ML13364A056: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRO/RONo.JP-ER-831-0001-402Revision3JPMTitleRequestEmergencyOffsiteServicesDuration20minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
{{#Wiki_filter:JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-ER-831-0001-402                        3 JPM Title                                                    Duration            Page Request Emergency Offsite Services                              20 minutes                      1 Examinee:                                                                     SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment1.*2.*3.4.*5.*6.7.*8.*9.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleRequestEmergencyOffsiteServicesNo.:JP-ER-831-0001-402Revision:3Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U    Comment        Element  S    U    Comment        Element      S    U    Comment 1.
JOBPERFORMANCEMEASUREJPMTitleRequestEmergencyOffsiteServicesNo.:JP-ER-831-0001-402Revision:3Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:N/ATask:74001-Requestoffsiteambulance/paramedic,fire,orhospitalsupport
* 2.
* 3.
4.
* 5.
* 6.
7.
* 8.
* 9.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations          Improvement              Expectations            Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-ER-831-0001-402 Request Emergency Offsite Services                                                            Revision: 3 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was        Did not recognize key at proper frequency, using    performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system  too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.               monitoring.               system status.
Control            Task preview used to          Adequate control of system No anticipation of results of prepare for job. Aware of    maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.             could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                   greater depth of knowledge parameters.
for anticipating system response.
Conservatism      Low threshold for            Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on  High threshold for problem stop when unsure if        task completion without    conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic  Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-ER-831-0001-402 Request Emergency Offsite Services                                                          Revision: 3 Page 3 JPM Information System:
N/A Task:
74001 - Request offsite ambulance/paramedic, fire, or hospital support


==References:==
==References:==
Required(R)/Available(A)EP-290,EmergencyNotifications(R)EP-29004,Ambulance/ParamedicSupportRequestForm(A)EP-29005,HospitalSupportRequestForm(A)EP-29006,SecondaryAlarmStationReport(A)ToolsandEquipmentRequired:NoneInitialConditions:YouareanextraoperatorintheControlRoomwhenamajorsteamleakoccurs.Thesteamleakhasjustbeenisolatedwhenthecontrolroomreceivesareportthat3personnelhavereceivedlife-threateningburnsfromthesteamleak.ThepersonnelareintheNorthHeaterDrainPumpRoomwhereradiationlevelsarenotexcessive.Theareasurroundingthelocationoftheseriouslyburnedpersonneliscontaminated.InitiatingCue(s):TheSMdirectsyoutoobtainambulanceandparamedicassistance.InformtheSMwhentherequestsforassistancehavebeenmadeandarrangementsforentryoftherespondingpersonnelhavebeencompleted.TerminatingCue(s):Offsiteassistancehasbeenrequested,thehospitalhasbeeninformedandsiteentryhasbeenexpeditedforrespondingpersonnel.TaskStandard:OffsiteAssistancehasbeenrequestedfromFrenchtownFireDepartment,AmbulanceandParamedicsperEP290.
Required (R) / Available (A)
JOBPERFORMANCEMEASUREJPMTitleRequestEmergencyOffsiteServicesNo.:JP-ER-831-0001-402Revision:3Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:N/AK/A
EP-290, Emergency Notifications (R)
EP-29004, Ambulance/ Paramedic Support Request Form (A)
EP-29005, Hospital Support Request Form (A)
EP-29006, Secondary Alarm Station Report (A)
Tools and Equipment Required:
None Initial Conditions:
You are an extra operator in the Control Room when a major steam leak occurs.
The steam leak has just been isolated when the control room receives a report that 3 personnel have received life-threatening burns from the steam leak.
The personnel are in the North Heater Drain Pump Room where radiation levels are not excessive.
The area surrounding the location of the seriously burned personnel is contaminated.
Initiating Cue(s):
The SM directs you to obtain ambulance and paramedic assistance.
Inform the SM when the requests for assistance have been made and arrangements for entry of the responding personnel have been completed.
Terminating Cue(s):
Offsite assistance has been requested, the hospital has been informed and site entry has been expedited for responding personnel.
Task Standard:
Offsite Assistance has been requested from Frenchtown Fire Department, Ambulance and Paramedics per EP 290.
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                              No.: JP-ER-831-0001-402 Request Emergency Offsite Services                                                            Revision: 3 Page 4 Licensed Operator Exam Information (required for NRC exams)
Safety Function:
N/A K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:GenericK/ASTATEMENT:2.4.43Knowledgeofemergencycommunicationssystemsandtechniques...............................3.2/3.8MaintenanceRuleSafetyClassification:N/AMaintenanceRuleRiskSignificant?(YesorNo)N/A JOBPERFORMANCEMEASUREJPMTitleRequestEmergencyOffsiteServicesNo.:JP-ER-831-0001-402Revision:3Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvideexamineewithCueSheet.Ifasked,provideexamineewithacopyofEP-290004.CUE:Ifrequested,SMinformsexamineethatparamedicsshouldbeawarethatareaaroundinjuredpersonnelaswellaspersonnelthemselvesmightbecontaminated.Arearadiationlevelsarenotasignificantrisk.1.ObtainEP-2900004,Ambulance/ParamedicSupportRequestForm,andcompleteappropriatesections.1.ObtainsandcompletesEP-290004asfollows:ChecksblockforRescueSquadandambulanceFillsinName,Title,andTelephoneNumber3injuredpersonnelSeriouslyBurned3potentiallycontaminatedTransporttoMercyMemorialCUE:AsCentralDispatch,acknowledgetheinformationprovided.*2.Call734-241-2727(forurgentmedicalassistance)torequestparamedicandambulance.*2.Callsnumber,states"Thisis(name,title,telephonenumber)callingfromFermi2.Thereareinjuredpersonnelonsiteandyourassistanceisrequiredimmediately."Providesotherinformationpreviouslyfilledinonform.CUE:AsCentralDispatch,respondthatcontactnameisRobertJames.*3.RequestcontactnamefromCentralDispatch,andenterdateandtime.*3.RequestscontactnamefromCentralDispatch,andnotesitonformalongwithcurrentdateandtime.NOTE:EP-290006maybecompletedbeforeEP-290005.CUE:Ifrequested,provideexamineewithacopyofEP-290005.4.ObtainEP-290005andcompletetheform.4.ObtainsEP-290005andcompletestheformwiththepreviouslycollectedinformation.*5.Call734-240-8477or734-240-8488(MercyMemorialHospital)askingfortheChargeNurseandprovidethecollectedinformation.*5.CallsMercyMemorial,states"Thisis(name,title,telephonenumber)callingfromFermi2.Thereareinjuredpersonnelonsiteandtheambulanceservicehasbeencontactedtotransportthevictimstoyou."Providestheotherinformationrequired,includingnumberofinjuredpersonnel(3).States"Youarerequestedtoimplementyourradiologicalemergencyresponseplan."
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleRequestEmergencyOffsiteServicesNo.:JP-ER-831-0001-402Revision:3Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1ELEMENTSTANDARDCUE:AsChargeNurse,respondthatcontactnameisSamuelSmith.*6.RequestcontactnamefromChargeNurse,andenterdateandtime.*6.RequestscontactnamefromChargeNurse,andnotesitonformalongwithcurrentdateandtime.CUE:Ifrequested,provideexamineewithacopyofEP-290006.Ifasked,SMreportsthatinjuredpersonnelareintheNorthHeaterBay.7.ObtainEP-290006andcompletetheform.7.ObtainsEP-290006andcompletestheformwiththerequiredinformation:ChecksthatFire/Paramedics,Ambulance,andHospitalcontacted.2vehiclesreportingonsite4personnelreportingonsiteChecksFermiDrivegatetobeusedInjuredpersonnelareintheNorthHeaterBay*8.UseControlRoom-SecuritydirectlinetoSAS(SecondaryAlarmStation)orcall6-5215,andreportrequiredinformation.*8.ContactsSecondaryAlarmStationandreports:Fire/Paramedics,Ambulance,andHospitalcontacted.2vehiclesreporting4personnelrespondingAccessisthroughFermiDrivegateInjuredpersonnelareintheNorthHeaterDrainPumpRoom(TurbineBuilding)CUE:AsSecuritySupervisor,respondthatcontactnameisJosephRuger.*9.RequestcontactnamefromSAS,andenterdateandtime.*9.RequestscontactnamefromSAS,andnotesitonformalongwithcurrentdateandtime.CUE:TerminateJPMwhenSMisnotifiedthatoffsiteassistancehasbeenrequested,thehospitalinformed,andsiteentryexpeditedforrespondingpersonnel.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleRequestEmergencyOffsiteServicesNo.:JP-ER-831-0001-402Revision:3Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:ThisJPMmaybestartedattheCRSDeskintheSimulator.ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:NoneSystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
K/A SYSTEM: Generic K/A STATEMENT:
JOBPERFORMANCEMEASUREJPMTitleRequestEmergencyOffsiteServicesNo.:JP-ER-831-0001-402Revision:3Page8WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
2.4.43 Knowledge of emergency communications systems and techniques. .............................. 3.2 / 3.8 Maintenance Rule Safety Classification:
N/A Maintenance Rule Risk Significant? (Yes or No)
N/A Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                          No.: JP-ER-831-0001-402 Request Emergency Offsite Services                                                                Revision: 3 Page 5 PERFORMANCE EVALUATION Start Time ELEMENT                                                STANDARD CUE:     Provide examinee with Cue Sheet. If asked, provide examinee with a copy of EP-290004.
CUE:     If requested, SM informs examinee that paramedics should be aware that area around injured personnel as well as personnel themselves might be contaminated. Area radiation levels are not a significant risk.
: 1. Obtain EP-2900004, Ambulance/ Paramedic            1. Obtains and completes EP-290004 as follows:
Support Request Form, and complete                          Checks block for Rescue Squad and appropriate sections.                                        ambulance Fills in Name, Title, and Telephone Number 3 injured personnel Seriously Burned 3 potentially contaminated Transport to Mercy Memorial CUE:     As Central Dispatch, acknowledge the information provided.
* 2. Call 734-241-2727 (for urgent medical
* 2. Calls number, states This is (name, title, assistance) to request paramedic and                  telephone number) calling from Fermi 2.
ambulance.                                             There are injured personnel onsite and your assistance is required immediately.
Provides other information previously filled in on form.
CUE:     As Central Dispatch, respond that contact name is Robert James.
* 3. Request contact name from Central Dispatch,
* 3. Requests contact name from Central and enter date and time.                              Dispatch, and notes it on form along with current date and time.
NOTE: EP-290006 may be completed before EP-290005.
CUE:     If requested, provide examinee with a copy of EP-290005.
: 4. Obtain EP-290005 and complete the form.             4. Obtains EP-290005 and completes the form with the previously collected information.
* 5. Call 734-240-8477 or 734-240-8488 (Mercy
* 5. Calls Mercy Memorial, states This is (name, Memorial Hospital) asking for the Charge              title, telephone number) calling from Fermi 2.
Nurse and provide the collected information.           There are injured personnel onsite and the ambulance service has been contacted to transport the victims to you.
Provides the other information required, including number of injured personnel (3).
States You are requested to implement your radiological emergency response plan.
Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-ER-831-0001-402 Request Emergency Offsite Services                                                          Revision: 3 Page 6 ELEMENT                                            STANDARD CUE:     As Charge Nurse, respond that contact name is Samuel Smith.
* 6. Request contact name from Charge Nurse,
* 6. Requests contact name from Charge Nurse, and enter date and time.                            and notes it on form along with current date and time.
CUE:     If requested, provide examinee with a copy of EP-290006. If asked, SM reports that injured personnel are in the North Heater Bay.
: 7. Obtain EP-290006 and complete the form.         7. Obtains EP-290006 and completes the form with the required information:
Checks that Fire/Paramedics, Ambulance, and Hospital contacted.
2 vehicles reporting onsite 4 personnel reporting onsite Checks Fermi Drive gate to be used Injured personnel are in the North Heater Bay
* 8. Use Control Room-Security direct line to SAS
* 8. Contacts Secondary Alarm Station and (Secondary Alarm Station) or call 6-5215, and      reports:
report required information.                           Fire/Paramedics, Ambulance, and Hospital contacted.
2 vehicles reporting 4 personnel responding Access is through Fermi Drive gate Injured personnel are in the North Heater Drain Pump Room (Turbine Building)
CUE:     As Security Supervisor, respond that contact name is Joseph Ruger.
* 9. Request contact name from SAS, and enter
* 9. Requests contact name from SAS, and notes date and time.                                     it on form along with current date and time.
CUE:     Terminate JPM when SM is notified that offsite assistance has been requested, the hospital informed, and site entry expedited for responding personnel.
______ SATISFACTORY                                ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-ER-831-0001-402 Request Emergency Offsite Services                                                          Revision: 3 Page 7 Evaluator Notes:
This JPM may be started at the CRS Desk in the Simulator.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-ER-831-0001-402 Request Emergency Offsite Services                                      Revision: 3 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleRequestEmergencyOffsiteServicesNo.:JP-ER-831-0001-402Revision:3Page9WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:N/AMalfunctions:NumberTitleValueDelayRampN/ARemoteFunctions:NumberTitleValueDelayRampN/AOverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:N/A JOBPERFORMANCEMEASURECueSheet:(JP-ER-831-0001-402)InitialConditions:YouareanextraoperatorintheControlRoomwhenamajorsteamleakoccurs.Thesteamleakhasjustbeenisolatedwhenthecontrolroomreceivesareportthat3personnelhavereceivedlife-threateningburnsfromthesteamleak.ThepersonnelareintheNorthHeaterDrainPumpRoomwhereradiationlevelsarenotexcessive.Theareasurroundingthelocationoftheseriouslyburnedpersonneliscontaminated.InitiatingCue(s):TheSMdirectsyoutoobtainambulanceandparamedicassistance.InformtheSMwhentherequestsforassistancehavebeenmadeandarrangementsforentryoftherespondingpersonnelhavebeencompleted.
===Response===
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1JobPositionSRO/RONo.JP-OP-315-0043-005Revision2JPMTitleRecoveryofRCICfollowingaManualTripDuration25minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Question:
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-ER-831-0001-402 Request Emergency Offsite Services                                      Revision: 3 Page 9 Simulator Setup IC#:
N/A Malfunctions:
Number                              Title                Value      Delay  Ramp N/A Remote Functions:
Number                              Title                Value      Delay  Ramp N/A Override Functions:
Number                              Title                Value      Delay  Ramp N/A Special Instructions:
N/A Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-ER-831-0001-402)
Initial Conditions:
You are an extra operator in the Control Room when a major steam leak occurs.
The steam leak has just been isolated when the control room receives a report that 3 personnel have received life-threatening burns from the steam leak.
The personnel are in the North Heater Drain Pump Room where radiation levels are not excessive.
The area surrounding the location of the seriously burned personnel is contaminated.
Initiating Cue(s):
The SM directs you to obtain ambulance and paramedic assistance.
Inform the SM when the requests for assistance have been made and arrangements for entry of the responding personnel have been completed.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-OP-315-0043-005                      2 JPM Title                                                      Duration              Page Recovery of RCIC following a Manual Trip                        25 minutes                      1 Examinee:                                                                   SRO / RO Evaluator:
JPM Type:                 Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                 Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*11.2.*12.*3.*13.4.14.5.*15.6.*16.*7.8.9.*10.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleRecoveryofRCICfollowingaManualTripNo.:JP-OP-315-0043-005Revision:2Page2WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S    U    Comment        Element    S    U    Comment      Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleRecoveryofRCICfollowingaManualTripNo.:JP-OP-315-0043-005Revision:2Page3WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1JPMInformationSystem:E5100-ReactorCoreIsolationCoolingSystemTask:63607-PerformarecoveryofRCICfollowingatrip
* 1.                                 *11.
: 2.                                 *12.
* 3.                                 *13.
: 4.                                 14.
: 5.                                 *15.
: 6.                                 *16.
* 7.
8.
9.
    *10.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental          Expectations            Improvement            Expectations              Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS      ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                        No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip                                                          Revision: 2 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                    Does not meet Expectations Improvement Monitoring        Equipment status monitored      Some monitoring was          Did not recognize key at proper frequency, using      performed but undue focus    equipment status indicators, multiple means if available. on task or lack of system    too much focus on single Understood which indications    knowledge prevented ideal    indications and ignored total were critical.                 monitoring.                   system status.
Control            Task preview used to prepare    Adequate control of system    No anticipation of results of for job. Aware of control      maintained throughout task    actions. Unaware or control bands and maintained them.     but some improvements        bands or not able to maintain Configuration control          could be made such as better  them. Lack of knowledge of maintained.                     manual control or greater    how to control system depth of knowledge for        parameters.
anticipating system response.
Conservatism      Low threshold for              Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding,   with unanswered questions.
Questioning attitude. Uses      High focus on task            High threshold for problem stop when unsure if          completion without            conditions.
needed. Sensitive to nuclear    consideration for other safety.                         system affects.
Teamwork          Routinely communicates          Communicated most status      Routinely takes action without system status changes to the    and actions. Some            informing the team.
team. Communicates actions      improvement would be before taking them.             warranted.
Knowledge          Able to anticipate system      Plant, system, or generic    Unable to predict system response based on solid        fundamental knowledge has    response, unsure of generic system knowledge. Good          some gaps.                   fundamentals concepts working knowledge of generic                                  related to plant operation.
fundamentals to predict and                                  Only relied on procedure for monitor system response.                                      operating knowledge.
Work Instruction                                                                                              WI 5.14 Job Performance Measures                                                                                        Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                          No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip                                                                                  Revision: 2 Page 3 JPM Information System:
E5100 - Reactor Core Isolation Cooling System Task:
63607 - Perform a recovery of RCIC following a trip


==References:==
==References:==
Required(R)/Available(A)23.206,ReactorCoreIsolationCoolingSystemToolsandEquipmentRequired:NoneInitialConditions:YouaretheControlRoomNSOwiththereactorshutdownfollowingatransient.TheEOPshavebeenentered.RCIC,SBFW,andCRDpumpswereinjectingtocontrolreactorwaterlevel.RCICwassubsequentlyshutdownusingthemanualtrippushbutton.N2103-F001(SBFWinjectionvalve)hasjustfailedclosed,andthepumpshavebeenshutdown.InitiatingCue(s):TheCRSdirectsyoutoresetandmanuallyrestartRCICper23.406section7,andrestorewaterlevelto173"-214".TerminatingCue(s):RCICisinjectingintotheRPVatapproximately650gpm.TaskStandard:RCIChasbeenrestartedfollowingamanualtripper23.206,ReactorCoreIsolationCoolingSystem.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:2-ReactorWaterInventoryControlK/A
Required (R) / Available (A) 23.206, Reactor Core Isolation Cooling System Tools and Equipment Required:
None Initial Conditions:
You are the Control Room NSO with the reactor shut down following a transient.
The EOPs have been entered.
RCIC, SBFW, and CRD pumps were injecting to control reactor water level.
RCIC was subsequently shutdown using the manual trip pushbutton.
N2103-F001 (SBFW injection valve) has just failed closed, and the pumps have been shut down.
Initiating Cue(s):
The CRS directs you to reset and manually restart RCIC per 23.406 section 7, and restore water level to 173"-214".
Terminating Cue(s):
RCIC is injecting into the RPV at approximately 650 gpm.
Task Standard:
RCIC has been restarted following a manual trip per 23.206, Reactor Core Isolation Cooling System.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
2-Reactor Water Inventory Control K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:217000-ReactorCoreIsolationCoolingSystemK/ASTATEMENT:A4.Abilitytooperateand/ormonitorinthecontrolroom:A4.02Turbinetripthrottlevalvereset.................................................................................3.9/3.9MaintenanceRuleSafetyClassification:E5100-01MaintenanceRuleRiskSignificant?(YesorNo)Yes JOBPERFORMANCEMEASUREJPMTitleRecoveryofRCICfollowingaManualTripNo.:JP-OP-315-0043-005Revision:2Page4WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:Providetheexamineewiththecuesheet.*1.[7.1.2.1.a]DepressRCICSystemInitiateSignalresetpushbuttonandverify:WhiteSEALEDINlightgoesoffAnnunciator1D24,RCICSYSTEMACTUATION,clears.*1.DepressesRCICSystemInitiateSignalresetpushbutton,andverifiesSEALEDINlightgoesoutand1D24clears.2.[7.1.2.1.b]CloseorverifyclosedE5150-F095,RCICTurbStmInletBypVlv.2.VerifiesE5150-F095isclosed.*3.[7.1.2.1.c]Closeorverifyclosedthefollowingvalves:E5150-F059,RCICTurbineTripThrottleVlvE5150-F019,RCICMinFlowVlvE5150-F013,RCICDischtoFWInbdIsoValveE5150-F045,RCICTurbSteamInletVlvE5150-F046,RCICOilClrClgWaterIsoVlv*3.ClosesE5150-F059.VerifiesE5150-F019isclosed.VerifiesE5150-F013isclosed.ClosesE5150-F045.ClosesE5150-F046.4.[7.1.2.1.d]Openthefollowingvalves:E5150-F025,RCICTurbStmDrnPotInbdIsoE5150-F026,RCICTurbStmDrnPotOtbdIsoE5150-F005,RCICCondToRWOtbdIsoVlv4.Verifiesthefollowingvalvesareopen:E5150-F025E5150-F026E5150-F005NOTE:RPVLevelis>Level2,andRCICwastrippedmanually,so7.1.2.2&7.1.2.3areNA.5.[7.1.2.4.c]PlaceRCICTurbineTripPushbuttoncollarinDISARMED.5.VerifiesRCICTurbineTripPBcollarisinDISARMED.6.[7.1.2.5.c]CloseE5150-F059,RCICTurbineTripThrottleVlv,6.VerifiesE5150-F059isclosed.*7.[7.1.2.5.d]OpenE5150-F059,RCICTurbineTripThrottleVlv,*7.OpensE5150-F059.8.[7.1.2.5.e]Verifyannunciator1D94,RCICTurbineTrippedisclear.8.Verifies1D94isclear.CUE:NOreportsthatvalvestemforE51-F059,RCICTurbineInletTripThrottleVlv,isinOPEN.9.[7.1.2.5.f]VerifylocallyvalvestemforE51-F059,RCICTurbineInletTripThrottleVlv,isinOPEN.9.DirectsNOtolocallyverifyvalvestemforE51-F059,RCICTurbineInletTripThrottleVlv,isinOPEN.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleRecoveryofRCICfollowingaManualTripNo.:JP-OP-315-0043-005Revision:2Page5WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1ELEMENTSTANDARDNOTE:StudentmayrestartRCICusingsection5.4orEnclosureBwithallprerequisitesmetorwaivedbyCRS.*10..[5.4.2.1]StartE5101-C004RCICBaroCndrVacuumPump.*10.StartsE5101-C004,RCICBaroCndrVacuumPump.*11.[5.4.2.2]OpenE5150-F046,RCICOilClrClgWaterIsoVlv.*11.OpensE5150-F046.NOTE:ExamineeshouldmakeHiComannouncementandCrewUpdate"StartingRCIC"*12.[5.4.2.3.a]OpenE5150-F095,RCICTurbStmInletBypVlv.*12.OpensE5150-F095.*13.[5.4.2.3.b]Afterapproximately15seconds,openE5150-F045,RCICTurbSteamInletVlv.*13.After15seconds,opensE5150-F045.14.[5.4.2.4]Verifythefollowingvalvesclose:E5150-F025,RCICTurbStmDrnPotInbdIsoE5150-F026,RCICTurbStmDrnPotOtbdIso14.VerifiesE5150-F025andE5150-F026close.*15.[5.4.2.6]OpenE5150-F013,RCICDishToFWInbdIsoValve*15.OpensE5150-F013.*16.[5.4.2.7]AdjustflowasnecessarywithE51-K615,RCICDischargeFlowController.*16.AdjustsflowwithE51-K615tomaintainRPVLevel.CUE:EndJPMwhenRCICisinjectingwithapproximately650gpmwithlevelincreasing.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleRecoveryofRCICfollowingaManualTripNo.:JP-OP-315-0043-005Revision:2Page6WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1EvaluatorNotes:ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:CMCswitcheswillturnREDandamperagewillincreasewhentheswitchisrotatedtothestartpositionstarted.Thecurrentshouldinitiallybefivetoseventimesthenormalrunningampswiththeammeterflashing.AscounterEMFisdeveloped,theamperagewilllowertothenormalrunningamperageandtheammeterwillnolongerflash.CMCswitcheswillturnGREENwhenthepumpsarestoppedandamperagewilldecreasetozero.Ex.:Pumpstart:"Switchhasbeenrotatedtothestartposition,redlightislit,greenlightisout,amperageinitiallypegsouthigh,andisnowindicating__X__amps."Pumpstop:"Switchhasbeenrotatedtothestopposition,greenlightislit,redlightisout,amperageindicates0amps."Remotelyoperatedvalvepositionisdeterminedwithopenandcloseindicatinglights.AREDlightonlywouldindicatethatthevalveisopen.AGREENlightonlywouldindicatethatthevalveisclosed.Dualindicationwouldindicatethatthevalveisinsomeintermediateposition.ControllershaveanAutolightthatisGREENwhenselectedandAMBER(YELLOW)whenManualisselected.WheninManual,theopenandclosedpushbuttonscontroltheparametertobechangedbyadjustingpositionorspeed.Whenthedeviationmeterisnulled,thentheprocesscanbeshiftedtoAutotoallowthedesiredsetpointtocontroltheprocess.SystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
K/A SYSTEM: 217000 - Reactor Core Isolation Cooling System K/A STATEMENT:
JOBPERFORMANCEMEASUREJPMTitleRecoveryofRCICfollowingaManualTripNo.:JP-OP-315-0043-005Revision:2Page7WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
A4.       Ability to operate and/or monitor in the control room:
A4.02 Turbine trip throttle valve reset................................................................................. 3.9/3.9 Maintenance Rule Safety Classification:
E5100-01 Maintenance Rule Risk Significant? (Yes or No)
Yes Work Instruction                                                                                                                      WI 5.14 Job Performance Measures                                                                                                                Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip                                                  Revision: 2 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                        STANDARD CUE:     Provide the examinee with the cue sheet.
* 1.     [7.1.2.1.a] Depress RCIC System Initiate
* 1. Depresses RCIC System Initiate Signal Signal reset pushbutton and verify:             reset pushbutton, and verifies SEALED IN White SEALED IN light goes off            light goes out and 1D24 clears.
Annunciator 1D24, RCIC SYSTEM ACTUATION, clears.
: 2.     [7.1.2.1.b] Close or verify closed E5150-     2. Verifies E5150-F095 is closed.
F095, RCIC Turb Stm Inlet Byp Vlv.
* 3.     [7.1.2.1.c] Close or verify closed the
* 3. Closes E5150-F059.
following valves:                                Verifies E5150-F019 is closed.
E5150-F059, RCIC Turbine Trip              Verifies E5150-F013 is closed.
Throttle Vlv Closes E5150-F045.
E5150-F019, RCIC Min Flow Vlv              Closes E5150-F046.
E5150-F013, RCIC Disch to FW Inbd Iso Valve E5150-F045, RCIC Turb Steam Inlet Vlv E5150-F046, RCIC Oil Clr Clg Water Iso Vlv
: 4.     [7.1.2.1.d] Open the following valves:       4. Verifies the following valves are open:
E5150-F025, RCIC Turb Stm Drn Pot              E5150-F025 Inbd Iso                                      E5150-F026 E5150-F026, RCIC Turb Stm Drn Pot              E5150-F005 Otbd Iso E5150-F005, RCIC Cond To RW Otbd Iso Vlv NOTE: RPV Level is >Level 2, and RCIC was tripped manually, so 7.1.2.2 & 7.1.2.3 are NA.
: 5.     [7.1.2.4.c] Place RCIC Turbine Trip          5. Verifies RCIC Turbine Trip PB collar is in Pushbutton collar in DISARMED.                   DISARMED.
: 6.     [7.1.2.5.c] Close E5150-F059, RCIC            6. Verifies E5150-F059 is closed.
Turbine Trip Throttle Vlv,
* 7.     [7.1.2.5.d] Open E5150-F059, RCIC
* 7. Opens E5150-F059.
Turbine Trip Throttle Vlv,
: 8.     [7.1.2.5.e] Verify annunciator 1D94, RCIC    8. Verifies 1D94 is clear.
Turbine Tripped is clear.
CUE: NO reports that valve stem for E51-F059, RCIC Turbine Inlet Trip Throttle Vlv, is in OPEN.
: 9.     [7.1.2.5.f] Verify locally valve stem for    9. Directs NO to locally verify valve stem for E51-F059, RCIC Turbine Inlet Trip                E51-F059, RCIC Turbine Inlet Trip Throttle Vlv, is in OPEN.                        Throttle Vlv, is in OPEN.
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip                                                  Revision: 2 Page 5 ELEMENT                                          STANDARD NOTE: Student may restart RCIC using section 5.4 or Enclosure B with all prerequisites met or waived by CRS.
*10..   [5.4.2.1] Start E5101-C004 RCIC Baro        *10. Starts E5101-C004, RCIC Baro Cndr Cndr Vacuum Pump.                                   Vacuum Pump.
*11.     [5.4.2.2] Open E5150-F046, RCIC Oil Clr      *11. Opens E5150-F046.
Clg Water Iso Vlv.
NOTE: Examinee should make Hi Com announcement and Crew Update "Starting RCIC"
*12.     [5.4.2.3.a] Open E5150-F095, RCIC Turb      *12. Opens E5150-F095.
Stm Inlet Byp Vlv.
*13.     [5.4.2.3.b] After approximately 15          *13. After 15 seconds, opens E5150-F045.
seconds, open E5150-F045, RCIC Turb Steam Inlet Vlv.
: 14.     [5.4.2.4] Verify the following valves close: 14. Verifies E5150-F025 and E5150-F026 E5150-F025, RCIC Turb Stm Drn Pot            close.
Inbd Iso E5150-F026, RCIC Turb Stm Drn Pot Otbd Iso
*15.     [5.4.2.6] Open E5150-F013, RCIC Dish        *15. Opens E5150-F013.
To FW Inbd Iso Valve
*16.     [5.4.2.7] Adjust flow as necessary with      *16. Adjusts flow with E51-K615 to maintain E51-K615, RCIC Discharge Flow                      RPV Level.
Controller.
CUE:     End JPM when RCIC is injecting with approximately 650 gpm with level increasing.
______ SATISFACTORY                                  ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip                                                    Revision: 2 Page 6 Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.
Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                    No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip                                  Revision: 2 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleRecoveryofRCICfollowingaManualTripNo.:JP-OP-315-0043-005Revision:2Page8WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1SimulatorSetupIC#:20Malfunctions:NumberTitleValueDelayRampN20MF0023HeaterFeedPumpTripCACTIVE00N20MF0024HeaterFeedPumpTripEACTIVE00N20MF0025HeaterFeedPumpTripWACTIVE00RemoteFunctions:NumberTitleValueDelayRampOverrideFunctions:NumberTitleValueDelayRampSpecialInstructions:1.InitializethesimulatortothedesiredIC,andplaceinRUN.2.OpenandExecutelessonJP0043-005.lsn,orsetthemalfunctionslistedabove.3.PlaceModeSwitchinShutdown.4.DialdowntheRCICflowcontrollerto0,andmanuallytriptheRCICturbine.5.VerifyRPVlevelabout160",thenplacethesimulatorinFREEZE.
===Response===
JOBPERFORMANCEMEASURECueSheet:(JP-OP-315-0043-005)InitialConditions:YouaretheControlRoomNSOwiththereactorshutdownfollowingatransient.TheEOPshavebeenentered.RCIC,SBFW,andCRDpumpswereinjectingtocontrolreactorwaterlevel.RCICwassubsequentlyshutdownusingthemanualtrippushbutton.N2103-F001(SBFWinjectionvalve)hasjustfailedclosed,andthepumpshavebeenshutdown.InitiatingCue(s):TheCRSdirectsyoutoresetandmanuallyrestartRCICper23.406section7,andrestorewaterlevelto173"-214".
Question:
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1JobPositionSRO/RONo.JP-OP-315-0107-002Revision1JPMTitleTransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlDuration15minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Reference
 
===Response===
Work Instruction                                                                    WI 5.14 Job Performance Measures                                                              Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip                                                  Revision: 2 Page 8 Simulator Setup IC#:     20 Malfunctions:
Number                                  Title                            Value      Delay    Ramp N20MF0023                    Heater Feed Pump Trip C                    ACTIVE        0          0 N20MF0024                    Heater Feed Pump Trip E                    ACTIVE        0          0 N20MF0025                    Heater Feed Pump Trip W                    ACTIVE        0          0 Remote Functions:
Number                                  Title                            Value      Delay    Ramp Override Functions:
Number                                  Title                            Value      Delay    Ramp Special Instructions:
: 1. Initialize the simulator to the desired IC, and place in RUN.
: 2. Open and Execute lesson JP0043-005.lsn, or set the malfunctions listed above.
: 3. Place Mode Switch in Shutdown.
: 4. Dial down the RCIC flow controller to 0, and manually trip the RCIC turbine.
: 5. Verify RPV level about 160, then place the simulator in FREEZE.
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                            Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0043-005)
Initial Conditions:
You are the Control Room NSO with the reactor shut down following a transient.
The EOPs have been entered.
RCIC, SBFW, and CRD pumps were injecting to control reactor water level.
RCIC was subsequently shutdown using the manual trip pushbutton.
N2103-F001 (SBFW injection valve) has just failed closed, and the pumps have been shut down.
Initiating Cue(s):
The CRS directs you to reset and manually restart RCIC per 23.406 section 7, and restore water level to 173"-214".
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-OP-315-0107-002                        1 JPM Title                                                    Duration              Page Transfer Feedwater Control from Long Cycle Cleanup to          15 minutes                        1 Startup Level Control Examinee:                                                                   SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                 Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment1.*11.2.*12.3.13.*4.*5.*6.*7.*8.9.10.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleTransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlNo.:JP-OP-315-0107-002Revision:1Page2WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U      Comment        Element    S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleTransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlNo.:JP-OP-315-0107-002Revision:1Page3WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1JPMInformationSystem:N2100-ReactorFeedwaterSystemTask:62073-Transferfromlongcyclecleanuptostartuplevelcontrol
: 1.                                 *11.
: 2.                                 *12.
: 3.                                   13.
* 4.
* 5.
* 6.
* 7.
* 8.
9.
10.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations            Improvement            Expectations              Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                              WI 5.14 Job Performance Measures                                                                                        Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to                                            Revision: 1 Startup Level Control                                                                                Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                  Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was          Did not recognize key at proper frequency, using    performed but undue focus    equipment status indicators, multiple means if available. on task or lack of system    too much focus on single Understood which indications  knowledge prevented ideal    indications and ignored total were critical.               monitoring.                   system status.
Control            Task preview used to prepare  Adequate control of system    No anticipation of results of for job. Aware of control    maintained throughout task    actions. Unaware or control bands and maintained them. but some improvements        bands or not able to maintain Configuration control        could be made such as better  them. Lack of knowledge of maintained.                   manual control or greater    how to control system depth of knowledge for        parameters.
anticipating system response.
Conservatism      Low threshold for            Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding,   with unanswered questions.
Questioning attitude. Uses    High focus on task            High threshold for problem stop when unsure if        completion without            conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status      Routinely takes action without system status changes to the  and actions. Some            informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic    Unable to predict system response based on solid      fundamental knowledge has    response, unsure of generic system knowledge. Good        some gaps.                    fundamentals concepts working knowledge of generic                                related to plant operation.
fundamentals to predict and                                Only relied on procedure for monitor system response.                                   operating knowledge.
Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                              No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to                                                                          Revision: 1 Startup Level Control                                                                                                                Page 3 JPM Information System:
N2100 - Reactor Feedwater System Task:
62073 - Transfer from long cycle cleanup to startup level control


==References:==
==References:==
Required(R)/Available(A)23.107,ReactorFeedwaterandCondensate(R)ToolsandEquipmentRequired:NoneInitialConditions:YouaretheControlRoomNSO.Plantstartupisinprogress.Thereactorisjustcritical.Pressurizationistobegin.FeedwaterisinLongCycleCleanupmode.ChemistryhasreportedCondensateandFeedwaterchemistryiswithintheadministrativelimits.InitiatingCue(s):TheCRSdirectsyoutotransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlper23.107.TerminatingCue(s):FeedwaterisinStartupLevelControl.TaskStandard:FeedwaterControlistransferredfromLongCycleCleanuptoStartupLevelControlper23.107.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:SF-2-ReactorWaterInventoryControlK/A
Required (R) / Available (A) 23.107, Reactor Feedwater and Condensate (R)
Tools and Equipment Required:
None Initial Conditions:
You are the Control Room NSO.
Plant startup is in progress. The reactor is just critical. Pressurization is to begin.
Feedwater is in Long Cycle Cleanup mode. Chemistry has reported Condensate and Feedwater chemistry is within the administrative limits.
Initiating Cue(s):
The CRS directs you to transfer Feedwater Control from Long Cycle Cleanup to Startup Level Control per 23.107.
Terminating Cue(s):
Feedwater is in Startup Level Control.
Task Standard:
Feedwater Control is transferred from Long Cycle Cleanup to Startup Level Control per 23.107.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
SF Reactor Water Inventory Control K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:259001-ReactorFeedwaterSystemK/ASTATEMENT:A4Abilitytomanuallyoperateand/ormonitorinthecontrolroom:A4.05ReactorWaterLevel.....................................................................................................4.0/3.9MaintenanceRuleSafetyClassification:N2100-06MaintenanceRuleRiskSignificant?(YesorNo)No JOBPERFORMANCEMEASUREJPMTitleTransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlNo.:JP-OP-315-0107-002Revision:1Page4WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDNOTE:CUE:ProvideexamineewithCueSheet.1.[5.1.2.2]Placeorverify,RPVStartupLCVModeSwitchinSTART.IfC32-K816,FW&RRFlatPanelDisplay,isavailable,verifyDCSlogicisinSTART.1.RPVStartupLCVModeSwitchisverifiedinSTART.DCSlogicisverifiedinSTART.2.[5.1.2.3.a]VerifyFeedwaterLogicwhitePOSTSCRAMlightisOFF.2.FeedwaterLogicwhitePOSTSCRAMlightisverifiedOFF.3.[5.1.2.3.b]VerifyReactorWaterLevelSetDownwhitePOSTSCRAMlightisOFF.3.ReactorWaterLevelSetDownwhitePOSTSCRAMlightisverifiedOFF.*4.[5.1.2.4]PlaceorverifyC32-R620,N21-F403RPVStartupLCVController,inMANUAL.*4.C32-R620,N21-F403RPVStartupLCVController,isplacedinMANUAL.*5.[5.1.2.5]Placeorverify,LevelControlModeswitchin1ELEM.IfC32-K816,FW&RRFlatPanelDisplay,isavailable,verifyDCSlogicisin1ELEMENT.*5.LevelControlModeswitchisplacedin1ELEM.DCSlogicisverifiedin1ELEMENT.NOTE:ThisstepisperformedwhileverifyingthatN20-F404throttles.IfN20-F404failstothrottle,N2000-F618mustbemanuallythrottledtomaintainproperflow.*6.[5.1.2.6]AdjustoutputofC32-R620,N21-F403RPVStartupLCVController,to0%(COPH11-P603),whilemaintainingCondensateflowrateatapproximately9000gpm,asindicatedonN20-R815,CondToCondF/D'sFlowRecorder.*6.OutputofC32-R620,N21-F403RPVStartupLCVController,isadjustedto0%whilemaintainingCondensateflowrateatapproximately9000gpm.*7.[5.1.2.7]CloseN2100-F604,FwHtr6NCondRtrntoCndrVlv,andN2100-F605,FwHtr6SCondRtrntoCndrVlv.*7.N2100-F604andN2100-F605areclosed.*8.[5.1.2.8]OpenN2100-F601,FwHtr6NOutletIsoValve,andN2100-F602,FwHtr6SOutletIsoValve.*8.N2100-F601andN2100-F602areopened.CUE:ReportasNOthatdisconnectswitchMCC72A-4APosition4A,isinOFFforN2100-F604.9.[5.1.2.9]PlacedisconnectswitchMCC72A-4A,Position4A,inOFFforN2100-F604,FwHtr6NCondRtrntoCndrVlv.9.DirectsNOtoplacedisconnectswitchMCC72A-4A,Position4A,inOFFforN2100-F604.CUE:ReportasNOthatdisconnectswitchMCC72R-2APosition3C,isinOFFforN2100-F605.10.[5.1.2.10]PlacedisconnectswitchMCC72R-2A,Position3C,inOFFforN2100-F605,FwHtr6SCondRtrntoCndrVlv.10.DirectsNOtoplacedisconnectswitchMCC72R-2A,Position3C,inOFFforN2100-F605.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleTransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlNo.:JP-OP-315-0107-002Revision:1Page5WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1ELEMENTSTANDARDNOTE:ThisstepisperformedwhileverifyingthatN20-F404throttles.IfN20-F404failstothrottle,N2000-F618mustbemanuallythrottledtomaintainproperflow.*11.[5.1.2.11]SlowlyadjustoutputofC32-R620,N21-F403RPVStartupLCVController,toopenN21-F403,RPVStartupLCV,untilRPVwaterlevelstartstorise,whilemaintainingCondensateflowrateatapproximately9000gpm.*11.OutputofC32-R620,N21-F403RPVStartupLCVController,isadjusteduntilRPVwaterlevelstartstorisewhilemaintainingCondensateflowrateatapproximately9000gpm.*12.[5.1.2.12]WHENdesiredRPVwaterlevelisreached(Level4toLevel7),placeC32-R620,N21-F403RPVStartupLCVController,inAUTO.*12.C32-R620,N21-F403RPVStartupLCVController,isplacedinAUTOwhendesiredRPVlevelisreached.13.[5.1.2.13]AdjustRPVwaterlevelsetpointtomaintaindesiredReactorWaterLevel(Level4toLevel7).13.RPVwaterlevelsetpointisadjustedtomaintaindesiredReactorWaterLevel.CUE:EndJPMwhenFeedwaterisinStartupLevelControl.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleTransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlNo.:JP-OP-315-0107-002Revision:1Page6WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1EvaluatorNotes:ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:CMCswitcheswillturnREDandamperagewillincreasewhentheswitchisrotatedtothestartpositionstarted.Thecurrentshouldinitiallybefivetoseventimesthenormalrunningampswiththeammeterflashing.AscounterEMFisdeveloped,theamperagewilllowertothenormalrunningamperageandtheammeterwillnolongerflash.CMCswitcheswillturnGREENwhenthepumpsarestoppedandamperagewilldecreasetozero.Remotelyoperatedvalvepositionisdeterminedwithopenandcloseindicatinglights.AREDlightonlywouldindicatethatthevalveisopen.AGREENlightonlywouldindicatethatthevalveisclosed.Dualindicationwouldindicatethatthevalveisinsomeintermediateposition.SystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
K/A SYSTEM: 259001 - Reactor Feedwater System K/A STATEMENT:
JOBPERFORMANCEMEASUREJPMTitleTransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlNo.:JP-OP-315-0107-002Revision:1Page7WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
A4 Ability to manually operate and/or monitor in the control room:
A4.05 Reactor Water Level ..................................................................................................... 4.0 / 3.9 Maintenance Rule Safety Classification:
N2100-06 Maintenance Rule Risk Significant? (Yes or No)
No Work Instruction                                                                                                                          WI 5.14 Job Performance Measures                                                                                                                    Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to                                    Revision: 1 Startup Level Control                                                                          Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                          STANDARD NOTE:
CUE:     Provide examinee with Cue Sheet.
: 1.     [5.1.2.2] Place or verify, RPV Startup LCV  1. RPV Startup LCV Mode Switch is verified Mode Switch in START. If C32-K816, FW           in START.
            & RR Flat Panel Display, is available,           DCS logic is verified in START.
verify DCS logic is in START.
: 2.     [5.1.2.3.a] Verify Feedwater Logic white    2. Feedwater Logic white POST SCRAM POST SCRAM light is OFF.                         light is verified OFF.
: 3.     [5.1.2.3.b] Verify Reactor Water Level Set  3. Reactor Water Level Set Down white Down white POST SCRAM light is OFF.             POST SCRAM light is verified OFF.
* 4.     [5.1.2.4] Place or verify C32-R620, N21-
* 4. C32-R620, N21-F403 RPV Startup LCV F403 RPV Startup LCV Controller, in              Controller, is placed in MANUAL.
MANUAL.
* 5.     [5.1.2.5] Place or verify, Level Control
* 5. Level Control Mode switch is placed in 1 Mode switch in 1 ELEM. If C32-K816, FW           ELEM. DCS logic is verified in 1
            & RR Flat Panel Display, is available,           ELEMENT.
verify DCS logic is in 1 ELEMENT.
NOTE: This step is performed while verifying that N20-F404 throttles. If N20-F404 fails to throttle, N2000-F618 must be manually throttled to maintain proper flow.
* 6.     [5.1.2.6] Adjust output of C32-R620, N21-
* 6. Output of C32-R620, N21-F403 RPV F403 RPV Startup LCV Controller, to 0%          Startup LCV Controller, is adjusted to 0%
(COP H11-P603), while maintaining                while maintaining Condensate flow rate at Condensate flow rate at approximately            approximately 9000 gpm.
9000 gpm, as indicated on N20-R815, Cond To Cond F/Ds Flow Recorder.
* 7.     [5.1.2.7] Close N2100-F604, Fw Htr 6N
* 7. N2100-F604 and N2100-F605 are closed.
Cond Rtrn to Cndr Vlv, and N2100-F605, Fw Htr 6S Cond Rtrn to Cndr Vlv.
* 8.     [5.1.2.8] Open N2100-F601, Fw Htr 6N
* 8. N2100-F601 and N2100-F602 are Outlet Iso Valve, and N2100-F602, Fw Htr        opened.
6S Outlet Iso Valve.
CUE:     Report as NO that disconnect switch MCC 72A-4A Position 4A, is in OFF for N2100-F604.
: 9.     [5.1.2.9] Place disconnect switch MCC        9. Directs NO to place disconnect switch 72A-4A, Position 4A, in OFF for N2100-          MCC 72A-4A, Position 4A, in OFF for F604, Fw Htr 6N Cond Rtrn to Cndr Vlv.          N2100-F604.
CUE:     Report as NO that disconnect switch MCC 72R-2A Position 3C, is in OFF for N2100-F605.
: 10.     [5.1.2.10] Place disconnect switch MCC      10. Directs NO to place disconnect switch 72R-2A, Position 3C, in OFF for N2100-           MCC 72R-2A, Position 3C, in OFF for F605, Fw Htr 6S Cond Rtrn to Cndr Vlv.          N2100-F605.
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to                                      Revision: 1 Startup Level Control                                                                            Page 5 ELEMENT                                          STANDARD NOTE: This step is performed while verifying that N20-F404 throttles. If N20-F404 fails to throttle, N2000-F618 must be manually throttled to maintain proper flow.
  *11.     [5.1.2.11] Slowly adjust output of C32-    *11. Output of C32-R620, N21-F403 RPV R620, N21-F403 RPV Startup LCV                    Startup LCV Controller, is adjusted until Controller, to open N21-F403, RPV                RPV water level starts to rise while Startup LCV, until RPV water level starts        maintaining Condensate flow rate at to rise, while maintaining Condensate flow        approximately 9000 gpm.
rate at approximately 9000 gpm.
  *12.     [5.1.2.12] WHEN desired RPV water level    *12. C32-R620, N21-F403 RPV Startup LCV is reached (Level 4 to Level 7), place            Controller, is placed in AUTO when C32-R620, N21-F403 RPV Startup LCV                desired RPV level is reached.
Controller, in AUTO.
: 13.     [5.1.2.13] Adjust RPV water level setpoint  13. RPV water level setpoint is adjusted to to maintain desired Reactor Water Level          maintain desired Reactor Water Level.
(Level 4 to Level 7).
CUE:     End JPM when Feedwater is in Startup Level Control.
______ SATISFACTORY                                  ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to                                      Revision: 1 Startup Level Control                                                                            Page 6 Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to                    Revision: 1 Startup Level Control                                                        Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleTransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlNo.:JP-OP-315-0107-002Revision:1Page8WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1SimulatorSetupIC#:IC-05Malfunctions:NumberTitleValueDelayRampRemoteFunctions:NumberTitleValueDelayRampOverrideFunctions:NumberTitleValueDelayRampSpecialInstructions:1.InitializethesimulatortoIC-05,andplaceinRUN.2.Ifnecessary,insertcontrolrodstostabilizepower.3.VerifyLongCycleCleanupisestablished.4.EstablishRWCUblowdownflowofabout60gpm.
===Response===
JOBPERFORMANCEMEASURECueSheet:(JP-OP-315-0107-002)InitialConditions:YouaretheControlRoomNSO.Plantstartupisinprogress.Thereactorisjustcritical.Pressurizationistobegin.FeedwaterisinLongCycleCleanupmode.ChemistryhasreportedCondensateandFeedwaterchemistryiswithintheadministrativelimits.InitiatingCue(s):TheCRSdirectsyoutotransferFeedwaterControlfromLongCycleCleanuptoStartupLevelControlper23.107.
Question:
JOB PERFORMANCE MEASURE Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 2 Job Position SRO / RO No. JP-OP-315-0110-407 Revision 0 JPM Title Conduct Control Rod Drive Coupling Integrity Test with Coupling Failure Duration 15 minutes Page 1 Examinee:   SRO / RO Evaluator:     JPM Type: Normal / Alternate Path / Time Critical Start Time   Evaluation Method: Perform / Walkthrough / Discuss Stop Time   Location: Plant / Simulator / Classroom Total Time:   PERFORMANCE EVALUATION  
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                        No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to                          Revision: 1 Startup Level Control                                                              Page 8 Simulator Setup IC#:
IC-05 Malfunctions:
Number                                    Title                Value      Delay  Ramp Remote Functions:
Number                                    Title                Value      Delay  Ramp Override Functions:
Number                                    Title                Value      Delay  Ramp Special Instructions:
: 1. Initialize the simulator to IC-05, and place in RUN.
: 2. If necessary, insert control rods to stabilize power.
: 3. Verify Long Cycle Cleanup is established.
: 4. Establish RWCU blowdown flow of about 60 gpm.
Work Instruction                                                                        WI 5.14 Job Performance Measures                                                                  Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0107-002)
Initial Conditions:
You are the Control Room NSO.
Plant startup is in progress. The reactor is just critical. Pressurization is to begin.
Feedwater is in Long Cycle Cleanup mode. Chemistry has reported Condensate and Feedwater chemistry is within the administrative limits.
Initiating Cue(s):
The CRS directs you to transfer Feedwater Control from Long Cycle Cleanup to Startup Level Control per 23.107.
 
JOB PERFORMANCE MEASURE Job Position                                                       No.                                  Revision SRO / RO                                                           JP-OP-315-0110-407                           0 JPM Title                                                         Duration                Page Conduct Control Rod Drive Coupling Integrity Test with               15 minutes                         1 Coupling Failure Examinee:                                                                           SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical               Start Time Evaluation Method:           Perform / Walkthrough / Discuss                       Stop Time Location:                   Plant / Simulator / Classroom                         Total Time:
PERFORMANCE EVALUATION  


==SUMMARY==
==SUMMARY==
Element S U Comment Element S U Comment Element S U Comment
 
* 1. 11.       2. 12.       3.   *13.       4. 14.       5.           6.
Element       S   U     Comment         Element S U             Comment         Element       S   U   Comment
* 1.                                     11.
: 2.                                     12.
: 3.                                     *13.
: 4.                                     14.
5.
6.
* 7.
* 7.
* 8.
* 8.
* 9.           *10.             OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation. Operator Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Comment Number Monitoring     Control     Conservatism     Teamwork     Knowledge     OVERALL EVALUATOR COMMENTS:           ______ PASS ______ FAIL Evaluator Signature / Date: /
* 9.
JOB PERFORMANCE MEASURE JPM Title Conduct Control Rod Drive Coupling Integrity Test with Coupling Failure No.: JP-OP-315-0110-407 Revision: 0 Page 2 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 JPM Observation Criteria Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Monitoring Equipment status monitored at proper frequency, using multiple means if available. Understood which indications were critical. Some monitoring was performed but undue focus on task or lack of system knowledge prevented ideal monitoring. Did not recognize key equipment status indicators, too much focus on single indications and ignored total system status. Control Task preview used to prepare for job. Aware of control bands and maintained them. Configuration control maintained. Adequate control of system maintained throughout task but some improvements could be made such as better manual control or greater depth of knowledge for anticipating system response. No anticipation of results of actions. Unaware or control bands or not able to maintain them. Lack of knowledge of how to control system parameters. Conservatism Low threshold for identification of problems. Questioning nuclear safety. Some opportunities existed to question before proceeding, High focus on task completion without consideration for other system affects. Proceeds even when unsure with unanswered questions. High threshold for problem conditions. Teamwork Routinely communicates system status changes to the team. Communicates actions before taking them. Communicated most status and actions. Some improvement would be warranted. Routinely takes action without informing the team. Knowledge Able to anticipate system response based on solid system knowledge. Good working knowledge of generic fundamentals to predict and monitor system response. Plant, system, or  generic fundamental knowledge has some gaps. Unable to predict system response, unsure of generic fundamentals concepts related to plant operation. Only relied on procedure for operating knowledge.
    *10.
JOB PERFORMANCE MEASURE JPM Title Conduct Control Rod Drive Coupling Integrity Test with Coupling Failure No.: JP-OP-315-0110-407 Revision: 0 Page 3 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 JPM Information System: C1102 Control Drive and Drive Mechanism Task: 74311 - Perform actions for Control Rod re-coupling not successful OR Control Rod cannot be verified coupled  
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Meets all           Opportunity for             Does not meet             Comment Operator Fundamental Expectations            Improvement                  Expectations             Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS       ______ FAIL Evaluator Signature / Date:                                                                     /
Work Instruction                                                                                                      WI 5.14 Job Performance Measures                                                                                                Rev 1 Attachment 2
 
JOB PERFORMANCE MEASURE JPM Title                                                                           No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with                                                  Revision: 0 Coupling Failure                                                                                            Page 2 JPM Observation Criteria Fundamental             Meets all Expectations       Opportunity for Improvement       Does not meet Expectations Monitoring         Equipment status monitored at   Some monitoring was            Did not recognize key equipment proper frequency, using         performed but undue focus on   status indicators, too much focus multiple means if available. task or lack of system          on single indications and ignored Understood which indications    knowledge prevented ideal      total system status.
were critical.                  monitoring.
Control           Task preview used to prepare     Adequate control of system      No anticipation of results of for job. Aware of control bands maintained throughout task but  actions. Unaware or control and maintained them.             some improvements could be     bands or not able to maintain Configuration control            made such as better manual      them. Lack of knowledge of how maintained.                      control or greater depth of    to control system parameters.
knowledge for anticipating system response.
Conservatism       Low threshold for identification Some opportunities existed to  Proceeds even when unsure with of problems. Questioning         question before proceeding,     unanswered questions. High attitude. Uses stop when        High focus on task completion   threshold for problem unsure if needed. Sensitive to  without consideration for other conditions.
nuclear safety.                  system affects.
Teamwork           Routinely communicates system   Communicated most status and    Routinely takes action without status changes to the team.     actions. Some improvement       informing the team.
Communicates actions before      would be warranted.
taking them.
Knowledge         Able to anticipate system       Plant, system, or generic       Unable to predict system response based on solid system   fundamental knowledge has       response, unsure of generic knowledge. Good working          some gaps.                      fundamentals concepts related knowledge of generic                                            to plant operation. Only relied fundamentals to predict and                                      on procedure for operating monitor system response.                                        knowledge.
Work Instruction                                                                                                  WI 5.14 Job Performance Measures                                                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                               No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with                                                                        Revision: 0 Coupling Failure                                                                                                                    Page 3 JPM Information System:
C1102 - Control Drive and Drive Mechanism Task:
74311 - Perform actions for Control Rod re-coupling not successful OR Control Rod cannot be verified coupled


==References:==
==References:==
Required (R) / Available (A) AOP 20.106.02 (R) SOP 23.623 (R) ARPs 3D76 & 3D80 (A) Tools and Equipment Required: Marked up 23.623, Attachment 2 Initial Conditions: A plant startup is in progress. Reactor power level is ~55%. You are the P603 operator. Initiating Cue(s): The CRS directs you to continue the reactor startup with rods on Post-LPSP Control Rod Pull Sheet A-9/2, RWM-Step 50, from control rod 14-47. I will act as your Verifier. Terminating Cue(s): Control Rod 14-47 is disarmed in accordance with 20.106.02. Task Standard: CRD Coupling Integrity Test is performed in accordance with 23.623. Control Rod 14-47 is disarmed in accordance with 20.106.02. Licensed Operator Exam Information (required for NRC exams) Safety Function/Category: 1 Reactivity Control 11 Abnormal Plant Evolutions K/A  
Required (R) / Available (A)
AOP 20.106.02 (R)
SOP 23.623 (R)
ARPs 3D76 & 3D80 (A)
Tools and Equipment Required:
Marked up 23.623, Attachment 2 Initial Conditions:
A plant startup is in progress.
Reactor power level is ~55%.
You are the P603 operator.
Initiating Cue(s):
The CRS directs you to continue the reactor startup with rods on Post-LPSP Control Rod Pull Sheet A-9/2, RWM-Step 50, from control rod 14-47. I will act as your Verifier.
Terminating Cue(s):
Control Rod 14-47 is disarmed in accordance with 20.106.02.
Task Standard:
CRD Coupling Integrity Test is performed in accordance with 23.623. Control Rod 14-47 is disarmed in accordance with 20.106.02.
Licensed Operator Exam Information (required for NRC exams)
Safety Function/Category:
1 - Reactivity Control 11 - Abnormal Plant Evolutions K/A  


==Reference:==
==Reference:==
K/A SYSTEM: 201003 - Control Rod and Drive Mechanism K/A STATEMENT:   A2 Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6) A2.02 Uncoupled rod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.7 / 3.8 Maintenance Rule Safety Classification: B1100-07 Maintenance Rule Risk Significant? (Yes or No) No JOB PERFORMANCE MEASURE JPM Title Conduct Control Rod Drive Coupling Integrity Test with Coupling Failure No.:  JP-OP-315-0110-407 Revision: 0 Page 4 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 PERFORMANCE EVALUATION Start Time   ELEMENT STANDARD CUE: Provide examinee with Cue Sheet, Rod Pull Sheet, and marked up 23.623, Attachment 2. NOTE: Rod can be continuously withdrawn using Override vs. notching out. *1. Begin withdrawing Control Rod 14-47 from Position 18 to 48 by notching rod, or continuously withdrawing iaw 23.623. *1. Rod Movement Control taken to OUT NOTCH. When the settle function is complete, this step is repeated until the rod is at Position 48. OR Rod Out Notch Override taken to OVERRD and Rod Movement Control taken to OUT NOTCH. NOTE: When rod 14-47 reaches Position 48, the Four-Rod Display indicates blank, he Full Core Display. 2. Respond to 3D76 alarm. Inform CRS of rod overtravel past Position 48. 2. CRS is informed of overtravel. 3. [IR 1.] Verify Control Rod overtravel at 4-Rod Display by checking that no position number is indicated in window and Full Out light on the Full Core Display is out. 3. 4-Rod Display and Full Core Display is checked for selected rod. 4. [IR 2.] Verify 3D80, CONTROL ROD DRIFT, is received. 4. 3D80, CONTROL ROD DRIFT, is verified to be in alarm. CUE: The CRS will direct the performance of AOP 20.106.02, Condition C. 5. [IR 3.] Recommend CRS enters 20.106.02. 5. Recommends entering 20.106.02. CUE: If asked, the CRS will contact the SNE to evaluate the rod pattern. 6. [C.1] Direct the Station Nuclear Engineer to evaluate the effect on Control Rod Pattern. 6. Station Nuclear Engineer contacted. *7. [C.2.a] Insert CRD in notch mode until nuclear instrumentation indicates Control Rod is being inserted. *7. Uncoupled rod is inserted one notch at a time until nuclear instrumentation indicates Control Rod is being inserted. CUE: The SM and SNE give permission to withdraw control rod. *8. [C.2.b] Obtain permission from the SM and SNE to withdraw Control Rod. *8. Requests permission from the SM and SNE to withdraw Control Rod. *9. [C.2.c] Fully withdraw Control Rod in notch mode while observing nuclear instrumentation response. *9. Rod Movement Control taken to OUT NOTCH. When the settle function is complete, this step is repeated until the rod is at Position 48. NOTE: The following steps are directed by 20.106.02, step C.2.d, and performed per 23.623. *10. [6.1.2.2.a] Attempt to withdraw Control Rod from Position 48 by notching rod. *10. Rod Movement Control taken to OUT NOTCH.
 
