ML072630222: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML072630222
| number = ML072630222
| issue date = 09/20/2007
| issue date = 09/20/2007
| title = 08/10/2007 Summary of Category 1 Working-Level Meeting with PPL to Discuss Pre-Audit Preparations Regarding Anticipated Transient Without Scram (ATWS) and Long-Term Stability Solution Implementation
| title = Summary of Category 1 Working-Level Meeting with PPL to Discuss Pre-Audit Preparations Regarding Anticipated Transient Without Scram (ATWS) and Long-Term Stability Solution Implementation
| author name = Guzman R
| author name = Guzman R
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
| author affiliation = NRC/NRR/ADRO/DORL/LPLI-1
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:September 20, 2007LICENSEE:PPL Susquehanna, LLC (PPL)FACILITY:Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2)
{{#Wiki_filter:September 20, 2007 LICENSEE:             PPL Susquehanna, LLC (PPL)
FACILITY:             Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2)


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF AUGUST 10, 2007, CATEGORY 1 WORKING-LEVELMEETING WITH PPL TO DISCUSS PRE-AUDIT PREPARATIONS REGARDING ANTICIPATED TRANSIENT WITHOUT SCRAM (ATWS)
OF AUGUST 10, 2007, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS PRE-AUDIT PREPARATIONS REGARDING ANTICIPATED TRANSIENT WITHOUT SCRAM (ATWS)
AND LONG-TERM STABILITY SOLUTION IMPLEMENTATIONOn August 10, 2007, a public meeting was held between the U.S. Nuclear RegulatoryCommission (NRC), and representatives of PPL, at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss (1)
AND LONG-TERM STABILITY SOLUTION IMPLEMENTATION On August 10, 2007, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of PPL, at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss (1)
PPL's implementation status of the Long-Term Stability Solution, (2) emergency operating procedures (EOPs) and stability mitigation actions as it relates to ATWS, and (3) the effects of a proposed constant pressure power uprate on ATWS and EOPs. The meeting was requested by the NRC staff in preparation for, and in support of, their scheduled September 17-18, 2007, generic audit on ATWS/Long-Term Stability.There were no members of the public in attendance, and no public meeting feedback formswere received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensee's slides presented at the meeting (Agencywide Documents Access and Management System Accession No. ML072560065). Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov./RA/Richard V. Guzman, Senior Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-387 and 50-388
PPLs implementation status of the Long-Term Stability Solution, (2) emergency operating procedures (EOPs) and stability mitigation actions as it relates to ATWS, and (3) the effects of a proposed constant pressure power uprate on ATWS and EOPs. The meeting was requested by the NRC staff in preparation for, and in support of, their scheduled September 17-18, 2007, generic audit on ATWS/Long-Term Stability.
There were no members of the public in attendance, and no public meeting feedback forms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensees slides presented at the meeting (Agencywide Documents Access and Management System Accession No. ML072560065).
Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov.
                                            /RA/
Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Licensee's Handouts/Slides cc w/encls: See next page
: 2. Licensees Handouts/Slides cc w/encls: See next page


