ML070160124
ML070160124 | |
Person / Time | |
---|---|
Site: | Yankee Rowe |
Issue date: | 11/09/2005 |
From: | Yankee Atomic Electric Co |
To: | NRC/FSME |
References | |
OOL-03, YA-REPT-00-003-05 YNPS-FSS-OOL-03-00 | |
Download: ML070160124 (3) | |
Similar Documents at Yankee Rowe | |
---|---|
Category:Report
MONTHYEARML16043A3752016-01-25025 January 2016
[Table view]Yankee ISFSI - Revision 3 to the Post-Shutdown Decommissioning Activities Report ML15051A3712015-02-0404 February 2015 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - 10 CFR 95.57(b) Log for January 2015 ML14069A1842014-02-25025 February 2014 Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation, Revision 2, Post-Shutdown Decommissioning Activities Report ML13028A1222013-01-14014 January 2013 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests and Experiments ML11166A1242011-06-0808 June 2011 Response to Second Request (Part 2) for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar ML0907001352009-02-23023 February 2009 10 CFR 72.48 Evaluation Biennial Summary Report for 2007/2008 ML0906804082009-02-19019 February 2009 Yankee Atomic Electric Company (Yaec) - 10CFR50.59 Evaluation Biennial Summary Report for 2007 and 2008 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0703204732006-12-12012 December 2006 Licensee Response, Dated 12/12/2006, to NRC Comments on Yankee Final Status Survey Reports, NOL-03, NOL-06, OOL-10, OOL-11, and OOL-18 ML0633204422006-10-27027 October 2006 YA-REPT-00-018-06, Estimated Doses from Inhalation, Ingestion and Remote Exposure from Residual Discrete Particles at Yankee Nuclear Power Station Following NRC License Termination. ML0629700392006-10-0606 October 2006 Yankee Nuclear Power Station - Control Point Portable Instrument Accountability Form ML0629700362006-10-0606 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 OOL-07-01 Through 15 OOL-07-03 ML0629700692006-10-0505 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 NOL-05-01 Through 10 NOL-05-02 ML0701602732006-08-0909 August 2006 Yankee Nuclear Power Station Final Status Survey Reports, YNPS-FSS-OMB06-00 & YNS-FSS-OOL15-00, for Survey Areas OMB-06 & OOL-15 ML0629300872006-06-12012 June 2006 YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet ML0600403082005-12-0808 December 2005 Response to Request for Final Status Survey-Related Procedures ML0615303932005-12-0202 December 2005 In-Process Inspection Survey Results for the Turbine Building Slab Area at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0701601132005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix a, Final Status Survey Planning Worksheets. ML0701601242005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix D, Generic ALARA Evaluation Comparison Worksheet. ML0629700622005-11-0404 November 2005 Yankee Nuclear Power Station - Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys, YA-REPT-00-018-05 ML0627803832005-11-0404 November 2005 YA-REPT-00-018-05, Rev 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0531202752005-10-31031 October 2005 Yankee Atomic Electric Company Request for Approval of Revised Proposed Procedures in Accordance with 10 CFR 20.2002 ML0615303832005-10-12012 October 2005 In-Process Inspection Survey Results for the Reactor Support Structure Concrete Base and Inside Open Land Areas at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0702304712005-10-11011 October 2005 Appendix D, YA-REPT-00-018-05, Rev . 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0630705032005-08-26026 August 2005 Yankee - YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet. ML0716601052005-06-17017 June 2005 Yankee Nuclear Power Station Site Closure Project Amended Phase III - Remedial Action Plan/Phase IV - Remedy Implementation Plan ML0525004532005-06-0101 June 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Support Final Status Surveys for Compliance with License Termination Criteria ML0525004512005-05-0909 May 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria ML0513704122005-05-0505 May 2005 Errata for Report of Continuing Hydrogeologic Investigations in 2004 ML0511501762005-04-14014 April 2005 YA-REPT-00-010-05, Report of Continuing Hydrogeologic Investigations in 2004. ML0704304972005-03-22022 March 2005 Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures ML0632104992005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0631201422005-01-18018 January 2005 Yankee Nuclear Power Stations, Technical Report, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0633402622005-01-18018 January 2005 Yankee Nuclear Power Station, Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0633502172005-01-18018 January 2005 Yankee Nuclear Power Station - Report YNPS-FSS-OOL-04-00, Final Status Survey Report for Survey Area OOL-04, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0631201082005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0630705022005-01-18018 January 2005 Yankee - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0630600562005-01-18018 