JOB PERFORMANCE MEASURE  JPM Title Conduct Control Rod Drive Coupling Integrity Test with Coupling Failure No.: JP-OP-315-0110-407 Revision: 0 Page 5 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 ELEMENT STANDARD 11. [6.1.2.2.b] Verify Control Rod is coupled as follows: 1) Rod settling back to Position 48. 2) Annunciator 3D76, CONTROL ROD OVERTRAVEL, does not alarm. 11. Identifies rod does not settle back to Position 48 and 3D76 alarms. The selected control rod is NOT coupled. CUE: The CRS acknowledges the report, then directs the performance of AOP 20.106.02, Conditions E.2 and E.3. 12. Inform CRS that control rod 14-47 re-coupling is not successful. 12. CRS is informed that control rod 14-47 re-coupling is not successful. *13. [E.2] Fully insert Control Rod. *13. Control Rod 14-47 is fully inserted. CUE: Notify Examinee that time compression may be used for activities performed outside of the Control Room. Report that amphenols are disconnected, or C11-F103 and C11-F105 are closed, whichever has been directed. 14. [E.3] Disarm affected HCU by one of the following methods: - Disconnect amphenols to directional control valves. OR - Close C11-F103, then C11-F105 14. NO directed to disarm HCU 14-47 by one of the following methods: - Disconnect amphenols to directional control valves. OR - Close C11-F103, then C11-F105 CUE: End the JPM when Control Rod 14-47 is disarmed in accordance with 20.106.02. ______ SATISFACTORY ______ UNSATISFACTORY     Stop Time
K/A SYSTEM: 201003 - Control Rod and Drive Mechanism K/A STATEMENT:
* Critical Steps JOB PERFORMANCE MEASURE JPM Title Conduct Control Rod Drive Coupling Integrity Test with Coupling Failure No.: JP-OP-315-0110-407 Revision: 0 Page 6 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 Evaluator Notes: Provide the examinee the pull sheets for the next control rod to be withdrawn to position 48 (LPSP Pull Sheet A-9/2, RWM-Step: 50, marked with rods pulling from 18 to 48) and 23.623 Attachment 2 marked up with current rod pattern. This JPM can be performed at low power (startup) or at higher power (control rod pattern adjustment). If this JPM is being performed at low power, provide normal pull sheets; if being performed at high power provide rod pattern adjustment sheets. You will act as the SNE to verify the correct control rod is selected for movement. The trainee may jump directly to 20.106.02 vs. reviewing ARP 3D76 or 3D80. ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES. Generic Notes and Cues: None System Specific Notes and Cues: None Task Performance and Cues: The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Critical Steps: Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
A2     Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)
JOB PERFORMANCE MEASURE JPM Title Conduct Control Rod Drive Coupling Integrity Test with Coupling Failure No.: JP-OP-315-0110-407 Revision: 0 Page 7 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):                                     Question:                                                                              
A2.02       Uncoupled rod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.7 / 3.8 Maintenance Rule Safety Classification:
B1100-07 Maintenance Rule Risk Significant? (Yes or No)
No Work Instruction                                                                                                                          WI 5.14 Job Performance Measures                                                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with                                      Revision: 0 Coupling Failure                                                                                  Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                             STANDARD CUE:     Provide examinee with Cue Sheet, Rod Pull Sheet, and marked up 23.623, Attachment 2.
NOTE: Rod can be continuously withdrawn using Override vs. notching out.
  *1. Begin withdrawing Control Rod 14-47 from         *1. Rod Movement Control taken to OUT Position 18 to 48 by notching rod, or               NOTCH. When the settle function is continuously withdrawing iaw 23.623.                 complete, this step is repeated until the rod is at Position 48.
OR Rod Out Notch Override taken to OVERRD and Rod Movement Control taken to OUT NOTCH.
NOTE: When rod 14-47 reaches Position 48, the Four-Rod Display indicates blank, annunciators 3D76 and 3D80 alarm, and the rods DRIFT light indicates on the Full Core Display.
: 2. Respond to 3D76 alarm. Inform CRS of rod         2. CRS is informed of overtravel.
overtravel past Position 48.
: 3. [IR 1.] Verify Control Rod overtravel at 4-Rod   3. 4-Rod Display and Full Core Display is Display by checking that no position number         checked for selected rod.
is indicated in window and Full Out light on the Full Core Display is out.
: 4. [IR 2.] Verify 3D80, CONTROL ROD DRIFT,           4. 3D80, CONTROL ROD DRIFT, is verified to is received.                                        be in alarm.
CUE:     The CRS will direct the performance of AOP 20.106.02, Condition C.
: 5. [IR 3.] Recommend CRS enters 20.106.02.           5. Recommends entering 20.106.02.
CUE:     If asked, the CRS will contact the SNE to evaluate the rod pattern.
: 6. [C.1] Direct the Station Nuclear Engineer to     6. Station Nuclear Engineer contacted.
evaluate the effect on Control Rod Pattern.
  *7. [C.2.a] Insert CRD in notch mode until           *7. Uncoupled rod is inserted one notch at a time nuclear instrumentation indicates Control Rod        until nuclear instrumentation indicates Control is being inserted.                                  Rod is being inserted.
CUE:     The SM and SNE give permission to withdraw control rod.
  *8. [C.2.b] Obtain permission from the SM and       *8. Requests permission from the SM and SNE SNE to withdraw Control Rod.                        to withdraw Control Rod.
  *9. [C.2.c] Fully withdraw Control Rod in notch     *9. Rod Movement Control taken to OUT mode while observing nuclear                        NOTCH. When the settle function is instrumentation response.                            complete, this step is repeated until the rod is at Position 48.
NOTE: The following steps are directed by 20.106.02, step C.2.d, and performed per 23.623.
  *10. [6.1.2.2.a] Attempt to withdraw Control Rod     *10. Rod Movement Control taken to OUT from Position 48 by notching rod.                    NOTCH.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                   No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with                                      Revision: 0 Coupling Failure                                                                                  Page 5 ELEMENT                                           STANDARD
: 11. [6.1.2.2.b] Verify Control Rod is coupled as   11. Identifies rod does not settle back to Position follows:                                            48 and 3D76 alarms. The selected control
: 1) Rod settling back to Position 48.                rod is NOT coupled.
: 2) Annunciator 3D76, CONTROL ROD OVERTRAVEL, does not alarm.
CUE:      The CRS acknowledges the report, then directs the performance of AOP 20.106.02, Conditions E.2 and E.3.
: 12. Inform CRS that control rod 14-47 re-coupling   12. CRS is informed that control rod 14-47 re-is not successful.                                 coupling is not successful.
  *13. [E.2] Fully insert Control Rod.               *13. Control Rod 14-47 is fully inserted.
CUE:     Notify Examinee that time compression may be used for activities performed outside of the Control Room. Report that amphenols are disconnected, or C11-F103 and C11-F105 are closed, whichever has been directed.
: 14. [E.3] Disarm affected HCU by one of the        14. NO directed to disarm HCU 14-47 by one of following methods:                                  the following methods:
        - Disconnect amphenols to directional              - Disconnect amphenols to directional control valves.                                   control valves.
OR                                                  OR
        - Close C11-F103, then C11-F105                     - Close C11-F103, then C11-F105 CUE: End the JPM when Control Rod 14-47 is disarmed in accordance with 20.106.02.
______ SATISFACTORY                                 ______ UNSATISFACTORY Stop Time
* Critical Steps Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with                                      Revision: 0 Coupling Failure                                                                                  Page 6 Evaluator Notes:
Provide the examinee the pull sheets for the next control rod to be withdrawn to position 48 (LPSP Pull Sheet A-9/2, RWM-Step: 50, marked with rods pulling from 18 to 48) and 23.623 Attachment 2 marked up with current rod pattern.
This JPM can be performed at low power (startup) or at higher power (control rod pattern adjustment).
If this JPM is being performed at low power, provide normal pull sheets; if being performed at high power provide rod pattern adjustment sheets.
You will act as the SNE to verify the correct control rod is selected for movement.
The trainee may jump directly to 20.106.02 vs. reviewing ARP 3D76 or 3D80.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                 No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with                  Revision: 0 Coupling Failure                                                            Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:                                                                                                      Question:                                                                               Reference           Response:
 
JOB PERFORMANCE MEASURE JPM Title Conduct Control Rod Drive Coupling Integrity Test with Coupling Failure No.: JP-OP-315-0110-407 Revision: 0 Page 8 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 Simulator Setup IC#: IC-15 Malfunctions: Number Title Value Delay Ramp C11MF0233 CONTROL ROD 14-47 UNCOUPLED ACTIVE 0 0 Remote Functions: Number Title Value Delay Ramp C11RF0398 Re-Initialize NUMAC RWM RESET 0 0 Override Functions: Number Title Value Delay Ramp None Special Instructions: 1. Initialize the simulator to IC-15 (or the selected IC), and place the simulator in RUN. 3. Open and Execute Lesson JP0110-407.lsn, or set the malfunctions as indicated above.
===Response===
JOB PERFORMANCE MEASURE   Cue Sheet: (JP-OP-315-0110-407)   Initial Conditions: A plant startup is in progress. Reactor power level is ~55%. You are the P603 operator. Initiating Cue(s): The CRS directs you to continue the reactor startup with rods on Post-LPSP Control Rod Pull Sheet A-9/2, RWM-Step 50, from control rod 14-47. I will act as your Verifier.
Question:
JOB PERFORMANCE MEASURE Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 2 Job Position SRO / RO No. JP-OP-315-0139-005 Revision 1 JPM Title Manually Isolate HPCI System (Alt Path) Duration 10 minutes Page 1 Examinee:   SRO / RO Evaluator:     JPM Type: Normal / Alternate Path / Time Critical Start Time   Evaluation Method: Perform / Walkthrough / Discuss Stop Time   Location: Plant / Simulator / Classroom Total Time:   PERFORMANCE EVALUATION  
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with                                      Revision: 0 Coupling Failure                                                                                Page 8 Simulator Setup IC#:
IC-15 Malfunctions:
Number                                   Title                             Value       Delay   Ramp C11MF0233                   CONTROL ROD 14-47 UNCOUPLED                     ACTIVE         0         0 Remote Functions:
Number                                   Title                             Value       Delay   Ramp C11RF0398                   Re-Initialize NUMAC RWM                       RESET         0         0 Override Functions:
Number                                   Title                             Value       Delay   Ramp None Special Instructions:
: 1. Initialize the simulator to IC-15 (or the selected IC), and place the simulator in RUN.
: 3. Open and Execute Lesson JP0110-407.lsn, or set the malfunctions as indicated above.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0110-407)
Initial Conditions:
A plant startup is in progress.
Reactor power level is ~55%.
You are the P603 operator.
Initiating Cue(s):
The CRS directs you to continue the reactor startup with rods on Post-LPSP Control Rod Pull Sheet A-9/2, RWM-Step 50, from control rod 14-47. I will act as your Verifier.
 
JOB PERFORMANCE MEASURE Job Position                                                 No.                                Revision SRO / RO                                                     JP-OP-315-0139-005                       1 JPM Title                                                     Duration              Page Manually Isolate HPCI System (Alt Path)                         10 minutes                       1 Examinee:                                                                     SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical         Start Time Evaluation Method:         Perform / Walkthrough / Discuss                 Stop Time Location:                   Plant / Simulator / Classroom                   Total Time:
PERFORMANCE EVALUATION  


==SUMMARY==
==SUMMARY==
Element S U Comment Element S U Comment Element S U Comment 1.   *11.       2.   *12.
 
* 3.   *13.
Element       S   U     Comment         Element   S   U     Comment       Element     S     U     Comment
* 4. 14.
: 1.                                 *11.
* 5. 15.
: 2.                                 *12.
* 6. 16.       7. 17.
* 3.                                 *13.
* 8. 18.
* 4.                                   14.
* 9.   *19.       *10.             OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation. Operator Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Comment Number Monitoring     Control     Conservatism     Teamwork     Knowledge     OVERALL EVALUATOR COMMENTS:           ______ PASS ______ FAIL Evaluator Signature / Date: /
* 5.                                   15.
JOB PERFORMANCE MEASURE JPM Title Manually Isolate HPCI System (Alt Path) No.: JP-OP-315-0139-005 Revision: 1 Page 2 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 JPM Observation Criteria Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Monitoring Equipment status monitored at proper frequency, using multiple means if available. Understood which indications were critical. Some monitoring was performed but undue focus on task or lack of system knowledge prevented ideal monitoring. Did not recognize key equipment status indicators, too much focus on single indications and ignored total system status. Control Task preview used to prepare for job. Aware of control bands and maintained them. Configuration control maintained. Adequate control of system maintained throughout task but some improvements could be made such as better manual control or greater depth of knowledge for anticipating system response. No anticipation of results of actions. Unaware or control bands or not able to maintain them. Lack of knowledge of how to control system parameters. Conservatism Low threshold for identification of problems. Questioning attitude. Uses needed. Sensitive to nuclear safety. Some opportunities existed to question before proceeding, High focus on task completion without consideration for other system affects. Proceeds even when unsure with unanswered questions. High threshold for problem conditions. Teamwork Routinely communicates system status changes to the team. Communicates actions before taking them. Communicated most status and actions. Some improvement would be warranted. Routinely takes action without informing the team. Knowledge Able to anticipate system response based on solid system knowledge. Good working knowledge of generic fundamentals to predict and monitor system response. Plant, system, or  generic fundamental knowledge has some gaps. Unable to predict system response, unsure of generic fundamentals concepts related to plant operation. Only relied on procedure for operating knowledge.
* 6.                                   16.
JOB PERFORMANCE MEASURE JPM Title Manually Isolate HPCI System (Alt Path) No.: JP-OP-315-0139-005 Revision: 1 Page 3 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 JPM Information System: E4100 - High Pressure Coolant Injection System Task: 63658 - Start HPCI in the Test Mode  
: 7.                                   17.
* 8.                                   18.
* 9.                                 *19.
      *10.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator             Meets all           Opportunity for         Does not meet           Comment Fundamental            Expectations          Improvement              Expectations             Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS         ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 2
 
JOB PERFORMANCE MEASURE JPM Title                                                                   No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path)                                                      Revision: 1 Page 2 JPM Observation Criteria Opportunity for Fundamental           Meets all Expectations                               Does not meet Expectations Improvement Monitoring         Equipment status monitored   Some monitoring was        Did not recognize key at proper frequency, using   performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.                monitoring.                system status.
Control           Task preview used to         Adequate control of system No anticipation of results of prepare for job. Aware of     maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.              could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                  greater depth of knowledge parameters.
for anticipating system response.
Conservatism       Low threshold for             Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on High threshold for problem stop when unsure if        task completion without   conditions.
needed. Sensitive to nuclear  consideration for other safety.                      system affects.
Teamwork           Routinely communicates       Communicated most status  Routinely takes action without system status changes to the and actions. Some          informing the team.
team. Communicates actions   improvement would be before taking them.           warranted.
Knowledge         Able to anticipate system     Plant, system, or generic Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                       No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path)                                                                  Revision: 1 Page 3 JPM Information System:
E4100 - High Pressure Coolant Injection System Task:
63658 - Start HPCI in the Test Mode


==References:==
==References:==
Required (R) / Available (A) 23.202, High Pressure Coolant Injection System (R) Tools and Equipment Required: None Initial Conditions: You are the Control Room NSO. HPCI is to be run in the Test Mode. RHR Division 1 is in Torus Cooling. Division 1 SGTS is in operation. All other prerequisites have been met. Initiating Cue(s): The CRS directs you to start HPCI in the Test Mode in accordance with 23.202, Section 6.1. Terminating Cue(s): HPCI System is manually isolated. Task Standard: HPCI System is shutdown and isolated in accordance with ARP 2D49 and/or 2D53. Licensed Operator Exam Information (required for NRC exams) Safety Function: SF-5 Containment Integrity K/A  
Required (R) / Available (A) 23.202, High Pressure Coolant Injection System (R)
Tools and Equipment Required:
None Initial Conditions:
You are the Control Room NSO.
HPCI is to be run in the Test Mode.
RHR Division 1 is in Torus Cooling.
Division 1 SGTS is in operation.
All other prerequisites have been met.
Initiating Cue(s):
The CRS directs you to start HPCI in the Test Mode in accordance with 23.202, Section 6.1.
Terminating Cue(s):
HPCI System is manually isolated.
Task Standard:
HPCI System is shutdown and isolated in accordance with ARP 2D49 and/or 2D53.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
SF-5 Containment Integrity K/A  


==Reference:==
==Reference:==
(from NUREG 1123) K/A SYSTEM: 295032 - High Secondary Containment Area Temperature K/A STATEMENT:   EA1. Ability to operate and/or monitor the following as they apply to HIGH SECONDARY CONTAINMENT AREA TEMPERATURE: (CFR: 41.7 / 45.6) EA1.05 Affected systems so as to isolate damaged portions ............................................. 3.7 / 3.9 Maintenance Rule Safety Classification: E4100-06 Maintenance Rule Risk Significant? (Yes or No) No JOB PERFORMANCE MEASURE JPM Title Manually Isolate HPCI System (Alt Path) No.: JP-OP-315-0139-005 Revision: 1 Page 4 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 PERFORMANCE EVALUATION Start Time   ELEMENT STANDARD CUE: Provide examinee with Cue Sheet. 1. [6.1.2.1] Verify or place E41-K820, Test Iso/PCV E41-F011 Ctrlr, in AUTO. 1. E41-K820 is verified in AUTO. 2. [6.1.2.2.a] On E41-K820, depress D button until S comes ON. 2. S is verified ON.
(from NUREG 1123)
* 3. [6.1.2.a.1)] Turn the pulser knob to set the valve position open setpoint to approximately 56.5% on the digital display.
K/A SYSTEM: 295032 - High Secondary Containment Area Temperature K/A STATEMENT:
* 3. Pulser knob is turned until ~56.5 is read on the digital display.
EA1. Ability to operate and/or monitor the following as they apply to HIGH SECONDARY CONTAINMENT AREA TEMPERATURE: (CFR: 41.7 / 45.6)
* 4. [6.1.2.2.b] On E41-K820, depress D button until Y comes ON.
EA1.05 Affected systems so as to isolate damaged portions ............................................. 3.7 / 3.9 Maintenance Rule Safety Classification:
E4100-06 Maintenance Rule Risk Significant? (Yes or No)
No Work Instruction                                                                                                    WI 5.14 Job Performance Measures                                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path)                                                    Revision: 1 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                         STANDARD CUE:     Provide examinee with Cue Sheet.
: 1.     [6.1.2.1] Verify or place E41-K820, Test       1. E41-K820 is verified in AUTO.
Iso/PCV E41-F011 Ctrlr, in AUTO.
: 2.     [6.1.2.2.a] On E41-K820, depress D             2. S is verified ON.
button until S comes ON.
* 3.     [6.1.2.a.1)] Turn the pulser knob to set the
* 3. Pulser knob is turned until ~56.5 is read valve position open setpoint to                  on the digital display.
approximately 56.5% on the digital display.
* 4.     [6.1.2.2.b] On E41-K820, depress D
* 4. D button is depressed until Y comes ON.
* 4. D button is depressed until Y comes ON.
* 5. [6.1.2.b.1)] If Reactor Pressure is >150 psig, turn the pulser knob to set the discharge pressure setpoint to 250 psi on the digital display.
button until Y comes ON.
* 5. Pulser knob is turned until 250 is read on the digital display.
* 5.     [6.1.2.b.1)] If Reactor Pressure is >150
* 6. [6.1.2.3] Place E4100-M001, HPCI Test Line Iso/PCV E41-F011 Selector Switch, in OPER.
* 5. Pulser knob is turned until 250 is read on psig, turn the pulser knob to set the             the digital display.
* 6. E4100-M001 is placed in OPER. 7. [6.1.2.4] Verify E41-F011, HPCI/RCIC Test Iso/PCV, closed. 7. E41-F011 is verified closed.
discharge pressure setpoint to 250 psi on the digital display.
* 8. [6.1.2.5] Open E4150-F008, HPCI Test Line Iso Vlv.
* 6.     [6.1.2.3] Place E4100-M001, HPCI Test
* 6. E4100-M001 is placed in OPER.
Line Iso/PCV E41-F011 Selector Switch, in OPER.
: 7.     [6.1.2.4] Verify E41-F011, HPCI/RCIC           7. E41-F011 is verified closed.
Test Iso/PCV, closed.
* 8.     [6.1.2.5] Open E4150-F008, HPCI Test
* 8. E4150-F008 is opened.
* 8. E4150-F008 is opened.
* 9. [6.1.2.6] Open T4600-F406, HPCI to SGTS Iso Vlv.
Line Iso Vlv.
* 9. T4600-F406 is opened. *10. [6.1.2.7] Place E4101-C003, HPCI Baro Cndr Vacuum Pump CMC switch, in RUN, and verify pump starts. *10. HPCI Baro Cndr Vacuum Pump CMC switch is placed in RUN, and pump is verified to start. *11. [6.1.2.8] Open E4150-F003, HPCI Stm Sply Oybd Iso Vlv. *11. E4150-F003 is opened. *12. [6.1.2.9] Open E4150-F059, HPCI Oil Clr Clg Water Iso Vlv. *12. E4150-F059 is opened. *13. [6.1.2.10] Simultaneously: Place E4101-C005, HPCI Turbine Aux Oil Pump, in RUN, and verify pump starts, AND Open E4150-F001, HPCI Turb Stm Sply Iso Vlv. *13. Simultaneously: HPCI Turbine Aux Oil Pump is placed in RUN, and pump start verified, AND  E4150-F001 is opened. 14. [6.1.2.11] Verify HPCI Pump and Turbine starts and speed increases. 14. HPCI Pump and Turbine start and speed increase is verified.
* 9.     [6.1.2.6] Open T4600-F406, HPCI to
JOB PERFORMANCE MEASURE JPM Title Manually Isolate HPCI System (Alt Path) No.: JP-OP-315-0139-005 Revision: 1 Page 5 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 ELEMENT STANDARD Alternate Path begins when HPCI Turbine speed reaches 3000 rpm. CUE: As CRS, acknowledge alarm report. 15. Respond to annunciators 1D70, Steam Leak Detection Diff Temp High, and 1D66, Steam Leak Detection Ambient Temp High. 15. Announces the alarms to the CRS, and references the appropriate ARPs. CUE: If examinee requests H11-P614 information, report that alarmed module is for HPCI Equipment Room, and temperature is reading 155°F. 16. [1D66/1D70] Direct an operator to RR H11-P614, NSSS Temperature Recording and Leak Detection Cabinet, to determine alarmed module and temperature. 16. Directs operator to RR H11-P614, NSSS Temperature Recording and Leak Detection Cabinet, to determine alarmed module and temperature. CUE: As CRS, acknowledge alarm report. 17. Respond to annunciators 2D49, HPCI Logic A Isolation Trip Signal Initiated, and 2D53, HPCI Logic B Isolation Trip Signal Initiated. 17. Announces the alarms to the CRS, and references the appropriate ARPs. CUE: If examinee reports the isolation failure and requests direction, direct examinee to manually isolate the HPCI System. 18. [2D49/2D53] Verify HPCI Turbine has tripped and is isolated. 18. Verifies HPCI Turbine has tripped and recognizes system has NOT isolated. NOTE: Closing either E41-F002 or E41-F003 will effectively isolate the HPCI System. *19. [2D49/2D53] Manually close E41-F002, HPCI Steam Supply Inboard Isolation Valve, and/or E41-F003, HPCI Steam Supply Outboard Isolation Valve. *19. Manually closes E41-F002, HPCI Steam Supply Inboard Isolation Valve, and/or E41-F003, HPCI Steam Supply Outboard Isolation Valve. CUE: End JPM when the HPCI System is manually isolated. ______ SATISFACTORY ______ UNSATISFACTORY     Stop Time
* 9. T4600-F406 is opened.
* Critical Step JOB PERFORMANCE MEASURE JPM Title Manually Isolate HPCI System (Alt Path) No.: JP-OP-315-0139-005 Revision: 1 Page 6 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1  Evaluator Notes: This is an Alternate Path JPM. The steam supply line will break as speed increases, and the system will fail to automatically isolate. ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES. Generic Notes and Cues: CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero. Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position. Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process. System Specific Notes and Cues: None Task Performance and Cues: The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Critical Steps: Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
SGTS Iso Vlv.
JOB PERFORMANCE MEASURE JPM Title Manually Isolate HPCI System (Alt Path) No.: JP-OP-315-0139-005 Revision: 1 Page 7 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):                                     Question:                                                                              
  *10.     [6.1.2.7] Place E4101-C003, HPCI Baro       *10. HPCI Baro Cndr Vacuum Pump CMC Cndr Vacuum Pump CMC switch, in RUN,             switch is placed in RUN, and pump is and verify pump starts.                          verified to start.
  *11.     [6.1.2.8] Open E4150-F003, HPCI Stm         *11. E4150-F003 is opened.
Sply Oybd Iso Vlv.
  *12.     [6.1.2.9] Open E4150-F059, HPCI Oil Clr     *12. E4150-F059 is opened.
Clg Water Iso Vlv.
  *13.     [6.1.2.10] Simultaneously:                   *13. Simultaneously:
Place E4101-C005, HPCI Turbine Aux               HPCI Turbine Aux Oil Pump is placed Oil Pump, in RUN, and verify pump                 in RUN, and pump start verified, AND starts, AND E4150-F001 is opened.
Open E4150-F001, HPCI Turb Stm Sply Iso Vlv.
: 14.     [6.1.2.11] Verify HPCI Pump and Turbine       14. HPCI Pump and Turbine start and speed starts and speed increases.                      increase is verified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path)                                                      Revision: 1 Page 5 ELEMENT                                           STANDARD Alternate Path begins when HPCI Turbine speed reaches 3000 rpm.
CUE:     As CRS, acknowledge alarm report.
: 15.     Respond to annunciators 1D70, Steam           15. Announces the alarms to the CRS, and Leak Detection Diff Temp High, and                 references the appropriate ARPs.
1D66, Steam Leak Detection Ambient Temp High.
CUE:     If examinee requests H11-P614 information, report that alarmed module is for HPCI Equipment Room, and temperature is reading 155°F.
: 16.     [1D66/1D70] Direct an operator to RR         16. Directs operator to RR H11-P614, NSSS H11-P614, NSSS Temperature Recording                Temperature Recording and Leak and Leak Detection Cabinet, to determine            Detection Cabinet, to determine alarmed alarmed module and temperature.                    module and temperature.
CUE:     As CRS, acknowledge alarm report.
: 17.     Respond to annunciators 2D49, HPCI           17. Announces the alarms to the CRS, and Logic A Isolation Trip Signal Initiated, and       references the appropriate ARPs.
2D53, HPCI Logic B Isolation Trip Signal Initiated.
CUE:     If examinee reports the isolation failure and requests direction, direct examinee to manually isolate the HPCI System.
: 18.     [2D49/2D53] Verify HPCI Turbine has           18. Verifies HPCI Turbine has tripped and tripped and is isolated.                            recognizes system has NOT isolated.
NOTE: Closing either E41-F002 or E41-F003 will effectively isolate the HPCI System.
  *19.     [2D49/2D53] Manually close E41-F002,         *19. Manually closes E41-F002, HPCI Steam HPCI Steam Supply Inboard Isolation                Supply Inboard Isolation Valve, and/or Valve, and/or E41-F003, HPCI Steam                  E41-F003, HPCI Steam Supply Outboard Supply Outboard Isolation Valve.                    Isolation Valve.
CUE:     End JPM when the HPCI System is manually isolated.
______ SATISFACTORY                                   ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path)                                                    Revision: 1 Page 6 Evaluator Notes:
This is an Alternate Path JPM. The steam supply line will break as speed increases, and the system will fail to automatically isolate.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                   No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path)                                  Revision: 1 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:                                                                                                      Question:                                                                               Reference           Response:
 
JOB PERFORMANCE MEASURE JPM Title Manually Isolate HPCI System (Alt Path) No.: JP-OP-315-0139-005 Revision: 1 Page 8 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 Simulator Setup IC#: IC-20 Malfunctions: Number Title Value Delay Ramp E41MF0007 HPCI Steam Line Break [NOTE 1] 20 0 0   Remote Functions: Number Title Value Delay Ramp EOPRF0022 E41-F002 Isolation Defeat for RPV Venting [NOTE 2] DEFEAT 0 0   EOPRF0023 E41-F003 Isolation Defeat for RPV Venting [NOTE 2] DEFEAT 0 0   Override Functions: Number Title Value Delay Ramp N/A NOTE 1: Conditional on HPCI Turbine speed >3000 rpm (H_P602_A137_1 GT 3000). NOTE 2: Conditional on HPCI Turbine Aux Oil Pump in RUN (P602_A117_3 EQ 1). Special Instructions: 1. Initialize the simulator to IC-20 and place in RUN. 2. Start SGTS T4600-C003, Div. 1 SGTS Exhaust Fan. 3. Start Div. 1 RHRSW: a. Throttle open E4150-F068A for 5 seconds. b. Start one RHRSW Pump. c. Throttle open E4150-F068A to ~6000 gpm. d. Start the second RHRSW Pump. e. Fully open E4150-F068A. 4. Start Div. 1 RHR in Torus Cooling: a. Open E1150-F028B, Div. 2 Torus Isolation Vlv. b. Start one Div. 1 RHR Pump. c. Throttle open E1150-F024B, Div. 2 Torus Cooling Vlv, to ~10,000 gpm. 5. Pump down Torus using TWMS to -1 inches. 6. Open and execute lesson JP0139-005.lsn. 7. Trigger First Step.
===Response===
JOB PERFORMANCE MEASURE   Cue Sheet: (JP-OP-315-0139-005)   Initial Conditions: You are the Control Room NSO. HPCI is to be run in the Test Mode. RHR Division 1 is in Torus Cooling. Division 1 SGTS is in operation. All other prerequisites have been met. Initiating Cue(s): The CRS directs you to start HPCI in the Test Mode in accordance with 23.202, Section 6.1.
Question:
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRO/RONo.JP-OP-315-0150-001Revision3JPMTitleStartupFuelPoolVentilationExhaustRadiationMonitorD11-K609ADuration5minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path)                                                    Revision: 1 Page 8 Simulator Setup IC#:
IC-20 Malfunctions:
Number                                       Title                         Value     Delay   Ramp E41MF0007                     HPCI Steam Line Break [NOTE 1]                 20         0         0 cd= H_P602_A137_1 GT 3000 Remote Functions:
Number                                       Title                         Value     Delay   Ramp EOPRF0022           E41-F002 Isolation Defeat for RPV Venting [NOTE 2]     DEFEAT       0         0 cd= P602_A117_3 EQ 1 EOPRF0023           E41-F003 Isolation Defeat for RPV Venting [NOTE 2]     DEFEAT       0         0 cd= P602_A117_3 EQ 1 Override Functions:
Number                                       Title                         Value     Delay   Ramp N/A NOTE 1: Conditional on HPCI Turbine speed >3000 rpm (H_P602_A137_1 GT 3000).
NOTE 2: Conditional on HPCI Turbine Aux Oil Pump in RUN (P602_A117_3 EQ 1).
Special Instructions:
: 1.       Initialize the simulator to IC-20 and place in RUN.
: 2.       Start SGTS T4600-C003, Div. 1 SGTS Exhaust Fan.
: 3.       Start Div. 1 RHRSW:
: a. Throttle open E4150-F068A for 5 seconds.
: b. Start one RHRSW Pump.
: c. Throttle open E4150-F068A to ~6000 gpm.
: d. Start the second RHRSW Pump.
: e. Fully open E4150-F068A.
: 4.       Start Div. 1 RHR in Torus Cooling:
: a. Open E1150-F028B, Div. 2 Torus Isolation Vlv.
: b. Start one Div. 1 RHR Pump.
: c. Throttle open E1150-F024B, Div. 2 Torus Cooling Vlv, to ~10,000 gpm.
: 5.       Pump down Torus using TWMS to -1 inches.
: 6.       Open and execute lesson JP0139-005.lsn.
: 7.       Trigger First Step.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0139-005)
Initial Conditions:
You are the Control Room NSO.
HPCI is to be run in the Test Mode.
RHR Division 1 is in Torus Cooling.
Division 1 SGTS is in operation.
All other prerequisites have been met.
Initiating Cue(s):
The CRS directs you to start HPCI in the Test Mode in accordance with 23.202, Section 6.1.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-OP-315-0150-001                        3 JPM Title                                                    Duration            Page Start up Fuel Pool Ventilation Exhaust Radiation Monitor        5 minutes                        1 D11-K609A Examinee:                                                                     SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*2.*3.4.5.6.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleStartupFuelPoolVentilationExhaustRadiationMonitorD11-K609ANo.:JP-OP-315-0150-001Revision:3Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U    Comment        Element  S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleStartupFuelPoolVentilationExhaustRadiationMonitorD11-K609ANo.:JP-OP-315-0150-001Revision:3Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:D1100-RadiationMonitoringTask:62960-StartupD11-K609A,B,C,D,Div1andDiv2FuelPoolEandWVentExhDuctRadMonitor
* 1.
* 2.
* 3.
4.
5.
6.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations          Improvement              Expectations            Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11-                                Revision: 3 K609A                                                                                              Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was        Did not recognize key at proper frequency, using    performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system  too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.               monitoring.               system status.
Control            Task preview used to          Adequate control of system No anticipation of results of prepare for job. Aware of    maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.             could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                   greater depth of knowledge parameters.
for anticipating system response.
Conservatism      Low threshold for            Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on  High threshold for problem stop when unsure if        task completion without    conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic  Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11-                                        Revision: 3 K609A                                                                                                        Page 3 JPM Information System:
D1100 - Radiation Monitoring Task:
62960 - Startup D11-K609A, B, C, D, Div 1 and Div 2 Fuel Pool E and W Vent Exh Duct Rad Monitor


==References:==
==References:==
Required(R)/Available(A)23.625,ProcessGaseousRadiationMonitoring(R)ToolsandEquipmentRequired:NoneInitialConditions:YouarethePatrolNSO.TroubleshootingwasperformedonFuelPoolVentilationExhaustRadiationMonitorD11-K609A.Troubleshootingiscomplete.InitiatingCue(s):TheCRSdirectsyoutoplaceDivIFuelPoolVentilationExhaustRadiationMonitorD11-K609Ainserviceinaccordancewith23.625.Prerequisitesforthisprocedurehavebeenwaivedandlogged.TerminatingCue(s):FuelPoolVentExhaustRadiationMonitorD11-K609Aisinserviceper23.625.TaskStandard:FuelPoolVentExhaustRadiationMonitorD11-K609Ahasbeenstartedupinaccordancewith23.625.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:SF-9RadioactivityReleaseK/A
Required (R) / Available (A) 23.625, Process Gaseous Radiation Monitoring (R)
Tools and Equipment Required:
None Initial Conditions:
You are the Patrol NSO.
Troubleshooting was performed on Fuel Pool Ventilation Exhaust Radiation Monitor D11-K609A.
Troubleshooting is complete.
Initiating Cue(s):
The CRS directs you to place Div I Fuel Pool Ventilation Exhaust Radiation Monitor D11-K609A in service in accordance with 23.625.
Prerequisites for this procedure have been waived and logged.
Terminating Cue(s):
Fuel Pool Vent Exhaust Radiation Monitor D11-K609A is in service per 23.625.
Task Standard:
Fuel Pool Vent Exhaust Radiation Monitor D11-K609A has been started up in accordance with 23.625.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
SF-9 Radioactivity Release K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:272000-RadiationMonitoringSystemK/ASTATEMENT:A1.Abilitytopredictand/ormonitorchangesinparametersassociatedwithoperatingtheRADIATIONMONITORINGSYSTEMcontrolsincluding:(CFR:41.5/45.5)A1.01Lights,alarms,andindicationsassociatedwithnormaloperations.....................3.2/3.2MaintenanceRuleSafetyClassification:D1100-03MaintenanceRuleRiskSignificant?(YesorNo)Yes JOBPERFORMANCEMEASUREJPMTitleStartupFuelPoolVentilationExhaustRadiationMonitorD11-K609ANo.:JP-OP-315-0150-001Revision:3Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvideexamineewithCueSheet.CUE:ModeSelectorSwitch(S1)isinSTANDBY.*1.[8.2.1.1]AtD11-K609A,Div1FuelPoolEVentExhRadMonitor,verifyModeSelectorSwitch(S1)isinOPERATE.*1.VerifiesModeSelectorSwitch(S1)position.CUE:ModeSelectorSwitch(S1)isinOPERATE.*2.[8.2.1.1]PlaceModeSelectorSwitch(S1)inOPERATE.*2.PlacesModeSelectorSwitch(S1)inOPERATE.CUE:RESETPushbutton(S2)hasbeendepressed.*3.[8.2.1.2]AtD11-K609A,Div1FuelPoolEVentExhRadMonitor,depressRESETPushbutton(S2).*3.DepressesRESETPushbutton(S2).CUE:WhiteLOWlight(DS-1)isOFF.4.[8.2.1.3.a]AtD11-K609A,Div1FuelPoolEVentExhRadMonitor,verifywhiteLOWlight(DS-1)isOFF.4.VerifieswhiteLOWlight(DS-1)isOFF.CUE:AmberHIGHlight(DS-2)isOFF.5.[8.2.1.3.b]AtD11-K609A,Div1FuelPoolEVentExhRadMonitor,verifyamberHIGHlight(DS-2)isOFF.5.VerifiesamberHIGHlight(DS-2)isOFF.CUE:Alarms3D27,3D31,and3D35areclear.6.[8.2.2]Verifythefollowingalarmsareclear:3D27,DIVI/IIFPVENTEXHRADNMONITORDNSCL/INOP3D31,DIVI/IIFPVENTEXHRADNMONITORUPSCALE3D35,DIVI/IIFPVENTEXHRADNMONITORUPSCALETRIP6.ContactstheControlRoomtoverifyalarms3D27,3D31,and3D35areclear.CUE:EndJPMwhenFuelPoolVentExhaustRadiationMonitorD11-K609Aisinservice.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleStartupFuelPoolVentilationExhaustRadiationMonitorD11-K609ANo.:JP-OP-315-0150-001Revision:3Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:Donotpermittheexamineetooperateanyplantequipment.PlacingtheModeSelectorSwitchinanypositionotherthanOPERATEwilltripRBHVAC.ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:CMCswitcheswillturnREDandamperagewillincreasewhentheswitchisrotatedtothestartpositionstarted.Thecurrentshouldinitiallybefivetoseventimesthenormalrunningampswiththeammeterflashing.AscounterEMFisdeveloped,theamperagewilllowertothenormalrunningamperageandtheammeterwillnolongerflash.CMCswitcheswillturnGREENwhenthepumpsarestoppedandamperagewilldecreasetozero.Ex.:Pumpstart:"Switchhasbeenrotatedtothestartposition,redlightislit,greenlightisout,amperageinitiallypegsouthigh,andisnowindicating__X__amps."Pumpstop:"Switchhasbeenrotatedtothestopposition,greenlightislit,redlightisout,amperageindicates0amps."Remotelyoperatedvalvepositionisdeterminedwithopenandcloseindicatinglights.AREDlightonlywouldindicatethatthevalveisopen.AGREENlightonlywouldindicatethatthevalveisclosed.Dualindicationwouldindicatethatthevalveisinsomeintermediateposition.SystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleStartupFuelPoolVentilationExhaustRadiationMonitorD11-K609ANo.:JP-OP-315-0150-001Revision:3Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
K/A SYSTEM: 272000 - Radiation Monitoring System K/A STATEMENT:
A1.       Ability to predict and/or monitor changes in parameters associated with operating the RADIATION MONITORING SYSTEM controls including: (CFR: 41.5 / 45.5)
A1.01    Lights, alarms, and indications associated with normal operations. .................... 3.2 / 3.2 Maintenance Rule Safety Classification:
D1100-03 Maintenance Rule Risk Significant? (Yes or No)
Yes Work Instruction                                                                                                  WI 5.14 Job Performance Measures                                                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11-                            Revision: 3 K609A                                                                                          Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                        STANDARD CUE:     Provide examinee with Cue Sheet.
CUE:     Mode Selector Switch (S1) is in STANDBY.
* 1.     [8.2.1.1] At D11-K609A, Div 1 Fuel Pool E
* 1. Verifies Mode Selector Switch (S1)
Vent Exh Rad Monitor, verify Mode                position.
Selector Switch (S1) is in OPERATE.
CUE:     Mode Selector Switch (S1) is in OPERATE.
* 2.     [8.2.1.1] Place Mode Selector Switch (S1)
* 2. Places Mode Selector Switch (S1) in in OPERATE.                                       OPERATE.
CUE:     RESET Pushbutton (S2) has been depressed.
* 3.     [8.2.1.2] At D11-K609A, Div 1 Fuel Pool E
* 3. Depresses RESET Pushbutton (S2).
Vent Exh Rad Monitor, depress RESET Pushbutton (S2).
CUE:     White LOW light (DS-1) is OFF.
: 4.     [8.2.1.3.a] At D11-K609A, Div 1 Fuel Pool  4. Verifies white LOW light (DS-1) is OFF.
E Vent Exh Rad Monitor, verify white LOW light (DS-1) is OFF.
CUE:     Amber HIGH light (DS-2) is OFF.
: 5.     [8.2.1.3.b] At D11-K609A, Div 1 Fuel Pool  5. Verifies amber HIGH light (DS-2) is OFF.
E Vent Exh Rad Monitor, verify amber HIGH light (DS-2) is OFF.
CUE:     Alarms 3D27, 3D31, and 3D35 are clear.
: 6.     [8.2.2] Verify the following alarms are    6. Contacts the Control Room to verify clear:                                           alarms 3D27, 3D31, and 3D35 are clear.
3D27, DIV I/II FP VENT EXH RADN MONITOR DNSCL/INOP 3D31, DIV I/II FP VENT EXH RADN MONITOR UPSCALE 3D35, DIV I/II FP VENT EXH RADN MONITOR UPSCALE TRIP CUE:     End JPM when Fuel Pool Vent Exhaust Radiation Monitor D11-K609A is in service.
______ SATISFACTORY                                ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11-                              Revision: 3 K609A                                                                                            Page 5 Evaluator Notes:
Do not permit the examinee to operate any plant equipment. Placing the Mode Selector Switch in any position other than OPERATE will trip RBHVAC.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.
Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                    No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11-              Revision: 3 K609A                                                                          Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleStartupFuelPoolVentilationExhaustRadiationMonitorD11-K609ANo.:JP-OP-315-0150-001Revision:3Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:N/AMalfunctions:NumberTitleValueDelayRampN/ARemoteFunctions:NumberTitleValueDelayRampN/AOverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:N/A JOBPERFORMANCEMEASURECueSheet:(JP-OP-315-0150-001)InitialConditions:YouarethePatrolNSO.TroubleshootingwasperformedonFuelPoolVentExhaustRadiationMonitorD11-K609A.Thetroubleshootingiscomplete.InitiatingCue(s):TheCRSdirectsyoutoplaceDivIFuelPoolVentilationExhaustRadiationMonitorD11-K609Ainserviceinaccordancewith23.625.Prerequisitesforthisprocedurehavebeenwaivedandlogged.
===Response===
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment2JobPositionSRO/RONo.JP-OP-315-0158-402Revision3JPMTitleLoss64CandEDG12FailstoStartDuration15minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Question:
Reference
 
===Response===
Work Instruction                                                                    WI 5.14 Job Performance Measures                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                        No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11-                  Revision: 3 K609A                                                                              Page 7 Simulator Setup IC#:
N/A Malfunctions:
Number                                Title                    Value      Delay  Ramp N/A Remote Functions:
Number                                Title                    Value      Delay  Ramp N/A Override Functions:
Number                                Title                    Value      Delay  Ramp N/A Special Instructions:
N/A Work Instruction                                                                        WI 5.14 Job Performance Measures                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0150-001)
Initial Conditions:
You are the Patrol NSO.
Troubleshooting was performed on Fuel Pool Vent Exhaust Radiation Monitor D11-K609A. The troubleshooting is complete.
Initiating Cue(s):
The CRS directs you to place Div I Fuel Pool Ventilation Exhaust Radiation Monitor D11-K609A in service in accordance with 23.625.
Prerequisites for this procedure have been waived and logged.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-OP-315-0158-402                        3 JPM Title                                                    Duration            Page Loss 64C and EDG 12 Fails to Start                              15 minutes                      1 Examinee:                                                                     SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.2.*3.*4.*5.*6.*7.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleLoss64CandEDG12FailstoStartNo.:JP-OP-315-0158-402Revision:3Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U    Comment        Element  S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleLoss64CandEDG12FailstoStartNo.:JP-OP-315-0158-402Revision:3Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:R1400-4160/480VESFElectricalDistributionTask:74965-RestoreNorthRRMG.64234-ManuallyinitiateastartofSGTS64864-ShiftDivisionsofCCHVAC
* 1.
2.
* 3.
* 4.
* 5.
* 6.
* 7.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations          Improvement              Expectations            Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 2
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start                                                            Revision: 3 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was        Did not recognize key at proper frequency, using    performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system  too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.               monitoring.               system status.
Control            Task preview used to          Adequate control of system No anticipation of results of prepare for job. Aware of    maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.             could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                   greater depth of knowledge parameters.
for anticipating system response.
Conservatism      Low threshold for            Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on  High threshold for problem stop when unsure if        task completion without    conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic  Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start                                                              Revision: 3 Page 3 JPM Information System:
R1400 - 4160/480V ESF Electrical Distribution Task:
74965 - Restore North RR MG.
64234 - Manually initiate a start of SGTS 64864 - Shift Divisions of CCHVAC


==References:==
==References:==
Required(R)/Available(A)20.300.64C,LossofBus64C(R)20.300.72C,LossofBus72C(R)ToolsandEquipmentRequired:NoneInitialConditions:Youarethe3rdNSO.ReactorPowerisat100%.Plantconditionsarestableasyouseethem.InitiatingCue(s):TheCRShasdirectedyoutoperformanelectricalwalkdown.TerminatingCue(s):AOP20.300.72C,"LossofBus72C",SubsequentActions,ConditionsA,B,C&Harecomplete.TaskStandard:Theelectricalwalkdownwilldeterminethat4160VBus64ChastrippedandEDG12failedtostartduetoabusfault.Actionsaretakeninresponsetothelossof480VBus72CinaccordancewithstepsA,B,CandHof20.300.72C,LossofBus72C.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:SF-6-ElectricalK/A
Required (R) / Available (A) 20.300.64C, Loss of Bus 64C (R) 20.300.72C, Loss of Bus 72C (R)
Tools and Equipment Required:
None Initial Conditions:
rd You are the 3 NSO.
Reactor Power is at 100%.
Plant conditions are stable as you see them.
Initiating Cue(s):
The CRS has directed you to perform an electrical walkdown.
Terminating Cue(s):
AOP 20.300.72C, Loss of Bus 72C, Subsequent Actions, Conditions A, B, C & H are complete.
Task Standard:
The electrical walkdown will determine that 4160V Bus 64C has tripped and EDG 12 failed to start due to a bus fault. Actions are taken in response to the loss of 480V Bus 72C in accordance with steps A, B, C and H of 20.300.72C, Loss of Bus 72C.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
SF Electrical K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:262001-ACElectricalDistributionK/ASTATEMENT:A2.Abilityto(a)predicttheimpactsofthefollowingontheA.C.ELECTRICALDISTRIBUTION;and(b)basedonthosepredictions,useprocedurestocorrect,control,ormitigatetheconsequencesofthoseabnormalconditionsoroperations:(CFR:41.5/45.6)A2.04Typesofloadsthat,ifde-energized,woulddegradeorhinderplantoperation........3.8/4.2MaintenanceRuleSafetyClassification:R1400-01MaintenanceRuleRiskSignificant?(YesorNo)Yes JOBPERFORMANCEMEASUREJPMTitleLoss64CandEDG12FailstoStartNo.:JP-OP-315-0158-402Revision:3Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDNOTE:Examineewillannounceactionswhichchangeplantconditions/alarmswith"CrewUpdate."CUE:ProvideExamineewithCUESHEETandmarkupof23.202.CUE:AcknowledgethereportasCRS.Announceentryinto20.300.72C,LossofBus72CanddirecttheexamineetoperformConditionsA,B,CandHofAOP20.300.72C.*1.Performanelectricalwalkdown.*1.DeterminesthatBus64Ctripped,breakersB6andB8areopenindicatingabusfault,andtheEDGdidnotstart.2.[A.1]VerifyMCC72CFtransferredtoAlternate(23.321).2.480VESFBus72FPosition5CverifiedAUTOCLOSElightON.*3.[B.1]PlaceRRMGNorthCoolingFaninOFF/RESET,theninRUN.*3.RRMGNorthCoolingFanCMCswitchplacedinOFF/RESET,theninRUN.CUE:TheRTCwillbriefanoperatortotakeLocalManualcontroloftheNorthRRMGSet.*4.[B.2]TakeLocalManualcontrolofNorthRRMGSet(23.138.01).*4.EnsurespropercommunicationsandactionsarebeingtakentotakelocalmanualcontrolofNorthRRMGSet.*5.[C.1]StartDiv2SGTS.*5.Div2SGTSExhaustFanCMCswitchplacedinRUN.*6.[H.1]PlaceDiv1CCHVACModeSelectSwitchinALLSTOP.*6.Div1CCHVACModeSelectSwitchplacedinALLSTOP.*7.]H.2]PlaceDiv2CCHVACModeSelectSwitchinALLAUTO.*7.Div2CCHVACModeSelectSwitchplacedinALLAUTO.CUE:EndJPMwhenAOP20.300.72C,stepsA,B,C,andHarecompleted.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleLoss64CandEDG12FailstoStartNo.:JP-OP-315-0158-402Revision:3Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:CMCswitcheswillturnREDandamperagewillincreasewhentheswitchisrotatedtothestartpositionstarted.Thecurrentshouldinitiallybefivetoseventimesthenormalrunningampswiththeammeterflashing.AscounterEMFisdeveloped,theamperagewilllowertothenormalrunningamperageandtheammeterwillnolongerflash.CMCswitcheswillturnGREENwhenthepumpsarestoppedandamperagewilldecreasetozero.Remotelyoperatedvalvepositionisdeterminedwithopenandcloseindicatinglights.AREDlightonlywouldindicatethatthevalveisopen.AGREENlightonlywouldindicatethatthevalveisclosed.Dualindicationwouldindicatethatthevalveisinsomeintermediateposition.ControllershaveanAutolightthatisGREENwhenselectedandAMBER(YELLOW)whenManualisselected.WheninManual,theopenandclosedpushbuttonscontroltheparametertobechangedbyadjustingpositionorspeed.Whenthedeviationmeterisnulled,thentheprocesscanbeshiftedtoAutotoallowthedesiredsetpointtocontroltheprocess.SystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleLoss64CandEDG12FailstoStartNo.:JP-OP-315-0158-402Revision:3Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
K/A SYSTEM: 262001 - AC Electrical Distribution K/A STATEMENT:
A2. Ability to (a) predict the impacts of the following on the A.C. ELECTRICAL DISTRIBUTION; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)
A2.04      Types of loads that, if de-energized, would degrade or hinder plant operation ........ 3.8/4.2 Maintenance Rule Safety Classification:
R1400-01 Maintenance Rule Risk Significant? (Yes or No)
Yes Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start                                                        Revision: 3 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                        STANDARD NOTE: Examinee will announce actions which change plant conditions/alarms with Crew Update.
CUE:     Provide Examinee with CUE SHEET and markup of 23.202.
CUE:     Acknowledge the report as CRS. Announce entry into 20.300.72C, Loss of Bus 72C and direct the examinee to perform Conditions A, B, C and H of AOP 20.300.72C.
    *1.     Perform an electrical walkdown.           *1. Determines that Bus 64C tripped, breakers B6 and B8 are open indicating a bus fault, and the EDG did not start.
: 2.     [A.1] Verify MCC 72CF transferred to        2. 480V ESF Bus 72F Position 5C verified Alternate (23.321).                             AUTO CLOSE light ON.
    *3.     [B.1] Place RR MG North Cooling Fan in    *3. RR MG North Cooling Fan CMC switch OFF/RESET, then in RUN.                         placed in OFF/RESET, then in RUN.
CUE:     The RTC will brief an operator to take Local Manual control of the North RR MG Set.
    *4.     [B.2] Take Local Manual control of North  *4. Ensures proper communications and RR MG Set (23.138.01).                           actions are being taken to take local manual control of North RR MG Set.
    *5.     [C.1] Start Div 2 SGTS.                   *5. Div 2 SGTS Exhaust Fan CMC switch placed in RUN.
    *6.     [H.1] Place Div 1 CCHVAC Mode Select      *6. Div 1 CCHVAC Mode Select Switch Switch in ALL STOP.                              placed in ALL STOP.
    *7.     ]H.2] Place Div 2 CCHVAC Mode Select      *7. Div 2 CCHVAC Mode Select Switch Switch in ALL AUTO.                              placed in ALL AUTO.
CUE:     End JPM when AOP 20.300.72C, steps A, B, C, and H are completed.
______ SATISFACTORY                                ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start                                                          Revision: 3 Page 5 Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start                                      Revision: 3 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleLoss64CandEDG12FailstoStartNo.:JP-OP-315-0158-402Revision:3Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:IC-20oranyfullpowerIC.Malfunctions:NumberTitleValueDelayRampR11MF0055EDG-12AutoStartFailureACTIVE00R11MF00124160VBusTrip64CACTIVE00RemoteFunctions:NumberTitleValueDelayRampNoneOverrideFunctions:NumberTitleValueDelayRampNoneSpecialInstructions:1.InitializesimulatortoselectedIC.2.PlacesimulatorinRUN.3.OpenandexecutelessonJP0158-402.lsn JOBPERFORMANCEMEASURECueSheet:(JP-OP-315-0158-402)InitialConditions:Youarethe3rdNSO.ReactorPowerisat100%.Plantconditionsarestableasyouseethem.InitiatingCue(s):TheCRShasdirectedyoutoperformanelectricalwalkdown.
===Response===
JOB PERFORMANCE MEASURE Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 2 Job Position SRO / RO No. JP-OP-315-0166-404 Revision 0 JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test Duration 15 minutes Page 1  Examinee:   SRO / RO Evaluator:     JPM Type: Normal / Alternate Path / Time Critical Start Time   Evaluation Method: Perform / Walkthrough / Discuss Stop Time   Location: Plant / Simulator / Classroom Total Time:   PERFORMANCE EVALUATION  
Question:
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                    No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start                                        Revision: 3 Page 7 Simulator Setup IC#:
IC-20 or any full power IC.
Malfunctions:
Number                                  Title                Value      Delay  Ramp R11MF0055                    EDG-12 Auto Start Failure      ACTIVE        0        0 R11MF0012                      4160V Bus Trip 64C          ACTIVE        0        0 Remote Functions:
Number                                  Title                Value      Delay  Ramp None Override Functions:
Number                                  Title                Value      Delay  Ramp None Special Instructions:
: 1. Initialize simulator to selected IC.
: 2. Place simulator in RUN.
: 3. Open and execute lesson JP0158-402.lsn Work Instruction                                                                      WI 5.14 Job Performance Measures                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0158-402)
Initial Conditions:
You are the 3rd NSO.
Reactor Power is at 100%.
Plant conditions are stable as you see them.
Initiating Cue(s):
The CRS has directed you to perform an electrical walkdown.
 
JOB PERFORMANCE MEASURE Job Position                                               No.                        Revision SRO / RO                                                   JP-OP-315-0166-404                 0 JPM Title                                                 Duration            Page Perform Div 2 SGTS Filter and Secondary Containment         15 minutes                1 Isolation Damper Operability Test Examinee:                                                               SRO / RO Evaluator:
JPM Type:                 Normal / Alternate Path / Time Critical       Start Time Evaluation Method:       Perform / Walkthrough / Discuss               Stop Time Location:                 Plant / Simulator / Classroom                 Total Time:
PERFORMANCE EVALUATION  


==SUMMARY==
==SUMMARY==
Element S U Comment Element S U Comment Element S U Comment 1. 11.
 
