| {{#Wiki_filter:Mr. M. E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968, Mail Drop 1023 Richland, WA 99352-0968 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 June 6,2013 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 June 6,2013 Mr. M. E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968, Mail Drop 1023 Richland, WA 99352-0968 |
|
| |
|
| ==Subject:== | | ==Subject:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF END-OF-CYCLE MEETING WITH ENERGY NORTHWEST REGARDING COLUMBIA GENERATING STATION 2012 PERFORMANCE | | OF END-OF-CYCLE MEETING WITH ENERGY NORTHWEST REGARDING COLUMBIA GENERATING STATION 2012 PERFORMANCE |
|
| |
|
| ==Dear Mr. Reddemann:== | | ==Dear Mr. Reddemann:== |
|
| |
|
| This letter refers to the public End-of-Cycle meeting conducted on June 4, 2013, in Richland, Washington between the NRC and your staff. The purpose of the meeting was to discuss the NRC's assessment of the licensee's performance results at Columbia Generating Station for the inspection period of January 1 through December 31, 2012. The presentation slides from the NRC staff and Energy Northwest are enclosed. | | This letter refers to the public End-of-Cycle meeting conducted on June 4, 2013, in Richland, Washington between the NRC and your staff. The purpose of the meeting was to discuss the NRC's assessment of the licensee's performance results at Columbia Generating Station for the inspection period of January 1 through December 31, 2012. The presentation slides from the NRC staff and Energy Northwest are enclosed. |
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at rm/adams.html (the Public Electronic Reading Room). Should you have any questions concerning this matter, we will be pleased to discuss them with you. Docket: 50-397 License: NPF-21 | | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
| | Should you have any questions concerning this matter, we will be pleased to discuss them with you. |
| | Sincerely, vJ "<s:- C W~ |
| | Wayne C. Walker Chief, Projects Branch A Division of Reactor Projects Docket: 50-397 License: NPF-21 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| : 1. NRC Presentation Slides Sincerely, vJ "<s:-C Wayne C. Walker Chief, Projects Branch A Division of Reactor Projects 2. Energy Northwest Presentation Slides 4>> Energy Northwest Corn | | : 1. NRC Presentation Slides |
| | : 2. Energy Northwest Presentation Slides |
| | |
| | 4>> Energy Northwest Corn |
| * Closing Remarks | | * Closing Remarks |
| * Public Comments and Questions 2 Protecti1lg People a1ld the E11viro1lme1lt 1 | | * Public Comments and Questions 2 Protecti1lg People a1ld the E11viro1lme1lt 1 |
| -WClyne of Reactor Project, NRC iii Jeremy Groom, Senior Resident Inspector at Columbia 3 Protecting People flnd the Environment | | |
| -Security: | | -WClyne of Reactor Project, NRC iii Jeremy Groom, Senior Resident Inspector at Columbia 3 Protecting People flnd the Environment |
| Ehsureadeq n 4 in the secure use and management of radioactive materials. | | - Security: Ehsureadeq n in the secure use and management of radioactive materials. |
| Protectillg People fllld the E11vironment 2 | | 4 Protectillg People fllld the E11vironment 2 |
| 5 White: Red: 6 Regulatory Response Protecting People alld the EIlI';1'01l1nellt Very low issue low to moderate safety issue Substantial safety issue High safety issue Protecting People alld the El1V;r01l111ent 3
| | |
| Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 7 Protecting People and the ETlviro1l11lellt | | Regulatory Response 5 Protecting People alld the EIlI';1'01l1nellt Very low issue White: low to moderate safety issue Substantial safety issue Red: High safety issue 6 Protecting People alld the El1V;r01l111ent 3 |
