ML22153A525
| ML22153A525 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/28/2022 |
| From: | Bruce Bartlett NRC/RGN-III/DRS/OLB |
| To: | AmerGen Energy Co |
| Bartlett B | |
| Shared Package | |
| ML20136A320 | List: |
| References | |
| Download: ML22153A525 (4) | |
Text
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2 Facility:
Clinton Date of Examination:
1/17/2022 Exam Level: RO SRO-I SRO-U Operating Test Number:
2022-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
A, D, S 1
A, EN, N, S 3
- d. 245000 A4.01 2.7 / JPM 580 Testing of Emergency Bearing Oil Pump N, S 4
- f. 262001 A4.04 3.6 / JPM 432 Transferring 4160V Bus 1B1 from the Main to the Reserve Source (Alternate Path)
A, D, P, S 6
- g. 212000 A4.02 3.6 / JPM 519 Perform a Manual Scram Functional
/ SDV Hi Level Bypass Test D, S 7
- h. 288000 A4.01 3.1 / JPM 417 Startup Containment Building/Drywell HVAC (VR, VQ) in Containment Vent Mode (Alternate Path)
A, D, S 9
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
A, D, E, L, S 7
- k. 295019 AA1.02 3.3 / JPM 428 Place IA Ring Header Automatic Isolation Valve into Service D, E, P, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1 Facility:
Clinton Date of Examination:
1/17/2022 Exam Level: RO SRO-I SRO-U Operating Test Number:
2022-301 Control Room Systems:* 8 for RO, 7 for SRO-I, and 2 or 3 for SRO-U System/JPM Title Type Code*
Safety Function
A, D, S 1
A, EN, N, S 3
- d. 245000 A4.01 2.7 JPM 580 Testing of Emergency Bearing Oil Pump N, S 4
- f. 262001 A4.04 3.7 / JPM 432 Transferring 4160V Bus 1B1 from the Main to the Reserve Source (Alternate Path)
A, D, P, S 6
- g. 212000 A4.02 3.7 / JPM 519 Perform a Manual Scram Functional
/ SDV Hi Level Bypass Test D, S 7
- h.
In-Plant Systems:* 3 for RO, 3 for SRO-I, and 3 or 2 for SRO-U
A, D, E, L, S 2/4
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- k. 295019 AA1.02 3.1 / JPM 428 Place IA Ring Header Automatic Isolation Valve into Service D, E, P, R 8
All RO and SRO-I control room (and in-plant) systems must be different and serve different safety functions, all five SRO-U systems must serve different safety functions, and in-plant systems and functions may overlap those tested in the control room.
ES-301 Control Room/In-Plant Systems Outline Form ES-301-2
- Type Codes Criteria for R /SRO-I/SRO-U (A)lternate path (C)ontrol room (D)irect from bank (E)mergency or abnormal in-plant (EN)gineered safety feature (L)ow-Power/Shutdown (N)ew or (M)odified from bank including 1(A)
(P)revious 2 exams (R)CA (S)imulator 4-6/4-6 /2-3 9/ 8/ 4 1/ 1/ 1 1/ 1/ 1 (control room system) 1/ 1/ 1 2/ 2/ 1 3/ 3/ 2 (randomly selected) 1/ 1/ 1