TQ-AA-150-J020 Revision 01 Page 1 of 51 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Job Performance Measure Perform CPS 9820.01 Core Thermal Limits JPM Number:

JPM402 Revision Number:

01 Date: 5/10/2021 Developed By:

Bill Kiser

/

5/10/21 Instructor: Print / Sign Date Reviewed By:

Justin Reynolds

/

8/27/21 SME or Instructor: Print / Sign Date Reviewed By:

Aaron Speagle

/

8/27/21 Operations Representative: Print / Sign Date Approved By:

Matthew Beeler

/

8/27/21 Training Department: Print / Sign Date

TQ-AA-150-J020 Revision 01 Page 2 of 51 JPM402 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

1. Task description and number, JPM description and number are identified.
2. Knowledge and Abilities (K/A) references are included.
3. Performance location specified. (in-plant, control room, simulator, or other)
4. Initial setup conditions are identified.
5. Initiating cue (and terminating cue if required) are properly identified.
6. Task standards identified and verified by instructor or SME review.
7. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
8. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
9. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: CPS 9820.01 Revision:

34a Procedure: CPS 9820.01D001 Revision:

32e Procedure:

Revision:

Procedure:

Revision:

10. Verify cues both verbal and visual are free of conflict.
11. Verify performance time is accurate.
12. If the JPM cannot be performed as written with proper responses, then revise the JPM.
13. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

TQ-AA-150-J020 Revision 01 Page 3 of 51 JPM402 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)

Revision #

Summary 00 3/8/18 - New JPM.

01 5/10/21 - Updated JPM format.

TQ-AA-150-J020 Revision 01 Page 4 of 51 JPM402 SRRS: 3D.100; There are no retention requirements for this section SETUP INSTRUCTIONS

1. This JPM can be performed in a classroom or other secure area with the 3D cases generated per step 2.
2. The following can be used as necessary to recreate the 3D Case printouts with out of spec MFLCPR and MFLPD:
a. Initialize to a full power IC.
b. Insert Malfunction M3D_FLCPR_V_10 to a final value of 1.012 to raise MFLCPR for fuel assembly 21-18 to a value greater than 1.0.
c. Insert Malfunction M3D_FLPD_V_2 to a final value of 1.083 to raise MFLPD for fuel assembly 23-32 to a value greater than 1.0.
d. Print out a 3D case.
e. Verify MFLCPR and MFLPD are > 1.0.
3. Freeze Simulator.

TQ-AA-150-J020 Revision 01 Page 5 of 51 JPM402 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS You are the B RO.

The plant is at full power with RR Pumps A and B operating in fast speed.

INITIATING CUE The Control Room Supervisor directs you to perform the daily surveillance CPS 9820.01, Power Distribution Limits.

Report to the CRS after completing the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 01 Page 6 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

JPM Sequence #:

of Task Standard:

The examinee will complete the daily surveillance IAW CPS 9820.01 POWER DISTRIBUTION LIMITS and document all deficiencies identified during performance of the surveillance.

STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE Provide the examinee with a copy of:

  • Initiating Cue (last page of JPM)
  • CPS 9820.01 Power Distribution Limits
  • CPS 9820.01D001 Power Distribution Limits Data Sheet
  • Attachment 1 - 3D Case pages 1 & 2.

NOTE:

For the following steps, refer to CPS 9820.01D001 Answer Key on JPM pages 11 and 12.

CUE As CRS, acknowledge start of surveillance notification.

01 CPS 9820.01 step 5.1 Notifies SMngt prior to performing procedure.

Examinee notifies Shift Management that he/she is commencing surveillance.

On CPS 9820.01D001 Power Distribution Limits Data Sheet, examinee:

enters start date and time.

initials step 5.1 as complete.

NOTE:

Per the initiating cue, the reactor is operating at full power.

02 CPS 9820.01 step 5.2 Verifies Core Thermal Power level.

Examinee verifies Core Thermal Power is 21.6% of RTP.

On CPS 9820.01D001 Power Distribution Limits Data Sheet, examinee initials step 5.2 as complete.

TQ-AA-150-J020 Revision 01 Page 7 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number NOTE:

Per the initiating cue, the entry condition is Daily Surveillance.

03 CPS 9820.01 step 5.3 Determines applicable entry conditions.

Examinee determines that the applicable entry condition is Daily Surveillance.

On CPS 9820.01D001 Power Distribution Limits Data Sheet step 5.3, examinee checks the Daily Surveillance box.

NOTE:

The case ID number appears in the upper right hand corner of the 3D case on page 1, below the date. The second character of the 3D CASE ID is 'M'.

04 CPS 9820.01 step 5.4 Verifies 3D Case ID.

Examinee determines that the second character of the 3D CASE ID is 'M'.

On CPS 9820.01D001 Power Distribution Limits Data Sheet, examinee initials step 5.4 as complete.

NOTE:

Per the initiating cue, RR Pumps A and B operating in fast speed.

05 CPS 9820.01 step 5.5 Determines applicable RR Pump Status.

Examinee determines that 2 RR pumps are in operation.

On CPS 9820.01D001 Power Distribution Limits Data Sheet step 5.5, examinee checks the 2 RR pumps in operation box.

NOTE:

Information for step 06 is located to the right of OPTION on the 3D Case.

ARTS, 2 LOOPS ON and MANUAL FLOW are all applicable.

TQ-AA-150-J020 Revision 01 Page 8 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number 06 CPS 9820.01 step 5.6 Determines applicable 3D Case OPTIONS.

Examinee determines that ARTS, 2 LOOPS ON and MANUAL FLOW are all applicable.

