete will also be tested for RCRA 8 metals. Any non-PCB paint containing RCRA-8 metals at concentrations exceeding applicable BUD re-use criteria will be removed prior to reuse.Mastic coatings are present on some subsurface foundations that will remain in-place.
On-going abatement of PCB-containing paint at concentrations of 50 mg/kg or greater of PCBs has been conducted under specific United States Environmental Protection Agency (US EPA) approved work plans developed in accordance with the Alternative Method of Disposal Authorization (AMDA), issued by the US EPA under Section 6(e)(1) under the Toxic Substance Control Act (TSCA) and the PCB regulations (40 CFR 761).
Where accessible, the mastic coatings have been tested for asbestos.
The concrete foundations remaining in the subsurface are undergoing visual inspection, where accessible, to determine if any coatings are present. Any paint remaining on subsurface materials proposed to be left in-place (except spray paint incidental to demolition) will be tested to confirm that PCBs are not present in the paint. Any paint found to contain PCBs will be removed from the surface of the concrete prior to.
Discussions have been held with the Department regarding the feasibility of removal of mastic from these structures.
reuse under the BUD. Any non-PCB paint to remain on concrete will also be tested for RCRA 8 metals. Any non-PCB paint containing RCRA-8 metals at concentrations exceeding applicable BUD re-use criteria will be removed prior to reuse.
YAEC proposes that mastic coatings on foundations remain in-place for the following reasons:* Mastic coatings containing asbestos are non-friable.
Mastic coatings are present on some subsurface foundations that will remain in-place. Where accessible, the mastic coatings have been tested for asbestos. Discussions have been held with the Department regarding the feasibility of removal of mastic from these structures. YAEC proposes that mastic coatings on foundations remain in-place for the following reasons:
These coatings were designed to be used in the subsurface, and as such, pose a low potential for adverse impact to human health and/or the environment if they remain on the structures, are not disturbed or rendered friable.ERM YANKEE 28054 3/22/05 I Removal of mastic coatings would require extensive excavation and removal of the upper surface of the concrete containing the coating. Disturbance of these materials during removal could pose a significant short-term risk to worker health and safety and the environment due to the potential for asbestos fibers to become friable and be released to the environment.
* Mastic coatings containing asbestos are non-friable. These coatings were designed to be used in the subsurface, and as such, pose a low potential for adverse impact to human health and/or the environment if they remain on the structures, are not disturbed or rendered friable.
Containment and monitoring would minimize the potential risks associated with asbestos removal, but not eliminate short-term risks associated with waste generation, management, off-site transportation and disposal.Leaving mastic coatings on subsurface structures would eliminate the short-term risk to human health and the environment posed by removal and waste management.
ERM                                                         YANKEE 28054 3/22/05 I
Placement of restrictions on the deed to the property that prohibit subsurface excavation or disturbance of subsurface structures containing mastic coatings and/or require appropriate oversight of excavations and management of wastes encountered, as necessary, would eliminate the potential for future adverse exposure to human health and the environment posed by mastic coatings.Therefore, YAEC proposes to leave mastic coatings on subsurface structures and file a deed restriction prohibiting future work that could result in the disturbance of these materials, unless the work is conducted by a qualified professional.
This approach will eliminate the short-term risks to human health and the environment posed by mastic removal and ensure continued protection of human health and the environment into the foreseeable future.2.1.2 Utility Lines to Remain In-Place An extensive evaluation has been performed of all subsurface utilities and associated structures based on site drawings.
A utility matrix was developed to aid in evaluating whether a utility component should be removed or decommissioned in-place.
This evaluation is based on ongoing discussions with the Department, including a meeting held at the Yankee site on February 2, 2005.YAEC is proposing to leave selected inactive utility lines in-place that are problematic to remove due to obstacles such as their location beneath building slabs, their encasement in concrete ducts, the presence of asbestos-containing material (ACM) as a pipe component or around the pipes and difficulties associated with ACM abatement or the location/depth of the utility line. Reasonable measures will be taken to FERM YANKEEF 28054 3/20 0 remove the contents of the utility lines (i.e., water, wires, etc) as part of the decommissioning process; however, wires/cables may remain in-place in inaccessible locations (including some wires that could be coated with ACM). Lines proposed to remain in-place will be permanently capped at each end with grout where accessible.
Site underground utilities have been separated into the following categories to facilitate the Department's review of this application and to document the rationale for the leaving proposed utilities in-place.
These include the following:
* Under Building Slab (pipes) -Pipes located beneath or immediately adjacent to the foundation of a building slab are proposed to be left in-place.
Removal of these lines would require a significant effort that is not justified since the slabs are proposed to remain in-place.If the pipe is greater than eight inches in diameter, it will be filled with flow-fill.
Pipes less than eight inches in diameter will not be filled, but contents removed and ends capped with grout, as feasible.* Concrete Encased Duct Bank -Many of the site electric conduits were installed within concrete structures (duct banks) and encased within concrete within the structure to protect them from the elements.
Much of this pipe is identified as 'fiber' pipe and limited testing has revealed it not to be ACM. Asbestos wrap around cables within utility manholes entering these pipes has been identified as ACM. This asbestos material will be removed within the manhole prior to pulling cables, however, should the cable not be fully removed, ACM may remain. Once cables have been pulled, YAEC proposes to grout the ends of accessible conduits and leave duct banks and filled manholes in-place following demolition.
Removal of these structures would require abatement of ACM that is currently isolated and encased in concrete.
The ACM as either wrap, a component of the cable, or conduit does not pose a significant adverse risk to human health or the environment under current or proposed future conditions.
Therefore, YAEC proposes to leave ACM within subsurface structures and file a deed restriction prohibiting future work that could result in the disturbance of these materials, unless the work is conducted by a qualified professional.
This approach will eliminate the short-term risks to human health and the environment posed by ACM removal and ensure continued protection of human health and the environment into the foreseeable future.EIM 9 YANKEE 28054 3/22/05
" Creosote Timbers over Concrete Duct Bank -Site drawings have identified the presence of 2-inch thick creosote wooden timbers placed as markers to prevent excavation and accidentally penetrating electrical lines within the duct banks. YAEC proposes to leave these timbers in-place so that they can continue to serve as markers to prevent accidental damage of the conduits within the duct banks. The presence of these timbers as markers will be noted in the deed restriction to be placed on that portion of the property subject to the BUD to facilitate their future use as markers in the event that future activities require controlled subsurface excavation and/or management of subsurface ACM. Creosote timbers associated with rail lines will be removed." Concrete and Steel Pipes -Pipes have been identified that are predominantly made of concrete or steel, which are similar to the concrete duct banks and inert materials.
Many of the pipes are located in close proximity to the Sherman Dam and removal would have a potential adverse effects on the structural integrity of the dam. YAEC proposes to remove pipes where the majority of the line is located at a depth of less than five feet. YAEC proposes to leave the pipes in-place where the majority of the line is located at a depth of greater than five feet and fill the pipes with flow-fill.
Pipes with a diameter of eight inches or less would not be filled, but the contents (wires, etc.) removed to the extent practical and the ends of the pipe capped with grout. Pipes encountered during site excavation activities will be removed if encountered.
As an example, the Circulating and Service Water Lines that provided cooling water from Sherman Reservoir through the Screenwell House to the Turbine Building and then back through the Discharge Structure to Sherman Reservoir are proposed to be left in-place including:
* One 100-foot long, 10-foot diameter buried corrugated steel intake pipe between Sherman Reservoir and Screenwell House* One 7-foot diameter concrete intake pipe between Screenwell House and Turbine Building* Two 1-foot' diameter steel water service lines between Screenwell House and Turbine Building& Four 5-foot diameter steel pipes below Turbine Building* One 3-foot diameter corrugated steel pipe between Screenwell House and Discharge Structure ERM t n YANKEE 28054 3/22/05 IU
* One 7-foot diameter discharge pipe between Turbine Building and Discharge Structure (a portion of the pipe is concrete lined with steel and a portion of the pipe is all steel)* Three 4-foot diameter steel capped pipes near Discharge Structure branching off from the 7-foot diameter steel pipe Yankee intends to leave each of the above lines in-place and fill them with a flow-fill.
* Storm Water Distribution System -An evaluation has been performed of the East and West storm water collection systems to determine whether site radiological release criteria have been met.The systems are comprised of storm water catch basins and lateral lines that direct storm water through two outfalls managed under a National Discharge and Elimination System (NPDES) permit issued jointly by EPA and the Department.
YAEC propose to leave the majority of these systems in-place and fill the voids with flow-fill.
Exceptions include those segments of both systems that will be removed due to excavations to remove the deep foundations (Spent Fuel Pool / Ion Exchange Pit), the Sherman Dam extension base development, and shoreline components that will be removed to accommodate the final site grading." Individual Electrical Conduits / Utility Lines -Subsurface site electrical conduits, other small utility lines and pipes are made of inert materials that do not pose an adverse risk of harm to human health and/or the environment.
YAEC proposes to remove conduits and utility lines where the majority of the line is shallower than five feet below existing grades. YAEC proposes to evaluate the feasibility of removal of utility lines where the majority of the line is at a depth of greater than five feet below existing grade.Where removal is feasible based on depth and/or other planned site excavation activities, those lines would be removed. Where removal is judged to be infeasible due to the location, depth and/or structure of the line (e.g., found to contain ACM), these lines are proposed to remain in-place.* Electrical Grounding Grid -Due to the former use of the site as a power station, an extensive grounding grid was established during plant construction (1950s) that tied into each structure and subsurface amenity to ensure all aspects of operation were properly protected.
Composed of bare copper cable, YAEC intends to remove those portions of the grid that are encountered during ERM -. YANKIEE 280S4 3/22/05 II ongoing excavation and/or demolition activities.
YAEC proposes to leave the remainder of the grounding grid in-place.* Fire Water Protection System -A fire water protection system consists of a looped header that connected to numerous hydrant stations throughout the site. The depth of this system is at least seven feet below existing grades. YAEC intends to leave that portion of this system that is decommissioned in-place unless encountered through other excavation.
Hydrants will be removed to a depth of five feet below grade.Sanitary System- Sanitary sewer lines are considered outside the scope of this BUD application since the closure of septic systems will be addressed under the requirements of the State, Environmental Code Title 5 regulations (310 CMR 15.000).However, portions of the sanitary line, primarily within the footprint of the Sherman Dam extension, will be removed.2.1.3 Processed Concrete and Asphalt YAEC proposes to beneficially reuse processed concrete block, reinforced concrete and asphalt from paved areas at the site. The locations-where processed concrete and asphalt will be reused to grade the site are shown in Figure 3. All processed concrete will meet the Materials Reuse Protocol that is under development between YAEC, the Department, and DPH with regards to a potential radiological constituents (Section 3.1.2). All paint containing PCBs will be removed from the concrete prior to reuse.Non-PCB paints that remain on concrete will be evaluated to ensure the metals concentrations comply with BUD'risk criteria.
Processed concrete and asphalt used on site will be placed in horizontal lifts and compacted to reduce void space and create a stable fill material.2.1.4 End-State Following the completion of demolition activities aboveground structures that will remain at the site will include the ISFSI, the Gatehouse, an office building, and a potable water well. The post-decommissioning grading and planting plans (Kleinschmidt, August 2004) have been approved by the Department as part of the Integrated Permit Package submitted to the Division of Waterways and Wetlands.
YAEC intends to extend the east embankment of the Sherman Dam to permanently replace the temporary flood control measures that had been part of YNPS. The site will be regraded and planted following the completion of demolition activities.
ERM 12 YANKEE 28054 3/22/05 The regrading plan will provide a minimum of 36 inches of soil cover above any foundations or utility lines that are left in-place.A deed restriction will be placed on that portion of the YAEC property where material will remain in the subsurface that was approved for beneficial reuse under the BUD. The deed restriction will meet the Department's requirements and conditions imposed under BUD approval and will be separate and distinct from any Notice of Activity and Use Limitation (AUL) that may be placed on the property to prevent adverse exposure to residual levels of radioactivity, oil and/or hazardous materials that may remain in the subsurface on site.2.2 SOURCE The Yankee Nuclear Power Station in Rowe, Massachusetts is the source of the solid waste that will remain on-site. The name and address of the generator are: Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367 2.3 INDUSTRIAL PROCESSES The solid waste that will remain in-place is derived from the decommissioning of YNPS. The items were constructed using traditional construction methods and include concrete, steel reinforced concrete, asphalt, steel pipes, fiber pipes, concrete pipes, and copper wire.2.4 QUANTITY The volumes of concrete materials to be used on site are described by structure in Section 2.1.1, and total 16,490 cubic yards plus approximately 1,000 cubic yards of flow fill. In addition, approximately 1,500 cubic yards of asphalt are also anticipated to be re-used. Concrete, flow fill, and asphalt combine to approximately 18,990 cubic yards of material.:
The volume estimates of materials to be reused on-site under the BUD are based on the current site closure plans and reasonable knowledge of the dimensions/construction of features to remain on-site. Based on the ability of processed concrete to meet the Materials Reuse Protocol, this EN 13 YANKEE 28054 3/22/05 quantity may vary. The actual volumes used and these final site conditions will be documented on as-built drawings showing fill areas and buried features.
In the event that additional structures/foundations are deemed eligible for on-site use, YAEC will ensure that these items meet all of the criteria that have been specified in this submittal.
ERM 14 YANKEE 28054 3/22/05 3.0 CHEMICAL, PHYSICAL, AND BIOLOGICAL PROPERTIES


===3.1 CHEMICAL===
Removal of mastic coatings would require extensive excavation and removal of the upper surface of the concrete containing the coating. Disturbance of these materials during removal could pose a significant short-term risk to worker health and safety and the environment due to the potential for asbestos fibers to become friable and be released to the environment. Containment and monitoring would minimize the potential risks associated with asbestos removal, but not eliminate short-term risks associated with waste generation, management, off-site transportation and disposal.
PROPERTIES
Leaving mastic coatings on subsurface structures would eliminate the short-term risk to human health and the environment posed by removal and waste management. Placement of restrictions on the deed to the property that prohibit subsurface excavation or disturbance of subsurface structures containing mastic coatings and/or require appropriate oversight of excavations and management of wastes encountered, as necessary, would eliminate the potential for future adverse exposure to human health and the environment posed by mastic coatings.
Therefore, YAEC proposes to leave mastic coatings on subsurface structures and file a deed restriction prohibiting future work that could result in the disturbance of these materials, unless the work is conducted by a qualified professional. This approach will eliminate the short-term risks to human health and the environment posed by mastic removal and ensure continued protection of human health and the environment into the foreseeable future.
2.1.2 Utility Lines to Remain In-Place An extensive evaluation has been performed of all subsurface utilities and associated structures based on site drawings. A utility matrix was developed to aid in evaluating whether a utility component should be removed or decommissioned in-place. This evaluation is based on ongoing discussions with the Department, including a meeting held at the Yankee site on February 2, 2005.
YAEC is proposing to leave selected inactive utility lines in-place that are problematic to remove due to obstacles such as their location beneath building slabs, their encasement in concrete ducts, the presence of asbestos-containing material (ACM) as a pipe component or around the pipes and difficulties associated with ACM abatement or the location/depth of the utility line. Reasonable measures will be taken to FERM                                                          YANKEEF 28054 3/20 0


====3.1.1 Overview====
remove the contents of the utility lines (i.e., water, wires, etc) as part of the decommissioning process; however, wires/cables may remain in-place in inaccessible locations (including some wires that could be coated with ACM). Lines proposed to remain in-place will be permanently capped at each end with grout where accessible.
The solid wasteto be beneficially reused primarily consists of concrete blocks, reinforced concrete and asphalt. Concrete is produced by mixing cement and water with inert materials such as sand and gravel. A chemical reaction known as hydration occurs between the cement and water.that creates a hard, rock-like product. Steel reinforcing bar (rebar) is imbedded in poured concrete.
Site underground utilities have been separated into the following categories to facilitate the Department's review of this application and to document the rationale for the leaving proposed utilities in-place. These include the following:
Asphalt pavement typically contains approximately 95 percent aggregate, consisting of stone, sand, or gravel and five percent asphalt cement as a binder.Due to the inert nature of the concrete and asphalt, reactivity, leachability, metals content and volatile organic compound concentrations are not a potential concern. The pH of groundwater at the site, which currently ranges from 5 to 8, is not expected to be impacted by leaving the reinforced concrete in-place.3.1.2 Radiological -Characterization The following Materials Reuse Protocols are under development by YAEC in coordination with the Massachusetts DPH. The Materials Reuse Protocols are being utilized for determination of above and below grade processed concrete debris that would qualify for purposes of reuse as backfill (including grading material).
* Under Building Slab (pipes) - Pipes located beneath or immediately adjacent to the foundation of a building slab are proposed to be left in-place. Removal of these lines would require a significant effort that is not justified since the slabs are proposed to remain in-place.
Note that these protocols apply only to above and below grade processed concrete debris for use as fill and do not apply to existing subsurface slabs/structures and asphalt. The Materials Reuse Protocols are being finalized and currently include: 1. Performance of bulk monitoring of all potentially radioactive bulk-reuse materials utilizing gamma sensitive instrumentation capable of detecting a volumetric concentration that would not contribute more than 1 millirem per year (mrem/yr)
If the pipe is greater than eight inches in diameter, it will be filled with flow-fill. Pipes less than eight inches in diameter will not be filled, but contents removed and ends capped with grout, as feasible.
Total Effective Dose Equivalent (TEDE) above background after burial to any individual.
* Concrete Encased Duct Bank - Many of the site electric conduits were installed within concrete structures (duct banks) and encased within concrete within the structure to protect them from the elements. Much of this pipe is identified as 'fiber' pipe and limited testing has revealed it not to be ACM. Asbestos wrap around cables within utility manholes entering these pipes has been identified as ACM. This asbestos material will be removed within the manhole prior to pulling cables, however, should the cable not be fully removed, ACM may remain. Once cables have been pulled, YAEC proposes to grout the ends of accessible conduits and leave duct banks and filled manholes in-place following demolition. Removal of these structures would require abatement of ACM that is currently isolated and encased in concrete. The ACM as either wrap, a component of the cable, or conduit does not pose a significant adverse risk to human health or the environment under current or proposed future conditions. Therefore, YAEC proposes to leave ACM within subsurface structures and file a deed restriction prohibiting future work that could result in the disturbance of these materials, unless the work is conducted by a qualified professional. This approach will eliminate the short-term risks to human health and the environment posed by ACM removal and ensure continued protection of human health and the environment into the foreseeable future.
Materials above this requirement would not be considered acceptable for re-use as backfill.ERM Y " "ANKE 28054 3 /22I/S 1 11...............
EIM                                      9                      YANKEE 28054 3/22/05
I .....
 
    " Creosote Timbers over Concrete Duct Bank - Site drawings have identified the presence of 2-inch thick creosote wooden timbers placed as markers to prevent excavation and accidentally penetrating electrical lines within the duct banks. YAEC proposes to leave these timbers in-place so that they can continue to serve as markers to prevent accidental damage of the conduits within the duct banks. The presence of these timbers as markers will be noted in the deed restriction to be placed on that portion of the property subject to the BUD to facilitate their future use as markers in the event that future activities require controlled subsurface excavation and/or management of subsurface ACM. Creosote timbers associated with rail lines will be removed.
    " Concrete and Steel Pipes - Pipes have been identified that are predominantly made of concrete or steel, which are similar to the concrete duct banks and inert materials. Many of the pipes are located in close proximity to the Sherman Dam and removal would have a potential adverse effects on the structural integrity of the dam. YAEC proposes to remove pipes where the majority of the line is located at a depth of less than five feet. YAEC proposes to leave the pipes in-place where the majority of the line is located at a depth of greater than five feet and fill the pipes with flow-fill.
Pipes with a diameter of eight inches or less would not be filled, but the contents (wires, etc.) removed to the extent practical and the ends of the pipe capped with grout. Pipes encountered during site excavation activities will be removed if encountered. As an example, the Circulating and Service Water Lines that provided cooling water from Sherman Reservoir through the Screenwell House to the Turbine Building and then back through the Discharge Structure to Sherman Reservoir are proposed to be left in-place including:
* One 100-foot long, 10-foot diameter buried corrugated steel intake pipe between Sherman Reservoir and Screenwell House
* One 7-foot diameter concrete intake pipe between Screenwell House and Turbine Building
* Two 1-foot' diameter steel water service lines between Screenwell House and Turbine Building
      & Four 5-foot diameter steel pipes below Turbine Building
* One 3-foot diameter corrugated steel pipe between Screenwell House and Discharge Structure ERM                                  t n                    YANKEE 28054 3/22/05 IU
* One 7-foot diameter discharge pipe between Turbine Building and Discharge Structure (a portion of the pipe is concrete lined with steel and a portion of the pipe is all steel)
* Three 4-foot diameter steel capped pipes near Discharge Structure branching off from the 7-foot diameter steel pipe Yankee intends to leave each of the above lines in-place and fill them with a flow-fill.
* Storm Water Distribution System - An evaluation has been performed of the East and West storm water collection systems to determine whether site radiological release criteria have been met.
The systems are comprised of storm water catch basins and lateral lines that direct storm water through two outfalls managed under a National Discharge and Elimination System (NPDES) permit issued jointly by EPA and the Department. YAEC propose to leave the majority of these systems in-place and fill the voids with flow-fill.
Exceptions include those segments of both systems that will be removed due to excavations to remove the deep foundations (Spent Fuel Pool / Ion Exchange Pit), the Sherman Dam extension base development, and shoreline components that will be removed to accommodate the final site grading.
    " Individual Electrical Conduits / Utility Lines - Subsurface site electrical conduits, other small utility lines and pipes are made of inert materials that do not pose an adverse risk of harm to human health and/or the environment. YAEC proposes to remove conduits and utility lines where the majority of the line is shallower than five feet below existing grades. YAEC proposes to evaluate the feasibility of removal of utility lines where the majority of the line is at a depth of greater than five feet below existing grade.
Where removal is feasible based on depth and/or other planned site excavation activities, those lines would be removed. Where removal is judged to be infeasible due to the location, depth and/or structure of the line (e.g., found to contain ACM), these lines are proposed to remain in-place.
* Electrical Grounding Grid - Due to the former use of the site as a power station, an extensive grounding grid was established during plant construction (1950s) that tied into each structure and subsurface amenity to ensure all aspects of operation were properly protected. Composed of bare copper cable, YAEC intends to remove those portions of the grid that are encountered during ERM                                  -.                      YANKIEE 280S4 3/22/05 II
 
ongoing excavation and/or demolition activities. YAEC proposes to leave the remainder of the grounding grid in-place.
* Fire Water Protection System - A fire water protection system consists of a looped header that connected to numerous hydrant stations throughout the site. The depth of this system is at least seven feet below existing grades. YAEC intends to leave that portion of this system that is decommissioned in-place unless encountered through other excavation. Hydrants will be removed to a depth of five feet below grade.
Sanitary System- Sanitary sewer lines are considered outside the scope of this BUD application since the closure of septic systems will be addressed under the requirements of the State, Environmental Code Title 5 regulations (310 CMR 15.000).
However, portions of the sanitary line, primarily within the footprint of the Sherman Dam extension, will be removed.
2.1.3 Processed Concrete and Asphalt YAEC proposes to beneficially reuse processed concrete block, reinforced concrete and asphalt from paved areas at the site. The locations-where processed concrete and asphalt will be reused to grade the site are shown in Figure 3. All processed concrete will meet the Materials Reuse Protocol that is under development between YAEC, the Department, and DPH with regards to a potential radiological constituents (Section 3.1.2). All paint containing PCBs will be removed from the concrete prior to reuse.
Non-PCB paints that remain on concrete will be evaluated to ensure the metals concentrations comply with BUD'risk criteria. Processed concrete and asphalt used on site will be placed in horizontal lifts and compacted to reduce void space and create a stable fill material.
2.1.4 End-State Following the completion of demolition activities aboveground structures that will remain at the site will include the ISFSI, the Gatehouse, an office building, and a potable water well. The post-decommissioning grading and planting plans (Kleinschmidt, August 2004) have been approved by the Department as part of the Integrated Permit Package submitted to the Division of Waterways and Wetlands. YAEC intends to extend the east embankment of the Sherman Dam to permanently replace the temporary flood control measures that had been part of YNPS. The site will be regraded and planted following the completion of demolition activities.
ERM                                    12                    YANKEE 28054 3/22/05
 
The regrading plan will provide a minimum of 36 inches of soil cover above any foundations or utility lines that are left in-place.
A deed restriction will be placed on that portion of the YAEC property where material will remain in the subsurface that was approved for beneficial reuse under the BUD. The deed restriction will meet the Department's requirements and conditions imposed under BUD approval and will be separate and distinct from any Notice of Activity and Use Limitation (AUL) that may be placed on the property to prevent adverse exposure to residual levels of radioactivity, oil and/or hazardous materials that may remain in the subsurface on site.
2.2 SOURCE The Yankee Nuclear Power Station in Rowe, Massachusetts is the source of the solid waste that will remain on-site. The name and address of the generator are:
Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367 2.3 INDUSTRIAL PROCESSES The solid waste that will remain in-place is derived from the decommissioning of YNPS. The items were constructed using traditional construction methods and include concrete, steel reinforced concrete, asphalt, steel pipes, fiber pipes, concrete pipes, and copper wire.
2.4 QUANTITY The volumes of concrete materials to be used on site are described by structure in Section 2.1.1, and total 16,490 cubic yards plus approximately 1,000 cubic yards of flow fill. In addition, approximately 1,500 cubic yards of asphalt are also anticipated to be re-used. Concrete, flow fill, and asphalt combine to approximately 18,990 cubic yards of material.:
The volume estimates of materials to be reused on-site under the BUD are based on the current site closure plans and reasonable knowledge of the dimensions/construction of features to remain on-site. Based on the ability of processed concrete to meet the Materials Reuse Protocol, this EN                                    13                      YANKEE 28054 3/22/05
 
quantity may vary. The actual volumes used and these final site conditions will be documented on as-built drawings showing fill areas and buried features. In the event that additional structures/foundations are deemed eligible for on-site use, YAEC will ensure that these items meet all of the criteria that have been specified in this submittal.
ERM                                                          YANKEE 28054 3/22/05 14
 