| -Operations | | |
| -Engineering | | Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 7 Protecting People and the ETlviro1l11lellt |
| -Radiation Protection | | - Operations |
| -Security -Emergency Preparedness 8 Protectillg People alld the Environment 4 | | - Engineering |
| It Triennial Fire Protection Inspection 9 Protecting People and the Enviro1l1llCllt 10 Protecting People mul the ElIvirollmmt 5 | | - Radiation Protection |
| ::' ;,-, ,
| | - Security |
| * CblllmbiclGeheratih | | - Emergency Preparedness 8 Protectillg People alld the Environment 4 |
| ..... | | |
| ..... "'.T..,. June | | It Triennial Fire Protection Inspection 9 Protecting People and the Enviro1l1llCllt 10 Protecting People mul the ElIvirollmmt 5 |
| .... . | | * CblllmbiclGeheratih De~.radedCorne,r~ton . . . ri.*fij;B;:.~"*c:J\tri+iinn ..... "'.T..,. |
| a standard emergEmcyaction levelscneme. | | June 27,2Q12~> ..... |
| -White finding lJecause the licensee did not maintain an accurate dose assessment capalJility. | | -White*fr.ldinglJ~cau~~t:h~ licel1s~~didriotmaintain a standard emergEmcyaction levelscneme. |
| 11 Protecting People alld the Enllironme11t practical in a major loss of emergency assessment capalJility. | | - White finding lJecause the licensee did not maintain an accurate dose assessment capalJility. |
| 12 Protectillg People al1d the EllvirOllmellt 6 | | 11 Protecting People alld the Enllironme11t practical in a major loss of emergency assessment capalJility. |
| -Concl usiOh:'Move Response Column requires normal Baseline Inspection. | | 12 Protectillg People al1d the EllvirOllmellt 6 |
| 13 14 Vice':Presi Generation/Chief Protecting People tllld the Erwiro1l11lellt Energy Northwest P/,otectillg People tlIul the EI1Viroll111C1lt 7 | | |
| Division of Reactor P.rojects NRC Region IV 15 | | - Concl usiOh:'Move Response Column requires normal Baseline Inspection. |
| * At | | 13 Protecting People tllld the Erwiro1l11lellt Vice':Presi Generation/Chief Energy Northwest 14 P/,otectillg People tlIul the EI1Viroll111C1lt 7 |
| -Read NRC testimony, and policy decisions; Protecting People and the EUlliro1l1llCllt | | |
| -Access the agency's Electronic Reading Room to find NRC publications and documents. | | Division of Reactor P.rojects NRC Region IV 15 Protecting People and the EUlliro1l1llCllt |
| -16 Protecting People and the EllllirOllllleut 8 | | * At wWvJ:~r~'90V, |
| ..;.. Allegation@nrc.gov | | ~Find publicli1~eting |
| * General information or questions | | - Read NRC testimony, and policy decisions; |
| -www.nrc.gov | | - Access the agency's Electronic Reading Room to find NRC publications and documents. |
| -Select "What We Do" for Public Affairs 17 Protecting People and tbe Environment e Office of Public Affairs Point ofCol'ltact: | | -16 Protecting People and the EllllirOllllleut 8 |
| OPA.resource@nrc.gov or 301-415 ... 8200 18 Protecting People and tbe Environment 9 | | |
| | ..;.. Allegation@nrc.gov |
| | * General information or questions |
| | - www.nrc.gov |
| | - Select "What We Do" for Public Affairs 17 Protecting People and tbe Environment e Office of Public Affairs Point ofCol'ltact: |
| | OPA.resource@nrc.gov or 301-415 . .8200 18 Protecting People and tbe Environment 9 |
| * Flickr: | | * Flickr: |
| * Twitter: * | | * Twitter: |
| * RSS: http://www.nrc.gov/public-involvellistserver.html#rss 19 Protecting People and the Environment | | * YouTube:~~~~~~~~~~~~~~~~ |
| ;". :.: . ;",'", * .
| | * RSS: http://www.nrc.gov/public-involvellistserver.html#rss 19 Protecting People and the Environment |
| .:.. .
