Category:Report
MONTHYEARML16043A3752016-01-25025 January 2016 Yankee ISFSI - Revision 3 to the Post-Shutdown Decommissioning Activities Report ML15051A3712015-02-0404 February 2015 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - 10 CFR 95.57(b) Log for January 2015 ML14069A1842014-02-25025 February 2014 Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation, Revision 2, Post-Shutdown Decommissioning Activities Report ML13028A1222013-01-14014 January 2013 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests and Experiments ML11166A1242011-06-0808 June 2011 Response to Second Request (Part 2) for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar ML0907001352009-02-23023 February 2009 10 CFR 72.48 Evaluation Biennial Summary Report for 2007/2008 ML0906804082009-02-19019 February 2009 Yankee Atomic Electric Company (Yaec) - 10CFR50.59 Evaluation Biennial Summary Report for 2007 and 2008 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0703204732006-12-12012 December 2006 Licensee Response, Dated 12/12/2006, to NRC Comments on Yankee Final Status Survey Reports, NOL-03, NOL-06, OOL-10, OOL-11, and OOL-18 ML0633204422006-10-27027 October 2006 YA-REPT-00-018-06, Estimated Doses from Inhalation, Ingestion and Remote Exposure from Residual Discrete Particles at Yankee Nuclear Power Station Following NRC License Termination. ML0629700392006-10-0606 October 2006 Yankee Nuclear Power Station - Control Point Portable Instrument Accountability Form ML0629700362006-10-0606 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 OOL-07-01 Through 15 OOL-07-03 ML0629700692006-10-0505 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 NOL-05-01 Through 10 NOL-05-02 ML0701602732006-08-0909 August 2006 Yankee Nuclear Power Station Final Status Survey Reports, YNPS-FSS-OMB06-00 & YNS-FSS-OOL15-00, for Survey Areas OMB-06 & OOL-15 ML0629300872006-06-12012 June 2006 YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet ML0600403082005-12-0808 December 2005 Response to Request for Final Status Survey-Related Procedures ML0615303932005-12-0202 December 2005 In-Process Inspection Survey Results for the Turbine Building Slab Area at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0701601132005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix a, Final Status Survey Planning Worksheets. ML0701601242005-11-0909 November 2005 YNPS-FSS-OOL-03-00, Appendix D, Generic ALARA Evaluation Comparison Worksheet. ML0629700622005-11-0404 November 2005 Yankee Nuclear Power Station - Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys, YA-REPT-00-018-05 ML0627803832005-11-0404 November 2005 YA-REPT-00-018-05, Rev 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0531202752005-10-31031 October 2005 Yankee Atomic Electric Company Request for Approval of Revised Proposed Procedures in Accordance with 10 CFR 20.2002 ML0615303832005-10-12012 October 2005 In-Process Inspection Survey Results for the Reactor Support Structure Concrete Base and Inside Open Land Areas at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0702304712005-10-11011 October 2005 Appendix D, YA-REPT-00-018-05, Rev . 0, Use of In-Situ Gamma Spectrum Analysis to Perform Elevated Measurement Comparisons in Support of Final Status Surveys. ML0630705032005-08-26026 August 2005 Yankee - YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet. ML0716601052005-06-17017 June 2005 Yankee Nuclear Power Station Site Closure Project Amended Phase III - Remedial Action Plan/Phase IV - Remedy Implementation Plan ML0525004532005-06-0101 June 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Support Final Status Surveys for Compliance with License Termination Criteria ML0525004512005-05-0909 May 2005 Yankee Atomic Electric Company In-Situ Gamma Spectrum Analysis Reports; Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria ML0513704122005-05-0505 May 2005 Errata for Report of Continuing Hydrogeologic Investigations in 2004 ML0511501762005-04-14014 April 2005 YA-REPT-00-010-05, Report of Continuing Hydrogeologic Investigations in 2004. ML0704304972005-03-22022 March 2005 Yankee Nuclear Power Station Revised Beneficial Use Determination for Structures ML0632104992005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0631201422005-01-18018 January 2005 Yankee Nuclear Power