Meeting Slides - Alternate Source Term Resubmittal
ML023470090
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/12/2002
From:
Energy Northwest
To:
Office of Nuclear Reactor Regulation
References
Download: ML023470090 (18)


Text

ENERGY LNORTHWEST People. Vision. Solutions NRC MEETING

1

AST RESUBMITTAL DECEMBER 12, 2002 I

OENERGY NORTHWEST People -Vision. Solutions

,Agenda

  • Opening Remarks
  • Review of Submittal m Meteorological Data Errors Preparation m MSLB Analysis m Operability Basis m Review of Submittal Issues
  • Control Room Ingress/Egress

ENERGY ONORTHWEST People.-Vision. Solutions

-Agenda (Cont'd)

  • Actions Being Taken by Energy Northwest

"* Meteorological Data Preparation

"* X/Q Modeling and Reanalysis

"* Drawdown Analysis

"* MSLB Analysis

  • Project Schedule
  • Closing Remarks 3

(ENERGY NORTHWEST People. Vision. Solutions Submittal Errors Meteorological Data Preparation

" Errors related to data preparation and input to ARCON96

"* Incorrect coding of missing or invalid data with 9's

"* Not recognizing orientation of delta T measurement

"* Incorrect wind speed unit selection

"* Conversion to degrees centigrade per 100 meters

"* ARCON96 analysis done by contractor in 1999 4

eENERGY NORTHWEST People. Vision. Solutions

, Submittal Errors (Cont'd)

I m Energy Northwest provided Contractor with.

  • Delta T measurements reversed from ARCON96 input format (lower minus upper provided)

- Wind speed data in miles per hour. ARCON96 default is meters/sec

  • Delta T in degrees Fahrenheit per 212 feet 5

ENERGY NORTHWEST People. Vision. Solutions Submittal Errors (Cont'd)

"* Contractor verified and approved his analysis per his nuclear QA Class 1 program

"* AST project utilized this previously approved and accepted vendor analysis with one additional review

  • Energy Northwest Peer Review included industry expert in ARCON96

"* Preliminary analysis using corrected met data files indicates the control room dose is slightly over 5 Rem limit (keeping other analysis inputs the same) 6

OENERGY NORTHWEST People. Vision. Solutions Submittal Errors (Cont'd)

Main Steam Line Break (MSLB)

"* The gravity term in the force equation was missing

"* A conservatively small drag coefficient was used.

"* Above effects compensated for each other so dose effectively unchanged 7

  • ENERGY NORTHWEST People. Vision. Solutions Operability Basis

" The existing JCO for building drawdown remains valid n Basis for JCO is an analysis that utilized NUREG 5055 to calculate X/Q values and it is not impacted by the current met data errors

"- The existing FAO for Control Room inleakage is based on administering KI to Control Room personnel and is not impacted by the current issues 8

O ENERGY NORTHWEST People. Vision-Solutions SubmittaI Issues

  • Control Room In-leakage Flow

"* Telecon may have confused issue of ingress/egress versus measured in-leakage

"* Per Lagus, the tracer gas test does not specifically quantify ingress/egress related inleakage

"* One ingress/egress point to Control Room used during test (normal activity was.not restricted however)

"* Normally two ingress/egress points used for Control Room access (both with double doors) 9

CENERGY NORTHWEST People.Vision-Solutions

-Submittal Issues (Cont'd)

  • The Control Room has a total of 5 doors (access points). 3 of the doors are not used
  • Unfiltered Control Room inleakage attributable to ingress/egress will be addressed by our resubmittal 10
  • ENERGY NORTHWEST People. Vision. Solutions Submittal Issues (Cont'd)

Secondary containment drawdown analysis Resubmittal (12/01) was not clear on what GOTHIC analysis was used and what related information from the 1996 submittal was still valid 11

OENERGY NORTHWEST People. Vision -Solutions Actions Being Taken

- Meteorological Data

"* Met data conversion errors have been corrected

"* Revised met data files have been verified by Energy Northwest and a consultant

"* ARCON96 analysis has been re-run using above revised met data files.

12

OENERGY NORTHWEST People. Vision-Solutions Actios -Being Taken (Cont'd)

X/Q Modeling and Reanalysis

"* Refine to more accurately model unfiltered inleakage into Control Room through receptor point within the Radwaste Building

"* For unfiltered Control Room inleakage, utilize ARCON96 X/Q from release point to Radwaste Building HVAC intake point

"* New analysis will model the nuclide buildup within the Radwaste Building which becomes the source for unfiltered inleakage to the Control Room 13

  • ENERGY NORTHWEST People-Vision-Solutions Actions Being Taken (Cont'd)

Drawdown Analysis

" Previously submitted (1996) GOTHIC model of the building has not been changed

"* This model will be re-validated prior to re submittal

"* Re-submittal will clarify any changes made from the 1996 GOTHIC analysis, e.g.:

"* GOTHIC updated to version 6.Oa

"* ASHRAE formulation used for boundary condition pressure calculations due to wind on building exterior

"* Bounding condition basis (temperature and wind conditions) not changed 14

@ENERGY NORTHWEST People. Vision Solutions Actions Being Taken (Cont'd)

"* Submittal will continue to be based on the bubble model currently used corrected by:

"* Gravity term has been added to the force equation

"* Drag coefficient has been revised to 8/3

"* Sensitivity case will be performed based on DG-1111 15

OENERGY NORTHWEST People.-Vision -Solutions Actions Being Taken (Cont'd)

  • Dose Analysis

"* Revised met data, updated ARCON96 analysis, and modified transport approach for Control Room unfiltered inleakage

"* No credit for Reactor Building mixing (40%

previously)

"* Control Room tracer gas inleakage test result being investigated to determine appropriate value to use in the analysis 16

(ENERGY NORTHWEST People-Vision. Solutions Actions Being Taken (Cont'd)

" PAVAN offsite X/Q values remain unchanged

"* Resubmittal based on revised dose analysis for each accident (LOCA, FHA, CRDA, and MSLB) 17

ENERGY NORTHWEST People-Vision. Solutions Project Schedule

" Detailed manloading of schedule and funding requests are currently in process.

"* Preliminary schedule indicates resubmittal by July 2003.

"* Resubmittal date to be confirmed by January 6, 2003 18