ML23258A095

From kanterella
Jump to navigation Jump to search
Licensee Exam Submittal Letter (Clinton 2023)
ML23258A095
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/06/2023
From: Chalmers T
NRC/RGN-III
To:
Constellation Energy Generation
Ted Wingfield
Shared Package
ML22007A089 List:
References
U-604754
Download: ML23258A095 (4)


Text

Clinton Power Station 8401 Power Road Clinton, IL 61727 U-604754 April 6, 2023 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461

Subject:

Submittal of Integrated Initial License Training Examination Materials Enclosed are the examination materials, which Clinton Power Station (CPS) is submitting in support of the initial license exam scheduled for the weeks of 07/17/23 through 07/28/23, at CPS.

This submittal includes the Senior Reactor Operator and Reactor Operator Written Examinations, Job Performance Measures, and Integrated Plant Operation Scenario Guides.

These examination materials have been developed in accordance with NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 12. Please note that reference materials are included in the package.

As of the 150-day submittal, modifications have been made to the Integrated Examination Outlines with regards to Scenarios 1 and 3 and the SRO Administrative JPM outline to improve content and ensure Critical Task validity. These changes improve examination quality and are in compliance with NUREG-1021, Revision 12, Operator Licensing Examination Standards for Power Reactors.

In accordance with NUREG-1021, Revision 12, Section ES-1.3, Examination Security, please ensure that these materials are withheld from public disclosure until after the examinations are complete.

There are no regulatory commitments contained in this letter. Should you have any questions concerning this letter please contact Ms. Amanda Corrigan, Senior Manager Site Training at (217) 937-4000. For questions concerning examination materials please contact Mr. Matthew Beeler, Lead Operations Instructor, at (217) 937-4078.

Respectfully, Chalmers, Digitally signed by Chalmers, Tom Tom Date: 2023.04.06 07:16:56 -05'00' Thomas D. Chalmers Site Vice President Clinton Power Station

U.S. Nuclear Regulatory Commission U-604754 Page 2 of 2

Enclosures:

(Mailed to Ted Wingfield, NRC Region Ill Chief Examiner)

RO/SRO Composite Examination with references attached Control Room Systems and Facility Walk-Through Job Performance Measures with references attached Administrative Topic Job Performance Measures with references attached Integrated Plant Operation Scenario Guides Completed Checklists:

Operating Test Quality Checklist (Form 2.3-2)

Events and Evolutions Checklist (Form 3.4-1)

Written Exam Quality Checklist (Form 2.3-4)

Examination Security Agreements (Form 1.3-1)

Record of Rejected K/As (Form 4.1-1) cc: Chief, NRC Operator Licensing Branch (without Enclosures)

NRC Senior Resident Inspector - Clinton Power Station (without Enclosures)

NRC Project Manager, NRR - Clinton Power Station (without Enclosures)

NRC Document Control Desk (without Enclosures)

U-604754

Subject:

Submittal of Integrated Initial License Training Examination Materials Bcc: (without Enclosures)

Site Vice President - Clinton Station Regulatory Assurance Manager - Clinton Station Vice President - Licensing and Regulatory Affairs Director, Licensing - Cantera Manager, Licensing - Clinton Station Clinton Station Nuclear Licensing Administrator Exelon Document Control Desk Licensing (Hard Copy)

Exelon Document Control Desk Licensing (Electronic Copy)

Human Resources - Clinton Station Training Manager - Clinton Station

LS-AA-117-1002 Revision 4 Page 1 of 1 LICENSING AND REGULATORY AFFAIRS CORRESPONDENCE CONCURRENCE FORM Station(s): Clinton Power Station Correspondence No.: U-604754 Subject/Document: Submittal of Initial License Training Examination Document Prepared by: Chelsie Miller Location: RA Extension: x2811 Required Review and Disciplines Assigned by: C. Miller / Regulatory Specialist Title Due Date: TBD Type of Review Required: Technical Verification Team Review (Reference LS-AA-117) Individual or Series Review No Technical Review Note: If the subject document falls within the scope of AD-AA-102, Station Qualified Review, one of the reviewers must be a Station Qualified Reviewer.

Disciplines Required:

Maintenance Radiation Protection Chemistry Training Operations Engineering - I&C Radwaste Reg Assurance / Licensing Rx Engineering Design Engineering Engr - Mech Systems Programs Engineering Nuclear Fuels Work Management Engr - Elect Systems Other:

Review Concurrence: Signature indicates that the individual has reviewed the subject document and concurs that the content is factual and accurate. Concurrence via e-mail shall be provided using the declaration provided in LS-AA-117.

Print Name / Signature Discipline Date Matthew Beeler / See email concurrence Training Amanda Corrigan / See email concurrence Training Does this letter contain commitments? Yes No If yes, corporate or site commitment coordinator has been notified: Date:

Required Reviews and Signatures (check as appropriate):

Station Qualified Review Required: Date:

PORC Approval Required: PORC Meeting No.

Corporate Licensing Concurrence Required: Date:

Site Regulatory Assurance Concurrence Required: See email concurrence Date:

Station Manager Approval Required: Date:

Chalmers, Tom Digitally signed by Chalmers, Tom Date: 2023.04.06 07:17:20 -05'00' Site Vice President Approval Required: Date:

SRRS Record ID: 5A.113 (Destroy at Option (DAO))