3.0  CHEMICAL, PHYSICAL, AND BIOLOGICAL PROPERTIES 3.1  CHEMICAL PROPERTIES 3.1.1 Overview The solid wasteto be beneficially reused primarily consists of concrete blocks, reinforced concrete and asphalt. Concrete is produced by mixing cement and water with inert materials such as sand and gravel. A chemical reaction known as hydration occurs between the cement and water.that creates a hard, rock-like product. Steel reinforcing bar (rebar) is imbedded in poured concrete. Asphalt pavement typically contains approximately 95 percent aggregate, consisting of stone, sand, or gravel and five percent asphalt cement as a binder.
Due to the inert nature of the concrete and asphalt, reactivity, leachability, metals content and volatile organic compound concentrations are not a potential concern. The pH of groundwater at the site, which currently ranges from 5 to 8, is not expected to be impacted by leaving the reinforced concrete in-place.
3.1.2 Radiological-Characterization The following Materials Reuse Protocols are under development by YAEC in coordination with the Massachusetts DPH. The Materials Reuse Protocols are being utilized for determination of above and below grade processed concrete debris that would qualify for purposes of reuse as backfill (including grading material). Note that these protocols apply only to above and below grade processed concrete debris for use as fill and do not apply to existing subsurface slabs/structures and asphalt. The Materials Reuse Protocols are being finalized and currently include:
: 1. Performance of bulk monitoring of all potentially radioactive bulk-reuse materials utilizing gamma sensitive instrumentation capable of detecting a volumetric concentration that would not contribute more than 1 millirem per year (mrem/yr) Total Effective Dose Equivalent (TEDE) above background after burial to any individual. Materials above this requirement would not be considered acceptable for re-use as backfill.
ERM                                     "                    Y "ANKE
                                                                    ............... 28054 3 I/22I/S 1 11
: 2. Included in the above I mrem/yr requirement are evaluations of the presence of the hard-to-detect radionuclides (e.g., Iron-55, Nickel-63, Carbon-14, Hydrogen-3).
: 2. Included in the above I mrem/yr requirement are evaluations of the presence of the hard-to-detect radionuclides (e.g., Iron-55, Nickel-63, Carbon-14, Hydrogen-3).
: 3. The concrete is to contain no detectable plant related transuranics.
: 3. The concrete is to contain no detectable plant related transuranics.
: 4. The exposure modeling and parameters to be used will be coordinated with the DPH and Nuclear Regulatory Commission (NRC) and implemented with DPH concurrence.
: 4. The exposure modeling and parameters to be used will be coordinated with the DPH and Nuclear Regulatory Commission (NRC) and implemented with DPH concurrence.
Existing subsurface structures to be reused under the BUD, including below grade concrete structures, concrete slabs (fractured and/or perforated) and asphalt will meet release criteria determined by meeting 10 mrem/yr Derived Concentration Guideline Levels (DCGLs). In addition, excavated soils to be used as backfill within the BUD area will also meet the 10 mrem/yr DCGL criteria.
Existing subsurface structures to be reused under the BUD, including below grade concrete structures, concrete slabs (fractured and/or perforated) and asphalt will meet release criteria determined by meeting 10 mrem/yr Derived Concentration Guideline Levels (DCGLs). In addition, excavated soils to be used as backfill within the BUD area will also meet the 10 mrem/yr DCGL criteria. The YNPS License Termination Plan (LTP) includes the applicable DCGLs that are being applied to the site. It should be noted that the DPH site release criteria (10 mrem/yr) is more conservative than the NRC criteria (25 mrem/yr) and as such, the DCGLs found in the LTP will be adjusted to reflect the DPH criteria.
The YNPS License Termination Plan (LTP) includes the applicable DCGLs that are being applied to the site. It should be noted that the DPH site release criteria (10 mrem/yr) is more conservative than the NRC criteria (25 mrem/yr) and as such, the DCGLs found in the LTP will be adjusted to reflect the DPH criteria.3.1.3 Non-Radiological Characterization As described in Section 2.1, paint containing PCBs will be removed from concrete and asphalt to be used for site grading. YAEC has collected core samples of the concrete to verify that PCB concentrations are less than two (2) milligrams per kilogram (mg/kg) following the removal of paint. In the event that non-PCB paint remains on concrete, core samples will be collected to verify that that metals concentrations do not pose a risk (see Section 4.2 for risk criteria).
3.1.3 Non-Radiological Characterization As described in Section 2.1, paint containing PCBs will be removed from concrete and asphalt to be used for site grading. YAEC has collected core samples of the concrete to verify that PCB concentrations are less than two (2) milligrams per kilogram (mg/kg) following the removal of paint. In the event that non-PCB paint remains on concrete, core samples will be collected to verify that that metals concentrations do not pose a risk (see Section 4.2 for risk criteria).
A mastic coating will remain on some foundation walls at the site. The mastic coating is inert. As described in Section 2.1, some of the mastic may contain non-friable asbestos.3.2 PHYSICAL PROPERTIES 3.2.1 Size The concrete foundations and walls are generally up to I foot thick, except where two walls abut. Concrete to be used for site grading and asphalt from paved areas will be processed as necessary to provide a suitable base for the three feet of soil that will be placed over the non-native materials.
A mastic coating will remain on some foundation walls at the site. The mastic coating is inert. As described in Section 2.1, some of the mastic may contain non-friable asbestos.
ERM 16 YANKEE 28054 3/22/05  
3.2   PHYSICAL PROPERTIES 3.2.1 Size The concrete foundations and walls are generally up to I foot thick, except where two walls abut. Concrete to be used for site grading and asphalt from paved areas will be processed as necessary to provide a suitable base for the three feet of soil that will be placed over the non-native materials.
ERM                                     16                     YANKEE 28054 3/22/05


====3.2.2 Density====
3.2.2 Density The concrete will contain rebar and typically has a density of 150 pounds per cubic foot. Certain structures, such as the Fuel Transfer Chute (most of which has been shipped off-site), were constructed with concrete that had a density of at least 225 pounds per cubic foot. The density of asphalt is estimated to be approximately 140 pounds per cubic foot.
The concrete will contain rebar and typically has a density of 150 pounds per cubic foot. Certain structures, such as the Fuel Transfer Chute (most of which has been shipped off-site), were constructed with concrete that had a density of at least 225 pounds per cubic foot. The density of asphalt is estimated to be approximately 140 pounds per cubic foot.3.2.3 Percent Solids The solid waste to be beneficially used is reinforced concrete and asphalt that is 100 percent solid.3.2.4 Liquid Content The concrete is free of liquids.'
3.2.3 Percent Solids The solid waste to be beneficially used is reinforced concrete and asphalt that is 100 percent solid.
Water that may be present in some subsurface utility lines (e.g., water and sewer lines) will be removed prior to decommissioning the lines.3.3 BIOLOGICAL PROPERTIES Due to the nature of the concrete and asphalt, there is no biological activity or pathogens associated with the foundations or utility lines.ERM I YANKEE.28054 3/22/05 I/  
3.2.4 Liquid Content The concrete is free of liquids.' Water that may be present in some subsurface utility lines (e.g., water and sewer lines) will be removed prior to decommissioning the lines.
3.3   BIOLOGICAL PROPERTIES Due to the nature of the concrete and asphalt, there is no biological activity or pathogens associated with the foundations or utility lines.
ERM                                   -1  -I                 YANKEE.28054 3/22/05 I/


===4.0 PROPOSED===
4.0   PROPOSED HANDLING METHODS AND UTILIZATION 4.1  PROPOSEDHANDLING The foundations, concrete and asphalt and utility lines remaining at the site will be managed on site. Voids within utility lines greater than eight inches in diameter will be filled. Utility lines less than eight inches in diameter will be abandoned in-place. Three feet of soil will cover any non-native materials left in-place.
HANDLING METHODS AND UTILIZATION
The concrete structures (buildings, slabs and support columns) will be demolished using standard construction practices and heavy machinery.
Large structures such as the Reactor Support Structure will be minimized by mechanical means. Smaller structures will be demolished with various hydraulic claws and shears, as appropriate. Once the buildings are brought to grade elevation, structural steel beams and metal will be segregated into piles for sorting, packaging and disposal. Rebar that is exposed will be cut off as close as possible for disposal and rebar that is contained within concrete will remain on-site. Concrete will be crushed using heavy equipment to accommodate stockpiling, prior to being loaded into containers for radiation surveying on-site in accordance with the Materials Reuse Protocol. Material surveyed for re-use on site will be either placed directly into building voids or stockpiled until used for site grading.
4.2  PROPOSED UTILIZATION 4.2.1 General Description The remaining foundations and buried utility lines will be incorporated in the final site re-grading.
4.2.2 Locations Where Material is to be Used Figure 2 shows the locations of foundations that will remain. Figure 3 shows where processed concrete and asphalt will be used.
ERM                                                            YANKEE
                                                                      .................. 28054 3/22/05
                                                                                                  ,vv 10$


===4.1 PROPOSED===
4.2.3 Health and EnvironmentalImpacts The material to be reused under the BUD primarily consists of inert construction materials comprised of concrete and asphalt. Potential residual impacts on the concrete include paint, as well as radiological constituents (below DCGLs) for remaining structures (with the exception of the ISFSI facility) including foundations, slabs, subsurface asphalt and soil.
HANDLING The foundations, concrete and asphalt and utility lines remaining at the site will be managed on site. Voids within utility lines greater than eight inches in diameter will be filled. Utility lines less than eight inches in diameter will be abandoned in-place.
The BUD guidance document states that the applicant must demonstrate that Critical Contaminants of Concern (CCCs), such as PCBs as defined in the guidance document, are consistent with background. Based on discussions with DEP at a pre-application meeting held on 1 July 2004, it is our understanding that this requirement of the BUD guidance may not be applicable for a Category 3 BUD and that this issue will undergo further review by DEP.
Three feet of soil will cover any non-native materials left in-place.The concrete structures (buildings, slabs and support columns) will be demolished using standard construction practices and heavy machinery.
Confirmation sampling of the concrete is being performed to ensure that the maximum residual PCB concentration will be no more than 2 mg/kg in the concrete debris. This maximum threshold is essentially equivalent to the proposed default BUD S-2 and S-3 standard of 1.6 mg/kg for PCBs.
Large structures such as the Reactor Support Structure will be minimized by mechanical means. Smaller structures will be demolished with various hydraulic claws and shears, as appropriate.
The S-2 and S-3 BUD values represent an average concentration (this is inherent to the risk assessment process). Although concrete will be confirmed to contain no more than 2 mg/kg as a sample-specific maximum concentration, the actual average PCB concentration in concrete will be well below the S-2 and S-3 BUD standards for PCBs. Because PCBs in concrete will meet the BUD S-2 and S-3 standards, no further assessment for PCBs is required.
Once the buildings are brought to grade elevation, structural steel beams and metal will be segregated into piles for sorting, packaging and disposal.
In the event that non-PCB paint is left on concrete surfaces, the coated concrete will be tested for RCRA 8 metals. The sampling results will be evaluated to ensure that the average concentrations are below the S-2 and S-3 BUD values. If the average concentrations are higher, then the paint will be abated or the concrete will be disposed off-site.
Rebar that is exposed will be cut off as close as possible for disposal and rebar that is contained within concrete will remain on-site. Concrete will be crushed using heavy equipment to accommodate stockpiling, prior to being loaded into containers for radiation surveying on-site in accordance with the Materials Reuse Protocol.
No standards exist in the draft BUD guidance for radionuclides.
Material surveyed for re-use on site will be either placed directly into building voids or stockpiled until used for site grading.4.2 PROPOSED UTILIZATION
However, due to the operation of the power plant, the concrete may contain radiological constituents at concentration less than or equal to the DCGL. The use of the Materials Reuse Protocol is consistent with a Category 3 Beneficial Use of Secondary Materials in Restricted Applications because the management of the concrete beneath 3-foot of soil overburden meets the DEP BUD guidance risk management criteria (overall cancer risk less than or equal to 5 in 10,000; or 0.5 x10-5 ). A Human Health Risk Assessment was prepared by Gradient Corporation ERM                                                            YANKEE 28054 3/22/05 19


====4.2.1 General====
(Appendix B) to evaluate potential risks associated with the on-site reuse of concrete.
Description The remaining foundations and buried utility lines will be incorporated in the final site re-grading.
The risk assessment guidelines for the BUD, which adopt those defined under the MCP with a more conservative risk threshold, define health protection on the basis of cancer risk, rather than radiation dose. MADEP does not have guidelines for the evaluation of cancer risk for radionuclides. Consequently, the U.S. EPA guidelines, published in the Soil Screening Guidancefor Radionuclides (USEPA, 2000a,b) were used for the Human Health Risk Assessment.
The final site grading and re-vegetation plan will ensure that the concrete will reside beneath 3-feet of soil. A deed restriction will require a Health
& Safety Plan and Soil Management Plan for subsurface excavation activities. Thus, the deed restriction will prevent "direct contact" pathways such as incidental ingestion and dermal contact with subsurface materials. Thus, the primary pathway of possible concern for exposure to radionuclides in the subsurface concrete is from external radiation (e.g.,
ionizing radiation emitted as the result of radioactive decay).
The health assessment presented here indicates that soil grading plan and use of concrete debris as fill, satisfies the interim draft BUD guidance for Category 3 use of Secondary Materials in Restricted Applications. As such, compliance with the Materials Reuse Protocol under development with the Massachusetts DPH would provide an even greater level of protection to human health and the environment.
ERM                                                            YANKEE 28054 3/22/05 L-U


====4.2.2 Locations====
==5.0  REFERENCES==


Where Material is to be Used Figure 2 shows the locations of foundations that will remain. Figure 3 shows where processed concrete and asphalt will be used.ERM YANKEE 28054 3/22/05 10$.................. ,vv
U.S. Environmental Protection Agency (USEPA). 2000a. Soil Screening Guidance for Radionuclides: Technical Background Document.
EPA/540-R-00-006. Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response. Washington, DC.
U.S. Environmental Protection Agency (USEPA). 2000b. Soil Screening Guidance for Radionuclides: User's Guide. EPA/540-R-O0-007. Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response.
Washington, DC.
Massachusetts Department of Environmental Protection, Bureau of Waste Prevention, "Draft Interim Guidance Document for Beneficial Use Determination Regulations 310 CMR 19.060", March 18, 2004.
ERM                                                      YANKEE 28054 3/22/05 Z"I


====4.2.3 Health====
Table 1 Summary of Structures to be Reused Yankee Nuclear Power Station, Rowe, MA Structure Name                        Approximate Volume of           Approximate Volume of Concrete to Remain In-Place        Concrete to be Processed (cubic yards)                  (cubic yards)
and Environmental Impacts The material to be reused under the BUD primarily consists of inert construction materials comprised of concrete and asphalt. Potential residual impacts on the concrete include paint, as well as radiological constituents (below DCGLs) for remaining structures (with the exception of the ISFSI facility) including foundations, slabs, subsurface asphalt and soil.The BUD guidance document states that the applicant must demonstrate that Critical Contaminants of Concern (CCCs), such as PCBs as defined in the guidance document, are consistent with background.
Turbine Building                                                        1,400 Service Building                                                        550 Stores Warehouse                                                        350 Tank Farm Moat &Gas Drum Decay Area                                      400 Ion Exchange Pit (south wall)                                           200 Safety Injection/Diesel Generator Building                                60 New/Old SI Tank Base                                                      30 Tank 39 Base Primary Water Tank                                          40 Demin Water Tank Slab                                                    15 Vapor Container/Reactor Support Structure                              1,700                          7,000 Compactor Building                                                        85 Waste Disposal Building                                                  135 PCA Warehouse                                                            610 Fire Water Tank Slab                                                      60 Fire Water Pump House                                                    65 Safe Shutdown Building                                                  200 Circulating Water Discharge Structure                                    300 Circulating Water Intake Structure                                      1,350 Primary Auxiliary Building                                              700                          1,200 Yard Crane Supports                                                      40 Subtotal                                                                8,290                          8,200 Total                                                                                16,490 Note: Table does not include a summary of utilities or asphalt to be reused under the BUD.
Based on discussions with DEP at a pre-application meeting held on 1 July 2004, it is our understanding that this requirement of the BUD guidance may not be applicable for a Category 3 BUD and that this issue will undergo further review by DEP.Confirmation sampling of the concrete is being performed to ensure that the maximum residual PCB concentration will be no more than 2 mg/kg in the concrete debris. This maximum threshold is essentially equivalent to the proposed default BUD S-2 and S-3 standard of 1.6 mg/kg for PCBs.The S-2 and S-3 BUD values represent an average concentration (this is inherent to the risk assessment process).
Although concrete will be confirmed to contain no more than 2 mg/kg as a sample-specific maximum concentration, the actual average PCB concentration in concrete will be well below the S-2 and S-3 BUD standards for PCBs. Because PCBs in concrete will meet the BUD S-2 and S-3 standards, no further assessment for PCBs is required.In the event that non-PCB paint is left on concrete surfaces, the coated concrete will be tested for RCRA 8 metals. The sampling results will be evaluated to ensure that the average concentrations are below the S-2 and S-3 BUD values. If the average concentrations are higher, then the paint will be abated or the concrete will be disposed off-site.No standards exist in the draft BUD guidance for radionuclides.
However, due to the operation of the power plant, the concrete may contain radiological constituents at concentration less than or equal to the DCGL. The use of the Materials Reuse Protocol is consistent with a Category 3 Beneficial Use of Secondary Materials in Restricted Applications because the management of the concrete beneath 3-foot of soil overburden meets the DEP BUD guidance risk management criteria (overall cancer risk less than or equal to 5 in 10,000; or 0.5 x10-5). A Human Health Risk Assessment was prepared by Gradient Corporation ERM 19 YANKEE 28054 3/22/05 (Appendix B) to evaluate potential risks associated with the on-site reuse of concrete.The risk assessment guidelines for the BUD, which adopt those defined under the MCP with a more conservative risk threshold, define health protection on the basis of cancer risk, rather than radiation dose. MADEP does not have guidelines for the evaluation of cancer risk for radionuclides.
Consequently, the U.S. EPA guidelines, published in the Soil Screening Guidance for Radionuclides (USEPA, 2000a,b) were used for the Human Health Risk Assessment.
The final site grading and re-vegetation plan will ensure that the concrete will reside beneath 3-feet of soil. A deed restriction will require a Health& Safety Plan and Soil Management Plan for subsurface excavation activities.
Thus, the deed restriction will prevent "direct contact" pathways such as incidental ingestion and dermal contact with subsurface materials.
Thus, the primary pathway of possible concern for exposure to radionuclides in the subsurface concrete is from external radiation (e.g., ionizing radiation emitted as the result of radioactive decay).The health assessment presented here indicates that soil grading plan and use of concrete debris as fill, satisfies the interim draft BUD guidance for Category 3 use of Secondary Materials in Restricted Applications.
As such, compliance with the Materials Reuse Protocol under development with the Massachusetts DPH would provide an even greater level of protection to human health and the environment.
ERM YANKEE 28054 3/22/05 L-U


==5.0 REFERENCES==
jmft t
*~ /
      ~-YAEC Prop" tBoundary                Scale 125,000 0.5 km        0        500 m 0.5 mi                    0     1,000 ft Figure 1 - Locus Map Yankee Nuclear Power Station - Rowe, MA ERM
 
Appendix A Transmittaland Application Forms
 
Enter your transmittal number                                    -                W0508611_,                      i TriaismittalfN6 rber Your unique Transmittal Number can be accessed online: http:/lwww.state.ma.us/scripts/depltrasmfrm.stm or call DEP's InfoLine at 617-338-2255 or 800-462-0444 (from 508, 781, and 978 area codes).
Massachusetts Department of Environmental Protection Transmittal Form for Permit Application and Payment
: 1. Please type or    A. Permit Information print. A separate Transmittal Form          BWPSWO1 3                                                              Beneficial Use Determination - Major must be completed        1. Permit Code: 7 or 8 characte r code from permit instructions        2. Name of Permit Category for each permit          Beneficial use of concre te foundations and application.              3. Type of Project or Activity                            utility line3S
: 2. Make your check payable to      B. Applicant Information - Firm or Individual the Commonwealth of Massachusetts          Yankee Atomic Electric Company and mail it with a        1. Name of Firm - Or, if party needing this approval is an individual enter name below:
copy of this form to:
DEP, P.O. Box 4062, Boston, MA          2. Last Name of Individual                                    3. First Name of Individual                              4. MI 02211.                  49 Yankee Road
: 5. Street Address
: 3. Three copies of Rowe                                                        MA            01367                413-424-5261 this form will be
: 6. City/Town                                                7. State      8. Zip Code          9. Telephone #          10. Ext. #
needed.
Kenneth Dow                                                            dow@yankee.com Copy 1 - the              11. Contact Person                                                      12. e-mail address (optional) original must accompany your permit application. C. Facility, Site or Individual Requiring Approval Copy 2 must accompany your            Yankee Atomic Electric Company fee payment.              1. Name of Facility, Site Or Individual Copy 3 should be          49 Yankee Road retained for your        2. Street Address records Rowe                                                        MA            01367                413-424-5261
: 4. Both fee-paying        3. City/Town                                                4. State      5. Zip Code          6. Telephone #          7. Ext. #
and exempt applicants must          8. DEP Facility Number (if Known)                            9. Federal I.D. Number (if Known)        10. BWSC Tracking # (if Known) mail a copy of this transmittal form to:
D. Application Prepared by (if different from Section B)*
DEP P.O. Box 4062 Environmental Resources Management Boston, MA            1. Name of Firm Or Individual 02211                399 Boylston St. 6th Floor
: 2. Address Boston                                                      MA            02116                617-646-7842
* Note:
: 3. City/Town                                                4. State      5. Zip Code          6. Telephone #          7. Ext. #
For BWSC Permits, enter the LSP.
John McTigue
: 8. Contact Person                                                      9. LSP Number (BWSC Permits only)
E. Permit - Project Coordination
: 1. Is this project subject to MEPA review? N yes LI no If yes, enter the project's EOEA file number - assigned when an Environmental Notification Form is submitted to the MEPA unit:                      13247 EOEA File Number F. Amount Due DEP Use Only          Special Provisions:
: 1. E5  Fee Exempt (city, town or municipal housing authority)(state agency if fee is $100 or less).
Permit No:                There are no fee exemptions for BWSC permits, regardlessof applicantstatus.
: 2. 0l Hardship Request - payment extensions according to 310 CMR 4.04(3)(c).
Rec'd Date:          3. E] Alternative Schedule Project (according to 310 CMR 4.05 and 4.10).
: 4. El Homeowner (according to 310 CMR 4.02).
Reviewer:                Fee addressed under MOU                        $1,580.00 between Yankee and DEP                        Dollar Amount                                  Date transmittal-form BUD.doc - rev. 09/03                                                                                                              Page 1 of 1


U.S. Environmental Protection Agency (USEPA). 2000a. Soil Screening Guidance for Radionuclides:
Massachusetts Department of Environmental Protection Bureau of - Waste Prevention - Solid Waste Management                  W050861 BWP SW 13 Beneficial Use Determination - Major                        Transmittal Number #
Technical Background Document.EPA/540-R-00-006.
BWP SW 30 Beneficial Use Determination - Minor Application for Beneficial Use Determination                          Facility ID (if known)
Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response.
A. Project Information Important:
Washington, DC.U.S. Environmental Protection Agency (USEPA). 2000b. Soil Screening Guidance for Radionuclides:
When filling out  1. Which permit category are you applying for?      [    BWP SW 13 [:1BWP SW 30 forms on the computer, use only the tab key to move your cursor - do not    2. General Information about the Solid Waste       Page #
User's Guide. EPA/540-R-O0-007.
use the return key.
Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response.Washington, DC.Massachusetts Department of Environmental Protection, Bureau of Waste Prevention, "Draft Interim Guidance Document for Beneficial Use Determination Regulations 310 CMR 19.060", March 18, 2004.ERM YANKEE 28054 3/22/05 Z"I Table 1 Summary of Structures to be Reused Yankee Nuclear Power Station, Rowe, MA Structure Name Approximate Volume of Approximate Volume of Concrete to Remain In-Place Concrete to be Processed (cubic yards) (cubic yards)Turbine Building 1,400 Service Building 550 Stores Warehouse 350 Tank Farm Moat &Gas Drum Decay Area 400 Ion Exchange Pit (south wall) 200 Safety Injection/Diesel Generator Building 60 New/Old SI Tank Base 30 Tank 39 Base Primary Water Tank 40 Demin Water Tank Slab 15 Vapor Container/Reactor Support Structure 1,700 7,000 Compactor Building 85 Waste Disposal Building 135 PCA Warehouse 610 Fire Water Tank Slab 60 Fire Water Pump House 65 Safe Shutdown Building 200 Circulating Water Discharge Structure 300 Circulating Water Intake Structure 1,350 Primary Auxiliary Building 700 1,200 Yard Crane Supports 40 Subtotal 8,290 8,200 Total 16,490 Note: Table does not include a summary of utilities or asphalt to be reused under the BUD.
3
jmft t~ /~-YAEC Prop" tBoundary Scale 1 25,000 0.5 km 0 500 m 0.5 mi 0 1,000 ft Figure 1 -Locus Map Yankee Nuclear Power Station -Rowe, MA ERM
: a. General description of the waste
: b. Source of the waste 7
(1) Name of the generator 7
(2) Address of the generator
: c. Description of the industrial process which  7 produces the waste DIRECTIONS:                                                               7
: 1. Specify the        d. Quantity (volume and/or tonnage) page numbers in which the          3. Chemical, Physical and Biological Properties following              of the Waste information is located.               a. Chemical properties of the waste
: 2. Enter NA if                                                            8 information            (1) pH requested is not applicable.                                                               8 (2) reactivity 8
(3) leachabilty (TCLP test) 8 (4) total metals 8
(5) VOCs 8
(6) other appropriate constituents
: b. Physical properties of the waste 9
(1) size 9
(2) density 10 (3) percent solids 10 (4) liquid content of the waste
: c. Biological properties of the waste, if applicable swl3-30 form Yankee.doc - 08/01                                                          BWP SW 13, 30 - Page 1 of 2


