Category:Meeting Briefing Package/Handouts
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24057A3542024-02-26026 February 2024 Mella+/Extended Power Uprate - License Amendment Strategy ML22067A1842022-03-0101 March 2022 Enc 2 -NRC Regulatory Conference Presentation ML22067A1852022-03-0101 March 2022 Enc 3 - Energy Northwest Presentation ML21081A1812021-03-22022 March 2021 Pre-Submittal Meeting Slides ML20093F0162020-04-0606 April 2020 Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution Subsystems ML19023A0362019-01-24024 January 2019 Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3 ML18313A0322018-11-15015 November 2018 Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water System ML18317A0862018-11-15015 November 2018 Licensee Pre-Submittal Presentation Regarding Chiller System for Columbia Generating Station, Pending LAR (EPID-L-2018-LRM-0070) ML16264A0362016-09-20020 September 2016 Licensee Presentation Regarding Columbia Presubmittal Meeting - Change 7-Day Completion Time to Support Replace RHR-A Pump, Motor Affects TS 3.5.1A, 3.6.1.5.A, 3.6.2.3.A ML16182A1592016-06-30030 June 2016 Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791) ML16134A5782016-05-0202 May 2016 5/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate ML15155A7482015-06-0404 June 2015 NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015 ML15154B3962015-06-0404 June 2015 Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015 ML15054A4732015-02-23023 February 2015 Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup System ML14127A6012014-05-0707 May 2014 Summary of Annual Performance Assessment Meeting for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML13158A0112013-06-0606 June 2013 Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance ML12292A1642012-10-18018 October 2012 Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML1126306032011-09-20020 September 2011 Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station ML11161A0612011-08-23023 August 2011 04/27/2010 Columbia Generating Station License Renewal Environmental Review (Log No.: 121007-20-NRC) ML1118700592011-07-0606 July 2011 Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System ML1015405372010-06-0303 June 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment ML1005601892010-02-24024 February 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives ML0928810962009-10-14014 October 2009 Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session) ML0928810622009-10-14014 October 2009 Presentation Slides, Energy Re 618-11 Burial Ground Project Status ML0617405742006-06-20020 June 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0604405782006-02-0808 February 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0431001482004-11-0404 November 2004 Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station ML0401504532004-01-14014 January 2004 Summary of Meeting with Energy Northwest Columbia Generating Station General Engineering Issues and Licensee Improvement Innitiatives ML0234700902002-12-12012 December 2002 Columbia - Meeting Slides - Alternate Source Term Resubmittal ML0227604042002-10-0202 October 2002 Meeting Handouts from Energy Northwest Columbia Generating Station Energy Northwest/Framatome Anp Transition Cycle Licensing ML0208107562002-03-19019 March 2002 Operator Licensing Workshop Meeting Summary ML17037B8491975-08-23023 August 1975 08/21/1975 Summary of Meeting with Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC Staff to Discuss Load Factors and Load Combinations Proposed by the Mark II Owners and Their Architect ... 2024-06-28
[Table view] Category:Meeting Summary
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station ML24142A4982024-05-22022 May 2024 Summary of April 17, 2024, Partially Closed Pre-Application Meeting with Energy Northwest Regarding an Extended Power Uprate Combined with Maximum Load Line Limit Analysis Plus for Columbia Generating Station ML23297A2642023-11-0606 November 2023 October 5, 2023, Summary of Teleconference with Energy Northwest Regarding Proposed License Amendment Request to Revise the Emergency Plan for Columbia Generating Station ML23156A2822023-06-0505 June 2023 Summary of Meeting with Q & a Session to Discuss the 2022 Annual Assessment of Safety Performance at CGS ML22147A0932022-06-0606 June 2022 2021 Annual Assessment Public Meeting Summary ML22067A1832022-03-10010 March 2022 Summary of Energy Northwest Regulatory Conference Columbia Generating Station, Airborne Radioactivity Event Resulting in Preliminary White Finding, March 1, 2022 ML21321A0422021-12-13013 December 2021 Summary of October 22, 2021, Teleconference Meeting with Energy Northwest Regarding Proposed License Amendment Requests to Adopt Technical Specifications Task Force (TSTF)-505, and 10 CFR 50.69 Categorization Program ML21140A3892021-05-24024 May 2021 Riv Column 1 EOC 2020 Public Meeting Summary ML21112A3512021-05-0303 May 2021 Summary of March 31, 