Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23275A2425 October 2023Pre-Submittal Meeting SlidesMinimum staff
ML22067A1841 March 2022Enc 2 -NRC Regulatory Conference PresentationHigh Radiation Area
Locked High Radiation Area
Significance Determination Process
Substantial potential for overexposure
ML22067A1851 March 2022Enc 3 - Energy Northwest PresentationLocked High Radiation Area
Significance Determination Process
Foreign Material Exclusion
Substantial potential for overexposure
ML21292A14119 October 2021Meeting SlidesInternal Flooding
Probabilistic Risk Assessment
FLEX
ML21081A18122 March 2021Pre-Submittal Meeting SlidesAging Management
ML20093F0166 April 2020Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution SubsystemsEmergency Lighting
ML19023A03624 January 2019Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3
ML18313A03215 November 2018Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water SystemSafe Shutdown
ML18086A77421 February 2018LOR Program Biennial Inspection 71111.11B Exam Overlap Issues
ML17136A20616 May 2017Summary of Regulatory Conference to Discuss Safety Significance of Columbia Generating Station Radwaste Shipping Deficiency
ML16182A15930 June 2016Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791)Shutdown Margin
ML16134A1723 May 2016Licencee Presentation Regarding Chiller System, Pending LARSafe Shutdown
Operator Manual Action
ML16134A1822 May 2016Licensee Presentation Regarding Portional Reclassification of the Reactor Water Cleanup System, Pending LARSafe Shutdown
Internal Flooding
ML16138A1682 May 2016Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR
ML16134A5782 May 20165/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate
ML15163A18015 June 2015Energy Northwest Columbia Generating Station Slides for Regulatory Conference June 15 2015-FinalEarthquake
ML15155A7484 June 2015NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Backfit
ML15154B3964 June 2015Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015Ultimate heat sink
Probabilistic Risk Assessment
FLEX
Earthquake
ML15054A47323 February 2015Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup SystemPacking leak
Hydrostatic
Nondestructive Examination
ML14127A6017 May 2014Summary of Annual Performance Assessment Meeting for Columbia Generating Station
ML13339B1455 December 2013Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station
ML13158A0116 June 2013Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance
ML12292A16418 October 2012Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012Fire Protection Program
ML12293A05918 October 2012Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives
ML12157A27211 June 20125/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, aEarthquake
ML12012011012 January 2012Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives
ML11263060320 September 2011Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station
ML1118700596 July 2011Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System
ML11018038118 January 2011Licensee Slides - 1/18/2011 Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station
ML1015405373 June 2010Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment
ML10125051910 May 201004/06/2010 - Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058 and ME3121)Aging Management
Environmental Justice
ML10056018924 February 2010Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives
ML09288106214 October 2009Presentation Slides, Energy Re 618-11 Burial Ground Project StatusSafe Shutdown
ML09288109614 October 2009Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session)
ML0812305601 May 2008Summary of Meeting with Energy Northwest to Discuss Initiatives at the Columbia Generating Station Equipment Reliability and Engineering Issues Along with Burial Ground Assessment and Remediation Activities
ML06174057420 June 2006Summary of Meeting with Energy Northwest Regarding Columbia Generating Station
ML0615901678 June 200606-01-06 Summary of Meeting with Energy Northwest Regarding Columbia Generating Stations End-of-Cycle Assessment
ML0604405788 February 2006Summary of Meeting with Energy Northwest Regarding Columbia Generating Station
ML05356033722 December 2005Summary of 12/15/2005 Meeting with Energy Northwest Regarding Columbia Generating Station
ML0534901538 December 2005Slides - December 8, 2005, Meeting with Energy Northwest on the Risk-Informed Diesel Generator Allowed Completion Time ExtensionSafe Shutdown
ML0431001484 November 2004Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station
ML04226027612 August 2004Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing FeedbackJob Performance Measure
ML05104008313 April 2004Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station
ML04077038116 March 2004Meeting with Columbia Generating Station to Discuss Proposed Regulatory Guide 1.200 Pilot Application License Amendment for Diesel Generation Completion Time ExtensionMission time
ML04015058114 January 2004Columbia - Pre-Submittal Meetingslides - Alternative Source Term License Amendment
ML04014044713 January 2004Meeting Slides (1/13/04) and Letter - Shutdown Cooling Isolation Reportability and a Letter from Dennis Allison to Christina Perino Dated 11/24/2003Reactor Vessel Water Level
ML03140031418 April 2003Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station
ML02154011824 May 2002Meeting with Columbia Generating Station Re Plant Fuel Corrosion Issues & Engineering InitiativesSafe Shutdown
ML02109063319 April 20024/10/2002 Columbia Generating Station End-of-Cycle Meeting Summary