January 2005 Yankee Nuclear Power Station - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629901572005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629700582005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0634804382005-01-18018 January 2005 Appendix C - YA-REPT-00-003-005, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634804112005-01-18018 January 2005 Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629700302005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629300852005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701604912005-01-18018 January 2005 Yankee Nuclear Power Station - Final Status Survey Report, Generic ALARA Review for Final Status Survey of Soil at Ynps, Appendix B - YA-REPT-00-003-05 ML0700305502005-01-18018 January 2005 Yankee Nuclear, Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0700305272005-01-18018 January 2005 Yankee Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701601202005-01-18018 January 2005 YNPS-FSS-OOL-03-00, Appendix C, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634806042005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0435700142004-12-10010 December 2004 Ynps Technical Report - Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria 2016-01-25 Category:Technical MONTHYEARML0703204732006-12-12012 December 2006
[Table view]Licensee Response, Dated 12/12/2006, to NRC Comments on Yankee Final Status Survey Reports, NOL-03, NOL-06, OOL-10, OOL-11, and OOL-18 ML0633204422006-10-27027 October 2006 YA-REPT-00-018-06, Estimated Doses from Inhalation, Ingestion and Remote Exposure from Residual Discrete Particles at Yankee Nuclear Power Station Following NRC License Termination. ML0701602732006-08-0909 August 2006 Yankee Nuclear Power Station Final Status Survey Reports, YNPS-FSS-OMB06-00 & YNS-FSS-OOL15-00, for Survey Areas OMB-06 & OOL-15 ML0701601242005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix D, Generic ALARA Evaluation Comparison Worksheet. ML0701601132005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix a, Final Status Survey Planning Worksheets. ML0629700622005-11-0404 November 2005 Yankee Nuclear Power Station - Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys, YA-REPT-00-018-05 ML0627803832005-11-0404 November 2005 YA-REPT-00-018-05, Rev 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0702304712005-10-11011 October 2005 Appendix D, YA-REPT-00-018-05, Rev . 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0525004532005-06-0101 June 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Support Final Status Surveys for Compliance with License Termination Criteria ML0525004512005-05-0909 May 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria ML0511501762005-04-14014 April 2005 YA-REPT-00-010-05, Report of Continuing Hydrogeologic Investigations in 2004. ML0704304972005-03-22022 March 2005 Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures ML0630600562005-01-18018 January 2005 Yankee Nuclear Power Station - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0633502172005-01-18018 January 2005 Yankee Nuclear Power Station - Report YNPS-FSS-OOL-04-00, Final Status Survey Report for Survey Area OOL-04, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0633402622005-01-18018 January 2005 Yankee Nuclear Power Station, Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0632104992005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634804112005-01-18018 January 2005 Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0631201422005-01-18018 January 2005 Yankee Nuclear Power Stations, Technical Report, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0631201082005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0630705022005-01-18018 January 2005 Yankee - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0629901572005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629700582005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0634806042005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0700305272005-01-18018 January 2005 Yankee Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0700305502005-01-18018 January 2005 Yankee Nuclear, Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701601202005-01-18018 January 2005 YNPS-FSS-OOL-03-00, Appendix C, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0701604912005-01-18018 January 2005 Yankee Nuclear Power Station - Final Status Survey Report, Generic ALARA Review for Final Status Survey of Soil at Ynps, Appendix B - YA-REPT-00-003-05 ML0629300852005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0634804382005-01-18018 January 2005 Appendix C - YA-REPT-00-003-005, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629700302005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0435700142004-12-10010 December 2004 Ynps Technical Report - Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria ML0630705002004-10-17017 October 2004 Yankee - Technical Report, YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe ML0700305282004-10-13013 October 2004 Yankee Final Status Survey Report, Appendix D - ALARA Evaluations, OOL-08 ML0629700572004-10-0707 October 2004 Yankee Nuclear Power Station - Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe, YA-REPT-00-015-04, Revision 0 ML0627803792004-10-0707 October 2004 YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0629901302004-10-0707 October 2004 Yankee Nuclear Power Station - Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe, YA-REPT-00-015-04, Rev 0 ML0631201052004-10-0707 October 2004 YA-REPT-00-015-04, Revision 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0631201412004-10-0707 October 2004 Yankee Nuclear Power Stations, Technical Report, YA-REPT-00-015-04, Rev. 