Appendix A Transmittal and Application Forms Enter your transmittal number -W0508611_, i TriaismittalfN6 rber Your unique Transmittal Number can be accessed online: http:/lwww.state.ma.us/scripts/depltrasmfrm.stm or call DEP's InfoLine at 617-338-2255 or 800-462-0444 (from 508, 781, and 978 area codes).Massachusetts Department of Environmental Protection Transmittal Form for Permit Application and Payment 1. Please type or A. Permit Information print. A separate Transmittal Form BWPSWO1 3 must be completed
I                 Massachusetts Department of Environmental Protection Bureau of -Waste Prevention - Solid Waste Management                             W050861 BWP SW 13 Beneficial Use Determination - Major                                   Transmittal Number #
: 1. Permit Code: 7 or 8 characte for each permit Beneficial use of concre application.
BWP SW 30 Beneficial Use Determination - Minor Application for Beneficial Use Determination                                     Facility ID(if known)
: 3. Type of Project or Activity r code from permit instructions te foundations and utility line Beneficial Use Determination
A. Project Information (cont.)
-Major 2. Name of Permit Category 3S 2. Make your check payable to B. Applicant Information
(1) pathogens
-Firm or Individual the Commonwealth of Massachusetts and mail it with a copy of this form to: DEP, P.O. Box 4062, Boston, MA 02211.3. Three copies of this form will be needed.Copy 1 -the original must accompany your permit application.
: 4. Proposed Handling Methods and Utilization
Copy 2 must accompany your fee payment.Copy 3 should be retained for your records 4. Both fee-paying and exempt applicants must mail a copy of this transmittal form to: DEP P.O. Box 4062 Boston, MA 02211* Note: For BWSC Permits, enter the LSP.Yankee Atomic Electric Company 1. Name of Firm -Or, if party needing this approval is an individual enter name below: 2. Last Name of Individual
: 3. First Name of Individual
: 4. MI 49 Yankee Road 5. Street Address Rowe 6. City/Town Kenneth Dow 11. Contact Person MA 01367 7. State 8. Zip Code 413-424-5261
: 9. Telephone
#10. Ext. #dow@yankee.com
: 12. e-mail address (optional)
C. Facility, Site or Individual Requiring Approval Yankee Atomic Electric Company 1. Name of Facility, Site Or Individual 49 Yankee Road 2. Street Address Rowe MA 01367 413-424-5261
: 3. City/Town
: 4. State 5. Zip Code 6. Telephone
# 7. Ext. #8. DEP Facility Number (if Known) 9. Federal I.D. Number (if Known) 10. BWSC Tracking # (if Known)D. Application Prepared by (if different from Section B)*Environmental Resources Management
: 1. Name of Firm Or Individual 399 Boylston St. 6th Floor 2. Address Boston MA 02116 617-646-7842
: 3. City/Town
: 4. State 5. Zip Code 6. Telephone
# 7. Ext. #John McTigue 8. Contact Person 9. LSP Number (BWSC Permits only)E. Permit -Project Coordination
: 1. Is this project subject to MEPA review? N yes LI no If yes, enter the project's EOEA file number -assigned when an Environmental Notification Form is submitted to the MEPA unit: 13247 EOEA File Number F. Amount Due DEP Use Only Special Provisions:
: 1. E5 Fee Exempt (city, town or municipal housing authority)(state agency if fee is $100 or less).Permit No: There are no fee exemptions for BWSC permits, regardless of applicant status.2. 0l Hardship Request -payment extensions according to 310 CMR 4.04(3)(c).
Rec'd Date: 3. E] Alternative Schedule Project (according to 310 CMR 4.05 and 4.10).4. El Homeowner (according to 310 CMR 4.02).Reviewer: Fee addressed under MOU between Yankee and DEP$1,580.00 Dollar Amount Date transmittal-form BUD.doc -rev. 09/03 Page 1 of 1 Massachusetts Department of Environmental Protection Bureau of -Waste Prevention  
-Solid Waste Management BWP SW 13 Beneficial Use Determination  
-Major BWP SW 30 Beneficial Use Determination
-Minor Application for Beneficial Use Determination A. Project Information
: 1. Which permit category are you applying for? [ BWP SW 13 W050861 Transmittal Number #Facility ID (if known)Important:
When filling out forms on the computer, use only the tab key to move your cursor -do not use the return key.DIRECTIONS:
: 1. Specify the page numbers in which the following information is located.2. Enter NA if information requested is not applicable.
[:1BWP SW 30 2. General Information about the Solid Waste a. General description of the waste b. Source of the waste (1) Name of the generator (2) Address of the generator c. Description of the industrial process which produces the waste d. Quantity (volume and/or tonnage)3. Chemical, Physical and Biological Properties of the Waste a. Chemical properties of the waste (1) pH (2) reactivity (3) leachabilty (TCLP test)(4) total metals (5) VOCs (6) other appropriate constituents
: b. Physical properties of the waste (1) size (2) density (3) percent solids (4) liquid content of the waste c. Biological properties of the waste, if applicable Page #3 7 7 7 7 8 8 8 8 8 8 9 9 10 10 BWP SW 13, 30 -Page 1 of 2 swl3-30 form Yankee.doc
-08/01 I Massachusetts Department of Environmental Protection Bureau of -Waste Prevention
-Solid Waste Management BWP SW 13 Beneficial Use Determination  
-Major BWP SW 30 Beneficial Use Determination
-Minor Application for Beneficial Use Determination W050861 Transmittal Number #Facility ID (if known)A. Project Information (cont.)(1) pathogens 4. Proposed Handling Methods and Utilization
: a. Proposed handling methods (1) transportation (2) storage (3) processing
: a. Proposed handling methods (1) transportation (2) storage (3) processing
: b. Proposed utilization (1) general description (2) location(s) where material is to be used (3) health and environmental impacts B. Certification:
: b. Proposed utilization (1) general description (2) location(s) where material is to be used (3) health and environmental impacts B. Certification: 310 CMR 19.011 Any person, required by these regulations or         Frank Helin any order issued by the Department, to submit       Print Na papers shall identify themselves by name, profession, and relationship to the applicant and   Authorized    'ature legal interest in the facility, and make the         Decommis oning Director following certification: "I certify under penalty of Position/Title law that I have personally examined and am familiar with the information submitted in this     Date document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant penalties both civil and criminal for submitting false information including possible fines and imprisonment.
310 CMR 19.011 Any person, required by these regulations or any order issued by the Department, to submit papers shall identify themselves by name, profession, and relationship to the applicant and legal interest in the facility, and make the following certification: "I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete.
sw13-30 form Yankee.doc - 08/01                                                                   BWP SW 13,30 - Page 2 of 2
I am aware that there are significant penalties both civil and criminal for submitting false information including possible fines and imprisonment.
 
Frank Helin Print Na Authorized
UMassachusetts Department of Environmental Protection Bureau of -Waste Prevention - Solid Waste Management BWP SW 13 Beneficial Use Determination - Major BWP SW 30 Beneficial Use Determination - Minor W050861 Transmittal Number #
'ature Decommis oning Director Position/Title Date sw13-30 form Yankee.doc  
Application for Beneficial Use Determination                           Facility ID (if known)
-08/01 BWP SW 13,30 -Page 2 of 2 Massachusetts Department of Environmental Protection U Bureau of -Waste Prevention  
A. Project Information Important:
-Solid Waste Management BWP SW 13 Beneficial Use Determination  
When filling out   1. Which permit category are you applying for?     [   BWP SW 13 El  BWP SW 30 forms on the computer, use only the tab key to move your cursor -do not   2. General Information about the Solid Waste       Page #
-Major..... BWP SW 30 Beneficial Use Determination  
use the return key.
-Minor Application for Beneficial Use Determination A. Project Information Important:
                                                                        '-I
When filling out 1. Which permit category are you applying for? [ BWP SW 13 forms on the computer, use only the tab key to move your cursor -do not 2. General Information about the Solid Waste Page #use the return key.W050861 Transmittal Number #Facility ID (if known)El BWP SW 30 I1~D DIRECTIONS:
: a. General description of the waste I1~D                 b. Source of the waste 7
e -the page-:nu.mbers in whicdhthe olldvicng information is located.2.,Enler NA if information requested is not applicable.
(1) Name of the generator                        7 7
: a. General description of the waste b. Source of the waste (1) Name of the generator (2) Address of the generator c. Description of-the industrial process which produces the waste d. Quantity (volume and/or tonnage)3. Chemical, Physical and Biological Properties of the Waste a. Chemical properties of the waste (1)pH (2) reactivity (3) leachabilty (TCLP test)(4) total metals (5) VOCS (6) other appropriate constituents
(2) Address of the generator
: b. Physical properties of the Waste (1) size (2) density (3) percent solids (4) liquid content of the waste c. Biological properties of the waste, if applicable
: c. Description of-the industrial process which 7 produces the waste DIRECTIONS:
'-I 7 7 7 7 8 8 8 8 8 8 9 9 10 10 BWP SW 13, 30 -Page 1 of 2 sw13-30 form USGen NE-doc.doc
e -the      d. Quantity (volume and/or tonnage) page-:nu.mbers in whicdhthe         3. Chemical, Physical and Biological Properties olldvicng             of the Waste                                    8 information is located.               a. Chemical properties of the waste 2.,Enler NA if information           (1)pH 8
-08/01 1 .-I LI Massachusetts Department of Environmental Protection Bureau of -Waste Prevention
requested is not applicable.           (2) reactivity 8
-Solid Waste Management BWP SW 13 Beneficial Use Determination
(3) leachabilty (TCLP test) 8 (4) total metals 88 (5) VOCS (6) other appropriate constituents
-Major BWP SW 30 Beneficial Use Determination
: b. Physical properties of the Waste 9
-Minor Application for Beneficial Use Determination W050861 Transmittal Number #Facility ID (if known)A. Project Information (cont.)Page #(1) pathogens 4. Proposed Handling Methods and Utilization 10 11 11 11 a. Proposed handling methods (1) transportation (2) storage 11 (3) processing
(1) size 9
: b. Proposed utilization (1) general description (2) location(s) where material is to be used (3) health and environmental impacts 11 11 11 B. Certification:
(2) density 10 (3) percent solids 10 (4) liquid content of the waste
310 CMR 19.011 Any person, required by these regulations or any order issued by the Department, to submit papers shall identify themselves by name, profession, and relationship to the applicant and legal interest in the facility, and make the following certification: "I certify under penalty of law that I have.personally examined and, am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe. that the information is true, accurate and complete.
: c. Biological properties of the waste, if applicable sw13-30 form USGen NE-doc.doc - 08/01                                                  BWP SW 13, 30 - Page 1 of 2
I am aware that there are significant penalties both civil and criminal for submitting false information including possible fines and imprisonment.
: 1. -I LI Massachusetts Department of Environmental Protection Bureau of - Waste Prevention - Solid Waste Management W050861 BWP SW 13 Beneficial Use Determination - Major                                Transmittal Number #
MtlchcceC( G.7 1/7e-Pnint.Namne 9  ~6kA Authokzed Signatlbre Positionfritle
BWP SW 30 Beneficial Use Determination - Minor Application for Beneficial Use Determination                                  Facility ID (if known)
, 2A~L/Q~/1 Date sw13-30 form USGen NE.doc-doc
A. Project Information (cont.)
-08101 OWP SW 13, 30 -Page 2 of 2 Appendix B Human Health Risk Assessment BUD for Concrete YNPS Human Health Risk Assessment  
Page #
-BUD for Concrete Human Health Risk Assessment Beneficial Use Determination (BUD) for Concrete Yankee Nuclear Power Station Rowe, Massachusetts Prepared for Yankee Atomic Electric Company 49 Yankee Road Rowe, Massachusetts 01367 Prepared by Gradient Corporation 20 University Road Cambridge, MA 02138 September 22, 2004\202073\workplans~hhra\-'946  
10 (1) pathogens 11
!144,doc Gradient CORPORATION YNPS Human Health Risk Assessment  
: 4. Proposed Handling Methods and Utilization
-BUD for Concrete Table of Contents I Introduction and BUD Goals ....................................................................................
: a. Proposed handling methods 11 (1) transportation 11 (2) storage 11 (3) processing
1 2 Hazard Identification  
: b. Proposed utilization 11 (1) general description 11 (2) location(s) where material is to be used 11 (3) health and environmental impacts B. Certification: 310 CMR 19.011 Any person, required by these regulations or         MtlchcceC( G.7 1*/7e-any order issued by the Department, to submit       Pnint.Namne  9  ~6kA papers shall identify themselves by name, profession, and relationship to the applicant and   Authokzed Signatlbre legal interest in the facility, and make the following certification: "Icertify under penalty of Positionfritle    ,
............................................................................................
law that I have.personally examined and, am familiar with the information submitted in this     Date 2A~L/Q~/1 document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe. that the information is true, accurate and complete. I am aware that there are significant penalties both civil and criminal for submitting false information including possible fines and imprisonment.
2 3 Dose-Response Assessment  
sw13-30 form USGen NE.doc-doc - 08101                                                           OWP SW 13, 30 - Page 2 of 2
.................................................................................
 
2 4 Exposure Assessment  
Appendix B Human Health Risk Assessment BUD for Concrete
............................................................................................
 
3 5 Radiological Risk Characterization  
YNPS Human Health Risk Assessment - BUD for Concrete Human Health Risk Assessment Beneficial Use Determination (BUD) for Concrete Yankee Nuclear Power Station Rowe, Massachusetts Prepared for Yankee Atomic Electric Company 49 Yankee Road Rowe, Massachusetts 01367 Prepared by Gradient Corporation 20 University Road Cambridge, MA 02138 September 22, 2004
.........................................................  
\202073\workplans~hhra\-'946 !144,doc                                                   Gradient CORPORATION
................
 
4 5.1 External Radiation  
YNPS Human Health Risk Assessment - BUD for Concrete Table of Contents I             Introduction and BUD Goals ....................................................................................                           1 2             Hazard Identification ............................................................................................                       2 3             Dose-Response Assessment .................................................................................                               2 4             Exposure Assessment ............................................................................................                         3 5             Radiological Risk Characterization ......................................................... ................ 4 5.1           External Radiation ....................................................................................................... 4 5.2           Leaching to Groundwater ..............................................................................................     7 References ............................................................................................................................                 9 List of Tables Table I                     Radiation Dose Reduction Due to 3-Foot Soil Overburden Table 2                     Summary of External Radiation Risk Calculations for BUD Table 3                     External Radiation Risk Calculations - No Overburden Conditions Table 4                     Screening Comparison of Radionuclide Leaching to Groundwater Compared to Drinking Water Guidelines
.......................................................................................................
\202073\ý orkp ans\hhra\-94611 44.doc                                                                                               Gradient CORPORATION
4 5.2 Leaching to Groundwater  
 
..............................................................................................
YNPS Human Health Risk Assessment - BUD for Concrete 1             Introduction and BUD Goals This document presents a human health risk assessment to support the Category 3 Beneficial Use Determination (BUD) for Secondary Materials in Restricted Applications for concrete debris. This BUD is a component of the environmental site closure underway at the Yankee Nuclear Power Station (YNPS).
7 References  
Yankee Atomic Electric Company (YAEC) owns YNPS and surrounding lands, which comprise approximately 1,800 acres, of which approximately 12 acres is occupied by the nuclear plant itself.
............................................................................................................................
Since 1992, the plant has been in the process of being dismantled and YAEC is terminating the YNPS federal license with the Nuclear Regulatory Commission (NRC). In order to terminate its nuclear operating license, YAEC must complete a process of radiological cleanup defined by the NRC and set forth in YAEC's License Termination Plan (LTP).                 In addition, YAEC will comply with the Massachusetts Department of Public Health (MADPH) requirements for meeting radiological dose guidelines. Both the NRC and MADPH require compliance with radiological "dose-based" requirements for the protection of human health.
9 List of Tables Table I Radiation Dose Reduction Due to 3-Foot Soil Overburden Table 2 Summary of External Radiation Risk Calculations for BUD Table 3 External Radiation Risk Calculations  
In parallel with the license termination and cleanup to meet the NRC and MADPH radiological dose requirements, YAEC is conducting a comprehensive environmental closure that will ensure that the property poses no adverse human or environmental risks once YAEC transfers title of the property. The environmental site closure is being performed as a voluntary action that will adhere to guidelines established by the Massachusetts Department of Environmental Protection (MADEP) as well as guidelines established by the U.S. Environmental Protection Agency (USEPA) -- in addition to the requirements noted above established by NRC and MADPH.
-No Overburden Conditions Table 4 Screening Comparison of Radionuclide Leaching to Groundwater Compared to Drinking Water Guidelines
This human health risk assessment was performed to support a Category 3 BUD as outlined in the March 18, 2004 Draft Interim Guidance Document for Beneficial Use Determination Regulations, 31OCMR19.060 (MADEP, 2004). The risk management guidelines defined in the draft BUD guidance require demonstration of meeting 0.5 X 10-6 cancer risk for an individual constituent, and 0.5 x 10-5 overall cancer risk summed over all constituents. No cleanup standards for radionuclides are available in the Draft BUD Guidance.               This risk assessment develops risk-based support for residual levels of radionuclides in concrete debris, and is consistent with an MCP Method 2 approach.
\202073\ý orkp ans\hhra\-94611 44.doc Gradient CORPORATION YNPS Human Health Risk Assessment  
The BUD risk assessment methods follow those defined under the MCP (MADEP, 1995).
-BUD for Concrete 1 Introduction and BUD Goals This document presents a human health risk assessment to support the Category 3 Beneficial Use Determination (BUD) for Secondary Materials in Restricted Applications for concrete debris. This BUD is a component of the environmental site closure underway at the Yankee Nuclear Power Station (YNPS).Yankee Atomic Electric Company (YAEC) owns YNPS and surrounding lands, which comprise approximately 1,800 acres, of which approximately 12 acres is occupied by the nuclear plant itself.Since 1992, the plant has been in the process of being dismantled and YAEC is terminating the YNPS federal license with the Nuclear Regulatory Commission (NRC). In order to terminate its nuclear operating license, YAEC must complete a process of radiological cleanup defined by the NRC and set forth in YAEC's License Termination Plan (LTP). In addition, YAEC will comply with the Massachusetts Department of Public Health (MADPH) requirements for meeting radiological dose guidelines.
However, MADEP does not have any published radiological risk assessment guidance.                   Thus, the
Both the NRC and MADPH require compliance with radiological "dose-based" requirements for the protection of human health.In parallel with the license termination and cleanup to meet the NRC and MADPH radiological dose requirements, YAEC is conducting a comprehensive environmental closure that will ensure that the property poses no adverse human or environmental risks once YAEC transfers title of the property.
\20207Y,,% rkplans~hhra\-9461 144.doc                     I                             Gradient CORPORATION
The environmental site closure is being performed as a voluntary action that will adhere to guidelines established by the Massachusetts Department of Environmental Protection (MADEP) as well as guidelines established by the U.S. Environmental Protection Agency (USEPA) -- in addition to the requirements noted above established by NRC and MADPH.This human health risk assessment was performed to support a Category 3 BUD as outlined in the March 18, 2004 Draft Interim Guidance Document for Beneficial Use Determination Regulations, 31OCMR19.060 (MADEP, 2004). The risk management guidelines defined in the draft BUD guidance require demonstration of meeting 0.5 X 10-6 cancer risk for an individual constituent, and 0.5 x 10-5 overall cancer risk summed over all constituents.
 
No cleanup standards for radionuclides are available in the Draft BUD Guidance.
i I
This risk assessment develops risk-based support for residual levels of radionuclides in concrete debris, and is consistent with an MCP Method 2 approach.The BUD risk assessment methods follow those defined under the MCP (MADEP, 1995).However, MADEP does not have any published radiological risk assessment guidance.
YNPS Human Health Risk Assessment - BUD for Concrete assessment of radiological risks to support the BUD relied upon the most recent guidance set forth in the USEPA (2000a) Soil Screening Guidance for Radionuclides: Technical Background Document.
Thus, the\20207Y,,%
2         Hazard Identification Constituents of potential concern (COPCs) for the BUD include residual PCBs and radionuclides in concrete debris. Confirmation sampling of the concrete will ensure that the maximum residual PCB concentration will be no more than 2 mg/kg in the concrete debris.                 This maximum threshold is essentially equivalent to the default BUD S-2 and S-3 standard of 1.6 mg/kg for PCBs. The BUD S-2 and             I S-3 defaults represent a risk-based acceptable average concentration (this is inherent to the risk assessment process). Although all concrete will be confirmed to contain no more than 2 mg/kg, the actual average PCB concentration in concrete will be below the S-2 and S-3 BUD standards for PCBs. Thus, no further risk assessment is required for PCBs in concrete to meet the BUD Category 3 guidelines.
rkplans~hhra\-9461 144.doc I Gradient CORPORATION i YNPS Human Health Risk Assessment  
No standards exist in the draft BUD guidance for radionuclides. Thus, the COPCs for the BUD risk assessment are the radionuclides listed in the YNPS LTP. The radionuclide COPCs are listed in Table 1.
-BUD for Concrete I assessment of radiological risks to support the BUD relied upon the most recent guidance set forth in the USEPA (2000a) Soil Screening Guidance for Radionuclides:
The Dose. Concentration Guideline Levels (DCGLs) developed in the LTP ensure that the radiation dose from exposure to residual radionuclides is no more than 25 mrem/yr to meet NRC requirements. These DCGLs for the concrete debris were developed using the RESRAD multipathway risk assessment and radionuclide fate modeling system developed by the U.S. Department of Energy                 I (ANL, 2001).                 The concrete debris that is proposed to be used as fill, covered by 3-feet of soil overburden, will have residual radionuclide concentrations that are less than or equal to the DCGL concentrations. Thus, for this risk evaluation, we conservatively assumed that the concrete debris had concentrations equal to the DCGLs, even though the actual average concentration will by definition be less than the DCGLs.
Technical Background Document.2 Hazard Identification Constituents of potential concern (COPCs) for the BUD include residual PCBs and radionuclides in concrete debris. Confirmation sampling of the concrete will ensure that the maximum residual PCB concentration will be no more than 2 mg/kg in the concrete debris. This maximum threshold is essentially equivalent to the default BUD S-2 and S-3 standard of 1.6 mg/kg for PCBs. The BUD S-2 and I S-3 defaults represent a risk-based acceptable average concentration (this is inherent to the risk assessment process).
3           Dose-Response Assessment                                                                             I USEPA classifies all radionuclides as carcinogens, based on their property of emitting ionizing       I radiation and on the extensive weight of evidence provided by epidemiological studies of radiologically induced cancers in humans. For radiological constituents, cancer slope factors have been published in the
Although all concrete will be confirmed to contain no more than 2 mg/kg, the actual average PCB concentration in concrete will be below the S-2 and S-3 BUD standards for PCBs. Thus, no further risk assessment is required for PCBs in concrete to meet the BUD Category 3 guidelines.
%202073Vworkplans,'hhra -9461144.doc                          2                              Gradient CORPORATION
No standards exist in the draft BUD guidance for radionuclides.
 