* 2. 12.       3. 13.
Element       S U   Comment     Element S U           Comment       Element     S U     Comment
* 4. 14.
: 1.                               11.
* 5. 15.
* 2.                               12.
* 6. 16.
: 3.                               13.
* 7.   *17.
* 4.                               14.
* 8. 18.        *9.           10.             OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation. Operator Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Comment Number Monitoring     Control     Conservatism     Teamwork     Knowledge     OVERALL EVALUATOR COMMENTS:         ______ PASS ______ FAIL Evaluator Signature / Date: /
* 5.                               15.
JOB PERFORMANCE MEASURE JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.: JP-OP-315-0166-404 Revision 0 Page 2 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1 JPM Observation Criteria Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Monitoring Equipment status monitored at proper frequency, using multiple means if available. Understood which indications were critical. Some monitoring was performed but undue focus on task or lack of system knowledge prevented ideal monitoring. Did not recognize key equipment status indicators, too much focus on single indications and ignored total system status. Control Task preview used to prepare for job. Aware of control bands and maintained them. Configuration control maintained. Adequate control of system maintained throughout task but some improvements could be made such as better manual control or greater depth of knowledge for anticipating system response. No anticipation of results of actions. Unaware or control bands or not able to maintain them. Lack of knowledge of how to control system parameters. Conservatism Low threshold for identification of problems. Questioning attitude. Uses needed. Sensitive to nuclear safety. Some opportunities existed to question before proceeding, High focus on task completion without consideration for other system affects. Proceeds even when unsure with unanswered questions. High threshold for problem conditions. Teamwork Routinely communicates system status changes to the team. Communicates actions before taking them. Communicated most status and actions. Some improvement would be warranted. Routinely takes action without informing the team. Knowledge Able to anticipate system response based on solid system knowledge. Good working knowledge of generic fundamentals to predict and monitor system response. Plant, system, or  generic fundamental knowledge has some gaps. Unable to predict system response, unsure of generic fundamentals concepts related to plant operation. Only relied on procedure for operating knowledge.
* 6.                               16.
JOB PERFORMANCE MEASURE JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.: JP-OP-315-0166-404 Revision 0 Page 3 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1 JPM Information System: T4600 - Standby Gas Treatment System Task: 77039 Perform Div 2 SGTS Filter & SC Isolation Damper Operability Test  
* 7.                               *17.
* 8.                               18.
       *9.
10.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator             Meets all           Opportunity for       Does not meet       Comment Fundamental          Expectations          Improvement            Expectations       Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS       ______ FAIL Evaluator Signature / Date:                                                     /
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 2
 
JOB PERFORMANCE MEASURE JPM Title                                                                   No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                                            Revision 0 Isolation Damper Operability Test                                                                  Page 2 JPM Observation Criteria Opportunity for Fundamental           Meets all Expectations                               Does not meet Expectations Improvement Monitoring         Equipment status monitored   Some monitoring was        Did not recognize key at proper frequency, using   performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.                monitoring.                system status.
Control           Task preview used to         Adequate control of system No anticipation of results of prepare for job. Aware of     maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.              could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                  greater depth of knowledge parameters.
for anticipating system response.
Conservatism       Low threshold for             Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on High threshold for problem stop when unsure if        task completion without   conditions.
needed. Sensitive to nuclear  consideration for other safety.                      system affects.
Teamwork           Routinely communicates       Communicated most status  Routinely takes action without system status changes to the and actions. Some          informing the team.
team. Communicates actions   improvement would be before taking them.           warranted.
Knowledge         Able to anticipate system     Plant, system, or generic Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                   No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                                      Revision 0 Isolation Damper Operability Test                                                            Page 3 JPM Information System:
T4600 - Standby Gas Treatment System Task:
77039 - Perform Div 2 SGTS Filter & SC Isolation Damper Operability Test


==References:==
==References:==
Required (R) / Available (A) (R) Tools and Equipment Required: Marked up copy of 24.404.04 to step 5.2. Stopwatch Initial Conditions: You are the Third NSO. RBHVAC is operating normally, CCHVAC is in the NORMAL Mode, and Div 1 & 2 SGTS are in standby. Maintenance is complete on the T4100-F010 Damper, solenoid replaced. The CRS and CRNSO have released partial surveillance 24.404.04. The surveillance is scheduled on the POD, to be performed on your shift. SPF Form is filled out, approved, and correct. The surveillance is complete to Section 5.2. A pre-job brief has been conducted with all participants. The RB Rounds operator is on the AB 5th Floor, standing by for your direction. Initiating Cue(s): The CRS directs you to perform 24.404.04, Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test, Section 5.2. (T4100-F010 ONLY) for you to perform. Terminating Cue(s): Div 1 SGTS is operating and RB D/P is -0.125 to -0.5 inches wc Task Standard: Perform Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test in accordance with 24.404.04.
Required (R) / Available (A) 24.404.04, Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test (R) 23.404, Standby Gas Treatment System (R)
JOB PERFORMANCE MEASURE JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.: JP-OP-315-0166-404 Revision 0 Page 4 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1 Licensed Operator Exam Information (required for NRC exams) Safety Function/Category: SF9 - Radioactivity Release K/A  
Tools and Equipment Required:
Marked up copy of 24.404.04 to step 5.2.
Stopwatch Initial Conditions:
You are the Third NSO.
RBHVAC is operating normally, CCHVAC is in the NORMAL Mode, and Div 1 & 2 SGTS are in standby.
Maintenance is complete on the T4100-F010 Damper, solenoid replaced.
The CRS and CRNSO have released partial surveillance 24.404.04.
The surveillance is scheduled on the POD, to be performed on your shift.
SPF Form is filled out, approved, and correct.
The surveillance is complete to Section 5.2.
A pre-job brief has been conducted with all participants.
th The RB Rounds operator is on the AB 5 Floor, standing by for your direction.
Initiating Cue(s):
The CRS directs you to perform 24.404.04, Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test, Section 5.2. (T4100-F010 ONLY) for you to perform.
Terminating Cue(s):
Div 1 SGTS is operating and RB D/P is -0.125 to -0.5 inches wc Task Standard:
Perform Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test in accordance with 24.404.04.
Work Instruction                                                                                  WI 5.14 Job Performance Measures                                                                            Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                               No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                                                                            Revision 0 Isolation Damper Operability Test                                                                                                    Page 4 Licensed Operator Exam Information (required for NRC exams)
Safety Function/Category:
SF9 - Radioactivity Release K/A  


==Reference:==
==Reference:==
(from NUREG 1123) K/A SYSTEM: 288000 Plant Ventilation Systems K/A STATEMENT: A3 - Ability to monitor automatic operations of the PLANT VENTILATION SYSTEMS including: A3.01 Isolation / Initiation Signals ............................................................................. 3.8 / 3.8 K/A SYSTEM: 290001 Secondary Containment K/A STATEMENT: A4 - Ability to manually operate and/or monitor in the control room: A4.01 Reactor Building D/P ...................................................................................... 3.3 / 3.4 A4.12 Surveillance Testing ....................................................................................... 2.8 / 3.2 Maintenance Rule Safety Classification: T4600-06 Maintenance Rule Risk Significant? (Yes or No) Yes JOB PERFORMANCE MEASURE JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.: JP-OP-315-0166-404 Revision 0 Page 5 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1 PERFORMANCE EVALUATION Start Time   ELEMENT STANDARD CUE: Inform the examinee that all communications will be directed to you and you will provide the necessary information and response. Provide Examinee with CUE SHEET and the marked up copy of 24.404.04. CUE: Report as RB Rounds that SGTS Totalizer Meter indicates 451 hours. 1. [5.2.1] Record initial indication on T46-R400B, Div 2 SGTS Elapsed Time Totalizer (T46-P404, AB5-G14). 1. Directs RB Rounds to obtain SGTS Totalizer Meter Reading. *2. [5.2.2] Place collar of Division 2 Manual Isolation TRIP pushbutton in ARMED and verify Annunciator 8D29, DIV II REAC BLDG ISO PB ARMED, alarms. *2. Places Div 2 Manual Isolation TRIP pushbutton collar in ARMED. Verifies 8D29, DIV II REAC BLDG ISO PB ARMED, alarms. 3. [5.2.3] Make the following announcement over the Hi-Com: "Attention all personnel, Division 2 SGTS is now in operation. No use of solvents or painting is permitted in the Reactor Building while SGTS is running." 3. Makes Hi-Com announcement and Crew Update. NOTE: RBHVAC will trip, and Div 2 SGTS will auto start, and CCHVAC will shift to Recirculation Mode. *4. [5.2.4] Depress Division 2 Manual Isolation TRIP pushbutton, measure stroke time of T4100-F010 to nearest 1/10th second, then record stroke time and verify acceptance criteria met. *4. Depresses Division 2 Manual Isolation TRIP pushbutton. Measures and records the stroke time for T4100-F010 damper. Verifies the damper stroke time meets the acceptance criteria. *5. [5.2.5] Record indication on T46-R800B, Div 2 SGTS Exh Gas Flow Recorder, and start time. *5. Records flow on Div 2 SGTS Exh Gas Flow Recorder. Records start time. *6. [5.2.6] Place all RBHVAC Supply and Exhaust Fan CMC switches in OFF/RESET. *6. Places all RBHVAC Supply and Exhaust Fan CMC switches in OFF/RESET. *7. [5.2.7] Place collar of Division 2 Manual Isolation TRIP pushbutton in DISARMED and verify Annunciator 8D29, DIV II REAC BLDG ISO PB ARMED, clears. *7. Places Div 2 Manual Isolation TRIP pushbutton collar in DISARMED, and verifies 8D29, DIV II REAC BLDG ISO PB ARMED, clears. *8. [5.2.8] Depress Division 2 Manual Isolation RESET pushbutton, and verify Division 2 Reactor Building Isolate RESET light is ON. *8. Depresses Div 2 Manual Isolation RESET pushbutton, and verifies Div 2 Reactor Building Isolate RESET light is ON.
(from NUREG 1123)
JOB PERFORMANCE MEASURE JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.:  JP-OP-315-0166-404 Revision 0 Page 6 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1 ELEMENT STANDARD NOTE: Steps for placing RBHVAC in the shutdown lineup are in 23.426. All equipment should be in the required condition except the Supply and Exhaust Fan switches. 9. [8.1.2.1] Shutdown selected Exhaust Fan. 9. Places an RBHVAC Exhaust Fan CMC switch in OFF/RESET. 10. [8.1.2.2] Verify paired supply fan trips, exhaust dampers close, and supply fan dampers close. 10. Verifies paired supply fan tripped, exhaust dampers closed, and supply fan dampers closed. 11. [8.1.2.3] Place switch for paired supply fan in OFF/RESET. 11. Places switch for paired supply fan in OFF/RESET. 12. [8.1.2.1] Shutdown (other) selected Exhaust Fan. 12. Places the remaining RBHVAC Exhaust Fan CMC switch in OFF/RESET. 13. [8.1.2.2] Verify paired supply fan trips, exhaust dampers close, and supply fan dampers close. 13. Verifies paired supply fan tripped, exhaust dampers closed, and supply fan dampers closed. 14. [8.1.2.3] Place switch for paired supply fan in OFF/RESET. 14. Places switch for paired supply fan in OFF/RESET. 15. [8.1.2.5] Verify T4100-F029, RBHVAC Intake Air Damper, closes when Reactor Building Supply and Exhaust Fans have been shutdown. 15. Verifies T4100-F029, RBHVAC Intake Air Damper, closes when Reactor Building Supply and Exhaust Fans have been shutdown. 16. [8.1.2.6] When Reactor Building Supply and Exhaust Fans have been shutdown, verify the following valves close: T4100-F010, RBHVAC Sply Otbd Iso Damper  T4100-F011, RBHVAC Sply Inbd Iso Damper T4100-F009, RBHVAC Exh Inbd Iso Damper  T4100-F008, RBHVAC Exh Otbd Iso Damper 16. When Reactor Building Supply and Exhaust Fans have been shutdown, verifies the following valves close:  T4100-F010, RBHVAC Sply Otbd Iso Damper  T4100-F011, RBHVAC Sply Inbd Iso Damper T4100-F009, RBHVAC Exh Inbd Iso Damper  T4100-F008, RBHVAC Exh Otbd Iso Damper *17. [8.1.2.7] Place switches for the following in OFF/RESET: T4100-C015, RB Sample Sink Bstr Exh Fan T4100-C016, RB CA Equip Room Bstr Exh Fan *17. Places switches for the following in OFF/RESET:  T4100-C015, RB Sample Sink Bstr Exh Fan  T4100-C016, RB CA Equip Room Bstr Exh Fan JOB PERFORMANCE MEASURE  JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.: JP-OP-315-0166-404 Revision 0 Page 7 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1 ELEMENT STANDARD 18. [8.1.2.8] Depress Reactor Building Exhaust Fan Trip Alarm Reset pushbutton, and turn pushbutton collar to OFF to defeat Reactor Building Fifth Floor Loss of Ventilation Alarm (RB5-A15). 18. Directs RB Rounds to depress Reactor Building Exhaust Fan Trip Alarm Reset pushbutton, and turn pushbutton collar to OFF to defeat Reactor Building Fifth Floor Loss of Ventilation Alarm (RB5-A15). CUE: Terminate JPM when Div 2 SGTS is operating, and RB HVAC is shut down. ______ SATISFACTORY ______ UNSATISFACTORY     Stop Time
K/A SYSTEM: 288000 - Plant Ventilation Systems K/A STATEMENT:
* Critical Step JOB PERFORMANCE MEASURE JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.: JP-OP-315-0166-404 Revision 0 Page 8 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1  Evaluator Notes: ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES. Generic Notes and Cues: CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero. Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position. System Specific Notes and Cues: None Task Performance and Cues: The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Critical Steps: Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
A3 - Ability to monitor automatic operations of the PLANT VENTILATION SYSTEMS including:
JOB PERFORMANCE MEASURE JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.:  JP-OP-315-0166-404 Revision 0 Page 9 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):                                     Question:                                                                              
A3.01     Isolation / Initiation Signals ............................................................................. 3.8 / 3.8 K/A SYSTEM: 290001 - Secondary Containment K/A STATEMENT:
A4 - Ability to manually operate and/or monitor in the control room:
A4.01     Reactor Building D/P ...................................................................................... 3.3 / 3.4 A4.12     Surveillance Testing ....................................................................................... 2.8 / 3.2 Maintenance Rule Safety Classification:
T4600-06 Maintenance Rule Risk Significant? (Yes or No)
Yes Work Instruction                                                                                                                          WI 5.14 Job Performance Measures                                                                                                                  Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                 No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                                        Revision 0 Isolation Damper Operability Test                                                            Page 5 PERFORMANCE EVALUATION Start Time ELEMENT                                       STANDARD CUE:     Inform the examinee that all communications will be directed to you and you will provide the necessary information and response. Provide Examinee with CUE SHEET and the marked up copy of 24.404.04.
CUE:     Report as RB Rounds that SGTS Totalizer Meter indicates 451 hours.
: 1.     [5.2.1] Record initial indication on T46-   1. Directs RB Rounds to obtain SGTS R400B, Div 2 SGTS Elapsed Time                 Totalizer Meter Reading.
Totalizer (T46-P404, AB5-G14).
    *2.     [5.2.2] Place collar of Division 2 Manual   *2. Places Div 2 Manual Isolation TRIP Isolation TRIP pushbutton in ARMED and         pushbutton collar in ARMED. Verifies verify Annunciator 8D29, DIV II REAC           8D29, DIV II REAC BLDG ISO PB BLDG ISO PB ARMED, alarms.                     ARMED, alarms.
: 3.     [5.2.3] Make the following announcement     3. Makes Hi-Com announcement and Crew over the Hi-Com:                               Update.
            "Attention all personnel, Division 2 SGTS is now in operation. No use of solvents or painting is permitted in the Reactor Building while SGTS is running."
NOTE: RBHVAC will trip, and Div 2 SGTS will auto start, and CCHVAC will shift to Recirculation Mode.
  *4.       [5.2.4] Depress Division 2 Manual           *4. Depresses Division 2 Manual Isolation Isolation TRIP pushbutton, measure             TRIP pushbutton.
stroke time of T4100-F010 to nearest           Measures and records the stroke time for th 1/10 second, then record stroke time and       T4100-F010 damper.
verify acceptance criteria met.
Verifies the damper stroke time meets the acceptance criteria.
  *5.       [5.2.5] Record indication on T46-R800B,     *5. Records flow on Div 2 SGTS Exh Gas Div 2 SGTS Exh Gas Flow Recorder, and          Flow Recorder.
start time.
Records start time.
  *6.       [5.2.6] Place all RBHVAC Supply and        *6. Places all RBHVAC Supply and Exhaust Exhaust Fan CMC switches in                    Fan CMC switches in OFF/RESET.
OFF/RESET.
  *7.       [5.2.7] Place collar of Division 2 Manual  *7. Places Div 2 Manual Isolation TRIP Isolation TRIP pushbutton in DISARMED           pushbutton collar in DISARMED, and and verify Annunciator 8D29, DIV II REAC       verifies 8D29, DIV II REAC BLDG ISO PB BLDG ISO PB ARMED, clears.                     ARMED, clears.
  *8.       [5.2.8] Depress Division 2 Manual         *8. Depresses Div 2 Manual Isolation RESET Isolation RESET pushbutton, and verify          pushbutton, and verifies Div 2 Reactor Division 2 Reactor Building Isolate RESET       Building Isolate RESET light is ON.
light is ON.
Work Instruction                                                                                  WI 5.14 Job Performance Measures                                                                            Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                                            Revision 0 Isolation Damper Operability Test                                                                  Page 6 ELEMENT                                          STANDARD NOTE: Steps for placing RBHVAC in the shutdown lineup are in 23.426. All equipment should be in the required condition except the Supply and Exhaust Fan switches.
: 9.     [8.1.2.1] Shutdown selected Exhaust Fan.       9. Places an RBHVAC Exhaust Fan CMC switch in OFF/RESET.
: 10.     [8.1.2.2] Verify paired supply fan trips,     10. Verifies paired supply fan tripped, exhaust exhaust dampers close, and supply fan              dampers closed, and supply fan dampers dampers close.                                    closed.
: 11.       [8.1.2.3] Place switch for paired supply fan 11. Places switch for paired supply fan in in OFF/RESET.                                      OFF/RESET.
: 12.       [8.1.2.1] Shutdown (other) selected           12. Places the remaining RBHVAC Exhaust Exhaust Fan.                                      Fan CMC switch in OFF/RESET.
: 13.     [8.1.2.2] Verify paired supply fan trips,     13. Verifies paired supply fan tripped, exhaust exhaust dampers close, and supply fan              dampers closed, and supply fan dampers dampers close.                                    closed.
: 14.       [8.1.2.3] Place switch for paired supply fan 14. Places switch for paired supply fan in in OFF/RESET.                                      OFF/RESET.
: 15.       [8.1.2.5] Verify T4100-F029, RBHVAC           15. Verifies T4100-F029, RBHVAC Intake Air Intake Air Damper, closes when Reactor            Damper, closes when Reactor Building Building Supply and Exhaust Fans have             Supply and Exhaust Fans have been been shutdown.                                     shutdown.
: 16.       [8.1.2.6] When Reactor Building Supply       16. When Reactor Building Supply and and Exhaust Fans have been shutdown,              Exhaust Fans have been shutdown, verify the following valves close:                 verifies the following valves close:
* T4100-F010, RBHVAC Sply Otbd Iso
* T4100-F010, RBHVAC Sply Otbd Iso Damper                                             Damper
* T4100-F011, RBHVAC Sply Inbd Iso
* T4100-F011, RBHVAC Sply Inbd Iso Damper                                             Damper
* T4100-F009, RBHVAC Exh Inbd Iso
* T4100-F009, RBHVAC Exh Inbd Iso Damper                                             Damper
* T4100-F008, RBHVAC Exh Otbd Iso
* T4100-F008, RBHVAC Exh Otbd Iso Damper                                             Damper
  *17.     [8.1.2.7] Place switches for the following in *17. Places switches for the following in OFF/RESET:                                         OFF/RESET:
* T4100-C015, RB Sample Sink Bstr Exh
* T4100-C015, RB Sample Sink Bstr Exh Fan                                               Fan
* T4100-C016, RB CA Equip Room Bstr
* T4100-C016, RB CA Equip Room Bstr Exh Fan                                           Exh Fan Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                   No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                                        Revision 0 Isolation Damper Operability Test                                                              Page 7 ELEMENT                                         STANDARD
: 18.       [8.1.2.8] Depress Reactor Building         18. Directs RB Rounds to depress Reactor Exhaust Fan Trip Alarm Reset                      Building Exhaust Fan Trip Alarm Reset pushbutton, and turn pushbutton collar to        pushbutton, and turn pushbutton collar to OFF to defeat Reactor Building Fifth Floor        OFF to defeat Reactor Building Fifth Floor Loss of Ventilation Alarm (RB5-A15).             Loss of Ventilation Alarm (RB5-A15).
CUE: Terminate JPM when Div 2 SGTS is operating, and RB HVAC is shut down.
______ SATISFACTORY                                 ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                                          Revision 0 Isolation Damper Operability Test                                                                Page 8 Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                   No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                      Revision 0 Isolation Damper Operability Test                                            Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:                                                                                                      Question:                                                                               Reference           Response:
 
JOB PERFORMANCE MEASURE JPM Title Perform Div 2 SGTS Filter and Secondary Containment Isolation Damper Operability Test No.: JP-OP-315-0166-404 Revision 0 Page 10 Work Instruction WI 5.14 Job Performance Measures Rev 3  Attachment 1 Simulator Setup IC#: IC-20 or any full power IC. Malfunctions: Number Title Value Delay Ramp None Remote Functions: Number Title Value Delay Ramp None Override Functions: Number Title Value Delay Ramp None Special Instructions: 1. Initialize to the desired IC, and place the simulator in RUN.
===Response===
JOB PERFORMANCE MEASURE   Cue Sheet: (JP-OP-315-0166-404)   Initial Conditions: You are the Third NSO. RBHVAC is operating normally, CCHVAC is in the NORMAL Mode, and Div 1 & 2 SGTS are in standby. Maintenance is complete on the T4100-F010 Damper, solenoid replaced. The CRS and CRNSO have released partial surveillance 24.404.04 (T4100-F010 PMT stroke time)for you to perform. The surveillance is scheduled on the POD, to be performed on your shift. The SPF Form is filled out, approved, and is correct. The surveillance is complete to Section 5.2. A pre-job brief has been conducted with all participants. The RB Rounds operator is on the AB 5th Floor, standing by for your direction. Initiating Cue(s): The CRS directs you to perform 24.404.04, Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test, Section 5.2. (T4100-F010 ONLY)
Question:
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1JobPositionSRO/RONo.JP-OP-315-0262-003Revision1JPMTitleTransferUPSfromNormaltoAlternatePowerusingStaticTransferSwitch(AltPath)Duration10minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                               No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment                                    Revision 0 Isolation Damper Operability Test                                                        Page 10 Simulator Setup IC#:
IC-20 or any full power IC.
Malfunctions:
Number                                             Title               Value     Delay   Ramp None Remote Functions:
Number                                             Title               Value     Delay   Ramp None Override Functions:
Number                                             Title               Value     Delay   Ramp None Special Instructions:
: 1.       Initialize to the desired IC, and place the simulator in RUN.
Work Instruction                                                                                WI 5.14 Job Performance Measures                                                                          Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0166-404)
Initial Conditions:
You are the Third NSO.
RBHVAC is operating normally, CCHVAC is in the NORMAL Mode, and Div 1 & 2 SGTS are in standby.
Maintenance is complete on the T4100-F010 Damper, solenoid replaced.
The CRS and CRNSO have released partial surveillance 24.404.04 (T4100-F010 PMT stroke time)for you to perform.
The surveillance is scheduled on the POD, to be performed on your shift.
The SPF Form is filled out, approved, and is correct.
The surveillance is complete to Section 5.2.
A pre-job brief has been conducted with all participants.
The RB Rounds operator is on the AB 5th Floor, standing by for your direction.
Initiating Cue(s):
The CRS directs you to perform 24.404.04, Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test, Section 5.2.
(T4100-F010 ONLY)
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-OP-315-0262-003                        1 JPM Title                                                    Duration              Page Transfer UPS from Normal to Alternate Power using              10 minutes                        1 Static Transfer Switch (Alt Path)
Examinee:                                                                   SRO / RO Evaluator:
JPM Type:                 Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*11.21.2.12.3.13.4.*14.*5.15.6.16.7.*17.8.*18.9.19.10.20.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleTransferUPSfromNormaltoAlternatePowerusingStaticTransferSwitch(AltPath)No.:JP-OP-315-0262-003Revision:1Page2WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U      Comment        Element    S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleTransferUPSfromNormaltoAlternatePowerusingStaticTransferSwitch(AltPath)No.:JP-OP-315-0262-003Revision:1Page3WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1JPMInformationSystem:R3100-UninterruptiblePowerSupplyTask:78271-TransferUninterruptiblePowerSupplyfromNormaltoAlternatePowerusingStaticTransferSwitch
* 1.                                 *11.                                 21.
: 2.                                   12.
: 3.                                   13.
: 4.                                 *14.
* 5.                                   15.
: 6.                                   16.
: 7.                                 *17.
: 8.                                 *18.
: 9.                                   19.
: 10.                                   20.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations            Improvement            Expectations              Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                              WI 5.14 Job Performance Measures                                                                                        Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static                                        Revision: 1 Transfer Switch (Alt Path)                                                                            Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                  Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was          Did not recognize key at proper frequency, using    performed but undue focus    equipment status indicators, multiple means if available. on task or lack of system    too much focus on single Understood which indications  knowledge prevented ideal    indications and ignored total were critical.               monitoring.                   system status.
Control            Task preview used to prepare  Adequate control of system    No anticipation of results of for job. Aware of control    maintained throughout task    actions. Unaware or control bands and maintained them. but some improvements        bands or not able to maintain Configuration control        could be made such as better  them. Lack of knowledge of maintained.                   manual control or greater    how to control system depth of knowledge for        parameters.
anticipating system response.
Conservatism      Low threshold for            Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding,   with unanswered questions.
Questioning attitude. Uses    High focus on task            High threshold for problem stop when unsure if        completion without            conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status      Routinely takes action without system status changes to the  and actions. Some            informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic    Unable to predict system response based on solid      fundamental knowledge has    response, unsure of generic system knowledge. Good        some gaps.                    fundamentals concepts working knowledge of generic                                related to plant operation.
fundamentals to predict and                                Only relied on procedure for monitor system response.                                    operating knowledge.
Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                              No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static                                                                        Revision: 1 Transfer Switch (Alt Path)                                                                                                            Page 3 JPM Information System:
R3100 - Uninterruptible Power Supply Task:
78271 - Transfer Uninterruptible Power Supply from Normal to Alternate Power using Static Transfer Switch


==References:==
==References:==
Required(R)/Available(A)23.308.01,UninterruptiblePowerSupply(UPS)System(R)ToolsandEquipmentRequired:NoneInitialConditions:Youaretheextraoperatoronshift.InitiatingCue(s):TheControlRoomNSOdirectsyoutoshiftUPSA(B)PowerSupplyfromNormaltoAlternateusingtheStaticTransferSwitch.TerminatingCue(s):UPSA(B)hasbeentransferredbacktothenormalpowersupplyusingtheStaticTransferSwitch.TaskStandard:UPSisinservicealignedtotheNormalPowerSupplyinaccordancewith23.308.01.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:SF-6ElectricalK/A
Required (R) / Available (A) 23.308.01, Uninterruptible Power Supply (UPS) System (R)
Tools and Equipment Required:
None Initial Conditions:
You are the extra operator on shift.
Initiating Cue(s):
The Control Room NSO directs you to shift UPS A (B) Power Supply from Normal to Alternate using the Static Transfer Switch.
Terminating Cue(s):
UPS A(B) has been transferred back to the normal power supply using the Static Transfer Switch.
Task Standard:
UPS is in service aligned to the Normal Power Supply in accordance with 23.308.01.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
SF-6 Electrical K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:262002-UninterruptablePowerSupply(A.C./D.C.)K/ASTATEMENT:A2.Abilityto(a)predicttheimpactsofUPSbusundervoltage;and(b)basedonthosepredictions,useprocedurestocorrect,control,ormitigatetheconsequencesA2.01UnderVoltage..........................................................................................................2.6/2.8MaintenanceRuleSafetyClassification:R3100-05MaintenanceRuleRiskSignificant?(YesorNo)No JOBPERFORMANCEMEASUREJPMTitleTransferUPSfromNormaltoAlternatePowerusingStaticTransferSwitch(AltPath)No.:JP-OP-315-0262-003Revision:1Page4WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvideExamineewithCueSheet.CUE:ReturnModeswitchisinMAN.*1.[5.1.2.1]PlaceReturnModeswitchinMAN(MimicBus).*1.PlacesReturnModeswitchinMAN.CUE:SyncSwitchisinON.2.[5.1.2.2]VerifySyncSwitchisinON.2.VerifiesSyncSwitchisinON.CUE:RetransferBlockedlightisON.3.[5.1.2.3]VerifyamberRetransferBlockedlightisON.3.VerifiesamberRetransferBlockedlightisON.CUE:SyncMonitorlightisOFF.4.[5.1.2.4]VerifyclearSyncMonitorlightisOFF(MimicBus).4.VerifiesclearSyncMonitorlightisOFF.CUE:TestswitchisinALTLINE.*5.[5.1.2.5]PlaceTestswitchtoALTLINE(MimicBus).*5.PlacesTestswitchtoALTLINE.CUE:AlternateLinelightisON.6.[5.1.2.6]VerifyamberAlternateLinelightisON(MimicBus).6.VerifiesamberAlternateLinelightisON.CUE:InverterlightisOFF.7.[5.1.2.7]VerifyredInverterlightisOFF(MimicBus).7.VerifiesredInverterlightisOFF.AlternatePathBeginsHereCUE:ControlRoomreportstheUPSUNITA/BTROUBLEalarm(3D22)hasbeenreceivedandrequestslocalstatusofUPSUnitA(B).CUE:WhenexamineerequestsUPSUnitstatus,reportthatamberREGULATORFAILURElightisON,andtheStaticTransferSwitchOutputvoltage(UPSACVOLTAGE)isreading100VAC.NOTE:ExamineeshouldrecognizefailureofAlternatePowerSupply.ThisrequiresUPStobetransferredbacktoNormal.CUE:AsControlRoom,acknowledgestatusreport.Ifnotrecommendedbyexaminee,directUPStransferredbacktoNORMAL(per3D22)8.DeterminestatusofUPSUnitA(B).8.ReportsUPSUnitstatustoControlRoom.CUE:AlternateLinelightisON.9.[5.2.2.1]VerifyamberAlternateLinelightisON(MimicBus).9.VerifiesamberAlternateLinelightisON.CUE:ReturnModeswitchisinMAN.10.[5.2.2.2]VerifyorplaceReturnModeswitchinMAN(MimicBus).10.VerifiesReturnModeswitchinMAN.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleTransferUPSfromNormaltoAlternatePowerusingStaticTransferSwitch(AltPath)No.:JP-OP-315-0262-003Revision:1Page5WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1ELEMENTSTANDARDCUE:TestswitchisinCENTER.*11.[5.2.2.3]VerifyorplaceTestswitchinCENTER(MimicBus).*11.PlacesTestswitchinCENTER.CUE:SyncSwitchisinON12.[5.2.2.4]VerifySyncSwitchisinON.12.VerifiesSyncSwitchisinON.CUE:SyncMonitorlightisOFF.13.[5.2.2.5]VerifyclearSyncMonitorlightisOFF(MimicBus).13.VerifiesclearSyncMonitorlightisOFF.CUE:Resetpushbuttonisdepressed.*14.[5.2.2.6]DepressResetpushbutton(MimicBus).*14.DepressesResetpushbutton.CUE:RedInverterlightisON.15.[5.2.2.7]VerifyredInverterlightisON(MimicBus).15.VerifiesredInverterlightisON.CUE:AlternateLinelightisOFF.16.[5.2.2.8]VerifyamberAlternateLinelightisOFF(MimicBus).16.VerifiesamberAlternateLinelightisOFF.CUE:ReturnModeswitchisinAUTO.*17.[5.2.2.9]PlaceReturnModeswitchinAUTO(MimicBus).*17.PlacesReturnModeswitchinAUTO.CUE:AlarmLatchResetpushbuttonisdepressed.*18.[5.2.2.10]DepressAlarmLatchResetpushbutton(MimicBus).*18.DepressesAlarmLatchResetpushbutton.CUE:RetransferBlockedlightisOFF.19.[5.2.2.11]VerifyamberRetransferBlockedlightisOFF.19.VerifiesamberRetransferBlockedlightisOFF.CUE:SummaryAlarmlightisOFF.20.[5.2.2.12]VerifyamberSummaryAlarmlightisOFF(MimicBus).20.VerifiesamberSummaryAlarmlightisOFF.CUE:TheCRSacknowledgesthereport.21.InformtheControlRoomthatUPSA(B)hasbeentransferredbacktothenormalpowersupplyusingtheStaticTransferSwitch.21.InformstheControlRoomthatUPSA(B)isalignedtothenormalpowersupply.CUE:EndJPMwhenUPSA(B)hasbeentransferredbacktothenormalpowersupplyusingtheStaticTransferSwitch.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleTransferUPSfromNormaltoAlternatePowerusingStaticTransferSwitch(AltPath)No.:JP-OP-315-0262-003Revision:1Page6WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1EvaluatorNotes:StartthisJPMattheUPS.ThisJPMcanbeperformedoneitherUPS.ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:CMCswitcheswillturnREDandamperagewillincreasewhentheswitchisrotatedtothestartpositionstarted.Thecurrentshouldinitiallybefivetoseventimesthenormalrunningampswiththeammeterflashing.AscounterEMFisdeveloped,theamperagewilllowertothenormalrunningamperageandtheammeterwillnolongerflash.CMCswitcheswillturnGREENwhenthepumpsarestoppedandamperagewilldecreasetozero.Ex.:Pumpstart:"Switchhasbeenrotatedtothestartposition,redlightislit,greenlightisout,amperageinitiallypegsouthigh,andisnowindicating__X__amps."Pumpstop:"Switchhasbeenrotatedtothestopposition,greenlightislit,redlightisout,amperageindicates0amps."Remotelyoperatedvalvepositionisdeterminedwithopenandcloseindicatinglights.AREDlightonlywouldindicatethatthevalveisopen.AGREENlightonlywouldindicatethatthevalveisclosed.Dualindicationwouldindicatethatthevalveisinsomeintermediateposition.Manualvalvesarecheckedinthecloseddirection(MOP02andMOP05).Valvestempositionmayaidinvalvepositiondetermination,butcannotbeusedasIndependentVerification(MOP02).Ex.:Verifyvalveclosed:"Valvehandwheelindicatesnovalvemovementintheclockwisedirection."Verifyvalveopen:"Valvehandwheelhasbeenrotatedslightlyintheclockwisedirectionandreturnedtotheoriginalpositions."Closingavalve:"Valvehandwheelhasbeenrotatedinthefullyclockwisedirectionuntilnoadditionalvalvemovement.Valvestemisdown."Openingavalve:"Valvehandwheelhasbeenrotatedinthefullycounterclockwisedirectionuntilnoadditionalvalvemovement,valvestemisout."ControllershaveanAutolightthatisGREENwhenselectedandAMBER(YELLOW)whenManualisselected.WheninManual,theopenandclosedpushbuttonscontroltheparametertobechangedbyadjustingpositionorspeed.Whenthedeviationmeterisnulled,thentheprocesscanbeshiftedtoAutotoallowthedesiredsetpointtocontroltheprocess.SystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
K/A SYSTEM: 262002 - Uninterruptable Power Supply (A.C./D.C.)
JOBPERFORMANCEMEASUREJPMTitleTransferUPSfromNormaltoAlternatePowerusingStaticTransferSwitch(AltPath)No.:JP-OP-315-0262-003Revision:1Page7WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
K/A STATEMENT:
A2. Ability to (a) predict the impacts of UPS bus under voltage; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences A2.01 Under Voltage .......................................................................................................... 2.6 / 2.8 Maintenance Rule Safety Classification:
R3100-05 Maintenance Rule Risk Significant? (Yes or No)
No Work Instruction                                                                                                                            WI 5.14 Job Performance Measures                                                                                                                      Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static                                        Revision: 1 Transfer Switch (Alt Path)                                                                            Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                              STANDARD CUE:     Provide Examinee with Cue Sheet.
CUE:     Return Mode switch is in MAN.
* 1.     [5.1.2.1] Place Return Mode switch in
* 1. Places Return Mode switch in MAN.
MAN (Mimic Bus).
CUE:     Sync Switch is in ON.
: 2.     [5.1.2.2] Verify Sync Switch is in ON.           2. Verifies Sync Switch is in ON.
CUE:     Retransfer Blocked light is ON.
: 3.     [5.1.2.3] Verify amber Retransfer Blocked        3. Verifies amber Retransfer Blocked light is light is ON.                                         ON.
CUE:     Sync Monitor light is OFF.
: 4.     [5.1.2.4] Verify clear Sync Monitor light is    4. Verifies clear Sync Monitor light is OFF.
OFF (Mimic Bus).
CUE:     Test switch is in ALT LINE.
* 5.     [5.1.2.5] Place Test switch to ALT LINE
* 5. Places Test switch to ALT LINE.
(Mimic Bus).
CUE:     Alternate Line light is ON.
: 6.     [5.1.2.6] Verify amber Alternate Line light      6. Verifies amber Alternate Line light is ON.
is ON (Mimic Bus).
CUE:     Inverter light is OFF.
: 7.     [5.1.2.7] Verify red Inverter light is OFF      7. Verifies red Inverter light is OFF.
(Mimic Bus).
Alternate Path Begins Here CUE:     Control Room reports the UPS UNIT A/B TROUBLE alarm (3D22) has been received and requests local status of UPS Unit A(B).
CUE:     When examinee requests UPS Unit status, report that amber REGULATOR FAILURE light is ON, and the Static Transfer Switch Output voltage (UPS AC VOLTAGE) is reading 100 VAC.
NOTE: Examinee should recognize failure of Alternate Power Supply. This requires UPS to be transferred back to Normal.
CUE:     As Control Room, acknowledge status report. If not recommended by examinee, direct UPS transferred back to NORMAL (per 3D22)
: 8.     Determine status of UPS Unit A(B).               8. Reports UPS Unit status to Control Room.
CUE:     Alternate Line light is ON.
: 9.     [5.2.2.1] Verify amber Alternate Line light      9. Verifies amber Alternate Line light is ON.
is ON (Mimic Bus).
CUE:     Return Mode switch is in MAN.
: 10.     [5.2.2.2] Verify or place Return Mode          10. Verifies Return Mode switch in MAN.
switch in MAN (Mimic Bus).
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static                                      Revision: 1 Transfer Switch (Alt Path)                                                                          Page 5 ELEMENT                                            STANDARD CUE:     Test switch is in CENTER.
  *11.     [5.2.2.3] Verify or place Test switch in    *11. Places Test switch in CENTER.
CENTER (Mimic Bus).
CUE:     Sync Switch is in ON
: 12.     [5.2.2.4] Verify Sync Switch is in ON.       12. Verifies Sync Switch is in ON.
CUE:     Sync Monitor light is OFF.
: 13.     [5.2.2.5] Verify clear Sync Monitor light is  13. Verifies clear Sync Monitor light is OFF.
OFF (Mimic Bus).
CUE:     Reset pushbutton is depressed.
  *14.     [5.2.2.6] Depress Reset pushbutton          *14. Depresses Reset pushbutton.
(Mimic Bus).
CUE:     Red Inverter light is ON.
: 15.     [5.2.2.7] Verify red Inverter light is ON    15. Verifies red Inverter light is ON.
(Mimic Bus).
CUE:     Alternate Line light is OFF.
: 16.     [5.2.2.8] Verify amber Alternate Line light  16. Verifies amber Alternate Line light is OFF.
is OFF (Mimic Bus).
CUE:     Return Mode switch is in AUTO.
  *17.     [5.2.2.9] Place Return Mode switch in        *17. Places Return Mode switch in AUTO.
AUTO (Mimic Bus).
CUE:     Alarm Latch Reset pushbutton is depressed.
  *18.     [5.2.2.10] Depress Alarm Latch Reset        *18. Depresses Alarm Latch Reset pushbutton (Mimic Bus).                             pushbutton.
CUE:     Retransfer Blocked light is OFF.
: 19.     [5.2.2.11] Verify amber Retransfer            19. Verifies amber Retransfer Blocked light is Blocked light is OFF.                               OFF.
CUE:     Summary Alarm light is OFF.
: 20.     [5.2.2.12] Verify amber Summary Alarm        20. Verifies amber Summary Alarm light is light is OFF (Mimic Bus).                           OFF.
CUE:     The CRS acknowledges the report.
: 21.     Inform the Control Room that UPS A (B)       21. Informs the Control Room that UPS A (B) has been transferred back to the normal            is aligned to the normal power supply.
power supply using the Static Transfer Switch.
CUE:     End JPM when UPS A(B) has been transferred back to the normal power supply using the Static Transfer Switch.
______ SATISFACTORY                                    ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static                                    Revision: 1 Transfer Switch (Alt Path)                                                                        Page 6 Evaluator Notes:
Start this JPM at the UPS. This JPM can be performed on either UPS.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.
Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).
Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.
Verify valve open:   Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.
Closing a valve:     Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.
Opening a valve:     Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.
Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                    No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static                  Revision: 1 Transfer Switch (Alt Path)                                                    Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleTransferUPSfromNormaltoAlternatePowerusingStaticTransferSwitch(AltPath)No.:JP-OP-315-0262-003Revision:1Page8WorkInstructionWI5.14JobPerformanceMeasuresRev3Attachment1SimulatorSetupIC#:N/AMalfunctions:NumberTitleValueDelayRampN/ARemoteFunctions:NumberTitleValueDelayRampN/AOverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:N/A JOBPERFORMANCEMEASURECueSheet:(JP-OP-315-0262-003)InitialConditions:Youaretheextraoperatoronshift.InitiatingCue(s):TheControlRoomNSOdirectsyoutoshiftUPSA(B)PowerSupplyfromNormaltoAlternateusingtheStaticTransferSwitch.
===Response===
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRO/RONo.JP-OP-802-2001-211Revision5JPMTitleControlReactorPressurefromtheRemoteShutdownPanel(AltPath)Duration20minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Question:
Reference
 
===Response===
Work Instruction                                                                    WI 5.14 Job Performance Measures                                                              Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                    No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static                  Revision: 1 Transfer Switch (Alt Path)                                                    Page 8 Simulator Setup IC#:
N/A Malfunctions:
Number                              Title                  Value      Delay  Ramp N/A Remote Functions:
Number                              Title                  Value      Delay  Ramp N/A Override Functions:
Number                              Title                  Value      Delay  Ramp N/A Special Instructions:
N/A Work Instruction                                                                    WI 5.14 Job Performance Measures                                                              Rev 3 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0262-003)
Initial Conditions:
You are the extra operator on shift.
Initiating Cue(s):
The Control Room NSO directs you to shift UPS A (B) Power Supply from Normal to Alternate using the Static Transfer Switch.
 
JOB PERFORMANCE MEASURE Job Position                                                      No.                                   Revision SRO / RO                                                          JP-OP-802-2001-211                            5 JPM Title                                                          Duration                Page Control Reactor Pressure from the Remote Shutdown                    20 minutes                          1 Panel (Alt Path)
Examinee:                                                                           SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical                Start Time Evaluation Method:           Perform / Walkthrough / Discuss                        Stop Time Location:                   Plant / Simulator / Classroom                          Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*2.*3.*4.*5.*6.7.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleControlReactorPressurefromtheRemoteShutdownPanel(AltPath)No.:JP-OP-802-2001-211Revision:5Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U      Comment          Element S U            Comment          Element        S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleControlReactorPressurefromtheRemoteShutdownPanel(AltPath)No.:JP-OP-802-2001-211Revision:5Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:B2104-SafetyandReliefValvesTask:73750-ControlreactorpressureattheremoteshutdownpanelbyoperatingSRVAand/orB.
* 1.
* 2.
* 3.
* 4.
* 5.
* 6.
7.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Meets all            Opportunity for              Does not meet            Comment Operator Fundamental Expectations            Improvement                  Expectations              Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                                     /
Work Instruction                                                                                                      WI 5.14 Job Performance Measures                                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                            No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel                                                Revision: 5 (Alt Path)                                                                                                  Page 2 JPM Observation Criteria Fundamental              Meets all Expectations      Opportunity for Improvement      Does not meet Expectations Monitoring        Equipment status monitored at    Some monitoring was            Did not recognize key equipment proper frequency, using          performed but undue focus on    status indicators, too much focus multiple means if available. task or lack of system          on single indications and ignored Understood which indications    knowledge prevented ideal      total system status.
were critical.                   monitoring.
Control            Task preview used to prepare    Adequate control of system      No anticipation of results of for job. Aware of control bands  maintained throughout task but  actions. Unaware or control and maintained them.             some improvements could be      bands or not able to maintain Configuration control            made such as better manual      them. Lack of knowledge of how maintained.                     control or greater depth of    to control system parameters.
knowledge for anticipating system response.
Conservatism      Low threshold for identification Some opportunities existed to  Proceeds even when unsure with of problems. Questioning        question before proceeding,     unanswered questions. High attitude. Uses stop when        High focus on task completion  threshold for problem unsure if needed. Sensitive to  without consideration for other conditions.
nuclear safety.                 system affects.
Teamwork          Routinely communicates system    Communicated most status and    Routinely takes action without status changes to the team.     actions. Some improvement      informing the team.
Communicates actions before      would be warranted.
taking them.
Knowledge          Able to anticipate system        Plant, system, or generic      Unable to predict system response based on solid system  fundamental knowledge has      response, unsure of generic knowledge. Good working          some gaps.                     fundamentals concepts related knowledge of generic                                            to plant operation. Only relied on fundamentals to predict and                                      procedure for operating monitor system response.                                         knowledge.
Work Instruction                                                                                                  WI 5.14 Job Performance Measures                                                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel                                    Revision: 5 (Alt Path)                                                                                      Page 3 JPM Information System:
B2104 - Safety and Relief Valves Task:
73750 - Control reactor pressure at the remote shutdown panel by operating SRV A and/or B.


==References:==
==References:==
Required(R)/Available(A)AOP20.000.19,ShutdownfromOutsidetheControlRoom(R)ToolsandEquipmentRequired:NoneInitialConditions:YouaretheControlRoomNSO.Thecontrolroomisbeingevacuatedduetotoxicfumesmakingthecontrolroomuninhabitable.TheEast(A)CRDPumpcontrolswitchisintheRUNpositioninthemaincontrolroom.Division1RHRisinitsnormalstandbylineup.AGroup1isolationhasoccurred.InitiatingCue(s):TheCRSdirectsyoutocontrolreactorpressureandlevelinaccordancewithAOP20.000.19,ShutdownfromOutsidetheControlRoom.Allprerequisitesarecomplete.ConditionsAthroughDhavebeencompleted,andyouaretobeginatConditionE.YouaretoinformtheCRSwhenreactorpressureandlevelarebeingcontrolled.Youmayallowpressuretoriseslightlyabove1093psigtoallowLow-LowSetSRVstoarmandoperate.TerminatingCue(s):ReactorlevelandpressurearebeingcontrolledinaccordancewithAOP20.000.19.TaskStandard:ReactorpressureandreactorwaterlevelaremaintainedwithinallowablelimitsfromtheRemoteShutdownPanelinaccordancewith20.000.19ShutdownfromOutsidetheControlRoom.
Required (R) / Available (A)
JOBPERFORMANCEMEASUREJPMTitleControlReactorPressurefromtheRemoteShutdownPanel(AltPath)No.:JP-OP-802-2001-211Revision:5Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:3-ReactorPressureControlK/A
AOP 20.000.19, Shutdown from Outside the Control Room (R)
Tools and Equipment Required:
None Initial Conditions:
You are the Control Room NSO.
The control room is being evacuated due to toxic fumes making the control room uninhabitable.
The East (A) CRD Pump control switch is in the RUN position in the main control room. Division 1 RHR is in its normal standby lineup.
A Group 1 isolation has occurred.
Initiating Cue(s):
The CRS directs you to control reactor pressure and level in accordance with AOP 20.000.19, Shutdown from Outside the Control Room.
All prerequisites are complete.
Conditions A through D have been completed, and you are to begin at Condition E.
You are to inform the CRS when reactor pressure and level are being controlled.
You may allow pressure to rise slightly above 1093 psig to allow Low-Low Set SRVs to arm and operate.
Terminating Cue(s):
Reactor level and pressure are being controlled in accordance with AOP 20.000.19.
Task Standard:
Reactor pressure and reactor water level are maintained within allowable limits from the Remote Shutdown Panel in accordance with 20.000.19 Shutdown from Outside the Control Room.
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                          No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel                                                                    Revision: 5 (Alt Path)                                                                                                                      Page 4 Licensed Operator Exam Information (required for NRC exams)
Safety Function:
3 - Reactor Pressure Control K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:295016-ControlRoomAbandonmentK/ASTATEMENT:AA1Abilitytooperateand/ormonitorthefollowingastheyapplytoCONTROLROOMABANDONMENT:(CFR:41.7/45.6)AA1.08ReactorPressure.............................................................................................4.0/4.0MaintenanceRuleSafetyClassification:B2104-03MaintenanceRuleRiskSignificant?(YesorNo)Yes JOBPERFORMANCEMEASUREJPMTitleControlReactorPressurefromtheRemoteShutdownPanel(AltPath)No.:JP-OP-802-2001-211Revision:5Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvidetheexamineetheCueSheet.*1.[E.1]PositionCMCswitchestomatchthoseoftheMainControlRoom.*1.PlacestheEast(A)CRDPumpCMCSWITCHinRun.*2.[E.2]PlacethefollowingtransferswitchestoON:a.C3500-M130,Div.2DCTransferSwitchb.C3500-M131,BOPTransferSwitchc.C3500-M134,SwingBusTransferSwitchd.C3500-M132,Div.IDCTransferSwitche.C3500-M133,Div.IACTransferSwitch*2.Rotateseachswitchclockwiseabout45degreestotheONposition.*3.[E.3]PlacetheRCICRmHighTempIsolationDefeat(LogicA)inBYPASS*3.RotatestheswitchclockwisetotheBYPASSposition.*4.[E.4]PlacetheRCICRmHighTempIsolationDefeat(LogicB)inBYPASS.*4.RotatestheswitchclockwisetotheBYPASSpositionNOTE:Thecandidatemaydecidetocontrolpressurefirstiflevelinitiallyappearsnormal.Ifso,thecandidatewillreturntothissteplater.*5.[E.5]MaintainReactorWaterLevelbetween174and214inchesusingoneofthefollowing:a.RCICb.CRD*5.DepressesandholdsRCICINITIATEpushbuttonontheRSDPanel,untilflowisindicatedonC35-R006,RCICPumpDischargeFlowIndicator,orOperatestheCRDpumpsasnecessary.AlternatePathBeginsHereNOTE:SRVAhasfailedclosed,andwillnotoperateinLow-LowSet.WhentheexamineenoticesthatSRVAdoesnotreopenafterinitialclosure,hewillbeforcedtouseSRVBtocontrolreactorpressure.*6.[E.6]MaintainReactorPressurebetween900and1050psigbyusingB2104-F013Aand/orB2104-F013B.*6.AllowspressuretorisetoobserveSRVAoperateinLow-LowSet,thendeterminesthatBOTHLow-LowSetSRVshavefailed.OperatesSRV"B"usingtheopenandclosedpushbuttonstocontrolreactorpressure..CUE:IFasked,informtheexamineethatToruscoolingisnotrequiredtobeplacedinserviceperSMinstructions.7.Oncepressureandlevelarebeingcontrolled,informCRS.7.ExamineeinformsCRSthatpressureandlevelarebeingcontrolled.CUE:EndJPMwhenreactorlevelandpressureiswithintheproperbandsinaccordancewithAOP20.000.19.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleControlReactorPressurefromtheRemoteShutdownPanel(AltPath)No.:JP-OP-802-2001-211Revision:5Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:TheRemoteShutdownPanelintheSimulatorwillbeusedtoperformthisJPM.ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:CMCswitcheswillturnREDandamperagewillincreasewhentheswitchisrotatedtothestartpositionstarted.Thecurrentshouldinitiallybefivetoseventimesthenormalrunningampswiththeammeterflashing.AscounterEMFisdeveloped,theamperagewilllowertothenormalrunningamperageandtheammeterwillnolongerflash.CMCswitcheswillturnGREENwhenthepumpsarestoppedandamperagewilldecreasetozero.Remotelyoperatedvalvepositionisdeterminedwithopenandcloseindicatinglights.AREDlightonlywouldindicatethatthevalveisopen.AGREENlightonlywouldindicatethatthevalveisclosed.Dualindicationwouldindicatethatthevalveisinsomeintermediateposition.ControllershaveanAutolightthatisGREENwhenselectedandAMBER(YELLOW)whenManualisselected.WheninManual,theopenandclosedpushbuttonscontroltheparametertobechangedbyadjustingpositionorspeed.Whenthedeviationmeterisnulled,thentheprocesscanbeshiftedtoAutotoallowthedesiredsetpointtocontroltheprocess.SystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleControlReactorPressurefromtheRemoteShutdownPanel(AltPath)No.:JP-OP-802-2001-211Revision:5Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
K/A SYSTEM: 295016 - Control Room Abandonment K/A STATEMENT:
AA1      Ability to operate and/or monitor the following as they apply to CONTROL ROOM ABANDONMENT : (CFR: 41.7 / 45.6)
AA1.08 Reactor Pressure .............................................................................................4.0 / 4.0 Maintenance Rule Safety Classification:
B2104-03 Maintenance Rule Risk Significant? (Yes or No)
Yes Work Instruction                                                                                                                      WI 5.14 Job Performance Measures                                                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel                                        Revision: 5 (Alt Path)                                                                                        Page 5 PERFORMANCE EVALUATION Start Time ELEMENT                                            STANDARD CUE:     Provide the examinee the Cue Sheet.
* 1.   [E.1] Position CMC switches to match those
* 1. Places the East (A) CRD Pump CMC of the Main Control Room.                             SWITCH in Run.
* 2.   [E.2] Place the following transfer switches to
* 2. Rotates each switch clockwise about ON:                                                  45 degrees to the ON position.
: a. C3500-M130, Div. 2 DC Transfer Switch
: b. C3500-M131, BOP Transfer Switch
: c. C3500-M134, Swing Bus Transfer Switch
: d. C3500-M132, Div. I DC Transfer Switch
: e. C3500-M133, Div. I AC Transfer Switch
* 3.   [E.3] Place the RCIC Rm High Temp
* 3. Rotates the switch clockwise to the BYPASS Isolation Defeat (Logic A) in BYPASS                  position.
* 4.   [E.4] Place the RCIC Rm High Temp
* 4. Rotates the switch clockwise to the BYPASS Isolation Defeat (Logic B) in BYPASS.                 position NOTE: The candidate may decide to control pressure first if level initially appears normal. If so, the candidate will return to this step later.
* 5.   [E.5] Maintain Reactor Water Level between
* 5. Depresses and holds RCIC INITIATE 174 and 214 inches using one of the                  pushbutton on the RSD Panel, until flow is following:                                            indicated on C35-R006, RCIC Pump Discharge Flow Indicator, or
: a. RCIC
: b. CRD                                                Operates the CRD pumps as necessary.
Alternate Path Begins Here NOTE: SRV A has failed closed, and will not operate in Low-Low Set. When the examinee notices that SRV A does not reopen after initial closure, he will be forced to use SRV B to control reactor pressure.
* 6.   [E.6] Maintain Reactor Pressure between
* 6. Allows pressure to rise to observe SRV A 900 and 1050 psig by using B2104-F013A                operate in Low-Low Set, then determines and/or B2104-F013B.                                   that BOTH Low-Low Set SRVs have failed.
Operates SRV B using the open and closed pushbuttons to control reactor pressure..
CUE:     IF asked, inform the examinee that Torus cooling is not required to be placed in service per SM instructions.
: 7. Once pressure and level are being                  7. Examinee informs CRS that pressure and controlled, inform CRS.                               level are being controlled.
CUE:     End JPM when reactor level and pressure is within the proper bands in accordance with AOP 20.000.19.
______ SATISFACTORY                                    ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel                                    Revision: 5 (Alt Path)                                                                                      Page 6 Evaluator Notes:
The Remote Shutdown Panel in the Simulator will be used to perform this JPM .
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel                  Revision: 5 (Alt Path)                                                                    Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleControlReactorPressurefromtheRemoteShutdownPanel(AltPath)No.:JP-OP-802-2001-211Revision:5Page8WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:IC-20,oranyfullpowerIC.Malfunctions:NumberTitleValueDelayRampB21MF0102SpuriousMainSteamIsolationACTIVE00B21MF0023MainSteamSRVFailureB2100-F013A10040B21MF0029MainSteamSRVFailureB2100-F013G000B21MF0023MainSteamSRVFailureB2100-F013A000cd='H_P601_C006_1LT855'RemoteFunctions:NumberTitleValueDelayRampNoneOverrideFunctions:NumberTitleValueDelayRampP603_A048_1ReactorModeShutdownHandlePos.110P804_A061_2TurbineTripArmedPos120P804_A061_3TurbineTripTripSwitch130P601_B220_1LowLowSetDiv2ResetSwitch110cd='H_P601_C006_1LT855'P601_B217_1LowLowSetDiv1ResetSwitch110cd='H_P601_C006_1LT855'P601_B220_1LowLowSetDiv2ResetSwitch-120cd='H_P601_C006_1LT855'P601_B217_1LowLowSetDiv1ResetSwitch-120cd='H_P601_C006_1LT855'SpecialInstructions:1.InitializesimulatortodesiredIC.2.IfNOTinasavedICforthisJPM:a.PlacesimulatorinRUNb.OpenandexecuteLessonJP2001-211.lsn.c.Whenlessonhascompletedexecution,placethesimulatorinFREEZE.3.WhenreadytostarttheJPM,placethesimulatorinRUN.
===Response===
JOBPERFORMANCEMEASURECueSheet:(JP-OP-802-2001-211)InitialConditions:YouaretheControlRoomNSO.Theplantisbeginningtheprocessofbeingshutdownfromoutsidethecontrolroomduetotoxicfumesmakingthecontrolroomuninhabitable.The"East"or"A"CRDPumpcontrolswitchisintheRUNpositioninthemaincontrolroom.Division1RHRisinitsnormalstandbylineup.AGroup1Isolationhasoccurred.InitiatingCue(s):TheCRSdirectsyoutocontrolreactorpressureandlevelIAWAOP20.000.19,ShutdownfromOutsidetheControlRoom.Allprerequisitesarecomplete.AOP20.000.19,ConditionsAthroughDhavebeencompleted,andyouaretobeginatE.YouaretoinformtheCRSwhenreactorpressureandlevelarebeingcontrolled.Youmayallowpressuretoriseslightlyabove1093toallowLow-LowSetSRVstoarmandoperate.
Question:
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRO/RONo.JP-OP-802-2104-212Revision4JPMTitleRespondtoMultipleControlRodDriftsandRPSFailureDuration3minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel                                Revision: 5 (Alt Path)                                                                                  Page 8 Simulator Setup IC#:
IC-20, or any full power IC.
Malfunctions:
Number                                Title                            Value      Delay  Ramp B21MF0102                  Spurious Main Steam Isolation                ACTIVE        0        0 B21MF0023              Main Steam SRV Failure B2100-F013A                100          4        0 B21MF0029              Main Steam SRV Failure B2100-F013G                  0          0        0 B21MF0023              Main Steam SRV Failure B2100-F013A                  0          0        0 cd=H_P601_C006_1 LT 855 Remote Functions:
Number                                Title                            Value      Delay  Ramp None Override Functions:
Number                                Title                            Value      Delay  Ramp P603_A048_1            Reactor Mode Shutdown Handle Pos.                   1          1        0 P804_A061_2                  Turbine Trip Armed Pos                        1          2        0 P804_A061_3                  Turbine Trip Trip Switch                      1          3        0 P601_B220_1              Low Low Set Div 2 Reset Switch                    1          1        0 cd=H_P601_C006_1 LT 855 P601_B217_1                Low Low Set Div 1Reset Switch                    1          1        0 cd=H_P601_C006_1 LT 855 P601_B220_1              Low Low Set Div 2 Reset Switch                  -1          2        0 cd=H_P601_C006_1 LT 855 P601_B217_1              Low Low Set Div 1 Reset Switch                  -1          2        0 cd=H_P601_C006_1 LT 855 Special Instructions:
: 1. Initialize simulator to desired IC.
: 2. If NOT in a saved IC for this JPM:
: a. Place simulator in RUN
: b. Open and execute Lesson JP2001-211.lsn.
: c. When lesson has completed execution, place the simulator in FREEZE.
: 3. When ready to start the JPM, place the simulator in RUN.
Work Instruction                                                                                  WI 5.14 Job Performance Measures                                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-2001-211)
Initial Conditions:
You are the Control Room NSO.
The plant is beginning the process of being shutdown from outside the control room due to toxic fumes making the control room uninhabitable.
The East or A CRD Pump control switch is in the RUN position in the main control room. Division 1 RHR is in its normal standby lineup.
A Group 1 Isolation has occurred.
Initiating Cue(s):
The CRS directs you to control reactor pressure and level IAW AOP 20.000.19, Shutdown from Outside the Control Room.
All prerequisites are complete.
AOP 20.000.19, Conditions A through D have been completed, and you are to begin at E.
You are to inform the CRS when reactor pressure and level are being controlled.
You may allow pressure to rise slightly above 1093 to allow Low-Low Set SRVs to arm and operate.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-OP-802-2104-212                        4 JPM Title                                                    Duration            Page Respond to Multiple Control Rod Drifts and RPS Failure          3 minutes                        1 Examinee:                                                                     SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment1.2.*3.4.*5.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleRespondtoMultipleControlRodDriftsandRPSFailureNo.:JP-OP-802-2104-212Revision:4Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U    Comment        Element  S    U    Comment        Element      S    U    Comment 1.
JOBPERFORMANCEMEASUREJPMTitleRespondtoMultipleControlRodDriftsandRPSFailureNo.:JP-OP-802-2104-212Revision:4Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:C1100-ControlRodDriveHydraulicSystemTask:75357-PerformImmediateActionsforControlRodDrift
2.
        *3.
4.
        *5.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations          Improvement              Expectations            Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure                                        Revision: 4 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was        Did not recognize key at proper frequency, using    performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system  too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.               monitoring.               system status.
Control            Task preview used to          Adequate control of system No anticipation of results of prepare for job. Aware of    maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.             could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                   greater depth of knowledge parameters.
for anticipating system response.
Conservatism      Low threshold for            Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on  High threshold for problem stop when unsure if        task completion without    conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic  Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure                                      Revision: 4 Page 3 JPM Information System:
C1100 - Control Rod Drive Hydraulic System Task:
75357 - Perform Immediate Actions for Control Rod Drift