On CPS 9820.01D001 Power Distribution Limits Data Sheet step 5.6, examinee checks the ARTS, 2 LOOPS ON and MANUAL FLOW boxes.

CUE If requested, core flow instrumentation is operating normally.

07 CPS 9820.01 step 5.7 Determines core flow accuracy.

Examinee determines core flow accuracy.

On CPS 9820.01 Power Distribution Limits, examinee marks step 5.7 as N/A.

08 CPS 9820.01 step 8.1 Determines Official 3D Case is available.

No action necessary.

09 CPS 9820.01 step 8.2 Determines highest MAPRAT value.

Examinee determines the highest MAPRAT value is 1.0.

On CPS 9820.01D001 Power Distribution Limits Data Sheet, examinee initials step 8.2 as complete.

NOTE:

One location will have a MFLCPR value > 1.0 (21-18).

CUE If examinee reports MFLCPR value is > 1.0, acknowledge the report and then cue him/her to complete the surveillance.

TQ-AA-150-J020 Revision 01 Page 9 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 10 CPS 9820.01 step 8.3 Determines highest MFLCPR value.

Examinee determines the highest MFLCPR value is > 1.0.

On CPS 9820.01D001 Power Distribution Limits Data Sheet, examinee does not initial step 8.3 as complete.

Examinee documents out of specification value in the Comments/Deficiencies section of 9820.01D001.

NOTE:

One location has MFLPD value > 1.0 (23-32).

CUE If examinee reports MFLPD value is > 1.0, acknowledge the report and then cue him/her to complete the surveillance.

  • 11 CPS 9820.01 step 8.4 Determines highest MFLPD value.

Examinee determines the highest MFLPD value is > 1.0.

On CPS 9820.01D001 Power Distribution Limits Data Sheet, examinee does not initial step 8.4 as complete.

Examinee documents out of specification value in the Comments/Deficiencies section of 9820.01D001.

CUE Acknowledge notification of OOS conditions. If earlier 3D printouts are requested state the previous 3D cases are within limits.

  • 12 CPS 9820.01 step 8.5 Notifies SMngt of OOS conditions.

Examinee notifies Shift Management that MFLCPR and MFLPD are out of specification.

TQ-AA-150-J020 Revision 01 Page 10 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number 13 CPS 9820.01 step 8.6 Notifies SMngt of surveillance completion.

Examinee notifies Shift Management of surveillance completion.

On CPS 9820.01D001 Power Distribution Limits Data Sheet, examinee:

enters stop date and time.

initials step 8.6 as complete.

CUE JPM is complete.

JPM Stop Time:

TQ-AA-150-J020 Revision 01 Page 11 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training) 9820.01D001 ANSWER KEY POWER DISTRIBUTION LIMITS DATA SHEET Initial 5.1 SMngt notification.

Date ________ Time ________

5.2 Verify Core Thermal Power 21.6% RTP.

5.3 Check the applicable entry condition:

Daily surveillance (at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />)

Within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> after 21.6% RTP Within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of entering single loop RR operations Other (explain) ___________________________________________________________________________________

5.4 Verify 2nd character of 3D CASE ID is an M.

5.5 2 RR pumps in operation 5.6 ARTS 1 RR pump in operation 2 LOOPS ON MANUAL FLOW 1 LOOP ON Step(s)

Parameter Admin Limit (3005.01)

Acceptable Value (ITS)

Initial 8.2 MAPRAT 0.98 1.0 8.3 MFLCPR 0.98 1.0 8.4 MFLPD 0.98 1.0 8.6 Inform SMngt of surveillance completion Date ________ Time ________

Corrective Action Taken Operability Requirements:

ITS LCOs: 3.2.1 3.2.2 3.2.3 ORM ORs: None ODCM ORs: None As applicable:

Initiated Condition Report No. ____________________

Initiated Work Document No. _______________________

Comments/Deficiencies Review and Approval SMngt Review: ____________________________________________________________________________________________________________________

(Signature)

(Date) 9820.01D001 ANSWER KEY XX/XX/XXXX XXXX RO RO RO RO Note 1 Note 2 XX/XX/XXXX XXXX RO Note 1: MFLCPR 1.012 and greater than 1.0 (or equivalent)

Note 2: MFLPD 1.083 and greater than 1.0 (or equivalent)

TQ-AA-150-J020 Revision 01 Page 12 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operators Name:

Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Perform CPS 9820.01 Core Thermal Limits JPM Number: JPM402 Revision Number: 01 Task Number and

Title:

982001.01 / Evaluate Core Thermal Limits during Power Operations Task Standard: The examinee will complete the daily surveillance IAW CPS 9820.01 POWER DISTRIBUTION LIMITS and document all deficiencies identified during performance of the surveillance.

K/A Number and Importance:

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.19 3.9 3.8 Suggested Testing Environment: Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

Procedure: CPS 9820.01 Revision:

34a CPS 9820.01D001 32e Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

15 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 01 Page 13 of 51 SRRS: 3D.105 (when utilized for operator initial or continuing training) - 3D Case (Page 1)

FOR TRAINING USE ONLY PAGE 1 CLINTON CYCLE 18 SEQUENCE NO 10 CORE PARAMETERS 3D MONICORE XX-XXX-2018 13:47 CALCULATED POWER MWT 3401. PERIODIC LOG XX-XXX-2018 13:48 PRINTED POWER MWE 1113. CASE ID FMLD1180410134733 FLOW MLB/HR 84.228 CALC RESULTS RESTART FMLD1180410134733 FPAPDR ***** LPRM SHAPE - FULL CORE SUBC BTU/LB 29.98 Keff 1.0001 PR PSIa 1038.0 XE WORTH % -2.36 LOAD LINE