ML072630222OFFICELPLI-1/PMLPLI-1/LALPLI-1/BCNAMERGuzmanSLittleMKowalDATE9/19/079/19/079/20/07 LIST OF ATTENDEESNUCLEAR REGULATORY COMMISSION (NRC)NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETINGWITH PPL SUSQUEHANNA, LLC (PPL)ANTICIPATED TRANSIENT WITHOUT SCRAM ANDLONG-TERM STABILITY SOLUTION IMPLMENTATIONSUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2AUGUST 10, 2007NAME ORGANIZATION1. Richard GuzmanNRC/NRR/Plant Licensing Branch I-12. Gregory CranstonNRC/NRR/Reactor Systems Branch
ML072630222 OFFICE LPLI-1/PM                LPLI-1/LA            LPLI-1/BC NAME RGuzman                    SLittle              MKowal DATE      9/19/07              9/19/07              9/20/07 LIST OF ATTENDEES NUCLEAR REGULATORY COMMISSION (NRC)
: 3. Benjamin ParksNRC/NRR/Reactor Systems Branch
NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETING WITH PPL SUSQUEHANNA, LLC (PPL)
: 4. Tai HuangNRC/NRR/Reactor Systems Branch
ANTICIPATED TRANSIENT WITHOUT SCRAM AND LONG-TERM STABILITY SOLUTION IMPLMENTATION SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 AUGUST 10, 2007 NAME                          ORGANIZATION
: 5. Harold ScottNRC/Office of Nuclear Regulatory Research
: 1. Richard Guzman              NRC/NRR/Plant Licensing Branch I-1
: 6. Mike CrowthersPPL
: 2. Gregory Cranston            NRC/NRR/Reactor Systems Branch
: 7. John BartosPPL
: 3. Benjamin Parks              NRC/NRR/Reactor Systems Branch
: 8. James K. WilliamsPPL
: 4. Tai Huang                  NRC/NRR/Reactor Systems Branch
: 9. John KraisPPL
: 5. Harold Scott                NRC/Office of Nuclear Regulatory Research
: 10. Chet LehmannPPL
: 6. Mike Crowthers              PPL
: 11. Gerald GlaserPPL
: 7. John Bartos                PPL
: 12. Robert BoeschPPLEnclosure 1 MEETING SLIDES Enclosure 2 Susquehanna Steam Electric Station, Units 1 and 2 cc:
: 8. James K. Williams          PPL
Britt T. McKinneySr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA  18603-0467Cornelius J. GannonVice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA  18603-0467Robert M. PaleyGeneral Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467Rocco R. SgarroManager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Supervisor -Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467Michael H. CrowthersSupervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Ronald E. SmithGeneral Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467Manager - Quality AssurancePPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467Luis A. RamosCommunity Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA  18603-0467Bryan A. Snapp, EsqAssoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA  18101-1179Supervisor - Document Control ServicesPPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Richard W. OsborneAllegheny Electric Cooperative, Inc.
: 9. John Krais                  PPL
212 Locust Street P.O. Box 1266 Harrisburg, PA  17108-1266Director, Bureau of Radiation ProtectionPennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4Berwick, PA 18603-0035Regional Administrator, Region 1U.S. Nuclear Regulatory Commission
: 10. Chet Lehmann              PPL
: 11. Gerald Glaser              PPL
: 12. Robert Boesch              PPL Enclosure 1


475 Allendale Road King of Prussia, PA 19406Board of SupervisorsSalem Township P.O. Box 405 Berwick, PA 18603-0035Dr. Judith JohnsrudNational Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803}}
MEETING SLIDES Enclosure 2
 
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Britt T. McKinney                                Luis A. Ramos Sr. Vice President and                            Community Relations Manager, Chief Nuclear Officer                            Susquehanna PPL Susquehanna, LLC                              PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3                          634 Salem Blvd., SSO Berwick, PA 18603-0467                            Berwick, PA 18603-0467 Cornelius J. Gannon                              Bryan A. Snapp, Esq Vice President - Nuclear Operations              Assoc. General Counsel PPL Susquehanna, LLC                              PPL Services Corporation 769 Salem Blvd., NUCSB3                          Two North Ninth Street, GENTW3 Berwick, PA 18603-0467                            Allentown, PA 18101-1179 Robert M. Paley                                  Supervisor - Document Control Services General Manager - Plant Support                  PPL Susquehanna, LLC PPL Susquehanna, LLC                              Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2                          Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro                                  Allegheny Electric Cooperative, Inc.
Manager - Nuclear Regulatory Affairs              212 Locust Street PPL Susquehanna, LLC                              P.O. Box 1266 Two North Ninth Street, GENPL4                    Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Supervisor -                                      Pennsylvania Department of Nuclear Regulatory Affairs                        Environmental Protection PPL Susquehanna, LLC                              Rachel Carson State Office Building 769 Salem Blvd., NUCSA4                          P.O. Box 8469 Berwick, PA 18603-0467                            Harrisburg, PA 17105-8469 Michael H. Crowthers                              Senior Resident Inspector Supervising Engineer                              U.S. Nuclear Regulatory Commission Nuclear Regulatory Affairs                        P.O. Box 35, NUCSA4 PPL Susquehanna, LLC                              Berwick, PA 18603-0035 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179                          Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission Ronald E. Smith                                  475 Allendale Road General Manager - Site Preparedness              King of Prussia, PA 19406 and Services PPL Susquehanna, LLC                              Board of Supervisors 769 Salem Blvd., NUCSA4                          Salem Township Berwick, PA 18603-0467                            P.O. Box 405 Berwick, PA 18603-0035 Manager - Quality Assurance PPL Susquehanna, LLC                              Dr. Judith Johnsrud 769 Salem Blvd., NUCSB2                          National Energy Committee Berwick, PA 18603-0467                            Sierra Club 443 Orlando Avenue State College, PA 16803}}