==References:==
==References:==
Required(R)/Available(A)3D80,ControlRodDrift(R)20.106.07,ControlRodDrift(A)23.106,ControlRodDriveHydraulicSystem(A)ODE-10,EmergencyOperatingProcedureExpectations(A)ToolsandEquipmentRequired:NoneInitialConditions:YouaretheP603Operator.Plantconditionsareasyouseethem.InitiatingCue(s):Respondtoconditionsinaccordancewithplantprocedures.Anotheroperatorwilladdressplantalarmsnotassociatedwiththistask.TerminatingCue(s):ModeSwitchisinSHUTDOWN,RPShasactuatedusingManualScrampushbuttonsandallrodsarefullyinserted.TaskStandard:ExamineeplacesModeSwitchinShutdownduetomultipleroddrifts.ThenheidentifiesfailureofModeSwitchanddepressesManualScramPushbuttonsresultinginafullscram.
Required (R) / Available (A) 3D80, Control Rod Drift (R) 20.106.07, Control Rod Drift (A) 23.106, Control Rod Drive Hydraulic System (A)
JOBPERFORMANCEMEASUREJPMTitleRespondtoMultipleControlRodDriftsandRPSFailureNo.:JP-OP-802-2104-212Revision:4Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction/Category:7-Instrumentation11-AbnormalPlantEvolutionsK/A
ODE-10, Emergency Operating Procedure Expectations (A)
Tools and Equipment Required:
None Initial Conditions:
You are the P603 Operator.
Plant conditions are as you see them.
Initiating Cue(s):
Respond to conditions in accordance with plant procedures.
Another operator will address plant alarms not associated with this task.
Terminating Cue(s):
Mode Switch is in SHUTDOWN, RPS has actuated using Manual Scram pushbuttons and all rods are fully inserted.
Task Standard:
Examinee places Mode Switch in Shutdown due to multiple rod drifts. Then he identifies failure of Mode Switch and depresses Manual Scram Pushbuttons resulting in a full scram.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                  No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure                                                              Revision: 4 Page 4 Licensed Operator Exam Information (required for NRC exams)
Safety Function/Category:
7 - Instrumentation 11- Abnormal Plant Evolutions K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:212000-ReactorProtectionSystemK/ASTATEMENT:A2.Abilityto(a)predicttheimpactsofthefollowingontheREACTORPROTECTIONSYSTEM;and(b)basedonthosepredictions,useprocedurestocorrect,control,ormitigatetheconsequencesofthoseabnormalconditionsoroperations:A2.16Changingmodeswitchposition..........................................................................4.0/4.1MaintenanceRuleSafetyClassification:C7100-02MaintenanceRuleRiskSignificant?(YesorNo)Yes JOBPERFORMANCEMEASUREJPMTitleRespondtoMultipleControlRodDriftsandRPSFailureNo.:JP-OP-802-2104-212Revision:4Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvideExamineewithCUESHEET.Afterexamineestatesheisready,informhimhehascontrol,thencuetheconsoleoperatortotriggertheroddrifts.CUE:AsCRS,acknowledgealarmreport.1.Respondtoalarm3D80,CONTROLRODDRIFT.1.CallsoutalarmandreviewsARP.CUE:AsCRS,acknowledgereport.AnnounceentryintoAOP20.106.07,ControlRodDrift.NOTE:Actionsforsinglecontrolroddriftneednotbecompletedintheirentiretybeforeinitiationofmultipleroddrifts.2.[1.]VerifyRodDriftasfollows:*RedRodDriftlightONatFullCoreDisplay.*Rodmovingoutorintocore.*NuclearInstrumentationforpowerchangescausedbymovingControlRods.2.UsingFullCoreDisplay,identifiesdriftingrod10-15.Ifrod10-15isSELECTED,rodisdriftingIN.ReportsdriftingrodtoCRS.CUE:AsCRS,acknowledgereport.Ifexamineeasksfordirection,directhimtoperformtherequiredproceduralactions.*3.Examineeobservesandidentifiesmultiplecontrolrodsdrifting.*3.Examineeidentifiesandreportsmultiplecontrolrodsaredrifting.AlternatePathBeginsHere(RPSFailure)4.[IA.1]PlaceReactorModeSwitchinSHUTDOWN.4.ImmediateactionstoplacethemodeswitchinSHUTDOWNarecarriedoutwithoutdirectionwhenrequiredby20.106.07,ControlRodDrift.ExamineeidentifiesRPSdidnotactuate.*5.[ODE-10]IfoneorbothdivisionsofRPSfailtoactuateafterModeSwitchinShutdown,examineedepressesRPSManualScramPushbuttonsandmonitorsforproperoperationofRPS.*5.ManualScramPushbuttonsaredepressed.CUE:EndJPMwhenRPShasbeenactuatedusingManualScrampushbuttons,andallrodsarefullyinserted.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleRespondtoMultipleControlRodDriftsandRPSFailureNo.:JP-OP-802-2104-212Revision:4Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:CMCswitcheswillturnREDandamperagewillincreasewhentheswitchisrotatedtothestartpositionstarted.Thecurrentshouldinitiallybefivetoseventimesthenormalrunningampswiththeammeterflashing.AscounterEMFisdeveloped,theamperagewilllowertothenormalrunningamperageandtheammeterwillnolongerflash.CMCswitcheswillturnGREENwhenthepumpsarestoppedandamperagewilldecreasetozero.Remotelyoperatedvalvepositionisdeterminedwithopenandcloseindicatinglights.AREDlightonlywouldindicatethatthevalveisopen.AGREENlightonlywouldindicatethatthevalveisclosed.Dualindicationwouldindicatethatthevalveisinsomeintermediateposition.ControllershaveanAutolightthatisGREENwhenselectedandAMBER(YELLOW)whenManualisselected.WheninManual,theopenandclosedpushbuttonscontroltheparametertobechangedbyadjustingpositionorspeed.Whenthedeviationmeterisnulled,thentheprocesscanbeshiftedtoAutotoallowthedesiredsetpointtocontroltheprocess.SystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleRespondtoMultipleControlRodDriftsandRPSFailureNo.:JP-OP-802-2104-212Revision:4Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
K/A SYSTEM: 212000 - Reactor Protection System K/A STATEMENT:
A2.       Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM ;
and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:
A2.16 Changing mode switch position..........................................................................4.0 / 4.1 Maintenance Rule Safety Classification:
C7100-02 Maintenance Rule Risk Significant? (Yes or No)
Yes Work Instruction                                                                                                              WI 5.14 Job Performance Measures                                                                                                        Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure                                        Revision: 4 Page 5 PERFORMANCE EVALUATION Start Time ELEMENT                                            STANDARD CUE:     Provide Examinee with CUE SHEET. After examinee states he is ready, inform him he has control, then cue the console operator to trigger the rod drifts.
CUE:     As CRS, acknowledge alarm report.
: 1.     Respond to alarm 3D80, CONTROL ROD            1. Calls out alarm and reviews ARP.
DRIFT.
CUE:     As CRS, acknowledge report. Announce entry into AOP 20.106.07, Control Rod Drift.
NOTE: Actions for single control rod drift need not be completed in their entirety before initiation of multiple rod drifts.
: 2.     [1.] Verify Rod Drift as follows:             2. Using Full Core Display, identifies drifting
* Red Rod Drift light ON at Full Core                rod 10-15.
Display.
If rod 10-15 is SELECTED, rod is drifting
* Rod moving out or into core.
IN.
* Nuclear Instrumentation for power changes caused by moving Control                  Reports drifting rod to CRS.
Rods.
CUE:     As CRS, acknowledge report. If examinee asks for direction, direct him to perform the required procedural actions.
* 3.     Examinee observes and identifies multiple
* 3. Examinee identifies and reports multiple control rods drifting.                               control rods are drifting.
Alternate Path Begins Here (RPS Failure)
: 4.     [IA.1] Place Reactor Mode Switch in            4. Immediate actions to place the mode SHUTDOWN.                                           switch in SHUTDOWN are carried out without direction when required by 20.106.07, Control Rod Drift.
Examinee identifies RPS did not actuate.
* 5.     [ODE-10] If one or both divisions of RPS
* 5. Manual Scram Pushbuttons are fail to actuate after Mode Switch in                depressed.
Shutdown, examinee depresses RPS Manual Scram Pushbuttons and monitors for proper operation of RPS.
CUE:     End JPM when RPS has been actuated using Manual Scram pushbuttons, and all rods are fully inserted.
______ SATISFACTORY                                    ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                    Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure                                      Revision: 4 Page 6 Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.
System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure                  Revision: 4 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleRespondtoMultipleControlRodDriftsandRPSFailureNo.:JP-OP-802-2104-212Revision:4Page8WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:IC-19(oranyfullpowerIC)Malfunctions:NumberTitleValueDelayRampStepC11MF0109ControlRod10-15DriftInACTIVE001C11MF0067ControlRod06-27DriftIn*SeeNOTE1ACTIVE1002C11MF0283ControlRod18-27DriftIn*SeeNOTE1ACTIVE1302C11MF0661ControlRod34-39DriftIn*SeeNOTE1ACTIVE1602C11MF0859ControlRod42-51DriftIn*SeeNOTE1ACTIVE1902C11MF1039ControlRod54-27DriftIn*SeeNOTE1ACTIVE2202C11MF0109ControlRod10-15DriftInCLEAR003RemoteFunctions:NumberTitleValueDelayRampStepN/AOverrideFunctions:NumberTitleValueDelayRampStepP603_A048_4ReactorModeRunHandlePos1001*NOTE1-ConditionalonP603_A071_1EQ1(RodDriftResetSwitchinRESET)SpecialInstructions:1.InitializethesimulatortothedesiredICandplaceinRUN.2.OpenandexecuteLessonJP2104-212.lsn,orloadthemalfunctions/overridesaslistedabove.3.Triggerthefirstcontrolroddriftwhencuedbyexaminer.4.Trigger"DisarmCR10-15"whencuedbyexaminer.
===Response===
JOBPERFORMANCEMEASURECueSheet(JP-OP-802-2104-212)InitialConditions:YouaretheP603Operator.Plantconditionsareasyouseethem.InitiatingCue(s):Respondtoconditionsinaccordancewithplantprocedures.Anotheroperatorwilladdressplantalarmsnotassociatedwiththistask.
Question:
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRO/RONo.JP-OP-802-3006-321Revision3JPMTitleDefeatRBCCW/EECWtoDrywellIsolationsDuration25minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                              No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure                                Revision: 4 Page 8 Simulator Setup IC#:
IC-19 (or any full power IC)
Malfunctions:
Number                          Title                          Value Delay    Ramp      Step C11MF0109                Control Rod 10-15 Drift In          ACTIVE    0          0        1 C11MF0067        Control Rod 06-27 Drift In* See NOTE 1      ACTIVE  10          0        2 C11MF0283        Control Rod 18-27 Drift In* See NOTE 1      ACTIVE  13          0        2 C11MF0661        Control Rod 34-39 Drift In* See NOTE 1      ACTIVE  16          0        2 C11MF0859        Control Rod 42-51 Drift In* See NOTE 1      ACTIVE  19          0        2 C11MF1039        Control Rod 54-27 Drift In* See NOTE 1      ACTIVE  22          0        2 C11MF0109                Control Rod 10-15 Drift In            CLEAR    0          0        3 Remote Functions:
Number                          Title                          Value Delay    Ramp      Step N/A Override Functions:
Number                          Title                          Value Delay    Ramp      Step P603_A048_4        Reactor Mode Run Handle Pos                    1    0          0        1
* NOTE 1 - Conditional on P603_A071_1 EQ 1 (Rod Drift Reset Switch in RESET)
Special Instructions:
: 1. Initialize the simulator to the desired IC and place in RUN.
: 2. Open and execute Lesson JP2104-212.lsn, or load the malfunctions/overrides as listed above.
: 3. Trigger the first control rod drift when cued by examiner.
: 4. Trigger "Disarm CR 10-15" when cued by examiner.
Work Instruction                                                                                WI 5.14 Job Performance Measures                                                                          Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet (JP-OP-802-2104-212)
Initial Conditions:
You are the P603 Operator.
Plant conditions are as you see them.
Initiating Cue(s):
Respond to conditions in accordance with plant procedures.
Another operator will address plant alarms not associated with this task.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-OP-802-3006-321                        3 JPM Title                                                    Duration              Page Defeat RBCCW/EECW to Drywell Isolations                        25 minutes                        1 Examinee:                                                                   SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*2.*3.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleDefeatRBCCW/EECWtoDrywellIsolationsNo.:JP-OP-802-3006-321Revision:3Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U      Comment        Element    S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleDefeatRBCCW/EECWtoDrywellIsolationsNo.:JP-OP-802-3006-321Revision:3Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:P4400-EECW/RBCCWTask:51995-DefeatRBCCW/EECWCoolingWatertoDrywellIsolations
* 1.
* 2.
* 3.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations            Improvement            Expectations              Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                              WI 5.14 Job Performance Measures                                                                                        Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations                                                          Revision: 3 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                  Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was          Did not recognize key at proper frequency, using    performed but undue focus    equipment status indicators, multiple means if available. on task or lack of system    too much focus on single Understood which indications  knowledge prevented ideal    indications and ignored total were critical.               monitoring.                   system status.
Control            Task preview used to prepare  Adequate control of system    No anticipation of results of for job. Aware of control    maintained throughout task    actions. Unaware or control bands and maintained them. but some improvements        bands or not able to maintain Configuration control        could be made such as better  them. Lack of knowledge of maintained.                   manual control or greater    how to control system depth of knowledge for        parameters.
anticipating system response.
Conservatism      Low threshold for            Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding,   with unanswered questions.
Questioning attitude. Uses    High focus on task            High threshold for problem stop when unsure if        completion without            conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status      Routinely takes action without system status changes to the  and actions. Some            informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic    Unable to predict system response based on solid      fundamental knowledge has    response, unsure of generic system knowledge. Good        some gaps.                    fundamentals concepts working knowledge of generic                                related to plant operation.
fundamentals to predict and                                Only relied on procedure for monitor system response.                                    operating knowledge.
Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                            No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations                                                                                      Revision: 3 Page 3 JPM Information System:
P4400 - EECW / RBCCW Task:
51995 - Defeat RBCCW/EECW Cooling Water to Drywell Isolations


==References:==
==References:==
Required(R)/Available(A)29.ESP.23,DefeatofRBCCW/EECWtoDrywell(R)ODE-14,Attachment9,EnergizedEquipmentWorkPermit(A)ToolsandEquipmentRequired:NoneInitialConditions:YouaretheControlRoomNSO.EOPflowchartsdirectdefeatofRBCCW/EECWIsolations.InitiatingCue(s):TheCRSdirectsyoutodefeatRBCCW/EECWIsolationsper29.ESP.23.TerminatingCue(s):RBCCW/EECWIsolationisdefeatedper29.ESP.23.TaskStandard:RBCCW/EECWIsolationisdefeatedper29.ESP.23.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:SF-8PlantServiceSystemsK/A
Required (R) / Available (A) 29.ESP.23, Defeat of RBCCW/EECW to Drywell (R)
ODE-14, Attachment 9, Energized Equipment Work Permit (A)
Tools and Equipment Required:
None Initial Conditions:
You are the Control Room NSO.
EOP flowcharts direct defeat of RBCCW/EECW Isolations.
Initiating Cue(s):
The CRS directs you to defeat RBCCW/EECW Isolations per 29.ESP.23.
Terminating Cue(s):
RBCCW/EECW Isolation is defeated per 29.ESP.23.
Task Standard:
RBCCW/EECW Isolation is defeated per 29.ESP.23.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
SF-8 Plant Service Systems K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:295024-HighDrywellPressureK/ASTATEMENT:EA1.Abilitytooperateand/ormonitorthefollowingastheyapplytoHIGHDRYWELLPRESSURE:EA1.07PCIS/NSSSS........................................................................................................3.8/3.9MaintenanceRuleSafetyClassification:P4400-01MaintenanceRuleRiskSignificant?(YesorNo)Yes JOBPERFORMANCEMEASUREJPMTitleDefeatRBCCW/EECWtoDrywellIsolationsNo.:JP-OP-802-3006-321Revision:3Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDNOTE:Cuesareindicatedonthelineabove(justpriorto)thestepforwhichtheyare/mayberequired.CUE:ProvideexamineewithCueSheet.AfterSMEOPLockerisopened,provideexamineewithcopyof29.ESP.23andODE-14,Attachment9.*1.[1.1]RetrieveEOPDefeatPackagefromSMEOPLocker.*1.EOPDefeatPackageretrievedfromSMEOPLocker.NOTE:WhileworkingintheRelayRoompanels,allconductivejewelryshouldberemoved,andsafetyglassesand100%cottonlongsleevesshouldbeworn.CUE:TheLeadatTerminalB-171islifted.*2.[2.1]AtRRH11-P857,liftleadatTerminalB-171(Division1).*2.LeadatTerminalB-171lifted.CUE:TheLeadatTerminalE-191islifted.*3.[2.2]AtRRH11-P870,liftleadatTerminalE-191(Division2).*3.LeadatTerminalE-191lifted.CUE:EndJPMwhenRBCCW/EECWIsolationisdefeatedper29.ESP.23.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleDefeatRBCCW/EECWtoDrywellIsolationsNo.:JP-OP-802-3006-321Revision:3Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:EnsureSMinformedofJPMwalkthroughinrelayroomandcabinetdoorsopenedforwalkthroughofthistask.StoptheJPMif,atanytime,thisJPMinterfereswithplantoperation.ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:CMCswitcheswillturnREDandamperagewillincreasewhentheswitchisrotatedtothestartpositionstarted.Thecurrentshouldinitiallybefivetoseventimesthenormalrunningampswiththeammeterflashing.AscounterEMFisdeveloped,theamperagewilllowertothenormalrunningamperageandtheammeterwillnolongerflash.CMCswitcheswillturnGREENwhenthepumpsarestoppedandamperagewilldecreasetozero.Ex.:Pumpstart:"Switchhasbeenrotatedtothestartposition,redlightislit,greenlightisout,amperageinitiallypegsouthigh,andisnowindicating__X__amps."Pumpstop:"Switchhasbeenrotatedtothestopposition,greenlightislit,redlightisout,amperageindicates0amps."Remotelyoperatedvalvepositionisdeterminedwithopenandcloseindicatinglights.AREDlightonlywouldindicatethatthevalveisopen.AGREENlightonlywouldindicatethatthevalveisclosed.Dualindicationwouldindicatethatthevalveisinsomeintermediateposition.Manualvalvesarecheckedinthecloseddirection(MOP02andMOP05).Valvestempositionmayaidinvalvepositiondetermination,butcannotbeusedasIndependentVerification(MOP02).Ex.:Verifyvalveclosed:"Valvehandwheelindicatesnovalvemovementintheclockwisedirection."Verifyvalveopen:"Valvehandwheelhasbeenrotatedslightlyintheclockwisedirectionandreturnedtotheoriginalpositions."Closingavalve:"Valvehandwheelhasbeenrotatedinthefullyclockwisedirectionuntilnoadditionalvalvemovement.Valvestemisdown."Openingavalve:"Valvehandwheelhasbeenrotatedinthefullycounterclockwisedirectionuntilnoadditionalvalvemovement,valvestemisout."ControllershaveanAutolightthatisGREENwhenselectedandAMBER(YELLOW)whenManualisselected.WheninManual,theopenandclosedpushbuttonscontroltheparametertobechangedbyadjustingpositionorspeed.Whenthedeviationmeterisnulled,thentheprocesscanbeshiftedtoAutotoallowthedesiredsetpointtocontroltheprocess.SystemSpecificNotesandCues:ESPDefeatsareinstalledeitherbyinstallingajumper,liftingleads,orremovingaplug-inrelayorfuse.InstallingJumpers:EnsuretheoperatorgoestotheSMandobtainsthekeytotheEOPcabinet.Uponunlockingthecabinet,theoperatorfindsthecorrectpackageandensurestheproperequipmentisinthepackage.Pertheattacheddrawing,locatethepanelandverifythepanelopenediscorrectandtheoperatorhasopenedthecorrectsidedoor.Withinthepanel,locatetheproperterminalstripandverifythattheproperterminalnumberisselected.Usingpropersafetytechniques,ajumperislandedoneachterminalensuringthatnootherterminalistouchedorcabinetgroundistouchedwiththefreeend.Repeatuntilalljumpersareinstalledperthepackage.Forsomecabinets,theterminalsareseparatedloadtosourcesideoftheterminalpointbyaKnifeSwitch.InthesecabinetsthedirectionoftheESPhastheknifeswitchscrewunlockedandopenedpriortoinstallingthedefeat.Thiswillbespelledoutandthenthesamerulesasaboveapply.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleDefeatRBCCW/EECWtoDrywellIsolationsNo.:JP-OP-802-3006-321Revision:3Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1Whenbothendsaresafelylandedonalljumpersperthepackageintheproperlocation,theoperatorcallsthecontrolroomandinformsthemthatthedefeatisinstalled.LiftingLeads:EnsuretheoperatorgoestotheSMandobtainsthekeytotheEOPcabinet.Uponunlockingthecabinet,theoperatorfindsthecorrectpackageandensurestheproperequipmentisinthepackage.Pertheattacheddrawing,locatethepanelandverifythepanelopenediscorrectandtheoperatorhasopenedthecorrectsidedoor.Withinthepanel,locatetheproperterminalstripandverifythattheproperterminalnumberisselected.Usingthepropersafetytechniques,removethelockingscrewandremovethewirefromtheterminalpointkeepingitfrommakingcontactwiththeothercabinetwiringorcabinetsides.Tapethewireelectricalendorinstallthebootprovided.Forsometerminalpoints,morethanonewirewillbeterminatedattheproperpoint.Forthese,theinstructionwillread"Liftandseparateleads".Thismeansremovetheleadssafelyandplaceeachintobootsortapeseparately.Forsomecabinets,theterminalsareseparatedloadtosourcesideoftheterminalpointbyaKnifeSwitch.InthesecabinetsthedirectionoftheESPhastheknifeswitchscrewunlockedandopenedpriortoinstallingthedefeat.Thiswillbespelledoutandthenthesamerulesasaboveapply.Whenallleadsareremovedperthepackageintheproperlocation,theoperatorcallsthecontrolroomandinformsthemthatthedefeatiscomplete.RemovePlug-inRelayorFuse:EnsuretheoperatorgoestotheSMandobtainsthekeytotheEOPcabinet.Uponunlockingthecabinet,theoperatorfindsthecorrectpackageandensurestheproperequipmentisinthepackage.Pertheattacheddrawing,locatethepanelandverifythepanelopenediscorrectandtheoperatorhasopenedthecorrectsidedoor.Locatetheplug-inrelayorfuseandverifythedefeatpackagetotherelay,orfuseinquestion,labels.Plug-inrelayshaveseismicclipswhichneedtoberemovedfirstandthengraspedoneithersideandpulledstraightbackoutofthecabinet.Fusesneedtobegraspedbyfusepullersandpulledoutevenlyandinonemotion.Thereisafuseidentifiermylarcoveronsomefuseswhichneedstoberemovedtoreachthefuse.TheoneexceptionistheMainTurbineBypassDumpSystemfuseswhichsetintheH11P632cabinetinafuseblock.FS59&FS60arecontainedinablockthatcanbepulledoutmuchliketheplug-inrelaywithouttheseismicclip.Whenallstepsarecomplete,contactthecontrolroomandannouncethatthedefeatiscompleted.TaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
K/A SYSTEM: 295024 - High Drywell Pressure K/A STATEMENT:
JOBPERFORMANCEMEASUREJPMTitleDefeatRBCCW/EECWtoDrywellIsolationsNo.:JP-OP-802-3006-321Revision:3Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
EA1. Ability to operate and/or monitor the following as they apply to HIGH DRYWELL PRESSURE:
EA 1.07PCIS/NSSSS........................................................................................................ 3.8 / 3.9 Maintenance Rule Safety Classification:
P4400-01 Maintenance Rule Risk Significant? (Yes or No)
Yes Work Instruction                                                                                                                          WI 5.14 Job Performance Measures                                                                                                                    Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations                                                    Revision: 3 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                        STANDARD NOTE: Cues are indicated on the line above (just prior to) the step for which they are/may be required.
CUE:     Provide examinee with Cue Sheet. After SM EOP Locker is opened, provide examinee with copy of 29.ESP.23 and ODE-14, Attachment 9.
* 1.     [1.1] Retrieve EOP Defeat Package from
* 1. EOP Defeat Package retrieved from SM SM EOP Locker.                                    EOP Locker.
NOTE: While working in the Relay Room panels, all conductive jewelry should be removed, and safety glasses and 100% cotton long sleeves should be worn.
CUE:     The Lead at Terminal B-171 is lifted.
* 2.     [2.1] At RR H11-P857, lift lead at Terminal
* 2. Lead at Terminal B-171 lifted.
B-171 (Division 1).
CUE:     The Lead at Terminal E-191 is lifted.
* 3.     [2.2] At RR H11-P870, lift lead at Terminal
* 3. Lead at Terminal E-191 lifted.
E-191 (Division 2).
CUE:     End JPM when RBCCW/EECW Isolation is defeated per 29.ESP.23.
______ SATISFACTORY                                  ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                        No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations                                                        Revision: 3 Page 5 Evaluator Notes:
Ensure SM informed of JPM walkthrough in relay room and cabinet doors opened for walkthrough of this task.
Stop the JPM if, at any time, this JPM interferes with plant operation.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.
Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.
Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.
Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.
Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).
Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.
Verify valve open:     Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.
Closing a valve:       Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.
Opening a valve:       Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.
Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.
System Specific Notes and Cues:
ESP Defeats are installed either by installing a jumper, lifting leads, or removing a plug-in relay or fuse.
Installing Jumpers:
Ensure the operator goes to the SM and obtains the key to the EOP cabinet.
Upon unlocking the cabinet, the operator finds the correct package and ensures the proper equipment is in the package.
Per the attached drawing, locate the panel and verify the panel opened is correct and the operator has opened the correct side door.
Within the panel, locate the proper terminal strip and verify that the proper terminal number is selected.
Using proper safety techniques, a jumper is landed on each terminal ensuring that no other terminal is touched or cabinet ground is touched with the free end.
Repeat until all jumpers are installed per the package.
For some cabinets, the terminals are separated load to source side of the terminal point by a Knife Switch. In these cabinets the direction of the ESP has the knife switch screw unlocked and opened prior to installing the defeat. This will be spelled out and then the same rules as above apply.
Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                        No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations                                                        Revision: 3 Page 6 When both ends are safely landed on all jumpers per the package in the proper location, the operator calls the control room and informs them that the defeat is installed.
Lifting Leads:
Ensure the operator goes to the SM and obtains the key to the EOP cabinet.
Upon unlocking the cabinet, the operator finds the correct package and ensures the proper equipment is in the package.
Per the attached drawing, locate the panel and verify the panel opened is correct and the operator has opened the correct side door.
Within the panel, locate the proper terminal strip and verify that the proper terminal number is selected.
Using the proper safety techniques, remove the locking screw and remove the wire from the terminal point keeping it from making contact with the other cabinet wiring or cabinet sides.
Tape the wire electrical end or install the boot provided.
For some terminal points, more than one wire will be terminated at the proper point. For these, the instruction will read  Lift and separate leads. This means remove the leads safely and place each into boots or tape separately.
For some cabinets, the terminals are separated load to source side of the terminal point by a Knife Switch. In these cabinets the direction of the ESP has the knife switch screw unlocked and opened prior to installing the defeat. This will be spelled out and then the same rules as above apply.
When all leads are removed per the package in the proper location, the operator calls the control room and informs them that the defeat is complete.
Remove Plug-in Relay or Fuse:
Ensure the operator goes to the SM and obtains the key to the EOP cabinet.
Upon unlocking the cabinet, the operator finds the correct package and ensures the proper equipment is in the package.
Per the attached drawing, locate the panel and verify the panel opened is correct and the operator has opened the correct side door.
Locate the plug-in relay or fuse and verify the defeat package to the relay, or fuse in question, labels.
Plug-in relays have seismic clips which need to be removed first and then grasped on either side and pulled straight back out of the cabinet.
Fuses need to be grasped by fuse pullers and pulled out evenly and in one motion. There is a fuse identifier mylar cover on some fuses which needs to be removed to reach the fuse.
The one exception is the Main Turbine Bypass Dump System fuses which set in the H11P632 cabinet in a fuse block. FS59 & FS60 are contained in a block that can be pulled out much like the plug-in relay without the seismic clip.
When all steps are complete, contact the control room and announce that the defeat is completed.
Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations                                  Revision: 3 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleDefeatRBCCW/EECWtoDrywellIsolationsNo.:JP-OP-802-3006-321Revision:3Page8WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:N/AMalfunctions:NumberTitleValueDelayRampN/ARemoteFunctions:NumberTitleValueDelayRampN/AOverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:N/A JOBPERFORMANCEMEASURECueSheet:(JP-OP-802-3006-321)InitialConditions:YouaretheCRNSO.EOPflowchartsdirectdefeatofRBCCW/EECWIsolations.InitiatingCue(s):TheCRSdirectsyoutodefeatRBCCW/EECWIsolationsper29.ESP.23.
===Response===
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRO/RONo.JP-OP-802-3006-401Revision0JPMTitlePerformTorusWaterAverageTemperatureCalculationDuration10minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Question:
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                              No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations                              Revision: 3 Page 8 Simulator Setup IC#:
N/A Malfunctions:
Number                            Title                Value      Delay  Ramp N/A Remote Functions:
Number                            Title                Value      Delay  Ramp N/A Override Functions:
Number                            Title                Value      Delay  Ramp N/A Special Instructions:
N/A Work Instruction                                                              WI 5.14 Job Performance Measures                                                        Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-3006-321)
Initial Conditions:
You are the CRNSO.
EOP flowcharts direct defeat of RBCCW/EECW Isolations.
Initiating Cue(s):
The CRS directs you to defeat RBCCW/EECW Isolations per 29.ESP.23.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO / RO                                                      JP-OP-802-3006-401                        0 JPM Title                                                    Duration            Page Perform Torus Water Average Temperature Calculation            10 minutes                      1 Examinee:                                                                     SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*2.*3.*4.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitlePerformTorusWaterAverageTemperatureCalculationNo.:JP-OP-802-3006-401Revision:0Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U    Comment        Element  S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitlePerformTorusWaterAverageTemperatureCalculationNo.:JP-OP-802-3006-401Revision:0Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:T5000-PrimaryContainmentMonitoringSystemTask:52016-CalculateTorusWaterAverageTemperature
* 1.
* 2.
* 3.
* 4.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations          Improvement              Expectations            Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation                                          Revision: 0 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was        Did not recognize key at proper frequency, using    performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system  too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.               monitoring.               system status.
Control            Task preview used to          Adequate control of system No anticipation of results of prepare for job. Aware of    maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.             could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                   greater depth of knowledge parameters.
for anticipating system response.
Conservatism      Low threshold for            Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on  High threshold for problem stop when unsure if        task completion without    conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic  Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                              No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation                                                            Revision: 0 Page 3 JPM Information System:
T5000 - Primary Containment Monitoring System Task:
52016 - Calculate Torus Water Average Temperature


==References:==
==References:==
Required(R)/Available(A)29.ESP.01,SupplementalInformation,Section15,TorusWaterTemperatureCalculation(R)ToolsandEquipmentRequired:CalculatorInitialConditions:Youareanextrapersononshift.PrimaryContainmentControlEOPhasbeenenteredduetoDrywellTemperatureof147F.InitiatingCue(s):TheCRSdirectsyoutocalculateTorusWaterAverageTemperatureinaccordancewith29.ESP.01.TerminatingCue(s):TorusWatertemperaturehasbeendeterminedbycalculation.TaskStandard:PerformTorusWaterAverageTemperatureCalculationinaccordancewith29.ESP.01,Section15.0.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction/Category:10-EmergencyPlantEvolutionsK/A
Required (R) / Available (A) 29.ESP.01, Supplemental Information, Section 15, Torus Water Temperature Calculation (R)
Tools and Equipment Required:
Calculator Initial Conditions:
You are an extra person on shift.
Primary Containment Control EOP has been entered due to Drywell Temperature of 147F.
Initiating Cue(s):
The CRS directs you to calculate Torus Water Average Temperature in accordance with 29.ESP.01.
Terminating Cue(s):
Torus Water temperature has been determined by calculation.
Task Standard:
Perform Torus Water Average Temperature Calculation in accordance with 29.ESP.01, Section 15.0.
Licensed Operator Exam Information (required for NRC exams)
Safety Function/Category:
10 - Emergency Plant Evolutions K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:295026-SuppressionPoolHighWaterTemperatureK/ASTATEMENT:EA2.Abilitytodetermineand/orinterpretthefollowingastheyapplytoSuppressionPoolHighWaterTemperature:EA2.01SuppressionPoolWatertemperature...............................................................4.1/4.2MaintenanceRuleSafetyClassification:N/AMaintenanceRuleRiskSignificant?(YesorNo)N/A JOBPERFORMANCEMEASUREJPMTitlePerformTorusWaterAverageTemperatureCalculationNo.:JP-OP-802-3006-401Revision:0Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvideexamineewithCueSheet.Aftertheexamineedemonstrates/explainshowhewouldobtainacontrolledcopyoftheprocedure,handtheexamineeacopyof29.ESP.01.ControlledprocedurecopiesarelocatedintheTaggingCenter.Otherproceduresarelocatedinremotelocations.Proceduresmaybeobtainedand/orverifiedcurrentelectronicallyusingAutomatedRecordManagementSystem(ARMS)."Current"statusiscoded"AFC".CUE:Ifasked,Toruswaterlevelindicates0inches.*1.[15.0CAUTION]DetermineifToruswaterlevelislessthan-11inches.*1.DeterminesToruswaterlevel.CUE:Ifasked,reportthatnoSRVhasactuatedinthepast48hours.*2.[15.0NOTE(1/2)]DetermineifanSRVhasactuated.*2.DeterminesthatanSRVhasNOTactuated.CUE:Whenaskedfortheinstrumentpointreadings,providetheexamineewiththeDataSheet.*3.DetermineT23-R800,TorusWaterTemperatureRecorder,instrumentpointreadings.*3.T23-R800instrumentpointreadingsdetermined.*4.CalculateAverageTorusWaterTemperature.*4.CalculatesAverageTorusWaterTemperature.(93.4°F)CUE:EndJPMwhenTorusWatertemperaturehasbeendeterminedbycalculation.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitlePerformTorusWaterAverageTemperatureCalculationNo.:JP-OP-802-3006-401Revision:0Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:NoneSystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitlePerformTorusWaterAverageTemperatureCalculationNo.:JP-OP-802-3006-401Revision:0Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
K/A SYSTEM: 295026 - Suppression Pool High Water Temperature K/A STATEMENT:
EA2.     Ability to determine and/or interpret the following as they apply to Suppression Pool High Water Temperature:
EA2.01 Suppression Pool Water temperature...............................................................4.1 / 4.2 Maintenance Rule Safety Classification:
N/A Maintenance Rule Risk Significant? (Yes or No)
N/A Work Instruction                                                                                                          WI 5.14 Job Performance Measures                                                                                                    Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation                                      Revision: 0 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                        STANDARD CUE:     Provide examinee with Cue Sheet.
After the examinee demonstrates/explains how he would obtain a controlled copy of the procedure, hand the examinee a copy of 29.ESP.01.
Controlled procedure copies are located in the Tagging Center. Other procedures are located in remote locations.
Procedures may be obtained and/or verified current electronically using Automated Record Management System (ARMS). Current status is coded AFC.
CUE:     If asked, Torus water level indicates 0 inches.
* 1.     [15.0 CAUTION] Determine if Torus water
* 1. Determines Torus water level.
level is less than -11 inches.
CUE:     If asked, report that no SRV has actuated in the past 48 hours.
* 2.     [15.0 NOTE (1/2)] Determine if an SRV
* 2. Determines that an SRV has NOT has actuated.                                    actuated.
CUE:     When asked for the instrument point readings, provide the examinee with the Data Sheet.
* 3.     Determine T23-R800, Torus Water
* 3. T23-R800 instrument point readings Temperature Recorder, instrument point            determined.
readings.
* 4.     Calculate Average Torus Water
* 4. Calculates Average Torus Water Temperature.                                      Temperature. (93.4°F)
CUE:     End JPM when Torus Water temperature has been determined by calculation.
______ SATISFACTORY                                  ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                  WI 5.14 Job Performance Measures                                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation                                        Revision: 0 Page 5 Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation                      Revision: 0 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitlePerformTorusWaterAverageTemperatureCalculationNo.:JP-OP-802-3006-401Revision:0Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:N/AMalfunctions:NumberTitleValueDelayRampN/ARemoteFunctions:NumberTitleValueDelayRampN/AOverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:N/A JOBPERFORMANCEMEASUREDataSheet:(JP-OP-802-3006-401)T23-R800,TorusWaterTemperatureRecorder,InstrumentPointReadingsPt.1=96°FPt.5=90°FPt.2=98°FPt.6=88°FPt.3=91°FPt.7=INOPPt.4=89°FPt.8=97°F JOBPERFORMANCEMEASURECueSheet:(JP-OP-802-3006-401)InitialConditions:Youareanextrapersononshift.PrimaryContainmentControlEOPhasbeenenteredduetoDrywelltemperatureof147F.InitiatingCue(s):TheCRSdirectsyoutocalculateTorusWaterAverageTemperatureinaccordancewith29.ESP.01.
===Response===
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRONo.JP-OP-802-4101-102Revision1JPMTitleEvaluateDegradedPowerSourcesDuration15minutesPage1Examinee:SROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Question:
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation                  Revision: 0 Page 7 Simulator Setup IC#:
N/A Malfunctions:
Number                            Title                Value      Delay  Ramp N/A Remote Functions:
Number                            Title                Value      Delay  Ramp N/A Override Functions:
Number                            Title                Value      Delay  Ramp N/A Special Instructions:
N/A Work Instruction                                                                WI 5.14 Job Performance Measures                                                          Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Data Sheet: (JP-OP-802-3006-401)
T23-R800, Torus Water Temperature Recorder, Instrument Point Readings Pt. 1 = 96°F    Pt. 5 = 90°F Pt. 2 = 98°F    Pt. 6 = 88°F Pt. 3 = 91°F      Pt. 7 = INOP Pt. 4 = 89°F    Pt. 8 = 97°F
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-3006-401)
Initial Conditions:
You are an extra person on shift.
Primary Containment Control EOP has been entered due to Drywell temperature of 147F.
Initiating Cue(s):
The CRS directs you to calculate Torus Water Average Temperature in accordance with 29.ESP.01.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO                                                          JP-OP-802-4101-102                        1 JPM Title                                                    Duration            Page Evaluate Degraded Power Sources                                15 minutes                      1 Examinee:                                                                     SRO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*2.*3.4.*5.*6.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleEvaluateDegradedPowerSourcesNo.:JP-OP-802-4101-102Revision:1Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U    Comment        Element  S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleEvaluateDegradedPowerSourcesNo.:JP-OP-802-4101-102Revision:1Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:N/ATask:76034-ImplementTechnicalSpecification/TechnicalRequirementsManualactions
* 1.
* 2.
* 3.
4.
* 5.
* 6.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations          Improvement              Expectations            Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources                                                              Revision: 1 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was        Did not recognize key at proper frequency, using    performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system  too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.               monitoring.               system status.
Control            Task preview used to          Adequate control of system No anticipation of results of prepare for job. Aware of    maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.             could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                   greater depth of knowledge parameters.
for anticipating system response.
Conservatism      Low threshold for            Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on  High threshold for problem stop when unsure if        task completion without    conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic  Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                        No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources                                                                          Revision: 1 Page 3 JPM Information System:
N/A Task:
76034 - Implement Technical Specification/Technical Requirements Manual actions


==References:==
==References:==
Required(R)/Available(A)TechSpecs3.8.1,ACSources-Operating(R)ToolsandEquipmentRequired:NoneInitialConditions:YouaretheCRS.Ten(10)minutesago,ITCwasperformingtroubleshootingactivitieswhen345kVbreakersBM&DFopenedonfault.Allattemptstoreclosethebreakershavefailed.Allother345kV/120kVbreakersareinthenormalposition.Nootherplantequipmentisoutofservice.InitiatingCue(s):TheSMdirectsyoutoevaluatethismalfunctionforpotentialTechSpecimpact,anddocumentaccordingly.TerminatingCue(s):RequiredactionslistedunderTechSpec3.8.1,ConditionD,havebeenidentified,andtheLCOdocumentedusingMOP05003.TaskStandard:RequiredactionsofTechSpec3.8.1,ConditionD,havebeenidentified,andtheLCOSheetiscompletedcorrectlyperMOP05003.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:N/AK/A
Required (R) / Available (A)
Tech Specs 3.8.1, AC Sources - Operating (R)
Tools and Equipment Required:
None Initial Conditions:
You are the CRS.
Ten (10) minutes ago, ITC was performing troubleshooting activities when 345kV breakers BM &
DF opened on fault. All attempts to reclose the breakers have failed.
All other 345kV / 120kV breakers are in the normal position.
No other plant equipment is out of service.
Initiating Cue(s):
The SM directs you to evaluate this malfunction for potential Tech Spec impact, and document accordingly.
Terminating Cue(s):
Required actions listed under Tech Spec 3.8.1, Condition D, have been identified, and the LCO documented using MOP05003.
Task Standard:
Required actions of Tech Spec 3.8.1, Condition D, have been identified, and the LCO Sheet is completed correctly per MOP05003.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
N/A K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:GENERICK/ASTATEMENT:2.2.36Abilitytoanalyzetheeffectofmaintenanceactivities,suchasdegradedpowersources,onthestatusoflimitingconditionsforoperations.(CFR41.10/43.2/45.13)............................3.1/4.2MaintenanceRuleSafetyClassification:N/AMaintenanceRuleRiskSignificant?(YesorNo)N/A JOBPERFORMANCEMEASUREJPMTitleEvaluateDegradedPowerSourcesNo.:JP-OP-802-4101-102Revision:1Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvideexamineewithCueSheet.*1.ReviewinitialconditionstodeterminewhichTechSpecLCOisimpacted.*1.Determinesthat,withtheBM&DFbreakersopen,anoffsitecircuitmustbedeclaredinoperable(lossofmaingeneratorcouldleadtolossofoffsitecircuit).*2.ReviewTechSpecLCO3.8.1todeterminewhichCondition(s)applytothemalfunction.*2.DeterminesthatConditionDappliestooneoffsitecircuitinoperable.*3.ReviewLCO3.8.1,ActionD.1todetermineitsapplicability.*3.DeterminesthatSR3.8.1foroperableoffsitecircuitmustbecompleted.4.ReviewLCO3.8.1,ActionD.2todetermineitsapplicability.4.DeterminesthatActionD.2isNOTrequired.*5.ReviewLCO3.8.1,ActionD.3todetermineitsapplicability.*5.Determinesthattheoffsitecircuitmustberestoredtooperablestatuswithin72hours.CUE:Ifasked,theLCOSheetcannotbegeneratedelectronicallyandmustbedocumentedonpaper.ProvidetheexamineewithacopyofMOP05003.*6.Documenttheoperabilitydetermination.*6.OperabilitydeterminationdocumentedonLCOSheet.CUE:EndJPMwhenrequiredactionslistedunderTechSpec3.8.1,ConditionD,havebeenidentified,andLCOisdocumentedonMOP05003.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleEvaluateDegradedPowerSourcesNo.:JP-OP-802-4101-102Revision:1Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:ThisJPMmaybestartedattheCRSdeskinthesimulator.ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:NoneSystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleEvaluateDegradedPowerSourcesNo.:JP-OP-802-4101-102Revision:1Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
K/A SYSTEM: GENERIC K/A STATEMENT:
2.2.36 Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations. (CFR 41.10 / 43.2 / 45.13) ............................ 3.1 / 4.2 Maintenance Rule Safety Classification:
N/A Maintenance Rule Risk Significant? (Yes or No)
N/A Work Instruction                                                                                                      WI 5.14 Job Performance Measures                                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources                                                            Revision: 1 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                          STANDARD CUE:     Provide examinee with Cue Sheet.
* 1.     Review initial conditions to determine
* 1. Determines that, with the BM & DF which Tech Spec LCO is impacted.                breakers open, an offsite circuit must be declared inoperable (loss of main generator could lead to loss of offsite circuit).
* 2.     Review Tech Spec LCO 3.8.1 to
* 2. Determines that Condition D applies to determine which Condition(s) apply to the        one offsite circuit inoperable.
malfunction.
* 3.     Review LCO 3.8.1, Action D.1 to
* 3. Determines that SR 3.8.1 for operable determine its applicability.                     offsite circuit must be completed.
: 4.     Review LCO 3.8.1, Action D.2 to            4. Determines that Action D.2 is NOT determine its applicability.                     required.
* 5.     Review LCO 3.8.1, Action D.3 to
* 5. Determines that the offsite circuit must be determine its applicability.                     restored to operable status within 72 hours.
CUE:     If asked, the LCO Sheet cannot be generated electronically and must be documented on paper. Provide the examinee with a copy of MOP05003.
* 6.     Document the operability determination.
* 6. Operability determination documented on LCO Sheet.
CUE:     End JPM when required actions listed under Tech Spec 3.8.1, Condition D, have been identified, and LCO is documented on MOP05003.
______ SATISFACTORY                                ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources                                                            Revision: 1 Page 5 Evaluator Notes:
This JPM may be started at the CRS desk in the simulator.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources                                          Revision: 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleEvaluateDegradedPowerSourcesNo.:JP-OP-802-4101-102Revision:1Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:N/AMalfunctions:NumberTitleValueDelayRampN/ARemoteFunctions:NumberTitleValueDelayRampN/AOverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:N/A JOBPERFORMANCEMEASURECueSheet:(JP-OP-802-4101-102)InitialConditions:YouaretheCRS.Ten(10)minutesago,ITCwasperformingtroubleshootingactivitieswhen345kVbreakersBM&DFopenedonfault.Allattemptstoreclosethebreakershavefailed.Allother345kV/120kVbreakersareinthenormalposition.Nootherplantequipmentisoutofservice.InitiatingCue(s):TheSMdirectsyoutoevaluatethismalfunctionforpotentialTechSpecimpact,anddocumentaccordingly.
===Response===
JOB PERFORMANCE MEASURE Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 Job Position SRO / RO No. JP-OP-802-4101-413 Revision 3 JPM Title Calculate Stay time and determine if dose extension is needed. Duration 20 minutes Page 1 Examinee:   SRO / RO Evaluator:     JPM Type: Normal / Alternate Path / Time Critical Start Time   Evaluation Method: Perform / Walkthrough / Discuss Stop Time   Location: Plant / Simulator / Classroom Total Time:   PERFORMANCE EVALUATION  
Question:
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources                                        Revision: 1 Page 7 Simulator Setup IC#:
N/A Malfunctions:
Number                            Title                Value      Delay  Ramp N/A Remote Functions:
Number                            Title                Value      Delay  Ramp N/A Override Functions:
Number                            Title                Value      Delay  Ramp N/A Special Instructions:
N/A Work Instruction                                                                WI 5.14 Job Performance Measures                                                          Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-102)
Initial Conditions:
You are the CRS.
Ten (10) minutes ago, ITC was performing troubleshooting activities when 345kV breakers BM & DF opened on fault. All attempts to reclose the breakers have failed.
All other 345kV / 120kV breakers are in the normal position.
No other plant equipment is out of service.
Initiating Cue(s):
The SM directs you to evaluate this malfunction for potential Tech Spec impact, and document accordingly.
 
JOB PERFORMANCE MEASURE Job Position                                               No.                        Revision SRO / RO                                                   JP-OP-802-4101-413                 3 JPM Title                                                 Duration            Page Calculate Stay time and determine if dose extension is       20 minutes                 1 needed.
Examinee:                                                               SRO / RO Evaluator:
JPM Type:                 Normal / Alternate Path / Time Critical       Start Time Evaluation Method:       Perform / Walkthrough / Discuss               Stop Time Location:                 Plant / Simulator / Classroom                 Total Time:
PERFORMANCE EVALUATION  


==SUMMARY==
==SUMMARY==
Element S U Comment Element S U Comment Element S U Comment
 
Element       S U   Comment       Element S U         Comment       Element     S U     Comment
* 1.
* 1.
* 2.
* 2.
* 3.                                                                                                 OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation. Operator Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Comment Number Monitoring     Control     Conservatism     Teamwork     Knowledge     OVERALL EVALUATOR COMMENTS:         ______ PASS ______ FAIL Evaluator Signature / Date: /
* 3.
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine if dose extension is needed. No.: JP-OP-802-4101-413 Revision: 3 Page 2 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 JPM Observation Criteria Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Monitoring Equipment status monitored at proper frequency, using multiple means if available. Understood which indications were critical. Some monitoring was performed but undue focus on task or lack of system knowledge prevented ideal monitoring. Did not recognize key equipment status indicators, too much focus on single indications and ignored total system status. Control Task preview used to prepare for job. Aware of control bands and maintained them. Configuration control maintained. Adequate control of system maintained throughout task but some improvements could be made such as better manual control or greater depth of knowledge for anticipating system response. No anticipation of results of actions. Unaware or control bands or not able to maintain them. Lack of knowledge of how to control system parameters. Conservatism Low threshold for identification of problems. Questioning attitude. Uses needed. Sensitive to nuclear safety. Some opportunities existed to question before proceeding, High focus on task completion without consideration for other system affects. Proceeds even when unsure with unanswered questions. High threshold for problem conditions. Teamwork Routinely communicates system status changes to the team. Communicates actions before taking them. Communicated most status and actions. Some improvement would be warranted. Routinely takes action without informing the team. Knowledge Able to anticipate system response based on solid system knowledge. Good working knowledge of generic fundamentals to predict and monitor system response. Plant, system, or  generic fundamental knowledge has some gaps. Unable to predict system response, unsure of generic fundamentals concepts related to plant operation. Only relied on procedure for operating knowledge.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine if dose extension is needed. No.: JP-OP-802-4101-413 Revision: 3 Page 3 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 JPM Information System: N/A Task: 73443 - SOER 01-1 Rec. 5 - Radiation protection training and retraining for plant personnel should include a review of selected industry events involving large, unplanned exposures and the responsibility of individuals for the prevention of such events.  
Operator             Meets all           Opportunity for       Does not meet       Comment Fundamental          Expectations          Improvement            Expectations       Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS       ______ FAIL Evaluator Signature / Date:                                                     /
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                   No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is                                        Revision: 3 needed.                                                                                            Page 2 JPM Observation Criteria Opportunity for Fundamental           Meets all Expectations                               Does not meet Expectations Improvement Monitoring         Equipment status monitored   Some monitoring was        Did not recognize key at proper frequency, using   performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.                monitoring.                system status.
Control           Task preview used to         Adequate control of system No anticipation of results of prepare for job. Aware of     maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.              could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                  greater depth of knowledge parameters.
for anticipating system response.
Conservatism       Low threshold for             Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on High threshold for problem stop when unsure if        task completion without   conditions.
needed. Sensitive to nuclear  consideration for other safety.                      system affects.
Teamwork           Routinely communicates       Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions   improvement would be before taking them.           warranted.
Knowledge         Able to anticipate system     Plant, system, or generic Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                   No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is                                                            Revision: 3 needed.                                                                                                                  Page 3 JPM Information System:
N/A Task:
73443 - SOER 01-1 Rec. 5 - Radiation protection training and retraining for plant personnel should include a review of selected industry events involving large, unplanned exposures and the responsibility of individuals for the prevention of such events.


==References:==
==References:==
Required (R) / Available (A) MRP12, Authorization To Exceed Dose Control Thresholds (R) Tools and Equipment Required: Survey Map for N. RWCU Room Initial Conditions: An NSO must enter the N. RWCU Pump Room to perform an investigation of G33-F012A, North RWCU Pump Discharge Isolation Valve. The estimated time necessary to perform the inspection is 6 minutes. exposure for the year is 753 mrem TEDE. The situation is NOT an emergency, but there is no alternative to performing the inspection. Initiating Cue(s): Determine what requirements must be met, if any, to allow the NSO to perform this inspection. Terminating Cue(s): Candidate informs SM that dose extension must be obtained. Task Standard: Determination is made that authorization to exceed Fermi 2 Administrative Guidelines must be obtained in accordance with MRP 12. Licensed Operator Exam Information (required for NRC exams) Safety Function: N/A K/A  
Required (R) / Available (A)
MRP12, Authorization To Exceed Dose Control Thresholds (R)
Tools and Equipment Required:
Survey Map for N. RWCU Room Initial Conditions:
An NSO must enter the N. RWCU Pump Room to perform an investigation of G33-F012A, North RWCU Pump Discharge Isolation Valve.
The estimated time necessary to perform the inspection is 6 minutes.
The NSOs exposure for the year is 753 mrem TEDE.
The situation is NOT an emergency, but there is no alternative to performing the inspection.
Initiating Cue(s):
Determine what requirements must be met, if any, to allow the NSO to perform this inspection.
Terminating Cue(s):
Candidate informs SM that dose extension must be obtained.
Task Standard:
Determination is made that authorization to exceed Fermi 2 Administrative Guidelines must be obtained in accordance with MRP 12.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
N/A K/A  


==Reference:==
==Reference:==
(from NUREG 1123) K/A SYSTEM: GENERICS K/A STATEMENT:   2.3.4 Knowledge of Radiation exposure limits and contamination control including               permissible levels in excess of those authorized. ........................................................ 2.5 / 3.1 Maintenance Rule Safety Classification: N/A Maintenance Rule Risk Significant? (Yes or No) N/A JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine if dose extension is needed. No.: JP-OP-802-4101-413 Revision: 3 Page 4 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 PERFORMANCE EVALUATION Start Time   ELEMENT STANDARD CUE: Provide candidate with Cue Sheet. If asked, provide candidate with Survey Map of N. RWCU Pump Room. CUE: If asked, the radiation level in the area of the valve to be inspected is 6 Rem/hr.
(from NUREG 1123)
* 1. Determine that RWP survey results are needed for estimation of radiation dose.
K/A SYSTEM: GENERICS K/A STATEMENT:
* 1. Determines radiation level in the area of the valve is 6 Rem/hr.
2.3.4   Knowledge of Radiation exposure limits and contamination control including permissible levels in excess of those authorized. ........................................................2.5 / 3.1 Maintenance Rule Safety Classification:
* 2. Calculate dose.
N/A Maintenance Rule Risk Significant? (Yes or No)
* 2. Dose =   6/60 hr
N/A Work Instruction                                                                                                              WI 5.14 Job Performance Measures                                                                                                        Rev 1 Attachment 1
* 6 Rem/hr = 0.1 hr
 
* 6000 mr/hr = 600 mr 600 mr + 753 mr = 1353 mr = 1.353 R (Fermi Admin Guideline = 1 REM/yr TEDE) CUE: As SM, acknowledge the report.
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is                                        Revision: 3 needed.                                                                                            Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                             STANDARD CUE:     Provide candidate with Cue Sheet. If asked, provide candidate with Survey Map of N.
* 3. Inform SM that dose will exceed Fermi 2 administrative guidelines, and a dose extension will be required.
RWCU Pump Room.
* 3. Informs SM that dose will exceed Fermi 2 administrative guidelines, and a dose extension is necessary. CUE: End JPM when SM has been informed that a dose extension is necessary. ______ SATISFACTORY ______ UNSATISFACTORY Stop Time
CUE:     If asked, the radiation level in the area of the valve to be inspected is 6 Rem/hr.
* Critical Step JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine if dose extension is needed. No.: JP-OP-802-4101-413 Revision: 3 Page 5 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1  Evaluator Notes: The Plant can be in any mode of operation to conduct this JPM. This JPM may be started at the CRS Desk in the Simulator. ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES. Generic Notes and Cues: None System Specific Notes and Cues: None Task Performance and Cues: The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Critical Steps: Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
* 1.     Determine that RWP survey results are
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine if dose extension is needed. No.: JP-OP-802-4101-413 Revision: 3 Page 6 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):                                     Question:                                                                              
* 1. Determines radiation level in the area of needed for estimation of radiation dose.            the valve is 6 Rem/hr.
* 2.     Calculate dose.
* 2. Dose =
6/60 hr
* 6 Rem/hr =
0.1 hr
* 6000 mr/hr = 600 mr 600 mr + 753 mr = 1353 mr = 1.353 R (Fermi Admin Guideline = 1 REM/yr TEDE)
CUE:     As SM, acknowledge the report.
* 3.     Inform SM that dose will exceed Fermi 2
* 3. Informs SM that dose will exceed Fermi 2 administrative guidelines, and a dose               administrative guidelines, and a dose extension will be required.                          extension is necessary.
CUE: End JPM when SM has been informed that a dose extension is necessary.
______ SATISFACTORY                                     ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is                                      Revision: 3 needed.                                                                                          Page 5 Evaluator Notes:
The Plant can be in any mode of operation to conduct this JPM.
This JPM may be started at the CRS Desk in the Simulator.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                   No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is                  Revision: 3 needed.                                                                      Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:                                                                                                      Question:                                                                               Reference           Response:
 
JOB PERFORMANCE MEASURE JPM Title Calculate Stay time and determine if dose extension is needed. No.: JP-OP-802-4101-413 Revision: 3 Page 7 Work Instruction WI 5.14 Job Performance Measures Rev 1  Attachment 1 Simulator Setup IC#: N/A Malfunctions: Number Title Value Delay Ramp None Remote Functions: Number Title Value Delay Ramp None Override Functions: Number Title Value Delay Ramp None Special Instructions:
===Response===
JOB PERFORMANCE MEASURE   Cue Sheet: (JP-OP-802-4101-413)   Initial Conditions: An NSO must enter the N. RWCU Pump Room to perform an investigation of G33-F012A, North RWCU Pump Discharge Isolation Valve. The estimated time necessary to perform the inspection is 6 minutes. The situation is NOT an emergency, but there is no alternative to performing the inspection. Initiating Cue(s): Determine what requirements must be met, if any, to allow the NSO to perform this inspection.
Question:
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRONo.JP-OP-802-4101-419Revision4JPMTitlePerformaCRSShortTermReliefDuration20minutesPage1Examinee:SROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                 No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is                  Revision: 3 needed.                                                                      Page 7 Simulator Setup IC#:
N/A Malfunctions:
Number                                 Title             Value     Delay   Ramp None Remote Functions:
Number                                 Title             Value     Delay   Ramp None Override Functions:
Number                                 Title             Value     Delay   Ramp None Special Instructions:
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-413)
Initial Conditions:
An NSO must enter the N. RWCU Pump Room to perform an investigation of G33-F012A, North RWCU Pump Discharge Isolation Valve.
The estimated time necessary to perform the inspection is 6 minutes.
The NSOs exposure for the year is 753 mrem TEDE.
The situation is NOT an emergency, but there is no alternative to performing the inspection.
Initiating Cue(s):
Determine what requirements must be met, if any, to allow the NSO to perform this inspection.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO                                                          JP-OP-802-4101-419                        4 JPM Title                                                    Duration            Page Perform a CRS Short Term Relief                                20 minutes                      1 Examinee:                                                                     SRO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                   Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*2.*3.4.*5.*6.*7.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitlePerformaCRSShortTermReliefNo.:JP-OP-802-4101-419Revision:4Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U    Comment        Element  S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitlePerformaCRSShortTermReliefNo.:JP-OP-802-4101-419Revision:4Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:N/ATask:76128-ProvideShortTermRelief
* 1.
* 2.
* 3.
4.
* 5.
* 6.
* 7.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations          Improvement              Expectations            Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief                                                              Revision: 4 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was        Did not recognize key at proper frequency, using    performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system  too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.               monitoring.               system status.
Control            Task preview used to          Adequate control of system No anticipation of results of prepare for job. Aware of    maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.             could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                   greater depth of knowledge parameters.
for anticipating system response.
Conservatism      Low threshold for            Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on  High threshold for problem stop when unsure if        task completion without    conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic  Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                 fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief                                                                    Revision: 4 Page 3 JPM Information System:
N/A Task:
76128 - Provide Short Term Relief


