Yankee - YA-REPT-00-003-05, Generic ALARA Evaluation Comparison Worksheet
ML063070503
Person / Time
Site: Yankee Rowe
Issue date: 08/26/2005
From: Bisson J, Danni Smith
Yankee Atomic Electric Co
To:
NRC/FSME
References
DPF-8867-1, Rev 2 YA-REPT-00-003-05
Download: ML063070503 (3)


Text

Generic ALARA Evaluation Comparison Worksheet Survey Area:

&DL - 06 Survey Unit: o I

Reference Generic ALAR4 Evaluation No.:

)/fi -xnr-oo -003 Applicable Generic ALAR4 AL:

1 6 5 Radionuclide Average Concentration DCGL fiaction DCGL

1.

Csi37 0.2 5' 34Cf5

0. U B 3
2.

c0 60

a. ag O,OLL/

J.

4.

C(fiaction DCGL) =

O,/97 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.

Check one:

/

Generic ALARA AL IS satisfied.

Generic ALARA AL IS NOT satisfied.

Prepared by:

Date: x- /& - o r Date: 8-26..0 1'-

FSS Project h&iager/~adiation Protection Manager DPF-8867.1 Rev. 2 Page 1 of 1

Generic ALARA Evaluation Comparison Worksheet Survey Area:

NOL-06 Survey Unit:

02 Reference Generic ALARA Evaluation No.:

YA-REPT-00-003-05 Applicable Generic ALARA AL:

165 Radionuclide Average Concentration DCGL fraction DCGL

1.

Co-60 0.102 pCi/g 1.4 0.07

2.

Cs-137 0.04 pCi1g 3.O 0.0 1

3.
4.

Z(fraction DCGL) =

0.08 If the C(fraction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.

Check one:

Generic ALARA AL IS satisfied.

Generic ALARA AL IS NOT satisfied.

Prepared by: 2nd A*, 6

&ate:

S-zJ -ad FSS Radiological Engineer DPF-8867.1 Page 1 of 1

Generic ALARA Evaluation Comparison Worksheet Survey Area: /VQL -0 6 Survey Unit: 43 Reference Generic ALARA Evaluation No.:

)'A - T E P T -

- 003 - c Applicable Generic ALARA AL:

16 5 Radionuclide Average Concentration DCGL fraction DCGL I. C,-Lo * + 0, OG

2.

CS-137

-=w?

=&-

8. 0 I

3.
4.

C(fiaction DCGL) =

a 0 7 If the Z(fiaction DCGL) < the generic ALARA AL, then the generic ALARA evaluation is applicable to the survey unit.

Check one:

h e n e r i c ALARA AL IS satisfied.

Generic ALARA AL IS NOT satisfied.

Prepared by:

Date: /I-/ 54 5-S Radiological Engineer Reviewed by:

Date: ti/k-[fl FS S ~ r o j e'ct Managerl'adiation Protection Manager DPF-8867.1 Rev. 2 Page 1 of 1