| | *. PUbjitElectroni~'~1~~i~~~gJ~'<" |
| * Public Document Room 800-397-4209 (Toll Free) 20 Protecting People and the Environment 10 21 Protecting People find the Ellld'"01I11U:lIt 11 I 1 oad to ExCellence ENERGY NORTHWEST NORTHWEST | | .:.. http://www.nrc~g'()v/readingjrll1.l1tfnr . |
| .. .Implemented corrective actions to prevent recurrence | | * Public Document Room 800-397-4209 (Toll Free) 20 Protecting People and the Environment 10 |
| .. Elevated sensitivity to EP functions ENERGY: NORTHWEST The Right Picture d ........ ' Nuclear Excellence J1lmi' ** CII IIiiIi l safe, Rellabl ... Predictable . jIiIII Orgooizatiooal Opaa1looal Training Equipment Excellence Excellern:e ExceU"""" ElroeIlence Predictable Safety TeaillWOO: | | |
| Zero Tole!ance Teamwod ConflQUliltIon Effective Reliable Ao:ountaIJle Control Aa:ountable PrroktabIe learning Tea!T1\'\'Ot'k Model Pride OlyanizatIon | | 21 Protecting People find the Ellld'"01I11U:lIt 11 |
| ...........Phase I -Improving Behaviors | | |
| .. *>PI18se II -DemonstratinaFfestilts
| | ENERGY NORTHWEST I 1 oad to ExCellence ENE~~~~' |
| .. .. ..-....,-. -. .. ... Phase III -Achieving Excellence IV -Sustaining Plant Performance
| | NORTHWEST |
| .. Lowest recorded dose ENERGY NORTHWEST 61 Highest level of equipment reliability 61 Continuous run for more than 3 years without unplanned time offline <I Highest ever annual produ' .. million megawatt hours rformance, '.' ..... / .. ber of Occupational Safety and He?lth .' ....**.. . "'. ration recordable accidents of any kind -three; . . * .--"".,..r'r.i"'.* | | |
| .. ,planned maintenance outage May . . under dose projection, ahead of schedule.* . Looking Forward ENERGY NORTHWEST}}
| | .. .Implemented corrective actions to prevent recurrence |
| | .. Elevated sensitivity to EP functions ENERGY: |
| | NORTHWEST The Right Picture d . . . . . . .' Nuclear Excellence J1lmi'* *CII IIiiIi l safe, Rellabl ... Predictable . jIiIII Orgooizatiooal Opaa1looal Training Equipment Excellence Excellern:e ExceU"""" ElroeIlence Predictable Safety TeaillWOO: Zero Tole!ance Teamwod ConflQUliltIon Effective Reliable Ao:ountaIJle Control Aa:ountable PrroktabIe learning Tea!T1\'\'Ot'k Model Pride OlyanizatIon |
| | |
| | ...........Phase I - Improving Behaviors . |
| | *>PI18se II - DemonstratinaFfestilts |
| | . . . Phase III - Achieving Excellence IV - Sustaining Excell~nce** |
| | ENERGY NORTHWEST Plant Performance |
| | .. Lowest recorded dose 61 Highest level of equipment reliability 61 Continuous run for more than 3 years without unplanned time offline |
| | <I Highest ever annual produ' . million megawatt hours |
| | |
| | rformance, |
| | '.' ..... / . ber of Occupational Safety and He?lth .' . . **.. |
| | . "'. ration recordable accidents of any kind - three; |
| | . ~ . |
| | *.--"".,..r'r.i"'.*. ,planned maintenance outage May 2012:s~f~,,' |
| | . . under dose projection, ahead of schedule.* . |
| | ENERGY NORTHWEST Looking Forward}} |
|
---|
Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] Category:Meeting Briefing Package/Handouts
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24057A3542024-02-26026 February 2024 Mella+/Extended Power Uprate - License Amendment Strategy ML22067A1842022-03-0101 March 2022 Enc 2 -NRC Regulatory Conference Presentation ML22067A1852022-03-0101 March 2022 Enc 3 - Energy Northwest Presentation ML21081A1812021-03-22022 March 2021 Pre-Submittal Meeting Slides ML20093F0162020-04-0606 April 2020 Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution Subsystems ML19023A0362019-01-24024 January 2019 Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3 ML18313A0322018-11-15015 November 2018 Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water System ML18317A0862018-11-15015 November 2018 Licensee Pre-Submittal Presentation Regarding Chiller System for Columbia Generating Station, Pending LAR (EPID-L-2018-LRM-0070) ML16264A0362016-09-20020 September 2016 Licensee Presentation Regarding Columbia Presubmittal Meeting - Change 7-Day Completion Time to Support Replace RHR-A Pump, Motor Affects TS 3.5.1A, 3.6.1.5.A, 3.6.2.3.A ML16182A1592016-06-30030 June 2016 Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791) ML16134A5782016-05-0202 May 2016 