==References:==
==References:==
Required(R)/Available(A)MOP07,ShiftTurnover(R)MOP01003,CRSShiftReliefChecklist(R)ToolsandEquipmentRequired:UnitLogforprevious24hoursUrgentRequiredReadingBookLCObookInitialConditions:YouareanextraSROassignedtotheshift.Youattendedtheshiftturnovermeetingthismorning.Plantconditionsarestableandasyouseethem.InitiatingCue(s):TheSMdirectsyoutoprovideaShortTermReliefwiththeCRS.Allprerequisitesarecomplete.TerminatingCue(s):ShortTermReliefhasbeencompletedinaccordancewithMOP07.TaskStandard:ConductaCRSShortTermReliefintheControlRoominaccordancewithMOP07.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:N/AK/A
Required (R) / Available (A)
MOP07, Shift Turnover (R)
MOP01003, CRS Shift Relief Checklist (R)
Tools and Equipment Required:
Unit Log for previous 24 hours Urgent Required Reading Book LCO book Initial Conditions:
You are an extra SRO assigned to the shift.
You attended the shift turnover meeting this morning.
Plant conditions are stable and as you see them.
Initiating Cue(s):
The SM directs you to provide a Short Term Relief with the CRS.
All prerequisites are complete.
Terminating Cue(s):
Short Term Relief has been completed in accordance with MOP07.
Task Standard:
Conduct a CRS Short Term Relief in the Control Room in accordance with MOP07.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
N/A K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:GenericK/ASTATEMENT:2.1.3Knowledgeofshiftorshort-termreliefturnoverpractices.(CFR41.10/45.13).................3.7/3.9MaintenanceRuleSafetyClassification:N/AMaintenanceRuleRiskSignificant?(YesorNo)N/A JOBPERFORMANCEMEASUREJPMTitlePerformaCRSShortTermReliefNo.:JP-OP-802-4101-419Revision:4Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvideexamineewithCueSheet.Ifasked,providetheexamineewiththeCRSShiftReliefChecklist(attached).NOTE:ExamineristoperformastheCRSbeingrelieved.CUE:Whenasked,providetheexamineewiththeUnitLogforthepast24hours(attached).*1.ReviewUnitLogandabnormaleventsthathaveoccurredinthelast24hours.*1.ReviewsUnitLog,andinitialsMOP01003.CUE:Afewhoursagopowerwasraisedfrom82%to100%.PowerhadbeenreducedtoperformTurbineValvetesting.TheReactorBuildingRoundsNOismonitoringandadjustingRecircMGSetoiltemperaturesasnecessary.HPCIwastaggedouttoperformcorrectivemaintenanceontheAuxOilPump,andHPCIhasbeenrestoredtooperablestatus.*2.ReviewGeneralPlantStatusbydiscussingoperatingcondition,speciallimitations,bandsandranges.*2.ReviewsGeneralPlantStatuswithCRSbydiscussingoperatingcondition,speciallimitations,bandsandranges,andinitialsMOP01003.CUE:Ifasked,therearenooutstandingLCOs.*3.ReviewLCOs.*3.ReviewsLCOlogbookordiscusseswithCRS,andinitialsMOP01003.4.ReadUrgentRequiredReading.4.VerifiesnoUrgentRequiredReadingpresent(redbinder).CUE:Alarm1D34isinduetoafaultyconductivitycellE11-N001A.TherehasbeenaCARDwrittentoaddresstheproblem.Conductivityiscurrentlynormal,andChemistryischeckingtheconductivityeachshift.Alarm4D78isinduetoabrokenlevelswitchN30-N095.TherehasbeenaCARDwrittentoaddresstheproblem.Thetankleveliscurrentlynormal,andtheTurbineBuildingRoundsNOischeckingtheleveltwicepershift.CUE:SMacknowledgesreportoftheproblemwithHPCI,anddirectstheexamineetocompletetheturnover.TheconcernwithHPCIwillbeaddressedwhenturnoveriscomplete.*5.WalkdownCOPs,anddiscussanyoff-normalcondition,statusofESFequipment,reasonsforlitannunciators,andIPCSalarms.*5.WalksdownCOPs,anddiscussesanyoff-normalcondition,statusofESFequipment,reasonsforlitannunciators,andIPCSalarms,andinitialsMOP01003.Asksreasonsforalarms1D34&4D78.DeterminesHPCIAuxOilPumpCMCisimproperlypositionedandinformsSM/CRS.CUE:Currently,thereareno"non-triggered"situationsurveillancesrequired.*6.Discuss"non-triggered"situationalsurveillancerequirements.*6.Discusses"non-triggered"situationalsurveillancerequirements,andinitialsMOP01003.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitlePerformaCRSShortTermReliefNo.:JP-OP-802-4101-419Revision:4Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1ELEMENTSTANDARD*7.Verifyqualificationforposition.*7.VerifiesqualificationslistedintheQualificationReportingTool,andinitialsMOP01003.CUE:EndJPMwhentheitemsnotedbyanasteriskontheShiftReliefChecklistarecompleted.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitlePerformaCRSShortTermReliefNo.:JP-OP-802-4101-419Revision:4Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:ThisJPMshouldbestartedattheCRSDeskintheSimulator.ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:NoneSystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
K/A SYSTEM: Generic K/A STATEMENT:
JOBPERFORMANCEMEASUREJPMTitlePerformaCRSShortTermReliefNo.:JP-OP-802-4101-419Revision:4Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
2.1.3    Knowledge of shift or short-term relief turnover practices. (CFR 41.10/45.13) ................. 3.7 / 3.9 Maintenance Rule Safety Classification:
N/A Maintenance Rule Risk Significant? (Yes or No)
N/A Work Instruction                                                                                                WI 5.14 Job Performance Measures                                                                                          Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief                                                                Revision: 4 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                              STANDARD CUE:       Provide examinee with Cue Sheet. If asked, provide the examinee with the CRS Shift Relief Checklist (attached).
NOTE: Examiner is to perform as the CRS being relieved.
CUE:       When asked, provide the examinee with the Unit Log for the past 24 hours (attached).
* 1. Review Unit Log and abnormal events that
* 1. Reviews Unit Log, and initials MOP01003.
have occurred in the last 24 hours.
CUE:       A few hours ago power was raised from 82% to 100%. Power had been reduced to perform Turbine Valve testing. The Reactor Building Rounds NO is monitoring and adjusting Recirc MG Set oil temperatures as necessary.
HPCI was tagged out to perform corrective maintenance on the Aux Oil Pump, and HPCI has been restored to operable status.
* 2. Review General Plant Status by discussing
* 2. Reviews General Plant Status with CRS by operating condition, special limitations, bands      discussing operating condition, special and ranges.                                           limitations, bands and ranges, and initials MOP01003.
CUE:       If asked, there are no outstanding LCOs.
* 3. Review LCOs.
* 3. Reviews LCO log book or discusses with CRS, and initials MOP01003.
: 4. Read Urgent Required Reading.                     4. Verifies no Urgent Required Reading present (red binder).
CUE:       Alarm 1D34 is in due to a faulty conductivity cell E11-N001A. There has been a CARD written to address the problem. Conductivity is currently normal, and Chemistry is checking the conductivity each shift.
Alarm 4D78 is in due to a broken level switch N30-N095. There has been a CARD written to address the problem. The tank level is currently normal, and the Turbine Building Rounds NO is checking the level twice per shift.
CUE:       SM acknowledges report of the problem with HPCI, and directs the examinee to complete the turnover. The concern with HPCI will be addressed when turnover is complete.
* 5. Walk down COPs, and discuss any off-normal
* 5. Walks down COPs, and discusses any off-condition, status of ESF equipment, reasons          normal condition, status of ESF equipment, for lit annunciators, and IPCS alarms.                reasons for lit annunciators, and IPCS alarms, and initials MOP01003.
Asks reasons for alarms 1D34 & 4D78.
Determines HPCI Aux Oil Pump CMC is improperly positioned and informs SM/CRS.
CUE:       Currently, there are no non-triggered situation surveillances required.
* 6. Discuss non-triggered situational
* 6. Discusses non-triggered situational surveillance requirements.                            surveillance requirements, and initials MOP01003.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief                                                                Revision: 4 Page 5 ELEMENT                                          STANDARD
* 7. Verify qualification for position.
* 7. Verifies qualifications listed in the Qualification Reporting Tool, and initials MOP01003.
CUE:     End JPM when the items noted by an asterisk on the Shift Relief Checklist are completed.
______ SATISFACTORY                                ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief                                                            Revision: 4 Page 6 Evaluator Notes:
This JPM should be started at the CRS Desk in the Simulator.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief                                          Revision: 4 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitlePerformaCRSShortTermReliefNo.:JP-OP-802-4101-419Revision:4Page8WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:IC-20Malfunctions:NumberTitleValueDelayRampC97MF004801D034RHRHXWaterConductivityHigh100C97MF070904D078SealOilReservoirTankLevelLow100RemoteFunctions:NumberTitleValueDelayRampN/AOverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:1.InitializethesimulatorandplaceinRUN.2.Openandexecutelesson802_4101_419.lsn,orinsertthemalfunctionslistedabove.3.PlaceE4101-C005,HPCITurbineAuxOilPump,CMCswitchinOFFRESET.4.Acknowledgeallalarms,andensureplantconditionsarestable.5.Ensurethefollowingitemsareavailable:CRSshiftReliefChecklist-MOP01003Previous24hoursunitlog(attachedtoJPM)RequiredreadingbooksLCObook JOBPERFORMANCEMEASUREPage9CueSheet:(JP-OP-802-4101-419)InitialConditions:YouareanextraSROassignedtotheshift.Youattendedtheshiftturnovermeetingthismorning.Plantconditionsarestableandasyouseethem.InitiatingCue(s):TheSMdirectsyoutoprovideaShortTermReliefwiththeCRS.Allprerequisitesarecomplete.
===Response===
JOBPERFORMANCEMEASUREPage10TRAININGUSEONLYFermi2ControlRoomLogDateEntryUserYesterday07:02G.NecorelievedR.ValorasCRNSO,T.SwordrelievedR.KitchenasP603,P.CrabberelievedA.NightlightasCRS,M.L.HopwickrelievedJ.KonnersasSTAMode:1ReactorPower:82%2807MWtRecircSpeeds:A:62%B:63%CoreFlow:77MLB/HRRPVPressure:1001PSIGRPVLevel:197INTorusTemp:79DEGFTorusLevel:-0.6INDWTemp:129DEGFDWPress:0.4PSIGCondenserPressure:1.07PSIAGeneratorOutput:923MWee52xxxYesterday15:42N3000AddedhydrogentothegeneratorIAW23.122section11.0,Initialpressure70PSIGFinalPressure75PSIGe51xxxYesterday18:30Rel-S.FloydrelievedJ.KochasRadwasteOperatorAssigned.AlsoFredSeeverisU.I.forROAe50xxxYesterday19:05R.ValorrelievedG.NecoasCRNSO,R.KitchenrelievedT.SwordasP603,A.NightlightrelievedP.CrabbeasCRS,J.KonnersrelievedM.L.HopwickasSTAMode:1ReactorPower:82%2808MWtRecircSpeeds:A:62%B:63%CoreFlow:77MLB/HRRPVPressure:1002PSIGRPVLevel:197INTorusTemp:80DEGFTorusLevel:-0.6INDWTemp:129DEGFDWPress:0.4PSIGCondenserPressure:1.06PSIAGeneratorOutput:924MWee56xxxYesterday19:20StartedP4100C011CWRESERVOIRWESTMAKEUPPUMPinaccordancewith23.131section6.8-CWReservoirMakeupPumpOperatione56xxxYesterday19:25M.AdorerelievedG.AlmosasShiftManagerShiftassignmentsareinaccordancewiththeshiftassignmentsheet.e57xxxYesterday20:32N3033AddedwatertoStatorWaterHeadTankIAW23.120section6.4e56xxxYesterday21:43StoppedP4100C010CWRESERVOIREASTMAKEUPPUMPinaccordancewith23.131section6.8-CWReservoirMakeupPumpOperatione56xxxYesterday23:28N3000AddedhydrogentothegeneratorIAW23.122section11.0,Initialpressure70PSIGFinalPressure75PSIGe58xxxToday01:42Startedaplannedreactivitychangefrom82%to100%reactorpowerusingacombinationofFlowandRodsforRodPatternAdjustmentInitialRecircSpeeds:A62.00B63.00InitialCoreFlowis77e59xxxToday02:32StartedP4100C010CWRESERVOIREASTMAKEUPPUMPinaccordancewith23.131section6.8-CWReservoirMakeupPumpOperatione58xxxToday04:39N3000AddedhydrogentothegeneratorIAW23.122section11.0,Initialpressure71PSIGFinalPressure75PSIGe58xxxToday04:45Verifiedreactorpowerat95%iswithin3%(ofrated)ofthevalueindicatedinthePowervs.SteamFlowgraphIAW22.000.03e59xxxToday05:08StoppedP4100C011CWRESERVOIRWESTMAKEUPPUMPinaccordancewith23.131section6.8-CWReservoirMakeupPumpOperatione58xxxToday05:38Completedaplannedreactivitychangefrom82%to100%reactorpowerusingRecircFlow.FinalRecircSpeeds:A70.2B70.2FinalCoreFlowis84.8ContactedCSS(Mitchell)andMOC(Scott).e55xxxToday06:18CompletedlicensedoperatorwalkdownandreturnedHPCIAuxOilPumptoservice.e59xxxToday06:20E4101-ExitLCO09-0573forHPCIAuxOilPumpInoperable.e59xxxToday06:30Rel-J.KochrelievedS.FloydasRadwasteOperatorAssigned.e55xxxToday06:55R.ValorrelievedG.NecoasCRNSO,R.KitchenrelievedT.SwordasP603,A.NightlightrelievedP.CrabbeasCRS,J.KonnersrelievedM.L.HopwickasSTAMode:1ReactorPower:99.5%3430MWtRecircSpeeds:A:70.25%B:70.25%CoreFlow:84.8MLB/HRRPVPressure:1030PSIGRPVLevel:197INTorusTemp:78.8DEGFTorusLevel:0.12INDWTemp:135.5DEGFDWPress:0.52PSIGCondenserPressure:1.36PSIAGeneratorOutput:1153MWee56xxx JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JobPositionSRO/RONo.JP-OP-802-4101-421Revision2JPMTitleVerifyOffsiteElectricalLineupDuration10minutesPage1Examinee:SRO/ROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Question:
Reference
 
===Response===
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief                                                      Revision: 4 Page 8 Simulator Setup IC#:
IC-20 Malfunctions:
Number                                      Title                    Value        Delay  Ramp C97MF0048                01D034 RHR HX Water Conductivity High          1          0        0 C97MF0709                04D078 Seal Oil Reservoir Tank Level Low        1          0        0 Remote Functions:
Number                                      Title                    Value        Delay  Ramp N/A Override Functions:
Number                                      Title                    Value        Delay  Ramp N/A Special Instructions:
: 1. Initialize the simulator and place in RUN.
: 2. Open and execute lesson 802_4101_419.lsn, or insert the malfunctions listed above.
: 3. Place E4101-C005, HPCI Turbine Aux Oil Pump, CMC switch in OFF RESET.
: 4. Acknowledge all alarms, and ensure plant conditions are stable.
: 5. Ensure the following items are available:
CRS shift Relief Checklist - MOP01003 Previous 24 hours unit log (attached to JPM)
Required reading books LCO book Work Instruction                                                                                WI 5.14 Job Performance Measures                                                                          Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE                Page 9 Cue Sheet: (JP-OP-802-4101-419)
Initial Conditions:
You are an extra SRO assigned to the shift.
You attended the shift turnover meeting this morning.
Plant conditions are stable and as you see them.
Initiating Cue(s):
The SM directs you to provide a Short Term Relief with the CRS.
All prerequisites are complete.
 
JOB PERFORMANCE MEASURE                                      Page 10 TRAINING USE ONLY Fermi 2 Control Room Log Date      Entry                                                                                          User Yesterday G. Neco relieved R. Valor as CRNSO, T. Sword relieved R. Kitchen as P603, P. Crabbe            e52xxx 07:02    relieved A. Nightlight as CRS, M. L. Hopwick relieved J. Konners as STA Mode: 1 Reactor Power: 82 % 2807MWt Recirc Speeds: A: 62 % B: 63 % Core Flow: 77 MLB/HR RPV Pressure: 1001 PSIG RPV Level: 197 IN Torus Temp: 79 DEGF Torus Level: -0.6 IN DW Temp: 129 DEGF DW Press: 0.4 PSIG Condenser Pressure: 1.07 PSIA Generator Output: 923 MWe Yesterday N3000 Added hydrogen to the generator IAW 23.122 section 11.0, Initial pressure 70            e51xxx 15:42    PSIG Final Pressure 75 PSIG Yesterday Rel - S.Floyd relieved J.Koch as Radwaste Operator Assigned. Also Fred Seever is U.I.         e50xxx 18:30    for ROA Yesterday R. Valor relieved G. Neco as CRNSO, R. Kitchen relieved T. Sword as P603, A.                   e56xxx 19:05    Nightlight relieved P. Crabbe as CRS, J. Konners relieved M. L. Hopwick as STA Mode: 1 Reactor Power: 82 % 2808MWt Recirc Speeds: A: 62 % B: 63 % Core Flow: 77 MLB/HR RPV Pressure: 1002 PSIG RPV Level: 197 IN Torus Temp: 80 DEGF Torus Level: -0.6 IN DW Temp: 129 DEGF DW Press: 0.4 PSIG Condenser Pressure: 1.06 PSIA Generator Output: 924 MWe Yesterday Started P4100C011 CW RESERVOIR WEST MAKEUP PUMP in accordance with                            e56xxx 19:20    23.131 section 6.8 - CW Reservoir Makeup Pump Operation Yesterday M. Adore relieved G. Almos as Shift Manager Shift assignments are in accordance with          e57xxx 19:25    the shift assignment sheet.
Yesterday N3033 Added water to Stator Water Head Tank IAW 23.120 section 6.4                            e56xxx 20:32 Yesterday Stopped P4100C010 CW RESERVOIR EAST MAKEUP PUMP in accordance with                            e56xxx 21:43    23.131 section 6.8 - CW Reservoir Makeup Pump Operation Yesterday N3000 Added hydrogen to the generator IAW 23.122 section 11.0, Initial pressure 70            e58xxx 23:28    PSIG Final Pressure 75 PSIG Today    Started a planned reactivity change from 82% to 100% reactor power using a                    e59xxx 01:42    combination of Flow and Rods for Rod Pattern Adjustment Initial Recirc Speeds: A 62.00 B 63.00 Initial Core Flow is 77 Today    Started P4100C010 CW RESERVOIR EAST MAKEUP PUMP in accordance with 23.131                      e58xxx 02:32    section 6.8 - CW Reservoir Makeup Pump Operation Today    N3000 Added hydrogen to the generator IAW 23.122 section 11.0, Initial pressure 71            e58xxx 04:39    PSIG Final Pressure 75 PSIG Today    Verified reactor power at 95% is within 3% (of rated) of the value indicated in the Power      e59xxx 04:45    vs. Steam Flow graph IAW 22.000.03 Today    Stopped P4100C011 CW RESERVOIR WEST MAKEUP PUMP in accordance with                            e58xxx 05:08    23.131 section 6.8 - CW Reservoir Makeup Pump Operation Today    Completed a planned reactivity change from 82% to 100% reactor power using Recirc              e55xxx 05:38    Flow. Final Recirc Speeds: A 70.2 B 70.2 Final Core Flow is 84.8 Contacted CSS (Mitchell) and MOC (Scott).
Today    Completed licensed operator walkdown and returned HPCI Aux Oil Pump to service.               e59xxx 06:18 Today    E4101 - Exit LCO 09-0573 for HPCI Aux Oil Pump Inoperable.                                     e59xxx 06:20 Today    Rel - J. Koch relieved S. Floyd as Radwaste Operator Assigned.                                 e55xxx 06:30 Today    R. Valor relieved G. Neco as CRNSO, R. Kitchen relieved T. Sword as P603, A.                   e56xxx 06:55    Nightlight relieved P. Crabbe as CRS, J. Konners relieved M. L. Hopwick as STA Mode: 1 Reactor Power: 99.5% 3430 MWt Recirc Speeds: A: 70.25% B: 70.25% Core Flow: 84.8 MLB/HR RPV Pressure: 1030 PSIG RPV Level: 197 IN Torus Temp: 78.8 DEGF Torus Level: 0.12 IN DW Temp: 135.5 DEGF DW Press: 0.52 PSIG Condenser Pressure: 1.36 PSIA Generator Output: 1153 MWe
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                             Revision SRO / RO                                                      JP-OP-802-4101-421                      2 JPM Title                                                      Duration            Page Verify Offsite Electrical Lineup                                10 minutes                      1 Examinee:                                                                     SRO / RO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical        Start Time Evaluation Method:           Perform / Walkthrough / Discuss                Stop Time Location:                   Plant / Simulator / Classroom                  Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*11.*2.*12.*3.*13.*4.14.*5.15.*6.*7.*8.*9.*10.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleVerifyOffsiteElectricalLineupNo.:JP-OP-802-4101-421Revision:2Page2WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U      Comment        Element    S  U      Comment      Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleVerifyOffsiteElectricalLineupNo.:JP-OP-802-4101-421Revision:2Page3WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1JPMInformationSystem:S2000/S4000-120/345KVSwitchyardsTask:57520-PerformControlRoom-Mode1,2,3Surveillances
* 1.                                 *11.
* 2.                                 *12.
* 3.                                 *13.
* 4.                                   14.
* 5.                                   15.
* 6.
* 7.
* 8.
* 9.
      *10.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for        Does not meet            Comment Fundamental            Expectations            Improvement            Expectations            Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup                                                              Revision: 2 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was        Did not recognize key at proper frequency, using    performed but undue focus  equipment status indicators, multiple means if available. on task or lack of system  too much focus on single Understood which indications  knowledge prevented ideal  indications and ignored total were critical.               monitoring.               system status.
Control            Task preview used to          Adequate control of system No anticipation of results of prepare for job. Aware of    maintained throughout task actions. Unaware or control control bands and            but some improvements      bands or not able to maintain maintained them.             could be made such as      them. Lack of knowledge of Configuration control        better manual control or  how to control system maintained.                   greater depth of knowledge parameters.
for anticipating system response.
Conservatism      Low threshold for            Some opportunities existed Proceeds even when unsure identification of problems. to question before        with unanswered questions.
Questioning attitude. Uses   proceeding, High focus on  High threshold for problem stop when unsure if        task completion without    conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status  Routinely takes action without system status changes to the  and actions. Some          informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic  Unable to predict system response based on solid      fundamental knowledge has  response, unsure of generic system knowledge. Good        some gaps.                fundamentals concepts working knowledge of                                    related to plant operation.
generic fundamentals to                                  Only relied on procedure for predict and monitor system                              operating knowledge.
response.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                                              No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup                                                                                                Revision: 2 Page 3 JPM Information System:
S2000/S4000 - 120/345KV Switchyards Task:
57520 - Perform Control Room - Mode 1, 2, 3 Surveillances


==References:==
==References:==
Required(R)/Available(A)24.000.01,SituationalSurveillances/LCOActionTracking,Attachment28b(R)ToolsandEquipmentRequired:Markedup24.000.01,Attachments28a&28bInitialConditions:YouaretheCRNSO.Thecurrenttimeis0500.EDG-11isoutofserviceformaintenance.TheCRShasenteredLCO3.8.1ActionA.InitiatingCue(s):TheCRSdirectsyoutoperform24.000.01,Attachment28b.TerminatingCue(s):24.000.01Attachment28biscompleted.TaskStandard:24.000.01,Attachment28b,iscompletedcorrectly.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:N/AK/A
Required (R) / Available (A) 24.000.01, Situational Surveillances/LCO Action Tracking, Attachment 28b (R)
Tools and Equipment Required:
Marked up 24.000.01, Attachments 28a & 28b Initial Conditions:
You are the CRNSO.
The current time is 0500.
EDG-11 is out of service for maintenance.
The CRS has entered LCO 3.8.1 Action A.
Initiating Cue(s):
The CRS directs you to perform 24.000.01, Attachment 28b.
Terminating Cue(s):
24.000.01 Attachment 28b is completed.
Task Standard:
24.000.01, Attachment 28b, is completed correctly.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
N/A K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:GENERICK/ASTATEMENT:2.1.29Knowledgeofhowtoconductsystemlineups,suchasvalves,breakers,switches,etc.(CFR41.10/45.1/45.12).................................................................................................4.1/4.0MaintenanceRuleSafetyClassification:N/AMaintenanceRuleRiskSignificant?(YesorNo)N/A JOBPERFORMANCEMEASUREJPMTitleVerifyOffsiteElectricalLineupNo.:JP-OP-802-4101-421Revision:2Page4WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDCUE:ProvideexamineewithCueSheetandmarkedup24.000.01Attachments28a&28b.*1.[1.1.1]RecordBus101voltage.*1.Records120VBus101voltage.*2.[1.1.2]Verifyindicatedvoltageisapproximately120VAC.*2.Recordsinitialsverifyingvoltageis~120VAC.*3.[1.1.3]Ifindicatedbusvoltageis<116VAC,notifytheSM,otherwiseNA.*3.RecordsNAintheinitialsblock.CUE:Ifasked,informexamineethatBreakerGDwasopenedmid-shiftatITC'srequest.*4.[1.1.4]Verifyonethefollowinglineupsismet:ForShoalLinesupplying,BreakerGDisCLOSED.ForRadkaLinesupplying,BreakerGKandGHareCLOSED.ForSwanCreekLineSupplying,BreakersGMandGHareCLOSED.*4.Checksoffthefollowingboxes,andinitialsthatatleastoneofthelineupsiscorrect:ForRadkaLinesupplying,BreakerGKandGHareCLOSED.ForSwanCreekLineSupplying,BreakersGMandGHareCLOSED.*5.[1.1.5]VerifythefollowingbreakersareCLOSED:TRANS1DECPOSABKRCONTROLSSTRANS64PRIPOSDBKRCONTROL*5.ChecksoffeachboxandinitialsthatbreakersareCLOSED.*6.[1.2]ForBus102supplyingSST64,performthefollowing:*6.ThissectionisNA,thereforeexamineerecordsNAonsteps1.2.1through1.2.5.*7.[1.3]Verifyatleastoneofthetwoconditionsismet:Steps1.1.2,1.1.4,andStep1.1.5werecompletedsatisfactorily.orSteps1.2.2,1.2.4,andStep1.2.5werecompletedsatisfactorily.*7.Placesacheckmarknexttostep1.3.1andinitialstheAcceptanceCriteria.*8.[1.4.1]RecordBus301voltage.*8.Records120VBus301voltage.*9.[1.4.2]Verifyindicatedvoltageisapproximately120VAC.*9.Recordsinitialsverifyingvoltageis~120VAC.*10.[1.4.3]Ifindicatedbusvoltageis<118.1VAC,notifytheSM,otherwiseNA*10.RecordsNAintheinitialsblock.
(from NUREG 1123)
JOBPERFORMANCEMEASUREJPMTitleVerifyOffsiteElectricalLineupNo.:JP-OP-802-4101-421Revision:2Page5WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1ELEMENTSTANDARD*11.[1.4.4]Verifyonethefollowinglineupsismet:ForBRTN2Linesupplying,BreakerDFisCLOSED.ForBRTN2Linesupplying,BreakersDM,CM,andCFareCLOSEDwithMainGeneratoroffline.ForBRTN3Line,BreakerBMisCLOSEDForBRTN3Line,BreakersBT,CMandCFareCLOSEDwithMainGeneratoroffline.*11.Checksoffthefollowingboxes,andinitialsthatatleastoneofthelineupsiscorrect:ForBRTN2Linesupplying,BreakerDFisCLOSED.ForBRTN3Line,BreakerBMisCLOSED*12.[1.4.5]Breakers65E-E6and65F-F6areclosed.*12.InitialsthatBreakers65E-E6and65F-F6areclosed.*13.[1.5]VerifyStep1.4.2andStep1.4.4and1.4.5werecompletedsatisfactorily.*13.RecordsinitialstheAcceptanceCriteriablock.14.[1.6]SignforcompletedandrecordName,InitialsandSignature14.Recordsdateandtimeofcompletion,andrecordsName,InitialsandSignature.15.DocumentonAttachment28athatAction2wasperformedbyrecordingDate,Time,InitialsandIDnumber.15.RecordsDateandTimeperformed,InitialsandentersIDnumberonAttachment28a,Action2.CUE:TerminateJPMwhen24.000.01,Attachment28b,iscompleted.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleVerifyOffsiteElectricalLineupNo.:JP-OP-802-4101-421Revision:2Page6WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1EvaluatorNotes:ThisJPMcanbeperformedintheSimulatorortheControlRoom.ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:NoneSystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
K/A SYSTEM: GENERIC K/A STATEMENT:
JOBPERFORMANCEMEASUREJPMTitleVerifyOffsiteElectricalLineupNo.:JP-OP-802-4101-421Revision:2Page7WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
2.1.29 Knowledge of how to conduct system lineups, such as valves, breakers, switches, etc.
(CFR 41.10 / 45.1 / 45.12)................................................................................................. 4.1 / 4.0 Maintenance Rule Safety Classification:
N/A Maintenance Rule Risk Significant? (Yes or No)
N/A Work Instruction                                                                                                                            WI 5.14 Job Performance Measures                                                                                                                      Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup                                                            Revision: 2 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                        STANDARD CUE:     Provide examinee with Cue Sheet and marked up 24.000.01 Attachments 28a & 28b.
* 1.     [1.1.1] Record Bus 101 voltage.
* 1. Records 120V Bus 101 voltage.
* 2.     [1.1.2] Verify indicated voltage is
* 2. Records initials verifying voltage is approximately 120 VAC.                          ~120 VAC.
* 3.     [1.1.3] If indicated bus voltage is <116
* 3. Records NA in the initials block.
VAC, notify the SM, otherwise NA.
CUE:     If asked, inform examinee that Breaker GD was opened mid-shift at ITCs request.
* 4.     [1.1.4] Verify one the following lineups is
* 4. Checks off the following boxes, and initials met:                                             that at least one of the lineups is correct:
For Shoal Line supplying, Breaker GD            For Radka Line supplying, Breaker is CLOSED.                                       GK and GH are CLOSED.
For Radka Line supplying, Breaker              For Swan Creek Line Supplying, GK and GH are CLOSED.                            Breakers GM and GH are CLOSED.
For Swan Creek Line Supplying, Breakers GM and GH are CLOSED.
* 5.     [1.1.5] Verify the following breakers are
* 5. Checks off each box and initials that CLOSED:                                          breakers are CLOSED.
TRANS 1 DEC POS A BKR CONTROL SS TRANS 64 PRI POS D BKR CONTROL
* 6.     [1.2] For Bus 102 supplying SST 64,
* 6. This section is NA, therefore examinee perform the following:                          records NA on steps 1.2.1 through 1.2.5.
* 7.     [1.3] Verify at least one of the two
* 7. Places a check mark next to step 1.3.1 conditions is met:                               and initials the Acceptance Criteria.
Steps 1.1.2, 1.1.4, and Step 1.1.5 were completed satisfactorily.
or Steps 1.2.2, 1.2.4, and Step 1.2.5 were completed satisfactorily.
* 8.     [1.4.1] Record Bus 301 voltage.
* 8. Records 120V Bus 301 voltage.
* 9.     [1.4.2] Verify indicated voltage is
* 9. Records initials verifying voltage is approximately 120 VAC.                          ~120 VAC.
  *10.     [1.4.3] If indicated bus voltage is <118.*10. Records NA in the initials block.
VAC, notify the SM, otherwise NA Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup                                                              Revision: 2 Page 5 ELEMENT                                            STANDARD
  *11.     [1.4.4] Verify one the following lineups is *11. Checks off the following boxes, and initials met:                                               that at least one of the lineups is correct:
For BRTN 2 Line supplying, Breaker                For BRTN 2 Line supplying, Breaker DF is CLOSED.                                      DF is CLOSED.
For BRTN 2 Line supplying, Breakers              For BRTN 3 Line, Breaker BM is DM, CM, and CF are CLOSED with                    CLOSED Main Generator off line.
For BRTN 3 Line, Breaker BM is CLOSED For BRTN 3 Line, Breakers BT, CM and CF are CLOSED with Main Generator off line.
  *12.     [1.4.5] Breakers 65E-E6 and 65F-F6 are      *12. Initials that Breakers 65E-E6 and 65F-F6 closed.                                            are closed.
  *13.     [1.5] Verify Step 1.4.2 and Step 1.4.4 and  *13. Records initials the Acceptance Criteria 1.4.5 were completed satisfactorily.               block.
: 14.     [1.6] Sign for completed and record          14. Records date and time of completion, and Name, Initials and Signature                      records Name, Initials and Signature.
: 15.     Document on Attachment 28a that              15. Records Date and Time performed, Action 2 was performed by recording                Initials and enters ID number on Date, Time, Initials and ID number.               Attachment 28a, Action 2.
CUE:     Terminate JPM when 24.000.01, Attachment 28b, is completed.
______ SATISFACTORY                                  ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup                                                            Revision: 2 Page 6 Evaluator Notes:
This JPM can be performed in the Simulator or the Control Room.
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                      No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup                                            Revision: 2 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleVerifyOffsiteElectricalLineupNo.:JP-OP-802-4101-421Revision:2Page8WorkInstructionWI5.14JobPerformanceMeasuresRev1Attachment1SimulatorSetupIC#:IC-20oranyfullpowerIC.Malfunctions:NumberTitleValueDelayRampN/ARemoteFunctions:NumberTitleValueDelayRampR30RF0009EDG11ControlModeSwitchMPO00OverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:1.InitializetodesiredIC,andplacethesimulatorinRUN.2.OpenShoalLineBreakerGD.3.Inserttheremotefunctionlistedabove.4.Silenceandacknowledgeallalarms,andplacethesimulatorinFREEZE.
===Response===
JOBPERFORMANCEMEASURECueSheet:(JP-OP-802-4101-421)InitialConditions:YouaretheCRNSO.Thecurrenttimeis0500.EDG-11isoutofserviceformaintenance.TheCRShasenteredLCO3.8.1ActionA.InitiatingCue(s):TheCRSdirectsyoutoperform24.000.01,Attachment28b.
Question:
JOB PERFORMANCE MEASURE Work Instruction WI 5.14 Job Performance Measures Rev 2  Attachment 1 Job Position SRO / RO / NO No. JP-OP-802-4101-441 Revision 1 JPM Title Identify the Isolation Boundaries for a Clearance to Replace a Pump Impeller Duration 20 minutes Page 1  Examinee:   SRO / RO / NO Evaluator:     JPM Type: Normal / Alternate Path / Time Critical Start Time   Evaluation Method: Perform / Walkthrough / Discuss Stop Time   Location: Plant / Simulator / Classroom Total Time:   PERFORMANCE EVALUATION  
Reference
 
===Response===
Work Instruction                                                                      WI 5.14 Job Performance Measures                                                                Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                  No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup                                                        Revision: 2 Page 8 Simulator Setup IC#:
IC-20 or any full power IC.
Malfunctions:
Number                                    Title                          Value      Delay  Ramp N/A Remote Functions:
Number                                    Title                          Value      Delay  Ramp R30RF0009                    EDG 11 Control Mode Switch                  MPO          0        0 Override Functions:
Number                                    Title                          Value      Delay  Ramp N/A Special Instructions:
: 1.       Initialize to desired IC, and place the simulator in RUN.
: 2.       Open Shoal Line Breaker GD.
: 3.       Insert the remote function listed above.
: 4.       Silence and acknowledge all alarms, and place the simulator in FREEZE.
Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                            Rev 1 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-421)
Initial Conditions:
You are the CRNSO.
The current time is 0500.
EDG-11 is out of service for maintenance.
The CRS has entered LCO 3.8.1 Action A.
Initiating Cue(s):
The CRS directs you to perform 24.000.01, Attachment 28b.
 
JOB PERFORMANCE MEASURE Job Position                                                 No.                                Revision SRO / RO / NO                                                 JP-OP-802-4101-441                         1 JPM Title                                                     Duration              Page Identify the Isolation Boundaries for a Clearance to           20 minutes                        1 Replace a Pump Impeller Examinee:                                                                     SRO / RO / NO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical         Start Time Evaluation Method:         Perform / Walkthrough / Discuss                 Stop Time Location:                   Plant / Simulator / Classroom                   Total Time:
PERFORMANCE EVALUATION  


==SUMMARY==
==SUMMARY==
Element S U Comment Element S U Comment Element S U Comment 1.
 
* 2.           3.
Element     S   U     Comment       Element   S   U     Comment       Element     S     U     Comment 1.
* 2.
3.
* 4.
* 4.
* 5.
* 5.
* 6.
* 6.
* 7.                                                 OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation. Operator Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Comment Number Monitoring     Control     Conservatism     Teamwork     Knowledge     OVERALL EVALUATOR COMMENTS:             ______ PASS ______ FAIL Evaluator Signature / Date: /
* 7.
JOB PERFORMANCE MEASURE JPM Title Identify the Isolation Boundaries for a Clearance to Replace a Pump Impeller No.: JP-OP-802-4101-441 Revision: 1 Page 2 Work Instruction WI 5.14 Job Performance Measures Rev 2  Attachment 1 JPM Observation Criteria Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Monitoring Equipment status monitored at proper frequency, using multiple means if available. Understood which indications were critical. Some monitoring was performed but undue focus on task or lack of system knowledge prevented ideal monitoring. Did not recognize key equipment status indicators, too much focus on single indications and ignored total system status. Control Task preview used to prepare for job. Aware of control bands and maintained them. Configuration control maintained. Adequate control of system maintained throughout task but some improvements could be made such as better manual control or greater depth of knowledge for anticipating system response. No anticipation of results of actions. Unaware or control bands or not able to maintain them. Lack of knowledge of how to control system parameters. Conservatism Low threshold for identification of problems. Questioning attitude. Uses needed. Sensitive to nuclear safety. Some opportunities existed to question before proceeding, High focus on task completion without consideration for other system affects. Proceeds even when unsure with unanswered questions. High threshold for problem conditions. Teamwork Routinely communicates system status changes to the team. Communicates actions before taking them. Communicated most status and actions. Some improvement would be warranted. Routinely takes action without informing the team. Knowledge Able to anticipate system response based on solid system knowledge. Good working knowledge of generic fundamentals to predict and monitor system response. Plant, system, or generic fundamental knowledge has some gaps. Unable to predict system response, unsure of generic fundamentals concepts related to plant operation. Only relied on procedure for operating knowledge.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
JOB PERFORMANCE MEASURE JPM Title Identify the Isolation Boundaries for a Clearance to Replace a Pump Impeller No.: JP-OP-802-4101-441 Revision: 1 Page 3 Work Instruction WI 5.14 Job Performance Measures Rev 2  Attachment 1 JPM Information System: N/A Task: 20993 Perform Protective tagging as the Shift Foreman (Determines the limits of protection necessary and proper tag locations required to protect all aspects of the work).  
Operator             Meets all           Opportunity for         Does not meet             Comment Fundamental          Expectations           Improvement              Expectations              Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS         ______ FAIL Evaluator Signature / Date:                                                             /
Work Instruction                                                                                              WI 5.14 Job Performance Measures                                                                                        Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                       No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a                                    Revision: 1 Pump Impeller                                                                                          Page 2 JPM Observation Criteria Opportunity for Fundamental           Meets all Expectations                                   Does not meet Expectations Improvement Monitoring         Equipment status monitored   Some monitoring was          Did not recognize key at proper frequency, using   performed but undue focus    equipment status indicators, multiple means if available. on task or lack of system     too much focus on single Understood which indications  knowledge prevented ideal    indications and ignored total were critical.                monitoring.                  system status.
Control             Task preview used to prepare Adequate control of system    No anticipation of results of for job. Aware of control    maintained throughout task    actions. Unaware or control bands and maintained them. but some improvements         bands or not able to maintain Configuration control        could be made such as better them. Lack of knowledge of maintained.                  manual control or greater     how to control system depth of knowledge for       parameters.
anticipating system response.
Conservatism       Low threshold for             Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding,  with unanswered questions.
Questioning attitude. Uses   High focus on task           High threshold for problem stop when unsure if        completion without           conditions.
needed. Sensitive to nuclear  consideration for other safety.                      system affects.
Teamwork           Routinely communicates       Communicated most status      Routinely takes action without system status changes to the and actions. Some            informing the team.
team. Communicates actions   improvement would be before taking them.           warranted.
Knowledge           Able to anticipate system     Plant, system, or generic     Unable to predict system response based on solid      fundamental knowledge has    response, unsure of generic system knowledge. Good        some gaps.                    fundamentals concepts working knowledge of generic                                related to plant operation.
fundamentals to predict and                                Only relied on procedure for monitor system response.                                    operating knowledge.
Work Instruction                                                                                            WI 5.14 Job Performance Measures                                                                                      Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                       No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a                                Revision: 1 Pump Impeller                                                                                      Page 3 JPM Information System:
N/A Task:
20993 Perform Protective tagging as the Shift Foreman (Determines the limits of protection necessary and proper tag locations required to protect all aspects of the work).


==References:==
==References:==
Required (R) / Available (A) MOP12, Tagging and Protective Barrier System (R) 23.120, Stator Water Cooling (A) M-5717-4, Generator Stator Winding Cooling System Functional Operating Sketch (A) I-2341-24 Schematic Diagram, Stator Coolant Pump East & West (A) Tools and Equipment Required: Mechanical Piping Diagram, Electrical Diagram Initial Conditions: You are the Control Room NSO. A tagout has been requested to permit replacement of the East Stator Water Cooling Pump impeller. The E-Tagging system is not available. Initiating Cue(s): In preparation for initiating a Safety Tagging Record (STR) to replace the impeller on the East Stator Water Cooling Pump, determine the limits of protection necessary and proper tag locations required to protect all aspects of the work order. Terminating Cue(s): The applicant provides the component isolation boundaries. Task Standard: The component isolation boundaries are identified per MOP12. Licensed Operator Exam Information (required for NRC exams) Safety Function: N/A K/A  
Required (R) / Available (A)
MOP12, Tagging and Protective Barrier System (R) 23.120, Stator Water Cooling (A)
M-5717-4, Generator Stator Winding Cooling System Functional Operating Sketch (A)
I-2341-24 Schematic Diagram, Stator Coolant Pump East & West (A)
Tools and Equipment Required:
Mechanical Piping Diagram, Electrical Diagram Initial Conditions:
You are the Control Room NSO.
A tagout has been requested to permit replacement of the East Stator Water Cooling Pump impeller.
The E-Tagging system is not available.
Initiating Cue(s):
In preparation for initiating a Safety Tagging Record (STR) to replace the impeller on the East Stator Water Cooling Pump, determine the limits of protection necessary and proper tag locations required to protect all aspects of the work order.
Terminating Cue(s):
The applicant provides the component isolation boundaries.
Task Standard:
The component isolation boundaries are identified per MOP12.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
N/A K/A  


==Reference:==
==Reference:==
(from NUREG 1123) K/A SYSTEM: Generic/Equipment Control K/A STATEMENT: 2.2.13 Knowledge of tagging and clearance procedures (4.1/4.3) Maintenance Rule Safety Classification: N/A Maintenance Rule Risk Significant? (Yes or No) N/A JOB PERFORMANCE MEASURE JPM Title Identify the Isolation Boundaries for a Clearance to Replace a Pump Impeller No.: JP-OP-802-4101-441 Revision: 1 Page 4 Work Instruction WI 5.14 Job Performance Measures Rev 2  Attachment 1 PERFORMANCE EVALUATION Start Time   ELEMENT STANDARD CUE: Provide the applicant with a blank Safety Tagging Record to document his findings. If requested, provide copy of MOP12 and/or ODE-19. NOTE: The applicant is not being graded on completion of the form, only that the required boundaries and tag locations are identified. NOTE: If hard copies of the mechanical/electrical drawings are unavailable, a Fermi computer may be used to access the drawings (M-5717-4 or I-2341-24) as needed. 1. Using the associated electrical drawing, identify the electrical isolation boundary. 1. Identifies the Power Supply Breaker as the electrical isolation boundary. *2. Identify the proper tag location for each component identified in the previous step.
(from NUREG 1123)
* 2. Identifies Bus 72A Pos 4C, N3033C047 East Stator Water Cooling Pump breaker should be in the disconnect position and RED TAGGED. 3. Using the associated mechanical drawing, identify the mechanical isolation boundaries. 3. Identifies the following mechanical isolation boundaries: Suction Valve, N3033-F089A Discharge Valve, N3033-F070A Vent Valve, N3033-F907A Drain Valve, N3033-F067A *4. Identify the required position of the Suction Valve.  *4. Identifies the Suction Valve N3033-F089A should be Closed and RED TAGGED. *5. Identify the required position of the Discharge Valve.  *5. Identifies the Discharge Valve N3033-F070A should be Closed and RED TAGGED. *6. Identify the required position of the Drain Valve.  *6. Identifies the Drain Valve N3033-F067A should be Open and RED TAGGED. *7. Identify the required position of the Vent Valve.  *7. Identifies the Vent Valve N3033-F907A should be Open and RED TAGGED. CUE: The JPM may be terminated when the applicant provides the component isolation boundaries. ______ SATISFACTORY ______ UNSATISFACTORY Stop Time
K/A SYSTEM: Generic/Equipment Control K/A STATEMENT: 2.2.13 Knowledge of tagging and clearance procedures (4.1/4.3)
* Critical Step JOB PERFORMANCE MEASURE JPM Title Identify the Isolation Boundaries for a Clearance to Replace a Pump Impeller No.: JP-OP-802-4101-441 Revision: 1 Page 5 Work Instruction WI 5.14 Job Performance Measures Rev 2  Attachment 1 Evaluator Notes: ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES. Generic Notes and Cues: None System Specific Notes and Cues: None Task Performance and Cues: The Elements of this JPM are step by step in accordance with the procedure. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee. Critical Steps: Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Maintenance Rule Safety Classification:
JOB PERFORMANCE MEASURE JPM Title Identify the Isolation Boundaries for a Clearance to Replace a Pump Impeller No.: JP-OP-802-4101-441 Revision: 1 Page 6 Work Instruction WI 5.14 Job Performance Measures Rev 2  Attachment 1 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):                                     Question:                                                                              
N/A Maintenance Rule Risk Significant? (Yes or No)
N/A Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                       No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a                              Revision: 1 Pump Impeller                                                                                      Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                             STANDARD CUE:     Provide the applicant with a blank Safety Tagging Record to document his findings. If requested, provide copy of MOP12 and/or ODE-19.
NOTE: The applicant is not being graded on completion of the form, only that the required boundaries and tag locations are identified.
NOTE: If hard copies of the mechanical/electrical drawings are unavailable, a Fermi computer may be used to access the drawings (M-5717-4 or I-2341-24) as needed.
: 1. Using the associated electrical drawing,           1. Identifies the Power Supply Breaker as the identify the electrical isolation boundary.           electrical isolation boundary.
    *2. Identify the proper tag location for each
* 2. Identifies Bus 72A Pos 4C, N3033C047 East component identified in the previous step.            Stator Water Cooling Pump breaker should be in the disconnect position and RED TAGGED.
: 3. Using the associated mechanical drawing,           3. Identifies the following mechanical isolation identify the mechanical isolation boundaries.        boundaries:
Suction Valve, N3033-F089A Discharge Valve, N3033-F070A Vent Valve, N3033-F907A Drain Valve, N3033-F067A
    *4. Identify the required position of the Suction     *4. Identifies the Suction Valve N3033-F089A Valve.                                                should be Closed and RED TAGGED.
    *5. Identify the required position of the Discharge   *5. Identifies the Discharge Valve N3033-F070A Valve.                                                should be Closed and RED TAGGED.
    *6. Identify the required position of the Drain       *6. Identifies the Drain Valve N3033-F067A Valve.                                                should be Open and RED TAGGED.
    *7. Identify the required position of the Vent       *7. Identifies the Vent Valve N3033-F907A Valve.                                                should be Open and RED TAGGED.
CUE:     The JPM may be terminated when the applicant provides the component isolation boundaries.
______ SATISFACTORY                                   ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                     No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a                              Revision: 1 Pump Impeller                                                                                    Page 5 Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                     No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a              Revision: 1 Pump Impeller                                                                    Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:                                                                                                      Question:                                                                               Reference           Response:
 
JOB PERFORMANCE MEASURE JPM Title Identify the Isolation Boundaries for a Clearance to Replace a Pump Impeller No.: JP-OP-802-4101-441 Revision: 1 Page 7 Work Instruction WI 5.14 Job Performance Measures Rev 2  Attachment 1 Simulator Setup IC#:   Malfunctions: Number Title Value Delay Ramp Remote Functions: Number Title Value Delay Ramp Override Functions: Number Title Value Delay Ramp Special Instructions:
===Response===
JOB PERFORMANCE MEASURE   Cue Sheet: (JP-OP-802-4101-441)   Initial Conditions: You are the CRNSO. A tag out has been requested to permit replacement of the East Stator Water Cooling Pump impeller. The E-Tagging system is not available   Initiating Cue(s): In preparation for initiating a Safety Tagging Record (STR) to replace the impeller on the East Stator Water Cooling Pump, determine the limits of protection necessary and proper tag locations required to protect all aspects of the work order.
Question:
JOBPERFORMANCEMEASUREWorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1JobPositionSRONo.JP-OP-802-4101-443Revision0ActivateECOSinaccordancewithEP-290Duration15minutesPage1Examinee:SROEvaluator:JPMType:Normal/AlternatePath/TimeCriticalStartTimeEvaluationMethod:Perform/Walkthrough/DiscussStopTimeLocation:Plant/Simulator/ClassroomTotalTime:PERFORMANCEEVALUATION
Reference
 
===Response===
Work Instruction                                                                      WI 5.14 Job Performance Measures                                                                Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                         No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a                  Revision: 1 Pump Impeller                                                                        Page 7 Simulator Setup IC#:
Malfunctions:
Number                                   Title                   Value     Delay   Ramp Remote Functions:
Number                                   Title                   Value     Delay   Ramp Override Functions:
Number                                   Title                   Value     Delay   Ramp Special Instructions:
Work Instruction                                                                          WI 5.14 Job Performance Measures                                                                    Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-441)
Initial Conditions:
You are the CRNSO.
A tag out has been requested to permit replacement of the East Stator Water Cooling Pump impeller.
The E-Tagging system is not available Initiating Cue(s):
In preparation for initiating a Safety Tagging Record (STR) to replace the impeller on the East Stator Water Cooling Pump, determine the limits of protection necessary and proper tag locations required to protect all aspects of the work order.
 
JOB PERFORMANCE MEASURE Job Position                                                  No.                               Revision SRO                                                          JP-OP-802-4101-443                        0 Duration              Page Activate ECOS in accordance with EP-290 15 minutes                        1 Examinee:                                                                   SRO Evaluator:
JPM Type:                   Normal / Alternate Path / Time Critical          Start Time Evaluation Method:         Perform / Walkthrough / Discuss                  Stop Time Location:                 Plant / Simulator / Classroom                    Total Time:
PERFORMANCE EVALUATION


==SUMMARY==
==SUMMARY==
ElementSUCommentElementSUCommentElementSUComment*1.*2.*3.*4.*5.*6.*7.*8.OPERATORFUNDAMENTALSOBSERVATIONMonitoroperatorfundamentalsduringtheJPMset.Rateeachareabasedonthecriteriabyplacingacheckmarkintheappropriatecolumn.Indicatethecommentnumberassociatedwiththeobservation.OperatorFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsCommentNumberMonitoringControlConservatismTeamworkKnowledgeOVERALLEVALUATORCOMMENTS:______PASS______FAILEvaluatorSignature/Date:/
 
JOBPERFORMANCEMEASUREJPMTitleActivateECOSinaccordancewithEP-290No.:JP-OP-802-4101-443Revision:0Page2WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1JPMObservationCriteriaFundamentalMeetsallExpectationsOpportunityforImprovementDoesnotmeetExpectationsMonitoringEquipmentstatusmonitoredatproperfrequency,usingmultiplemeansifavailable.Understoodwhichindicationswerecritical.Somemonitoringwasperformedbutunduefocusontaskorlackofsystemknowledgepreventedidealmonitoring.Didnotrecognizekeyequipmentstatusindicators,toomuchfocusonsingleindicationsandignoredtotalsystemstatus.ControlTaskpreviewusedtoprepareforjob.Awareofcontrolbandsandmaintainedthem.Configurationcontrolmaintained.Adequatecontrolofsystemmaintainedthroughouttaskbutsomeimprovementscouldbemadesuchasbettermanualcontrolorgreaterdepthofknowledgeforanticipatingsystemresponse.Noanticipationofresultsofactions.Unawareorcontrolbandsornotabletomaintainthem.Lackofknowledgeofhowtocontrolsystemparameters.ConservatismLowthresholdforidentificationofproblems.Questioningattitude.Uses"stopwhenunsure"ifneeded.Sensitivetonuclearsafety.Someopportunitiesexistedtoquestionbeforeproceeding,Highfocusontaskcompletionwithoutconsiderationforothersystemaffects.Proceedsevenwhenunsurewithunansweredquestions.Highthresholdforproblemconditions.TeamworkRoutinelycommunicatessystemstatuschangestotheteam.Communicatesactionsbeforetakingthem.Communicatedmoststatusandactions.Someimprovementwouldbewarranted.Routinelytakesactionwithoutinformingtheteam.KnowledgeAbletoanticipatesystemresponsebasedonsolidsystemknowledge.Goodworkingknowledgeofgenericfundamentalstopredictandmonitorsystemresponse.Plant,system,orgenericfundamentalknowledgehassomegaps.Unabletopredictsystemresponse,unsureofgenericfundamentalsconceptsrelatedtoplantoperation.Onlyreliedonprocedureforoperatingknowledge.
Element      S  U      Comment        Element    S    U    Comment        Element      S    U    Comment
JOBPERFORMANCEMEASUREJPMTitleActivateECOSinaccordancewithEP-290No.:JP-OP-802-4101-443Revision:0Page3WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1JPMInformationSystem:N/ATask:73999-ActivatetheEmergencyCallOutSystem(ECOS)
* 1.
* 2.
* 3.
* 4.
* 5.
* 6.
* 7.
* 8.
OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.
Operator              Meets all          Opportunity for          Does not meet            Comment Fundamental            Expectations            Improvement            Expectations              Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:
______ PASS        ______ FAIL Evaluator Signature / Date:                                                           /
Work Instruction                                                                                              WI 5.14 Job Performance Measures                                                                                        Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290                                                          Revision: 0 Page 2 JPM Observation Criteria Opportunity for Fundamental          Meets all Expectations                                  Does not meet Expectations Improvement Monitoring        Equipment status monitored    Some monitoring was          Did not recognize key at proper frequency, using    performed but undue focus    equipment status indicators, multiple means if available. on task or lack of system    too much focus on single Understood which indications  knowledge prevented ideal    indications and ignored total were critical.               monitoring.                   system status.
Control            Task preview used to prepare  Adequate control of system    No anticipation of results of for job. Aware of control    maintained throughout task    actions. Unaware or control bands and maintained them. but some improvements        bands or not able to maintain Configuration control        could be made such as better  them. Lack of knowledge of maintained.                   manual control or greater    how to control system depth of knowledge for        parameters.
anticipating system response.
Conservatism      Low threshold for            Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding,   with unanswered questions.
Questioning attitude. Uses    High focus on task            High threshold for problem stop when unsure if        completion without            conditions.
needed. Sensitive to nuclear  consideration for other safety.                       system affects.
Teamwork          Routinely communicates        Communicated most status      Routinely takes action without system status changes to the  and actions. Some            informing the team.
team. Communicates actions    improvement would be before taking them.           warranted.
Knowledge          Able to anticipate system    Plant, system, or generic    Unable to predict system response based on solid      fundamental knowledge has    response, unsure of generic system knowledge. Good        some gaps.                    fundamentals concepts working knowledge of generic                                related to plant operation.
fundamentals to predict and                                Only relied on procedure for monitor system response.                                   operating knowledge.
Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290                                                        Revision: 0 Page 3 JPM Information System:
N/A Task:
73999 - Activate the Emergency Call Out System (ECOS)


==References:==
==References:==
Required(R)/Available(A)EP-290,EmergencyNotifications(R)ToolsandEquipmentRequired:UnpluggedTelephoneInitialConditions:YouaretheWorkControlSupervisor.ItisbackshiftonaSaturdaynight.ASiteAreaEmergencyhasbeendeclaredandyouhavereportedtotheMainControlRoomasrequestedbytheShiftManager.InitialnotificationstoCounty,State,andOntarioProvencehavebeencompleted.InitiatingCue(s):ActivateECOSusingaphoneinaccordancewithEnclosureE,ofEP-290,EmergencyNotifications.TerminatingCue(s):ECOSisactivated.TaskStandard:ECOSisactivatedusingaphoneinaccordancewithEP-290,EnclosureE.LicensedOperatorExamInformation(requiredforNRCexams)SafetyFunction:N/AK/A
Required (R) / Available (A)
EP-290, Emergency Notifications (R)
Tools and Equipment Required:
Unplugged Telephone Initial Conditions:
You are the Work Control Supervisor.
It is back shift on a Saturday night.
A Site Area Emergency has been declared and you have reported to the Main Control Room as requested by the Shift Manager.
Initial notifications to County, State, and Ontario Provence have been completed.
Initiating Cue(s):
Activate ECOS using a phone in accordance with Enclosure E, of EP-290, Emergency Notifications.
Terminating Cue(s):
ECOS is activated.
Task Standard:
ECOS is activated using a phone in accordance with EP-290, Enclosure E.
Licensed Operator Exam Information (required for NRC exams)
Safety Function:
N/A K/A  


==Reference:==
==Reference:==
(fromNUREG1123)K/ASYSTEM:GenericK/ASTATEMENT:2.4.43-Knowledgeofemergencycommunicationsystemsandtechniques.............................3.2/3.8MaintenanceRuleSafetyClassification:NoMaintenanceRuleRiskSignificant?(YesorNo)No JOBPERFORMANCEMEASUREJPMTitleActivateECOSinaccordancewithEP-290No.:JP-OP-802-4101-443Revision:0Page4WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1PERFORMANCEEVALUATIONStartTimeELEMENTSTANDARDNOTE:Anunpluggedtelephoneavailableforexaminee'susewillallowmoreeffectivesimulationofECOSactivationbySMphone.CUE:ProvidetheexamineewiththeCueSheet.Ifnecessary,providetheexamineewithacurrentcopyofEP-290.*1.[3.1.1]HavereadytheapplicableScenarioIDNumberfromTable1-1forthecorrespondingclassification.*1.DeterminescorrectScenarioIDNumberfromTable1-1is 3.*2.[3.1.2]CalltheRemoteScenarioActivationphonenumber(800)380-0407or(615)844-5611.*2.Dials[800]380-0407or[615]986-3719.CUE:Afterthephonenumberhasbeendialed,state"Welcome,enteryourUserIDNumberfollowedbythe#sign."*3.[3.1.3]AtthepromptforUserID,enter65235,thenpress#.*3.Enters65235,followedby
(from NUREG 1123)
#.CUE:AftertheUserIDand#havebeenentered,state"EnteryourSecurityPINnumber,followedbythe#sign.
K/A SYSTEM: Generic K/A STATEMENT:
"CUE:Ifasked,theSecurityPINnumberis12345.*4.[3.1.4]AtthepromptforSecurityPIN,entertheconfidentialPINnumber,thenpress#.*4.Enters12345,followedby
2.4.43 - Knowledge of emergency communication systems and techniques. ............................ 3.2 / 3.8 Maintenance Rule Safety Classification:
#.CUE:AftertheSecurityPINand#havebeenentered,state"EntertheScenarioIDNumberfollowedbythe#sign."*5.[3.1.5]AtthepromptforScenarioID,entertheassociatedScenarioIDfromTable1-1,andthenpress#.*5.Enters 3,followedby
No Maintenance Rule Risk Significant? (Yes or No)
#.NOTE:Thesystemwillgothroughalistofoptionsfromtheprogrammenu.CUE:AftertheScenarioIDand#havebeenentered,state"ListentothefollowingOptionsthenpresstheappropriatenumberonthephonekeypad:Press1-tolistentothecurrentscenariomessage[pre-recordedmessagesdesignedforFermi2ERO]-or-Press2-tore-recordthescenariomessage.Thesystemwillgiveinstructionsonhowtorecordandverifyyourmessage.-or-Press3-tostartthescenario.Whenyouheartheresponse,"Thescenarioisbuilding",exittheprogrambypressing#.-or-Press4-toreturntothemainmenu."*6.[3.1.6]Presstheappropriatenumberonthephonekeypad.*6.Presses 3.CUE:Afterthenumber3hasbeenentered,state"TheScenarioisbuilding."*7.[3.1.6]Whenthesystemreportsthatthescenarioisbuildingexittheprogrambypressingthe#sign.*7.Presses
No Work Instruction                                                                                          WI 5.14 Job Performance Measures                                                                                    Rev 2 Attachment 1
#,andhangsupthephone.
 