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0632104972004-10-0707 October 2004 YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of Final Status Survey at Yankee Rowe. ML0633402592004-10-0707 October 2004 Yankee Nuclear Power Station, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculation in Support of the Final Status Survey, YA-REPT-00-015-04 ML0634804102004-10-0707 October 2004 Appendix B - YA-REPT-00-015-04, Rev 0 Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0634806032004-10-0707 October 2004 YA-REPT-00-015-04, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculation in Support of the Final Status Survey at Yankee Rowe ML0634806222004-10-0707 October 2004 YA-REPT-00-015-04, Revision 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe ML0629300842004-10-0707 October 2004 YA-REPT-00-015-04, Rev 00, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of Final Status Survey at Yankee Rowe ML0629700212004-10-0707 October 2004 Yankee Nuclear Power Station - Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe, YA-REPT-00-015-04, Rev 0 ML0702304292004-10-0707 October 2004 Appendix B, YA-REPT-00-015-04, Rev. 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0702302652004-10-0707 October 2004 Appendix B, YA-REPT-00-015-04, Rev. 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0701601162004-10-0707 October 2004 YNPS-FSS-OOL-03-00, Appendix B, YA-REPT-00-015-04, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0700305492004-10-0707 October 2004 Yankee Nuclear, Final Status Survey Report, Appendix B - YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe ML0700305262004-10-0707 October 2004 Yankee Final Status Survey Report, Appendix B - YA-REPT-00-015-04, Rev 0, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe 2006-08-09 Category:Status Report MONTHYEARML23080A1112023-03-0606 March 2023
[Table view]Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML23080A1072023-03-0606 March 2023 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22082A1232022-03-14014 March 2022 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML22089A1002022-03-14014 March 2022 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML21077A1682021-03-0202 March 2021 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML20087J6642020-03-16016 March 2020 Yankee Nuclear Power Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML19116A0502019-03-12012 March 2019 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation Decommissioning Funding Assurance Status Report ML18075A3252018-03-0505 March 2018 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML18078A3012018-03-0505 March 2018 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML17090A4112017-03-0909 March 2017 Yankee Nuclear Power Plant Independent Spent Fuel Storage Installation - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML17094A7342017-03-0909 March 2017 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML16096A3652016-03-21021 March 2016 Yankee ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML16076A2742016-03-0909 March 2016 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation - Decommissioning Funding Assurance Status Report ML15065A1382015-02-10010 February 2015 Yankee ISFSI - Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML14085A0192014-03-11011 March 2014 Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML14085A0172014-03-11011 March 2014 Yankee - Decommissioning Funding Assurance Status Report ML13094A1162013-03-25025 March 2013 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Decommissioning Funding Assurance Status Report ML13092A1432013-03-19019 March 2013 Yankee Nuclear Power Station Independent Spent Fuel Storage Installation, Funding Status Report for Managing Irradiated Fuel and GTCC Waste ML1210706332012-03-27027 March 2012 Redacted - Yankee, Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML1108101152011-03-15015 March 2011 Yankee, Decommissioning Funding Assurance Status Report ML1029403622010-11-12012 November 2010 October 2010 10 CFR 2.206 Monthly Status Report: Enclosures ML0908301902009-03-16016 March 2009 Yankee Atomic Electric Company - Decommissioning Funding Assurance Status Report - 10CFR 50.75 ML0629300822006-10-13013 October 2006 Yankee Nuclear Power