5/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate ML15155A7482015-06-0404 June 2015 NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015 ML15154B3962015-06-0404 June 2015 Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015 ML15054A4732015-02-23023 February 2015 Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup System ML14127A6012014-05-0707 May 2014 Summary of Annual Performance Assessment Meeting for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML13158A0112013-06-0606 June 2013 Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance ML12292A1642012-10-18018 October 2012 Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML1126306032011-09-20020 September 2011 Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station ML11161A0612011-08-23023 August 2011 04/27/2010 Columbia Generating Station License Renewal Environmental Review (Log No.: 121007-20-NRC) ML1118700592011-07-0606 July 2011 Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System ML1015405372010-06-0303 June 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment ML1005601892010-02-24024 February 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives ML0928810962009-10-14014 October 2009 Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session) ML0928810622009-10-14014 October 2009 Presentation Slides, Energy Re 618-11 Burial Ground Project Status ML0617405742006-06-20020 June 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0604405782006-02-0808 February 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0431001482004-11-0404 November 2004 Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station ML0401504532004-01-14014 January 2004 Summary of Meeting with Energy Northwest Columbia Generating Station General Engineering Issues and Licensee Improvement Innitiatives ML0234700902002-12-12012 December 2002 Columbia - Meeting Slides - Alternate Source Term Resubmittal ML0227604042002-10-0202 October 2002 Meeting Handouts from Energy Northwest Columbia Generating Station Energy Northwest/Framatome Anp Transition Cycle Licensing ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary ML17037B8491975-08-23023 August 1975 08/21/1975 Summary of Meeting with Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC Staff to Discuss Load Factors and Load Combinations Proposed by the Mark II Owners and Their Architect ... 2024-06-28
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station ML24142A4502024-05-21021 May 2024 2023 Annual Assessment Meeting - NRC Presentation Slides GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24057A3542024-02-26026 February 2024 Mella+/Extended Power Uprate - License Amendment Strategy ML23275A2422023-10-0505 October 2023 Pre-Submittal Meeting Slides ML22067A1842022-03-0101 March 2022 Enc 2 -NRC Regulatory Conference Presentation ML22067A1852022-03-0101 March 2022 Enc 3 - Energy Northwest Presentation ML21292A1412021-10-19019 October 2021 Meeting Slides ML21081A1812021-03-22022 March 2021 Pre-Submittal Meeting Slides ML20093F0162020-04-0606 April 2020 Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution Subsystems ML19023A0362019-01-24024 January 2019 Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3 ML18313A0322018-11-15015 November 2018 Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water System ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML17136A2062017-05-16016 May 2017 Summary of Regulatory Conference to Discuss Safety Significance of Columbia Generating Station Radwaste Shipping Deficiency ML16182A1592016-06-30030 June 2016 Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791) ML16134A1722016-05-0303 May 2016 Licencee Presentation Regarding Chiller System, Pending LAR ML16134A1822016-05-0202 May 2016 Licensee Presentation Regarding Portional Reclassification of the Reactor Water Cleanup System, Pending LAR ML16138A1682016-05-0202 May 2016 Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR ML16134A5782016-05-0202 May 2016 5/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate ML15163A1802015-06-15015 June 2015 Energy Northwest Columbia Generating Station Slides for Regulatory Conference June 15 2015-Final ML15155A7482015-06-0404 June 2015 NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015 ML15154B3962015-06-0404 