Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23275A242 | 5 October 2023 | Pre-Submittal Meeting Slides | Minimum staff |
ML22067A184 | 1 March 2022 | Enc 2 -NRC Regulatory Conference Presentation | High Radiation Area Locked High Radiation Area Significance Determination Process Substantial potential for overexposure |
ML22067A185 | 1 March 2022 | Enc 3 - Energy Northwest Presentation | Locked High Radiation Area Significance Determination Process Foreign Material Exclusion Substantial potential for overexposure |
ML21292A141 | 19 October 2021 | Meeting Slides | Internal Flooding Probabilistic Risk Assessment FLEX |
ML21081A181 | 22 March 2021 | Pre-Submittal Meeting Slides | Aging Management |
ML20093F016 | 6 April 2020 | Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution Subsystems | Emergency Lighting |
ML19023A036 | 24 January 2019 | Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3 | |
ML18313A032 | 15 November 2018 | Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water System | Safe Shutdown |
ML18086A774 | 21 February 2018 | LOR Program Biennial Inspection 71111.11B Exam Overlap Issues | |
ML17136A206 | 16 May 2017 | Summary of Regulatory Conference to Discuss Safety Significance of Columbia Generating Station Radwaste Shipping Deficiency | |
ML16182A159 | 30 June 2016 | Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791) | Shutdown Margin |
ML16134A172 | 3 May 2016 | Licencee Presentation Regarding Chiller System, Pending LAR | Safe Shutdown Operator Manual Action |
ML16134A182 | 2 May 2016 | Licensee Presentation Regarding Portional Reclassification of the Reactor Water Cleanup System, Pending LAR | Safe Shutdown Internal Flooding |
ML16138A168 | 2 May 2016 | Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR | |
ML16134A578 | 2 May 2016 | 5/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate | |
ML15163A180 | 15 June 2015 | Energy Northwest Columbia Generating Station Slides for Regulatory Conference June 15 2015-Final | Earthquake |
ML15155A748 | 4 June 2015 | NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015 | Safe Shutdown Earthquake Probabilistic Risk Assessment Earthquake Backfit |
ML15154B396 | 4 June 2015 | Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015 | Ultimate heat sink Probabilistic Risk Assessment FLEX Earthquake |
ML15054A473 | 23 February 2015 | Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup System | Packing leak Hydrostatic Nondestructive Examination |
ML14127A601 | 7 May 2014 | Summary of Annual Performance Assessment Meeting for Columbia Generating Station | |
ML13339B145 | 5 December 2013 | Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML13158A011 | 6 June 2013 | Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance | |
ML12292A164 | 18 October 2012 | Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 | Fire Protection Program |
ML12293A059 | 18 October 2012 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives | |
ML12157A272 | 11 June 2012 | 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a | Earthquake |
ML120120110 | 12 January 2012 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives | |
ML112630603 | 20 September 2011 | Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station | |
ML111870059 | 6 July 2011 | Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System | |
ML110180381 | 18 January 2011 | Licensee Slides - 1/18/2011 Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station | |
ML101540537 | 3 June 2010 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment | |
ML101250519 | 10 May 2010 | 04/06/2010 - Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058 and ME3121) | Aging Management Environmental Justice |
ML100560189 | 24 February 2010 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives | |
ML092881062 | 14 October 2009 | Presentation Slides, Energy Re 618-11 Burial Ground Project Status | Safe Shutdown |
ML092881096 | 14 October 2009 | Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session) | |
ML081230560 | 1 May 2008 | Summary of Meeting with Energy Northwest to Discuss Initiatives at the Columbia Generating Station Equipment Reliability and Engineering Issues Along with Burial Ground Assessment and Remediation Activities | |
ML061740574 | 20 June 2006 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML061590167 | 8 June 2006 | 06-01-06 Summary of Meeting with Energy Northwest Regarding Columbia Generating Stations End-of-Cycle Assessment | |
ML060440578 | 8 February 2006 | Summary of Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML053560337 | 22 December 2005 | Summary of 12/15/2005 Meeting with Energy Northwest Regarding Columbia Generating Station | |
ML053490153 | 8 December 2005 | Slides - December 8, 2005, Meeting with Energy Northwest on the Risk-Informed Diesel Generator Allowed Completion Time Extension | Safe Shutdown |
ML043100148 | 4 November 2004 | Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station | |
ML042260276 | 12 August 2004 | Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback | Job Performance Measure |
ML051040083 | 13 April 2004 | Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station | |
ML040770381 | 16 March 2004 | Meeting with Columbia Generating Station to Discuss Proposed Regulatory Guide 1.200 Pilot Application License Amendment for Diesel Generation Completion Time Extension | Mission time |
ML040150581 | 14 January 2004 | Columbia - Pre-Submittal Meetingslides - Alternative Source Term License Amendment | |
ML040140447 | 13 January 2004 | Meeting Slides (1/13/04) and Letter - Shutdown Cooling Isolation Reportability and a Letter from Dennis Allison to Christina Perino Dated 11/24/2003 | Reactor Vessel Water Level |
ML031400314 | 18 April 2003 | Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station | |
ML021540118 | 24 May 2002 | Meeting with Columbia Generating Station Re Plant Fuel Corrosion Issues & Engineering Initiatives | Safe Shutdown |
ML021090633 | 19 April 2002 | 4/10/2002 Columbia Generating Station End-of-Cycle Meeting Summary |