Latest revision as of 11:24, 13 March 2020

Summary of Category 1 Working-Level Meeting with PPL to Discuss Pre-Audit Preparations Regarding Anticipated Transient Without Scram (ATWS) and Long-Term Stability Solution Implementation
ML072630222
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/20/2007
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLI-1
To:
Guzman R, NRR/DORL, 415-1030
References
Download: ML072630222 (5)


Text

September 20, 2007 LICENSEE: PPL Susquehanna, LLC (PPL)

FACILITY: Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2)

SUBJECT:

SUMMARY

OF AUGUST 10, 2007, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS PRE-AUDIT PREPARATIONS REGARDING ANTICIPATED TRANSIENT WITHOUT SCRAM (ATWS)

AND LONG-TERM STABILITY SOLUTION IMPLEMENTATION On August 10, 2007, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of PPL, at NRC Headquarters, Two White Flint North, 11545 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss (1)

PPLs implementation status of the Long-Term Stability Solution, (2) emergency operating procedures (EOPs) and stability mitigation actions as it relates to ATWS, and (3) the effects of a proposed constant pressure power uprate on ATWS and EOPs. The meeting was requested by the NRC staff in preparation for, and in support of, their scheduled September 17-18, 2007, generic audit on ATWS/Long-Term Stability.

There were no members of the public in attendance, and no public meeting feedback forms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a copy of the licensees slides presented at the meeting (Agencywide Documents Access and Management System Accession No. ML072560065).

Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov.

/RA/

Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosures:

1. List of Attendees
2. Licensees Handouts/Slides cc w/encls: See next page

ML072630222 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME RGuzman SLittle MKowal DATE 9/19/07 9/19/07 9/20/07 LIST OF ATTENDEES NUCLEAR REGULATORY COMMISSION (NRC)

NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETING WITH PPL SUSQUEHANNA, LLC (PPL)

ANTICIPATED TRANSIENT WITHOUT SCRAM AND LONG-TERM STABILITY SOLUTION IMPLMENTATION SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 AUGUST 10, 2007 NAME ORGANIZATION

1. Richard Guzman NRC/NRR/Plant Licensing Branch I-1
2. Gregory Cranston NRC/NRR/Reactor Systems Branch
3. Benjamin Parks NRC/NRR/Reactor Systems Branch
4. Tai Huang NRC/NRR/Reactor Systems Branch
5. Harold Scott NRC/Office of Nuclear Regulatory Research
6. Mike Crowthers PPL
7. John Bartos PPL
8. James K. Williams PPL
9. John Krais PPL
10. Chet Lehmann PPL
11. Gerald Glaser PPL
12. Robert Boesch PPL Enclosure 1

MEETING SLIDES Enclosure 2

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Britt T. McKinney Luis A. Ramos Sr. Vice President and Community Relations Manager, Chief Nuclear Officer Susquehanna PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 634 Salem Blvd., SSO Berwick, PA 18603-0467 Berwick, PA 18603-0467 Cornelius J. Gannon Bryan A. Snapp, Esq Vice President - Nuclear Operations Assoc. General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Robert M. Paley Supervisor - Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.

Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Supervisor - Pennsylvania Department of Nuclear Regulatory Affairs Environmental Protection PPL Susquehanna, LLC Rachel Carson State Office Building 769 Salem Blvd., NUCSA4 P.O. Box 8469 Berwick, PA 18603-0467 Harrisburg, PA 17105-8469 Michael H. Crowthers Senior Resident Inspector Supervising Engineer U.S. Nuclear Regulatory Commission Nuclear Regulatory Affairs P.O. Box 35, NUCSA4 PPL Susquehanna, LLC Berwick, PA 18603-0035 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission Ronald E. Smith 475 Allendale Road General Manager - Site Preparedness King of Prussia, PA 19406 and Services PPL Susquehanna, LLC Board of Supervisors 769 Salem Blvd., NUCSA4 Salem Township Berwick, PA 18603-0467 P.O. Box 405 Berwick, PA 18603-0035 Manager - Quality Assurance PPL Susquehanna, LLC Dr. Judith Johnsrud 769 Salem Blvd., NUCSB2 National Energy Committee Berwick, PA 18603-0467 Sierra Club 443 Orlando Avenue State College, PA 16803