June 2015 Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015 ML15054A4732015-02-23023 February 2015 Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup System ML14127A6012014-05-0707 May 2014 Summary of Annual Performance Assessment Meeting for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML13158A0112013-06-0606 June 2013 Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12292A1642012-10-18018 October 2012 Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML1126306032011-09-20020 September 2011 Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station ML1118700592011-07-0606 July 2011 Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System ML1101803812011-01-18018 January 2011 Licensee Slides - 1/18/2011 Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1015405372010-06-0303 June 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment ML1012505192010-05-10010 May 2010 04/06/2010 - Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058 and ME3121) ML1005601892010-02-24024 February 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives ML0928810622009-10-14014 October 2009 Presentation Slides, Energy Re 618-11 Burial Ground Project Status ML0928810962009-10-14014 October 2009 Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session) ML0812305602008-05-0101 May 2008 Summary of Meeting with Energy Northwest to Discuss Initiatives at the Columbia Generating Station Equipment Reliability and Engineering Issues Along with Burial Ground Assessment and Remediation Activities ML0617405742006-06-20020 June 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0615901672006-06-0808 June 2006 06-01-06 Summary of Meeting with Energy Northwest Regarding Columbia Generating Stations End-of-Cycle Assessment ML0604405782006-02-0808 February 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0535603372005-12-22022 December 2005 Summary of 12/15/2005 Meeting with Energy Northwest Regarding Columbia Generating Station ML0534901532005-12-0808 December 2005 Slides - December 8, 2005, Meeting with Energy Northwest on the Risk-Informed Diesel Generator Allowed Completion Time Extension ML0431001482004-11-0404 November 2004 Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0510400832004-04-13013 April 2004 Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station ML0407703812004-03-16016 March 2004 Meeting with Columbia Generating Station to Discuss Proposed Regulatory Guide 1.200 Pilot Application License Amendment for Diesel Generation Completion Time Extension ML0401505812004-01-14014 January 2004 Columbia - Pre-Submittal Meetingslides - Alternative Source Term License Amendment ML0401404472004-01-13013 January 2004 Meeting Slides (1/13/04) and Letter - Shutdown Cooling Isolation Reportability and a Letter from Dennis Allison to Christina Perino Dated 11/24/2003 2024-06-28
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 EAST LAMAR BLVD ARLINGTON, TEXAS 76011-4511 June 6,2013 Mr. M. E. Reddemann Chief Executive Officer Energy Northwest P.O. Box 968, Mail Drop 1023 Richland, WA 99352-0968
Subject:
SUMMARY
OF END-OF-CYCLE MEETING WITH ENERGY NORTHWEST REGARDING COLUMBIA GENERATING STATION 2012 PERFORMANCE
Dear Mr. Reddemann:
This letter refers to the public End-of-Cycle meeting conducted on June 4, 2013, in Richland, Washington between the NRC and your staff. The purpose of the meeting was to discuss the NRC's assessment of the licensee's performance results at Columbia Generating Station for the inspection period of January 1 through December 31, 2012. The presentation slides from the NRC staff and Energy Northwest are enclosed.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosures will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely, vJ "<s:- C W~
Wayne C. Walker Chief, Projects Branch A Division of Reactor Projects Docket: 50-397 License: NPF-21
Enclosures:
- 1. NRC Presentation Slides
- 2. Energy Northwest Presentation Slides
4>> Energy Northwest Corn
- Public Comments and Questions 2 Protecti1lg People a1ld the E11viro1lme1lt 1
-WClyne of Reactor Project, NRC iii Jeremy Groom, Senior Resident Inspector at Columbia 3 Protecting People flnd the Environment
- Security: Ehsureadeq n in the secure use and management of radioactive materials.