JOBPERFORMANCEMEASUREJPMTitleActivateECOSinaccordancewithEP-290No.:JP-OP-802-4101-443Revision:0Page5WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1ELEMENTSTANDARDNOTE:ECOSisprogrammedtoimmediatelycall[734]586-5235attheShiftManager'sdeskfor"emergency"or"test"activations.CUE:Afterthephonehasbeenhungup,state"Thephoneisringing."Whentheapplicantanswersthephone,states"Enterthelast5digitsofyourSAPEmployeeNumber."*8.[4.2]Answerthecall,andwhenpromptedforthelastfivedigitsofyourSAPEmployeeNumber,enter11111,thenpress
JOB PERFORMANCE MEASURE JPM Title                                                                        No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290                                                        Revision: 0 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT                                              STANDARD NOTE: An unplugged telephone available for examinees use will allow more effective simulation of ECOS activation by SM phone.
#.*8.Enters11111,followedby
CUE:     Provide the examinee with the Cue Sheet. If necessary, provide the examinee with a current copy of EP-290.
#.CUE:After11111and#havebeenentered,state"ECOSisactivated."CUE:EndJPMwhenECOSisactivated.______SATISFACTORY______UNSATISFACTORYStopTime*CriticalStep JOBPERFORMANCEMEASUREJPMTitleActivateECOSinaccordancewithEP-290No.:JP-OP-802-4101-443Revision:0Page6WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1EvaluatorNotes:ENSUREALLINDUSTRIALANDPERSONNELSAFETYPRACTICESAREUSEDANDENFORCEDATALLTIMES.GenericNotesandCues:NoneSystemSpecificNotesandCues:NoneTaskPerformanceandCues:TheElementsofthisJPMarestepbystepinaccordancewiththeprocedure.TheStandardisthattheprocedureisperformedaswritten.TheCuesareaslistedaboveforindicationoraseachstepiscompletedtheappropriateinformationisreportedtotheexaminee.CriticalSteps:CriticalTasksareidentifiedbyasterisk(*)andboldedstepsonthecoversheet.Verifythatthelatestrevisionoftheprocedureisusedandcriticaltasksarecorrectlyidentified.
* 1. [3.1.1] Have ready the applicable Scenario ID
JOBPERFORMANCEMEASUREJPMTitleActivateECOSinaccordancewithEP-290No.:JP-OP-802-4101-443Revision:0Page7WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1FOLLOW-UPDOCUMENTATIONQUESTIONSReasonforfollow-upquestion(s):Question:
* 1. Determines correct Scenario ID Number from Number from Table 1-1 for the corresponding            Table 1-1 is 3.
classification.
* 2. [3.1.2] Call the Remote Scenario Activation
* 2. Dials [800] 380-0407 or [615] 986-3719.
phone number (800) 380-0407 or (615) 844-5611.
CUE:     After the phone number has been dialed, state Welcome, enter your User ID Number followed by the # sign.
* 3. [3.1.3] At the prompt for User ID, enter 65235,
* 3. Enters 65235, followed by #.
then press #.
CUE:     After the User ID and # have been entered, state Enter your Security PIN number, followed by the # sign.
CUE:     If asked, the Security PIN number is 12345.
* 4. [3.1.4] At the prompt for Security PIN, enter
* 4. Enters 12345, followed by #.
the confidential PIN number, then press #.
CUE:     After the Security PIN and # have been entered, state Enter the Scenario ID Number followed by the # sign.
* 5. [3.1.5] At the prompt for Scenario ID, enter the
* 5. Enters 3, followed by #.
associated Scenario ID from Table 1-1, and then press #.
NOTE: The system will go through a list of options from the program menu.
CUE:     After the Scenario ID and # have been entered, state Listen to the following Options then press the appropriate number on the phone key pad:
Press 1 - to listen to the current scenario message [pre-recorded messages designed for Fermi 2 ERO] - or -
Press 2 - to re-record the scenario message. The system will give instructions on how to record and verify your message. - or -
Press 3 - to start the scenario. When you hear the response, "The scenario is building", exit the program by pressing #. - or -
Press 4 - to return to the main menu.
* 6. [3.1.6] Press the appropriate number on the
* 6. Presses 3.
phone key pad.
CUE:     After the number 3 has been entered, state The Scenario is building.
* 7. [3.1.6] When the system reports that the
* 7. Presses #, and hangs up the phone.
scenario is building exit the program by pressing the # sign.
Work Instruction                                                                                        WI 5.14 Job Performance Measures                                                                                  Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                    No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290                                                    Revision: 0 Page 5 ELEMENT                                          STANDARD NOTE: ECOS is programmed to immediately call [734] 586-5235 at the Shift Manager's desk for "emergency" or "test" activations.
CUE:     After the phone has been hung up, state The phone is ringing.
When the applicant answers the phone, states Enter the last 5 digits of your SAP Employee Number.
* 8. [4.2] Answer the call, and when prompted for
* 8. Enters 11111, followed by #.
the last five digits of your SAP Employee Number, enter 11111, then press #.
CUE: After 11111 and # have been entered, state ECOS is activated.
CUE:     End JPM when ECOS is activated.
______ SATISFACTORY                                  ______ UNSATISFACTORY Stop Time
* Critical Step Work Instruction                                                                                    WI 5.14 Job Performance Measures                                                                              Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                                      No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290                                                    Revision: 0 Page 6 Evaluator Notes:
ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.
Generic Notes and Cues:
None System Specific Notes and Cues:
None Task Performance and Cues:
The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.
Critical Steps:
Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.
Work Instruction                                                                                      WI 5.14 Job Performance Measures                                                                                Rev 2 Attachment 1
 
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290                                  Revision: 0 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):
Question:


==Reference:==
==Reference:==
Response:Question:ReferenceResponse:
 
JOBPERFORMANCEMEASUREJPMTitleActivateECOSinaccordancewithEP-290No.:JP-OP-802-4101-443Revision:0Page8WorkInstructionWI5.14JobPerformanceMeasuresRev2Attachment1SimulatorSetupIC#:N/AMalfunctions:NumberTitleValueDelayRampN/ARemoteFunctions:NumberTitleValueDelayRampN/AOverrideFunctions:NumberTitleValueDelayRampN/ASpecialInstructions:N/A JOBPERFORMANCEMEASURECueSheet:(JP-OP-802-4101-443)InitialConditions:YouaretheWorkControlSupervisor.ItisbackshiftonaSaturdaynight.ASiteAreaEmergencyhasbeendeclaredandyouhavereportedtotheMainControlRoomasrequestedbytheShiftManager.InitialnotificationstoCounty,State,andOntarioProvencehavebeencompleted.InitiatingCue(s):ActivateECOSusingaphoneinaccordancewithEnclosureE,ofEP-290,EmergencyNotifications.
===Response===
AppendixD,38of39AppendixDScenarioOutlineFormES-D-1Facility:Fermi2ScenarioNo.1Op-TestNo:2013-1Examiners:C.MooreOperators:D.McNeilC.PhillipsInitialConditions:IC-20,MOL,100%Rx.PowerTurnover:_Theplanthasbeenoperatingat100%Reactorpowerforthelast205days.#2GSWisOOSformotorreplacement.Expectedreturntoserviceistwoweeks."B"CRDPumpisOOSforoilreplacementongearreducer.Returntoserviceisexpectedtomorrow.EventNo.Malf.No.EventType*EventDescription1NGADN3021C002TVSPC(BOP)C(SRO)#2TCVUnitizedActuatorFailure(OilLeak)-4D22R(ATC)R(SRO)ReduceReactorPower<93%tolockdown#2TCV3N(BOP)N(SRO)LockDown#2TCV-23.109,MainTurbine4C11MF1106C(ATC)C(SRO)CR58-39IndividualSCRAMfromhalfscramduring#2TCVlockdownandblownfuse.DisarmCRduetobadlydamagedfuseclip.CRSenterTS3.1.3,Controlrodoperability-onerodinopandinserted.5C93RF0001C97MF1087NAEarthquake-AOP20.000.01-AOPActions6E51MF0010EOPRF0024EOPRF0025C(All)RCICSteamLeak.AutoIsolationFails.ManualisolationSuccessful.EOP29.100.01Sheet5(CT1)CRSenterTS3.5.3,RCIC7N20MF0023N20MF0024N20MF0025M(All)LossofFeedwater-AOP20107.01-ModeSwitchtoS/DEOP29.100.01Sheet1-RPVControl8E41MF0011N21MF0011N21MF0038C(All)LossofHighPressureFeedSources-LowerRPVpressuretofeedwithHFP.InhibitADS(CT-2)*(N)ormal,(R)eactivity,(I)nstrument,(C)omponent,(M)ajor AppendixD,38of39AppendixDScenarioOutlineFormES-D-1Facility:Fermi2ScenarioNo.1Op-TestNo:2013-1Examiners:C.MooreOperators:D.McNeilB.PalagiInitialConditions:IC-20,MOL,100%Rx.PowerEventNo.Malf.No.EventType*EventDescription9B31MF0066M(All)Leakindrywell-EOP29.100.01Sheet2-PrimaryContainmentControlEmergencyDepressurizationEOP29.100.01Sheet3-(CT-3)10E21RF0005C(BOP)C(SRO)AutoStartFailure-Div.1CoreSpray11E11MF0016C(ATC)C(SRO)ContainmentSprayValveFailureE1150-F016ASprayDrywell(CT4)*(N)ormal,(R)eactivity,(I)nstrument,(C)omponent,(M)ajor AppendixD,38of39AppendixDScenarioOutlineFormES-D-1Facility:Fermi2ScenarioNo.2Op-TestNo:2013-2Examiners:C.MooreOperators:D.McNeilC.PhillipsInitialConditions:IC-15(55%Power)Turnover:_Reactorpoweris55%.AplantstartupisinprogressfollowingaplannedshutdownforrepairstoMainTransformer2A.Thestartupiscurrentlyonhold,awaitingchemistryresultsonheaterdrains.CWPump#5isOOSformotorreplacementEventNo.Malf.No.EventType*EventDescription1C102C11_PS_N001A_STFCLOSEC11MF1117C(ATC)C(SRO)TripofACRDPump(BCRDFails)AOP20.106.01-restartACRD.TS3.1.52TEAJSPECIFIC_F788753TFFC(BOP)C(SRO)HighVibration/HighAmps#6DrywellCoolingFan-8D45-ShutdownFan3B21MF0025C(All)CSRVOpen-AOP20.000.25-SRVcloseswhenfusespulledTS3.4.34N(BOP)N(SRO)TorusCooling-23.2055NMRDFU_11CCM(All)LossofSteamJetAirEjectors/LossofVacuum-AOP20.125.01ModeSwitchtoShutdown6C11MF0001C71MF0006M(All)ATWS-EOP29.100.01Sheet1and1AInhibitADS(CT1)TerminateandPrevent(CT2)7C41MF0003C41MF0004C(ATC)C(SRO)SLCPumpsTrip29.ESP.02-AlternateBoronInjection8EOPRF0007thruEOPRF0014NAInsertControlRods(CT3)29.ESP.1029.ESP.119B21MF0028C(All)FSRVfailsOpen-EOP29.100.01Sheet2-HighTorusTemp*(N)ormal,(R)eactivity,(I)nstrument,(C)omponent,(M)ajor AppendixD,38of39AppendixDScenarioOutlineFormES-D-1Facility:Fermi2ScenarioNo.3Op-TestNo:2013-3Examiners:C.MooreOperators:D.McNeilC.PhillipsInitialConditions:IC-13,MOL,25%Rx.PowerTurnover:Reactorpoweriscurrentlyabout25%Power.TheplantstartupisonholdduetoanoilleakonACoreSprayPump.ACoreSprayPumpisOOSforrepair.Returntoserviceisexpectedlatethisafternoon.FollowingACoreSprayPumpRTSthestartupwillcontinue._EventNo.Malf.No.EventType*EventDescription1C51MF0003C(ATC)C(SRO)APRMDownscale-BypassAPRM3TS3.3.1.1Tracking2P42MF0005C(BOP)C(SRO)RBCCWPumpTrip-AOP20.127.01-StartStandbyRBCCWPump3B21MF004C(BOP)C(SRO)DrywellPressureTransmitterFailureTS3.3.1.1,3.3.6.1,3.3.6.2,3.3.7.1(DrywellPressureInstrumentation)4N30MF0038N30MF0039M(All)MTLOPumpFailures-TripMainTurbine-AOP20.109.015C11MF0004C(ATC)C(SRO)ACRDFlowControlFailure-AOP20.106.036E41MF0007E41RF0033M(All)HPCISteamLeak-Failuretoisolate-E4150-F600BreakerTripsEOP29.100.01Sheet5,SecondaryContainment->MSOTemperature-ModeSwitchtoShutdown(CT1)EOP29.100.01Sheet1RPVControl7NAN(SRO)N(ATC)TorusCooling8TA20TEN206ZOUTM(All)TwoAreas>MSOTemperatureduetoHPCIwatertightdoornotclosed-EOP29.100.01Sheet3-EmergencyDepressurization(CT2)9B21MF0030C(BOP)C(SRO)SRVHFailureduringED-OpenOneotherSRV10E41RF0033NAEnergizeMOV/closeE41-F600-isolatesteamleak(CT 3)*(N)ormal,(R)eactivity,(I)nstrument,(C)omponent,(M)ajor AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:N/APage1of9EventDescription:OverviewInitialConditions:Theplanthasbeenoperatingat100%Reactorpowerforthelast205days.#2GSWisOOSformotorreplacement.Expectedreturntoserviceistwoweeks.BCRDPumpisOOSforoilreplacementongearreducer.Returntoserviceisexpectedtomorrow.Plansfortheshiftaretomaintainfullpower.Theobjectivesofthisscenarioareto:1.Recognize,respondto,andtaketherequiredactionsforaninstrument/equipmentfailuresrequiringtheuseofoperatorandTechSpecactions.2.RecognizeandrespondtoaUnitizedActuatorFailure.3.RecognizeandrespondtoaSeismicEvent.4.RecognizeandrespondtoaRCICSteamLeak5.RecognizeandrespondtoLossofHighPressureFeedSources6.RecognizeandrespondtoLOCAconditions.7.OperateRHRinallmodesforPrimaryContainmentControl.8.ExecutestepsinPrimaryContainmentControlandoperatetheRHRSystemtocontrolDrywellandTorusTemperatureandPressure.9.ExecutethestepsofRPVControlforlevel(L)andpressure(P).10.DirectandsupervisetheShiftteamduringNormal,Abnormal,andEmergencyoperations.Thecrewwillberequiredtorespondtothefollowingorderofevents:Failure#2TCVUnitizedActuator-OilleakReactorPowerreductionto<93%PowerIndividualControlRodScramEarthquakeRCICSteamLeakLossofFeedwater/LossofHighPressureFeedSourcesLeakinDrywell AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:1Page2of9EventDescription:#2HPCVUnitizedActuatorFailureTimePositionApplicant'sActionsorBehaviorT+1mMALF:NG12N3021LSEN236BTFCLOSE#2TCVUALLAlarmSRORespondto4D2,UnitizedActuatorThrottleVlvFaultBriefscrewonactionsforUAFailureBriefsPowerReductiontolock-downUA.ATCMonitorsplantconditions.BOPRespondto4D2,UnitizedActuatorThrottleVlvFaultDirectoperatortoinvestigate#2HPCVUnitizedActuatorROLEPLAY:ReportleakinsideUAenclosure.Cannotseewhereleakiscomingfrom,oilsprayobscuringwindow.NoleakageoutsideUAenclosure.Standingbyinlowdosearea.ROLEPLAY:ifupdaterequested,reportconditionsunchanged AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:2Page3of9EventDescription:PowerReductionto<93%TimePositionApplicant'sActionsorBehaviorT+5mSRODirectspowerreductionto<93%perSOP23.109prerequisiteforclosing#2HPCV.Monitorspowerreductionto<93%Plantannouncementofpowerreduction.ATCMonitorsplantconditions.LowerreactorpowerbyreductionofreactorrecirculationpumpspeedperSOP23.138.01.Reportspowerlessthan93%whencompleted.MayrequestroundsoperatormonitorRecircoiltemperaturesBOPMonitorsplantconditionsBrieflockdownof#2HPCVper23.109BriefShutdownofUnitizedActuatorper23.110 AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:3,4Page4of9EventDescription:CR58-39IndividualSCRAMTimePositionApplicant'sActionsorBehaviorT+15mMALF:C11MF1106ScramCR58-39SRODirect#2HPCVLockdownDirectShutdownof#2HPCVUABriefactionsforindividualrodscramContactSNEaboutindividualrodscramDirectCR58-39disarmedafterfuseclipdamagereported.EnterTS3.1.3,ControlRodOperability.ATCMonitorsplantconditions.Reportshalfscram,roddriftalarmandindividualrodscramCR58-39DispatchoperatortocheckHCU58-39.ROLEPLAY:RoundsoperatorreportsbothScramValvesopenatHCU58-39.Nothingelseisabnormal.DispatchoperatortocheckfusesforCR58-39.ROLEPLAY:ReportblownfuseandseverelydamagedandcharredfuseclipsonAsidefor58-39Resethalfscramandverifiesscramsignalclears.DirectsroundsoperatortodisarmCR58-39per23.106BOPMonitorsplantconditions.Perform#2HPCVlock-downper23.109Perform#2HPCVUAshutdownper23.110DirectsroundsoperatortocloseTBCCWValveforshutdownUAROLEPLAY:RoundsoperatorreportsTBCCWvalveto#2HPCVUnitizedActuatorclosedMaydispatchRTCtoassistroundsoperatortocheckfuses.
Question:
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:5Page5of9EventDescription:SeismicEventTimePositionApplicant'sActionsorBehaviorT+35mMALF:C97MF1087CD69-SeismicSystemEvent/Trouble(Earthquake)MALF:C93RF0001EarthquakeSoundSRORespondstoSeismicEventandenters20.000.01,ActsofNature.BriefsCrewonSeismicevent.MakesHi-ComannouncementofeventDirectsMonitoringthefollowingforabnormalvalues:ProcessRadiationMonitors.DirectsseismiceventactionsforConditionAC.MaycontactoffsiteagenciestoconfirmEarthquakeROLEPLAY:ifcontactedasoffsiteagency,confirmearthquakeat0.02Ghorizontalandvertical.ATCMonitorsPower,PressureandLevelasdirectedbySROfortheseismicevent.MaydispatchoperatorstoperformvisualinspectionofplantsystemsBOPRespondstoalarm6D69,SeismicEvent/TroubleDispatchesanoperatortotherelayroomtocheckstatusofSeismicPanelindications(RRH11-P831)per23.612ROLEPLAY:Operatorreportsfromtherelayroomthatseismiceventhasoccurredwithanindicationof0.02GHorizontaland0.02GVerticalReportsRelayRoomindicationsof0.02G.horizontaland0.02Gvertical.Start sallRHRSWMDCTFansandchecksforproper AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:5Page5of9EventDescription:SeismicEventrunningindications.ROLEPLAY:Whendirected,reportsatisfactoryoperationofMDCTfansfollowingstart.DirectsroundsoperatortoresetD1andD2CCHVACPurgeCompressors.ROLEPLAY:Whendirected,afterabout5min,reportD1andD2CCHVACPurgeCompressorsarereset.MaydispatchoperatorstoperformvisualinspectionofplantsystemsROLEPLAY:Aspartofseismicwalkdownpriortotriggeringsteamleak,RoundsOperatorreport1footsteamplumefrompackingglandareaofE5150-F045.
Reference
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:6Page6of9EventDescription:RCICSteamLeak.TimePositionApplicant'sActionsorBehaviorT+45mMALF:E51MF0010,RCICSteamLeakSRORespondto1D66Respondto1D70Enter29.100.01Sheet5DeterminerisingroomtemperatureinRCIC/CoreSprayroom.Enter29.100.01Sheet5,SecondaryContainmentControlMaydirectRCICisolation.ValidateisolationofleakbymonitoringforloweringroomtemperaturesEnterTS3.5.3RCICATCMonitorsplantconditions.BOPRespondto1D66Respondto1D70MonitorRCICsystemanddetermineRCICAutomaticisolationdidNOToccur.ManuallyisolateRCICSystembyclosingE5150-F007andE5150-F008(CT-1)Validateisolationofleakbymonitoringforloweringroomtemperatures AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:7Page6of9EventDescription:LossofFeedwaterTimePositionApplicant'sActionsorBehaviorT+55mMALF:N20MF0023CHFPTripMALF:N20MF0024EHFPTripMALF:N20MF0025WHFPTripSRODirectsModeSwitchtoShutdownperAOP20.107.01DirectsScramreportsfromATCandBOP.EntersEOP29.100.01,Sheet1,RPVControlEstablishesLevelbandof173to214inchesandpressurebandof900to1050psig.ATCPlacesReactorModeSwitchinShutdownProvidesScramreport.Verifiesallcontrolrodsarefullyinserted.BOPProvidesscramreport.MaydispatchoperatortoHFP'stoinvestigateROLEPLAY:IfdispatchedtoHFP,afterabout3min,reportnothingvisiblewithHFP's.
 
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:8Page7of9EventDescription:LossofHighPressureFeedSourcesTimePositionApplicant'sActionsorBehaviorT+55mMALF:E41MF0011,HPCIExhaustCheckValveFailureMALF:N21MF0011,ASBFWPumpTripMALF:N21MF0038,BSBFWPumpShaftShearSRODirectsATCtoperformScramProcedureAOP20.000.21ExpandsLevelbandto0to214inchesDirectsADSinhibitedBriefscrewonoptionsandintendedcourseofactionDirectsstartofSLCPumpDirectsattemptedrestartofHFPsDirectsRPVpressureloweredwithBypassValvesorPressureRegulatortofeedwithWHFPATCMayreportHPCIunavailableduetoisolationStartsAorBSLCPumpAttemptsHFPsstart,WHFPstartsLowersRPVpressurewithBypassValvesorPressureRegulatortofeedwithWHFPBOPReportsBothSBFWPumpsunavailableReportsHPCIunavailableduetoisolationInhibitsADS-(CT-2)AttemptsHFPsstart,WHFPstartsLowersRPVpressurewithBypassValvesorPressureRegulatortofeedwithWHFPMaydispatchoperatortoSBFWPumpsROLEPLAY:IfdispatchedtoSBFWpumps,afterabout3min,reportnothingvisiblewithAorBSBFWPump.
===Response===
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:9Page8of9EventDescription:RecirculationLoopRupture,ED,LevelrecoveryTimePositionApplicant'sActionsorBehaviorT+65mMALF:B31MF0066,RecircLoopRuptureAMALF:E21RF0005,AutoStartFailure-Div.1CSSROEntersEOP29.100.01Sheet2,PrimaryContainmentControlEstablishesLevelbandof173to214inches,expandsbandto0to214inches.ConductEOPBriefConductBriefforEmergencyDepressurizationEnter29.100.01,Sheet3,EmergencyDepressurizationAtTAF,Direct5ADSSRVsopened.-(CT-3)DirectsplacingRHRinTorusCoolingandTorusSpray.Directslevelbandof173to214followingEDATCReportsrisingDrywellPressureCoordinatewithBOPtoshutdown/operateLPPumpstorestoreandmaintainRPVwaterlevel173to214inchesPlacesRHRinTorusCoolingandTorusSprayasdirectedROLEPLAYIfdispatched,after5minreport,reportD1(D2)RadiationMonitorSamplePumpinservice.BOPReportsrisingDrywellPressureReportsunabletomaintainRPVlevelwithavailablehighpressuresources.ReportsDivision1CoreSprayPumpsfailedtostart,manuallystarts/alignDivision1CoreSprayPumpsOpens5SRVsasdirected-(CT-3)CoordinatewithATCtoshutdown/operateLPPumpstorestoreandmaintainRPVwaterlevel173to214inchesROLEPLAYIfdispatched,after5minreport,reportD1(D2)RadiationMonitorSamplePumpinservice.
Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 2 Attachment 1
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:1EventNo.:10Page9of9EventDescription:ContainmentCoolingandFailuresTimePositionApplicant'sActionsorBehaviorT+75mMALF:E11MF0016-ContainmentSprayValveFailureE1150-F16ASRODirectsplacingRHRinTorusCoolingandTorusSpray.WhenTorusPressurereached9psigdirectsDrywellSprayaftersecuringtheARecircPumpandstoppingallDrywellCoolingFans-(CT-4)DirectssecuringDrywellandTorusSpraysbeforeDrywellandTorusPressurereach0psig,MonitorsDWSILcurvepriortosprayingdrywellDirectsDrywellSprayonDivision2RHRATCShutsdowntheAReactorRecircpumpShutsdownalldrywellcoolingfansPlacesRHRinTorusCoolingandTorusSprayReportsfailureofE11-F016APlacesRHRD2inDrywellSpray-(CT-4)SecuresTorusandDrywellSpraysbeforeDrywellandToruspressurereach0psig.ROLEPLAYIfdispatchedtoE1150-F16Abreaker,after3minreport,acridburnedinsulationsmellnearMCC(72C-3A-5D)ROLEPLAYIfdispatched,after3minreport,reportD1(D2)RadiationMonitorSamplePumpinservice.
 
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39BOPPlacesRHRinTorusCoolingandTorusSpray.ReportsfailureofE11-F016APlacesRHRDiv.2inDrywellSpray-(CT-4)SecuresTorusandDrywellSpraysbeforeDrywellandToruspressurereach0psig.ROLEPLAYIfdispatched,after5minreport,reportD1(D2)RadiationMonitorSamplePumpinservice.
JOB PERFORMANCE MEASURE JPM Title                                                  No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290                                Revision: 0 Page 8 Simulator Setup IC#:
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-2ScenarioNo.:2EventNo.:N/APage1of8EventDescription:OverviewInitialConditions:Reactorpoweris55%.AplantstartupisinprogressfollowingaplannedshutdownforrepairstoMainTransformer2A.Thestartupiscurrentlyonhold,awaitingchemistryresultsonheaterdrains.CWPump#5isOOSformotorreplacement.Therefurbishedmotorarrivedon-siteyesterdayandiscurrentlybeinginstalled.RTSisexpectedlatetomorrow.Theobjectivesofthisscenarioareto:1.Recognize,respondto,andtaketherequiredactionsforaninstrument/equipmentfailuresrequiringtheuseofoperatorandTechSpecactions.2.RecognizeandrespondtoaCRDPumpTrip.3.Recognizeandrespondtoafailureof#6DrywellCoolingFan.4.RecognizeandrespondtoafailureofSRVandF5.RecognizeandrespondtoaLossofVacuumduetolossofallSJAE.6.RecognizeandrespondtoATWSconditions.7.ExecutestepsinPrimaryContainmentControlandoperatetheRHRSystemtocontrolTorusTemperatureandPressure.8.ExecutethestepsofRPVControl-ATWSforlevel(L)pressure(P),andpower(Q)9.DirectandsupervisetheShiftteamduringNormal,Abnormal,andEmergencyoperations.Thecrewwillberequiredtorespondtothefollowingorderofevents:CRDpumptrip.(AOP20.106.01)#6DWCFanFailureSRVCFailsOpen(AOP20.000.02)LossofSJAE/lossofVacuum(AOP20.125.01)ATWS(EOP29.100.01Sheet1and1A)BothSLCPumpsTripTerminateandPreventSRVFfailopen-EOP29.100.01Sheet2HighTorusTemperature AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-2ScenarioNo.:2EventNo.:1Page2of8EventDescription:CRDHydraulicPumpTripsTimePositionApplicant'sActionsorBehavior+2minMALF:C102C11_PS_N001A_STFCLOSE,CRDPumpATripSROEntersAOP20.106.01,CRDHydraulicSystemFailureBriefscrewonCRDPumpTripEntersTS3.1.5,ControlRodScramAccumulators,ConditionBDirectsrestartofACRDpumpATCPlacesCRDFlowControllerinMANUALClosesCRDFlowControlValveClosesCRDPressureControlValveReportsfailureofBCRDPumpRe-startsACRDPumpAdjustsCRDflowandpressureto37-63gpmanddifferentialpressureto255-265psid.PlacesCRDflowcontrollerinautoMaydirectoperatorstoinvestigateCRDpumptripROLEPLAY:Whendispatchedtopump,after3min,(checkcurrentstatusonpaneldisplay)reportnothingabnormalatACRDPump,reportmotorrotatingonBCRD,pumpisnotrotating.ROLEPLAY:AtACRDPump,reportgoodstartwhenpumpre-started.BOPMonitorsplantconditions.MaydirectoperatorstoinvestigateCRDpumptrip.ROLEPLAY:ROLEPLAY:Whendispatchedtopump,after3min,(checkcurrentstatusonpaneldisplay)reportnothingabnormalatACRDPump,reportmotorrotatingonBCRD,pumpisnotrotating.MaydirectoperatortoRelayRoomtoC11-R018,CRDTemperatureRecorder,(RRH21-P007)tocheckforhightemperaturesandclearalarm3D13.
N/A Malfunctions:
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39ROLEPLAY:ReportthatseveralCRDMs(38-31,26-27,34-43)wereinalarm(>300deg.F)butthatalltemperaturesarenowtrendingdown.
Number                              Title                Value      Delay  Ramp N/A Remote Functions:
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-2ScenarioNo.:2EventNo.:2Page3of8EventDescription:HighVibration/HighAmps#6DrywellCoolingFanTimePositionApplicant'sActionsorBehavior+15minMALF:TEAJSPECIFIC_F788753TFF,#6DrywellCoolingFanvibrationalarmSRORespondto8D45,Div1DrywellFanBrgVibHighBriefscrewonintendedactionsDirectsBOPtoshutdown#6DrywellCoolingFanATCMonitorsplantconditions.BOPRespondto8D45,Div1DrywellFanBrgVibHighReportsHighVibrationAlarm(8D45)andhighampson#6DWCfan.Shutdown#6DrywellCoolingFan AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-2ScenarioNo.:2EventNo.:3Page4of8EventDescription:CSRVFailureTimePositionApplicant'sActionsorBehavior+25minMALF:B21MF00-CSRVFailsOpenSRORespondto1D61,SRVOPENEnterAOP20.000.25,FailedSafetyReliefValveConductAOPBriefDirectfusesforSRVCpulledDirectRHRplacedinTorusCoolingEnterTS3.4.3,SRV,OnevalveinoperableATCMonitorsplantconditions.MaydirectoperatortomonitorSRVTailpipetemperaturesatB21-R614(RRH11-P614)ROLEPLAY:Whendispatched,afterabout3min,report(ifSRVstillopen)CSRVtailpipetemperatureis320degrees,(ifSRVclosed)reportSRVCtailpipetemperatureis275degreesandslowlylowering.ReportplantconditionsindicateSRVclosedBOPRespondto1D61,SRVOPENDepressOPENpushbutton,andthenCLOSEpushbutton.ReportSRVstillopen.DispatchoperatortopullfusesforSRVCperEnclosureAinAOP20.000.25.PlaceRHRinTorusCoolingROLEPLAY:ifdispatched,afterabout5min,reportstandingbytopullfusesforSRVC.DirectoperatortopullfusesforSRVCROLEPLAY:(triggerstep)reportfusesforSRVCremoved.ReportplantconditionsindicateSRVclosed.
Number                              Title                Value      Delay  Ramp N/A Override Functions:
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-2ScenarioNo.:2EventNo.:4Page5of8EventDescription:LossofSJAE/LossofVacuum.TimePositionApplicant'sActionsorBehavior+35minMALF:NMRDFU_11CC,LossofSteamJetAirEjectors-FuseFailureSRORespondtonumerousalarmsonH11-P806panelEnterAOP21.125.01,LossofCondenserVacuumDirectattempttorestartanySteamJetAirEjectorsAnnounceeventoverHi-ComConductAOPBriefDirectModeSwitchtoShutdownpriorto2.8psiaATCMonitorsplantconditionsPlaceModeSwitchinShutdownBOPRespondtonumerousalarmsonH11-P806panelReportsSJAEhavetrippedAttempttorestoreSJAEReportSJAEwillnotstartReportsvacuumdegrading AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-2ScenarioNo.:2EventNo.:5,6Page6of8EventDescription:ATWS.TimePositionApplicant'sActionsorBehavior+45minMALF:C11MF0001,RodsStuckMALF:C71MF0006,TotalScramFailureMALF:C41MF0003,ASLCPumpTripMALF:C41MF0004,BSLCPumpTripSRODirectsScramreportsfromATCandBOP.EntersEOPSheet1,RPVControlandSheet1ARPVControl-ATWSDirectsFS/Q1thru8DirectsADSinhibited(CT-1)DirectsSLCinjectionDirectsAlternateBoronInjection(29.ESP.02)Directs29.ESP.11andbypassandrestoreDWPneumaticsDirects29.ESP.10andinsertrodswith29.ESP.03(CT-3)DirectsTerminateandPreventforlevel(CT-2)DirectsRPVwaterlevelbandof50to100inchesConductsEOPBriefATCReportsfailuretoscramVerifiesModeSwitchinShutdownDepressmanualscrampushbuttonsProvidesScramreport.PerformFS/Q1thru8ReportsFS/Q1thru8completeReportsbothSLCPumpstrippedandRWCUisolatedDirectsoperatorstoperform29.ESP.02Directs29.ESP10andinsertsrodswith29.ESP.03(CT-3)ROLEPLAY:Whendispatched(triggerstep),afterabout10min,report29.ESP.10iscomplete.
Number                              Title                Value      Delay  Ramp N/A Special Instructions:
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-2ScenarioNo.:2EventNo.:5,6Page6of8EventDescription:ATWS.BOPProvidesscramreport.InhibitsADS(CT-1)Directsoperatorstoperform29.ESP.11Bypass/restoreDWPneumaticsROLEPLAY:Whendispatched(triggerstep),afterabout10min,report29.ESP.11iscomplete.PerformsTerminateandPreventforlevel(CT-2)MaintainsRPVwaterlevelbandof50to100inches AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-2ScenarioNo.:2EventNo.:7Page7of8EventDescription:ContainmentCoolingTimePositionApplicant'sActionsorBehavior+60minMALF:B21MF0028,SRVFOpenSROEnters-EOP29.100.01Sheet2-HighTorusTemperatureDirectsplacingRHRinTorusCoolingMaydirectDrywellCoolingFansrestartedDirectsRPVwaterlevelBandat173to214inchesafterallrodsinMaydirectATCtoAOP20.000.21ReactorScramDirectfusesremovedforSRVFATCContinuesControlRodinsertionper29.ESP.03When29.ESP.10iscomplete,linesuptodrainSDVWhenSDVdrained,re-initiateARIReportsallrodsinPerform20.000.21ifdirectedMayplacesRHRinTorusCoolingBOPPlacesRHRinTorusCoolingMaintainsRPVlevelband50to100inchesRestoreRPVwaterlevelto173to214inchesafterrodsinDirectoperatorremovefusesforSRVFROLEPLAY:ifdispatched,afterabout5min,reportstandingbytopullfusesforSRVF.DirectsoperatortopullfusesROLEPLAY:(triggerstep)reportfusesforSRVFremoved.PlantconditionsindicateSRVclosed(fusespulled)ReportsSRVFClosed(closeswhenRPVpressure<900psig)
N/A Work Instruction                                                                  WI 5.14 Job Performance Measures                                                            Rev 2 Attachment 1
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-3ScenarioNo.:3EventNo.:N/APage1of8EventDescription:OverviewInitialConditions:Reactorpoweriscurrentlyabout25%Power.TheplantstartupisonholdduetoanoilleakonACoreSprayPump.ACoreSprayPumpisOOSforrepair.Returntoserviceisexpectedlatethisafternoon.FollowingACoreSprayPumpRTSthestartupwillcontinue.Theobjectivesofthisscenarioareto:1.Recognize,respondto,andtaketherequiredactionsforaninstrument/equipmentfailuresrequiringtheuseofoperatorandTechSpecactions.2.RecognizeandrespondtoanAPRMDownscale.3.RecognizeandrespondtoanRBCCWPumpTrip.4.RecognizeandresondtoaDrywellPressureInstumentFailure.5.RecognizeandrespondtoaMTLOPumpFailure/TripofMainTurbine6.RecognizeandrespondtoaCRDFlowControlValveFailure7.RecognizeandrespondtoHPCISteamLeak/FailuretoIsolate.8.RecognizeandrespondtoSRVFailure9.ExecutethestepsofRPVControlforlevel(L)andpressure(P).10.ExecutethestepsofSecondaryContainmentControlforAreaTemperatures11.DirectandsupervisetheShiftteamduringNormal,Abnormal,andEmergencyoperations.Thecrewwillberequiredtorespondtothefollowingorderofevents:APRMdownscale(TS3.3.1.1)RBCCWPumpTripDrywellPressureInstrumentFailure(TS3.3.1.1,3.3.6.1,3.3.6.2,3.3.7.1)MTLOPumpFailure-TripMainTurbine.CRDFlowControlValveFailureHPCISteamLeak-FailuretoIsolate->MSOTemp-ScramTwoAreas>MSOTemperature-EDSRVHFailuretoopen AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:3EventNo.:1Page2of8EventDescription:APRMdownscaleTimePositionApplicant'sActionsorBehavior+2minMALF:C51MF0003,APRMDownscaleSRORespondto3D98EnterTS3.3.1.1TrackingDirectAPRM3bypassedATCRespondto3D98ReportAPRM3readingdownscaleBypassAPRM3DispatchoperatortoRelayRoomtocheckAPRM3ROLEPLAY:ReportAPRM3readingdownscale,nothingelseabnormal.BOPMonitorsplantconditions.MaydirectoperatortoRelayRoomtoCheckAPRM3ROLEPLAY:ReportAPRM3readingdownscale,nothingelseabnormal.
 
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:3EventNo.:2Page3of8EventDescription:RBCCWPumpTripTimePositionApplicant'sActionsorBehavior+10minMALF:P42MF0005,RBCCWPumpTripSRORespondto2D104,2D119EnterAOP20.127.01,LossofRBCCWDirectStartofStandbyRBCCWPumpDirectEECWrestoredtoStandbyATCMonitorsPower,PressureandLevelMaydispatchoperatortocheckCRBCCWPumpMaydispatchoperatortocheckCRBCCWBreaker(72F-2D)ROLEPLAY:Whendispatchedtopump,afterabout3min,reportnothingabnormalatCRBCCWpump.ReportgoodstartonSouthPumpROLEPLAY:Whendispatchedtobreaker(72F-2D),afterabout3min,reportbreakertrippedonoverload.BOPRespondto2D104,2D119ReportsCRBCCWTrippedStartStandbyRBCCWPumpDispatchoperatortocheckCRBCCWPumpDispatchoperatortocheckCRBCCWBreaker(72F-2D)RestoreEECWtoStandbyperSOPROLEPLAY:Whendispatchedtopump,afterabout3min,reportnothingabnormalatCRBCCWpump.ReportgoodstartonSouthPump.ROLEPLAY:Whendispatchedtobreaker(72F-2D),afterabout3min,reportbreakertrippedonoverload.
JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-443)
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:3EventNo.:3Page4of8EventDescription:DrywellPressureInstrumentationFailureTimePositionApplicant'sActionsorBehavior+30minMALF:B21MF0004DrywellPressureTransmitterFailureSRORespondto3D81EnterTS3.3.1.1,3.3.6.1,3.3.6.2,3.3.7.19(DrywellPressureInstrumentation)BriefcrewonTSimpactATCRespondto3D81MonitorsPower,PressureandLevelMaydispatchoperatortoTestabilityCabinetstocheckdrywellpressureinstrumentation.ROLEPLAY:WhendispatchedtoTestability,afterabout3min,reportC71-N650Areadingdownscale,allotherchannelsreadingnormal.BOPRespondto3D81MonitordrywellpressureWilldispatchoperatortoTestabilityCabinetstocheckdrywellpressureinstrumentation.ROLEPLAY:WhendispatchedtoTestability,afterabout3min,reportC71-N650Areadingdownscale,allotherchannelsreadingnormal.
Initial Conditions:
AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:3EventNo.:4Page5of8EventDescription:.MTLOPumpFailures/TripMainTurbineTimePositionApplicant'sActionsorBehavior+40minMALF:N30MF0038,TripAMTLOPumpMALF:N30MF0039,TripBMTLOPumpSRORespondtomultiplealarmsonH11P804DirectscheckofbearingoilpressureDirectsMainTurbinetripped.EnterAOP20.109.01,MainTurbineTripDirectSMTLOpumpshutdownPlantannouncementofMainTurbinetripDirectshutdownprocedureperSOP23.109ATCMonitorplantconditionsMaymakeplantannouncementofMainTurbinetripBOPRespondtomultiplealarmsonH11P804ReportNMTLOPumphastripped.SMTLORunningwithhighfluctuatingamps,EmergencyPumpalsorunning.ReportsbearingoilpressureTripMainTurbineShutdownsSMTLOpump.PerformturbineshutdownprocedureperSOP23.109ROLEPLAY:WhendispatchedtoMTLOPumps,afterabout3min,reportNorthPumpisOFF,motorverywarm.SouthPumpvibratingROLEPLAY:WhendispatchedtoMTLOPumpBreakers AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:3EventNo.:5Page6of9EventDescription:.CRDFlowControlValveFailureTimePositionApplicant'sActionsorBehavior+50minMALF:C11MF0004,ACRDFlowControlValveFailureSRORespondtoalarmsonH11P603EnterAOP20.106.03ConductsAOPBriefDirectsswaptoBFCVATCRespondtoalarmsonH11P603ReportACRDfailedclosedDirectsoperatortoAFCVROLEPLAY:Whendispatched,afterabout3mins,reportbrokenairlineonAFCV.DirectsoperatorthrueachstepinAOPforswaptoBFCVROLEPLAY:WhendirectedperformstepsandreportstepsduringswapovertoBFCVReportBFCVinserviceDirectoperatortomonitorCRDtemps(3D13)ROLEPLAY:Whendispatched,afterabout3min,report2CRDM(26-31and38-27)>250F(peakedat295F),nowbelow250F.Readytoresetalarm???BOPMonitorplantconditionsMaydirectoperatortoCRDFCVMaydirectoperatortoRRtomonitorCRDtemps AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:3EventNo.:6Page7of8EventDescription:HPCISteamLeak/FailuretoIsolate.TimePositionApplicant'sActionsorBehavior+65minMALF:E41MF0007,HPCISteamLeakMALF:E41MF0008,FailureE41-F002MALF:E41RF0033E41-F600BreakerTripSROROLEPLAY:Report1footsteamplumefrompackingglandonE4150-F001.Respondto1D66,1D70Enter29.100.01Sheet5,SecondaryContainmentControlDirectsIsolationofHPCIBriefActionsforSteamLeak/Scram.DirectModeSwitchtoShutdownpriortoMSOTemperature.(CT-1)DirectsScramreportfromATCandBOPEnter29.100.01Sheet1,RPVControlDirect173to214incheslevelbandand900to1050psigpressurebandMaydirectATCtoperformAOP20.000.21ATCPlacesReactorModeSwitchinShutdownwhendirected(CT1)ProvidesScramreport.Verifiesallcontrolrodsarefullyinserted.PerformactionsinAOP20.000.21BOPRespondto1D70,1D66ReportsfailureofHPCItoisolate-E41-F600failedtocloseProvidesscramreport.DispatchoperatortocheckMCCforE41-F600.(2PB1-1C)Maintainslevelandpressureasdirected AppendixDRequiredOperatorActionsFormES-D-2AppendixD,Page39of39Op-TestNo.:2013-1ScenarioNo.:3EventNo.:7,8.9,10Page8of8EventDescription:>MSOtemperature2ndArea,ED,IsolateSteamLeak.TimePositionApplicant'sActionsorBehavior+75minMALF:TA20TEN206ZOUT,Leakto2ndAreaMALF:B21MF0030,SRVHFailureSROBriefforrisingtemperatureinsecondareaFrom29.100.01Sheet5,DirectsOpen5SRVsADSpreferred(CT-2)DirectRHRinTorusCoolingConfirmleakisolationbyobservingloweringroomtemperatures(CT3)ATCMayreportrisingtemperatureinsecondareaPlaceRHRinTorusCoolingMayconfirmloweringtemperaturesafterE41-F600closedBOPMayreportrisingtemperatureinsecondareaOpens5SRVs.ReportsSRVHdidnotopen.OneotherSRVopened.(CT2)PlaceRHRinTorusCoolingROLEPLAY:WhendispatchedtoE41-F600,report(afterED)thatfusesareblown,gettingnewfuses.ROLEPLAY:Afterblownfusereport,wait3minandreportnewfusesinstalledstandingbytoclosebreakerforE41-F600.DirectoperatortoclosebreakerforE41-F600ROLEPLAY:(triggerstep)reportbreakerclosed.ReportE41-F600closed-leakisolated(CT3)MayconfirmloweringtemperaturesafterE41-F600closed}}
You are the Work Control Supervisor.
It is back shift on a Saturday night.
A Site Area Emergency has been declared and you have reported to the Main Control Room as requested by the Shift Manager.
Initial notifications to County, State, and Ontario Provence have been completed.
Initiating Cue(s):
Activate ECOS using a phone in accordance with Enclosure E, of EP-290, Emergency Notifications.
 
Appendix D                                Scenario Outline                          Form ES-D-1 Facility:             Fermi 2            Scenario No.       1            Op-Test No:   2013-1 Examiners:     C. Moore                          Operators:
D. McNeil C. Phillips Initial Conditions: IC-20, MOL, 100% Rx. Power Turnover: _  The plant has been operating at 100 % Reactor power for the last 205 days. #2 GSW is OOS for motor replacement. Expected return to service is two weeks. B CRD Pump is OOS for oil replacement on gear reducer. Return to service is expected tomorrow.
Event      Malf. No.       Event                                Event No.                       Type*                             Description 1        NGADN302        C(BOP)     #2 TCV Unitized Actuator Failure (Oil Leak) - 4D2 1C002TVSP        C(SRO) 2                          R(ATC)     Reduce Reactor Power < 93% to lock down #2 TCV R(SRO) 3                          N(BOP)     Lock Down #2 TCV - 23.109, Main Turbine N(SRO)
C11MF1106        C(ATC)     CR 58-39 Individual SCRAM from half scram during 4
                                      #2TCV lockdown and blown fuse. Disarm CR due to badly C(SRO) damaged fuse clip.
CRS enter TS 3.1.3, Control rod operability - one rod inop and inserted.
C93RF0001        NA        Earthquake - AOP 20.000.01 - AOP Actions 5
C97MF1087 6        E51MF0010        C(All)     RCIC Steam Leak. Auto Isolation Fails. Manual isolation Successful. EOP 29.100.01 Sheet 5 (CT 1)
EOPRF0024 CRS enter TS 3.5.3, RCIC EOPRF0025 N20MF0023        M(All)     Loss of Feedwater - AOP 20107.01 - Mode Switch to S/D 7
EOP 29.100.01 Sheet 1 - RPV Control N20MF0024 N20MF0025 E41MF0011        C(All)     Loss of High Pressure Feed Sources - Lower RPV pressure 8
to feed with HFP.
N21MF0011 Inhibit ADS (CT -2)
N21MF0038
* (N)ormal,   (R)eactivity, (I)nstrument,   (C)omponent,   (M)ajor Appendix D, 38 of 39
 
Appendix D                                Scenario Outline                          Form ES-D-1 Facility:         Fermi 2                  Scenario No.           1        Op-Test No: 2013-1 Examiners: C. Moore                              Operators:
D. McNeil B. Palagi Initial Conditions: IC-20, MOL, 100% Rx. Power Event      Malf. No.         Event                                  Event No.                       Type*                               Description 9        B31MF0066        M(All)       Leak in drywell - EOP 29.100.01 Sheet 2 - Primary Containment Control Emergency Depressurization EOP 29.100.01 Sheet 3 -
(CT-3) 10        E21RF0005        C(BOP)       Auto Start Failure - Div. 1 Core Spray C(SRO) 11        E11MF0016        C(ATC)       Containment Spray Valve Failure E1150-F016A C(SRO)       Spray Drywell (CT 4)
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,     (M)ajor Appendix D, 38 of 39
 
Appendix D                                  Scenario Outline                        Form ES-D-1 Facility:             Fermi 2            Scenario No.       2            Op-Test No: 2013-2 Examiners: C. Moore                              Operators:
D. McNeil C. Phillips Initial Conditions: IC-15 (55% Power)
Turnover: _ Reactor power is 55%. A plant startup is in progress following a planned shutdown for repairs to Main Transformer 2A. The startup is currently on hold, awaiting chemistry results on heater drains. CW Pump #5 is OOS for motor replacement Event      Malf. No.       Event                                Event No.                       Type*                             Description C102C11_P        C(ATC)     Trip of A CRD Pump (B CRD Fails) AOP 20.106.01 - restart 1
S_N001A_S                    A CRD.
C(SRO)
TFCLOSE C11MF1117                    TS 3.1.5 2        TEAJSPECI        C(BOP)     High Vibration/High Amps #6 Drywell Cooling Fan - 8D45 FIC_F78875        C(SRO)     - Shutdown Fan 3TFF B21MF0025        C(All)     C SRV Open - AOP 20.000.25 - SRV closes when fuses 3
pulled TS 3.4.3 4                          N(BOP)     Torus Cooling - 23.205 N(SRO)
NMRDFU_          M(All)     Loss of Steam Jet Air Ejectors/Loss of Vacuum - AOP 5
11CC                      20.125.01 Mode Switch to Shutdown 6        C11MF0001        M(All)     ATWS - EOP 29.100.01 Sheet 1 and 1A Inhibit ADS (CT 1)
C71MF0006 Terminate and Prevent (CT 2)
C41MF0003        C(ATC)     SLC Pumps Trip 7
C41MF0004        C(SRO)     29.ESP.02 - Alternate Boron Injection 8        EOPRF0007        NA        Insert Control Rods (CT 3) thru                    29.ESP.10 EOPRF0014 29.ESP.11 9        B21MF0028        C(All)     F SRV fails Open - EOP 29.100.01Sheet 2 - High Torus Temp
* (N)ormal,     (R)eactivity, (I)nstrument,   (C)omponent,   (M)ajor Appendix D, 38 of 39
 
Appendix D                                  Scenario Outline                            Form ES-D-1 Facility:             Fermi 2            Scenario No.       3                Op-Test No:   2013-3 Examiners:     C. Moore                          Operators:
D. McNeil C. Phillips Initial Conditions: IC-13, MOL, 25% Rx. Power Turnover: Reactor power is currently about 25% Power. The plant startup is on hold due to an oil leak on A Core Spray Pump. A Core Spray Pump is OOS for repair. Return to service is expected late this afternoon. Following A Core Spray Pump RTS the startup will continue. _
Event      Malf. No.       Event                                    Event No.                       Type*                               Description 1        C51MF0003        C(ATC)     APRM Downscale - Bypass APRM 3 C(SRO)
TS 3.3.1.1 Tracking 2        P42MF0005        C(BOP)     RBCCW Pump Trip - AOP 20.127.01 - Start Standby C(SRO)      RBCCW Pump 3        B21MF004        C(BOP)     Drywell Pressure Transmitter Failure C(SRO)     TS 3.3.1.1, 3.3.6.1, 3.3.6.2, 3.3.7.1( Drywell Pressure Instrumentation) 4        N30MF0038        M(All)     MTLO Pump Failures - Trip Main Turbine - AOP 20.109.01 N30MF0039 C11MF0004        C(ATC)     A CRD Flow Control Failure - AOP 20.106.03 5
C(SRO) 6        E41MF0007        M(All)     HPCI Steam Leak - Failure to isolate - E4150-F600 Breaker Trips E41RF0033                    EOP 29.100.01 Sheet 5, Secondary Containment - >MSO Temperature - Mode Switch to Shutdown (CT 1)
EOP 29.100.01 Sheet 1 RPV Control 7            NA          N(SRO)     Torus Cooling N(ATC) 8        TA20TEN2        M(All)     Two Areas > MSO Temperature due to HPCI watertight door 06ZOUT                    not closed - EOP 29.100.01 Sheet 3 - Emergency Depressurization (CT 2) 9        B21MF0030        C(BOP)     SRV H Failure during ED - Open One other SRV C(SRO) 10        E41RF0033        NA          Energize MOV/close E41-F600 - isolate steam leak (CT 3)
* (N)ormal,   (R)eactivity,   (I)nstrument,   (C)omponent,     (M)ajor Appendix D, 38 of 39
 
Appendix D                            Required Operator Actions                            Form ES-D-2 Op-Test No.: 2013-1            Scenario No.:     1    Event No.: N/A                  Page 1 of 9 Event
 
== Description:==
Overview Initial Conditions:
The plant has been operating at 100 % Reactor power for the last 205 days. #2 GSW is OOS for motor replacement. Expected return to service is two weeks. B CRD Pump is OOS for oil replacement on gear reducer. Return to service is expected tomorrow. Plans for the shift are to maintain full power.
The objectives of this scenario are to:
: 1.     Recognize, respond to, and take the required actions for an instrument / equipment failures requiring the use of operator and Tech Spec actions.
: 2.     Recognize and respond to a Unitized Actuator Failure.
: 3.     Recognize and respond to a Seismic Event.
: 4.     Recognize and respond to a RCIC Steam Leak
: 5.     Recognize and respond to Loss of High Pressure Feed Sources
: 6.     Recognize and respond to LOCA conditions.
: 7.     Operate RHR in all modes for Primary Containment Control.
: 8.     Execute steps in Primary Containment Control and operate the RHR System to control Drywell and Torus Temperature and Pressure.
: 9.     Execute the steps of RPV Control for level (L) and pressure (P).
: 10. Direct and supervise the Shift team during Normal, Abnormal, and Emergency operations.
The crew will be required to respond to the following order of events:
Failure #2 TCV Unitized Actuator - Oil leak Reactor Power reduction to <93% Power Individual Control Rod Scram Earthquake RCIC Steam Leak Loss of Feedwater/Loss of High Pressure Feed Sources Leak in Drywell Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                      Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 1      Event No.:       1              Page  2 of 9 Event
 
== Description:==
  #2 HPCV Unitized Actuator Failure Time    Position                      Applicant's Actions or Behavior T+1m                      MALF: NG12N3021LSEN236BTFCLOSE #2 TCV UA LL Alarm SRO      Respond to 4D2, Unitized Actuator Throttle Vlv Fault Briefs crew on actions for UA Failure Briefs Power Reduction to lock-down UA.
ATC      Monitors plant conditions.
BOP      Respond to 4D2, Unitized Actuator Throttle Vlv Fault Direct operator to investigate #2 HPCV Unitized Actuator ROLE PLAY: Report leak inside UA enclosure. Cannot see where leak is coming from, oil spray obscuring window. No leakage outside UA enclosure. Standing by in low dose area.
ROLE PLAY: if update requested, report conditions unchanged Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                        Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 1      Event No.:     2                Page    3 of 9 Event
 
== Description:==
Power Reduction to <93%
Time    Position                    Applicant's Actions or Behavior T+5m SRO      Directs power reduction to <93% per SOP 23.109 prerequisite for closing #2 HPCV.
Monitors power reduction to <93%
Plant announcement of power reduction.
ATC      Monitors plant conditions.
Lower reactor power by reduction of reactor recirculation pump speed per SOP 23.138.01.
Reports power less than 93% when completed.
May request rounds operator monitor Recirc oil temperatures BOP      Monitors plant conditions Brief lockdown of #2 HPCV per 23.109 Brief Shutdown of Unitized Actuator per 23.110 Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                        Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 1      Event No.:       3, 4              Page  4 of 9 Event
 
== Description:==
CR 58-39 Individual SCRAM Time    Position                      Applicant's Actions or Behavior T+15m                      MALF: C11MF1106 Scram CR 58-39 SRO      Direct #2 HPCV Lockdown Direct Shutdown of #2 HPCV UA Brief actions for individual rod scram Contact SNE about individual rod scram Direct CR 58-39 disarmed after fuse clip damage reported.
Enter TS 3.1.3, Control Rod Operability.
ATC      Monitors plant conditions.
Reports half scram, rod drift alarm and individual rod scram CR 58-39 Dispatch operator to check HCU 58-39.
ROLE PLAY: Rounds operator reports both Scram Valves open at HCU 58-39. Nothing else is abnormal.
Dispatch operator to check fuses for CR 58-39.
ROLE PLAY: Report blown fuse and severely damaged and charred fuse clips on A side for 58-39 Reset half scram and verifies scram signal clears.
Directs rounds operator to disarm CR 58-39 per 23.106 BOP      Monitors plant conditions.
Perform #2 HPCV lock-down per 23.109 Perform #2 HPCV UA shutdown per 23.110 Directs rounds operator to close TBCCW Valve for shutdown UA ROLE PLAY: Rounds operator reports TBCCW valve to #2 HPCV Unitized Actuator closed May dispatch RTC to assist rounds operator to check fuses.
Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                        Form ES-D-2 Op-Test No.:2013-1      Scenario No.:   1    Event No.: 5                Page    5 of 9 Event
 
== Description:==
Seismic Event Time      Position                    Applicant's Actions or Behavior T+35m                          MALF: C97MF1087 CD69 - Seismic System Event/Trouble (Earthquake)
MALF: C93RF0001 Earthquake Sound SRO            Responds to Seismic Event and enters 20.000.01, Acts of Nature.
Briefs Crew on Seismic event.
Makes Hi-Com announcement of event Directs Monitoring the following for abnormal values:
Reactor Vessel Level.
Reactor Vessel Pressure.
Reactor Power.
Drywell Pressure.
Torus Water Level.
Drywell Unidentified Leakage.
Process Radiation Monitors.
Spent Fuel Pool Water Level.
Spent Fuel Pool Temperature.
Directs seismic event actions for Condition AC.
May contact offsite agencies to confirm Earthquake ROLE PLAY: if contacted as offsite agency, confirm earthquake at 0.02G horizontal and vertical.
ATC            Monitors Power, Pressure and Level as directed by SRO for the seismic event.
May dispatch operators to perform visual inspection of plant systems BOP            Responds to alarm 6D69, Seismic Event/Trouble Dispatches an operator to the relay room to check status of Seismic Panel indications (RR H11-P831) per 23.612 ROLE PLAY: Operator reports from the relay room that seismic event has occurred with an indication of 0.02 G Horizontal and 0.02G Vertical Reports Relay Room indications of 0.02 G. horizontal and 0.02G vertical.
Starts all RHRSW MDCT Fans and checks for proper Appendix D, Page 39 of 39
 
Appendix D                  Required Operator Actions                        Form ES-D-2 Op-Test No.:2013-1    Scenario No.:   1      Event No.: 5              Page    5 of 9 Event
 
== Description:==
Seismic Event running indications.
ROLE PLAY: When directed, report satisfactory operation of MDCT fans following start.
Directs rounds operator to reset D1 and D2 CCHVAC Purge Compressors.
ROLE PLAY: When directed, after about 5 min, report D1 and D2 CCHVAC Purge Compressors are reset.
May dispatch operators to perform visual inspection of plant systems ROLE PLAY: As part of seismic walk down prior to triggering steam leak, Rounds Operator report 1 foot steam plume from packing gland area of E5150-F045.
Appendix D, Page 39 of 39
 
Appendix D                      Required Operator Actions                      Form ES-D-2 Op-Test No.:2013-1    Scenario No.:     1    Event No.:   6            Page    6 of 9 Event
 
== Description:==
RCIC Steam Leak.
Time      Position                      Applicant's Actions or Behavior T+45m                      MALF: E51MF0010, RCIC Steam Leak SRO        Respond to 1D66 Respond to 1D70 Enter 29.100.01 Sheet 5 Determine rising room temperature in RCIC/Core Spray room.
Enter 29.100.01 Sheet 5, Secondary Containment Control May direct RCIC isolation.
Validate isolation of leak by monitoring for lowering room temperatures Enter TS 3.5.3 RCIC ATC        Monitors plant conditions.
BOP        Respond to 1D66 Respond to 1D70 Monitor RCIC system and determine RCIC Automatic isolation did NOT occur.
Manually isolate RCIC System by closing E5150-F007 and E5150-F008 (CT-1)
Validate isolation of leak by monitoring for lowering room temperatures Appendix D, Page 39 of 39
 
Appendix D                      Required Operator Actions                    Form ES-D-2 Op-Test No.:2013-1    Scenario No.:       1      Event No.:   7          Page  6 of 9 Event
 
== Description:==
Loss of Feedwater Time      Position                      Applicant's Actions or Behavior T+55m                  MALF: N20MF0023 C HFP Trip MALF: N20MF0024 E HFP Trip MALF: N20MF0025 W HFP Trip SRO        Directs Mode Switch to Shutdown per AOP 20.107.01 Directs Scram reports from ATC and BOP.
Enters EOP 29.100.01, Sheet 1, RPV Control Establishes Level band of 173 to 214 inches and pressure band of 900 to 1050 psig.
ATC        Places Reactor Mode Switch in Shutdown Provides Scram report.
Verifies all control rods are fully inserted.
BOP        Provides scram report.
May dispatch operator to HFPs to investigate ROLE PLAY: If dispatched to HFP, after about 3 min, report nothing visible with HFPs.
Appendix D, Page 39 of 39
 