Thus, the COPCs for the BUD risk assessment are the radionuclides listed in the YNPS LTP. The radionuclide COPCs are listed in Table 1.The Dose. Concentration Guideline Levels (DCGLs) developed in the LTP ensure that the radiation dose from exposure to residual radionuclides is no more than 25 mrem/yr to meet NRC requirements.
YNPS Human Health Risk Assessment - BUD for Concrete USEPA (2000a) Soil Screening Guidance for Radionuclides:               Technical Background Document. This document was used as the bases of the dose-response (toxicity) factors used for the BUD risk assessment.
These DCGLs for the concrete debris were developed using the RESRAD multipathway risk assessment and radionuclide fate modeling system developed by the U.S. Department of Energy I (ANL, 2001). The concrete debris that is proposed to be used as fill, covered by 3-feet of soil overburden, will have residual radionuclide concentrations that are less than or equal to the DCGL concentrations.
4             Exposure Assessment Although the ultimate use for the Site has not been determined, it will likely include open space for recreational activities.           Furthermore, an Activity Use Limitation (AUL) will be enforced over that portion of the site that constituted the former industrial area, and this is the area applicable to the BUD for concrete. The AUL will ensure that the 3-foot overburden in the former industrial area is maintained.
Thus, for this risk evaluation, we conservatively assumed that the concrete debris had concentrations equal to the DCGLs, even though the actual average concentration will by definition be less than the DCGLs.3 Dose-Response Assessment I USEPA classifies all radionuclides as carcinogens, based on their property of emitting ionizing I radiation and on the extensive weight of evidence provided by epidemiological studies of radiologically induced cancers in humans. For radiological constituents, cancer slope factors have been published in the%202073Vworkplans,'hhra
-9461144.doc 2 Gradient CORPORATION YNPS Human Health Risk Assessment  
-BUD for Concrete USEPA (2000a) Soil Screening Guidance for Radionuclides:
Technical Background Document.
This document was used as the bases of the dose-response (toxicity) factors used for the BUD risk assessment.
4 Exposure Assessment Although the ultimate use for the Site has not been determined, it will likely include open space for recreational activities.
Furthermore, an Activity Use Limitation (AUL) will be enforced over that portion of the site that constituted the former industrial area, and this is the area applicable to the BUD for concrete.
The AUL will ensure that the 3-foot overburden in the former industrial area is maintained.
The AUL will preclude excavation, without a DEP-approved soil management plan and would occur only under the oversight of a Licensed Site Professional (LSP). Thus, the AUL will prevent "direct contact" pathways such as incidental ingestion and dermal contact with subsurface materials.
The AUL will preclude excavation, without a DEP-approved soil management plan and would occur only under the oversight of a Licensed Site Professional (LSP). Thus, the AUL will prevent "direct contact" pathways such as incidental ingestion and dermal contact with subsurface materials.
Furthermore, indirect pathways such as intake from vegetables that might conceivably be grown on the graded area, would not lead to the uptake of radionuclides as they would lie beneath the 3-foot of graded material.
Furthermore, indirect pathways such as intake from vegetables that might conceivably be grown on the graded area, would not lead to the uptake of radionuclides as they would lie beneath the 3-foot of graded material.           Thus, the remaining pathway of possible concern for exposure to radionuclides in the subsurface concrete, is from external radiation (e.g., ionizing radiation emitted as the result of radioactive decay).
Thus, the remaining pathway of possible concern for exposure to radionuclides in the subsurface concrete, is from external radiation (e.g., ionizing radiation emitted as the result of radioactive decay).In order to evaluate the attenuation provided by the 3-feet of overburden, we used the U.S.Department of Energy RESRAD multipathway risk assessment model (ANL, 2001). We first calculated the external radiation dose assuming no overburden, then performed a parallel calculation for a scenario that included 3-foot of soil overburden.
In order to evaluate the attenuation provided by the 3-feet of overburden, we used the U.S.
For both scenarios, a unit concentration (e.g., I pCi/g) was used for each radionuclide (the dose and risks scale directly as a function of the source concentration).
Department of Energy RESRAD multipathway risk assessment model (ANL, 2001). We first calculated the external radiation dose assuming no overburden, then performed a parallel calculation for a scenario that included 3-foot of soil overburden. For both scenarios, a unit concentration (e.g., I pCi/g) was used for each radionuclide (the dose and risks scale directly as a function of the source concentration).
As summarized in Table 1, the dose reduction provided by the 3-foot of overburden is quite large, ranging from over 10,000-fold at a minimum, and for some radionuclides diminishing the external radiation dose by well over a million-fold.
As summarized in Table 1, the dose reduction provided by the 3-foot of overburden is quite large, ranging from over 10,000-fold at a minimum, and for some radionuclides diminishing the external radiation dose by well over a million-fold.
Although the AUL may not necessarily preclude installation of a well for drinking water from a regulatory perspective, as a practical matter installation of a drinking water well would be implausible with the AUL in place. Nevertheless, we examined the leaching to groundwater pathway for the radionuclides in concrete, as discussed in the next section.%2 02073 \u orkpl ans~hhra ý-9461144.doc 3 Gradient CORPORATION I YNPS Human Health Risk Assessment  
Although the AUL may not necessarily preclude installation of a well for drinking water from a regulatory perspective, as a practical matter installation of a drinking water well would be implausible with the AUL in place.                 Nevertheless, we examined the leaching to groundwater pathway for the radionuclides in concrete, as discussed in the next section.
-BUD for Concrete I 5 Radiological Risk Characterization Although the AUL will preclude direct contact with subsurface concrete debris, radionuclides can 3 have a deleterious effect on humans without being taken into or brought in contact with the body. This is because high-energy beta particles and photons from radionuclides can exert their energy directly in human tissue. Such "external radiation" exposures can result from exposure to residual radionuclides at the site. Gamma and x-rays are the most penetrating of the emitted radiation and comprise the primary contribution to the radiation dose from external exposures.
%2 02073 \u orkpl ans~hhra ý-9461144.doc                       3                             Gradient CORPORATION
Radionuclide intake is expressed in units of 3 radiation activity (i.e., picocurie or pCi) rather than mass.I 5.1 External Radiation I Cancer risk associated with external radiation exposures was calculated using the following equation, which accounts for external radiation exposure while indoors and outdoors (USEPA, 2000b):I Risk Cx(- days/yr) xED xACFx[ETo  
 
+(ET, x GSF)] xCSF, (5-1) U Rik=x365 dy/y where: I C = Average exposure point concentration (pCi/g)EF = Exposure frequency (days/yr)ED = Exposure duration (e.g., 30 years) I ACF = Area correction factor (default = 0.9; USEPA, 2000a)ETo = Exposure time fraction outdoors (default = 0.073; USEPA, 2000a)ETi = Exposure time fraction indoors (default = 0.683; USEPA, 2000a) I GSF Gamma shielding factor (default = 0.4; USEPA, 2000a)CSFext = Cancer slope factor for external radiation (risk/yr per pCi/g)Values for the radionuclide cancer slope factors are given in USEPA's Soil Screening Guidance for Radionuclides (USEPA, 2000a) as well as the RESRAD User's Manual (ANL, 2001).Note that the equation in the USEPA Technical Background Document contains a typographical error, the correct equation is found in Equation 4, page 2-22, of the USEPA User's Guide. Note further that the USEPA SSLs are written in terms of a "risk based concentration" (e.g., the SSL term is the radionuclide concentration (C) term); the risk equation here simply rearranges the USEPAequation to express it as a function of risk.I'202073 orkplan~s hhra -9461 144.doc 4 Gradient CORPORATION I
I YNPS Human Health Risk Assessment - BUD for Concrete I
YNPS Human Health Risk Assessment  
5             Radiological Risk Characterization Although the AUL will preclude direct contact with subsurface concrete debris, radionuclides can                   3 have a deleterious effect on humans without being taken into or brought in contact with the body. This is because high-energy beta particles and photons from radionuclides can exert their energy directly in human tissue. Such "external radiation" exposures can result from exposure to residual radionuclides at the site. Gamma and x-rays are the most penetrating of the emitted radiation and comprise the primary contribution to the radiation dose from external exposures. Radionuclide intake is expressed in units of                           3 radiation activity (i.e., picocurie or pCi) rather than mass.
-BUD for Concrete Adjustment of Concentration for Radioactive Decay The concentration of radionuclides in the environment declines according to radionuclide-specific decay rates. Thus, the radionuclide concentration (C) is not a constant, but rather declines as a function of time according to the following exponential equation: C(t) Co e-t (5-2)where C(t) = concentration at time "t" in years (pCi/g)C( -initial concentration at time t=O (pCi/g)ln(2) is the decay constant (per year)t12 half-life (years)The average concentration (C) over a particular time period (T) is given by integrating the declining concentration over the time period: C = f C,,e-dt 0 (5-3)-(1 -e-7Ar)CO T where Co is the exposure point concentration at the beginning (time t=O) of the exposure period. In this analysis, we adopted the standard "default" assumption of a 30-year exposure duration (i.e., T = 30 years, where T and ED are synonymous).
I 5.1           External Radiation I
Cancer risk associated with external radiation exposures was calculated using the following equation, which accounts for external radiation exposure while indoors and outdoors (USEPA, 2000b):I Risk Rik=x365Cx(-       dy/y days/yr) xED xACFx[ETo +(ET, x GSF)] xCSF,                                         (5-1) U where:
I C             =         Average exposure point concentration (pCi/g)
EF           =         Exposure frequency (days/yr)
ED ACF
                              =
                              =
Exposure duration (e.g., 30 years)
Area correction factor (default = 0.9; USEPA, 2000a)
I ETo                     Exposure time fraction outdoors (default = 0.073; USEPA, 2000a)
ETi GSF
                              =
                              =        Exposure time fraction indoors (default = 0.683; USEPA, 2000a)
Gamma shielding factor (default = 0.4; USEPA, 2000a)
I CSFext         =         Cancer slope factor for external radiation (risk/yr per pCi/g)
Values for the radionuclide cancer slope factors are given in USEPA's Soil Screening Guidance for Radionuclides (USEPA, 2000a) as well as the RESRAD User's Manual (ANL, 2001).
Note that the equation in the USEPA Technical Background Document contains a typographical error, the correct equation is found in Equation 4, page 2-22, of the USEPA User's Guide. Note further that the USEPA SSLs are written in terms of a "risk based concentration" (e.g., the SSL term is the radionuclide concentration (C) term); the risk equation here simply rearranges the USEPAequation to express it as a function of risk.
4                                    Gradient CORPORATION I
I
'202073 ,* orkplan~shhra -9461 144.doc
 
YNPS Human Health Risk Assessment - BUD for Concrete Adjustment of Concentration for Radioactive Decay The concentration of radionuclides in the environment declines according to radionuclide-specific decay rates. Thus, the radionuclide concentration (C) is not a constant, but rather declines as a function of time according to the following exponential equation:
C(t)             Co e-t                                                             (5-2) where C(t)         =       concentration at time "t" in years (pCi/g)
C(             -     initial concentration at time t=O (pCi/g) ln(2) is the decay constant (per year) t12                   half-life (years)
The average concentration (C) over a particular time period (T) is given by integrating the declining concentration over the time period:
C       =           f C,,e-dt 0                                                               (5-3)
                                                      -e-7Ar)
                                          -(1 CO       T where Co is the exposure point concentration at the beginning (time t=O) of the exposure period. In this analysis, we adopted the standard "default" assumption of a 30-year exposure duration (i.e., T = 30 years, where T and ED are synonymous).
For radionuclides with short half-lives (e.g., shorter than the typical exposure duration of interest), the time-averaged concentration can be appreciably less than the initial concentration.
For radionuclides with short half-lives (e.g., shorter than the typical exposure duration of interest), the time-averaged concentration can be appreciably less than the initial concentration.
Conversely, for long-lived radionuclides, the adjustment for radioactive decay is insignificant.
Conversely, for long-lived radionuclides, the adjustment for radioactive decay is insignificant.
A summary of the external radiation cancer risks for the BUD is provided in Table 2. The risks calculated for the 3-foot overburden are given by calculating the risks using Equation 5-1 with the average concentration given by Equation 5-3 as though no overburden existed (see Table 3), and then Q02 073 -orkpiansbhhra v 9 461144.do 5 Gradient CORPORATION YNPS Human Health Risk Assessment  
A summary of the external radiation cancer risks for the BUD is provided in Table 2. The risks calculated for the 3-foot overburden are given by calculating the risks using Equation 5-1 with the average concentration given by Equation 5-3 as though no overburden existed (see Table 3), and then 9
-BUD for Concrete adjusting these risks by accounting for dose reduction provided by the 3-foot overburden.
Q02 073 -orkpiansbhhra v   461144.do                               5                             Gradient CORPORATION
The risk assessment results meet the dual BUD risk-based criteria: 0 All individual radionuclide risks fall below 0.5 x 10-6 0 The total risk of I x 10-8 (rounded from 9.8 x l0-9) is well below the BUD risk guideline of 0.5 x 10-.This evaluation demonstrates that the Category 3 BUD for concrete meets the risk management guidelines in the Draft BUD Guidance document (MADEP, 2004).Relationship Between Radiation Dose (mreml/r) and Cancer Risk As noted in Section 2, the DCLGs in the LTP are established on the basis of limiting the possible radiation dose to 25 mrem/yr. Cancer risk can be related to radiation dose through the following equation: (1 -e-T) CSFex Riskex, = Doseext x ED x x( eSF_)A 2 DCFE, (5-4a)I I I I I 1 I I I I I I I I I I I I I For radionuclides with long half-lives, this reduces to: CSFex, Risk ex, = Doseet x ED x ( otCs, (5-4b)where Doseext CSFex, DCFex, External radiation dose (mrem/yr)External radiation cancer slope factor (risk per pCi/g)External radiation dose conversion factor (mrem/yr per pCi/g)The relationship between "risk" and "dose" is provided.here for completeness.
 
For the BUD, the dose calculations are not needed to ensure compliance with the BUD risk management guidelines.
YNPS Human Health Risk Assessment - BUD for Concrete I
However, as shown in Table 2, the dose for due to subsurface concrete materials would be approximately 10,000-fold below the Massachusetts Department of Public Health dose guideline of 10 mrem/year.
I adjusting these risks by accounting for dose reduction provided by the 3-foot overburden.                       The risk assessment results meet the dual BUD risk-based criteria:                                                                 I 0
\202073\workpIl\hhra\-9461 144.do 6 Gradient CORPORATION YNPS Human Health Risk Assessment  
0 All individual radionuclide risks fall below 0.5 x 10-6 The total risk of I x 10- 8 (rounded from 9.8     x l0-9) is well below the BUD risk guideline I
-BUD for Concrete 5.2 Leaching to Groundwater Using methods consistent with the MCP and MADEP Guidelines (MADEP 1994, 1995), and also defined in U.S. EPA's (2000a,b)
of 0.5 x 10-.
Soil Screening Guide for Radionuclides, we examined possible leaching to groundwater for the radionuclides in concrete.
I This evaluation demonstrates that the Category 3 BUD for concrete meets the risk management guidelines in the Draft BUD Guidance document (MADEP, 2004).                                                                         1 Relationship Between Radiation Dose (mreml/r) and Cancer Risk I
For this evaluation we performed the following stepwise screening evaluation:
As noted in Section 2, the DCLGs in the LTP are established on the basis of limiting the possible radiation dose to 25 mrem/yr.               Cancer risk can be related to radiation dose through the following I
: 1. Calculate an equilibrium concentration of radionuclide in pore water using standard equilibrium partitioning equations:
equation:
: 2. Applied a "dilution attenuation factor" (DAF) to the pore water values as a screening estimate of the concentration at a hypothetical well.3. Compared the resulting concentrations in "groundwater" to drinking water standards for radionuclides.
I (1 -e-T) x( CSFex   eSF_)
The equations used for step I and 2 are outlined below: Step 1: CW Csx +Ko Jx103 (g/kg) (5-5)Ob+ Pb d )Step 2: CC W (5-6)-DAF where CW = concentration in pore water (pCi/L)C, = concentration in soil (pCi/g)Cgw -concentration in groundwater (pCi/L)Kd = soil-water partition coefficient (L/kg)porosity or water content (cm 3/cm 3)Pb = soil bulk density (g/cm 3)DAF = dilution attenuation factor (unitless)
Riskex, = Doseext x ED x         A 2         DCFE,                                       (5-4a)
\2 02 07 3 %wo rkpi ansxhhma-94 61144. do 7 Gradient CORPORATION 1 YNPS Human Health Risk Assessment  
I For radionuclides with long half-lives, this reduces to:
-BUD for Concrete I The radionuclide soil-water partition coefficients, which are based on values published in the RESRAD User's Manual, are also summarized in the LTP (Appendix 6N). j There are no DAF values for radionuclides in the MADEP (1994, 1995) guidance.
I Risk ex, = Doseet x ED x (
However, the MADEP has derived DAF values for a range of organic compounds with varying soil-water K 4 parameters, as summarized below: Koc K, Parameter (L/kg) (L/kg) DAF benzene 83 0.083 56.5 ethylbenzene 575 0.575 121.1 toluene 270 0.27 80.6 o-xylene 302 0.302 83.3 TCE 124 0.124 76.3 PCE 468 0.468 86.2 1,1,1-TCA 157 0.157 169.2 Paphthalene 1288 1.288 222.2 Notes: Kd = K,, x f, (foc = 0.001, i.e-, 01% organic carbon)Source: MADEP (1994)/1 Based on these modeled DAF values, MADEP (1994) developed a regression equation for DAF values for non-modeled compounds as a function of chemical partition coefficient.
CSFex, )**--                                              (5-4b)
As summarized in Table 4, the soil-water partition coefficients for radionuclides are greater than (e.g., less soluble in water) than all of the compounds modeled by MADEP. Rather than extrapolate beyond the range of the MADEP modeled results, we adopted a DAF value of 222 (e.g., the value for naphthalene with a K1 value of 1.3), as this was the compound with the largest K1 value modeled. This DAF value is likely to underestimate the dilution for the radionuclides, with typical I( values ranging from approximately 10 L/kg to over 1,000 L/kg (see Table 4).2 The calculated radionuclide concentrations in groundwater (Cg.) calculated in this manner, were compared to the drinking water standards, as summarized in Table 4. Note that for this calculation, the average concentration in concrete debris over a 30-year period, taking into account radioactive decay (Equation 5-3), was used for the value of C, in Equation 5-5. As the results in Table 4 indicate, the placement of subsurface concrete debris under the BUD with radionuclide concentrations equal to the DCGLs would not lead to groundwater contamination above drinking water standards.
I otCs, I
2 Tritium (Hydrogen-3 in Table 4) is the notable exception, as it does not "partition" to soil.Q02073\workplans~hhra-9461 144.doc 8 Gradient CORPORATION I I I I I I I I I I I I I I YNPS Human Health Risk Assessment  
where Doseext               External radiation dose (mrem/yr)
-BUD for Concrete References Argonne National Laboratory (ANL). 2001. User's Manual for RESRAD Version 6. Environmental Prepared for U.S. Department of Energy (USDOE). July 2001.Massachusetts Department of Environmental Protection (MADEP). 2004. "Draft Interim Guidance Document for Beneficial Use Determination Regulations, 310CMRI9.060." Bureau of Waste Prevention, March 18, 2004.Massachusetts Department of Environmental Protection (MADEP). 1995. "Guidance for Disposal Site Risk Characterization  
I CSFex, DCFex, External radiation cancer slope factor (risk per pCi/g)
-In Support of the Massachusetts Contingency Plan (Interim final policy)." Bureau of Waste Site Cleanup and Office of Research and Standards (Boston, MA). BWSC/ORS-95-141.
External radiation dose conversion factor (mrem/yr per pCi/g)                         I The relationship between "risk" and "dose" is provided.here for completeness.                   For the BUD, the dose calculations are not needed to ensure compliance with the BUD risk management guidelines. However, I
July.Massachusetts Department of Environmental Protection (MADEP). 1994. "Background documentation for the development of the MCP numerical standards." Bureau of Waste Site Cleanup and Office of Research and Standards (Boston, MA), April 1994.U.S. Environmental Protection Agency (USEPA). 2000a. Soil Screening Guidance for Radionuclides:
as shown in Table 2, the dose for due to subsurface concrete materials would be approximately 10,000-fold below the Massachusetts Department of Public Health dose guideline of 10 mrem/year.                                 I I
Technical Background Document.
\202073\workpIl\hhra\-9461 144.do                               6                                   Gradient CORPORATION I
EPA/540-R-00-006.
 
Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response.
YNPS Human Health Risk Assessment - BUD for Concrete 5.2           Leaching to Groundwater Using methods consistent with the MCP and MADEP Guidelines (MADEP 1994, 1995), and also defined in U.S. EPA's (2000a,b) Soil Screening Guide for Radionuclides, we examined possible leaching to groundwater for the radionuclides in concrete.                       For this evaluation we performed the following stepwise screening evaluation:
Washington, DC.U.S. Environmental Protection Agency (USEPA). 2000b. Soil Screening Guidance for Radionuclides:
: 1.             Calculate an equilibrium concentration of radionuclide in pore water using standard equilibrium partitioning equations:
User's Guide. EPA/540-R-00-007.
: 2.             Applied a "dilution attenuation factor" (DAF) to the pore water values as a screening estimate of the concentration at a hypothetical well.
Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response.
: 3.             Compared the resulting concentrations in "groundwater" to drinking water standards for radionuclides.
Washington, DC.\202073\%
The equations used for step I and 2 are outlined below:
orkplansfhhraý~9461144,doc 9 Gradient CORPORATION YNPS Human Health Risk Assessment  
Step 1:
-BUD for Concrete Tables i I U I I 2O2O73\~Qrkpns~hh~\-946I I 44.doc Gradient CORPORATION Q202073\.
CW                       Csx     +Ko Ob+Pb Jx103 (g/kg)                                             (5-5) d)
orkp1ans hhra "-9461144.do-Gradient CORPORATION Table I Radiation Dose Reduction Due to 3-Foot Soil Overburden Radiation Dose at Year I Radionuclide External Radiation Dose (mrem/yr)
Step 2:
Dose No Overburden 3-Foot of Soil Reduction Cobalt (Co-60) 7.5E+00 1.6E-04 4.6E+04 Cesium (Cs- 137) 1.8E+'00 4.1E-06 4.5E+05 Silver (Ag-108m) 1.7E+00 2.9E-06 5.9E+05 Tritium (H-3) n/a n/a n/a Carbon (C- 14) 3.1E-08 5.4E-24 5.8E+15 Iron (Fe-55) n/a n/a n/a Nickel (Ni-63) n/a n/a n/a Strotium (Sr-90) 1.3E-02 9.4E- 10 1.4E+07 Niobium (Nb-94) 1.7E+00 6.7E-06 2.6E+05 Technetium (Tc-99) 2.3E-05 5.4E-18 4.3E+12 Antimony (Sb- 125) 3.1E-01 3.OE-07 L.OE+06 Cesium (Cs-134) 3.2E+00 9.4E-06 3.4E+05 Europium (Eu-152) 3.7E+00 3.6E-05 1.0E+05 Europium (Eu-154) 3.9E+00 4.9E-05 7.9E+04 Europium (Eu- 155) 8.5E-02 3.3E- 13 2.6E+l I Plutonium (Pu-238) 8.9E-05 5.9E- 17 1.5E+l 2 Plutonium (Pu-239) 1.7E-04 1.3E-12 1.3E+08 Plutonium (Pu-241) I.OE-05 3.9E- 15 2.6E+09 Americium (Am-241) 2.5E-02 5.3E-21 4.8E+18 Curium (Cm-243) 3.2E-01 2.9E-09 1. 1 E+08 Notes: All doses calculated using RESRAD 6.22 for a unit concentration (I pCi/g) in soil and default parameters from RESRAD.Doses and dose reduction are for external radiation pathways (all other pathways turned off).gamma shielding factor= 0.7 fraction of time outdoors = 0.5 fraction of time indoors = 0.25 n/a = not applicable, not a cancer risk for external radiation (USEPA, 2000).\21)2U 13\rep0nSgmthcntýbud\
CC                           W                                                                       (5-6)
BUD RiATWmýIsNBUD T.Wl Gradient CORPORATION Table 2 Summary of External Radiation Risk Calculations for BUD Radionuclide Concrete Debris External Radiation Cancer Risk Dose/Risk Reduction External Risk External Dose DCGL Without 3-Foot Overburden 3-Foot Overburden With 3-Foot Overburden With 3-Foot Overburden
                                      - DAF where CW             =         concentration in pore water (pCi/L)
[11 [2] [3] [41 [5](pCi/g) (pCi/g) (at Year i) mrern/yr)Co-60 4.3 1.2E-04 4.6E+04 2.6E-09 4.5E-04 Cs-137 + D 6.7 1.1E-04 4.5E+05 2.5E-10 1.51-05 Silver -108rn + D 7.0 4.2E-04 5.9E+05 7.0E-l0 3,4E-05 Hydrogen-3 280.0 n/a n/a n/a n/a Carbon- 14 7.2 5.OE- 10 5.8E+ 15 8.6E-26 4.9E-21 hron-55 140.0 n/a n/a n/a n/a Nickel-63 100.0 n/a tn/a n/a n/a Strotiurn-90+D 0.8 9.5E-08 l.4E+07 6.7E-1 5 3.9E-10 Njobium-94 7.0 4.6E-04 2,6E+05 1.8E-09 7.8E-05 Technetiurm-99m 61.0 4,5E-08 4.3E+ 12 l.OE-20 5 3E-16 Antimnony-125+D 31.0 7.2E-05 l.OE+06 7.OE- II 2.2E-05 Cesium- 134m 4.7 2.9E-05 3,4E+05 8.4E- 11 3 9E-05 Europium-152 9.5 2.3E-04 L.OE+05 2,2E-09 1.9E-04 Europiurn-154 9.1 1,7E-04 7.9E+04 2,l E-09 2,6 E-04 Europium-155 380.0 L.OE-04 2.6E+I I 3.9E- 16 8.0E- I I Plutonium-238 9.5 5.5E-09 1.5 E+ 12 3.6E-21 2.8E.16 Plutonium-239 8.8 1.6E-08 1.3E+08 1.2E- 16 6. I E- 12 Plutoniumu-241 140.0 2.7E-09 2.6E+09 L.OE-18 3.OE-13 Americium-241 4.1 9.9E-07 4.8E+ 18 2. 1 E-25 1. I E-20 Curium-243 4.7 1 .2E-05 1.1 E+08 1.1 E- 13 7.4AE-09 Totals 9.8E-09 1.! E-03 Notes: Regulatory Guideline I 5.OE-06 10[I] Dose concentration guideline levels for concrete debris in LTP (radionuclide concentration in concrete will be less than or equal to these values).[2] External radiation risk for no overburden calculated using EPA (2000) default parameters and cancer slope factors,[3] Dose reduction for 3-foot soil cover calculated using RESRAD 6.22 for a unit concentration (I p~i/g) in soil and default parameters from RESRAD.[4] Cancer risk for BUD based on 3-foot overburden (Column [2] divided by column [3].)[5] External radiation dose at year-I Cancer risk for BUD based on 3-foot overburden (Dose with no cover from Table 3, divided by column [3])n/a -radionuclide not a cancer risk for external radiation (EPA, 2000).U020Rr73I\
C,             =         concentration in soil (pCi/g)
5lJ, :vbk Page I of I Gradient CORPOAMTION M M M --M --M M -M---- M -I Table 3 External Radiation Risk and External Dose Calculations  
Cgw             -         concentration in groundwater (pCi/L)
-- No Overburden Conditions Radionuclides Concentration Half-Life Ave. Cone. Slope Factor DCF Cancer Risk Dose -1 yr Evaluated (C,,) fll (C-) (CSF) ( C. x IF x CSF) (C x IF x VCF)(pCi/g) (yrs) (pCi/g) (Risk/yr-pCi/g) (m rem/yr -. pCi/g) (mrem/yr)Co-60 4.3 5.3 1.07 1.24E-05 1.62E+0I I. 19E-04 2.1E+O I Cs-137 + D 6.7 30.0 4.83 2.55E-06 3.41E+00 1.IOE-04 6.8E+00 Silver -I108m + D 7.0 127.0 6,46 7.19E-06 9.65E+00 4.2E-04 2.0E+01 Hydrogen-3 280.0 12.0 133.02 Carbon- 14 7.2 5730.0 7.19 7,83 E- 12 1.34E-05 5.OE- I0 2.9E-05 Iron-55 140.0 3.0 20.18 Nickel-63 100.0 100.0 90.29 Strotium-90+D 0.8 29.0 0.54 1.96E-08 2.46E-02 9.5E-08 5.6E-03 Niobium-94 7.0 20000.0 7.00 7.29E-06 9.68E+00 4.6E-04 2.OE+0I Technetium-99m 61.0 210000.0 61.00 8.14E- I I 1.26E-04 4,5E-08 2.3 E-03 Antimony-125+D 31.0 3.0 4.47 1.81 E-06 2.45E+00 7.2E-05 2.3E+0 I Cesium-134m 4.7 2.0 0.45 7.10E-06 9.47E+00 2.9E-05 1,3E+O I Europium-152 9.5 13.0 4.74 5.30E-06 7,01E+00 2.3E-04 2.0E+0 1 Europium-154 9.1 8.0 3.24 .5.83E-06 7.68E+00 1.7E-04 2, 1 E+01 Europium-155 380.0 5.0 89.94 1.24E-07 1.82E-01 1,0E-04 2. 1 E+01 Plutonium-238 9.5 88.0 8.46 7.22E- I 1 1.51E-04 5.5E-09 4.3E-04 Plutonium-239 8.8 24000.0 8.80 2.00E- 10 2.95E.04 1.6E-08 7.8E-04 Plutoniumu-241 140.0 14.0 72,91 4.11E-12 .1.89E-05 2.7E-09 7.9E.04 Americium-241 4.1 432.0 4.00 2.76E-08 4,37E-02 9.9E-07 5.4E-02 Curium-243 4.7 28.0 3.32 4.19E-07 5.83E-01 1.2E-05 8,2E-01 I Total: 2.3E-04 2.8E+01 IF,".k (EF/365) x ED x ACF x (ET,,, +(ETj,, x GSF)) 8.96E+00 I F&_ (EF/365) x ACF x (ET +(ETi x GSF)) 2.99E-01 where: EF ED ACF Etout Etin GSF Exposure Frequency (d/yr)Adult + Child Exposure Duration(yr)
Kd             =         soil-water partition coefficient (L/kg) porosity or water content (cm 3/cm 3)
Area Correction Factor Exposure time outside (fraction)
Pb             =         soil bulk density (g/cm3 )
Exposure time inside (fraction) gamma shielding factor 350 30 0.9 0.073 0.683 0.40 (EPA, 2000)(EPA, 2000)0.5 acre (EPA, 2000)(EPA, 2000)(EPA, 2000)(EPA, 2000)ACF x (ETout +(ETin x GSF))Exposure time at site (hr/day)Away from site (hr/day)3.12E-01 18.1 5.9 Rik RadXIS Ml11) i OhlG I Page 1 of [Gradient CORPORATION Table 4 Screening Comparison of Radionuclide Leaching to Groundwater Compared to Drinking Water Guidelines Radionuclide Initial Conc. Average Cone. Partition Coeff. Concentration Concent'ration Drinking Water Half-life (DCGL) 30-years Kd in Pore Water DAF = 100 Guidelines
DAF           =         dilution attenuation factor (unitless)
[I) [2] [3] [4] [4] [5](yr) (pCi/g) (pCi/g) (L/kg) (pCi/L) (nCi/L) .piL Co-60 5.27 ... ..43 1. 282.0 3.8 0.02 100 Cs-137 -D 30 6.7 4.8 137.0 35.2 0.16 200 Silver -1.08m + D 127 7.0 .. 6.5 6500.0 .._... 1.0 0.00 5.8 (RBL)
\2 0207 3%workpi ansxhhma-94 61144. do                                 7                             Gradient CORPORATION
..n... 3 12 _ 2.80 13. 3 .3..0 ...0.00 731,598.7_
 
3, 2. 95 20,000 Carbon-14 5,730 7.2 7.2 70.70 101.4 0.46 2,000 lronn-55 3 140 20.2 12.5 1,591.1 7.17 2,000 Nickel-63 100 100 90.3 35.5 2,530.4 11.4 50 S~trotium-9-0+D  
1 YNPS Human Health Risk Assessment - BUD for Concrete I
--29 0.76--- -0.5 10.50_ 50..8. 0.23. 8 Niobium-94 2.OOE+04 7.0 7.0 316.0 22.1 0.10 6.1 (RBL)Technetitim-99m  
The radionuclide soil-water partition coefficients, which are based on values published in the RESRAD User's Manual, are also summarized in the LTP (Appendix 6N).                                                           j There are no DAF values for radionuclides in the MADEP (1994, 1995) guidance. However, the MADEP has derived DAF values for a range of organic compounds with varying soil-water K4 parameters, as summarized below:
: 2. 1013+05 61 61.0 _ 14 4,458.3 20,08 900 Antimony-125+D 3 31 4.5 1,550 2.9 0.01 300 Cesium-134m 2 4.7 0.5 137.0 3.3 0.01 80 Europium-.152 13 9.5 4.7 1,000.0 4.7 0.02 200 Europiurn-154 8 ..9.1 3.2 .1000.0 3.2 0.01 60)Europium-155 5 380 89.9 1,000 89.9 0.41 600 Plutoniumr-238 88 9.5 8.5 888.0 la .. 9.5 0.04 15 Plutonium-239 2.40E+04 8.8 8,8 888,0 [al 9.9 0.04 IS Plutoniumu-241 14 140 72.9 888.0 [a] 82.1 0._37 27 (RBL)Americium-241 432 4 4.0 447 [a] 9.0 0.04 15 Curium-243 28 4,7 3.3 400.0 [a] 8,3 0.04 15 Notes:[I] Values reported in License Termination Plan.[2] Calculated average concentration in subsurface concrete over 30 year time period based on radioactive decay (see text).[3] Median Kd values reported in LTP (from RESRAD), Values noted [a] are 25th percentiles from LTP Appendix 6N.[4] Equilibrium concentration between concrete/soil and groundwater assuming no dilution (see text).[5] Drinking water guidelines are MCLs from USEPA (2000) Soil Screening Guidance for Radionuclides.
Koc           K, Parameter benzene (L/kg) 83 (L/kg) 0.083 DAF 56.5                             I ethylbenzene toluene o-xylene 575 270 302 0.575 0.27 0.302 121.1 80.6 83.3 I
RBL = Risk Based Limit (no MCL)Parameters for [21, [31 and [41: Averaging Period (yrs): bulk density (g/cc): porosity (cc/cc): -Dilution Attenuation Factor (DAF)1.54 0.28 222\2020731,W~on.
TCE                               124       0.124       76.3 PCE 1,1,1-TCA 468 157 0.468 0.157 86.2 169.2 I
g-fi-NHIRAM 055,5 RiAk Rad.5[.SM O(II W RIO Page I of I Gradient CORPORATION M M M M -M M -= M- -- ---- = 1}}
Paphthalene                     1288       1.288       222.2 Notes:
Kd = K,, x f, (foc = 0.001, i.e-, 01% organic carbon)
Source: MADEP (1994)
I
                                                                                                                /1 Based on these modeled DAF values, MADEP (1994) developed a regression equation for DAF values                                 I for non-modeled compounds as a function of chemical partition coefficient.
As summarized in Table 4, the soil-water partition coefficients for radionuclides are greater than I
(e.g., less soluble in water) than all of the compounds modeled by MADEP.
beyond the range of the MADEP modeled results, we adopted a DAF value of 222 (e.g., the value for Rather than extrapolate I
naphthalene with a K1 value of 1.3), as this was the compound with the largest K1 value modeled. This DAF value is likely to underestimate the dilution for the radionuclides, with typical I( values ranging                       I from approximately 10 L/kg to over 1,000 L/kg (see Table 4).2 I
The calculated radionuclide concentrations in groundwater (Cg.) calculated in this manner, were compared to the drinking water standards, as summarized in Table 4. Note that for this calculation, the average concentration in concrete debris over a 30-year period, taking into account radioactive decay I
(Equation 5-3), was used for the value of C, in Equation 5-5.                         As the results in Table 4 indicate, the placement of subsurface concrete debris under the BUD with radionuclide concentrations equal to the I
DCGLs would not lead to groundwater contamination above drinking water standards.
I 2 Tritium (Hydrogen-3 in Table 4) is the notable exception, as it does not "partition" to soil.
I Q02073\workplans~hhra-9461 144.doc                                   8                                   Gradient CORPORATION I
 
YNPS Human Health Risk Assessment - BUD for Concrete References Argonne National Laboratory (ANL). 2001. User's Manual for RESRAD Version 6. Environmental Prepared for U.S. Department of Energy (USDOE). July 2001.
Massachusetts Department of Environmental Protection (MADEP). 2004. "Draft Interim Guidance Document for Beneficial Use Determination Regulations, 310CMRI9.060." Bureau of Waste Prevention, March 18, 2004.
Massachusetts Department of Environmental Protection (MADEP). 1995. "Guidance for Disposal Site Risk Characterization - In Support of the Massachusetts Contingency Plan (Interim final policy)." Bureau of Waste Site Cleanup and Office of Research and Standards (Boston, MA). BWSC/ORS-95-141. July.
Massachusetts Department of Environmental Protection (MADEP). 1994. "Background documentation for the development of the MCP numerical standards." Bureau of Waste Site Cleanup and Office of Research and Standards (Boston, MA), April 1994.
U.S. Environmental Protection Agency (USEPA). 2000a. Soil Screening Guidance for Radionuclides:
Technical Background Document. EPA/540-R-00-006. Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response. Washington, DC.
U.S. Environmental Protection Agency (USEPA). 2000b. Soil Screening Guidance for Radionuclides:
User's Guide. EPA/540-R-00-007. Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response. Washington, DC.
\202073\%orkplansfhhraý~9461144,doc                 9                               Gradient CORPORATION
 
YNPS Human Health Risk Assessment - BUD for Concrete Tables                                                                                     i I
U I
I I 44.doc Gradient  CORPORATION 2O2O73\~Qrkpns~hh~\-946I Q202073\. orkp1ans hhra "-9461144.do-                                 Gradient CORPORATION
 
Table I Radiation Dose Reduction Due to 3-Foot Soil Overburden Radiation Dose at Year I Radionuclide                                   External Radiation Dose (mrem/yr)                             Dose No Overburden                     3-Foot of Soil                 Reduction Cobalt (Co-60)                                 7.5E+00                         1.6E-04                       4.6E+04 Cesium (Cs- 137)                               1.8E+'00                       4.1E-06                       4.5E+05 Silver (Ag-108m)                               1.7E+00                         2.9E-06                       5.9E+05 Tritium (H-3)                                     n/a                             n/a                           n/a Carbon (C- 14)                                 3.1E-08                         5.4E-24                       5.8E+15 Iron (Fe-55)                                     n/a                             n/a                           n/a Nickel (Ni-63)                                   n/a                             n/a                           n/a Strotium (Sr-90)                               1.3E-02                         9.4E- 10                       1.4E+07 Niobium (Nb-94)                               1.7E+00                         6.7E-06                       2.6E+05 Technetium (Tc-99)                             2.3E-05                         5.4E-18                       4.3E+12 Antimony (Sb- 125)                             3.1E-01                         3.OE-07                       L.OE+06 Cesium (Cs-134)                               3.2E+00                         9.4E-06                       3.4E+05 Europium (Eu-152)                             3.7E+00                         3.6E-05                       1.0E+05 Europium (Eu-154)                             3.9E+00                       4.9E-05                       7.9E+04 Europium (Eu- 155)                             8.5E-02                         3.3E- 13                     2.6E+l I Plutonium (Pu-238)                             8.9E-05                         5.9E- 17                       1.5E+l 2 Plutonium (Pu-239)                             1.7E-04                         1.3E-12                       1.3E+08 Plutonium (Pu-241)                             I.OE-05                       3.9E- 15                     2.6E+09 Americium (Am-241)                             2.5E-02                         5.3E-21                       4.8E+18 Curium (Cm-243)                               3.2E-01                         2.9E-09                       1.1E+08 Notes:
All doses calculated using RESRAD 6.22 for a unit concentration (I pCi/g) in soil and default parameters from RESRAD.
Doses and dose reduction are for external radiation pathways (all other pathways turned off).
gamma shielding factor= 0.7 fraction of time outdoors = 0.5 fraction of time indoors = 0.25 n/a = not applicable, not a cancer risk for external radiation (USEPA, 2000).
\21)2U13\rep0nSgmthcntýbud\
BUD RiATWmýIsNBUD T.Wl                                                                                               Gradient CORPORATION
 
Table 2 Summary of External Radiation Risk Calculations for BUD Radionuclide                   Concrete Debris           External Radiation Cancer Risk           Dose/Risk Reduction                     External Risk       External Dose DCGL                   Without 3-Foot Overburden               3-Foot Overburden               With 3-Foot Overburden With 3-Foot Overburden
[11                               [2]                                 [3]                                 [41               [5]
(pCi/g)                             (pCi/g)                         (at Year i)                                               mrern/yr)
Co-60                                   4.3                             1.2E-04                           4.6E+04                             2.6E-09                       4.5E-04 Cs-137 + D                             6.7                             1.1E-04                           4.5E+05                             2.5E-10                       1.51-05 Silver - 108rn + D                     7.0                           4.2E-04                             5.9E+05                             7.0E-l0                       3,4E-05 Hydrogen-3                           280.0                               n/a                                 n/a                                 n/a               n/a Carbon- 14                             7.2                             5.OE- 10                           5.8E+ 15                           8.6E-26                       4.9E-21 hron-55                               140.0                               n/a                                 n/a                                 n/a               n/a Nickel-63                             100.0                               n/a                                 tn/a                                 n/a               n/a Strotiurn-90+D                         0.8                             9.5E-08                             l.4E+07                             6.7E-1 5                       3.9E-10 Njobium-94                             7.0                           4.6E-04                             2,6E+05                             1.8E-09                       7.8E-05 Technetiurm-99m                       61.0                             4,5E-08                             4.3E+ 12                           l.OE-20                       5 3E-16 Antimnony- 125+D                       31.0                             7.2E-05                             l.OE+06                             7.OE- II                       2.2E-05 Cesium- 134m                           4.7                             2.9E-05                             3,4E+05                             8.4E- 11                       3 9E-05 Europium-152                           9.5                             2.3E-04                             L.OE+05                             2,2E-09                         1.9E-04 Europiurn- 154                         9.1                             1,7E-04                           7.9E+04                             2,l E-09                       2,6 E-04 Europium- 155                         380.0                             L.OE-04                           2.6E+I I                           3.9E- 16                       8.0E- I I Plutonium-238                           9.5                             5.5E-09                             1.5 E+ 12                           3.6E-21                       2.8E.16 Plutonium-239                           8.8                             1.6E-08                           1.3E+08                             1.2E- 16                     6.I E-12 Plutoniumu-241                       140.0                             2.7E-09                             2.6E+09                             L.OE-18                       3.OE-13 Americium-241                           4.1                             9.9E-07                             4.8E+ 18                           2. 1E-25                       1.I E-20 Curium-243                             4.7             1                 .2E-05                           1.1E+08                             1.1 E- 13                     7.4AE-09 Totals                             9.8E-09             1.! E-03 Notes:                                                                                             Regulatory Guideline         I             5.OE-06                 10
[I] Dose concentration guideline levels for concrete debris in LTP (radionuclide concentration in concrete will be less than or equal to these values).
[2] External radiation risk for no overburden calculated using EPA (2000) default parameters and cancer slope factors,
[3] Dose reduction for 3-foot soil cover calculated using RESRAD 6.22 for a unit concentration (I p~i/g) in soil and default parameters from RESRAD.
[4] Cancer risk for BUD based on 3-foot overburden (Column [2] divided by column [3].)
[5] External radiation dose at year-I Cancer risk for BUD based on 3-foot overburden (Dose with no cover from Table 3, divided by column [3])
n/a - radionuclide not a cancer risk for external radiation (EPA, 2000).
U020Rr73I\ 5lJ, :vbk                                                                                           Page Iof I                                                                             Gradient CORPOAMTION M M             M                           -             -M                           -               -M M                            M---- -M                                                                               -I
 
Table 3 External Radiation Risk and External Dose Calculations -- No Overburden Conditions Radionuclides     Concentration     Half-Life Ave. Cone.               Slope Factor                     DCF                 Cancer Risk     Dose - 1 yr Evaluated               (C,,)           fll     (C-)                       (CSF)                                           (C. x IF x CSF) (C x IF x VCF)
(pCi/g)         (yrs)     (pCi/g)               (Risk/yr- pCi/g)           (m rem/yr -. pCi/g)                           (mrem/yr)
Co-60                   4.3             5.3       1.07                     1.24E-05                   1.62E+0I                 I. 19E-04       2.1E+O I Cs-137 + D               6.7           30.0       4.83                     2.55E-06                     3.41E+00                 1.IOE-04       6.8E+00 Silver - I108m + D       7.0           127.0       6,46                     7.19E-06                     9.65E+00                 4.2E-04         2.0E+01 Hydrogen-3             280.0             12.0     133.02 Carbon- 14               7.2         5730.0       7.19                     7,83 E- 12                   1.34E-05                 5.OE- I0       2.9E-05 Iron-55               140.0             3.0     20.18 Nickel-63             100.0           100.0     90.29 Strotium-90+D           0.8           29.0       0.54                     1.96E-08                   2.46E-02                 9.5E-08         5.6E-03 Niobium-94               7.0         20000.0       7.00                     7.29E-06                     9.68E+00                 4.6E-04         2.OE+0I Technetium-99m         61.0         210000.0     61.00                     8.14E- I I                   1.26E-04                 4,5E-08         2.3 E-03 Antimony- 125+D         31.0             3.0       4.47                     1.81 E-06                   2.45E+00                 7.2E-05         2.3E+0 I Cesium-134m             4.7             2.0       0.45                     7.10E-06                     9.47E+00                 2.9E-05         1,3E+O I Europium- 152           9.5             13.0     4.74                     5.30E-06                     7,01E+00                 2.3E-04         2.0E+0 1 Europium- 154           9.1             8.0       3.24 .                   5.83E-06                     7.68E+00                   1.7E-04       2, 1E+01 Europium- 155         380.0             5.0     89.94                     1.24E-07                   1.82E-01                   1,0E-04       2. 1E+01 Plutonium-238           9.5           88.0       8.46                     7.22E- I 1                   1.51E-04                 5.5E-09         4.3E-04 Plutonium-239           8.8         24000.0       8.80                     2.00E- 10                   2.95E.04                   1.6E-08       7.8E-04 Plutoniumu-241         140.0             14.0     72,91                     4.11E-12                   . 1.89E-05                 2.7E-09         7.9E.04 Americium-241           4.1           432.0       4.00                     2.76E-08                     4,37E-02                 9.9E-07         5.4E-02 Curium-243               4.7           28.0       3.32                     4.19E-07                     5.83E-01                   1.2E-05       8,2E-01 I               Total:         2.3E-04         2.8E+01 IF,".k       (EF/365) x ED x ACF x (ET,,, +(ETj,, x GSF))       8.96E+00 IF&_               (EF/365) x ACF x (ET +(ETi x GSF))             2.99E-01 where:
EF                   Exposure Frequency (d/yr)                     350          (EPA, 2000)
ED                  Adult + Child Exposure Duration(yr)            30          (EPA, 2000)
ACF                  Area Correction Factor                         0.9          0.5 acre (EPA, 2000)
Etout                  Exposure time outside (fraction)            0.073          (EPA, 2000)
Etin                  Exposure time inside (fraction)             0.683         (EPA, 2000)
GSF                  gamma shielding factor                        0.40          (EPA, 2000)
ACF x (ETout +(ETin x GSF))               3.12E-01 Exposure time at site (hr/day)               18.1 Away from site (hr/day)                       5.9 Rik RadXIS Ml11)   I                                                                         Page 1 of [                                                                       i Gradient OhlG CORPORATION
 
Table 4 Screening Comparison of Radionuclide Leaching to Groundwater Compared to Drinking Water Guidelines Radionuclide                                   Initial Conc.       Average Cone.         Partition Coeff.         Concentration       Concent'ration   Drinking Water Half-life           (DCGL)               30-years                   Kd               in Pore Water         DAF = 100         Guidelines
[I)                   [2]                     [3]                     [4]                   [4]             [5]
(yr)             (pCi/g)               (pCi/g)                 (L/kg)                   (pCi/L)             (nCi/L)         . piL Co-60                             5.27 . .. .     . 43                     1.                   282.0                             3.8               0.02           100 Cs-137 - D                         30                 6.7                 4.8                   137.0                             35.2               0.16           200 Silver - 1.08m + D               127                 7.0 ..               6.5                 6500.0           ..         _... 1.0             0.00             5.8 (RBL)
Hydro*,ge_ n...
                                        ..3                   12 _               2.80               13.
3.3..0 .   .   .     0.00                     731,598.7_               3,2.95       20,000 Carbon-14                       5,730               7.2                   7.2                   70.70                           101.4               0.46         2,000 lronn-55                           3                 140                 20.2                     12.5                       1,591.1               7.17         2,000 Nickel-63                         100               100                 90.3                   35.5                         2,530.4                 11.4             50 S~trotium-9-0+D               -- 29                 0.76---               -0.5                   10.50_                           50..8.             0.23.             8 Niobium-94                   2.OOE+04                 7.0                   7.0                   316.0                             22.1               0.10           6.1 (RBL)
Technetitim-99m             2.1013+05                 61                 61.0         _           14                         4,458.3               20,08           900 Antimony-125+D                     3                 31                 4.5                   1,550                             2.9               0.01           300 Cesium-134m                         2                 4.7                   0.5                   137.0                             3.3               0.01             80 Europium-.152                       13               9.5                 4.7                   1,000.0                             4.7               0.02           200 Europiurn-154                       8.   .           9.1                   3.2 .                 1000.0                             3.2               0.01             60)
Europium- 155                       5                 380                 89.9                   1,000                             89.9               0.41           600 Plutoniumr-238                     88                 9.5                   8.5                   888.0       la ..                 9.5               0.04             15 Plutonium-239               2.40E+04                 8.8                   8,8                   888,0     [al                     9.9               0.04             IS Plutoniumu-241                     14               140                 72.9                   888.0     [a]                   82.1               0._37             27 (RBL)
Americium-241                     432                   4                   4.0                   447       [a]                     9.0               0.04             15 Curium-243                         28                 4,7                   3.3                   400.0     [a]                     8,3               0.04             15 Notes:
[I] Values reported in License Termination Plan.
[2] Calculated average concentration in subsurface concrete over 30 year time period based on radioactive decay (see text).
[3] Median Kd values reported in LTP (from RESRAD), Values noted [a] are 25th percentiles from LTP Appendix 6N.
[4] Equilibrium concentration between concrete/soil and groundwater assuming no dilution (see text).
[5] Drinking water guidelines are MCLs from USEPA (2000) Soil Screening Guidance for Radionuclides. RBL = Risk Based Limit (no MCL)
Parameters for [21, [31 and [41:
Averaging Period (yrs):
bulk density (g/cc):                                         1.54 porosity (cc/cc):   -                                       0.28 Dilution Attenuation Factor (DAF)                             222
  \2020731,W~on.         055,5 g-fi-NHIRAM RiAkRad.5[.SMO(II W RIO Page I of I                                                                               Gradient CORPORATION M M               M           M             -         M               M             -=         M-                                         =--                         ----                                               1}}

Latest revision as of 20:14, 13 March 2020

Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures
ML070430497
Person / Time
Site: Yankee Rowe
Issue date: 03/22/2005
From: Demers G, Mctigue J
Environmental Resources Management
To: Hall D
NRC/FSME, State of MA, Dept of Environmental Protection
References
BYR-2005-019
Download: ML070430497 (54)


Text

Environmental Resources Management 399 Bovlston Street, 6 "hFloor Boston, MA 02116 (617) 646-7800 (617) 267-6447 (fax) http://vwww.erm.com 22 March 2005

Reference:

BYR-2005-019 Mr. Daniel Hall, Section Chief Solid Waste Management Massachusetts Department of Environmental Protection Western Regional Office ERMCI 436 Dwight Street Springfield, MA 01103 RE: Revised Beneficial Use Determination for Structures Yankee Nuclear Power Station, Rowe, MA

Dear Mr. Hall:

Environmental Resources Management (ERM), on behalf of Yankee Atomic Electric Company (YAEC), is pleased to submit a revised Beneficial Use Determination (BUD) for Structures at the Yankee Nuclear Power Station (YNPS) in Rowe, Massachusetts.