SUMMARY

CORE MWD/sT 21573.8 XE/RATED 0.94 CORE POWER 97.9%

CYCLE MWD/sT 9000.0 AVE VF CORE FLOW 99.7%

MCPR 1.326 FLLLP LOAD LINE 98.1%

CORRECTION FACTOR: MFLCPR= 1.024 MFLPD= 0.990 MAPRAT= 0.990 OPTION: ARTS 2 LOOPS ON MANUAL FLOW MCPRLIM= 1.310 MOST LIMITING LOCATIONS (NON-SYMMETRIC)

MFLCPR LOC MFLPD LOC MAPRAT LOC PCMARG LOC 1.012 21-18 1.083 23 4 0.751 17 2 0.100 21-18 0.831 15-40 0.876 17 2 0.750 41 1 0.080 15-40 0.829 41-16 0.876 15 2 0.746 39 2 0.065 41-16 0.825 41-40 0.875 41 3 0.739 17 3 0.048 41-40 0.818 15-18 0.874 15 1 0.732 19 2 0.033 15-18 0.810 19-46 0.873 15 2 0.731 43 2 0.028 19-46 0.809 45-38 0.873 17 2 0.729 37 3 0.020 45-38 0.807 37-12 0.872 39 1 0.726 13 1 0.010 37-12 0.803 11-22 0.871 39 3 0.716 11 1 0.000 11-22 0.793 11-36 0.870 41 2 0.714 25 2 -0.010 11-36 SEQ. A-2 C=MFLCPR D=MFLPD M=MAPRAT P=PCRAT *=MULTIPLE CORE AVE AXIAL 53 12 NOTCH REL PW LOC 0.417 25 49 00 0.695 24 L 02 0.787 23 45 22 16 04 0.879 22 06 0.924 21 41 08 0.948 20 L M 10 0.971 19 37 16 22 12 0.995 18 14 1.008 17 33 16 1.020 16 L D 18 1.033 15 29 12 12 20 1.035 14 22 1.037 13 25 24 1.039 12 L 26 1.077 11 21 22 16 28 1.114 10 30 1.152 09 17 C 32 1.209 08 L 34 1.267 07 13 16 22 36 1.325 06 38 1.304 05 09 40 1.284 04 L 42 1.287 03 05 12 44 0.912 02 L L L L L L 46 0.281 01 04 08 12 16 20 24 28 32 36 40 44 48 52

TQ-AA-150-J020 Revision 01 Page 14 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CORE AVERAGE RADIAL POWER DISTRIBUTION RING # 1 2 3 4 5 6 7 REL PW 0.932 1.128 1.202 1.090 1.192 1.089 0.596

TQ-AA-150-J020 Revision 01 Page 15 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training) - 3D Case (Page 2)

FOR TRAINING USE ONLY PAGE 2 CLINTON CYCLE 18 INSTRUMENT READINGS/STATUS SEQUENCE NO 10 CALIBRATED LPRM READINGS XX-XXX-2018 13:47 CALCULATED XX-XXX-2018 13:48 PRINTED 47D 29.9 43.8 46.1 41.7 17.8 CASE ID FMLD1180410134733 C 31.3 43.3 44.3 40.9 18.1 LPRM SHAPE - FULL CORE B 31.2 40.7 45.6 44.4 18.0 A 30.7 43.4 42.4 42.9 15.9 FAILED SENSORS:

39D 27.4 48.9 50.0 52.1 53.1 40.9 LPRM ( 0 SIGNAL FAILED)

C 28.2 45.4 43.4 41.4 46.7 40.5 LPRM ( 0 PANACEA REJECTED)

B 29.5 47.8 41.1 39.2 46.0 38.2 OTHER SENSORS ( 0 TOTAL)

A 27.4 44.9M 34.7 30.4 41.5 41.8 SUB RODS NONE 31D 36.6 49.9 55.9 53.7 53.3 46.8 C 36.4 40.7 45.8 44.3 41.3 44.0 T = TIP RUN RECOMMENDED B 37.3 40.1 42.6 40.3 38.9 44.1 C = MFLCPR LOCATION A 34.0 34.3 31.5D 27.6 30.5 42.1 M = MAPRAT LOCATION D = MFLPD LOCATION 23D 33.9 50.4 57.4 55.0 53.8 46.8 P = PCRAT LOCATION C 33.8 42.4 47.3 46.0 44.0 44.1 * = MULTIPLE LIMIT B 33.8 38.5 45.0 42.8 42.7 47.5 A 33.0 38.5 35.7 31.6 35.1 44.9 + = CTP/WT OUT OF RANGE 15D 16.5 42.4 C50.8 45.7 47.2 30.9 C 16.6 42.3 42.5 40.3 45.7 32.2 B 16.2 43.3 44.2 38.8 42.8 33.4 A 14.9 42.9 39.2 34.0 44.5 31.7 07D 16.9 34.4 35.8 26.3 C 17.1 34.8 36.1 27.0 B 17.3 36.4 36.4 26.7 A 15.1 33.8 33.7 26.4 06 14 22 30 38 46 CORE

SUMMARY

CORE POWER 97.9% CALC SUB FLOW 97.5% DP MEAS PSI 18.95 CORE FLOW 99.7% OPER SUB FLOW -2.1% DP CALC PSI 21.59 LOAD LINE 98.1% FLOW BASIS MEAS FEEDWTR FLOW MLB/HR 14.71 APRM CALIBRATION A B C D READING 97.4 97.1 97.9 97.3 AGAF 1.006 1.008 1.000 1.007 APRM - %CTP -0.6 -0.8 -0.0 -0.6 TIP RUNS RECOMMENDED STRINGS: NONE DRIVE FLOW MLB/HR FEEDWTR TEMP DEG.F

TQ-AA-150-J020 Revision 01 Page 16 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS You are the B RO.