Appendix D                      Required Operator Actions                      Form ES-D-2 Op-Test No.:2013-1    Scenario No.:       1    Event No.:   8            Page  7 of 9 Event
 
== Description:==
Loss of High Pressure Feed Sources Time      Position                        Applicant's Actions or Behavior T+55m                  MALF: E41MF0011, HPCI Exhaust Check Valve Failure MALF: N21MF0011, A SBFW Pump Trip MALF: N21MF0038, B SBFW Pump Shaft Shear SRO        Directs ATC to perform Scram Procedure AOP 20.000.21 Expands Level band to 0 to 214 inches Directs ADS inhibited Briefs crew on options and intended course of action Directs start of SLC Pump Directs attempted restart of HFPs Directs RPV pressure lowered with Bypass Valves or Pressure Regulator to feed with W HFP ATC        May report HPCI unavailable due to isolation Starts A or B SLC Pump Attempts HFPs start, W HFP starts Lowers RPV pressure with Bypass Valves or Pressure Regulator to feed with W HFP BOP        Reports Both SBFW Pumps unavailable Reports HPCI unavailable due to isolation Inhibits ADS - (CT-2)
Attempts HFPs start, W HFP starts Lowers RPV pressure with Bypass Valves or Pressure Regulator to feed with W HFP May dispatch operator to SBFW Pumps ROLE PLAY: If dispatched to SBFW pumps, after about 3 min, report nothing visible with A or B SBFW Pump.
Appendix D, Page 39 of 39
 
Appendix D                      Required Operator Actions                        Form ES-D-2 Op-Test No.:2013-1      Scenario No.:     1    Event No.:   9          Page 8 of 9 Event
 
== Description:==
Recirculation Loop Rupture, ED, Level recovery Time      Position                      Applicant's Actions or Behavior MALF: B31MF0066, Recirc Loop Rupture A T+65m MALF: E21RF0005, Auto Start Failure - Div. 1 CS SRO          Enters EOP 29.100.01 Sheet 2, Primary Containment Control Establishes Level band of 173 to 214 inches, expands band to 0 to 214 inches.
Conduct EOP Brief Conduct Brief for Emergency Depressurization Enter 29.100.01, Sheet 3, Emergency Depressurization At TAF, Direct 5 ADS SRVs opened. - (CT-3)
Directs placing RHR in Torus Cooling and Torus Spray.
Directs level band of 173 to 214 following ED ATC          Reports rising Drywell Pressure Coordinate with BOP to shutdown/operate LP Pumps to restore and maintain RPV water level 173 to 214 inches Places RHR in Torus Cooling and Torus Spray as directed ROLE PLAY If dispatched, after 5 min report, report D 1(D2) Radiation Monitor Sample Pump in service.
BOP          Reports rising Drywell Pressure Reports unable to maintain RPV level with available high pressure sources.
Reports Division 1 Core Spray Pumps failed to start, manually starts/align Division 1 Core Spray Pumps Opens 5 SRVs as directed- (CT-3)
Coordinate with ATC to shutdown/operate LP Pumps to restore and maintain RPV water level 173 to 214 inches ROLE PLAY If dispatched, after 5 min report, report D 1(D2) Radiation Monitor Sample Pump in service.
Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                      Form ES-D-2 Op-Test No.:2013-1      Scenario No.:   1    Event No.:   10          Page 9 of 9 Event
 
== Description:==
Containment Cooling and Failures Time      Position                    Applicant's Actions or Behavior T+75m                MALF: E11MF0016 - Containment Spray Valve Failure E1150-F16A SRO        Directs placing RHR in Torus Cooling and Torus Spray.
When Torus Pressure reached 9 psig directs Drywell Spray after securing the A Recirc Pump and stopping all Drywell Cooling Fans- (CT-4)
Directs securing Drywell and Torus Sprays before Drywell and Torus Pressure reach 0 psig, Monitors DWSIL curve prior to spraying drywell Directs Drywell Spray on Division 2 RHR ATC        Shuts down the A Reactor Recirc pump Shuts down all drywell cooling fans Places RHR in Torus Cooling and Torus Spray Reports failure of E11-F016A Places RHR D2 in Drywell Spray- (CT-4)
Secures Torus and Drywell Sprays before Drywell and Torus pressure reach 0 psig.
ROLE PLAY If dispatched to E1150-F16A breaker, after 3 min report, acrid burned insulation smell near MCC (72C-3A-5D)
ROLE PLAY If dispatched, after 3 min report, report D 1(D2) Radiation Monitor Sample Pump in service.
Appendix D, Page 39 of 39
 
Appendix D          Required Operator Actions                      Form ES-D-2 BOP  Places RHR in Torus Cooling and Torus Spray.
Reports failure of E11-F016A Places RHR Div. 2 in Drywell Spray- (CT-4)
Secures Torus and Drywell Sprays before Drywell and Torus pressure reach 0 psig.
ROLE PLAY If dispatched, after 5 min report, report D 1(D2) Radiation Monitor Sample Pump in service.
Appendix D, Page 39 of 39
 
Appendix D                            Required Operator Actions                            Form ES-D-2 Op-Test No.: 2013-2            Scenario No.:     2    Event No.: N/A                  Page 1 of 8 Event
 
== Description:==
Overview Initial Conditions:
Reactor power is 55%. A plant startup is in progress following a planned shutdown for repairs to Main Transformer 2A. The startup is currently on hold, awaiting chemistry results on heater drains. CW Pump #5 is OOS for motor replacement. The refurbished motor arrived on-site yesterday and is currently being installed. RTS is expected late tomorrow.
The objectives of this scenario are to:
: 1.      Recognize, respond to, and take the required actions for an instrument / equipment failures requiring the use of operator and Tech Spec actions.
: 2.      Recognize and respond to a CRD Pump Trip.
: 3.     Recognize and respond to a failure of #6 Drywell Cooling Fan.
: 4.     Recognize and respond to a failure of SRV and F
: 5.      Recognize and respond to a Loss of Vacuum due to loss of all SJAE.
: 6.     Recognize and respond to ATWS conditions.
: 7.     Execute steps in Primary Containment Control and operate the RHR System to control Torus Temperature and Pressure.
: 8.      Execute the steps of RPV Control-ATWS for level (L) pressure (P),and power(Q)
: 9.     Direct and supervise the Shift team during Normal, Abnormal, and Emergency operations.
The crew will be required to respond to the following order of events:
CRD pump trip.(AOP 20.106.01)
        #6 DWC Fan Failure SRV C Fails Open (AOP 20.000.02)
Loss of SJAE/loss of Vacuum (AOP 20.125.01)
ATWS (EOP 29.100.01 Sheet 1 and 1A) Both SLC Pumps Trip Terminate and Prevent SRV F fail open - EOP 29.100.01 Sheet 2 High Torus Temperature Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                    Form ES-D-2 Op-Test No.: 2013-2 Scenario No.:   2    Event No.:   1              Page  2 of 8 Event
 
== Description:==
CRD Hydraulic Pump Trips Time    Position                      Applicant's Actions or Behavior
+2 min              MALF: C102C11_PS_N001A_STFCLOSE, CRD Pump A Trip SRO      Enters AOP 20.106.01, CRD Hydraulic System Failure Briefs crew on CRD Pump Trip Enters TS 3.1.5, Control Rod Scram Accumulators, Condition B Directs restart of A CRD pump ATC      Places CRD Flow Controller in MANUAL Closes CRD Flow Control Valve Closes CRD Pressure Control Valve Reports failure of B CRD Pump Re-starts A CRD Pump Adjusts CRD flow and pressure to 37-63 gpm and differential pressure to 255-265 psid.
Places CRD flow controller in auto May direct operators to investigate CRD pump trip ROLE PLAY: When dispatched to pump, after 3 min, (check current status on panel display) report nothing abnormal at A CRD Pump, report motor rotating on B CRD, pump is not rotating.
ROLE PLAY: At A CRD Pump, report good start when pump re-started.
BOP      Monitors plant conditions.
May direct operators to investigate CRD pump trip.
ROLE PLAY: ROLE PLAY: When dispatched to pump, after 3 min, (check current status on panel display) report nothing abnormal at A CRD Pump, report motor rotating on B CRD, pump is not rotating.
May direct operator to Relay Room to C11-R018, CRD Temperature Recorder, (RR H21-P007) to check for high temperatures and clear alarm 3D13.
Appendix D, Page 39 of 39
 
Appendix D          Required Operator Actions                    Form ES-D-2 ROLE PLAY: Report that several CRDMs (38-31, 26-27, 34-43) were in alarm (>300 deg. F) but that all temperatures are now trending down.
Appendix D, Page 39 of 39
 
Appendix D                      Required Operator Actions                  Form ES-D-2 Op-Test No.: 2013-2 Scenario No.:     2  Event No.:   2            Page  3 of 8 Event
 
== Description:==
High Vibration/High Amps #6 Drywell Cooling Fan Time      Position                    Applicant's Actions or Behavior
+15 min                  MALF: TEAJSPECIFIC_F788753TFF, #6 Drywell Cooling Fan vibration alarm SRO        Respond to 8D45, Div 1 Drywell Fan Brg Vib High Briefs crew on intended actions Directs BOP to shutdown #6 Drywell Cooling Fan ATC        Monitors plant conditions.
BOP        Respond to 8D45, Div 1 Drywell Fan Brg Vib High Reports High Vibration Alarm (8D45) and high amps on #6 DWC fan.
Shutdown #6 Drywell Cooling Fan Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                      Form ES-D-2 Op-Test No.:2013-2      Scenario No.:   2    Event No.: 3              Page  4 of 8 Event
 
== Description:==
C SRV Failure Time      Position                    Applicant's Actions or Behavior
+25 min                MALF: B21MF00 - C SRV Fails Open SRO      Respond to 1D61, SRV OPEN Enter AOP 20.000.25, Failed Safety Relief Valve Conduct AOP Brief Direct fuses for SRV C pulled Direct RHR placed in Torus Cooling Enter TS 3.4.3, SRV, One valve inoperable ATC      Monitors plant conditions.
May direct operator to monitor SRV Tailpipe temperatures at B21-R614 (RR H11-P614)
ROLE PLAY: When dispatched, after about 3 min, report (if SRV still open) C SRV tailpipe temperature is 320 degrees, (if SRV closed) report SRV C tailpipe temperature is 275 degrees and slowly lowering.
Report plant conditions indicate SRV closed BOP      Respond to 1D61, SRV OPEN Depress OPEN pushbutton, and then CLOSE pushbutton. Report SRV still open.
Dispatch operator to pull fuses for SRV C per Enclosure A in AOP 20.000.25.
Place RHR in Torus Cooling ROLE PLAY: if dispatched, after about 5 min, report standing by to pull fuses for SRV C.
Direct operator to pull fuses for SRV C ROLE PLAY: (trigger step) report fuses for SRV C removed.
Report plant conditions indicate SRV closed.
Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                        Form ES-D-2 Op-Test No.:2013-2    Scenario No.:      2    Event No.:    4             Page  5 of 8 Event
 
== Description:==
Loss of SJAE/Loss of Vacuum.
Time      Position                      Applicant's Actions or Behavior
+35 min                MALF: NMRDFU_11CC, Loss of Steam Jet Air Ejectors - Fuse Failure SRO        Respond to numerous alarms on H11-P806 panel Enter AOP 21.125.01, Loss of Condenser Vacuum Direct attempt to restart any Steam Jet Air Ejectors Announce event over Hi-Com Conduct AOP Brief Direct Mode Switch to Shutdown prior to 2.8 psia ATC        Monitors plant conditions Place Mode Switch in Shutdown BOP        Respond to numerous alarms on H11-P806 panel Reports SJAE have tripped Attempt to restore SJAE Report SJAE will not start Reports vacuum degrading Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                          Form ES-D-2 Op-Test No.:2013-2      Scenario No.:      2    Event No.:    5,6         Page 6 of 8 Event
 
== Description:==
ATWS.
Time      Position                      Applicant's Actions or Behavior
+45min                MALF: C11MF0001, Rods Stuck MALF: C71MF0006, Total Scram Failure MALF: C41MF0003, A SLC Pump Trip MALF: C41MF0004, B SLC Pump Trip SRO        Directs Scram reports from ATC and BOP.
Enters EOP Sheet 1, RPV Control and Sheet 1A RPV Control - ATWS Directs FS/Q 1 thru 8 Directs ADS inhibited (CT-1)
Directs SLC injection Directs Alternate Boron Injection (29.ESP.02)
Directs 29.ESP.11 and bypass and restore DW Pneumatics Directs 29.ESP.10 and insert rods with 29.ESP.03 (CT-3)
Directs Terminate and Prevent for level (CT-2)
Directs RPV water level band of 50 to 100 inches Conducts EOP Brief ATC        Reports failure to scram Verifies Mode Switch in Shutdown Depress manual scram pushbuttons Provides Scram report.
Perform FS/Q 1 thru 8 Reports FS/Q 1 thru 8 complete Reports both SLC Pumps tripped and RWCU isolated Directs operators to perform 29.ESP.02 Directs 29.ESP 10 and inserts rods with 29.ESP.03(CT-3)
ROLE PLAY: When dispatched (trigger step), after about 10 min, report 29.ESP.10 is complete.
Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                      Form ES-D-2 Op-Test No.:2013-2      Scenario No.:   2      Event No.:   5,6          Page 6 of 8 Event
 
== Description:==
ATWS.
BOP        Provides scram report.
Inhibits ADS (CT-1)
Directs operators to perform 29.ESP.11 Bypass/restore DW Pneumatics ROLE PLAY: When dispatched (trigger step), after about 10 min, report 29.ESP.11 is complete.
Performs Terminate and Prevent for level (CT-2)
Maintains RPV water level band of 50 to 100 inches Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                        Form ES-D-2 Op-Test No.:2013-2      Scenario No.:  2    Event No.:   7              Page 7 of 8 Event
 
== Description:==
Containment Cooling Time      Position                  Applicant's Actions or Behavior
+60 min                MALF: B21MF0028, SRV F Open SRO      Enters - EOP 29.100.01Sheet 2 - High Torus Temperature Directs placing RHR in Torus Cooling May direct Drywell Cooling Fans restarted Directs RPV water level Band at 173 to 214 inches after all rods in May direct ATC to AOP 20.000.21 Reactor Scram Direct fuses removed for SRV F ATC      Continues Control Rod insertion per 29.ESP.03 When 29.ESP.10 is complete, lines up to drain SDV When SDV drained, re-initiate ARI Reports all rods in Perform 20.000.21 if directed May places RHR in Torus Cooling BOP      Places RHR in Torus Cooling Maintains RPV level band 50 to 100 inches Restore RPV water level to 173 to 214 inches after rods in Direct operator remove fuses for SRV F ROLE PLAY: if dispatched, after about 5 min, report standing by to pull fuses for SRV F.
Directs operator to pull fuses ROLE PLAY: (trigger step) report fuses for SRV F removed.
Plant conditions indicate SRV closed (fuses pulled)
Reports SRV F Closed (closes when RPV pressure <900psig)
Appendix D, Page 39 of 39
 
Appendix D                          Required Operator Actions                            Form ES-D-2 Op-Test No.: 2013-3          Scenario No.:   3    Event No.: N/A                Page 1 of 8 Event
 
== Description:==
Overview Initial Conditions:
Reactor power is currently about 25% Power. The plant startup is on hold due to an oil leak on A Core Spray Pump. A Core Spray Pump is OOS for repair. Return to service is expected late this afternoon.
Following A Core Spray Pump RTS the startup will continue.
The objectives of this scenario are to:
: 1.     Recognize, respond to, and take the required actions for an instrument / equipment failures requiring the use of operator and Tech Spec actions.
: 2.     Recognize and respond to an APRM Downscale.
: 3.     Recognize and respond to an RBCCW Pump Trip.
: 4.     Recognize and resond to a Drywell Pressure Instument Failure.
: 5.     Recognize and respond to a MTLO Pump Failure/Trip of MainTurbine
: 6.     Recognize and respond to a CRD Flow Control Valve Failure
: 7.     Recognize and respond to HPCI Steam Leak/Failure to Isolate.
: 8.     Recognize and respond to SRV Failure
: 9.      Execute the steps of RPV Control for level (L) and pressure (P).
: 10. Execute the steps of Secondary Containment Control for Area Temperatures
: 11. Direct and supervise the Shift team during Normal, Abnormal, and Emergency operations.
The crew will be required to respond to the following order of events:
APRM downscale (TS 3.3.1.1)
RBCCW Pump Trip Drywell Pressure Instrument Failure (TS 3.3.1.1,3.3.6.1,3.3.6.2, 3.3.7.1)
MTLO Pump Failure - Trip Main Turbine.
CRD Flow Control Valve Failure HPCI Steam Leak - Failure to Isolate - >MSO Temp - Scram Two Areas >MSO Temperature - ED SRV H Failure to open Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                  Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 3      Event No.:      1            Page 2 of 8 Event
 
== Description:==
APRM downscale Time    Position                    Applicant's Actions or Behavior
+2 min                    MALF: C51MF0003, APRM Downscale SRO      Respond to 3D98 Enter TS 3.3.1.1 Tracking Direct APRM 3 bypassed ATC      Respond to 3D98 Report APRM 3 reading downscale Bypass APRM 3 Dispatch operator to Relay Room to check APRM 3 ROLE PLAY: Report APRM 3 reading downscale, nothing else abnormal.
BOP      Monitors plant conditions.
May direct operator to Relay Room to Check APRM 3 ROLE PLAY: Report APRM 3 reading downscale, nothing else abnormal.
Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                    Form ES-D-2 Op-Test No.: 2013-1 Scenario No.:  3      Event No.:      2            Page 3 of 8 Event
 
== Description:==
RBCCW Pump Trip Time      Position                    Applicant's Actions or Behavior MALF: P42MF0005, RBCCW Pump Trip
+10 min SRO        Respond to 2D104,2D119 Enter AOP 20.127.01, Loss of RBCCW Direct Start of Standby RBCCW Pump Direct EECW restored to Standby ATC        Monitors Power, Pressure and Level May dispatch operator to check C RBCCW Pump May dispatch operator to check C RBCCW Breaker(72F-2D)
ROLE PLAY: When dispatched to pump, after about 3 min, report nothing abnormal at C RBCCW pump. Report good start on South Pump ROLE PLAY: When dispatched to breaker (72F-2D), after about 3 min, report breaker tripped on overload.
BOP        Respond to 2D104,2D119 Reports C RBCCW Tripped Start Standby RBCCW Pump Dispatch operator to check C RBCCW Pump Dispatch operator to check C RBCCW Breaker(72F-2D)
Restore EECW to Standby per SOP ROLE PLAY: When dispatched to pump, after about 3 min, report nothing abnormal at C RBCCW pump. Report good start on South Pump.
ROLE PLAY: When dispatched to breaker (72F-2D), after about 3 min, report breaker tripped on overload.
Appendix D, Page 39 of 39
 
Appendix D                      Required Operator Actions                        Form ES-D-2 Op-Test No.: 2013-1 Scenario No.:    3      Event No.:      3            Page    4 of 8 Event
 
== Description:==
Drywell Pressure Instrumentation Failure Time      Position                      Applicant's Actions or Behavior
+30 min                MALF: B21MF0004 Drywell Pressure Transmitter Failure SRO      Respond to 3D81 Enter TS 3.3.1.1, 3.3.6.1, 3.3.6.2,3.3.7.1 9 (Drywell Pressure Instrumentation)
Brief crew on TS impact ATC      Respond to 3D81 Monitors Power, Pressure and Level May dispatch operator to Testability Cabinets to check drywell pressure instrumentation.
ROLE PLAY: When dispatched to Testability, after about 3 min, report C71-N650A reading downscale, all other channels reading normal.
BOP      Respond to 3D81 Monitor drywell pressure Will dispatch operator to Testability Cabinets to check drywell pressure instrumentation.
ROLE PLAY: When dispatched to Testability, after about 3 min, report C71-N650A reading downscale, all other channels reading normal.
Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                    Form ES-D-2 Op-Test No.:2013-1    Scenario No.:    3    Event No.:    4          Page 5 of 8 Event
 
== Description:==
. MTLO Pump Failures/Trip MainTurbine Time      Position                    Applicant's Actions or Behavior MALF: N30MF0038, Trip A MTLO Pump
+40 min                MALF: N30MF0039, Trip B MTLO Pump SRO      Respond to multiple alarms on H11P804 Directs check of bearing oil pressure Directs Main Turbine tripped.
Enter AOP 20.109.01, Main Turbine Trip Direct S MTLO pump shutdown Plant announcement of Main Turbine trip Direct shutdown procedure per SOP 23.109 ATC      Monitor plant conditions May make plant announcement of Main Turbine trip BOP      Respond to multiple alarms on H11P804 Report N MTLO Pump has tripped. S MTLO Running with high fluctuating amps, Emergency Pump also running.
Reports bearing oil pressure Trip Main Turbine Shutdowns S MTLO pump.
Perform turbine shutdown procedure per SOP 23.109 ROLE PLAY: When dispatched to MTLO Pumps, after about 3 min, report North Pump is OFF, motor very warm.
South Pump vibrating ROLE PLAY: When dispatched to MTLO Pump Breakers Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                      Form ES-D-2 Op-Test No.:2013-1    Scenario No.:    3    Event No.:    5          Page    6 of 9 Event
 
== Description:==
. CRD Flow Control Valve Failure Time      Position                    Applicant's Actions or Behavior MALF: C11MF0004, A CRD Flow Control Valve Failure
+50 min SRO      Respond to alarms on H11P603 Enter AOP 20.106.03 Conducts AOP Brief Directs swap to B FCV ATC      Respond to alarms on H11P603 Report A CRD failed closed Directs operator to A FCV ROLE PLAY: When dispatched, after about 3 mins, report broken air line on A FCV.
Directs operator thru each step in AOP for swap to B FCV ROLE PLAY: When directed perform steps and report steps during swap over to B FCV Report B FCV in service Direct operator to monitor CRD temps (3D13)
ROLE PLAY: When dispatched, after about 3 min, report 2 CRDM (26-31 and 38-27) >250F (peaked at 295F), now below 250F. Ready to reset alarm???
BOP      Monitor plant conditions May direct operator to CRD FCV May direct operator to RR to monitor CRD temps Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                        Form ES-D-2 Op-Test No.:2013-1      Scenario No.:    3    Event No.:    6        Page 7 of 8 Event
 
== Description:==
HPCI Steam Leak/Failure to Isolate.
Time      Position                      Applicant's Actions or Behavior
+65 min              MALF: E41MF0007, HPCI Steam Leak MALF: E41MF0008, Failure E41-F002 MALF: E41RF0033 E41-F600 Breaker Trip SRO      ROLE PLAY: Report 1 foot steam plume from packing gland on E4150-F001.
Respond to 1D66, 1D70 Enter 29.100.01 Sheet 5, Secondary Containment Control Directs Isolation of HPCI Brief Actions for Steam Leak/Scram.
Direct Mode Switch to Shutdown prior to MSO Temperature.(CT-1)
Directs Scram report from ATC and BOP Enter 29.100.01 Sheet 1, RPV Control Direct 173 to 214 inches level band and 900 to 1050 psig pressure band May direct ATC to perform AOP 20.000.21 ATC        Places Reactor Mode Switch in Shutdown when directed (CT 1)
Provides Scram report.
Verifies all control rods are fully inserted.
Perform actions in AOP 20.000.21 BOP        Respond to 1D70, 1D66 Reports failure of HPCI to isolate - E41-F600 failed to close Provides scram report.
Dispatch operator to check MCC for E41-F600.(2PB1-1C)
Maintains level and pressure as directed Appendix D, Page 39 of 39
 
Appendix D                    Required Operator Actions                      Form ES-D-2 Op-Test No.:2013-1      Scenario No.:  3    Event No.:    7,8.9,10        Page 8 of 8 Event
 
== Description:==
  >MSO temperature 2nd Area, ED, Isolate Steam Leak.
Time      Position                    Applicant's Actions or Behavior
+75 min                MALF: TA20TEN206ZOUT, Leak to 2nd Area MALF: B21MF0030, SRV H Failure SRO      Brief for rising temperature in second area From 29.100.01 Sheet 5, Directs Open 5 SRVs ADS preferred(CT-2)
Direct RHR in Torus Cooling Confirm leak isolation by observing lowering room temperatures (CT 3)
ATC      May report rising temperature in second area Place RHR in Torus Cooling May confirm lowering temperatures after E41-F600 closed BOP      May report rising temperature in second area Opens 5 SRVs. Reports SRV H did not open. One other SRV opened. (CT 2)
Place RHR in Torus Cooling ROLE PLAY: When dispatched to E41-F600, report (after ED) that fuses are blown, getting new fuses.
ROLE PLAY: After blown fuse report, wait 3 min and report new fuses installed standing by to close breaker for E41-F600.
Direct operator to close breaker for E41-F600 ROLE PLAY: (trigger step) report breaker closed.
Report E41-F600 closed - leak isolated (CT 3)
May confirm lowering temperatures after E41-F600 closed Appendix D, Page 39 of 39}}

Latest revision as of 00:12, 6 February 2020

Exam Proposed JPMs and Scenarios
ML13364A056
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/09/2013
From:
Division of Reactor Safety III
To:
Detroit Edison, Co
Carl Moore
Shared Package
ML11355A016 List:
References
Download: ML13364A056 (203)


Text

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-ER-831-0001-402 3 JPM Title Duration Page Request Emergency Offsite Services 20 minutes 1 Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment 1.

  • 2.
  • 3.

4.

  • 5.
  • 6.

7.

  • 8.
  • 9.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-ER-831-0001-402 Request Emergency Offsite Services Revision: 3 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-ER-831-0001-402 Request Emergency Offsite Services Revision: 3 Page 3 JPM Information System:

N/A Task:

74001 - Request offsite ambulance/paramedic, fire, or hospital support

References:

Required (R) / Available (A)

EP-290, Emergency Notifications (R)

EP-29004, Ambulance/ Paramedic Support Request Form (A)

EP-29005, Hospital Support Request Form (A)

EP-29006, Secondary Alarm Station Report (A)

Tools and Equipment Required:

None Initial Conditions:

You are an extra operator in the Control Room when a major steam leak occurs.

The steam leak has just been isolated when the control room receives a report that 3 personnel have received life-threatening burns from the steam leak.

The personnel are in the North Heater Drain Pump Room where radiation levels are not excessive.

The area surrounding the location of the seriously burned personnel is contaminated.

Initiating Cue(s):

The SM directs you to obtain ambulance and paramedic assistance.

Inform the SM when the requests for assistance have been made and arrangements for entry of the responding personnel have been completed.

Terminating Cue(s):

Offsite assistance has been requested, the hospital has been informed and site entry has been expedited for responding personnel.

Task Standard:

Offsite Assistance has been requested from Frenchtown Fire Department, Ambulance and Paramedics per EP 290.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-ER-831-0001-402 Request Emergency Offsite Services Revision: 3 Page 4 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

N/A K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: Generic K/A STATEMENT:

2.4.43 Knowledge of emergency communications systems and techniques. .............................. 3.2 / 3.8 Maintenance Rule Safety Classification:

N/A Maintenance Rule Risk Significant? (Yes or No)

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-ER-831-0001-402 Request Emergency Offsite Services Revision: 3 Page 5 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet. If asked, provide examinee with a copy of EP-290004.

CUE: If requested, SM informs examinee that paramedics should be aware that area around injured personnel as well as personnel themselves might be contaminated. Area radiation levels are not a significant risk.

1. Obtain EP-2900004, Ambulance/ Paramedic 1. Obtains and completes EP-290004 as follows:

Support Request Form, and complete Checks block for Rescue Squad and appropriate sections. ambulance Fills in Name, Title, and Telephone Number 3 injured personnel Seriously Burned 3 potentially contaminated Transport to Mercy Memorial CUE: As Central Dispatch, acknowledge the information provided.

  • 2. Call 734-241-2727 (for urgent medical
  • 2. Calls number, states This is (name, title, assistance) to request paramedic and telephone number) calling from Fermi 2.

ambulance. There are injured personnel onsite and your assistance is required immediately.

Provides other information previously filled in on form.

CUE: As Central Dispatch, respond that contact name is Robert James.

  • 3. Request contact name from Central Dispatch,
  • 3. Requests contact name from Central and enter date and time. Dispatch, and notes it on form along with current date and time.

NOTE: EP-290006 may be completed before EP-290005.

CUE: If requested, provide examinee with a copy of EP-290005.

4. Obtain EP-290005 and complete the form. 4. Obtains EP-290005 and completes the form with the previously collected information.
  • 5. Call 734-240-8477 or 734-240-8488 (Mercy
  • 5. Calls Mercy Memorial, states This is (name, Memorial Hospital) asking for the Charge title, telephone number) calling from Fermi 2.

Nurse and provide the collected information. There are injured personnel onsite and the ambulance service has been contacted to transport the victims to you.

Provides the other information required, including number of injured personnel (3).

States You are requested to implement your radiological emergency response plan.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-ER-831-0001-402 Request Emergency Offsite Services Revision: 3 Page 6 ELEMENT STANDARD CUE: As Charge Nurse, respond that contact name is Samuel Smith.

  • 6. Request contact name from Charge Nurse,
  • 6. Requests contact name from Charge Nurse, and enter date and time. and notes it on form along with current date and time.

CUE: If requested, provide examinee with a copy of EP-290006. If asked, SM reports that injured personnel are in the North Heater Bay.

7. Obtain EP-290006 and complete the form. 7. Obtains EP-290006 and completes the form with the required information:

Checks that Fire/Paramedics, Ambulance, and Hospital contacted.

2 vehicles reporting onsite 4 personnel reporting onsite Checks Fermi Drive gate to be used Injured personnel are in the North Heater Bay

  • 8. Use Control Room-Security direct line to SAS
  • 8. Contacts Secondary Alarm Station and (Secondary Alarm Station) or call 6-5215, and reports:

report required information. Fire/Paramedics, Ambulance, and Hospital contacted.

2 vehicles reporting 4 personnel responding Access is through Fermi Drive gate Injured personnel are in the North Heater Drain Pump Room (Turbine Building)

CUE: As Security Supervisor, respond that contact name is Joseph Ruger.

  • 9. Request contact name from SAS, and enter
  • 9. Requests contact name from SAS, and notes date and time. it on form along with current date and time.

CUE: Terminate JPM when SM is notified that offsite assistance has been requested, the hospital informed, and site entry expedited for responding personnel.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-ER-831-0001-402 Request Emergency Offsite Services Revision: 3 Page 7 Evaluator Notes:

This JPM may be started at the CRS Desk in the Simulator.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-ER-831-0001-402 Request Emergency Offsite Services Revision: 3 Page 8 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-ER-831-0001-402 Request Emergency Offsite Services Revision: 3 Page 9 Simulator Setup IC#:

N/A Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-ER-831-0001-402)

Initial Conditions:

You are an extra operator in the Control Room when a major steam leak occurs.

The steam leak has just been isolated when the control room receives a report that 3 personnel have received life-threatening burns from the steam leak.

The personnel are in the North Heater Drain Pump Room where radiation levels are not excessive.

The area surrounding the location of the seriously burned personnel is contaminated.

Initiating Cue(s):

The SM directs you to obtain ambulance and paramedic assistance.

Inform the SM when the requests for assistance have been made and arrangements for entry of the responding personnel have been completed.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0043-005 2 JPM Title Duration Page Recovery of RCIC following a Manual Trip 25 minutes 1 Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1. *11.
2. *12.
  • 3. *13.
4. 14.
5. *15.
6. *16.
  • 7.

8.

9.

  • 10.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip Revision: 2 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to prepare Adequate control of system No anticipation of results of for job. Aware of control maintained throughout task actions. Unaware or control bands and maintained them. but some improvements bands or not able to maintain Configuration control could be made such as better them. Lack of knowledge of maintained. manual control or greater how to control system depth of knowledge for parameters.

anticipating system response.

Conservatism Low threshold for Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding, with unanswered questions.

Questioning attitude. Uses High focus on task High threshold for problem stop when unsure if completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of generic related to plant operation.

fundamentals to predict and Only relied on procedure for monitor system response. operating knowledge.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip Revision: 2 Page 3 JPM Information System:

E5100 - Reactor Core Isolation Cooling System Task:

63607 - Perform a recovery of RCIC following a trip

References:

Required (R) / Available (A) 23.206, Reactor Core Isolation Cooling System Tools and Equipment Required:

None Initial Conditions:

You are the Control Room NSO with the reactor shut down following a transient.

The EOPs have been entered.

RCIC, SBFW, and CRD pumps were injecting to control reactor water level.

RCIC was subsequently shutdown using the manual trip pushbutton.

N2103-F001 (SBFW injection valve) has just failed closed, and the pumps have been shut down.

Initiating Cue(s):

The CRS directs you to reset and manually restart RCIC per 23.406 section 7, and restore water level to 173"-214".

Terminating Cue(s):

RCIC is injecting into the RPV at approximately 650 gpm.

Task Standard:

RCIC has been restarted following a manual trip per 23.206, Reactor Core Isolation Cooling System.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

2-Reactor Water Inventory Control K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 217000 - Reactor Core Isolation Cooling System K/A STATEMENT:

A4. Ability to operate and/or monitor in the control room:

A4.02 Turbine trip throttle valve reset................................................................................. 3.9/3.9 Maintenance Rule Safety Classification:

E5100-01 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip Revision: 2 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide the examinee with the cue sheet.

  • 1. [7.1.2.1.a] Depress RCIC System Initiate
  • 1. Depresses RCIC System Initiate Signal Signal reset pushbutton and verify: reset pushbutton, and verifies SEALED IN White SEALED IN light goes off light goes out and 1D24 clears.

Annunciator 1D24, RCIC SYSTEM ACTUATION, clears.

2. [7.1.2.1.b] Close or verify closed E5150- 2. Verifies E5150-F095 is closed.

F095, RCIC Turb Stm Inlet Byp Vlv.

  • 3. [7.1.2.1.c] Close or verify closed the
  • 3. Closes E5150-F059.

following valves: Verifies E5150-F019 is closed.

E5150-F059, RCIC Turbine Trip Verifies E5150-F013 is closed.

Throttle Vlv Closes E5150-F045.

E5150-F019, RCIC Min Flow Vlv Closes E5150-F046.

E5150-F013, RCIC Disch to FW Inbd Iso Valve E5150-F045, RCIC Turb Steam Inlet Vlv E5150-F046, RCIC Oil Clr Clg Water Iso Vlv

4. [7.1.2.1.d] Open the following valves: 4. Verifies the following valves are open:

E5150-F025, RCIC Turb Stm Drn Pot E5150-F025 Inbd Iso E5150-F026 E5150-F026, RCIC Turb Stm Drn Pot E5150-F005 Otbd Iso E5150-F005, RCIC Cond To RW Otbd Iso Vlv NOTE: RPV Level is >Level 2, and RCIC was tripped manually, so 7.1.2.2 & 7.1.2.3 are NA.

5. [7.1.2.4.c] Place RCIC Turbine Trip 5. Verifies RCIC Turbine Trip PB collar is in Pushbutton collar in DISARMED. DISARMED.
6. [7.1.2.5.c] Close E5150-F059, RCIC 6. Verifies E5150-F059 is closed.

Turbine Trip Throttle Vlv,

  • 7. [7.1.2.5.d] Open E5150-F059, RCIC
  • 7. Opens E5150-F059.

Turbine Trip Throttle Vlv,

8. [7.1.2.5.e] Verify annunciator 1D94, RCIC 8. Verifies 1D94 is clear.

Turbine Tripped is clear.

CUE: NO reports that valve stem for E51-F059, RCIC Turbine Inlet Trip Throttle Vlv, is in OPEN.

9. [7.1.2.5.f] Verify locally valve stem for 9. Directs NO to locally verify valve stem for E51-F059, RCIC Turbine Inlet Trip E51-F059, RCIC Turbine Inlet Trip Throttle Vlv, is in OPEN. Throttle Vlv, is in OPEN.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip Revision: 2 Page 5 ELEMENT STANDARD NOTE: Student may restart RCIC using section 5.4 or Enclosure B with all prerequisites met or waived by CRS.

  • 10.. [5.4.2.1] Start E5101-C004 RCIC Baro *10. Starts E5101-C004, RCIC Baro Cndr Cndr Vacuum Pump. Vacuum Pump.
  • 11. [5.4.2.2] Open E5150-F046, RCIC Oil Clr *11. Opens E5150-F046.

Clg Water Iso Vlv.

NOTE: Examinee should make Hi Com announcement and Crew Update "Starting RCIC"

  • 12. [5.4.2.3.a] Open E5150-F095, RCIC Turb *12. Opens E5150-F095.

Stm Inlet Byp Vlv.

  • 13. [5.4.2.3.b] After approximately 15 *13. After 15 seconds, opens E5150-F045.

seconds, open E5150-F045, RCIC Turb Steam Inlet Vlv.

14. [5.4.2.4] Verify the following valves close: 14. Verifies E5150-F025 and E5150-F026 E5150-F025, RCIC Turb Stm Drn Pot close.

Inbd Iso E5150-F026, RCIC Turb Stm Drn Pot Otbd Iso

  • 15. [5.4.2.6] Open E5150-F013, RCIC Dish *15. Opens E5150-F013.

To FW Inbd Iso Valve

  • 16. [5.4.2.7] Adjust flow as necessary with *16. Adjusts flow with E51-K615 to maintain E51-K615, RCIC Discharge Flow RPV Level.

Controller.

CUE: End JPM when RCIC is injecting with approximately 650 gpm with level increasing.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip Revision: 2 Page 6 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip Revision: 2 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0043-005 Recovery of RCIC following a Manual Trip Revision: 2 Page 8 Simulator Setup IC#: 20 Malfunctions:

Number Title Value Delay Ramp N20MF0023 Heater Feed Pump Trip C ACTIVE 0 0 N20MF0024 Heater Feed Pump Trip E ACTIVE 0 0 N20MF0025 Heater Feed Pump Trip W ACTIVE 0 0 Remote Functions:

Number Title Value Delay Ramp Override Functions:

Number Title Value Delay Ramp Special Instructions:

1. Initialize the simulator to the desired IC, and place in RUN.
2. Open and Execute lesson JP0043-005.lsn, or set the malfunctions listed above.
3. Place Mode Switch in Shutdown.
4. Dial down the RCIC flow controller to 0, and manually trip the RCIC turbine.
5. Verify RPV level about 160, then place the simulator in FREEZE.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0043-005)

Initial Conditions:

You are the Control Room NSO with the reactor shut down following a transient.

The EOPs have been entered.

RCIC, SBFW, and CRD pumps were injecting to control reactor water level.

RCIC was subsequently shutdown using the manual trip pushbutton.

N2103-F001 (SBFW injection valve) has just failed closed, and the pumps have been shut down.

Initiating Cue(s):

The CRS directs you to reset and manually restart RCIC per 23.406 section 7, and restore water level to 173"-214".

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0107-002 1 JPM Title Duration Page Transfer Feedwater Control from Long Cycle Cleanup to 15 minutes 1 Startup Level Control Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

1. *11.
2. *12.
3. 13.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.

9.

10.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to Revision: 1 Startup Level Control Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to prepare Adequate control of system No anticipation of results of for job. Aware of control maintained throughout task actions. Unaware or control bands and maintained them. but some improvements bands or not able to maintain Configuration control could be made such as better them. Lack of knowledge of maintained. manual control or greater how to control system depth of knowledge for parameters.

anticipating system response.

Conservatism Low threshold for Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding, with unanswered questions.

Questioning attitude. Uses High focus on task High threshold for problem stop when unsure if completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of generic related to plant operation.

fundamentals to predict and Only relied on procedure for monitor system response. operating knowledge.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to Revision: 1 Startup Level Control Page 3 JPM Information System:

N2100 - Reactor Feedwater System Task:

62073 - Transfer from long cycle cleanup to startup level control

References:

Required (R) / Available (A) 23.107, Reactor Feedwater and Condensate (R)

Tools and Equipment Required:

None Initial Conditions:

You are the Control Room NSO.

Plant startup is in progress. The reactor is just critical. Pressurization is to begin.

Feedwater is in Long Cycle Cleanup mode. Chemistry has reported Condensate and Feedwater chemistry is within the administrative limits.

Initiating Cue(s):

The CRS directs you to transfer Feedwater Control from Long Cycle Cleanup to Startup Level Control per 23.107.

Terminating Cue(s):

Feedwater is in Startup Level Control.

Task Standard:

Feedwater Control is transferred from Long Cycle Cleanup to Startup Level Control per 23.107.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

SF Reactor Water Inventory Control K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 259001 - Reactor Feedwater System K/A STATEMENT:

A4 Ability to manually operate and/or monitor in the control room:

A4.05 Reactor Water Level ..................................................................................................... 4.0 / 3.9 Maintenance Rule Safety Classification:

N2100-06 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to Revision: 1 Startup Level Control Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD NOTE:

CUE: Provide examinee with Cue Sheet.

1. [5.1.2.2] Place or verify, RPV Startup LCV 1. RPV Startup LCV Mode Switch is verified Mode Switch in START. If C32-K816, FW in START.

& RR Flat Panel Display, is available, DCS logic is verified in START.

verify DCS logic is in START.

2. [5.1.2.3.a] Verify Feedwater Logic white 2. Feedwater Logic white POST SCRAM POST SCRAM light is OFF. light is verified OFF.
3. [5.1.2.3.b] Verify Reactor Water Level Set 3. Reactor Water Level Set Down white Down white POST SCRAM light is OFF. POST SCRAM light is verified OFF.
  • 4. [5.1.2.4] Place or verify C32-R620, N21-
  • 4. C32-R620, N21-F403 RPV Startup LCV F403 RPV Startup LCV Controller, in Controller, is placed in MANUAL.

MANUAL.

  • 5. [5.1.2.5] Place or verify, Level Control
  • 5. Level Control Mode switch is placed in 1 Mode switch in 1 ELEM. If C32-K816, FW ELEM. DCS logic is verified in 1

& RR Flat Panel Display, is available, ELEMENT.

verify DCS logic is in 1 ELEMENT.

NOTE: This step is performed while verifying that N20-F404 throttles. If N20-F404 fails to throttle, N2000-F618 must be manually throttled to maintain proper flow.

  • 6. [5.1.2.6] Adjust output of C32-R620, N21-
  • 6. Output of C32-R620, N21-F403 RPV F403 RPV Startup LCV Controller, to 0% Startup LCV Controller, is adjusted to 0%

(COP H11-P603), while maintaining while maintaining Condensate flow rate at Condensate flow rate at approximately approximately 9000 gpm.

9000 gpm, as indicated on N20-R815, Cond To Cond F/Ds Flow Recorder.

  • 7. [5.1.2.7] Close N2100-F604, Fw Htr 6N
  • 7. N2100-F604 and N2100-F605 are closed.

Cond Rtrn to Cndr Vlv, and N2100-F605, Fw Htr 6S Cond Rtrn to Cndr Vlv.

  • 8. [5.1.2.8] Open N2100-F601, Fw Htr 6N
  • 8. N2100-F601 and N2100-F602 are Outlet Iso Valve, and N2100-F602, Fw Htr opened.

6S Outlet Iso Valve.

CUE: Report as NO that disconnect switch MCC 72A-4A Position 4A, is in OFF for N2100-F604.

9. [5.1.2.9] Place disconnect switch MCC 9. Directs NO to place disconnect switch 72A-4A, Position 4A, in OFF for N2100- MCC 72A-4A, Position 4A, in OFF for F604, Fw Htr 6N Cond Rtrn to Cndr Vlv. N2100-F604.

CUE: Report as NO that disconnect switch MCC 72R-2A Position 3C, is in OFF for N2100-F605.

10. [5.1.2.10] Place disconnect switch MCC 10. Directs NO to place disconnect switch 72R-2A, Position 3C, in OFF for N2100- MCC 72R-2A, Position 3C, in OFF for F605, Fw Htr 6S Cond Rtrn to Cndr Vlv. N2100-F605.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to Revision: 1 Startup Level Control Page 5 ELEMENT STANDARD NOTE: This step is performed while verifying that N20-F404 throttles. If N20-F404 fails to throttle, N2000-F618 must be manually throttled to maintain proper flow.

  • 11. [5.1.2.11] Slowly adjust output of C32- *11. Output of C32-R620, N21-F403 RPV R620, N21-F403 RPV Startup LCV Startup LCV Controller, is adjusted until Controller, to open N21-F403, RPV RPV water level starts to rise while Startup LCV, until RPV water level starts maintaining Condensate flow rate at to rise, while maintaining Condensate flow approximately 9000 gpm.

rate at approximately 9000 gpm.

  • 12. [5.1.2.12] WHEN desired RPV water level *12. C32-R620, N21-F403 RPV Startup LCV is reached (Level 4 to Level 7), place Controller, is placed in AUTO when C32-R620, N21-F403 RPV Startup LCV desired RPV level is reached.

Controller, in AUTO.

13. [5.1.2.13] Adjust RPV water level setpoint 13. RPV water level setpoint is adjusted to to maintain desired Reactor Water Level maintain desired Reactor Water Level.

(Level 4 to Level 7).

CUE: End JPM when Feedwater is in Startup Level Control.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to Revision: 1 Startup Level Control Page 6 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to Revision: 1 Startup Level Control Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0107-002 Transfer Feedwater Control from Long Cycle Cleanup to Revision: 1 Startup Level Control Page 8 Simulator Setup IC#:

IC-05 Malfunctions:

Number Title Value Delay Ramp Remote Functions:

Number Title Value Delay Ramp Override Functions:

Number Title Value Delay Ramp Special Instructions:

1. Initialize the simulator to IC-05, and place in RUN.
2. If necessary, insert control rods to stabilize power.
3. Verify Long Cycle Cleanup is established.
4. Establish RWCU blowdown flow of about 60 gpm.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0107-002)

Initial Conditions:

You are the Control Room NSO.

Plant startup is in progress. The reactor is just critical. Pressurization is to begin.

Feedwater is in Long Cycle Cleanup mode. Chemistry has reported Condensate and Feedwater chemistry is within the administrative limits.

Initiating Cue(s):

The CRS directs you to transfer Feedwater Control from Long Cycle Cleanup to Startup Level Control per 23.107.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0110-407 0 JPM Title Duration Page Conduct Control Rod Drive Coupling Integrity Test with 15 minutes 1 Coupling Failure Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1. 11.
2. 12.
3. *13.
4. 14.

5.

6.

  • 7.
  • 8.
  • 9.
  • 10.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Meets all Opportunity for Does not meet Comment Operator Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 2

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with Revision: 0 Coupling Failure Page 2 JPM Observation Criteria Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Monitoring Equipment status monitored at Some monitoring was Did not recognize key equipment proper frequency, using performed but undue focus on status indicators, too much focus multiple means if available. task or lack of system on single indications and ignored Understood which indications knowledge prevented ideal total system status.

were critical. monitoring.

Control Task preview used to prepare Adequate control of system No anticipation of results of for job. Aware of control bands maintained throughout task but actions. Unaware or control and maintained them. some improvements could be bands or not able to maintain Configuration control made such as better manual them. Lack of knowledge of how maintained. control or greater depth of to control system parameters.

knowledge for anticipating system response.

Conservatism Low threshold for identification Some opportunities existed to Proceeds even when unsure with of problems. Questioning question before proceeding, unanswered questions. High attitude. Uses stop when High focus on task completion threshold for problem unsure if needed. Sensitive to without consideration for other conditions.

nuclear safety. system affects.

Teamwork Routinely communicates system Communicated most status and Routinely takes action without status changes to the team. actions. Some improvement informing the team.

Communicates actions before would be warranted.

taking them.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid system fundamental knowledge has response, unsure of generic knowledge. Good working some gaps. fundamentals concepts related knowledge of generic to plant operation. Only relied fundamentals to predict and on procedure for operating monitor system response. knowledge.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with Revision: 0 Coupling Failure Page 3 JPM Information System:

C1102 - Control Drive and Drive Mechanism Task:

74311 - Perform actions for Control Rod re-coupling not successful OR Control Rod cannot be verified coupled

References:

Required (R) / Available (A)

AOP 20.106.02 (R)

SOP 23.623 (R)

ARPs 3D76 & 3D80 (A)

Tools and Equipment Required:

Marked up 23.623, Attachment 2 Initial Conditions:

A plant startup is in progress.

Reactor power level is ~55%.

You are the P603 operator.

Initiating Cue(s):

The CRS directs you to continue the reactor startup with rods on Post-LPSP Control Rod Pull Sheet A-9/2, RWM-Step 50, from control rod 14-47. I will act as your Verifier.

Terminating Cue(s):

Control Rod 14-47 is disarmed in accordance with 20.106.02.

Task Standard:

CRD Coupling Integrity Test is performed in accordance with 23.623. Control Rod 14-47 is disarmed in accordance with 20.106.02.

Licensed Operator Exam Information (required for NRC exams)

Safety Function/Category:

1 - Reactivity Control 11 - Abnormal Plant Evolutions K/A

Reference:

K/A SYSTEM: 201003 - Control Rod and Drive Mechanism K/A STATEMENT:

A2 Ability to (a) predict the impacts of the following on the CONTROL ROD AND DRIVE MECHANISM; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)

A2.02 Uncoupled rod . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3.7 / 3.8 Maintenance Rule Safety Classification:

B1100-07 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with Revision: 0 Coupling Failure Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet, Rod Pull Sheet, and marked up 23.623, Attachment 2.

NOTE: Rod can be continuously withdrawn using Override vs. notching out.

  • 1. Begin withdrawing Control Rod 14-47 from *1. Rod Movement Control taken to OUT Position 18 to 48 by notching rod, or NOTCH. When the settle function is continuously withdrawing iaw 23.623. complete, this step is repeated until the rod is at Position 48.

OR Rod Out Notch Override taken to OVERRD and Rod Movement Control taken to OUT NOTCH.

NOTE: When rod 14-47 reaches Position 48, the Four-Rod Display indicates blank, annunciators 3D76 and 3D80 alarm, and the rods DRIFT light indicates on the Full Core Display.

2. Respond to 3D76 alarm. Inform CRS of rod 2. CRS is informed of overtravel.

overtravel past Position 48.

3. [IR 1.] Verify Control Rod overtravel at 4-Rod 3. 4-Rod Display and Full Core Display is Display by checking that no position number checked for selected rod.

is indicated in window and Full Out light on the Full Core Display is out.

4. [IR 2.] Verify 3D80, CONTROL ROD DRIFT, 4. 3D80, CONTROL ROD DRIFT, is verified to is received. be in alarm.

CUE: The CRS will direct the performance of AOP 20.106.02, Condition C.

5. [IR 3.] Recommend CRS enters 20.106.02. 5. Recommends entering 20.106.02.

CUE: If asked, the CRS will contact the SNE to evaluate the rod pattern.

6. [C.1] Direct the Station Nuclear Engineer to 6. Station Nuclear Engineer contacted.

evaluate the effect on Control Rod Pattern.

  • 7. [C.2.a] Insert CRD in notch mode until *7. Uncoupled rod is inserted one notch at a time nuclear instrumentation indicates Control Rod until nuclear instrumentation indicates Control is being inserted. Rod is being inserted.

CUE: The SM and SNE give permission to withdraw control rod.

  • 9. [C.2.c] Fully withdraw Control Rod in notch *9. Rod Movement Control taken to OUT mode while observing nuclear NOTCH. When the settle function is instrumentation response. complete, this step is repeated until the rod is at Position 48.

NOTE: The following steps are directed by 20.106.02, step C.2.d, and performed per 23.623.

  • 10. [6.1.2.2.a] Attempt to withdraw Control Rod *10. Rod Movement Control taken to OUT from Position 48 by notching rod. NOTCH.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with Revision: 0 Coupling Failure Page 5 ELEMENT STANDARD

11. [6.1.2.2.b] Verify Control Rod is coupled as 11. Identifies rod does not settle back to Position follows: 48 and 3D76 alarms. The selected control
1) Rod settling back to Position 48. rod is NOT coupled.
2) Annunciator 3D76, CONTROL ROD OVERTRAVEL, does not alarm.

CUE: The CRS acknowledges the report, then directs the performance of AOP 20.106.02, Conditions E.2 and E.3.

12. Inform CRS that control rod 14-47 re-coupling 12. CRS is informed that control rod 14-47 re-is not successful. coupling is not successful.

CUE: Notify Examinee that time compression may be used for activities performed outside of the Control Room. Report that amphenols are disconnected, or C11-F103 and C11-F105 are closed, whichever has been directed.

14. [E.3] Disarm affected HCU by one of the 14. NO directed to disarm HCU 14-47 by one of following methods: the following methods:

- Disconnect amphenols to directional - Disconnect amphenols to directional control valves. control valves.

OR OR

- Close C11-F103, then C11-F105 - Close C11-F103, then C11-F105 CUE: End the JPM when Control Rod 14-47 is disarmed in accordance with 20.106.02.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with Revision: 0 Coupling Failure Page 6 Evaluator Notes:

Provide the examinee the pull sheets for the next control rod to be withdrawn to position 48 (LPSP Pull Sheet A-9/2, RWM-Step: 50, marked with rods pulling from 18 to 48) and 23.623 Attachment 2 marked up with current rod pattern.

This JPM can be performed at low power (startup) or at higher power (control rod pattern adjustment).

If this JPM is being performed at low power, provide normal pull sheets; if being performed at high power provide rod pattern adjustment sheets.

You will act as the SNE to verify the correct control rod is selected for movement.

The trainee may jump directly to 20.106.02 vs. reviewing ARP 3D76 or 3D80.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with Revision: 0 Coupling Failure Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0110-407 Conduct Control Rod Drive Coupling Integrity Test with Revision: 0 Coupling Failure Page 8 Simulator Setup IC#:

IC-15 Malfunctions:

Number Title Value Delay Ramp C11MF0233 CONTROL ROD 14-47 UNCOUPLED ACTIVE 0 0 Remote Functions:

Number Title Value Delay Ramp C11RF0398 Re-Initialize NUMAC RWM RESET 0 0 Override Functions:

Number Title Value Delay Ramp None Special Instructions:

1. Initialize the simulator to IC-15 (or the selected IC), and place the simulator in RUN.
3. Open and Execute Lesson JP0110-407.lsn, or set the malfunctions as indicated above.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0110-407)

Initial Conditions:

A plant startup is in progress.

Reactor power level is ~55%.

You are the P603 operator.

Initiating Cue(s):

The CRS directs you to continue the reactor startup with rods on Post-LPSP Control Rod Pull Sheet A-9/2, RWM-Step 50, from control rod 14-47. I will act as your Verifier.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0139-005 1 JPM Title Duration Page Manually Isolate HPCI System (Alt Path) 10 minutes 1 Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

1. *11.
2. *12.
  • 3. *13.
  • 4. 14.
  • 5. 15.
  • 6. 16.
7. 17.
  • 8. 18.
  • 9. *19.
  • 10.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 2

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 1 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 1 Page 3 JPM Information System:

E4100 - High Pressure Coolant Injection System Task:

63658 - Start HPCI in the Test Mode

References:

Required (R) / Available (A) 23.202, High Pressure Coolant Injection System (R)

Tools and Equipment Required:

None Initial Conditions:

You are the Control Room NSO.

HPCI is to be run in the Test Mode.

RHR Division 1 is in Torus Cooling.

Division 1 SGTS is in operation.

All other prerequisites have been met.

Initiating Cue(s):

The CRS directs you to start HPCI in the Test Mode in accordance with 23.202, Section 6.1.

Terminating Cue(s):

HPCI System is manually isolated.

Task Standard:

HPCI System is shutdown and isolated in accordance with ARP 2D49 and/or 2D53.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

SF-5 Containment Integrity K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 295032 - High Secondary Containment Area Temperature K/A STATEMENT:

EA1. Ability to operate and/or monitor the following as they apply to HIGH SECONDARY CONTAINMENT AREA TEMPERATURE: (CFR: 41.7 / 45.6)

EA1.05 Affected systems so as to isolate damaged portions ............................................. 3.7 / 3.9 Maintenance Rule Safety Classification:

E4100-06 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 1 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet.

1. [6.1.2.1] Verify or place E41-K820, Test 1. E41-K820 is verified in AUTO.

Iso/PCV E41-F011 Ctrlr, in AUTO.

2. [6.1.2.2.a] On E41-K820, depress D 2. S is verified ON.

button until S comes ON.

  • 3. [6.1.2.a.1)] Turn the pulser knob to set the
  • 3. Pulser knob is turned until ~56.5 is read valve position open setpoint to on the digital display.

approximately 56.5% on the digital display.

  • 4. [6.1.2.2.b] On E41-K820, depress D
  • 4. D button is depressed until Y comes ON.

button until Y comes ON.

  • 5. [6.1.2.b.1)] If Reactor Pressure is >150
  • 5. Pulser knob is turned until 250 is read on psig, turn the pulser knob to set the the digital display.

discharge pressure setpoint to 250 psi on the digital display.

  • 6. [6.1.2.3] Place E4100-M001, HPCI Test
  • 6. E4100-M001 is placed in OPER.

Line Iso/PCV E41-F011 Selector Switch, in OPER.

7. [6.1.2.4] Verify E41-F011, HPCI/RCIC 7. E41-F011 is verified closed.

Test Iso/PCV, closed.

  • 8. [6.1.2.5] Open E4150-F008, HPCI Test
  • 8. E4150-F008 is opened.

Line Iso Vlv.

  • 9. [6.1.2.6] Open T4600-F406, HPCI to
  • 9. T4600-F406 is opened.

SGTS Iso Vlv.

  • 10. [6.1.2.7] Place E4101-C003, HPCI Baro *10. HPCI Baro Cndr Vacuum Pump CMC Cndr Vacuum Pump CMC switch, in RUN, switch is placed in RUN, and pump is and verify pump starts. verified to start.
  • 11. [6.1.2.8] Open E4150-F003, HPCI Stm *11. E4150-F003 is opened.

Sply Oybd Iso Vlv.

  • 12. [6.1.2.9] Open E4150-F059, HPCI Oil Clr *12. E4150-F059 is opened.

Clg Water Iso Vlv.

  • 13. [6.1.2.10] Simultaneously: *13. Simultaneously:

Place E4101-C005, HPCI Turbine Aux HPCI Turbine Aux Oil Pump is placed Oil Pump, in RUN, and verify pump in RUN, and pump start verified, AND starts, AND E4150-F001 is opened.

Open E4150-F001, HPCI Turb Stm Sply Iso Vlv.

14. [6.1.2.11] Verify HPCI Pump and Turbine 14. HPCI Pump and Turbine start and speed starts and speed increases. increase is verified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 1 Page 5 ELEMENT STANDARD Alternate Path begins when HPCI Turbine speed reaches 3000 rpm.

CUE: As CRS, acknowledge alarm report.

15. Respond to annunciators 1D70, Steam 15. Announces the alarms to the CRS, and Leak Detection Diff Temp High, and references the appropriate ARPs.

1D66, Steam Leak Detection Ambient Temp High.

CUE: If examinee requests H11-P614 information, report that alarmed module is for HPCI Equipment Room, and temperature is reading 155°F.

16. [1D66/1D70] Direct an operator to RR 16. Directs operator to RR H11-P614, NSSS H11-P614, NSSS Temperature Recording Temperature Recording and Leak and Leak Detection Cabinet, to determine Detection Cabinet, to determine alarmed alarmed module and temperature. module and temperature.

CUE: As CRS, acknowledge alarm report.

17. Respond to annunciators 2D49, HPCI 17. Announces the alarms to the CRS, and Logic A Isolation Trip Signal Initiated, and references the appropriate ARPs.

2D53, HPCI Logic B Isolation Trip Signal Initiated.

CUE: If examinee reports the isolation failure and requests direction, direct examinee to manually isolate the HPCI System.

18. [2D49/2D53] Verify HPCI Turbine has 18. Verifies HPCI Turbine has tripped and tripped and is isolated. recognizes system has NOT isolated.

NOTE: Closing either E41-F002 or E41-F003 will effectively isolate the HPCI System.

  • 19. [2D49/2D53] Manually close E41-F002, *19. Manually closes E41-F002, HPCI Steam HPCI Steam Supply Inboard Isolation Supply Inboard Isolation Valve, and/or Valve, and/or E41-F003, HPCI Steam E41-F003, HPCI Steam Supply Outboard Supply Outboard Isolation Valve. Isolation Valve.

