Line 3: Line 3:
| issue date = 04/05/2012
| issue date = 04/05/2012
| title = 2012 Dresden Nuclear Power Station Initial License Examination ES-301-2 - RO
| title = 2012 Dresden Nuclear Power Station Initial License Examination ES-301-2 - RO
| author name = Reeser D W
| author name = Reeser D
| author affiliation = NRC/RGN-III/DRS/OB
| author affiliation = NRC/RGN-III/DRS/OB
| addressee name = Nelson J
| addressee name = Nelson J
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
=Text=
{{#Wiki_filter:ES-301                          Control Room/In-Plant Systems Outline                            Form ES-301-2 Facility: Dresden                                                        Date of Examination:      08/06/2012 Exam Level: RO            SRO-I      SRO-U                        Operating Test Number: 11-1 (2012-301)
Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)
Safety System / JPM Title                                      Type Code*
Function
: a. SBLC - INJECTION WITH PUMP AND RWCU ISOLATION FAILURES                                  A, P, S          1 (211000.A4.08)
: b. FW - ALTERNATE WATER INJECTION USING STANDBY COOLANT                                    D, L, S          2 (295031.A1.08)
: c. MAIN STEAM - UNISOLATE ONE LINE USING ALTERNATE METHOD                                    D, S            3 (239001.A4.01)
: d. ISO COND - SHUTDOWN (207000.A4.05)                                                        D, S            4
: e. TORUS COOLING - LOWER WATER LEVEL (219000.A4.02)                                        D, L, S          5
: f. EDG - PERFORM SURVEILLANCE TESTING, WITH SCRAM                                        A, L, P, S        6 (264000.A4.05)
: g. NI - IRM DETECTOR TEST, WITH FAILURE TO MEET ACCEPTANCE                                A, N, S          7 CRITERIA (215003.A4.06)
: h. SBGT - START SBGT WITH A FAILURE OF REACTOR BLDG TO                                    A, D, S          9 ISOLATE (261000.A2.13)
In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)
: i. CRD - CROSSTIE FOR ALTERNATE INJECTION (295031.A1.08)                                  D, E, R          2
: j. ISO COND - MAKEUP PUMP LOCAL OPERATION WITH COOLING                                      A, N            4 WATER FAILURE (207000.A2.05)
: k. IA - CROSS CONNECT 3C IAC TO UNIT 2 ONLY (300000.G.2.1.30)                                N, R            8
  @      All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.
* Type Codes                                    Criteria for RO / SRO-I / SRO-U (A)lternate path                                                      4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank                                                    <9    / <8    / <4 (E)mergency or abnormal in-plant                                      >1    / >1    / >1 (EN)gineered safety feature                                            -    /  -    / > 1 (control room system)
(L)ow-Power / Shutdown                                                >1    / >1    / >1 (N)ew or (M)odified from bank including 1(A)                          >2    / >2    / >1 (P)revious 2 exams                                                    <3    / <3    / < 2 (randomly selected)
(R)CA                                                                >1    / >1    / >1 (S)imulator ES-301, Page 23 of 27}}

Latest revision as of 16:23, 6 February 2020

2012 Dresden Nuclear Power Station Initial License Examination ES-301-2 - RO
ML12132A318
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 04/05/2012
From: David Reeser
Operations Branch III
To: Nelson J
Exelon Generation Co
Shared Package
ML11354A121 List:
References
Download: ML12132A318 (1)


Text

ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility: Dresden Date of Examination: 08/06/2012 Exam Level: RO SRO-I SRO-U Operating Test Number: 11-1 (2012-301)

Control Room Systems (8 for RO); (7 for SRO-I); (2 or 3 for SRO-U, including 1 ESF)

Safety System / JPM Title Type Code*

Function

a. SBLC - INJECTION WITH PUMP AND RWCU ISOLATION FAILURES A, P, S 1 (211000.A4.08)
b. FW - ALTERNATE WATER INJECTION USING STANDBY COOLANT D, L, S 2 (295031.A1.08)
c. MAIN STEAM - UNISOLATE ONE LINE USING ALTERNATE METHOD D, S 3 (239001.A4.01)
d. ISO COND - SHUTDOWN (207000.A4.05) D, S 4
e. TORUS COOLING - LOWER WATER LEVEL (219000.A4.02) D, L, S 5
f. EDG - PERFORM SURVEILLANCE TESTING, WITH SCRAM A, L, P, S 6 (264000.A4.05)
g. NI - IRM DETECTOR TEST, WITH FAILURE TO MEET ACCEPTANCE A, N, S 7 CRITERIA (215003.A4.06)
h. SBGT - START SBGT WITH A FAILURE OF REACTOR BLDG TO A, D, S 9 ISOLATE (261000.A2.13)

In-Plant Systems (3 for RO); (3 for SRO-I); (3 or 2 for SRO-U)

i. CRD - CROSSTIE FOR ALTERNATE INJECTION (295031.A1.08) D, E, R 2
j. ISO COND - MAKEUP PUMP LOCAL OPERATION WITH COOLING A, N 4 WATER FAILURE (207000.A2.05)
k. IA - CROSS CONNECT 3C IAC TO UNIT 2 ONLY (300000.G.2.1.30) N, R 8

@ All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions; all 5 SRO-U systems must serve different safety functions; in-plant systems and functions may overlap those tested in the control room.

  • Type Codes Criteria for RO / SRO-I / SRO-U (A)lternate path 4-6 / 4-6 / 2-3 (C)ontrol room (D)irect from bank <9 / <8 / <4 (E)mergency or abnormal in-plant >1 / >1 / >1 (EN)gineered safety feature - / - / > 1 (control room system)

(L)ow-Power / Shutdown >1 / >1 / >1 (N)ew or (M)odified from bank including 1(A) >2 / >2 / >1 (P)revious 2 exams <3 / <3 / < 2 (randomly selected)

(R)CA >1 / >1 / >1 (S)imulator ES-301, Page 23 of 27