The plant is at full power with RR Pumps A and B operating in fast speed.

INITIATING CUE The Control Room Supervisor directs you to perform the daily surveillance CPS 9820.01, Power Distribution Limits.

Report to the CRS after completing the task.

Job Performance Measure Prepare A Request To Alter The CX/CZ Database JPM Number:

JPM423 Revision Number:

01 Date: 5/10/2021 Developed By:

Bill Kiser

/

5/10/21 Instructor: Print / Sign Date Reviewed By:

Justin Reynolds

/

8/27/21 SME or Instructor: Print / Sign Date

TQ-AA-150-J020 Revision 01 Page 17 of 51 JPM402 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Reviewed By:

Aaron Speagle

/

8/27/21 Operations Representative: Print / Sign Date Approved By:

Matthew Beeler

/

8/27/21 Training Department: Print / Sign Date

TQ-AA-150-J020 Revision 01 Page 18 of 51 JPM423 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

14. Task description and number, JPM description and number are identified.
15. Knowledge and Abilities (K/A) references are included.
16. Performance location specified. (in-plant, control room, simulator, or other)
17. Initial setup conditions are identified.
18. Initiating cue (and terminating cue if required) are properly identified.
19. Task standards identified and verified by instructor or SME review.
20. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
21. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
22. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: CPS 3512.01 Revision:

15a Procedure: CPS 3512.01F002 Revision:

3 Procedure: CPS 2208.01F001 Revision:

8 Procedure:

Revision:

23. Verify cues both verbal and visual are free of conflict.
24. Verify performance time is accurate.
25. If the JPM cannot be performed as written with proper responses, then revise the JPM.
26. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

TQ-AA-150-J020 Revision 01 Page 19 of 51 JPM423 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)

Revision #

Summary 00 3/8/18 - New JPM.

01 5/10/21 - Updated JPM format. Updated references.

TQ-AA-150-J020 Revision 01 Page 20 of 51 JPM423 SRRS: 3D.100; There are no retention requirements for this section SETUP INSTRUCTIONS

4. No setup is required for this JPM.

TQ-AA-150-J020 Revision 01 Page 21 of 51 JPM423 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS The plant is at rated power.

1B21-F021, Inboard MSIV Before Seat Warmup Drain Valve has a bad limit switch and is indicating OPEN on the Plant Process Computer display screen.

1B21-F021 is actually shut.

INITIATING CUE Prepare a request to change the CX/CZ database for the Point State parameter computer point B21DC005 to indicate NOT OPEN.

When complete, submit the request to the SM/CRS for review and approval.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 01 Page 22 of 51 JPM423 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

JPM Sequence #:

of Task Standard:

The examinee will prepare a request to change the CX/CZ database for the Point State parameter computer point B21DC005 to indicate NOT OPEN IAW CPS 3512.01 PLANT PROCESS COMPUTER (PPC).

STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE Provide the examinee with a copy of:

  • Initiating Cue (last page of JPM)
  • CPS 3512.01 Plant Process Computer (PPC)
  • CPS 3512.01F002 CX/CZ Database Alteration Log (Marked Up)

NOTE:

For steps 1 through 7, terminology entered into CPS 3512.01F002 which is similar to that presented in the STANDARD may be accepted at the discretion of the examiner.

  • 01 8.3.1.1 Enters point ID into the Database Alteration Log.

Examinee enters B21DC005 in the Point ID field of CPS 3512.01F002.

  • 02 8.3.1.1 Enters desired parameter to change into the Database Alteration Log.

Examinee enters 1B21-F021 position in the Parameter field of CPS 3512.01F002.

  • 03 8.3.1.1 Enters original condition of the parameter into the Database Alteration Log.

Examinee enters Open and/or On in the Original Condition field of CPS 3512.01F002.

  • 04 8.3.1.1 Enters modified condition of the parameter into the Database Alteration Log.

Examinee enters Not Open and/or Off in the Modified Condition field of CPS 3512.01F002.

TQ-AA-150-J020 Revision 01 Page 23 of 51 JPM423 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 05 8.3.1.1 Enters reason for the change into the Database Alteration Log.

Examinee enters To make PPC indicate the actual valve position in the Reason field of CPS 3512.01F002.

CUE If requested, inform examinee the limit switch replacement is scoped into the next refueling outage.

06 8.3.1.1 Enters a duration after which removal/ restoration is required into the Database Alteration Log.

Examinee enters Until limit switch problem is corrected and/or Until completion of next refueling outage in the Necessary Duration field of CPS 3512.01F002.

CUE If requested, provide the examinee a copy of CPS 2208.01F001 Core Thermal Power Determination.

NOTE:

Notification is only required if the point being altered is used in the reactor heat balance calculation.

07 8.3.1.2 Makes required notifications to the SM and CRS.

Examinee enters NA in the notification initial blank.

08 8.3.1.3 Obtain SM/CRS approval.

Examinee submits completed CPS 3512.01F002 CX/CZ Database Alteration Log to the examiner.

CUE JPM is complete.

JPM Stop Time:

TQ-AA-150-J020 Revision 01 Page 24 of 51 JPM423 SRRS: 3D.105 (when utilized for operator initial or continuing training)

CX/CZ DATABASE ALTERATION LOG Page: _____

=========================================================

ALT. NO.: __________

POINT ID: ______________________

DESCRIPTION: _______________________________________________________

PARAMETER: _________________________________________________________

ORIGINAL CONDITION: ________________________________________________

MODIFIED CONDITION: ________________________________________________

REASON: ____________________________________________________________

NECESSARY DURATION: _____________________________________ __________

c Notify both the SM and CRS if the point being altered is used in the reactor heat balance calculations.