Station Final Status Survey Report, Report No. YNPS-FSS-OOL-09-00 ML0629700152006-10-0505 October 2006 Yankee Nuclear Power Station - Final Status Survey Report YNPS-FSS-OOL-07-00 ML0629700512006-10-0303 October 2006 Yankee Nuclear Power Station - Final Status Survey Report, YNPS-FSS-NOL-05-00 ML0701605402006-09-26026 September 2006 Yankee Nuclear Power Station Final Status Survey Report, YNPS-FSS-OOL-13-00 ML0701605442006-09-21021 September 2006 Yankee Nuclear Power Station Final Status Survey Report, YNPS-FSS-SVC-01-00 ML0701605222006-09-18018 September 2006 Yankee Nuclear Power Station Final Status Survey Report, YNPS-FSS-OOL-16 ML0701604902006-09-0707 September 2006 Yankee Nuclear Power Station Final Status Survey Report, YNPS-FSS-AUX-02 ML0701605412006-08-31031 August 2006 Yankee Nuclear Power Station Final Status Survey Report, YNPS-FSS-NOL-04-00 ML0701605372006-08-28028 August 2006 Yankee Nuclear Power Station Final Status Survey Report, YNPS-FSS-BRT-01-00 ML0629300832006-07-13013 July 2006 Yankee Nuclear Power Station, YNPS-FSSP-OOL0901-00, Final Status Survey Planning Worksheets ML0704701242006-05-11011 May 2006 Yankee Nuclear Power Station - Submittal of YNPS-FSS-AUX01-00 and YNS-FSS-NSY12-00, the Final Status Survey Reports for Survey Areas AUX-01 and NSY-12, Respectively ML0704701302006-05-11011 May 2006 Submittal of YNPS-FSS-AUX0I-00 and YNS-FSS-NSY12-00, Final Status Survey Reports for Survey Areas AUX-01 and NSY-12, Respectively ML0704701212006-04-17017 April 2006 Submittal of Yankee Nuclear Power Station, Final Status Survey Report for Area WST-01 ML0613202062006-02-15015 February 2006 E-mail from D. Croulet of Entergy to Various, Regarding Monitoring Well Status - February 15, 2006-0600 ML0701601242005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix D, Generic ALARA Evaluation Comparison Worksheet. ML0701601132005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix a, Final Status Survey Planning Worksheets. ML0629300892005-11-0404 November 2005 YA-REPT-00-018-05, Rev 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys ML0630704972005-08-29029 August 2005 Yankee - Final Status Survey Planning Worksheets, YNPS-FSSP-NOL-06, RSS Footprint within the West Lower RCA Yard- Central ML0633402552005-08-0909 August 2005 Yankee Nuclear Power Station, Final Status Survey Planning Worksheet ML0629700172005-07-18018 July 2005 Yankee Nuclear Power Station - Final Status Survey Planning Worksheet ML0509603032005-03-30030 March 2005 Evaluation Biennial Summary Report for 2003 / 2004 ML0704003942005-02-21021 February 2005 YNPS-FSS-TBN01-00, Final Status Survey Report, Volume 3 (Attachment B Through Appendix D) ML0704004002005-02-21021 February 2005 YNPS-FSS-TBN01-00, Final Status Survey Report, TBN-01-13, Frequency Plot FSS Data Through Calculation of ALARA Action Level ML0634806042005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701601202005-01-18018 January 2005 YNPS-FSS-OOL-03-00, Appendix C, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0700305252004-11-0303 November 2004 Yankee Final Status Survey Report, Appendix a - YNPS-FSSP-OOL-08, Final Status Survey Planning Worksheets ML0701601162004-10-0707 October 2004 YNPS-FSS-OOL-03-00, Appendix B, YA-REPT-00-015-04, Instrument Efficiency Determination for Use in Minimum Detectable Concentration Calculations in Support of the Final Status Survey at Yankee Rowe. ML0716700042004-06-0404 June 2004 Site Characterization Status Report, Yankee Nuclear Power Station Site Closure Project, Rowe, Massachusetts 2023-03-06 |
Text
Generic ALARA Evaluation Comparison Worksheet
/ Survey Area: 00L -03 Survey Unit: 0 1 I Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05
) Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL C(fraction DCGL) = 0 06 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.
Check one:
Generic ALARA AL IS satisfied.
Generic ALARA AL IS NOT satisfied.
FSS Project Manager DPF-8867.1 Rev. 2 Page 1 of 1
Generic ALARA Evaluation Comparison Worksheet
- -~~
Survey Area: OOL-03 Survey Unit: 02 Reference Generic A U R A Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL 1 CO-60 0.238 1.4 1.70E-01 2 CS-137 0.805 3 2.68E-01 3
4 C(fraction DCGL): 4.38E-01 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.
Check one:
X Generic ALARA AL IS satisfied.
Generic ALARA AL IS NOT satisfied.
Prepared by: Ron Shippee Date: 8/7/2006 FSS Radiological Engineer/
Reviewed by: r k f l nagdRadiation m c t i o n Manager Date:
Generic ALARA Evaluation Comparison Worksheet Survey Area: OOL-03 Survey Un~t: 03 Reference Generic ALARA Evaluation No.: YA-REPT-00-003-05 Applicable Generic ALARA AL: 165 Radionuclide Average Concentration DCGL fraction DCGL 1 Co-60 0.0102 1.4 7.29E-03 2 CS-137 0.1204 3 4.01E-02 3
4 C(fraction DCGL): 4.74E-02 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.
Check one:
Generic ALARA AL IS NOT satisfied.
Prepared by: Ron Shippee Date: 8/10/2006
/ I FSS Radiological Engineed Reviewed by:
- d Date:
~ r i $ i i a ~ h ~ d g Protection Manager