This submittal replaces the BUD for Structures application dated on 22 September 2004.

The revised BUD application is intended to allow concrete slabs and foundations to remain in-place, to allow concrete and asphalt to be processed and used for site grading, and to allow inactive subsurface utility lines to remain in-place. As discussed with the Department, this submittal is being made with the same transmittal and application forms as the original submittal.

We appreciate your support of this project. Should you have questions or require additional information, please contact Mr. Kenneth W. Dow, Environmental Manager, at (413) 424-2245.

Sincerely, V John W. McTigue, P.G., LSP Gregg A-Manaers, P.E., LSP Principal-in -Charge Project Manager

Enclosures:

Revised Beneficial Use Determination Application (2 copies)

Mr. Daniel Hall Environmental 22 March 2005 Resources Management

Reference:

BYR 2005-019 Page 2 cc: J. Hickman, NRC, Special Project Manager, NMSS J. Wray, Inspector, NRC Region I (w/o enclosure)

R. Gallagher, MA DPH D. Howland, Massachusetts Department of Environmental Protection M. Rosenstein, EPA, Region I W. Perlman, Franklin Regional Planning Board T. Hutcheson, Franklin Regional Planning Board L. Dunlavy, Franklin Regional Council of Government P. Sloan, Franklin Regional Council of Government D. Katz, CAN Rowe Board of Health M. Fischer, USGen New England, Inc.

Public Repository at Greenfield Community College

Application for Beneficial Use Determination for Structures Yankee Nuclear Power Station

--Noey LKEIiE Site Closure Project Rowe, Massachusetts 22 March 2005 ERM 399 Boylston St.

Boston, MA 02116 (617) 267-8377 Delivering sustainablesolutions in a more competitive world ERM C: 0 MUD y

1.0 INTRODUCTION

1

1.1 BACKGROUND

1 1.2 PURPOSE AND SCOPE 1 2.0 GENERAL INFORMATION 3 2.1 GENERAL DESCRIPTION 3 2.1.1 Planned Re-Use of Structures 3 2.1.2 Utility Lines to Remain In-Place 8 2.1.3 Processed Concreteand Asphalt 12 2.1.4 End-State 12 2.2 INDUSTRIAL PROCESSES 13 2.3 QUANTITY 13 3.0 CHEMICAL, PHYSICAL, AND BIOLOGICAL PROPERTIES 15 3.1 CHEMICAL PROPERTIES 15 3.1.1 Overview 15 3.1.2 Radiological Characterization 15 3.1.3 Non-Radiological Characterization 16 3.2 PHYSICAL PROPERTIES 16 3.2.1 Size 16 3.2.2 Density 17 3.2.3 Percent Solids 17 3.2.4 Liquid Content 17 3.3 BIOLOGICAL PROPERTIES 17 4.0 PROPOSEDHANDLING METHODS AND UTILIZATION 18 4.1 PROPOSEDHANDLING 18 4.2 PROPOSED UTILIZATION 18 4.2.1 General Description 18 4.2.2 Locations Where Material is to be Used 18 4.2.3 Health and Environmental Impacts 19 ERM YANKEE

........... 28054 3/22/05

__,w I

I I

5.0 REFERENCES

21 I

U U

U U

I U

ERM YANKEE 28054 3/22/05 II

TABLES Table I Summary of Structures to be Reused FIGURES Figure1 Site Locus Map Figure2 Foundationsand Utility Lines to Remain Figure3 Anticipated Limits of BUD Materials APPENDICES Appendix A Transmittal and Application Forms Appendix B Human Health Risk Assessment -BUD for Concrete ERM YANKEE 28054 3/22/05 III

1.0 INTRODUCTION

1.1 BACKGROUND

The Yankee Atomic Electric Company (YAEC) is in the process of decommissioning and closing the Yankee Nuclear Power Station (YNPS) located in Rowe, Massachusetts (see Figure 1). YNPS began operations in 1960 and operated safely and successfully for 31 years. In February 1992, the YAEC Board of Directors decided it was in the best economic interest of electric customers to cease operations permanently at YNPS and decommission the plant. YAEC intends to complete the majority of decommissioning and physical site closure activities at the site by mid-2005 and to restore the site to environmental quality standards that will enable future unrestricted use of the site, where feasible.

The site is located at 49 Yankee Road in the northwestern Massachusetts Town of Rowe, adjacent to the Vermont border (Figure 1). The site consists of an approximately 1,800-acre property owned by YAEC (see Figure 1) and portions of an adjacent property to the west owned by USGen New England, Inc. (USGen NE). The site abuts the eastern shore of the Deerfield River and Sherman Reservoir, adjacent to Sherman Dam, one of several dams along the Deerfield River used for hydroelectric power generation.

This revised application for a Beneficial Use Determination (BUD) - Major was developed by YAEC, with the assistance of Environmental Resources Management (ERM) and Gradient Corporation (Gradient), to support the site closure project. Copies were originally provided to the Massachusetts Department of Environmental Protection (DEP or Department) in September 2004. This revised application replaces the September 2004 version based on the Department's and the Massachusetts Department of Public Health's (DPH's) review and comment of the previous application and discussions with YAEC regarding planned demolition activities. The original Transmittal Forms (BWP SW 13, W050861) are included in Appendix A.

1.2 PURPOSE AND SCOPE The purpose of the BUD application is to provide the Department, DPH and other regulatory and non-regulatory stakeholders with ERM YANKEE 28054 3/22/05 1

documentation necessary to review and approve the proposed rationale, plans and procedures to beneficially reuse processed concrete and asphalt and to leave building slabs, foundations and utility lines in-place. This application was prepared consistent with available Department guidance for a BUD application and includes a description of the solid waste material to be beneficially used, estimated quantities, physical and chemical properties and proposed handling methods to ensure that beneficial reuse of materials on site poses no significant adverse effects to public health, safety, or the environment (MA DEP, 2004). This application also relies on the restoration of site topography by re-grading with at least 36 inches of soil over any non-native materials that are left on site under the BUD.

This BUD application does not address the management of soil in the Southeast Construction Fill Area (SCFA). A separate BUD application, along with a Corrective Action Design, both dated 4 November 2004, were submitted to address the removal of the SCFA and the reuse of soils from the SCFA for site regrading. A BUD approval for the SCFA was issued by the Department on 23 December 2004.

ERM YANKEE 28054 3/22/05 Z

2.0 GENERAL INFORMATION 2.1 GENERAL DESCRIPTION 2.1.1 Planned Re-Use of Structures Unless otherwise noted below, all building structures at the site will be demolished and the debris removed from the site, including floor slabs and foundations. A summary of those structures intended to remain at the site is provided in Table 1. Figure 2 shows what structures will remain in-place. A building-by-building is provided below (note that underground utilities are addressed in Section 2.1.2):

  • Office Building - This building will remain intact and is not subject to the BUD.
  • Gatehouse - These buildings will remain intact and is not subject to the BUD.
  • Interim Spent Fuel Storage Installation (ISFSI) - This radiological waste storage pad will remain intact and is not subject to the BUD..
  • Meteorological Tower - This tower will remain intact and is not subject to the BUD.

" Turbine Building and Auxiliary Building - The majority of the slab will remain in place with the exception of portions that will be removed to facilitate final site grading. Foundations will remain in place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 1,400 cubic yards.

" Office attached to Turbine Building - This slab will be removed to facilitate final site grading. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with Turbine Building estimate.

" Service Building - The majority of this slab will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. Foundations will remain in-place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance ERM YANKEE 28054 3/22/05 I

with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 550 cubic yards.

" Service Building Annex - The majority of the slab will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. Foundations will remain in-place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with Service Building estimate.

  • North Decon Room - All remaining portions of the slab and foundations will remain in place. Material to remain on-site: included with Service Building
  • Stores Warehouse - The majority of the slab will remain in place with the exception of portions that will be removed to facilitate final site grading. Foundations will remain in-place. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 350 cubic yards.
  • Tank Farm Moat & Gas Drum Decay Area - All remaining portions of the structures will remain in place. Material to remain on-site: 400 cubic yards.
  • Ion Exchange Pit (IX Pit) - Will be removed in its entirety with the exception of the south wall, which will remain to support final site grading. All removed concrete will be shipped off site for disposal.

Material to remain on-site: 200 cubic yards.

  • Safety Injection/ Diesel Generator (SI/DG) Building - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 60 cubic yards.

" New Fuel Vault - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none

  • Spent Fuel Pit - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none.
  • New and Old SI Tank Base - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 30 cubic yards.

ERM YANKEE 28054 3/22/05 4

Tank 39 Base Primary Water Tank - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 40 cubic yards.

" Demin Water Tank Slab - All remaining portions of the structures will remain in place. Material to remain on-site: 15 cubic yards.

  • Fuel Transfer Enclosure (South Decon Room) - Will be removed in its entirety. All removed concrete will be shipped off site for disposal.

Material to remain on-site: none.

  • Vapor Container/Reactor Support Structure (VC/RSS) - The RSS is a massive concrete structure. Following extensive characterization and abatement, demolition has begun on the RSS. Much of the original above grade structure will be stockpiled for reuse on-site. All remaining portions of the structural foundations will remain in place.

The stockpiled concrete from the RSS will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 1,700 from the in-place materials plus 7,000 cubic yards of processed concrete.

  • Compactor Building - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 85 cubic yards.
  • Waste Disposal Building - All remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 135 cubic yards.
  • Potentially Contaminated Area (PCA) Warehouse - The majority of the slab and foundations will remain in place with the exception of those areas that will be removed to access subsurface radiological concerns.

The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 610 cubic yards.

  • PCA #1 (Old PCA) - The majority of the slab and foundation will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. The removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: included with PCA Warehouse estimate.

" PCA #2 (New PCA) - All remaining portions of the slab and foundation will remain in place. Material to remain on-site: included with PCA Warehouse estimate.

ERM YANKEE 28054 3/22/05 Z)

  • Fire Water Tank Slab - All remaining portions of the structure's slab will remain in place. Material to remain on-site: 60 cubic yards.
  • Fire Water Pump House - All remaining portions of the slab and foundation will remain in place. Material to remain on-site: 65 cubic yards.

" Safe Shutdown Building - All remaining portions of the slab and foundation will remain in place. Material to remain on-site: 200 cubic yards.

" Circulating Water Discharge Structure (Seal Pit) - Following demolition activities to meet current local, state and federal permits for the Seal Pit, all remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 300 cubic yards.

" Circulating Water Intake (Screenwell House) - Following demolition activities to meet current local, state and federal permits for the Screenwell House, all remaining portions of the slabs and foundations will remain in place. Material to remain on-site: 1,350 cubic yards.

  • Primary Auxiliary Building (PAB) - The majority of the lower slab and foundations will remain in place with the exception of those areas that will be removed to access subsurface radiological piping and those portions removed to facilitate final site grading. The lower level south foundation wall will remain to assist in final site grading. In addition, following extensive characterization and abatement, much of the original above grade structure has been demolished and is being stored in a stockpile on-site. The stockpiled and other removed concrete will be processed and monitored for reuse as beneficial fill in accordance with the Materials Reuse Protocol described in Section 3.1.2. Material to remain on-site: 700 cubic yards from the in-place materials plus 1,200 cubic yards from the above grade stockpile.
  • Rad Lab Sump Pit - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none.

" Fuel Oil Transfer Pump House - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain oh-site: none.

  • Fuel Transfer Chute - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none.
  • Elevator Shaft - Will be removed in its entirety. All removed concrete will be shipped off site for disposal. Material to remain on-site: none.

ERM ,- YANKEE 28054 3/22/05 U

  • Yard Crane Supports - All remaining portions will remain in place.

Material to remain on-site: 40 cubic yards.

The building foundations proposed to remain on-site consist primarily of concrete reinforced with steel and concrete masonry units (i.e., cinder blocks). Subsurface concrete structures proposed to remain (e.g., slabs and sumps) will be perforated as necessary to allow infiltration of storm water and/or flow of groundwater through the foundations/structures.

Building surfaces were characterized for paint containing polychlorinated biphenyls (PCBs) and other hazardous constituents prior to demolition.

On-going abatement of PCB-containing paint at concentrations of 50 mg/kg or greater of PCBs has been conducted under specific United States Environmental Protection Agency (US EPA) approved work plans developed in accordance with the Alternative Method of Disposal Authorization (AMDA), issued by the US EPA under Section 6(e)(1) under the Toxic Substance Control Act (TSCA) and the PCB regulations (40 CFR 761).

The concrete foundations remaining in the subsurface are undergoing visual inspection, where accessible, to determine if any coatings are present. Any paint remaining on subsurface materials proposed to be left in-place (except spray paint incidental to demolition) will be tested to confirm that PCBs are not present in the paint. Any paint found to contain PCBs will be removed from the surface of the concrete prior to.

reuse under the BUD. Any non-PCB paint to remain on concrete will also be tested for RCRA 8 metals. Any non-PCB paint containing RCRA-8 metals at concentrations exceeding applicable BUD re-use criteria will be removed prior to reuse.

Mastic coatings are present on some subsurface foundations that will remain in-place. Where accessible, the mastic coatings have been tested for asbestos. Discussions have been held with the Department regarding the feasibility of removal of mastic from these structures. YAEC proposes that mastic coatings on foundations remain in-place for the following reasons:

  • Mastic coatings containing asbestos are non-friable. These coatings were designed to be used in the subsurface, and as such, pose a low potential for adverse impact to human health and/or the environment if they remain on the structures, are not disturbed or rendered friable.

ERM YANKEE 28054 3/22/05 I

Removal of mastic coatings would require extensive excavation and removal of the upper surface of the concrete containing the coating. Disturbance of these materials during removal could pose a significant short-term risk to worker health and safety and the environment due to the potential for asbestos fibers to become friable and be released to the environment. Containment and monitoring would minimize the potential risks associated with asbestos removal, but not eliminate short-term risks associated with waste generation, management, off-site transportation and disposal.

Leaving mastic coatings on subsurface structures would eliminate the short-term risk to human health and the environment posed by removal and waste management. Placement of restrictions on the deed to the property that prohibit subsurface excavation or disturbance of subsurface structures containing mastic coatings and/or require appropriate oversight of excavations and management of wastes encountered, as necessary, would eliminate the potential for future adverse exposure to human health and the environment posed by mastic coatings.

Therefore, YAEC proposes to leave mastic coatings on subsurface structures and file a deed restriction prohibiting future work that could result in the disturbance of these materials, unless the work is conducted by a qualified professional. This approach will eliminate the short-term risks to human health and the environment posed by mastic removal and ensure continued protection of human health and the environment into the foreseeable future.

2.1.2 Utility Lines to Remain In-Place An extensive evaluation has been performed of all subsurface utilities and associated structures based on site drawings. A utility matrix was developed to aid in evaluating whether a utility component should be removed or decommissioned in-place. This evaluation is based on ongoing discussions with the Department, including a meeting held at the Yankee site on February 2, 2005.

YAEC is proposing to leave selected inactive utility lines in-place that are problematic to remove due to obstacles such as their location beneath building slabs, their encasement in concrete ducts, the presence of asbestos-containing material (ACM) as a pipe component or around the pipes and difficulties associated with ACM abatement or the location/depth of the utility line. Reasonable measures will be taken to FERM YANKEEF 28054 3/20 0

remove the contents of the utility lines (i.e., water, wires, etc) as part of the decommissioning process; however, wires/cables may remain in-place in inaccessible locations (including some wires that could be coated with ACM). Lines proposed to remain in-place will be permanently capped at each end with grout where accessible.

Site underground utilities have been separated into the following categories to facilitate the Department's review of this application and to document the rationale for the leaving proposed utilities in-place. These include the following:

  • Under Building Slab (pipes) - Pipes located beneath or immediately adjacent to the foundation of a building slab are proposed to be left in-place. Removal of these lines would require a significant effort that is not justified since the slabs are proposed to remain in-place.

If the pipe is greater than eight inches in diameter, it will be filled with flow-fill. Pipes less than eight inches in diameter will not be filled, but contents removed and ends capped with grout, as feasible.

  • Concrete Encased Duct Bank - Many of the site electric conduits were installed within concrete structures (duct banks) and encased within concrete within the structure to protect them from the elements. Much of this pipe is identified as 'fiber' pipe and limited testing has revealed it not to be ACM. Asbestos wrap around cables within utility manholes entering these pipes has been identified as ACM. This asbestos material will be removed within the manhole prior to pulling cables, however, should the cable not be fully removed, ACM may remain. Once cables have been pulled, YAEC proposes to grout the ends of accessible conduits and leave duct banks and filled manholes in-place following demolition. Removal of these structures would require abatement of ACM that is currently isolated and encased in concrete. The ACM as either wrap, a component of the cable, or conduit does not pose a significant adverse risk to human health or the environment under current or proposed future conditions. Therefore, YAEC proposes to leave ACM within subsurface structures and file a deed restriction prohibiting future work that could result in the disturbance of these materials, unless the work is conducted by a qualified professional. This approach will eliminate the short-term risks to human health and the environment posed by ACM removal and ensure continued protection of human health and the environment into the foreseeable future.

EIM 9 YANKEE 28054 3/22/05

" Creosote Timbers over Concrete Duct Bank - Site drawings have identified the presence of 2-inch thick creosote wooden timbers placed as markers to prevent excavation and accidentally penetrating electrical lines within the duct banks. YAEC proposes to leave these timbers in-place so that they can continue to serve as markers to prevent accidental damage of the conduits within the duct banks. The presence of these timbers as markers will be noted in the deed restriction to be placed on that portion of the property subject to the BUD to facilitate their future use as markers in the event that future activities require controlled subsurface excavation and/or management of subsurface ACM. Creosote timbers associated with rail lines will be removed.

" Concrete and Steel Pipes - Pipes have been identified that are predominantly made of concrete or steel, which are similar to the concrete duct banks and inert materials. Many of the pipes are located in close proximity to the Sherman Dam and removal would have a potential adverse effects on the structural integrity of the dam. YAEC proposes to remove pipes where the majority of the line is located at a depth of less than five feet. YAEC proposes to leave the pipes in-place where the majority of the line is located at a depth of greater than five feet and fill the pipes with flow-fill.

Pipes with a diameter of eight inches or less would not be filled, but the contents (wires, etc.) removed to the extent practical and the ends of the pipe capped with grout. Pipes encountered during site excavation activities will be removed if encountered. As an example, the Circulating and Service Water Lines that provided cooling water from Sherman Reservoir through the Screenwell House to the Turbine Building and then back through the Discharge Structure to Sherman Reservoir are proposed to be left in-place including:

  • One 100-foot long, 10-foot diameter buried corrugated steel intake pipe between Sherman Reservoir and Screenwell House
  • One 7-foot diameter concrete intake pipe between Screenwell House and Turbine Building
  • Two 1-foot' diameter steel water service lines between Screenwell House and Turbine Building

& Four 5-foot diameter steel pipes below Turbine Building

  • One 3-foot diameter corrugated steel pipe between Screenwell House and Discharge Structure ERM t n YANKEE 28054 3/22/05 IU
  • One 7-foot diameter discharge pipe between Turbine Building and Discharge Structure (a portion of the pipe is concrete lined with steel and a portion of the pipe is all steel)
  • Three 4-foot diameter steel capped pipes near Discharge Structure branching off from the 7-foot diameter steel pipe Yankee intends to leave each of the above lines in-place and fill them with a flow-fill.
  • Storm Water Distribution System - An evaluation has been performed of the East and West storm water collection systems to determine whether site radiological release criteria have been met.

The systems are comprised of storm water catch basins and lateral lines that direct storm water through two outfalls managed under a National Discharge and Elimination System (NPDES) permit issued jointly by EPA and the Department. YAEC propose to leave the majority of these systems in-place and fill the voids with flow-fill.

Exceptions include those segments of both systems that will be removed due to excavations to remove the deep foundations (Spent Fuel Pool / Ion Exchange Pit), the Sherman Dam extension base development, and shoreline components that will be removed to accommodate the final site grading.

" Individual Electrical Conduits / Utility Lines - Subsurface site electrical conduits, other small utility lines and pipes are made of inert materials that do not pose an adverse risk of harm to human health and/or the environment. YAEC proposes to remove conduits and utility lines where the majority of the line is shallower than five feet below existing grades. YAEC proposes to evaluate the feasibility of removal of utility lines where the majority of the line is at a depth of greater than five feet below existing grade.

Where removal is feasible based on depth and/or other planned site excavation activities, those lines would be removed. Where removal is judged to be infeasible due to the location, depth and/or structure of the line (e.g., found to contain ACM), these lines are proposed to remain in-place.

  • Electrical Grounding Grid - Due to the former use of the site as a power station, an extensive grounding grid was established during plant construction (1950s) that tied into each structure and subsurface amenity to ensure all aspects of operation were properly protected. Composed of bare copper cable, YAEC intends to remove those portions of the grid that are encountered during ERM -. YANKIEE 280S4 3/22/05 II

ongoing excavation and/or demolition activities. YAEC proposes to leave the remainder of the grounding grid in-place.

  • Fire Water Protection System - A fire water protection system consists of a looped header that connected to numerous hydrant stations throughout the site. The depth of this system is at least seven feet below existing grades. YAEC intends to leave that portion of this system that is decommissioned in-place unless encountered through other excavation. Hydrants will be removed to a depth of five feet below grade.

Sanitary System- Sanitary sewer lines are considered outside the scope of this BUD application since the closure of septic systems will be addressed under the requirements of the State, Environmental Code Title 5 regulations (310 CMR 15.000).

However, portions of the sanitary line, primarily within the footprint of the Sherman Dam extension, will be removed.

2.1.3 Processed Concrete and Asphalt YAEC proposes to beneficially reuse processed concrete block, reinforced concrete and asphalt from paved areas at the site. The locations-where processed concrete and asphalt will be reused to grade the site are shown in Figure 3. All processed concrete will meet the Materials Reuse Protocol that is under development between YAEC, the Department, and DPH with regards to a potential radiological constituents (Section 3.1.2). All paint containing PCBs will be removed from the concrete prior to reuse.

Non-PCB paints that remain on concrete will be evaluated to ensure the metals concentrations comply with BUD'risk criteria. Processed concrete and asphalt used on site will be placed in horizontal lifts and compacted to reduce void space and create a stable fill material.

2.1.4 End-State Following the completion of demolition activities aboveground structures that will remain at the site will include the ISFSI, the Gatehouse, an office building, and a potable water well. The post-decommissioning grading and planting plans (Kleinschmidt, August 2004) have been approved by the Department as part of the Integrated Permit Package submitted to the Division of Waterways and Wetlands. YAEC intends to extend the east embankment of the Sherman Dam to permanently replace the temporary flood control measures that had been part of YNPS. The site will be regraded and planted following the completion of demolition activities.

ERM 12 YANKEE 28054 3/22/05

The regrading plan will provide a minimum of 36 inches of soil cover above any foundations or utility lines that are left in-place.

A deed restriction will be placed on that portion of the YAEC property where material will remain in the subsurface that was approved for beneficial reuse under the BUD. The deed restriction will meet the Department's requirements and conditions imposed under BUD approval and will be separate and distinct from any Notice of Activity and Use Limitation (AUL) that may be placed on the property to prevent adverse exposure to residual levels of radioactivity, oil and/or hazardous materials that may remain in the subsurface on site.

2.2 SOURCE The Yankee Nuclear Power Station in Rowe, Massachusetts is the source of the solid waste that will remain on-site. The name and address of the generator are:

Yankee Atomic Electric Company 49 Yankee Road Rowe, MA 01367 2.3 INDUSTRIAL PROCESSES The solid waste that will remain in-place is derived from the decommissioning of YNPS. The items were constructed using traditional construction methods and include concrete, steel reinforced concrete, asphalt, steel pipes, fiber pipes, concrete pipes, and copper wire.