INITIAL 0931 ANSWER KEY B21DC005 B21-F021 position Open Not Open To make PPC indicate the actual valve position.

Until limit switch problem is corrected.

N/A

TQ-AA-150-J020 Revision 01 Page 25 of 51 JPM423 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operators Name:

Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Prepare A Request To Alter The CX/CZ Database JPM Number: JPM423 Revision Number: 01 Task Number and

Title:

351201.43 Obtain Approval and Alter the PPC Database.

Task Standard: The examinee will prepare a request to change the CX/CZ database for the Point State parameter computer point B21DC005 to indicate NOT OPEN IAW CPS 3512.01 PLANT PROCESS COMPUTER (PPC).

K/A Number and Importance:

K/A System K/A Number Importance (RO/SRO)

Generic 2.1.20 4.6 4.6 Suggested Testing Environment: Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

Procedure: CPS 4008.01 Revision:

15a CPS 3512.01F002 3

CPS 2208.01F001 8

Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

10 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 01 Page 26 of 51 SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS The plant is at rated power.

1B21-F021, Inboard MSIV Before Seat Warmup Drain Valve has a bad limit switch and is indicating OPEN on the Plant Process Computer display screen.

1B21-F021 is actually shut.

INITIATING CUE Prepare a request to change the CX/CZ database for the Point State parameter computer point B21DC005 to indicate NOT OPEN.

When complete, submit the request to the SM/CRS for review and approval.

TQ-AA-150-J020 Revision 01 Page 27 of 51 JPM423 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Job Performance Measure Perform a Manual Jet Pump Operability JPM Number:

JPM512 Revision Number:

03 Date: 5/10/2021 Developed By:

Bill Kiser

/

5/10/21 Instructor: Print / Sign Date Reviewed By:

Justin Reynolds

/

8/27/21 SME or Instructor: Print / Sign Date Reviewed By:

Aaron Speagle

/

8/27/21 Operations Representative: Print / Sign Date Approved By:

Matthew Beeler

/

8/27/21 Training Department: Print / Sign Date

TQ-AA-150-J020 Revision 01 Page 28 of 51 JPM512 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

27. Task description and number, JPM description and number are identified.
28. Knowledge and Abilities (K/A) references are included.
29. Performance location specified. (in-plant, control room, simulator, or other)
30. Initial setup conditions are identified.
31. Initiating cue (and terminating cue if required) are properly identified.
32. Task standards identified and verified by instructor or SME review.
33. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
34. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
35. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: CPS 9041.01 Revision:

36c Procedure: CPS 9041.01D001 Revision:

34b Procedure:

Revision:

Procedure:

Revision:

36. Verify cues both verbal and visual are free of conflict.
37. Verify performance time is accurate.
38. If the JPM cannot be performed as written with proper responses, then revise the JPM.
39. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

TQ-AA-150-J020 Revision 01 Page 29 of 51 JPM512 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)

Revision #

Summary 00 12/5/5 - New format and numbering convention, revalidated. This replaces JPM 012202J005. Revision number reset to 00.

01 6/14/13 - Updated to new template and numbering convention. This replaces 90410101LAN01.

02 6/12/16 - Updated references.

03 8/18/20 - Updated JPM format.

TQ-AA-150-J020 Revision 01 Page 30 of 51 JPM512 SRRS: 3D.100; There are no retention requirements for this section SETUP INSTRUCTIONS

5. No setup is required for this JPM.

TQ-AA-150-J020 Revision 01 Page 31 of 51 JPM512 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS You are the extra RO.

The computerized method of performing CPS 9041.01 Jet Pump Operability Test is not available at this time.

Plant conditions are as follows:

  • Reactor is operating at 96% power.
  • RR Pumps A and B are operating in fast speed.
  • APRM calibrations are NOT in progress.

INITIATING CUE CPS 9041.01 Jet Pump Operability Test was started on midshift - completed through step 8.1.3. The Control Room Supervisor (CRS) has directed you to complete the remaining portions of CPS 9041.01. Document results on CPS 9041.01D001 Jet Pump Operability Test Data Sheet. Ensure Comments/Deficiencies are documented on the Supplemental Review Sheet, as necessary.

No Engineer is available to provide judgements or evaluations.

Report to the CRS after completing the task.

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 01 Page 32 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

JPM Sequence #:

of Task Standard:

The examinee will complete CPS 9041.01 Jet Pump Operability Test and determine:

  • Recirc Loop A Loop Flow % Deviation is outside the Acceptance Value and steps 8.3.2, 8.3.3 and 8.3.4 may NOT be omitted.
  • Jet Pump 19 Flow % Deviation is outside its Acceptance Value.

STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE Provide the examinee with a copy of:

  • Initiating Cue (last page of JPM)
  • Marked up copy of CPS 9041.01 Jet Pump Operability Test
  • Marked up copy of CPS 9041.01D001 Jet Pump Operability Test Data Sheet
  • Attachment 1 Data for Section 8.1 and 8.2
  • Calculator
  • 01 Step 8.1.4 Calculate the % deviation of the indicated loop flow from the established loop using the data sheet formula.

Examinee calculates Loop Flow % Deviation using the formula listed and records the following values:

Recirc Loop A:

  • Indicated flow - 32,500 gpm
  • Established flow -

28,800 gpm

  • Loop Flow % Deviation

- 12.8% to 13.0%

TQ-AA-150-J020 Revision 01 Page 33 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 01 (cont.)