4 Protectillg People fllld the E11vironment 2
Regulatory Response 5 Protecting People alld the EIlI';1'01l1nellt Very low issue White: low to moderate safety issue Substantial safety issue Red: High safety issue 6 Protecting People alld the El1V;r01l111ent 3
Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions 7 Protecting People and the ETlviro1l11lellt
- Operations
- Engineering
- Radiation Protection
- Security
- Emergency Preparedness 8 Protectillg People alld the Environment 4
It Triennial Fire Protection Inspection 9 Protecting People and the Enviro1l1llCllt 10 Protecting People mul the ElIvirollmmt 5
- CblllmbiclGeheratih De~.radedCorne,r~ton . . . ri.*fij;B;:.~"*c:J\tri+iinn ..... "'.T..,.
June 27,2Q12~> .....
-White*fr.ldinglJ~cau~~t:h~ licel1s~~didriotmaintain a standard emergEmcyaction levelscneme.
- White finding lJecause the licensee did not maintain an accurate dose assessment capalJility.
11 Protecting People alld the Enllironme11t practical in a major loss of emergency assessment capalJility.
12 Protectillg People al1d the EllvirOllmellt 6
- Concl usiOh:'Move Response Column requires normal Baseline Inspection.
13 Protecting People tllld the Erwiro1l11lellt Vice':Presi Generation/Chief Energy Northwest 14 P/,otectillg People tlIul the EI1Viroll111C1lt 7
Division of Reactor P.rojects NRC Region IV 15 Protecting People and the EUlliro1l1llCllt
~Find publicli1~eting
- Read NRC testimony, and policy decisions;
- Access the agency's Electronic Reading Room to find NRC publications and documents.
-16 Protecting People and the EllllirOllllleut 8
..;.. Allegation@nrc.gov
- General information or questions
- www.nrc.gov
- Select "What We Do" for Public Affairs 17 Protecting People and tbe Environment e Office of Public Affairs Point ofCol'ltact:
OPA.resource@nrc.gov or 301-415 . .8200 18 Protecting People and tbe Environment 9
- . PUbjitElectroni~'~1~~i~~~gJ~'<"
.:.. http://www.nrc~g'()v/readingjrll1.l1tfnr .
- Public Document Room 800-397-4209 (Toll Free) 20 Protecting People and the Environment 10
21 Protecting People find the Ellld'"01I11U:lIt 11
ENERGY NORTHWEST I 1 oad to ExCellence ENE~~~~'
NORTHWEST
.. .Implemented corrective actions to prevent recurrence
.. Elevated sensitivity to EP functions ENERGY:
NORTHWEST The Right Picture d . . . . . . .' Nuclear Excellence J1lmi'* *CII IIiiIi l safe, Rellabl ... Predictable . jIiIII Orgooizatiooal Opaa1looal Training Equipment Excellence Excellern:e ExceU"""" ElroeIlence Predictable Safety TeaillWOO: Zero Tole!ance Teamwod ConflQUliltIon Effective Reliable Ao:ountaIJle Control Aa:ountable PrroktabIe learning Tea!T1\'\'Ot'k Model Pride OlyanizatIon
...........Phase I - Improving Behaviors .
- >PI18se II - DemonstratinaFfestilts
. . . Phase III - Achieving Excellence IV - Sustaining Excell~nce**
ENERGY NORTHWEST Plant Performance
.. Lowest recorded dose 61 Highest level of equipment reliability 61 Continuous run for more than 3 years without unplanned time offline
<I Highest ever annual produ' . million megawatt hours
rformance,
'.' ..... / . ber of Occupational Safety and He?lth .' . . **..
. "'. ration recordable accidents of any kind - three;
. ~ .
- .--"".,..r'r.i"'.*. ,planned maintenance outage May 2012:s~f~,,'
. . under dose projection, ahead of schedule.* .
ENERGY NORTHWEST Looking Forward