2.4 QUANTITY The volumes of concrete materials to be used on site are described by structure in Section 2.1.1, and total 16,490 cubic yards plus approximately 1,000 cubic yards of flow fill. In addition, approximately 1,500 cubic yards of asphalt are also anticipated to be re-used. Concrete, flow fill, and asphalt combine to approximately 18,990 cubic yards of material.:

The volume estimates of materials to be reused on-site under the BUD are based on the current site closure plans and reasonable knowledge of the dimensions/construction of features to remain on-site. Based on the ability of processed concrete to meet the Materials Reuse Protocol, this EN 13 YANKEE 28054 3/22/05

quantity may vary. The actual volumes used and these final site conditions will be documented on as-built drawings showing fill areas and buried features. In the event that additional structures/foundations are deemed eligible for on-site use, YAEC will ensure that these items meet all of the criteria that have been specified in this submittal.

ERM YANKEE 28054 3/22/05 14

3.0 CHEMICAL, PHYSICAL, AND BIOLOGICAL PROPERTIES 3.1 CHEMICAL PROPERTIES 3.1.1 Overview The solid wasteto be beneficially reused primarily consists of concrete blocks, reinforced concrete and asphalt. Concrete is produced by mixing cement and water with inert materials such as sand and gravel. A chemical reaction known as hydration occurs between the cement and water.that creates a hard, rock-like product. Steel reinforcing bar (rebar) is imbedded in poured concrete. Asphalt pavement typically contains approximately 95 percent aggregate, consisting of stone, sand, or gravel and five percent asphalt cement as a binder.

Due to the inert nature of the concrete and asphalt, reactivity, leachability, metals content and volatile organic compound concentrations are not a potential concern. The pH of groundwater at the site, which currently ranges from 5 to 8, is not expected to be impacted by leaving the reinforced concrete in-place.

3.1.2 Radiological-Characterization The following Materials Reuse Protocols are under development by YAEC in coordination with the Massachusetts DPH. The Materials Reuse Protocols are being utilized for determination of above and below grade processed concrete debris that would qualify for purposes of reuse as backfill (including grading material). Note that these protocols apply only to above and below grade processed concrete debris for use as fill and do not apply to existing subsurface slabs/structures and asphalt. The Materials Reuse Protocols are being finalized and currently include:

1. Performance of bulk monitoring of all potentially radioactive bulk-reuse materials utilizing gamma sensitive instrumentation capable of detecting a volumetric concentration that would not contribute more than 1 millirem per year (mrem/yr) Total Effective Dose Equivalent (TEDE) above background after burial to any individual. Materials above this requirement would not be considered acceptable for re-use as backfill.

ERM " Y "ANKE

............... 28054 3 I/22I/S 1 11

2. Included in the above I mrem/yr requirement are evaluations of the presence of the hard-to-detect radionuclides (e.g., Iron-55, Nickel-63, Carbon-14, Hydrogen-3).
3. The concrete is to contain no detectable plant related transuranics.
4. The exposure modeling and parameters to be used will be coordinated with the DPH and Nuclear Regulatory Commission (NRC) and implemented with DPH concurrence.

Existing subsurface structures to be reused under the BUD, including below grade concrete structures, concrete slabs (fractured and/or perforated) and asphalt will meet release criteria determined by meeting 10 mrem/yr Derived Concentration Guideline Levels (DCGLs). In addition, excavated soils to be used as backfill within the BUD area will also meet the 10 mrem/yr DCGL criteria. The YNPS License Termination Plan (LTP) includes the applicable DCGLs that are being applied to the site. It should be noted that the DPH site release criteria (10 mrem/yr) is more conservative than the NRC criteria (25 mrem/yr) and as such, the DCGLs found in the LTP will be adjusted to reflect the DPH criteria.

3.1.3 Non-Radiological Characterization As described in Section 2.1, paint containing PCBs will be removed from concrete and asphalt to be used for site grading. YAEC has collected core samples of the concrete to verify that PCB concentrations are less than two (2) milligrams per kilogram (mg/kg) following the removal of paint. In the event that non-PCB paint remains on concrete, core samples will be collected to verify that that metals concentrations do not pose a risk (see Section 4.2 for risk criteria).

A mastic coating will remain on some foundation walls at the site. The mastic coating is inert. As described in Section 2.1, some of the mastic may contain non-friable asbestos.

3.2 PHYSICAL PROPERTIES 3.2.1 Size The concrete foundations and walls are generally up to I foot thick, except where two walls abut. Concrete to be used for site grading and asphalt from paved areas will be processed as necessary to provide a suitable base for the three feet of soil that will be placed over the non-native materials.

ERM 16 YANKEE 28054 3/22/05

3.2.2 Density The concrete will contain rebar and typically has a density of 150 pounds per cubic foot. Certain structures, such as the Fuel Transfer Chute (most of which has been shipped off-site), were constructed with concrete that had a density of at least 225 pounds per cubic foot. The density of asphalt is estimated to be approximately 140 pounds per cubic foot.

3.2.3 Percent Solids The solid waste to be beneficially used is reinforced concrete and asphalt that is 100 percent solid.

3.2.4 Liquid Content The concrete is free of liquids.' Water that may be present in some subsurface utility lines (e.g., water and sewer lines) will be removed prior to decommissioning the lines.

3.3 BIOLOGICAL PROPERTIES Due to the nature of the concrete and asphalt, there is no biological activity or pathogens associated with the foundations or utility lines.

ERM -1 -I YANKEE.28054 3/22/05 I/

4.0 PROPOSED HANDLING METHODS AND UTILIZATION 4.1 PROPOSEDHANDLING The foundations, concrete and asphalt and utility lines remaining at the site will be managed on site. Voids within utility lines greater than eight inches in diameter will be filled. Utility lines less than eight inches in diameter will be abandoned in-place. Three feet of soil will cover any non-native materials left in-place.

The concrete structures (buildings, slabs and support columns) will be demolished using standard construction practices and heavy machinery.

Large structures such as the Reactor Support Structure will be minimized by mechanical means. Smaller structures will be demolished with various hydraulic claws and shears, as appropriate. Once the buildings are brought to grade elevation, structural steel beams and metal will be segregated into piles for sorting, packaging and disposal. Rebar that is exposed will be cut off as close as possible for disposal and rebar that is contained within concrete will remain on-site. Concrete will be crushed using heavy equipment to accommodate stockpiling, prior to being loaded into containers for radiation surveying on-site in accordance with the Materials Reuse Protocol. Material surveyed for re-use on site will be either placed directly into building voids or stockpiled until used for site grading.

4.2 PROPOSED UTILIZATION 4.2.1 General Description The remaining foundations and buried utility lines will be incorporated in the final site re-grading.

4.2.2 Locations Where Material is to be Used Figure 2 shows the locations of foundations that will remain. Figure 3 shows where processed concrete and asphalt will be used.

ERM YANKEE

.................. 28054 3/22/05

,vv 10$

4.2.3 Health and EnvironmentalImpacts The material to be reused under the BUD primarily consists of inert construction materials comprised of concrete and asphalt. Potential residual impacts on the concrete include paint, as well as radiological constituents (below DCGLs) for remaining structures (with the exception of the ISFSI facility) including foundations, slabs, subsurface asphalt and soil.

The BUD guidance document states that the applicant must demonstrate that Critical Contaminants of Concern (CCCs), such as PCBs as defined in the guidance document, are consistent with background. Based on discussions with DEP at a pre-application meeting held on 1 July 2004, it is our understanding that this requirement of the BUD guidance may not be applicable for a Category 3 BUD and that this issue will undergo further review by DEP.

Confirmation sampling of the concrete is being performed to ensure that the maximum residual PCB concentration will be no more than 2 mg/kg in the concrete debris. This maximum threshold is essentially equivalent to the proposed default BUD S-2 and S-3 standard of 1.6 mg/kg for PCBs.

The S-2 and S-3 BUD values represent an average concentration (this is inherent to the risk assessment process). Although concrete will be confirmed to contain no more than 2 mg/kg as a sample-specific maximum concentration, the actual average PCB concentration in concrete will be well below the S-2 and S-3 BUD standards for PCBs. Because PCBs in concrete will meet the BUD S-2 and S-3 standards, no further assessment for PCBs is required.

In the event that non-PCB paint is left on concrete surfaces, the coated concrete will be tested for RCRA 8 metals. The sampling results will be evaluated to ensure that the average concentrations are below the S-2 and S-3 BUD values. If the average concentrations are higher, then the paint will be abated or the concrete will be disposed off-site.

No standards exist in the draft BUD guidance for radionuclides.

However, due to the operation of the power plant, the concrete may contain radiological constituents at concentration less than or equal to the DCGL. The use of the Materials Reuse Protocol is consistent with a Category 3 Beneficial Use of Secondary Materials in Restricted Applications because the management of the concrete beneath 3-foot of soil overburden meets the DEP BUD guidance risk management criteria (overall cancer risk less than or equal to 5 in 10,000; or 0.5 x10-5 ). A Human Health Risk Assessment was prepared by Gradient Corporation ERM YANKEE 28054 3/22/05 19

(Appendix B) to evaluate potential risks associated with the on-site reuse of concrete.

The risk assessment guidelines for the BUD, which adopt those defined under the MCP with a more conservative risk threshold, define health protection on the basis of cancer risk, rather than radiation dose. MADEP does not have guidelines for the evaluation of cancer risk for radionuclides. Consequently, the U.S. EPA guidelines, published in the Soil Screening Guidancefor Radionuclides (USEPA, 2000a,b) were used for the Human Health Risk Assessment.

The final site grading and re-vegetation plan will ensure that the concrete will reside beneath 3-feet of soil. A deed restriction will require a Health

& Safety Plan and Soil Management Plan for subsurface excavation activities. Thus, the deed restriction will prevent "direct contact" pathways such as incidental ingestion and dermal contact with subsurface materials. Thus, the primary pathway of possible concern for exposure to radionuclides in the subsurface concrete is from external radiation (e.g.,

ionizing radiation emitted as the result of radioactive decay).

The health assessment presented here indicates that soil grading plan and use of concrete debris as fill, satisfies the interim draft BUD guidance for Category 3 use of Secondary Materials in Restricted Applications. As such, compliance with the Materials Reuse Protocol under development with the Massachusetts DPH would provide an even greater level of protection to human health and the environment.

ERM YANKEE 28054 3/22/05 L-U

5.0 REFERENCES

U.S. Environmental Protection Agency (USEPA). 2000a. Soil Screening Guidance for Radionuclides: Technical Background Document.

EPA/540-R-00-006. Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response. Washington, DC.

U.S. Environmental Protection Agency (USEPA). 2000b. Soil Screening Guidance for Radionuclides: User's Guide. EPA/540-R-O0-007. Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response.

Washington, DC.

Massachusetts Department of Environmental Protection, Bureau of Waste Prevention, "Draft Interim Guidance Document for Beneficial Use Determination Regulations 310 CMR 19.060", March 18, 2004.

ERM YANKEE 28054 3/22/05 Z"I

Table 1 Summary of Structures to be Reused Yankee Nuclear Power Station, Rowe, MA Structure Name Approximate Volume of Approximate Volume of Concrete to Remain In-Place Concrete to be Processed (cubic yards) (cubic yards)

Turbine Building 1,400 Service Building 550 Stores Warehouse 350 Tank Farm Moat &Gas Drum Decay Area 400 Ion Exchange Pit (south wall) 200 Safety Injection/Diesel Generator Building 60 New/Old SI Tank Base 30 Tank 39 Base Primary Water Tank 40 Demin Water Tank Slab 15 Vapor Container/Reactor Support Structure 1,700 7,000 Compactor Building 85 Waste Disposal Building 135 PCA Warehouse 610 Fire Water Tank Slab 60 Fire Water Pump House 65 Safe Shutdown Building 200 Circulating Water Discharge Structure 300 Circulating Water Intake Structure 1,350 Primary Auxiliary Building 700 1,200 Yard Crane Supports 40 Subtotal 8,290 8,200 Total 16,490 Note: Table does not include a summary of utilities or asphalt to be reused under the BUD.

jmft t

  • ~ /

~-YAEC Prop" tBoundary Scale 125,000 0.5 km 0 500 m 0.5 mi 0 1,000 ft Figure 1 - Locus Map Yankee Nuclear Power Station - Rowe, MA ERM

Appendix A Transmittaland Application Forms

Enter your transmittal number - W0508611_, i TriaismittalfN6 rber Your unique Transmittal Number can be accessed online: http:/lwww.state.ma.us/scripts/depltrasmfrm.stm or call DEP's InfoLine at 617-338-2255 or 800-462-0444 (from 508, 781, and 978 area codes).

Massachusetts Department of Environmental Protection Transmittal Form for Permit Application and Payment

1. Please type or A. Permit Information print. A separate Transmittal Form BWPSWO1 3 Beneficial Use Determination - Major must be completed 1. Permit Code: 7 or 8 characte r code from permit instructions 2. Name of Permit Category for each permit Beneficial use of concre te foundations and application. 3. Type of Project or Activity utility line3S
2. Make your check payable to B. Applicant Information - Firm or Individual the Commonwealth of Massachusetts Yankee Atomic Electric Company and mail it with a 1. Name of Firm - Or, if party needing this approval is an individual enter name below:

copy of this form to:

DEP, P.O. Box 4062, Boston, MA 2. Last Name of Individual 3. First Name of Individual 4. MI 02211. 49 Yankee Road

5. Street Address
3. Three copies of Rowe MA 01367 413-424-5261 this form will be
6. City/Town 7. State 8. Zip Code 9. Telephone # 10. Ext. #

needed.

Kenneth Dow dow@yankee.com Copy 1 - the 11. Contact Person 12. e-mail address (optional) original must accompany your permit application. C. Facility, Site or Individual Requiring Approval Copy 2 must accompany your Yankee Atomic Electric Company fee payment. 1. Name of Facility, Site Or Individual Copy 3 should be 49 Yankee Road retained for your 2. Street Address records Rowe MA 01367 413-424-5261

4. Both fee-paying 3. City/Town 4. State 5. Zip Code 6. Telephone # 7. Ext. #

and exempt applicants must 8. DEP Facility Number (if Known) 9. Federal I.D. Number (if Known) 10. BWSC Tracking # (if Known) mail a copy of this transmittal form to:

D. Application Prepared by (if different from Section B)*

DEP P.O. Box 4062 Environmental Resources Management Boston, MA 1. Name of Firm Or Individual 02211 399 Boylston St. 6th Floor

2. Address Boston MA 02116 617-646-7842
  • Note:
3. City/Town 4. State 5. Zip Code 6. Telephone # 7. Ext. #

For BWSC Permits, enter the LSP.

John McTigue

8. Contact Person 9. LSP Number (BWSC Permits only)

E. Permit - Project Coordination

1. Is this project subject to MEPA review? N yes LI no If yes, enter the project's EOEA file number - assigned when an Environmental Notification Form is submitted to the MEPA unit: 13247 EOEA File Number F. Amount Due DEP Use Only Special Provisions:
1. E5 Fee Exempt (city, town or municipal housing authority)(state agency if fee is $100 or less).

Permit No: There are no fee exemptions for BWSC permits, regardlessof applicantstatus.

2. 0l Hardship Request - payment extensions according to 310 CMR 4.04(3)(c).

Rec'd Date: 3. E] Alternative Schedule Project (according to 310 CMR 4.05 and 4.10).

4. El Homeowner (according to 310 CMR 4.02).

Reviewer: Fee addressed under MOU $1,580.00 between Yankee and DEP Dollar Amount Date transmittal-form BUD.doc - rev. 09/03 Page 1 of 1

Massachusetts Department of Environmental Protection Bureau of - Waste Prevention - Solid Waste Management W050861 BWP SW 13 Beneficial Use Determination - Major Transmittal Number #

BWP SW 30 Beneficial Use Determination - Minor Application for Beneficial Use Determination Facility ID (if known)

A. Project Information Important:

When filling out 1. Which permit category are you applying for? [ BWP SW 13 [:1BWP SW 30 forms on the computer, use only the tab key to move your cursor - do not 2. General Information about the Solid Waste Page #

use the return key.

3

a. General description of the waste
b. Source of the waste 7

(1) Name of the generator 7

(2) Address of the generator

c. Description of the industrial process which 7 produces the waste DIRECTIONS: 7
1. Specify the d. Quantity (volume and/or tonnage) page numbers in which the 3. Chemical, Physical and Biological Properties following of the Waste information is located. a. Chemical properties of the waste
2. Enter NA if 8 information (1) pH requested is not applicable. 8 (2) reactivity 8

(3) leachabilty (TCLP test) 8 (4) total metals 8

(5) VOCs 8

(6) other appropriate constituents

b. Physical properties of the waste 9

(1) size 9

(2) density 10 (3) percent solids 10 (4) liquid content of the waste

c. Biological properties of the waste, if applicable swl3-30 form Yankee.doc - 08/01 BWP SW 13, 30 - Page 1 of 2

I Massachusetts Department of Environmental Protection Bureau of -Waste Prevention - Solid Waste Management W050861 BWP SW 13 Beneficial Use Determination - Major Transmittal Number #

BWP SW 30 Beneficial Use Determination - Minor Application for Beneficial Use Determination Facility ID(if known)

A. Project Information (cont.)

(1) pathogens

4. Proposed Handling Methods and Utilization
a. Proposed handling methods (1) transportation (2) storage (3) processing
b. Proposed utilization (1) general description (2) location(s) where material is to be used (3) health and environmental impacts B. Certification: 310 CMR 19.011 Any person, required by these regulations or Frank Helin any order issued by the Department, to submit Print Na papers shall identify themselves by name, profession, and relationship to the applicant and Authorized 'ature legal interest in the facility, and make the Decommis oning Director following certification: "I certify under penalty of Position/Title law that I have personally examined and am familiar with the information submitted in this Date document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe that the information is true, accurate and complete. I am aware that there are significant penalties both civil and criminal for submitting false information including possible fines and imprisonment.

sw13-30 form Yankee.doc - 08/01 BWP SW 13,30 - Page 2 of 2

UMassachusetts Department of Environmental Protection Bureau of -Waste Prevention - Solid Waste Management BWP SW 13 Beneficial Use Determination - Major BWP SW 30 Beneficial Use Determination - Minor W050861 Transmittal Number #

Application for Beneficial Use Determination Facility ID (if known)

A. Project Information Important:

When filling out 1. Which permit category are you applying for? [ BWP SW 13 El BWP SW 30 forms on the computer, use only the tab key to move your cursor -do not 2. General Information about the Solid Waste Page #

use the return key.

'-I

a. General description of the waste I1~D b. Source of the waste 7

(1) Name of the generator 7 7

(2) Address of the generator

c. Description of-the industrial process which 7 produces the waste DIRECTIONS:

e -the d. Quantity (volume and/or tonnage) page-:nu.mbers in whicdhthe 3. Chemical, Physical and Biological Properties olldvicng of the Waste 8 information is located. a. Chemical properties of the waste 2.,Enler NA if information (1)pH 8

requested is not applicable. (2) reactivity 8

(3) leachabilty (TCLP test) 8 (4) total metals 88 (5) VOCS (6) other appropriate constituents

b. Physical properties of the Waste 9

(1) size 9

(2) density 10 (3) percent solids 10 (4) liquid content of the waste

c. Biological properties of the waste, if applicable sw13-30 form USGen NE-doc.doc - 08/01 BWP SW 13, 30 - Page 1 of 2
1. -I LI Massachusetts Department of Environmental Protection Bureau of - Waste Prevention - Solid Waste Management W050861 BWP SW 13 Beneficial Use Determination - Major Transmittal Number #

BWP SW 30 Beneficial Use Determination - Minor Application for Beneficial Use Determination Facility ID (if known)

A. Project Information (cont.)

Page #

10 (1) pathogens 11

4. Proposed Handling Methods and Utilization
a. Proposed handling methods 11 (1) transportation 11 (2) storage 11 (3) processing
b. Proposed utilization 11 (1) general description 11 (2) location(s) where material is to be used 11 (3) health and environmental impacts B. Certification: 310 CMR 19.011 Any person, required by these regulations or MtlchcceC( G.7 1*/7e-any order issued by the Department, to submit Pnint.Namne 9 ~6kA papers shall identify themselves by name, profession, and relationship to the applicant and Authokzed Signatlbre legal interest in the facility, and make the following certification: "Icertify under penalty of Positionfritle ,

law that I have.personally examined and, am familiar with the information submitted in this Date 2A~L/Q~/1 document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe. that the information is true, accurate and complete. I am aware that there are significant penalties both civil and criminal for submitting false information including possible fines and imprisonment.

sw13-30 form USGen NE.doc-doc - 08101 OWP SW 13, 30 - Page 2 of 2

Appendix B Human Health Risk Assessment BUD for Concrete

YNPS Human Health Risk Assessment - BUD for Concrete Human Health Risk Assessment Beneficial Use Determination (BUD) for Concrete Yankee Nuclear Power Station Rowe, Massachusetts Prepared for Yankee Atomic Electric Company 49 Yankee Road Rowe, Massachusetts 01367 Prepared by Gradient Corporation 20 University Road Cambridge, MA 02138 September 22, 2004

\202073\workplans~hhra\-'946 !144,doc Gradient CORPORATION

YNPS Human Health Risk Assessment - BUD for Concrete Table of Contents I Introduction and BUD Goals .................................................................................... 1 2 Hazard Identification ............................................................................................ 2 3 Dose-Response Assessment ................................................................................. 2 4 Exposure Assessment ............................................................................................ 3 5 Radiological Risk Characterization ......................................................... ................ 4 5.1 External Radiation ....................................................................................................... 4 5.2 Leaching to Groundwater .............................................................................................. 7 References ............................................................................................................................ 9 List of Tables Table I Radiation Dose Reduction Due to 3-Foot Soil Overburden Table 2 Summary of External Radiation Risk Calculations for BUD Table 3 External Radiation Risk Calculations - No Overburden Conditions Table 4 Screening Comparison of Radionuclide Leaching to Groundwater Compared to Drinking Water Guidelines

\202073\ý orkp ans\hhra\-94611 44.doc Gradient CORPORATION

YNPS Human Health Risk Assessment - BUD for Concrete 1 Introduction and BUD Goals This document presents a human health risk assessment to support the Category 3 Beneficial Use Determination (BUD) for Secondary Materials in Restricted Applications for concrete debris. This BUD is a component of the environmental site closure underway at the Yankee Nuclear Power Station (YNPS).

Yankee Atomic Electric Company (YAEC) owns YNPS and surrounding lands, which comprise approximately 1,800 acres, of which approximately 12 acres is occupied by the nuclear plant itself.

Since 1992, the plant has been in the process of being dismantled and YAEC is terminating the YNPS federal license with the Nuclear Regulatory Commission (NRC). In order to terminate its nuclear operating license, YAEC must complete a process of radiological cleanup defined by the NRC and set forth in YAEC's License Termination Plan (LTP). In addition, YAEC will comply with the Massachusetts Department of Public Health (MADPH) requirements for meeting radiological dose guidelines. Both the NRC and MADPH require compliance with radiological "dose-based" requirements for the protection of human health.

In parallel with the license termination and cleanup to meet the NRC and MADPH radiological dose requirements, YAEC is conducting a comprehensive environmental closure that will ensure that the property poses no adverse human or environmental risks once YAEC transfers title of the property. The environmental site closure is being performed as a voluntary action that will adhere to guidelines established by the Massachusetts Department of Environmental Protection (MADEP) as well as guidelines established by the U.S. Environmental Protection Agency (USEPA) -- in addition to the requirements noted above established by NRC and MADPH.

This human health risk assessment was performed to support a Category 3 BUD as outlined in the March 18, 2004 Draft Interim Guidance Document for Beneficial Use Determination Regulations, 31OCMR19.060 (MADEP, 2004). The risk management guidelines defined in the draft BUD guidance require demonstration of meeting 0.5 X 10-6 cancer risk for an individual constituent, and 0.5 x 10-5 overall cancer risk summed over all constituents. No cleanup standards for radionuclides are available in the Draft BUD Guidance. This risk assessment develops risk-based support for residual levels of radionuclides in concrete debris, and is consistent with an MCP Method 2 approach.

The BUD risk assessment methods follow those defined under the MCP (MADEP, 1995).

However, MADEP does not have any published radiological risk assessment guidance. Thus, the

\20207Y,,% rkplans~hhra\-9461 144.doc I Gradient CORPORATION

i I

YNPS Human Health Risk Assessment - BUD for Concrete assessment of radiological risks to support the BUD relied upon the most recent guidance set forth in the USEPA (2000a) Soil Screening Guidance for Radionuclides: Technical Background Document.

2 Hazard Identification Constituents of potential concern (COPCs) for the BUD include residual PCBs and radionuclides in concrete debris. Confirmation sampling of the concrete will ensure that the maximum residual PCB concentration will be no more than 2 mg/kg in the concrete debris. This maximum threshold is essentially equivalent to the default BUD S-2 and S-3 standard of 1.6 mg/kg for PCBs. The BUD S-2 and I S-3 defaults represent a risk-based acceptable average concentration (this is inherent to the risk assessment process). Although all concrete will be confirmed to contain no more than 2 mg/kg, the actual average PCB concentration in concrete will be below the S-2 and S-3 BUD standards for PCBs. Thus, no further risk assessment is required for PCBs in concrete to meet the BUD Category 3 guidelines.

No standards exist in the draft BUD guidance for radionuclides. Thus, the COPCs for the BUD risk assessment are the radionuclides listed in the YNPS LTP. The radionuclide COPCs are listed in Table 1.