Recirc Loop B:

  • Indicated flow - 31,000 gpm
  • Established flow -

29,200 gpm

  • Loop Flow % Deviation

- 6.0% to 6.2%

Examinee checks the box for step 8.1.4 in CPS 9041.01.

CUE If the examinee reports that the A RR Loop % deviation is outside the +/-10%

acceptance value, acknowledge the report and cue the examinee to complete the surveillance and report any remaining data outside the acceptance criteria of CPS 9041.01.

02 Step 8.1.4 Documents A RR Loop %

deviation is outside the +/-10%

acceptance value.

Examinee records A RR Loop

% deviation being outside the

+/-10% acceptance value on CPS 9041.01D001 Supplemental Review Sheet.

03 Step 8.2.1 Records Indicated Total Core Flow.

Examinee records Indicated Total Core Flow (Attachment 1).

  • Indicated Total Core Flow - 77.0 Mlbm/hr
  • 04 Step 8.2.2 Calculates Total Recirc Loop Flow.

Examinee calculates Total Recirc Loop Flow using the formula listed and records the following values:

  • Loop A Indicated flow -

32,500 gpm

  • Loop B Indicated flow -

31,000 gpm

  • Total flow - 63,500 gpm

TQ-AA-150-J020 Revision 01 Page 34 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 05 Step 8.2.3.1 Determines and records Established Total Core Flow.

(Step 8.2.3.2 is N/A)

Examinee uses Figure 2a from CPS 9041.01 to determine Established Core Flow and records the following:

  • 81.0 - 83.0 Mlbm/hr Examinee checks the box for step 8.2.3.1 in CPS 9041.01.
  • 06 Step 8.2.4 Calculates Core Flow %

Deviation.

Examinee calculates Core Flow % Deviation using the formula listed and records the following values:

  • Indicated flow - 77.0 Mlbm/hr
  • Established flow - 81.0 to 83.0 Mlbm/hr
  • Core Flow % Deviation

- -4.9% to -7.2%

Examinee checks the box for step 8.2.4 in CPS 9041.01.

CUE Provide the examinee with a copy of Attachment 2 Jet Pump Flows for Section 8.3

  • 07 Step 8.3.1 Records Jet Pump Flow.

Examinee records Jet Pump Flows in Mlbm/hr (Attachment 2).

Determines steps 8.3.2, 8.3.3 and 8.3.4 must be completed.

Examinee determines steps 8.3.2, 8.3.3 and 8.3.4 must be completed due to step 8.1.4 failing to meet the Acceptance Value (Recirc Loop A).

TQ-AA-150-J020 Revision 01 Page 35 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 07 (cont.)

Records sum of each loops jet pump flows.

Examinee records the sum of each loops jet pump (JP) flows:

Loop A (JP 1 thru 10) - 37.97 Mlbm/hr Loop B (JP 11 thru 20) - 39.08 Mlbm/hr Examinee checks the box for step 8.3.1 in CPS 9041.01.

  • 08 Step 8.3.2 Calculates the Average Jet Pump Flow for each recirc loop.

Examinee calculates Average Jet Pump Flow for each recirc loop using Formula #1 and records the following values:

  • Loop A - 3.797 to 3.80 Mlbm/hr
  • Loop B - 3.9 to 3.91 Mlbm/hr

TQ-AA-150-J020 Revision 01 Page 36 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 09 Step 8.3.3 Calculates the Jet Pump Flow

% Deviation for jet pumps 1 through 10.

Examinee calculates the Jet Pump Flow % Deviation for each jet pump in each recirc loop using Formula #1 and records the following values:

JP

%Dev Range 1

5.0 to 5.1 2

5.0 to 5.1 3

-1.84 to -1.76 4

-0.79 to -0.71 5

0.0 to 0.08 6

0.26 to 0.34 7

-1.84 to -1.76 8

-1.05 to -0.97 9

-1.84 to -1.76 10

-3.68 to -3.6

TQ-AA-150-J020 Revision 01 Page 37 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 09 (cont.)

Step 8.3.3 (cont.)

Calculates the Jet Pump Flow

% Deviation for jet pumps 11 through 20.

Examinee calculates the Jet Pump Flow % Deviation for each jet pump in each recirc loop using Formula #1 and records the following values:

JP

%Dev Range 11 2.56 to 2.82 12 2.56 to 2.82 13

-1.3 to -1.0 14

-1.53 to -1.28 15

-1.3 to -1.0 16

-1.53 to -1.28 17

-1.3 to -1.0 18

- 2.56 to -2.31 19 6.6 to 6.92 20

-2.81 to -2.56 Examinee checks the box for step 8.3.3 in CPS 9041.01.

TQ-AA-150-J020 Revision 01 Page 38 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 10 Step 8.3.4.1 Compares Jet Pump Flow %

Deviation to the Acceptance Criteria.

Examinee compares the calculated jet pump flow %

deviation calculated in step 8.3.3 to the acceptance criteria on Table 1 - Fast Speed (80-100% Power).

Examinee notes that jet pump (JP) 19 is outside the acceptance criteria.

Examinee checks the box for step 8.3.4.1 in CPS 9041.01.

CUE If the examinee reports that jet pump 19 outside the acceptance value, acknowledge the report.

11 Step 8.3.4.1 Documents Jet Pump Flow %

deviation is outside the Table 1 acceptance value.

Examinee records Jet Pump Flow % deviation being outside the Table 1 acceptance value on CPS 9041.01D001 Supplemental Review Sheet.

12 Step 8.4 Determines Engineering evaluation was not performed.

Examinee reviews Initiating Cue and determines that there was no Engineer available to perform an evaluation.