2021, Pre-Application Teleconference with Energy Northwest to Discuss a Planned LAR Deletion of Certain License Conditions Relating to License Renewal Commitments for Columbia Generating Station ML20322A0362020-11-19019 November 2020 Summary of October 19, 2020, Presubmittal Teleconference with Energy Northwest Regarding Proposed COVID-19 Related Biennial Emergency Preparedness Exercise Exemption Request for Columbia Generating Station ML20314A0462020-11-0909 November 2020 Summary of November 4, 2020, NRC-NMFS Teleconference on Columbia Entrainment Study ML20189A2832020-07-0707 July 2020 Summary of Region IV Annual Assessment Public Meeting ML20101L5352020-04-14014 April 2020 Summary of April 6, 2020, Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Technical Specification Change License Amendment Request for the Columbia Generating Station ML19030A2152019-02-12012 February 2019 1/24/19, Summary of Presubmittal Teleconference Meeting with Energy Northwest, to Discuss a Shield Wall Deferral License Amendment Request for the Columbia Generating Station ML19030A3192019-02-12012 February 2019 1/17/2019, Summary of Presubmittal Meeting with Energy Northwest, to Discuss an Emergency Control Room Chiller License Amendment Request at Columbia Generating Station ML18354B0992019-01-0303 January 2019 Summary of Pre-Submittal Meeting with Energy Northwest, to Discuss an Emergency Control Room Chiller License Amendment Request for the Columbia Generating Station ML16266A3712016-09-29029 September 2016 Summary of Public Meeting with Energy Northwest to Discuss Upcoming License Amendment Request Regarding Change in Completion Time for Residual Heat Removal Pump a Repair for Columbia Generating Station ML16167A4602016-08-23023 August 2016 Summary of Closed Meeting with Representatives of the Us Army Corps of Engineers, Bureau of Reclamation, and Energy Northwest to Discuss the Flood Analysis Associated with Columbia Generating Station ML16193A0162016-07-14014 July 2016 Summary of 6/30/16 Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request to Revise Emergency Action Levels Based on Nuclear Energy Institute (NEI) 99-01, Revision 6 at Columbia Generating Station ML16138A3762016-05-25025 May 2016 Summary of 5/3/2016 Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request Regarding Emergency Control Room Chiller System at Columbia Generating Station ML16138A3292016-05-24024 May 2016 Summary of 5/2/2016 Prelicensing Meeting with Energy Northwest to Discuss Measurement Uncertainty Recapture Power Uprate License Amendment Request at Columbia Generating Station ML16126A4822016-05-17017 May 2016 Summary of Prelicensing Meeting with Energy Northwest to Discuss License Amendment Request Concerning Portional Reclassification of Reactor Water Cleanup System at Columbia Generating Station ML16138A1682016-05-0202 May 2016 Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR ML15187A4442015-07-0606 July 2015 Summary of a Regulatory Conference to Discuss the Safety Significance of a Columbia Finding Emergency Plan Implementing Procedures Did Not Implement Some Protective Action Recommendations Required by the Emergency Plan ML15173A2732015-06-30030 June 2015 Summary of June 4, 2015, Category 1 Public Meeting with Energy Northwest to Discussion Columbia Generating Station Seismic Hazard Reevaluation Associated with Implementation of Japan Lessons-Learned Near-Term Task Force Recommendation 2.1, ML15069A5162015-03-17017 March 2015 2/24/2014 Summary of Presubmittal Meeting with Energy Northwest to Discuss Relief Request for Radwaste Cleanup Piping for Columbia Generating Station ML14168A0452014-07-0808 July 2014 Summary of 6/10/14 Closed Meeting Between U.S. Army Corps of Engineers, U.S. Dept of Interior Bureau of Reclamation, and Energy Northwest to Discuss Flooding Analysis for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML12306A3332012-11-16016 November 2012 Summary of 10/18/12 Pre-licensing Meeting to Discuss Future License Amendment Request to Address Impacts of Remediation Activities Undertaken by Department of Energy in the Owner-Controlled Area at Columbia Generating Station ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML11350A0562011-12-21021 December 2011 12/15/11, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue and Operating Experience Open Items in the Columbia License Renewal Safety Evaluation Repo ML11339A0872011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 28, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Upper Shelf Energy Open Item in the Columbia License Renewal Safety Evaluation Report with O ML11339A0852011-12-12012 December 2011 November 8, 2011, Summary of Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open Items ML11336A1502011-12-12012 December 2011 Summary of Telephone Conference Call Held on November 14, 2011, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation Report with Open I ML11249A0132011-11-21021 November 2011 08/29/2011-Summary