Stations, Technical Report, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0633402622005-01-18018 January 2005 Yankee Nuclear Power Station, Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0633502172005-01-18018 January 2005 Yankee Nuclear Power Station - Report YNPS-FSS-OOL-04-00, Final Status Survey Report for Survey Area OOL-04, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0631201082005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0630705022005-01-18018 January 2005 Yankee - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0630600562005-01-18018 January 2005 Yankee Nuclear Power Station - Technical Report YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629901572005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629700582005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0634804382005-01-18018 January 2005 Appendix C - YA-REPT-00-003-005, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634804112005-01-18018 January 2005 Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0629700302005-01-18018 January 2005 Yankee Nuclear Power Station - Generic ALARA Review for Final Status Survey of Soil at Ynps, YA-REPT-00-003-05 ML0629300852005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701604912005-01-18018 January 2005 Yankee Nuclear Power Station - Final Status Survey Report, Generic ALARA Review for Final Status Survey of Soil at Ynps, Appendix B - YA-REPT-00-003-05 ML0700305502005-01-18018 January 2005 Yankee Nuclear, Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0700305272005-01-18018 January 2005 Yankee Final Status Survey Report, Appendix C - YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0701601202005-01-18018 January 2005 YNPS-FSS-OOL-03-00, Appendix C, YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps. ML0634806042005-01-18018 January 2005 YA-REPT-00-003-05, Generic ALARA Review for Final Status Survey of Soil at Ynps ML0435700142004-12-10010 December 2004 Ynps Technical Report - Use of Gamma Spectrum Analysis to Evaluate Bulk Materials for Compliance with License Termination Criteria 2016-01-25
[Table view] Category:Miscellaneous
MONTHYEARML16043A3752016-01-25025 January 2016 Yankee ISFSI - Revision 3 to the Post-Shutdown Decommissioning Activities Report ML15051A3712015-02-0404 February 2015 Yankee Atomic Electric Company - Yankee Rowe Independent Spent Fuel Storage Installation - 10 CFR 95.57(b) Log for January 2015 ML14069A1842014-02-25025 February 2014 Yankee Nuclear Power Station, Independent Spent Fuel Storage Installation, Revision 2, Post-Shutdown Decommissioning Activities Report ML13028A1222013-01-14014 January 2013 Yankee Atomic Electric Company - Report of 10 CFR 72.48 Changes, Tests and Experiments ML11166A1242011-06-0808 June 2011 Response to Second Request (Part 2) for Additional Information for Application for NRC Consent to Indirect License Transfer/Threshold Determination - Merger of Northeast Utilities and Nstar ML0907001352009-02-23023 February 2009 10 CFR 72.48 Evaluation Biennial Summary Report for 2007/2008 ML0906804082009-02-19019 February 2009 Yankee Atomic Electric Company (Yaec) - 10CFR50.59 Evaluation Biennial Summary Report for 2007 and 2008 ML0715203992007-05-30030 May 2007 Fy 2007 Final Fee Rule Workpapers ML0629700392006-10-0606 October 2006 Yankee Nuclear Power Station - Control Point Portable Instrument Accountability Form ML0629700362006-10-0606 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 OOL-07-01 Through 15 OOL-07-03 ML0629700692006-10-0505 October 2006 Yankee Nuclear Power Station - Attachment B Data Quality Assessment Plots and Curves, Figures 1 NOL-05-01 Through 10 NOL-05-02 ML0629300872006-06-12012 June 2006 YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet ML0600403082005-12-0808 December 2005 Response to Request for Final Status Survey-Related Procedures ML0615303932005-12-0202 December 2005 In-Process Inspection Survey Results for the Turbine Building Slab Area at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0531202752005-10-31031 October 2005 Yankee Atomic Electric Company Request for Approval of Revised Proposed Procedures in Accordance with 10 CFR 20.2002 ML0615303832005-10-12012 October 2005 In-Process Inspection Survey Results for the Reactor Support Structure Concrete Base and Inside Open Land