Step is N/A.

13 Step 8.5 Notifies SMngt of the completion of the test.

Examinee notifies SMngt that test is complete.

CUE If the examinee reports that the test is complete, acknowledge the report.

JPM is complete.

JPM Stop Time:

TQ-AA-150-J020 Revision 01 Page 39 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operators Name:

Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Perform a Manual Jet Pump Operability JPM Number: JPM512 Revision Number: 03 Task Number and

Title:

904101.01 Perform the Jet Pump Operability Test Task Standard: The examinee will complete CPS 9041.01 Jet Pump Operability Test and determine:

  • Recirc Loop A Loop Flow % Deviation is outside the Acceptance Value and steps 8.3.2, 8.3.3 and 8.3.4 may NOT be omitted.
  • Jet Pump 19 Flow % Deviation is outside its Acceptance Value.

K/A Number and Importance:

K/A System K/A Number Importance (RO/SRO)

Generic 2.2.12 3.7 4.1 Suggested Testing Environment: Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

Procedure: CPS 9041.01 Revision:

36c CPS 9041.01D001 Revision:

34b Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

20 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 01 Page 40 of 51 JPM512 SRRS: 3D.100; There are no retention requirements for this section : Data for CPS 9041.01 Sections 8.1 and 8.2 B33DA013 INDICATED Loop A Flow 32,500 gpm B33DA014 INDICATED Loop B Flow 31,000 gpm B33DA009 B33-F060A Recirc FCV Position RVDT 61%

B33DA010 B33-F060B Recirc FCV Position RVDT 61%

B33DA022 Loop A Jet Pump Flow 40.76 mlbm/Hr B33DA023 Loop B Jet Pump Flow 42.69 mlbm/Hr B33NA001 Indicated Total Core Flow 77.0 mlbm/Hr

TQ-AA-150-J020 Revision 01 Page 41 of 51 JPM512 SRRS: 3D.100; There are no retention requirements for this section : Data for CPS 9041.01 Sections 8.3 Jet Pump Number Jet Pump Flow (mlbm/hr)

JP 1 3.99 JP 2 3.99 JP 3 3.73 JP 4 3.77 JP 5 3.80 JP 6 3.81 JP 7 3.73 JP 8 3.76 JP 9 3.73 JP 10 3.66 JP 11 4.01 JP 12 4.01 JP 13 3.86 JP 14 3.85 JP 15 3.86 JP 16 3.85 JP 17 3.86 JP 18 3.81 JP 19 4.17 JP 20 3.80

TQ-AA-150-J020 Revision 01 Page 42 of 51 SRRS: 3D.105 (when utilized for operator initial or continuing training)

INITIAL CONDITIONS You are the extra RO.

The computerized method of performing CPS 9041.01 Jet Pump Operability Test is not available at this time.

Plant conditions are as follows:

  • Reactor is operating at 96% power.
  • RR Pumps A and B are operating in fast speed.
  • APRM calibrations are NOT in progress.

INITIATING CUE CPS 9041.01 Jet Pump Operability Test was started on midshift - completed through step 8.1.3. The Control Room Supervisor (CRS) has directed you to complete the remaining portions of CPS 9041.01. Document results on CPS 9041.01D001 Jet Pump Operability Test Data Sheet. Ensure Comments/Deficiencies are documented on the Supplemental Review Sheet, as necessary.

No Engineer is available to provide judgements or evaluations.

Report to the CRS after completing the task.

TQ-AA-150-J020 Revision 01 Page 43 of 51 JPM512 SRRS: 3D.105 (when utilized for operator initial or continuing training)

Job Performance Measure Determine Radiation Dose JPM Number:

JPM579 Revision Number:

00 Date: 4/30/2021 Developed By:

Matthew Beeler

/

4/30/21 Instructor: Print / Sign Date Reviewed By:

Justin Reynolds

/

8/27/21 SME or Instructor: Print / Sign Date Reviewed By:

Aaron Speagle

/

8/27/21 Operations Representative: Print / Sign Date Approved By:

Matthew Beeler

/

8/27/21 Training Department: Print / Sign Date

TQ-AA-150-J020 Revision 01 Page 44 of 51 JPM579 SRRS: 3D.100; There are no retention requirements for this section JOB PERFORMANCE MEASURE VALIDATION CHECKLIST NOTE: All steps of this checklist should be performed upon initial validation.

Prior to JPM usage, revalidate JPM using steps 9 and 13 below.

40. Task description and number, JPM description and number are identified.
41. Knowledge and Abilities (K/A) references are included.
42. Performance location specified. (in-plant, control room, simulator, or other)
43. Initial setup conditions are identified.
44. Initiating cue (and terminating cue if required) are properly identified.
45. Task standards identified and verified by instructor or SME review.
46. Critical steps meet the criteria for critical steps and are identified with an asterisk (*).
47. IAW NUREG 1021 Appendix C, clearly identify the task standard (i.e., the predetermined qualitative or quantitative outcome) against which task performance will be measured.
48. Verify the procedure(s) referenced by this JPM reflects the current revision:

Procedure: NISP-RP-002 Revision:

1 Procedure:

Revision:

Procedure:

Revision:

Procedure:

Revision:

49. Verify cues both verbal and visual are free of conflict.
50. Verify performance time is accurate.
51. If the JPM cannot be performed as written with proper responses, then revise the JPM.
52. When JPM is initially validated, sign and date JPM cover page. For subsequent validations, sign and date below:

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

/

SME / Instructor (Print/Sign)

Date

TQ-AA-150-J020 Revision 01 Page 45 of 51 JPM579 SRRS: 3D.100; There are no retention requirements for this section Revision Record (Summary)

Revision #

Summary 00 4/30/21 - New JPM.

