NRC Annual Assessment Summary Columbia Generating Station ADAMS Accession # ML24142A450

Defense In-Depth Regulation Compliance Continuous Training Assurance of Plant Safety Long-Term Maintenance

How We Regulate

NRC REACTOR OVERSIGHT PROCESS Implemented in each of the NRCs four regions Involves inspection and assessment activities Executed by regional and resident inspectors 1

2 3

4 NRC NRC

Reactor Oversight Framework

Reactor Oversight Inputs and Oversight INCREASING SAFETY SIGNIFICANCE Performance Indicators Performance within an expected level; Cornerstone objectives are met Performance outside expected range; Cornerstone objectives are still being met Related cornerstone objectives are being met; Minimal reduction in the safety margin Signals a significant reduction in safety margin in the area measured Findings Very low safety or security significance Low to moderate safety or security significance Substantial safety or security significance High safety or security significance Oversight Baseline Inspection Requires additional NRC oversight Requires more NRC oversight Requires most NRC oversight WHITE GREEN YELLOW RED INCREASING NRC OVERSIGHT

Action Matrix Columns Increasing:

Safety Significance Inspection Management Involvement Regulatory Action Licensee

Response

Regulatory

Response

Degraded Performance Multiple/Repetitive Degraded Cornerstone Unacceptable Performance

RESIDENT INSPECTOR PROGRAM

  • Resident inspectors live in the communities they serve
  • Perform inspections at Columbia Generating Station
  • Provide daily oversight of plant activities
  • Chris Highley - Senior Resident Inspector
  • Jason Brodlowicz -Resident Inspector
  • Amy Elam - Administrative Professional Chris Highley - Senior Resident Inspector Jason Brodlowicz -

Resident Inspector Amy Elam - Administrative Professional

Columbia Generating Station 2023 Assessment Summary

  • Energy Northwest operated the plant safely and in a manner that preserved the public health and safety and protected the environment
  • Regulatory Response Column
  • 6758 hours0.0782 days <br />1.877 hours <br />0.0112 weeks <br />0.00257 months <br /> of inspection and related activities
  • Green Performance Indicators
  • 4 Green violations and 2 White violations
  • Baseline inspection in 2024, with two additions:

95001 inspection for 2 White findings in the Occupational Radiation Safety Cornerstone 93100 inspection to review Safety Conscious Work Environment issues 9

Region IV - Division of Operating Reactor Safety Geoff Miller, Director

NRC Social Media Channels x

Facebook: https://www.facebook.com/nrcgov/

x Twitter: https://twitter.com/nrcgov x

YouTube: https://www.youtube.com/user/NRCgov x

Flickr: https://www.flickr.com/photos/nrcgov/sets x

LinkedIn: https://www.linkedin.com/company/u-s--nuclear-regulatory-commission/mycompany/

x GovDelivery: https://service.govdelivery.com/accounts/USNRC/subscriber/new 11

Contacting the NRC Report an emergency

  • (301) 816-5100 (call collect)

Report a safety concern

  • (800) 695-7403
  • Allegation@nrc.gov General information or questions
  • www.nrc.gov Contact Columbia Generating Station Resident Inspectors
  • 1-817-200-1932 NRC Office line
  • 1-240-704-4264 SRI Cell number