of Tele Conf Call Between the USNRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11311A2662011-11-10010 November 2011 Summary of Tele Conf Call Held on 11/2/11, Between the USNRC and Energy Northwest, Concerning the Core Plate Hold-Down Bolts Open Item in the Columbia License Renewal Safety Evaluation with Open Items ML11305A1762011-11-0303 November 2011 Summary of Tele Conf Call Held on 10/27/11, Between the USNRC and Energy Northwest, Concerning the Metal Fatigue Open Item in the Columbia License Renewal Safety Evaluation with Open Items ML11291A0792011-11-0101 November 2011 09/27/2011 Summary of Public Meetings Conducted to Discuss the Dseis Related to the Review of the Columbia Generating Station License Renewal Application (Tac No. ME3121) ML11273A0012011-10-0404 October 2011 Summary of Teleconf Call Held on Sept. 28, 2011, Between the USNRC and Energy Northwest, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11273A0662011-10-0404 October 2011 Summary of the Telephone Conference Call Held on September 29, 2011, Concerning the Inspection Report Pertaining to the Columbia Generating Station, License Renewal Application ML11256A3002011-09-23023 September 2011 Summary of Telephone Conference Call Held on September 12, 2011, Concerning the Draft Request for Additional Information Pertaining to the Columbia Generating Station, License Renewal Application ML11238A1582011-09-14014 September 2011 8/25/11 - Summary of Telephone Conference Call Between NRC and Energy Northwest Concerning Drais Pertaining to the SAMA Review of the Columbia Generating Station License Renewal Application ML11250A0152011-09-0808 September 2011 Summary of Tele Conf Call Held on August 22, 2011, Btw the USNRC and Energy Northwest, Concerning Topics Pertaining to the Columbia Generating Station, License Renewal Application ML11223A3512011-08-23023 August 2011 Summary of Telephone Conference Call Held on August 11, 2011, Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generation Station, LRA ML11230B0892011-08-23023 August 2011 August 17, 2011, Summary of Conference Call Held, Between the U.S. Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11216A2532011-08-11011 August 2011 August 3, 2011, Summary of Telephone Conference Call Held Between the NRC and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11217A0222011-08-11011 August 2011 8/3-4/11, Summary of Telephone Conference Call Held Between Nuclear Regulatory Commission and Energy Northwest, Concerning the Response to the Request for Additional Information Pertaining to the Columbia Generating Station, LRA ML11220A0102011-08-11011 August 2011 February 3, 2011, Summary of Telephone Conference Call Held Between NRC and Energy Northwest, Concerning the Responses to the RAI Pertaining to the Columbia Generating Station, LRA 2024-06-28
[Table view] Category:Slides and Viewgraphs
MONTHYEARML24177A1892024-06-28028 June 2024 Summary of Information Meeting with Question and Answer Session to Discuss the 2023 Annual Assessment of Safety Performance at Columbia Generating Station ML24142A4502024-05-21021 May 2024 2023 Annual Assessment Meeting - NRC Presentation Slides GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24057A3542024-02-26026 February 2024 Mella+/Extended Power Uprate - License Amendment Strategy ML23275A2422023-10-0505 October 2023 Pre-Submittal Meeting Slides ML22067A1842022-03-0101 March 2022 Enc 2 -NRC Regulatory Conference Presentation ML22067A1852022-03-0101 March 2022 Enc 3 - Energy Northwest Presentation ML21292A1412021-10-19019 October 2021 Meeting Slides ML21081A1812021-03-22022 March 2021 Pre-Submittal Meeting Slides ML20093F0162020-04-0606 April 2020 Presubmittal Meeting: License Amendment Request for One-Time Completion Time Extension to Actions for Inoperable Electrical Distribution Subsystems ML19023A0362019-01-24024 January 2019 Presubmittal Meeting: License Amendment Request to Remove Operating License Condition 2.(C).11 and Attachment 3 ML18313A0322018-11-15015 November 2018 Presubmittal Meeting: License Amendment Request for Licensing Basis Change to Emergency Chilled Water System ML18086A7742018-02-21021 February 2018 LOR Program Biennial Inspection 71111.11B Exam Overlap Issues ML17136A2062017-05-16016 May 2017 Summary of Regulatory Conference to Discuss Safety Significance of Columbia Generating Station Radwaste Shipping Deficiency ML16182A1592016-06-30030 June 2016 Company Presentation Regarding EAL Scheme Change Pending LAR, Public Meeting, June 30 2016 (Cac No. MF7791) ML16134A1722016-05-0303 May 2016 Licencee Presentation Regarding Chiller System, Pending LAR ML16134A1822016-05-0202 May 2016 Licensee Presentation Regarding Portional Reclassification of the Reactor Water Cleanup System, Pending LAR ML16138A1682016-05-0202 May 2016 Licensee Presentation Regarding Mur Power Uprate for Columbia Generating Station, Pending LAR ML16134A5782016-05-0202 May 2016 5/2/16, Meeting Slides for Pre-Submittal Meeting