TQ-AA-150-J020 Revision 01 Page 46 of 51 JPM579 SRRS: 3D.100; There are no retention requirements for this section SETUP INSTRUCTIONS

6. This is an RO Admin JPM; no simulator setup is required.

TQ-AA-150-J020 Revision 01 Page 47 of 51 JPM579 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS While performing CPS 9061.01, Primary Containment Integrity Verification, an operator became incapacitated near RT Pump B. He is slumped against the east wall of the room, facing the B RT Pump. He is unable to move and has suffered unknown injuries. You and a Fire Brigade member will stabilize and rescue the operator.

INITIATING CUE Review the survey map for the RT Pump Rooms and determine the following using the most direct route to get to the injured person:

1. What is the highest contamination level?
2. What is the highest contact radiation level?
3. What is the highest general area dose rate level?
4. What is the estimated dose if it takes you 10 minutes to stabilize and prepare to remove the injured operator? (Disregard dose for traveling to and from the door to the operator).

Fill in the JPM Start Time when the student acknowledges the Initiating Cue.

Information For Evaluators Use:

UNSAT requires written comments on respective step.

  • Denotes critical steps.

Number any comments in the Comment Number column on the following pages. Then annotate that comment in the Comments section. The comment section should be used to document: the reason that a step is marked as unsatisfactory, marginal performance relating to management expectations, or problems the examinee had while performing the JPM.

Comments relating to procedural or equipment issues should be entered and tracked using the sites appropriate tracking system.

Some operations that are performed from outside of the control room may require multiple steps. These items may be listed as individual steps in this JPM. It is acceptable for the candidate to direct the local operator to perform groups of procedure steps instead of calling for each individual item to be performed.

The timeclock starts when the candidate acknowledges the initiating cue.

TQ-AA-150-J020 Revision 01 Page 48 of 51 JPM579 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM Start Time:

JPM Sequence #:

of Task Standard:

The examinee will determine radiological conditions and calculate dose to rescue the injured operator.

STEP ELEMENT STANDARD SAT UNSAT Comment Number CUE Provide the examinee with the Cue Sheet and the following:

  • NISP-RP-002, Radiological Posting and Labeling
  • Survey map
  • 01 Determines highest contamination levels in the B RT Pump Room.

Examinee identifies the intended locations on the map and determines the highest contamination level is 4,000 dpm/100cm2 at smear location 4 in the B RT Pump Room.

  • 02 Determines highest contact radiation levels in the B RT Pump Room.

Examinee identifies the intended locations on the map and determines the highest contact radiation level is 45 mrem/hr at the B RT Pump.

TQ-AA-150-J020 Revision 01 Page 49 of 51 JPM579 SRRS: 3D.105 (when utilized for operator initial or continuing training)

STEP ELEMENT STANDARD SAT UNSAT Comment Number

  • 03 Determines highest general area dose level in the B RT Pump Room.

Examinee identifies the intended locations on the map and determines the highest dose rate is 25 mrem/hr near the B RT Pump.

  • 04 Calculates the dose to stabilize and prepare to remove the injured operator.

Examinee calculates dose near B RT Pump is 25 mrem/hr for 10 minutes = 4.17 mrem per person. (4-4.5 mrem per person is acceptable.)

CUE JPM is complete.

JPM Stop Time:

TQ-AA-150-J020 Revision 01 Page 50 of 51 JPM579 SRRS: 3D.105 (when utilized for operator initial or continuing training)

JPM

SUMMARY

Operators Name:

Emp. ID#:

Job

Title:

EO RO SRO FS STA/IA SRO Cert JPM

Title:

Determine Radiation Dose JPM Number: JPM579 Revision Number: 0 Task Number and

Title:

995555.01 Complete in-plant radiological practices for a High Radiation Zone Task Standard: The examinee will determine radiological conditions and calculate dose to rescue the injured operator.

K/A Number and Importance:

K/A System K/A Number Importance (RO/SRO)

Generic 2.3.14 3.4 3.8 Suggested Testing Environment: Classroom Alternate Path:

Yes No SRO Only:

Yes No Time Critical:

Yes No Reference(s):

Procedure: NISP-RP-002 Revision:

1 Actual Testing Environment:

Simulator Control Room In-Plant Other Testing Method:

Simulate Perform Estimated Time to Complete:

10 minutes Actual Time Used:

minutes EVALUATION

SUMMARY

Were all the Critical Elements performed satisfactorily?

Yes No The operators performance was evaluated against standards contained within this JPM and has been determined to be:

Satisfactory Unsatisfactory NOTE: Enter finalized grading, comments, and notes relevant to this evaluation in the associated TQ-AA-150-F03A/B. (See AR 4282419).

Evaluators Name (Print):

Evaluators Signature:

Date:

TQ-AA-150-J020 Revision 01 Page 51 of 51 JPM579 SRRS: 3D.100; There are no retention requirements for this section INITIAL CONDITIONS While performing CPS 9061.01, Primary Containment Integrity Verification, an operator became incapacitated near RT Pump B. He is slumped against the east wall of the room, facing the B RT Pump. He is unable to move and has suffered unknown injuries. You and a Fire Brigade member will stabilize and rescue the operator.

INITIATING CUE Review the survey map for the RT Pump Rooms and determine the following using the most direct route to get to the injured person:

1. What is the highest contamination level?
2. What is the highest contact radiation level?
3. What is the highest general area dose rate level?
4. What is the estimated dose if it takes you 10 minutes to stabilize and prepare to remove the injured operator? (Disregard dose for traveling to and from the door to the operator).