Areas at the Yankee Nuclear Power Station, Rowe, Massachusetts (Docket No. 50-29; Rfta No. 05-008) ML0630705032005-08-26026 August 2005 Yankee - YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet. ML0716601052005-06-17017 June 2005 Yankee Nuclear Power Station Site Closure Project Amended Phase III - Remedial Action Plan/Phase IV - Remedy Implementation Plan ML0513704122005-05-0505 May 2005 Errata for Report of Continuing Hydrogeologic Investigations in 2004 ML0306407102003-02-27027 February 2003 10CFR72.48 Biennial Summary Report for 2001/2002 ML0212205452002-04-18018 April 2002 Request for Amendment of Certificate of Compliance for NAC-MPC System to Incorporate Fuel Enrichment Fabrication Tolerances Into Yankee-Class Fuel Parameters ML0205100462002-01-30030 January 2002 2001 Personnel Exposure Report by Duty Function for Yankee Nuclear Power Station 2016-01-25
[Table view] |
Text
NOL-05 Attachment B Data Quality Assessment Plots and Curves Attachment B Data Quality Assessment Plots and Curves List of Figures Figure________________________________________________________________Page FIGURE 1 NOL-05-01 PROSPECTIVE POWER CURVE ........................................................................................... 2 FIGURE 2 NOL-05-01 RETROSPECTIVE POWER CURVE....................................................................................... 2 FIGURE 3 NOL-05-01SUM OF FRACTIONS SCATTER PLOT .................................................................................. 3 T
FIGURE 4 NOL-05-01 SUM OF FRACTIONS QUANTILE PLOT ............................................................................... 3 FIGURE 5 NOL-05-01 SUM OF FRACTIONS FREQUENCY PLOT ............................................................................ 4 T
FIGURE 6 NOL-05-02 PROSPECTIVE POWER CURVE ........................................................................................... 5 FIGURE 7 NOL-05-02 RETROSPECTIVE POWER CURVE....................................................................................... 5 FIGURE 8 NOL-05-02 SUM OF FRACTIONS SCATTER PLOT ................................................................................. 6 T
FIGURE 9 NOL-05-02 SUM OF FRACTIONS QUANTILE PLOT ............................................................................... 6 FIGURE 10 NOL-05-02 SUM OF FRACTIONS FREQUENCY PLOT .......................................................................... 7 T
The LBGR on the Power Curves have been adjusted to demonstrate the actual power of the survey.
1
NOL-05 Attachment B Data Quality Assessment Plots and Curves Figure 1 NOL-05-01 Prospective Power Curve Figure 2 NOL-05-01 Retrospective Power Curve 2
NOL-05 Attachment B Data Quality Assessment Plots and Curves Figure 3 NOL-05-01Sum of Fractions Scatter Plot NOL-05-01 Sample Results Scatter Plot DCGLw = 1 SOF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 0.25
-0.05
-0.1 Activity Average "+3StDev" "-3StDev" Figure 4 NOL-05-01 Sum of Fractions Quantile Plot NOL-05-01 Sample Results Quantile Plot 0.25 0.2 Activity (SOF) 0.15 0.1 0.06 0.05 0
0 10 20 30 40 50 60 70 80 90 100 Percentile Direct Measurements median 75th Percentile 50th Percentile 3
NOL-05 Attachment B Data Quality Assessment Plots and Curves Figure 5 NOL-05-01 Sum of Fractions Frequency Plot NOL-05-01 Frequency Plot 8
7 6
Number of Observations 5
4 3
2 1
0 0.03 0.05 0.07 0.09 0.11 0.14 0.16 0.18 0.2 0.22 Bin Upper End Value (SOF) 4
NOL-05 Attachment B Data Quality Assessment Plots and Curves Figure 6 NOL-05-02 Prospective Power Curve Figure 7 NOL-05-02 Retrospective Power Curve 5
NOL-05 Attachment B Data Quality Assessment Plots and Curves Figure 8 NOL-05-02 Sum of Fractions Scatter Plot NOL-05-02 Sample Results Scatter Plot DCGLw = 1 SOF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 0.7 0.6 0.5
-0.1
-0.2 * -0.19
-0.3 Activity Average "+3StDev" "-3StDev" Figure 9 NOL-05-02 Sum of Fractions Quantile Plot NOL-05-02 Sample Results Quantile Plot 0.7 0.6 0.5 Activity (SOF) 0.4 0.3 0.2 0.1 0.11 0
0 10 20 30 40 50 60 70 80 90 100 Percentile Direct Measurements median 75th Percentile 50th Percentile 6
NOL-05 Attachment B Data Quality Assessment Plots and Curves Figure 10 NOL-05-02 Sum of Fractions Frequency Plot NOL-05-02 Frequency Plot 16 14 12 Number of Observations 10 8
6 4
2 0