Regarding License Amendment Request Measurement Uncertainty Recapture (Mur) Power Uprate ML15163A1802015-06-15015 June 2015 Energy Northwest Columbia Generating Station Slides for Regulatory Conference June 15 2015-Final ML15155A7482015-06-0404 June 2015 NRC Slides for Near-Term Task Force Recommendation 2.1 (R2.1) Seismic Hazard Evaluation - Energy Northwest Columbia Generating Station Public Meeting - June 4, 2015 ML15154B3962015-06-0404 June 2015 Discussion of Seismic Hazard Reevaluation and Nrc'S Technical Focus Areas for Columbia Generating Station - June 4, 2015 ML15054A4732015-02-23023 February 2015 Pre-Submittal Public Meeting with Energy Northwest to Discuss Upcoming Relief Request Regarding Reactor Water Cleanup System ML14127A6012014-05-0707 May 2014 Summary of Annual Performance Assessment Meeting for Columbia Generating Station ML13339B1452013-12-0505 December 2013 Meeting Summary for Public Meeting with Energy Northwest Regarding Columbia Generating Station ML13158A0112013-06-0606 June 2013 Summary of End-of-Cycle Meeting with Energy Northwest Regarding Columbia Generating Station 2012 Performance ML12293A0592012-10-18018 October 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML12292A1642012-10-18018 October 2012 Energy Northwest Presentation Slide to NRC on 618-11 Remediation 10-18-2012 ML12157A2722012-06-11011 June 2012 5/31/2012 Summary of Telephone Conference with Licensees Regarding Near Term Task Force Recommendation 2.1 Seismic Reevaluations - Diablo Canyon, 1 and 2, San Onofre, Units 2 and 3, Columbia Generating Station, and Palo Verde, Units 1, 2, a ML1201201102012-01-12012 January 2012 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance Improvement Initiatives ML1126306032011-09-20020 September 2011 Meeting Slides Preliminary Site-Specific Results of the License Renewal Environmental Review for Columbia Generating Station ML1118700592011-07-0606 July 2011 Licensee Handouts from 7/6/11 Meeting with Energy Northwest to Discuss the Status of Columbia Generating Station License Amendment Request on Power Range Neutron Monitoring System ML1101803812011-01-18018 January 2011 Licensee Slides - 1/18/2011 Pre-Licensing Meeting with Energy Northwest to Discuss Proposed Power Range Neutron Monitoring System/Arts/Mellla License Amendment Request for Columbia Generating Station ML1015405372010-06-0303 June 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station End of Cycle Assessment ML1012505192010-05-10010 May 2010 04/06/2010 - Summary of Public License Renewal Overview and Environmental Scoping Meetings Related to the Review of the Columbia Generating Station License Renewal Application (TAC Nos. ME3058 and ME3121) ML1005601892010-02-24024 February 2010 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station Performance and Improvement Initiatives ML0928810622009-10-14014 October 2009 Presentation Slides, Energy Re 618-11 Burial Ground Project Status ML0928810962009-10-14014 October 2009 Presentation Slides from October 14, 2009, Meeting with Energy Northwest, Department of Energy Re 618-11 Burial Ground Project Status (PM Session) ML0812305602008-05-0101 May 2008 Summary of Meeting with Energy Northwest to Discuss Initiatives at the Columbia Generating Station Equipment Reliability and Engineering Issues Along with Burial Ground Assessment and Remediation Activities ML0617405742006-06-20020 June 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0615901672006-06-0808 June 2006 06-01-06 Summary of Meeting with Energy Northwest Regarding Columbia Generating Stations End-of-Cycle Assessment ML0604405782006-02-0808 February 2006 Summary of Meeting with Energy Northwest Regarding Columbia Generating Station ML0535603372005-12-22022 December 2005 Summary of 12/15/2005 Meeting with Energy Northwest Regarding Columbia Generating Station ML0534901532005-12-0808 December 2005 Slides - December 8, 2005, Meeting with Energy Northwest on the Risk-Informed Diesel Generator Allowed Completion Time Extension ML0431001482004-11-0404 November 2004 Summary of Meeting with Energy Northwest Company Regarding Operational Issues & Improvement Initiatives Related to Columbia Generating Station ML0422602762004-08-12012 August 2004 Meeting Summary of the August 8, 2004 Public Workshop - Region IV Operator Licensing Feedback ML0510400832004-04-13013 April 2004 Meeting Summary for End-of-Cycle Performance Assessment for Columbia Generating Station ML0407703812004-03-16016 March 2004 Meeting with Columbia Generating Station to Discuss Proposed Regulatory Guide 1.200 Pilot Application License Amendment for Diesel Generation Completion Time Extension ML0401505812004-01-14014 January 2004 Columbia - Pre-Submittal Meetingslides - Alternative Source Term License Amendment ML0401404472004-01-13013 January 2004 Meeting Slides (1/13/04) and Letter - Shutdown Cooling Isolation Reportability and a Letter from Dennis Allison to Christina Perino Dated 11/24/2003 2024-06-28
[Table view] |