ML13231A208: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 5: Line 5:
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
| addressee name = Noll W G
| addressee name = Noll W
| addressee affiliation = Exelon Generation Co, LLC
| addressee affiliation = Exelon Generation Co, LLC
| docket = 05000461
| docket = 05000461
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:}}
{{#Wiki_filter:2013 CLINTON POWER STATION INITIAL LICENSE EXAMINATION OUTLINE SUBMITTAL
 
ur r
Exelon Generation
* Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604122 May 22,          2013                                                              10CFR55.40 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461
 
==Subject:==
Submittal of Initial License Training Examination Outline Enclosed are the examination outlines supporting the initial license training examination scheduled for the weeks of August 19, 2013, through August 30, 2013, at Clinton Power
* Station (CPS). This submittal includes all appropriate examination standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.
In accordance with NUREG-1021, Section ES-201, "Initial Operator Licensing Examination Process," please ensure that these materials are withheld from public disclosure until after the examinations are complete.
There are no regulatory commitments contained in this letter.
Should you have any questions concerning this letter please contact Mr. Christopher Dunn, Director Site Training at (217) 937-4000. For questions concerning examination materials please contact Mr. Tony Jennings, Senior Training Instructor, at (217) 937-3930.
William G. Noll Site Vice President Clinton Power Station DRA/blf
 
==Enclosures:==
(Hand delivered to NRC Region Ill Chief Examiner)
Examination Security Agreements (Form ES-201-3)
Administrative Topics Outline(s) (Form ES-301-1)
Control Room/In-Plant Systems Outline (Form ES-301-2)
BWR Examination Outline (Forms ES-401-1)
MAY 30 2013
 
U.S. Nuclear Regulatory Commission U-604122 May 22,2013 Page 2 of 2
 
==Enclosures:==
(Hand delivered to NRC Region Ill Chief Examiner)
(continued)    Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)
Statement detailing method of Written Exam Outline generation Scenario Outlines (Form ES-D-1)
Record of Rejected K/As (Form ES-401-4)
Completed Checklists:
Examination Outline Quality Checklist (Form ES-201-2)
Transient and Event Checklist (Form ES-301-5) cc:    Chief, NRC Operating Licensing Branch, NRC Region Ill (w/o Enclosures)
NRC Senior Resident Inspector- Clinton Power Station (w/o Enclosures)
*}}

Latest revision as of 02:23, 6 February 2020

2013 Clinton Power Station Initial License Examination Outline Submittal
ML13231A208
Person / Time
Site: Clinton Constellation icon.png
Issue date: 05/22/2013
From:
NRC/RGN-III
To: Noll W
Exelon Generation Co
Shared Package
ML11354A436 List:
References
Download: ML13231A208 (3)


Text

2013 CLINTON POWER STATION INITIAL LICENSE EXAMINATION OUTLINE SUBMITTAL

ur r

Exelon Generation

  • Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604122 May 22, 2013 10CFR55.40 Regional Administrator, Region Ill U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Submittal of Initial License Training Examination Outline Enclosed are the examination outlines supporting the initial license training examination scheduled for the weeks of August 19, 2013, through August 30, 2013, at Clinton Power

  • Station (CPS). This submittal includes all appropriate examination standard forms and outlines in accordance with NUREG-1021, "Operator Licensing Examination Standards for Power Reactors," Revision 9, Supplement 1.

In accordance with NUREG-1021, Section ES-201, "Initial Operator Licensing Examination Process," please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter.

Should you have any questions concerning this letter please contact Mr. Christopher Dunn, Director Site Training at (217) 937-4000. For questions concerning examination materials please contact Mr. Tony Jennings, Senior Training Instructor, at (217) 937-3930.

William G. Noll Site Vice President Clinton Power Station DRA/blf

Enclosures:

(Hand delivered to NRC Region Ill Chief Examiner)

Examination Security Agreements (Form ES-201-3)

Administrative Topics Outline(s) (Form ES-301-1)

Control Room/In-Plant Systems Outline (Form ES-301-2)

BWR Examination Outline (Forms ES-401-1)

MAY 30 2013

U.S. Nuclear Regulatory Commission U-604122 May 22,2013 Page 2 of 2

Enclosures:

(Hand delivered to NRC Region Ill Chief Examiner)

(continued) Generic Knowledge and Abilities Outline (Tier 3) (Form ES-401-3)

Statement detailing method of Written Exam Outline generation Scenario Outlines (Form ES-D-1)

Record of Rejected K/As (Form ES-401-4)

Completed Checklists:

Examination Outline Quality Checklist (Form ES-201-2)

Transient and Event Checklist (Form ES-301-5) cc: Chief, NRC Operating Licensing Branch, NRC Region Ill (w/o Enclosures)

NRC Senior Resident Inspector- Clinton Power Station (w/o Enclosures)