The Dose. Concentration Guideline Levels (DCGLs) developed in the LTP ensure that the radiation dose from exposure to residual radionuclides is no more than 25 mrem/yr to meet NRC requirements. These DCGLs for the concrete debris were developed using the RESRAD multipathway risk assessment and radionuclide fate modeling system developed by the U.S. Department of Energy I (ANL, 2001). The concrete debris that is proposed to be used as fill, covered by 3-feet of soil overburden, will have residual radionuclide concentrations that are less than or equal to the DCGL concentrations. Thus, for this risk evaluation, we conservatively assumed that the concrete debris had concentrations equal to the DCGLs, even though the actual average concentration will by definition be less than the DCGLs.

3 Dose-Response Assessment I USEPA classifies all radionuclides as carcinogens, based on their property of emitting ionizing I radiation and on the extensive weight of evidence provided by epidemiological studies of radiologically induced cancers in humans. For radiological constituents, cancer slope factors have been published in the

%202073Vworkplans,'hhra -9461144.doc 2 Gradient CORPORATION

YNPS Human Health Risk Assessment - BUD for Concrete USEPA (2000a) Soil Screening Guidance for Radionuclides: Technical Background Document. This document was used as the bases of the dose-response (toxicity) factors used for the BUD risk assessment.

4 Exposure Assessment Although the ultimate use for the Site has not been determined, it will likely include open space for recreational activities. Furthermore, an Activity Use Limitation (AUL) will be enforced over that portion of the site that constituted the former industrial area, and this is the area applicable to the BUD for concrete. The AUL will ensure that the 3-foot overburden in the former industrial area is maintained.

The AUL will preclude excavation, without a DEP-approved soil management plan and would occur only under the oversight of a Licensed Site Professional (LSP). Thus, the AUL will prevent "direct contact" pathways such as incidental ingestion and dermal contact with subsurface materials.

Furthermore, indirect pathways such as intake from vegetables that might conceivably be grown on the graded area, would not lead to the uptake of radionuclides as they would lie beneath the 3-foot of graded material. Thus, the remaining pathway of possible concern for exposure to radionuclides in the subsurface concrete, is from external radiation (e.g., ionizing radiation emitted as the result of radioactive decay).

In order to evaluate the attenuation provided by the 3-feet of overburden, we used the U.S.

Department of Energy RESRAD multipathway risk assessment model (ANL, 2001). We first calculated the external radiation dose assuming no overburden, then performed a parallel calculation for a scenario that included 3-foot of soil overburden. For both scenarios, a unit concentration (e.g., I pCi/g) was used for each radionuclide (the dose and risks scale directly as a function of the source concentration).

As summarized in Table 1, the dose reduction provided by the 3-foot of overburden is quite large, ranging from over 10,000-fold at a minimum, and for some radionuclides diminishing the external radiation dose by well over a million-fold.

Although the AUL may not necessarily preclude installation of a well for drinking water from a regulatory perspective, as a practical matter installation of a drinking water well would be implausible with the AUL in place. Nevertheless, we examined the leaching to groundwater pathway for the radionuclides in concrete, as discussed in the next section.

%2 02073 \u orkpl ans~hhra ý-9461144.doc 3 Gradient CORPORATION

I YNPS Human Health Risk Assessment - BUD for Concrete I

5 Radiological Risk Characterization Although the AUL will preclude direct contact with subsurface concrete debris, radionuclides can 3 have a deleterious effect on humans without being taken into or brought in contact with the body. This is because high-energy beta particles and photons from radionuclides can exert their energy directly in human tissue. Such "external radiation" exposures can result from exposure to residual radionuclides at the site. Gamma and x-rays are the most penetrating of the emitted radiation and comprise the primary contribution to the radiation dose from external exposures. Radionuclide intake is expressed in units of 3 radiation activity (i.e., picocurie or pCi) rather than mass.

I 5.1 External Radiation I

Cancer risk associated with external radiation exposures was calculated using the following equation, which accounts for external radiation exposure while indoors and outdoors (USEPA, 2000b):I Risk Rik=x365Cx(- dy/y days/yr) xED xACFx[ETo +(ET, x GSF)] xCSF, (5-1) U where:

I C = Average exposure point concentration (pCi/g)

EF = Exposure frequency (days/yr)

ED ACF

=

=

Exposure duration (e.g., 30 years)

Area correction factor (default = 0.9; USEPA, 2000a)

I ETo Exposure time fraction outdoors (default = 0.073; USEPA, 2000a)

ETi GSF

=

= Exposure time fraction indoors (default = 0.683; USEPA, 2000a)

Gamma shielding factor (default = 0.4; USEPA, 2000a)

I CSFext = Cancer slope factor for external radiation (risk/yr per pCi/g)

Values for the radionuclide cancer slope factors are given in USEPA's Soil Screening Guidance for Radionuclides (USEPA, 2000a) as well as the RESRAD User's Manual (ANL, 2001).

Note that the equation in the USEPA Technical Background Document contains a typographical error, the correct equation is found in Equation 4, page 2-22, of the USEPA User's Guide. Note further that the USEPA SSLs are written in terms of a "risk based concentration" (e.g., the SSL term is the radionuclide concentration (C) term); the risk equation here simply rearranges the USEPAequation to express it as a function of risk.

4 Gradient CORPORATION I

I

'202073 ,* orkplan~shhra -9461 144.doc

YNPS Human Health Risk Assessment - BUD for Concrete Adjustment of Concentration for Radioactive Decay The concentration of radionuclides in the environment declines according to radionuclide-specific decay rates. Thus, the radionuclide concentration (C) is not a constant, but rather declines as a function of time according to the following exponential equation:

C(t) Co e-t (5-2) where C(t) = concentration at time "t" in years (pCi/g)

C( - initial concentration at time t=O (pCi/g) ln(2) is the decay constant (per year) t12 half-life (years)

The average concentration (C) over a particular time period (T) is given by integrating the declining concentration over the time period:

C = f C,,e-dt 0 (5-3)

-e-7Ar)

-(1 CO T where Co is the exposure point concentration at the beginning (time t=O) of the exposure period. In this analysis, we adopted the standard "default" assumption of a 30-year exposure duration (i.e., T = 30 years, where T and ED are synonymous).

For radionuclides with short half-lives (e.g., shorter than the typical exposure duration of interest), the time-averaged concentration can be appreciably less than the initial concentration.

Conversely, for long-lived radionuclides, the adjustment for radioactive decay is insignificant.

A summary of the external radiation cancer risks for the BUD is provided in Table 2. The risks calculated for the 3-foot overburden are given by calculating the risks using Equation 5-1 with the average concentration given by Equation 5-3 as though no overburden existed (see Table 3), and then 9

Q02 073 -orkpiansbhhra v 461144.do 5 Gradient CORPORATION

YNPS Human Health Risk Assessment - BUD for Concrete I

I adjusting these risks by accounting for dose reduction provided by the 3-foot overburden. The risk assessment results meet the dual BUD risk-based criteria: I 0

0 All individual radionuclide risks fall below 0.5 x 10-6 The total risk of I x 10- 8 (rounded from 9.8 x l0-9) is well below the BUD risk guideline I

of 0.5 x 10-.

I This evaluation demonstrates that the Category 3 BUD for concrete meets the risk management guidelines in the Draft BUD Guidance document (MADEP, 2004). 1 Relationship Between Radiation Dose (mreml/r) and Cancer Risk I

As noted in Section 2, the DCLGs in the LTP are established on the basis of limiting the possible radiation dose to 25 mrem/yr. Cancer risk can be related to radiation dose through the following I

equation:

I (1 -e-T) x( CSFex eSF_)

Riskex, = Doseext x ED x A 2 DCFE, (5-4a)

I For radionuclides with long half-lives, this reduces to:

I Risk ex, = Doseet x ED x (

CSFex, )**-- (5-4b)

I otCs, I

where Doseext External radiation dose (mrem/yr)

I CSFex, DCFex, External radiation cancer slope factor (risk per pCi/g)

External radiation dose conversion factor (mrem/yr per pCi/g) I The relationship between "risk" and "dose" is provided.here for completeness. For the BUD, the dose calculations are not needed to ensure compliance with the BUD risk management guidelines. However, I

as shown in Table 2, the dose for due to subsurface concrete materials would be approximately 10,000-fold below the Massachusetts Department of Public Health dose guideline of 10 mrem/year. I I

\202073\workpIl\hhra\-9461 144.do 6 Gradient CORPORATION I

YNPS Human Health Risk Assessment - BUD for Concrete 5.2 Leaching to Groundwater Using methods consistent with the MCP and MADEP Guidelines (MADEP 1994, 1995), and also defined in U.S. EPA's (2000a,b) Soil Screening Guide for Radionuclides, we examined possible leaching to groundwater for the radionuclides in concrete. For this evaluation we performed the following stepwise screening evaluation:

1. Calculate an equilibrium concentration of radionuclide in pore water using standard equilibrium partitioning equations:
2. Applied a "dilution attenuation factor" (DAF) to the pore water values as a screening estimate of the concentration at a hypothetical well.
3. Compared the resulting concentrations in "groundwater" to drinking water standards for radionuclides.

The equations used for step I and 2 are outlined below:

Step 1:

CW Csx +Ko Ob+Pb Jx103 (g/kg) (5-5) d)

Step 2:

CC W (5-6)

- DAF where CW = concentration in pore water (pCi/L)

C, = concentration in soil (pCi/g)

Cgw - concentration in groundwater (pCi/L)

Kd = soil-water partition coefficient (L/kg) porosity or water content (cm 3/cm 3)

Pb = soil bulk density (g/cm3 )

DAF = dilution attenuation factor (unitless)

\2 0207 3%workpi ansxhhma-94 61144. do 7 Gradient CORPORATION

1 YNPS Human Health Risk Assessment - BUD for Concrete I

The radionuclide soil-water partition coefficients, which are based on values published in the RESRAD User's Manual, are also summarized in the LTP (Appendix 6N). j There are no DAF values for radionuclides in the MADEP (1994, 1995) guidance. However, the MADEP has derived DAF values for a range of organic compounds with varying soil-water K4 parameters, as summarized below:

Koc K, Parameter benzene (L/kg) 83 (L/kg) 0.083 DAF 56.5 I ethylbenzene toluene o-xylene 575 270 302 0.575 0.27 0.302 121.1 80.6 83.3 I

TCE 124 0.124 76.3 PCE 1,1,1-TCA 468 157 0.468 0.157 86.2 169.2 I

Paphthalene 1288 1.288 222.2 Notes:

Kd = K,, x f, (foc = 0.001, i.e-, 01% organic carbon)

Source: MADEP (1994)

I

/1 Based on these modeled DAF values, MADEP (1994) developed a regression equation for DAF values I for non-modeled compounds as a function of chemical partition coefficient.

As summarized in Table 4, the soil-water partition coefficients for radionuclides are greater than I

(e.g., less soluble in water) than all of the compounds modeled by MADEP.

beyond the range of the MADEP modeled results, we adopted a DAF value of 222 (e.g., the value for Rather than extrapolate I

naphthalene with a K1 value of 1.3), as this was the compound with the largest K1 value modeled. This DAF value is likely to underestimate the dilution for the radionuclides, with typical I( values ranging I from approximately 10 L/kg to over 1,000 L/kg (see Table 4).2 I

The calculated radionuclide concentrations in groundwater (Cg.) calculated in this manner, were compared to the drinking water standards, as summarized in Table 4. Note that for this calculation, the average concentration in concrete debris over a 30-year period, taking into account radioactive decay I

(Equation 5-3), was used for the value of C, in Equation 5-5. As the results in Table 4 indicate, the placement of subsurface concrete debris under the BUD with radionuclide concentrations equal to the I

DCGLs would not lead to groundwater contamination above drinking water standards.

I 2 Tritium (Hydrogen-3 in Table 4) is the notable exception, as it does not "partition" to soil.

I Q02073\workplans~hhra-9461 144.doc 8 Gradient CORPORATION I

YNPS Human Health Risk Assessment - BUD for Concrete References Argonne National Laboratory (ANL). 2001. User's Manual for RESRAD Version 6. Environmental Prepared for U.S. Department of Energy (USDOE). July 2001.

Massachusetts Department of Environmental Protection (MADEP). 2004. "Draft Interim Guidance Document for Beneficial Use Determination Regulations, 310CMRI9.060." Bureau of Waste Prevention, March 18, 2004.

Massachusetts Department of Environmental Protection (MADEP). 1995. "Guidance for Disposal Site Risk Characterization - In Support of the Massachusetts Contingency Plan (Interim final policy)." Bureau of Waste Site Cleanup and Office of Research and Standards (Boston, MA). BWSC/ORS-95-141. July.

Massachusetts Department of Environmental Protection (MADEP). 1994. "Background documentation for the development of the MCP numerical standards." Bureau of Waste Site Cleanup and Office of Research and Standards (Boston, MA), April 1994.

U.S. Environmental Protection Agency (USEPA). 2000a. Soil Screening Guidance for Radionuclides:

Technical Background Document. EPA/540-R-00-006. Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response. Washington, DC.

U.S. Environmental Protection Agency (USEPA). 2000b. Soil Screening Guidance for Radionuclides:

User's Guide. EPA/540-R-00-007. Office of Radiation and Indoor Air; Office of Solid Waste and Emergency Response. Washington, DC.

\202073\%orkplansfhhraý~9461144,doc 9 Gradient CORPORATION

YNPS Human Health Risk Assessment - BUD for Concrete Tables i I

U I

I I 44.doc Gradient CORPORATION 2O2O73\~Qrkpns~hh~\-946I Q202073\. orkp1ans hhra "-9461144.do- Gradient CORPORATION

Table I Radiation Dose Reduction Due to 3-Foot Soil Overburden Radiation Dose at Year I Radionuclide External Radiation Dose (mrem/yr) Dose No Overburden 3-Foot of Soil Reduction Cobalt (Co-60) 7.5E+00 1.6E-04 4.6E+04 Cesium (Cs- 137) 1.8E+'00 4.1E-06 4.5E+05 Silver (Ag-108m) 1.7E+00 2.9E-06 5.9E+05 Tritium (H-3) n/a n/a n/a Carbon (C- 14) 3.1E-08 5.4E-24 5.8E+15 Iron (Fe-55) n/a n/a n/a Nickel (Ni-63) n/a n/a n/a Strotium (Sr-90) 1.3E-02 9.4E- 10 1.4E+07 Niobium (Nb-94) 1.7E+00 6.7E-06 2.6E+05 Technetium (Tc-99) 2.3E-05 5.4E-18 4.3E+12 Antimony (Sb- 125) 3.1E-01 3.OE-07 L.OE+06 Cesium (Cs-134) 3.2E+00 9.4E-06 3.4E+05 Europium (Eu-152) 3.7E+00 3.6E-05 1.0E+05 Europium (Eu-154) 3.9E+00 4.9E-05 7.9E+04 Europium (Eu- 155) 8.5E-02 3.3E- 13 2.6E+l I Plutonium (Pu-238) 8.9E-05 5.9E- 17 1.5E+l 2 Plutonium (Pu-239) 1.7E-04 1.3E-12 1.3E+08 Plutonium (Pu-241) I.OE-05 3.9E- 15 2.6E+09 Americium (Am-241) 2.5E-02 5.3E-21 4.8E+18 Curium (Cm-243) 3.2E-01 2.9E-09 1.1E+08 Notes:

All doses calculated using RESRAD 6.22 for a unit concentration (I pCi/g) in soil and default parameters from RESRAD.

Doses and dose reduction are for external radiation pathways (all other pathways turned off).

gamma shielding factor= 0.7 fraction of time outdoors = 0.5 fraction of time indoors = 0.25 n/a = not applicable, not a cancer risk for external radiation (USEPA, 2000).

\21)2U13\rep0nSgmthcntýbud\

BUD RiATWmýIsNBUD T.Wl Gradient CORPORATION

Table 2 Summary of External Radiation Risk Calculations for BUD Radionuclide Concrete Debris External Radiation Cancer Risk Dose/Risk Reduction External Risk External Dose DCGL Without 3-Foot Overburden 3-Foot Overburden With 3-Foot Overburden With 3-Foot Overburden

[11 [2] [3] [41 [5]

(pCi/g) (pCi/g) (at Year i) mrern/yr)

Co-60 4.3 1.2E-04 4.6E+04 2.6E-09 4.5E-04 Cs-137 + D 6.7 1.1E-04 4.5E+05 2.5E-10 1.51-05 Silver - 108rn + D 7.0 4.2E-04 5.9E+05 7.0E-l0 3,4E-05 Hydrogen-3 280.0 n/a n/a n/a n/a Carbon- 14 7.2 5.OE- 10 5.8E+ 15 8.6E-26 4.9E-21 hron-55 140.0 n/a n/a n/a n/a Nickel-63 100.0 n/a tn/a n/a n/a Strotiurn-90+D 0.8 9.5E-08 l.4E+07 6.7E-1 5 3.9E-10 Njobium-94 7.0 4.6E-04 2,6E+05 1.8E-09 7.8E-05 Technetiurm-99m 61.0 4,5E-08 4.3E+ 12 l.OE-20 5 3E-16 Antimnony- 125+D 31.0 7.2E-05 l.OE+06 7.OE- II 2.2E-05 Cesium- 134m 4.7 2.9E-05 3,4E+05 8.4E- 11 3 9E-05 Europium-152 9.5 2.3E-04 L.OE+05 2,2E-09 1.9E-04 Europiurn- 154 9.1 1,7E-04 7.9E+04 2,l E-09 2,6 E-04 Europium- 155 380.0 L.OE-04 2.6E+I I 3.9E- 16 8.0E- I I Plutonium-238 9.5 5.5E-09 1.5 E+ 12 3.6E-21 2.8E.16 Plutonium-239 8.8 1.6E-08 1.3E+08 1.2E- 16 6.I E-12 Plutoniumu-241 140.0 2.7E-09 2.6E+09 L.OE-18 3.OE-13 Americium-241 4.1 9.9E-07 4.8E+ 18 2. 1E-25 1.I E-20 Curium-243 4.7 1 .2E-05 1.1E+08 1.1 E- 13 7.4AE-09 Totals 9.8E-09 1.! E-03 Notes: Regulatory Guideline I 5.OE-06 10

[I] Dose concentration guideline levels for concrete debris in LTP (radionuclide concentration in concrete will be less than or equal to these values).

[2] External radiation risk for no overburden calculated using EPA (2000) default parameters and cancer slope factors,

[3] Dose reduction for 3-foot soil cover calculated using RESRAD 6.22 for a unit concentration (I p~i/g) in soil and default parameters from RESRAD.

[4] Cancer risk for BUD based on 3-foot overburden (Column [2] divided by column [3].)

[5] External radiation dose at year-I Cancer risk for BUD based on 3-foot overburden (Dose with no cover from Table 3, divided by column [3])

n/a - radionuclide not a cancer risk for external radiation (EPA, 2000).

U020Rr73I\ 5lJ, :vbk Page Iof I Gradient CORPOAMTION M M M - -M - -M M M---- -M -I

Table 3 External Radiation Risk and External Dose Calculations -- No Overburden Conditions Radionuclides Concentration Half-Life Ave. Cone. Slope Factor DCF Cancer Risk Dose - 1 yr Evaluated (C,,) fll (C-) (CSF) (C. x IF x CSF) (C x IF x VCF)

(pCi/g) (yrs) (pCi/g) (Risk/yr- pCi/g) (m rem/yr -. pCi/g) (mrem/yr)

Co-60 4.3 5.3 1.07 1.24E-05 1.62E+0I I. 19E-04 2.1E+O I Cs-137 + D 6.7 30.0 4.83 2.55E-06 3.41E+00 1.IOE-04 6.8E+00 Silver - I108m + D 7.0 127.0 6,46 7.19E-06 9.65E+00 4.2E-04 2.0E+01 Hydrogen-3 280.0 12.0 133.02 Carbon- 14 7.2 5730.0 7.19 7,83 E- 12 1.34E-05 5.OE- I0 2.9E-05 Iron-55 140.0 3.0 20.18 Nickel-63 100.0 100.0 90.29 Strotium-90+D 0.8 29.0 0.54 1.96E-08 2.46E-02 9.5E-08 5.6E-03 Niobium-94 7.0 20000.0 7.00 7.29E-06 9.68E+00 4.6E-04 2.OE+0I Technetium-99m 61.0 210000.0 61.00 8.14E- I I 1.26E-04 4,5E-08 2.3 E-03 Antimony- 125+D 31.0 3.0 4.47 1.81 E-06 2.45E+00 7.2E-05 2.3E+0 I Cesium-134m 4.7 2.0 0.45 7.10E-06 9.47E+00 2.9E-05 1,3E+O I Europium- 152 9.5 13.0 4.74 5.30E-06 7,01E+00 2.3E-04 2.0E+0 1 Europium- 154 9.1 8.0 3.24 . 5.83E-06 7.68E+00 1.7E-04 2, 1E+01 Europium- 155 380.0 5.0 89.94 1.24E-07 1.82E-01 1,0E-04 2. 1E+01 Plutonium-238 9.5 88.0 8.46 7.22E- I 1 1.51E-04 5.5E-09 4.3E-04 Plutonium-239 8.8 24000.0 8.80 2.00E- 10 2.95E.04 1.6E-08 7.8E-04 Plutoniumu-241 140.0 14.0 72,91 4.11E-12 . 1.89E-05 2.7E-09 7.9E.04 Americium-241 4.1 432.0 4.00 2.76E-08 4,37E-02 9.9E-07 5.4E-02 Curium-243 4.7 28.0 3.32 4.19E-07 5.83E-01 1.2E-05 8,2E-01 I Total: 2.3E-04 2.8E+01 IF,".k (EF/365) x ED x ACF x (ET,,, +(ETj,, x GSF)) 8.96E+00 IF&_ (EF/365) x ACF x (ET +(ETi x GSF)) 2.99E-01 where:

EF Exposure Frequency (d/yr) 350 (EPA, 2000)

ED Adult + Child Exposure Duration(yr) 30 (EPA, 2000)

ACF Area Correction Factor 0.9 0.5 acre (EPA, 2000)

Etout Exposure time outside (fraction) 0.073 (EPA, 2000)

Etin Exposure time inside (fraction) 0.683 (EPA, 2000)

GSF gamma shielding factor 0.40 (EPA, 2000)

ACF x (ETout +(ETin x GSF)) 3.12E-01 Exposure time at site (hr/day) 18.1 Away from site (hr/day) 5.9 Rik RadXIS Ml11) I Page 1 of [ i Gradient OhlG CORPORATION

Table 4 Screening Comparison of Radionuclide Leaching to Groundwater Compared to Drinking Water Guidelines Radionuclide Initial Conc. Average Cone. Partition Coeff. Concentration Concent'ration Drinking Water Half-life (DCGL) 30-years Kd in Pore Water DAF = 100 Guidelines

[I) [2] [3] [4] [4] [5]

(yr) (pCi/g) (pCi/g) (L/kg) (pCi/L) (nCi/L) . piL Co-60 5.27 . .. . . 43 1. 282.0 3.8 0.02 100 Cs-137 - D 30 6.7 4.8 137.0 35.2 0.16 200 Silver - 1.08m + D 127 7.0 .. 6.5 6500.0 .. _... 1.0 0.00 5.8 (RBL)

Hydro*,ge_ n...

..3 12 _ 2.80 13.

3.3..0 . . . 0.00 731,598.7_ 3,2.95 20,000 Carbon-14 5,730 7.2 7.2 70.70 101.4 0.46 2,000 lronn-55 3 140 20.2 12.5 1,591.1 7.17 2,000 Nickel-63 100 100 90.3 35.5 2,530.4 11.4 50 S~trotium-9-0+D -- 29 0.76--- -0.5 10.50_ 50..8. 0.23. 8 Niobium-94 2.OOE+04 7.0 7.0 316.0 22.1 0.10 6.1 (RBL)

Technetitim-99m 2.1013+05 61 61.0 _ 14 4,458.3 20,08 900 Antimony-125+D 3 31 4.5 1,550 2.9 0.01 300 Cesium-134m 2 4.7 0.5 137.0 3.3 0.01 80 Europium-.152 13 9.5 4.7 1,000.0 4.7 0.02 200 Europiurn-154 8. . 9.1 3.2 . 1000.0 3.2 0.01 60)

Europium- 155 5 380 89.9 1,000 89.9 0.41 600 Plutoniumr-238 88 9.5 8.5 888.0 la .. 9.5 0.04 15 Plutonium-239 2.40E+04 8.8 8,8 888,0 [al 9.9 0.04 IS Plutoniumu-241 14 140 72.9 888.0 [a] 82.1 0._37 27 (RBL)

Americium-241 432 4 4.0 447 [a] 9.0 0.04 15 Curium-243 28 4,7 3.3 400.0 [a] 8,3 0.04 15 Notes:

[I] Values reported in License Termination Plan.

[2] Calculated average concentration in subsurface concrete over 30 year time period based on radioactive decay (see text).

[3] Median Kd values reported in LTP (from RESRAD), Values noted [a] are 25th percentiles from LTP Appendix 6N.

[4] Equilibrium concentration between concrete/soil and groundwater assuming no dilution (see text).

[5] Drinking water guidelines are MCLs from USEPA (2000) Soil Screening Guidance for Radionuclides. RBL = Risk Based Limit (no MCL)

Parameters for [21, [31 and [41:

Averaging Period (yrs):

bulk density (g/cc): 1.54 porosity (cc/cc): - 0.28 Dilution Attenuation Factor (DAF) 222

\2020731,W~on. 055,5 g-fi-NHIRAM RiAkRad.5[.SMO(II W RIO Page I of I Gradient CORPORATION M M M M - M M -= M- =-- ---- 1