CUE: End JPM when the HPCI System is manually isolated.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 1 Page 6 Evaluator Notes:

This is an Alternate Path JPM. The steam supply line will break as speed increases, and the system will fail to automatically isolate.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 1 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0139-005 Manually Isolate HPCI System (Alt Path) Revision: 1 Page 8 Simulator Setup IC#:

IC-20 Malfunctions:

Number Title Value Delay Ramp E41MF0007 HPCI Steam Line Break [NOTE 1] 20 0 0 cd= H_P602_A137_1 GT 3000 Remote Functions:

Number Title Value Delay Ramp EOPRF0022 E41-F002 Isolation Defeat for RPV Venting [NOTE 2] DEFEAT 0 0 cd= P602_A117_3 EQ 1 EOPRF0023 E41-F003 Isolation Defeat for RPV Venting [NOTE 2] DEFEAT 0 0 cd= P602_A117_3 EQ 1 Override Functions:

Number Title Value Delay Ramp N/A NOTE 1: Conditional on HPCI Turbine speed >3000 rpm (H_P602_A137_1 GT 3000).

NOTE 2: Conditional on HPCI Turbine Aux Oil Pump in RUN (P602_A117_3 EQ 1).

Special Instructions:

1. Initialize the simulator to IC-20 and place in RUN.
2. Start SGTS T4600-C003, Div. 1 SGTS Exhaust Fan.
3. Start Div. 1 RHRSW:
a. Throttle open E4150-F068A for 5 seconds.
b. Start one RHRSW Pump.
c. Throttle open E4150-F068A to ~6000 gpm.
d. Start the second RHRSW Pump.
e. Fully open E4150-F068A.
4. Start Div. 1 RHR in Torus Cooling:
a. Open E1150-F028B, Div. 2 Torus Isolation Vlv.
b. Start one Div. 1 RHR Pump.
c. Throttle open E1150-F024B, Div. 2 Torus Cooling Vlv, to ~10,000 gpm.
5. Pump down Torus using TWMS to -1 inches.
6. Open and execute lesson JP0139-005.lsn.
7. Trigger First Step.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0139-005)

Initial Conditions:

You are the Control Room NSO.

HPCI is to be run in the Test Mode.

RHR Division 1 is in Torus Cooling.

Division 1 SGTS is in operation.

All other prerequisites have been met.

Initiating Cue(s):

The CRS directs you to start HPCI in the Test Mode in accordance with 23.202, Section 6.1.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0150-001 3 JPM Title Duration Page Start up Fuel Pool Ventilation Exhaust Radiation Monitor 5 minutes 1 D11-K609A Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.
  • 2.
  • 3.

4.

5.

6.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11- Revision: 3 K609A Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11- Revision: 3 K609A Page 3 JPM Information System:

D1100 - Radiation Monitoring Task:

62960 - Startup D11-K609A, B, C, D, Div 1 and Div 2 Fuel Pool E and W Vent Exh Duct Rad Monitor

References:

Required (R) / Available (A) 23.625, Process Gaseous Radiation Monitoring (R)

Tools and Equipment Required:

None Initial Conditions:

You are the Patrol NSO.

Troubleshooting was performed on Fuel Pool Ventilation Exhaust Radiation Monitor D11-K609A.

Troubleshooting is complete.

Initiating Cue(s):

The CRS directs you to place Div I Fuel Pool Ventilation Exhaust Radiation Monitor D11-K609A in service in accordance with 23.625.

Prerequisites for this procedure have been waived and logged.

Terminating Cue(s):

Fuel Pool Vent Exhaust Radiation Monitor D11-K609A is in service per 23.625.

Task Standard:

Fuel Pool Vent Exhaust Radiation Monitor D11-K609A has been started up in accordance with 23.625.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

SF-9 Radioactivity Release K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 272000 - Radiation Monitoring System K/A STATEMENT:

A1. Ability to predict and/or monitor changes in parameters associated with operating the RADIATION MONITORING SYSTEM controls including: (CFR: 41.5 / 45.5)

A1.01 Lights, alarms, and indications associated with normal operations. .................... 3.2 / 3.2 Maintenance Rule Safety Classification:

D1100-03 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11- Revision: 3 K609A Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet.

CUE: Mode Selector Switch (S1) is in STANDBY.

  • 1. [8.2.1.1] At D11-K609A, Div 1 Fuel Pool E
  • 1. Verifies Mode Selector Switch (S1)

Vent Exh Rad Monitor, verify Mode position.

Selector Switch (S1) is in OPERATE.

CUE: Mode Selector Switch (S1) is in OPERATE.

  • 2. [8.2.1.1] Place Mode Selector Switch (S1)
  • 2. Places Mode Selector Switch (S1) in in OPERATE. OPERATE.

CUE: RESET Pushbutton (S2) has been depressed.

  • 3. [8.2.1.2] At D11-K609A, Div 1 Fuel Pool E
  • 3. Depresses RESET Pushbutton (S2).

Vent Exh Rad Monitor, depress RESET Pushbutton (S2).

CUE: White LOW light (DS-1) is OFF.

4. [8.2.1.3.a] At D11-K609A, Div 1 Fuel Pool 4. Verifies white LOW light (DS-1) is OFF.

E Vent Exh Rad Monitor, verify white LOW light (DS-1) is OFF.

CUE: Amber HIGH light (DS-2) is OFF.

5. [8.2.1.3.b] At D11-K609A, Div 1 Fuel Pool 5. Verifies amber HIGH light (DS-2) is OFF.

E Vent Exh Rad Monitor, verify amber HIGH light (DS-2) is OFF.

CUE: Alarms 3D27, 3D31, and 3D35 are clear.

6. [8.2.2] Verify the following alarms are 6. Contacts the Control Room to verify clear: alarms 3D27, 3D31, and 3D35 are clear.

3D27, DIV I/II FP VENT EXH RADN MONITOR DNSCL/INOP 3D31, DIV I/II FP VENT EXH RADN MONITOR UPSCALE 3D35, DIV I/II FP VENT EXH RADN MONITOR UPSCALE TRIP CUE: End JPM when Fuel Pool Vent Exhaust Radiation Monitor D11-K609A is in service.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11- Revision: 3 K609A Page 5 Evaluator Notes:

Do not permit the examinee to operate any plant equipment. Placing the Mode Selector Switch in any position other than OPERATE will trip RBHVAC.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11- Revision: 3 K609A Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0150-001 Start up Fuel Pool Ventilation Exhaust Radiation Monitor D11- Revision: 3 K609A Page 7 Simulator Setup IC#:

N/A Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0150-001)

Initial Conditions:

You are the Patrol NSO.

Troubleshooting was performed on Fuel Pool Vent Exhaust Radiation Monitor D11-K609A. The troubleshooting is complete.

Initiating Cue(s):

The CRS directs you to place Div I Fuel Pool Ventilation Exhaust Radiation Monitor D11-K609A in service in accordance with 23.625.

Prerequisites for this procedure have been waived and logged.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0158-402 3 JPM Title Duration Page Loss 64C and EDG 12 Fails to Start 15 minutes 1 Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.

2.

  • 3.
  • 4.
  • 5.
  • 6.
  • 7.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 2

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start Revision: 3 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start Revision: 3 Page 3 JPM Information System:

R1400 - 4160/480V ESF Electrical Distribution Task:

74965 - Restore North RR MG.

64234 - Manually initiate a start of SGTS 64864 - Shift Divisions of CCHVAC

References:

Required (R) / Available (A) 20.300.64C, Loss of Bus 64C (R) 20.300.72C, Loss of Bus 72C (R)

Tools and Equipment Required:

None Initial Conditions:

rd You are the 3 NSO.

Reactor Power is at 100%.

Plant conditions are stable as you see them.

Initiating Cue(s):

The CRS has directed you to perform an electrical walkdown.

Terminating Cue(s):

AOP 20.300.72C, Loss of Bus 72C, Subsequent Actions, Conditions A, B, C & H are complete.

Task Standard:

The electrical walkdown will determine that 4160V Bus 64C has tripped and EDG 12 failed to start due to a bus fault. Actions are taken in response to the loss of 480V Bus 72C in accordance with steps A, B, C and H of 20.300.72C, Loss of Bus 72C.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

SF Electrical K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 262001 - AC Electrical Distribution K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the A.C. ELECTRICAL DISTRIBUTION; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations: (CFR: 41.5 / 45.6)

A2.04 Types of loads that, if de-energized, would degrade or hinder plant operation ........ 3.8/4.2 Maintenance Rule Safety Classification:

R1400-01 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start Revision: 3 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD NOTE: Examinee will announce actions which change plant conditions/alarms with Crew Update.

CUE: Provide Examinee with CUE SHEET and markup of 23.202.

CUE: Acknowledge the report as CRS. Announce entry into 20.300.72C, Loss of Bus 72C and direct the examinee to perform Conditions A, B, C and H of AOP 20.300.72C.

  • 1. Perform an electrical walkdown. *1. Determines that Bus 64C tripped, breakers B6 and B8 are open indicating a bus fault, and the EDG did not start.
2. [A.1] Verify MCC 72CF transferred to 2. 480V ESF Bus 72F Position 5C verified Alternate (23.321). AUTO CLOSE light ON.
  • 3. [B.1] Place RR MG North Cooling Fan in *3. RR MG North Cooling Fan CMC switch OFF/RESET, then in RUN. placed in OFF/RESET, then in RUN.

CUE: The RTC will brief an operator to take Local Manual control of the North RR MG Set.

  • 4. [B.2] Take Local Manual control of North *4. Ensures proper communications and RR MG Set (23.138.01). actions are being taken to take local manual control of North RR MG Set.
  • 5. [C.1] Start Div 2 SGTS. *5. Div 2 SGTS Exhaust Fan CMC switch placed in RUN.
  • 6. [H.1] Place Div 1 CCHVAC Mode Select *6. Div 1 CCHVAC Mode Select Switch Switch in ALL STOP. placed in ALL STOP.
  • 7. ]H.2] Place Div 2 CCHVAC Mode Select *7. Div 2 CCHVAC Mode Select Switch Switch in ALL AUTO. placed in ALL AUTO.

CUE: End JPM when AOP 20.300.72C, steps A, B, C, and H are completed.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start Revision: 3 Page 5 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start Revision: 3 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0158-402 Loss 64C and EDG 12 Fails to Start Revision: 3 Page 7 Simulator Setup IC#:

IC-20 or any full power IC.

Malfunctions:

Number Title Value Delay Ramp R11MF0055 EDG-12 Auto Start Failure ACTIVE 0 0 R11MF0012 4160V Bus Trip 64C ACTIVE 0 0 Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp None Special Instructions:

1. Initialize simulator to selected IC.
2. Place simulator in RUN.
3. Open and execute lesson JP0158-402.lsn Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0158-402)

Initial Conditions:

You are the 3rd NSO.

Reactor Power is at 100%.

Plant conditions are stable as you see them.

Initiating Cue(s):

The CRS has directed you to perform an electrical walkdown.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0166-404 0 JPM Title Duration Page Perform Div 2 SGTS Filter and Secondary Containment 15 minutes 1 Isolation Damper Operability Test Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

1. 11.
  • 2. 12.
3. 13.
  • 4. 14.
  • 5. 15.
  • 6. 16.
  • 7. *17.
  • 8. 18.
  • 9.

10.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 2

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 3 JPM Information System:

T4600 - Standby Gas Treatment System Task:

77039 - Perform Div 2 SGTS Filter & SC Isolation Damper Operability Test

References:

Required (R) / Available (A) 24.404.04, Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test (R) 23.404, Standby Gas Treatment System (R)

Tools and Equipment Required:

Marked up copy of 24.404.04 to step 5.2.

Stopwatch Initial Conditions:

You are the Third NSO.

RBHVAC is operating normally, CCHVAC is in the NORMAL Mode, and Div 1 & 2 SGTS are in standby.

Maintenance is complete on the T4100-F010 Damper, solenoid replaced.

The CRS and CRNSO have released partial surveillance 24.404.04.

The surveillance is scheduled on the POD, to be performed on your shift.

SPF Form is filled out, approved, and correct.

The surveillance is complete to Section 5.2.

A pre-job brief has been conducted with all participants.

th The RB Rounds operator is on the AB 5 Floor, standing by for your direction.

Initiating Cue(s):

The CRS directs you to perform 24.404.04, Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test, Section 5.2. (T4100-F010 ONLY) for you to perform.

Terminating Cue(s):

Div 1 SGTS is operating and RB D/P is -0.125 to -0.5 inches wc Task Standard:

Perform Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test in accordance with 24.404.04.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 4 Licensed Operator Exam Information (required for NRC exams)

Safety Function/Category:

SF9 - Radioactivity Release K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 288000 - Plant Ventilation Systems K/A STATEMENT:

A3 - Ability to monitor automatic operations of the PLANT VENTILATION SYSTEMS including:

A3.01 Isolation / Initiation Signals ............................................................................. 3.8 / 3.8 K/A SYSTEM: 290001 - Secondary Containment K/A STATEMENT:

A4 - Ability to manually operate and/or monitor in the control room:

A4.01 Reactor Building D/P ...................................................................................... 3.3 / 3.4 A4.12 Surveillance Testing ....................................................................................... 2.8 / 3.2 Maintenance Rule Safety Classification:

T4600-06 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 5 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Inform the examinee that all communications will be directed to you and you will provide the necessary information and response. Provide Examinee with CUE SHEET and the marked up copy of 24.404.04.

CUE: Report as RB Rounds that SGTS Totalizer Meter indicates 451 hours0.00522 days <br />0.125 hours <br />7.457011e-4 weeks <br />1.716055e-4 months <br />.

1. [5.2.1] Record initial indication on T46- 1. Directs RB Rounds to obtain SGTS R400B, Div 2 SGTS Elapsed Time Totalizer Meter Reading.

Totalizer (T46-P404, AB5-G14).

  • 2. [5.2.2] Place collar of Division 2 Manual *2. Places Div 2 Manual Isolation TRIP Isolation TRIP pushbutton in ARMED and pushbutton collar in ARMED. Verifies verify Annunciator 8D29, DIV II REAC 8D29, DIV II REAC BLDG ISO PB BLDG ISO PB ARMED, alarms. ARMED, alarms.
3. [5.2.3] Make the following announcement 3. Makes Hi-Com announcement and Crew over the Hi-Com: Update.

"Attention all personnel, Division 2 SGTS is now in operation. No use of solvents or painting is permitted in the Reactor Building while SGTS is running."

NOTE: RBHVAC will trip, and Div 2 SGTS will auto start, and CCHVAC will shift to Recirculation Mode.

  • 4. [5.2.4] Depress Division 2 Manual *4. Depresses Division 2 Manual Isolation Isolation TRIP pushbutton, measure TRIP pushbutton.

stroke time of T4100-F010 to nearest Measures and records the stroke time for th 1/10 second, then record stroke time and T4100-F010 damper.

verify acceptance criteria met.

Verifies the damper stroke time meets the acceptance criteria.

  • 5. [5.2.5] Record indication on T46-R800B, *5. Records flow on Div 2 SGTS Exh Gas Div 2 SGTS Exh Gas Flow Recorder, and Flow Recorder.

start time.

Records start time.

  • 6. [5.2.6] Place all RBHVAC Supply and *6. Places all RBHVAC Supply and Exhaust Exhaust Fan CMC switches in Fan CMC switches in OFF/RESET.

OFF/RESET.

  • 7. [5.2.7] Place collar of Division 2 Manual *7. Places Div 2 Manual Isolation TRIP Isolation TRIP pushbutton in DISARMED pushbutton collar in DISARMED, and and verify Annunciator 8D29, DIV II REAC verifies 8D29, DIV II REAC BLDG ISO PB BLDG ISO PB ARMED, clears. ARMED, clears.
  • 8. [5.2.8] Depress Division 2 Manual *8. Depresses Div 2 Manual Isolation RESET Isolation RESET pushbutton, and verify pushbutton, and verifies Div 2 Reactor Division 2 Reactor Building Isolate RESET Building Isolate RESET light is ON.

light is ON.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 6 ELEMENT STANDARD NOTE: Steps for placing RBHVAC in the shutdown lineup are in 23.426. All equipment should be in the required condition except the Supply and Exhaust Fan switches.

9. [8.1.2.1] Shutdown selected Exhaust Fan. 9. Places an RBHVAC Exhaust Fan CMC switch in OFF/RESET.
10. [8.1.2.2] Verify paired supply fan trips, 10. Verifies paired supply fan tripped, exhaust exhaust dampers close, and supply fan dampers closed, and supply fan dampers dampers close. closed.
11. [8.1.2.3] Place switch for paired supply fan 11. Places switch for paired supply fan in in OFF/RESET. OFF/RESET.
12. [8.1.2.1] Shutdown (other) selected 12. Places the remaining RBHVAC Exhaust Exhaust Fan. Fan CMC switch in OFF/RESET.
13. [8.1.2.2] Verify paired supply fan trips, 13. Verifies paired supply fan tripped, exhaust exhaust dampers close, and supply fan dampers closed, and supply fan dampers dampers close. closed.
14. [8.1.2.3] Place switch for paired supply fan 14. Places switch for paired supply fan in in OFF/RESET. OFF/RESET.
15. [8.1.2.5] Verify T4100-F029, RBHVAC 15. Verifies T4100-F029, RBHVAC Intake Air Intake Air Damper, closes when Reactor Damper, closes when Reactor Building Building Supply and Exhaust Fans have Supply and Exhaust Fans have been been shutdown. shutdown.
16. [8.1.2.6] When Reactor Building Supply 16. When Reactor Building Supply and and Exhaust Fans have been shutdown, Exhaust Fans have been shutdown, verify the following valves close: verifies the following valves close:
  • T4100-F010, RBHVAC Sply Otbd Iso
  • T4100-F011, RBHVAC Sply Inbd Iso
  • T4100-F009, RBHVAC Exh Inbd Iso
  • T4100-F008, RBHVAC Exh Otbd Iso
  • 17. [8.1.2.7] Place switches for the following in *17. Places switches for the following in OFF/RESET: OFF/RESET:
  • T4100-C015, RB Sample Sink Bstr Exh
  • T4100-C015, RB Sample Sink Bstr Exh Fan Fan
  • T4100-C016, RB CA Equip Room Bstr

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 7 ELEMENT STANDARD

18. [8.1.2.8] Depress Reactor Building 18. Directs RB Rounds to depress Reactor Exhaust Fan Trip Alarm Reset Building Exhaust Fan Trip Alarm Reset pushbutton, and turn pushbutton collar to pushbutton, and turn pushbutton collar to OFF to defeat Reactor Building Fifth Floor OFF to defeat Reactor Building Fifth Floor Loss of Ventilation Alarm (RB5-A15). Loss of Ventilation Alarm (RB5-A15).

CUE: Terminate JPM when Div 2 SGTS is operating, and RB HVAC is shut down.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 8 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 9 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0166-404 Perform Div 2 SGTS Filter and Secondary Containment Revision 0 Isolation Damper Operability Test Page 10 Simulator Setup IC#:

IC-20 or any full power IC.

Malfunctions:

Number Title Value Delay Ramp None Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp None Special Instructions:

1. Initialize to the desired IC, and place the simulator in RUN.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0166-404)

Initial Conditions:

You are the Third NSO.

RBHVAC is operating normally, CCHVAC is in the NORMAL Mode, and Div 1 & 2 SGTS are in standby.

Maintenance is complete on the T4100-F010 Damper, solenoid replaced.

The CRS and CRNSO have released partial surveillance 24.404.04 (T4100-F010 PMT stroke time)for you to perform.

The surveillance is scheduled on the POD, to be performed on your shift.

The SPF Form is filled out, approved, and is correct.

The surveillance is complete to Section 5.2.

A pre-job brief has been conducted with all participants.

The RB Rounds operator is on the AB 5th Floor, standing by for your direction.

Initiating Cue(s):

The CRS directs you to perform 24.404.04, Division 2 SGTS Filter And Secondary Containment Isolation Damper Operability Test, Section 5.2.

(T4100-F010 ONLY)

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-315-0262-003 1 JPM Title Duration Page Transfer UPS from Normal to Alternate Power using 10 minutes 1 Static Transfer Switch (Alt Path)

Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1. *11. 21.
2. 12.
3. 13.
4. *14.
  • 5. 15.
6. 16.
7. *17.
8. *18.
9. 19.
10. 20.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static Revision: 1 Transfer Switch (Alt Path) Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to prepare Adequate control of system No anticipation of results of for job. Aware of control maintained throughout task actions. Unaware or control bands and maintained them. but some improvements bands or not able to maintain Configuration control could be made such as better them. Lack of knowledge of maintained. manual control or greater how to control system depth of knowledge for parameters.

anticipating system response.

Conservatism Low threshold for Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding, with unanswered questions.

Questioning attitude. Uses High focus on task High threshold for problem stop when unsure if completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of generic related to plant operation.

fundamentals to predict and Only relied on procedure for monitor system response. operating knowledge.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static Revision: 1 Transfer Switch (Alt Path) Page 3 JPM Information System:

R3100 - Uninterruptible Power Supply Task:

78271 - Transfer Uninterruptible Power Supply from Normal to Alternate Power using Static Transfer Switch

References:

Required (R) / Available (A) 23.308.01, Uninterruptible Power Supply (UPS) System (R)

Tools and Equipment Required:

None Initial Conditions:

You are the extra operator on shift.

Initiating Cue(s):

The Control Room NSO directs you to shift UPS A (B) Power Supply from Normal to Alternate using the Static Transfer Switch.

Terminating Cue(s):

UPS A(B) has been transferred back to the normal power supply using the Static Transfer Switch.

Task Standard:

UPS is in service aligned to the Normal Power Supply in accordance with 23.308.01.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

SF-6 Electrical K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 262002 - Uninterruptable Power Supply (A.C./D.C.)

K/A STATEMENT:

A2. Ability to (a) predict the impacts of UPS bus under voltage; and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences A2.01 Under Voltage .......................................................................................................... 2.6 / 2.8 Maintenance Rule Safety Classification:

R3100-05 Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static Revision: 1 Transfer Switch (Alt Path) Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide Examinee with Cue Sheet.

CUE: Return Mode switch is in MAN.

  • 1. [5.1.2.1] Place Return Mode switch in
  • 1. Places Return Mode switch in MAN.

MAN (Mimic Bus).

CUE: Sync Switch is in ON.

2. [5.1.2.2] Verify Sync Switch is in ON. 2. Verifies Sync Switch is in ON.

CUE: Retransfer Blocked light is ON.

3. [5.1.2.3] Verify amber Retransfer Blocked 3. Verifies amber Retransfer Blocked light is light is ON. ON.

CUE: Sync Monitor light is OFF.

4. [5.1.2.4] Verify clear Sync Monitor light is 4. Verifies clear Sync Monitor light is OFF.

OFF (Mimic Bus).

CUE: Test switch is in ALT LINE.

  • 5. [5.1.2.5] Place Test switch to ALT LINE
  • 5. Places Test switch to ALT LINE.

(Mimic Bus).

CUE: Alternate Line light is ON.

6. [5.1.2.6] Verify amber Alternate Line light 6. Verifies amber Alternate Line light is ON.

is ON (Mimic Bus).

CUE: Inverter light is OFF.

7. [5.1.2.7] Verify red Inverter light is OFF 7. Verifies red Inverter light is OFF.

(Mimic Bus).

Alternate Path Begins Here CUE: Control Room reports the UPS UNIT A/B TROUBLE alarm (3D22) has been received and requests local status of UPS Unit A(B).

CUE: When examinee requests UPS Unit status, report that amber REGULATOR FAILURE light is ON, and the Static Transfer Switch Output voltage (UPS AC VOLTAGE) is reading 100 VAC.

NOTE: Examinee should recognize failure of Alternate Power Supply. This requires UPS to be transferred back to Normal.

CUE: As Control Room, acknowledge status report. If not recommended by examinee, direct UPS transferred back to NORMAL (per 3D22)

8. Determine status of UPS Unit A(B). 8. Reports UPS Unit status to Control Room.

CUE: Alternate Line light is ON.

9. [5.2.2.1] Verify amber Alternate Line light 9. Verifies amber Alternate Line light is ON.

is ON (Mimic Bus).

CUE: Return Mode switch is in MAN.

10. [5.2.2.2] Verify or place Return Mode 10. Verifies Return Mode switch in MAN.

switch in MAN (Mimic Bus).

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static Revision: 1 Transfer Switch (Alt Path) Page 5 ELEMENT STANDARD CUE: Test switch is in CENTER.

  • 11. [5.2.2.3] Verify or place Test switch in *11. Places Test switch in CENTER.

CENTER (Mimic Bus).

CUE: Sync Switch is in ON

12. [5.2.2.4] Verify Sync Switch is in ON. 12. Verifies Sync Switch is in ON.

CUE: Sync Monitor light is OFF.

13. [5.2.2.5] Verify clear Sync Monitor light is 13. Verifies clear Sync Monitor light is OFF.

OFF (Mimic Bus).

CUE: Reset pushbutton is depressed.

  • 14. [5.2.2.6] Depress Reset pushbutton *14. Depresses Reset pushbutton.

(Mimic Bus).

CUE: Red Inverter light is ON.

15. [5.2.2.7] Verify red Inverter light is ON 15. Verifies red Inverter light is ON.

(Mimic Bus).

CUE: Alternate Line light is OFF.

16. [5.2.2.8] Verify amber Alternate Line light 16. Verifies amber Alternate Line light is OFF.

is OFF (Mimic Bus).

CUE: Return Mode switch is in AUTO.

  • 17. [5.2.2.9] Place Return Mode switch in *17. Places Return Mode switch in AUTO.

AUTO (Mimic Bus).

CUE: Alarm Latch Reset pushbutton is depressed.

  • 18. [5.2.2.10] Depress Alarm Latch Reset *18. Depresses Alarm Latch Reset pushbutton (Mimic Bus). pushbutton.

CUE: Retransfer Blocked light is OFF.

19. [5.2.2.11] Verify amber Retransfer 19. Verifies amber Retransfer Blocked light is Blocked light is OFF. OFF.

CUE: Summary Alarm light is OFF.

20. [5.2.2.12] Verify amber Summary Alarm 20. Verifies amber Summary Alarm light is light is OFF (Mimic Bus). OFF.

CUE: The CRS acknowledges the report.

21. Inform the Control Room that UPS A (B) 21. Informs the Control Room that UPS A (B) has been transferred back to the normal is aligned to the normal power supply.

power supply using the Static Transfer Switch.

CUE: End JPM when UPS A(B) has been transferred back to the normal power supply using the Static Transfer Switch.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static Revision: 1 Transfer Switch (Alt Path) Page 6 Evaluator Notes:

Start this JPM at the UPS. This JPM can be performed on either UPS.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static Revision: 1 Transfer Switch (Alt Path) Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-315-0262-003 Transfer UPS from Normal to Alternate Power using Static Revision: 1 Transfer Switch (Alt Path) Page 8 Simulator Setup IC#:

N/A Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

N/A Work Instruction WI 5.14 Job Performance Measures Rev 3 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-315-0262-003)

Initial Conditions:

You are the extra operator on shift.

Initiating Cue(s):

The Control Room NSO directs you to shift UPS A (B) Power Supply from Normal to Alternate using the Static Transfer Switch.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-802-2001-211 5 JPM Title Duration Page Control Reactor Pressure from the Remote Shutdown 20 minutes 1 Panel (Alt Path)

Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.

7.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Meets all Opportunity for Does not meet Comment Operator Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel Revision: 5 (Alt Path) Page 2 JPM Observation Criteria Fundamental Meets all Expectations Opportunity for Improvement Does not meet Expectations Monitoring Equipment status monitored at Some monitoring was Did not recognize key equipment proper frequency, using performed but undue focus on status indicators, too much focus multiple means if available. task or lack of system on single indications and ignored Understood which indications knowledge prevented ideal total system status.

were critical. monitoring.

Control Task preview used to prepare Adequate control of system No anticipation of results of for job. Aware of control bands maintained throughout task but actions. Unaware or control and maintained them. some improvements could be bands or not able to maintain Configuration control made such as better manual them. Lack of knowledge of how maintained. control or greater depth of to control system parameters.

knowledge for anticipating system response.

Conservatism Low threshold for identification Some opportunities existed to Proceeds even when unsure with of problems. Questioning question before proceeding, unanswered questions. High attitude. Uses stop when High focus on task completion threshold for problem unsure if needed. Sensitive to without consideration for other conditions.

nuclear safety. system affects.

Teamwork Routinely communicates system Communicated most status and Routinely takes action without status changes to the team. actions. Some improvement informing the team.

Communicates actions before would be warranted.

taking them.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid system fundamental knowledge has response, unsure of generic knowledge. Good working some gaps. fundamentals concepts related knowledge of generic to plant operation. Only relied on fundamentals to predict and procedure for operating monitor system response. knowledge.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel Revision: 5 (Alt Path) Page 3 JPM Information System:

B2104 - Safety and Relief Valves Task:

73750 - Control reactor pressure at the remote shutdown panel by operating SRV A and/or B.

References:

Required (R) / Available (A)

AOP 20.000.19, Shutdown from Outside the Control Room (R)

Tools and Equipment Required:

None Initial Conditions:

You are the Control Room NSO.

The control room is being evacuated due to toxic fumes making the control room uninhabitable.

The East (A) CRD Pump control switch is in the RUN position in the main control room. Division 1 RHR is in its normal standby lineup.

A Group 1 isolation has occurred.

Initiating Cue(s):

The CRS directs you to control reactor pressure and level in accordance with AOP 20.000.19, Shutdown from Outside the Control Room.

All prerequisites are complete.

Conditions A through D have been completed, and you are to begin at Condition E.

You are to inform the CRS when reactor pressure and level are being controlled.

You may allow pressure to rise slightly above 1093 psig to allow Low-Low Set SRVs to arm and operate.

Terminating Cue(s):

Reactor level and pressure are being controlled in accordance with AOP 20.000.19.

Task Standard:

Reactor pressure and reactor water level are maintained within allowable limits from the Remote Shutdown Panel in accordance with 20.000.19 Shutdown from Outside the Control Room.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel Revision: 5 (Alt Path) Page 4 Licensed Operator Exam Information (required for NRC exams)

Safety Function:

3 - Reactor Pressure Control K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 295016 - Control Room Abandonment K/A STATEMENT:

AA1 Ability to operate and/or monitor the following as they apply to CONTROL ROOM ABANDONMENT : (CFR: 41.7 / 45.6)

AA1.08 Reactor Pressure .............................................................................................4.0 / 4.0 Maintenance Rule Safety Classification:

B2104-03 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel Revision: 5 (Alt Path) Page 5 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide the examinee the Cue Sheet.

  • 1. [E.1] Position CMC switches to match those
  • 1. Places the East (A) CRD Pump CMC of the Main Control Room. SWITCH in Run.
  • 2. [E.2] Place the following transfer switches to
  • 2. Rotates each switch clockwise about ON: 45 degrees to the ON position.
a. C3500-M130, Div. 2 DC Transfer Switch
b. C3500-M131, BOP Transfer Switch
c. C3500-M134, Swing Bus Transfer Switch
d. C3500-M132, Div. I DC Transfer Switch
e. C3500-M133, Div. I AC Transfer Switch
  • 3. [E.3] Place the RCIC Rm High Temp
  • 3. Rotates the switch clockwise to the BYPASS Isolation Defeat (Logic A) in BYPASS position.
  • 4. [E.4] Place the RCIC Rm High Temp
  • 4. Rotates the switch clockwise to the BYPASS Isolation Defeat (Logic B) in BYPASS. position NOTE: The candidate may decide to control pressure first if level initially appears normal. If so, the candidate will return to this step later.
  • 5. [E.5] Maintain Reactor Water Level between
  • 5. Depresses and holds RCIC INITIATE 174 and 214 inches using one of the pushbutton on the RSD Panel, until flow is following: indicated on C35-R006, RCIC Pump Discharge Flow Indicator, or
a. RCIC
b. CRD Operates the CRD pumps as necessary.

Alternate Path Begins Here NOTE: SRV A has failed closed, and will not operate in Low-Low Set. When the examinee notices that SRV A does not reopen after initial closure, he will be forced to use SRV B to control reactor pressure.

  • 6. [E.6] Maintain Reactor Pressure between
  • 6. Allows pressure to rise to observe SRV A 900 and 1050 psig by using B2104-F013A operate in Low-Low Set, then determines and/or B2104-F013B. that BOTH Low-Low Set SRVs have failed.

Operates SRV B using the open and closed pushbuttons to control reactor pressure..

CUE: IF asked, inform the examinee that Torus cooling is not required to be placed in service per SM instructions.

7. Once pressure and level are being 7. Examinee informs CRS that pressure and controlled, inform CRS. level are being controlled.

CUE: End JPM when reactor level and pressure is within the proper bands in accordance with AOP 20.000.19.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel Revision: 5 (Alt Path) Page 6 Evaluator Notes:

The Remote Shutdown Panel in the Simulator will be used to perform this JPM .

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel Revision: 5 (Alt Path) Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2001-211 Control Reactor Pressure from the Remote Shutdown Panel Revision: 5 (Alt Path) Page 8 Simulator Setup IC#:

IC-20, or any full power IC.

Malfunctions:

Number Title Value Delay Ramp B21MF0102 Spurious Main Steam Isolation ACTIVE 0 0 B21MF0023 Main Steam SRV Failure B2100-F013A 100 4 0 B21MF0029 Main Steam SRV Failure B2100-F013G 0 0 0 B21MF0023 Main Steam SRV Failure B2100-F013A 0 0 0 cd=H_P601_C006_1 LT 855 Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp P603_A048_1 Reactor Mode Shutdown Handle Pos. 1 1 0 P804_A061_2 Turbine Trip Armed Pos 1 2 0 P804_A061_3 Turbine Trip Trip Switch 1 3 0 P601_B220_1 Low Low Set Div 2 Reset Switch 1 1 0 cd=H_P601_C006_1 LT 855 P601_B217_1 Low Low Set Div 1Reset Switch 1 1 0 cd=H_P601_C006_1 LT 855 P601_B220_1 Low Low Set Div 2 Reset Switch -1 2 0 cd=H_P601_C006_1 LT 855 P601_B217_1 Low Low Set Div 1 Reset Switch -1 2 0 cd=H_P601_C006_1 LT 855 Special Instructions:

1. Initialize simulator to desired IC.
2. If NOT in a saved IC for this JPM:
a. Place simulator in RUN
b. Open and execute Lesson JP2001-211.lsn.
c. When lesson has completed execution, place the simulator in FREEZE.
3. When ready to start the JPM, place the simulator in RUN.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-2001-211)

Initial Conditions:

You are the Control Room NSO.

The plant is beginning the process of being shutdown from outside the control room due to toxic fumes making the control room uninhabitable.

The East or A CRD Pump control switch is in the RUN position in the main control room. Division 1 RHR is in its normal standby lineup.

A Group 1 Isolation has occurred.

Initiating Cue(s):

The CRS directs you to control reactor pressure and level IAW AOP 20.000.19, Shutdown from Outside the Control Room.

All prerequisites are complete.

AOP 20.000.19, Conditions A through D have been completed, and you are to begin at E.

You are to inform the CRS when reactor pressure and level are being controlled.

You may allow pressure to rise slightly above 1093 to allow Low-Low Set SRVs to arm and operate.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-802-2104-212 4 JPM Title Duration Page Respond to Multiple Control Rod Drifts and RPS Failure 3 minutes 1 Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment 1.

2.

  • 3.

4.

  • 5.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 4 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 4 Page 3 JPM Information System:

C1100 - Control Rod Drive Hydraulic System Task:

75357 - Perform Immediate Actions for Control Rod Drift

References:

Required (R) / Available (A) 3D80, Control Rod Drift (R) 20.106.07, Control Rod Drift (A) 23.106, Control Rod Drive Hydraulic System (A)

ODE-10, Emergency Operating Procedure Expectations (A)

Tools and Equipment Required:

None Initial Conditions:

You are the P603 Operator.

Plant conditions are as you see them.

Initiating Cue(s):

Respond to conditions in accordance with plant procedures.

Another operator will address plant alarms not associated with this task.

Terminating Cue(s):

Mode Switch is in SHUTDOWN, RPS has actuated using Manual Scram pushbuttons and all rods are fully inserted.

Task Standard:

Examinee places Mode Switch in Shutdown due to multiple rod drifts. Then he identifies failure of Mode Switch and depresses Manual Scram Pushbuttons resulting in a full scram.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 4 Page 4 Licensed Operator Exam Information (required for NRC exams)

Safety Function/Category:

7 - Instrumentation 11- Abnormal Plant Evolutions K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 212000 - Reactor Protection System K/A STATEMENT:

A2. Ability to (a) predict the impacts of the following on the REACTOR PROTECTION SYSTEM ;

and (b) based on those predictions, use procedures to correct, control, or mitigate the consequences of those abnormal conditions or operations:

A2.16 Changing mode switch position..........................................................................4.0 / 4.1 Maintenance Rule Safety Classification:

C7100-02 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 4 Page 5 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide Examinee with CUE SHEET. After examinee states he is ready, inform him he has control, then cue the console operator to trigger the rod drifts.

CUE: As CRS, acknowledge alarm report.

1. Respond to alarm 3D80, CONTROL ROD 1. Calls out alarm and reviews ARP.

DRIFT.

CUE: As CRS, acknowledge report. Announce entry into AOP 20.106.07, Control Rod Drift.

NOTE: Actions for single control rod drift need not be completed in their entirety before initiation of multiple rod drifts.

2. [1.] Verify Rod Drift as follows: 2. Using Full Core Display, identifies drifting
  • Red Rod Drift light ON at Full Core rod 10-15.

Display.

If rod 10-15 is SELECTED, rod is drifting

  • Rod moving out or into core.

IN.

  • Nuclear Instrumentation for power changes caused by moving Control Reports drifting rod to CRS.

Rods.

CUE: As CRS, acknowledge report. If examinee asks for direction, direct him to perform the required procedural actions.

  • 3. Examinee observes and identifies multiple

Alternate Path Begins Here (RPS Failure)

4. [IA.1] Place Reactor Mode Switch in 4. Immediate actions to place the mode SHUTDOWN. switch in SHUTDOWN are carried out without direction when required by 20.106.07, Control Rod Drift.

Examinee identifies RPS did not actuate.

  • 5. [ODE-10] If one or both divisions of RPS
  • 5. Manual Scram Pushbuttons are fail to actuate after Mode Switch in depressed.

Shutdown, examinee depresses RPS Manual Scram Pushbuttons and monitors for proper operation of RPS.

CUE: End JPM when RPS has been actuated using Manual Scram pushbuttons, and all rods are fully inserted.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 4 Page 6 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 4 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-2104-212 Respond to Multiple Control Rod Drifts and RPS Failure Revision: 4 Page 8 Simulator Setup IC#:

IC-19 (or any full power IC)

Malfunctions:

Number Title Value Delay Ramp Step C11MF0109 Control Rod 10-15 Drift In ACTIVE 0 0 1 C11MF0067 Control Rod 06-27 Drift In* See NOTE 1 ACTIVE 10 0 2 C11MF0283 Control Rod 18-27 Drift In* See NOTE 1 ACTIVE 13 0 2 C11MF0661 Control Rod 34-39 Drift In* See NOTE 1 ACTIVE 16 0 2 C11MF0859 Control Rod 42-51 Drift In* See NOTE 1 ACTIVE 19 0 2 C11MF1039 Control Rod 54-27 Drift In* See NOTE 1 ACTIVE 22 0 2 C11MF0109 Control Rod 10-15 Drift In CLEAR 0 0 3 Remote Functions:

Number Title Value Delay Ramp Step N/A Override Functions:

Number Title Value Delay Ramp Step P603_A048_4 Reactor Mode Run Handle Pos 1 0 0 1

  • NOTE 1 - Conditional on P603_A071_1 EQ 1 (Rod Drift Reset Switch in RESET)

Special Instructions:

1. Initialize the simulator to the desired IC and place in RUN.
2. Open and execute Lesson JP2104-212.lsn, or load the malfunctions/overrides as listed above.
3. Trigger the first control rod drift when cued by examiner.
4. Trigger "Disarm CR 10-15" when cued by examiner.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet (JP-OP-802-2104-212)

Initial Conditions:

You are the P603 Operator.

Plant conditions are as you see them.

Initiating Cue(s):

Respond to conditions in accordance with plant procedures.

Another operator will address plant alarms not associated with this task.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-802-3006-321 3 JPM Title Duration Page Defeat RBCCW/EECW to Drywell Isolations 25 minutes 1 Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.
  • 2.
  • 3.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations Revision: 3 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to prepare Adequate control of system No anticipation of results of for job. Aware of control maintained throughout task actions. Unaware or control bands and maintained them. but some improvements bands or not able to maintain Configuration control could be made such as better them. Lack of knowledge of maintained. manual control or greater how to control system depth of knowledge for parameters.

anticipating system response.

Conservatism Low threshold for Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding, with unanswered questions.

Questioning attitude. Uses High focus on task High threshold for problem stop when unsure if completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of generic related to plant operation.

fundamentals to predict and Only relied on procedure for monitor system response. operating knowledge.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations Revision: 3 Page 3 JPM Information System:

P4400 - EECW / RBCCW Task:

51995 - Defeat RBCCW/EECW Cooling Water to Drywell Isolations

References:

Required (R) / Available (A) 29.ESP.23, Defeat of RBCCW/EECW to Drywell (R)

ODE-14, Attachment 9, Energized Equipment Work Permit (A)

Tools and Equipment Required:

None Initial Conditions:

You are the Control Room NSO.

EOP flowcharts direct defeat of RBCCW/EECW Isolations.

Initiating Cue(s):

The CRS directs you to defeat RBCCW/EECW Isolations per 29.ESP.23.

Terminating Cue(s):

RBCCW/EECW Isolation is defeated per 29.ESP.23.

Task Standard:

RBCCW/EECW Isolation is defeated per 29.ESP.23.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

SF-8 Plant Service Systems K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 295024 - High Drywell Pressure K/A STATEMENT:

EA1. Ability to operate and/or monitor the following as they apply to HIGH DRYWELL PRESSURE:

EA 1.07PCIS/NSSSS........................................................................................................ 3.8 / 3.9 Maintenance Rule Safety Classification:

P4400-01 Maintenance Rule Risk Significant? (Yes or No)

Yes Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations Revision: 3 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD NOTE: Cues are indicated on the line above (just prior to) the step for which they are/may be required.

CUE: Provide examinee with Cue Sheet. After SM EOP Locker is opened, provide examinee with copy of 29.ESP.23 and ODE-14, Attachment 9.

  • 1. [1.1] Retrieve EOP Defeat Package from
  • 1. EOP Defeat Package retrieved from SM SM EOP Locker. EOP Locker.

NOTE: While working in the Relay Room panels, all conductive jewelry should be removed, and safety glasses and 100% cotton long sleeves should be worn.

CUE: The Lead at Terminal B-171 is lifted.

  • 2. [2.1] At RR H11-P857, lift lead at Terminal
  • 2. Lead at Terminal B-171 lifted.

B-171 (Division 1).

CUE: The Lead at Terminal E-191 is lifted.

  • 3. [2.2] At RR H11-P870, lift lead at Terminal
  • 3. Lead at Terminal E-191 lifted.

E-191 (Division 2).

CUE: End JPM when RBCCW/EECW Isolation is defeated per 29.ESP.23.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations Revision: 3 Page 5 Evaluator Notes:

Ensure SM informed of JPM walkthrough in relay room and cabinet doors opened for walkthrough of this task.

Stop the JPM if, at any time, this JPM interferes with plant operation.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

CMC switches will turn RED and amperage will increase when the switch is rotated to the start position started. The current should initially be five to seven times the normal running amps with the ammeter flashing. As counter EMF is developed, the amperage will lower to the normal running amperage and the ammeter will no longer flash. CMC switches will turn GREEN when the pumps are stopped and amperage will decrease to zero.

Ex.: Pump start: Switch has been rotated to the start position, red light is lit, green light is out, amperage initially pegs out high, and is now indicating __X__ amps.

Pump stop: Switch has been rotated to the stop position, green light is lit, red light is out, amperage indicates 0 amps.

Remotely operated valve position is determined with open and close indicating lights. A RED light only would indicate that the valve is open. A GREEN light only would indicate that the valve is closed. Dual indication would indicate that the valve is in some intermediate position.

Manual valves are checked in the closed direction (MOP02 and MOP05). Valve stem position may aid in valve position determination, but cannot be used as Independent Verification (MOP02).

Ex.: Verify valve closed: Valve handwheel indicates no valve movement in the clockwise direction.

Verify valve open: Valve handwheel has been rotated slightly in the clockwise direction and returned to the original positions.

Closing a valve: Valve handwheel has been rotated in the fully clockwise direction until no additional valve movement. Valve stem is down.

Opening a valve: Valve handwheel has been rotated in the fully counterclockwise direction until no additional valve movement, valve stem is out.

Controllers have an Auto light that is GREEN when selected and AMBER (YELLOW) when Manual is selected. When in Manual, the open and closed pushbuttons control the parameter to be changed by adjusting position or speed. When the deviation meter is nulled, then the process can be shifted to Auto to allow the desired setpoint to control the process.

System Specific Notes and Cues:

ESP Defeats are installed either by installing a jumper, lifting leads, or removing a plug-in relay or fuse.

Installing Jumpers:

Ensure the operator goes to the SM and obtains the key to the EOP cabinet.

Upon unlocking the cabinet, the operator finds the correct package and ensures the proper equipment is in the package.

Per the attached drawing, locate the panel and verify the panel opened is correct and the operator has opened the correct side door.

Within the panel, locate the proper terminal strip and verify that the proper terminal number is selected.

Using proper safety techniques, a jumper is landed on each terminal ensuring that no other terminal is touched or cabinet ground is touched with the free end.

Repeat until all jumpers are installed per the package.

For some cabinets, the terminals are separated load to source side of the terminal point by a Knife Switch. In these cabinets the direction of the ESP has the knife switch screw unlocked and opened prior to installing the defeat. This will be spelled out and then the same rules as above apply.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations Revision: 3 Page 6 When both ends are safely landed on all jumpers per the package in the proper location, the operator calls the control room and informs them that the defeat is installed.

Lifting Leads:

Ensure the operator goes to the SM and obtains the key to the EOP cabinet.

Upon unlocking the cabinet, the operator finds the correct package and ensures the proper equipment is in the package.

Per the attached drawing, locate the panel and verify the panel opened is correct and the operator has opened the correct side door.

Within the panel, locate the proper terminal strip and verify that the proper terminal number is selected.

Using the proper safety techniques, remove the locking screw and remove the wire from the terminal point keeping it from making contact with the other cabinet wiring or cabinet sides.

Tape the wire electrical end or install the boot provided.

For some terminal points, more than one wire will be terminated at the proper point. For these, the instruction will read Lift and separate leads. This means remove the leads safely and place each into boots or tape separately.

For some cabinets, the terminals are separated load to source side of the terminal point by a Knife Switch. In these cabinets the direction of the ESP has the knife switch screw unlocked and opened prior to installing the defeat. This will be spelled out and then the same rules as above apply.

When all leads are removed per the package in the proper location, the operator calls the control room and informs them that the defeat is complete.

Remove Plug-in Relay or Fuse:

Ensure the operator goes to the SM and obtains the key to the EOP cabinet.

Upon unlocking the cabinet, the operator finds the correct package and ensures the proper equipment is in the package.

Per the attached drawing, locate the panel and verify the panel opened is correct and the operator has opened the correct side door.

Locate the plug-in relay or fuse and verify the defeat package to the relay, or fuse in question, labels.

Plug-in relays have seismic clips which need to be removed first and then grasped on either side and pulled straight back out of the cabinet.

Fuses need to be grasped by fuse pullers and pulled out evenly and in one motion. There is a fuse identifier mylar cover on some fuses which needs to be removed to reach the fuse.

The one exception is the Main Turbine Bypass Dump System fuses which set in the H11P632 cabinet in a fuse block. FS59 & FS60 are contained in a block that can be pulled out much like the plug-in relay without the seismic clip.

When all steps are complete, contact the control room and announce that the defeat is completed.

Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations Revision: 3 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-321 Defeat RBCCW/EECW to Drywell Isolations Revision: 3 Page 8 Simulator Setup IC#:

N/A Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-3006-321)

Initial Conditions:

You are the CRNSO.

EOP flowcharts direct defeat of RBCCW/EECW Isolations.

Initiating Cue(s):

The CRS directs you to defeat RBCCW/EECW Isolations per 29.ESP.23.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-802-3006-401 0 JPM Title Duration Page Perform Torus Water Average Temperature Calculation 10 minutes 1 Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.
  • 2.
  • 3.
  • 4.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation Revision: 0 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation Revision: 0 Page 3 JPM Information System:

T5000 - Primary Containment Monitoring System Task:

52016 - Calculate Torus Water Average Temperature

References:

Required (R) / Available (A) 29.ESP.01, Supplemental Information, Section 15, Torus Water Temperature Calculation (R)

Tools and Equipment Required:

Calculator Initial Conditions:

You are an extra person on shift.

Primary Containment Control EOP has been entered due to Drywell Temperature of 147F.

Initiating Cue(s):

The CRS directs you to calculate Torus Water Average Temperature in accordance with 29.ESP.01.

Terminating Cue(s):

Torus Water temperature has been determined by calculation.

Task Standard:

Perform Torus Water Average Temperature Calculation in accordance with 29.ESP.01, Section 15.0.

Licensed Operator Exam Information (required for NRC exams)

Safety Function/Category:

10 - Emergency Plant Evolutions K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: 295026 - Suppression Pool High Water Temperature K/A STATEMENT:

EA2. Ability to determine and/or interpret the following as they apply to Suppression Pool High Water Temperature:

EA2.01 Suppression Pool Water temperature...............................................................4.1 / 4.2 Maintenance Rule Safety Classification:

N/A Maintenance Rule Risk Significant? (Yes or No)

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation Revision: 0 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet.

After the examinee demonstrates/explains how he would obtain a controlled copy of the procedure, hand the examinee a copy of 29.ESP.01.

Controlled procedure copies are located in the Tagging Center. Other procedures are located in remote locations.

Procedures may be obtained and/or verified current electronically using Automated Record Management System (ARMS). Current status is coded AFC.

CUE: If asked, Torus water level indicates 0 inches.

  • 1. [15.0 CAUTION] Determine if Torus water
  • 1. Determines Torus water level.

level is less than -11 inches.

CUE: If asked, report that no SRV has actuated in the past 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

  • 2. [15.0 NOTE (1/2)] Determine if an SRV
  • 2. Determines that an SRV has NOT has actuated. actuated.

CUE: When asked for the instrument point readings, provide the examinee with the Data Sheet.

  • 3. Determine T23-R800, Torus Water
  • 3. T23-R800 instrument point readings Temperature Recorder, instrument point determined.

readings.

  • 4. Calculate Average Torus Water
  • 4. Calculates Average Torus Water Temperature. Temperature. (93.4°F)

CUE: End JPM when Torus Water temperature has been determined by calculation.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation Revision: 0 Page 5 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation Revision: 0 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-3006-401 Perform Torus Water Average Temperature Calculation Revision: 0 Page 7 Simulator Setup IC#:

N/A Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Data Sheet: (JP-OP-802-3006-401)

T23-R800, Torus Water Temperature Recorder, Instrument Point Readings Pt. 1 = 96°F Pt. 5 = 90°F Pt. 2 = 98°F Pt. 6 = 88°F Pt. 3 = 91°F Pt. 7 = INOP Pt. 4 = 89°F Pt. 8 = 97°F

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-3006-401)

Initial Conditions:

You are an extra person on shift.

Primary Containment Control EOP has been entered due to Drywell temperature of 147F.

Initiating Cue(s):

The CRS directs you to calculate Torus Water Average Temperature in accordance with 29.ESP.01.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO JP-OP-802-4101-102 1 JPM Title Duration Page Evaluate Degraded Power Sources 15 minutes 1 Examinee: SRO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.
  • 2.
  • 3.

4.

  • 5.
  • 6.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources Revision: 1 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources Revision: 1 Page 3 JPM Information System:

N/A Task:

76034 - Implement Technical Specification/Technical Requirements Manual actions

References:

Required (R) / Available (A)

Tech Specs 3.8.1, AC Sources - Operating (R)

Tools and Equipment Required:

None Initial Conditions:

You are the CRS.

Ten (10) minutes ago, ITC was performing troubleshooting activities when 345kV breakers BM &

DF opened on fault. All attempts to reclose the breakers have failed.

All other 345kV / 120kV breakers are in the normal position.

No other plant equipment is out of service.

Initiating Cue(s):

The SM directs you to evaluate this malfunction for potential Tech Spec impact, and document accordingly.

Terminating Cue(s):

Required actions listed under Tech Spec 3.8.1, Condition D, have been identified, and the LCO documented using MOP05003.

Task Standard:

Required actions of Tech Spec 3.8.1, Condition D, have been identified, and the LCO Sheet is completed correctly per MOP05003.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

N/A K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: GENERIC K/A STATEMENT:

2.2.36 Ability to analyze the effect of maintenance activities, such as degraded power sources, on the status of limiting conditions for operations. (CFR 41.10 / 43.2 / 45.13) ............................ 3.1 / 4.2 Maintenance Rule Safety Classification:

N/A Maintenance Rule Risk Significant? (Yes or No)

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources Revision: 1 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet.

  • 1. Review initial conditions to determine

malfunction.

4. Review LCO 3.8.1, Action D.2 to 4. Determines that Action D.2 is NOT determine its applicability. required.
  • 5. Determines that the offsite circuit must be determine its applicability. restored to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.

CUE: If asked, the LCO Sheet cannot be generated electronically and must be documented on paper. Provide the examinee with a copy of MOP05003.

CUE: End JPM when required actions listed under Tech Spec 3.8.1, Condition D, have been identified, and LCO is documented on MOP05003.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources Revision: 1 Page 5 Evaluator Notes:

This JPM may be started at the CRS desk in the simulator.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources Revision: 1 Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-102 Evaluate Degraded Power Sources Revision: 1 Page 7 Simulator Setup IC#:

N/A Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-102)

Initial Conditions:

You are the CRS.

Ten (10) minutes ago, ITC was performing troubleshooting activities when 345kV breakers BM & DF opened on fault. All attempts to reclose the breakers have failed.

All other 345kV / 120kV breakers are in the normal position.

No other plant equipment is out of service.

Initiating Cue(s):

The SM directs you to evaluate this malfunction for potential Tech Spec impact, and document accordingly.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-802-4101-413 3 JPM Title Duration Page Calculate Stay time and determine if dose extension is 20 minutes 1 needed.

Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.
  • 2.
  • 3.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is Revision: 3 needed. Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is Revision: 3 needed. Page 3 JPM Information System:

N/A Task:

73443 - SOER 01-1 Rec. 5 - Radiation protection training and retraining for plant personnel should include a review of selected industry events involving large, unplanned exposures and the responsibility of individuals for the prevention of such events.

References:

Required (R) / Available (A)

MRP12, Authorization To Exceed Dose Control Thresholds (R)

Tools and Equipment Required:

Survey Map for N. RWCU Room Initial Conditions:

An NSO must enter the N. RWCU Pump Room to perform an investigation of G33-F012A, North RWCU Pump Discharge Isolation Valve.

The estimated time necessary to perform the inspection is 6 minutes.

The NSOs exposure for the year is 753 mrem TEDE.

The situation is NOT an emergency, but there is no alternative to performing the inspection.

Initiating Cue(s):

Determine what requirements must be met, if any, to allow the NSO to perform this inspection.

Terminating Cue(s):

Candidate informs SM that dose extension must be obtained.

Task Standard:

Determination is made that authorization to exceed Fermi 2 Administrative Guidelines must be obtained in accordance with MRP 12.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

N/A K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: GENERICS K/A STATEMENT:

2.3.4 Knowledge of Radiation exposure limits and contamination control including permissible levels in excess of those authorized. ........................................................2.5 / 3.1 Maintenance Rule Safety Classification:

N/A Maintenance Rule Risk Significant? (Yes or No)

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is Revision: 3 needed. Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide candidate with Cue Sheet. If asked, provide candidate with Survey Map of N.

RWCU Pump Room.

CUE: If asked, the radiation level in the area of the valve to be inspected is 6 Rem/hr.

  • 1. Determine that RWP survey results are
  • 1. Determines radiation level in the area of needed for estimation of radiation dose. the valve is 6 Rem/hr.
  • 2. Calculate dose.
  • 2. Dose =

6/60 hr

  • 6 Rem/hr =

0.1 hr

  • 6000 mr/hr = 600 mr 600 mr + 753 mr = 1353 mr = 1.353 R (Fermi Admin Guideline = 1 REM/yr TEDE)

CUE: As SM, acknowledge the report.

  • 3. Inform SM that dose will exceed Fermi 2
  • 3. Informs SM that dose will exceed Fermi 2 administrative guidelines, and a dose administrative guidelines, and a dose extension will be required. extension is necessary.

CUE: End JPM when SM has been informed that a dose extension is necessary.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is Revision: 3 needed. Page 5 Evaluator Notes:

The Plant can be in any mode of operation to conduct this JPM.

This JPM may be started at the CRS Desk in the Simulator.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is Revision: 3 needed. Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-413 Calculate Stay time and determine if dose extension is Revision: 3 needed. Page 7 Simulator Setup IC#:

N/A Malfunctions:

Number Title Value Delay Ramp None Remote Functions:

Number Title Value Delay Ramp None Override Functions:

Number Title Value Delay Ramp None Special Instructions:

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-413)

Initial Conditions:

An NSO must enter the N. RWCU Pump Room to perform an investigation of G33-F012A, North RWCU Pump Discharge Isolation Valve.

The estimated time necessary to perform the inspection is 6 minutes.

The NSOs exposure for the year is 753 mrem TEDE.

The situation is NOT an emergency, but there is no alternative to performing the inspection.

Initiating Cue(s):

Determine what requirements must be met, if any, to allow the NSO to perform this inspection.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO JP-OP-802-4101-419 4 JPM Title Duration Page Perform a CRS Short Term Relief 20 minutes 1 Examinee: SRO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.
  • 2.
  • 3.

4.

  • 5.
  • 6.
  • 7.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief Revision: 4 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief Revision: 4 Page 3 JPM Information System:

N/A Task:

76128 - Provide Short Term Relief

References:

Required (R) / Available (A)

MOP07, Shift Turnover (R)

MOP01003, CRS Shift Relief Checklist (R)

Tools and Equipment Required:

Unit Log for previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Urgent Required Reading Book LCO book Initial Conditions:

You are an extra SRO assigned to the shift.

You attended the shift turnover meeting this morning.

Plant conditions are stable and as you see them.

Initiating Cue(s):

The SM directs you to provide a Short Term Relief with the CRS.

All prerequisites are complete.

Terminating Cue(s):

Short Term Relief has been completed in accordance with MOP07.

Task Standard:

Conduct a CRS Short Term Relief in the Control Room in accordance with MOP07.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

N/A K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: Generic K/A STATEMENT:

2.1.3 Knowledge of shift or short-term relief turnover practices. (CFR 41.10/45.13) ................. 3.7 / 3.9 Maintenance Rule Safety Classification:

N/A Maintenance Rule Risk Significant? (Yes or No)

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief Revision: 4 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet. If asked, provide the examinee with the CRS Shift Relief Checklist (attached).

NOTE: Examiner is to perform as the CRS being relieved.

CUE: When asked, provide the examinee with the Unit Log for the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (attached).

  • 1. Review Unit Log and abnormal events that
  • 1. Reviews Unit Log, and initials MOP01003.

have occurred in the last 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

CUE: A few hours ago power was raised from 82% to 100%. Power had been reduced to perform Turbine Valve testing. The Reactor Building Rounds NO is monitoring and adjusting Recirc MG Set oil temperatures as necessary.

HPCI was tagged out to perform corrective maintenance on the Aux Oil Pump, and HPCI has been restored to operable status.

  • 2. Review General Plant Status by discussing
  • 2. Reviews General Plant Status with CRS by operating condition, special limitations, bands discussing operating condition, special and ranges. limitations, bands and ranges, and initials MOP01003.

CUE: If asked, there are no outstanding LCOs.

  • 3. Review LCOs.
  • 3. Reviews LCO log book or discusses with CRS, and initials MOP01003.
4. Read Urgent Required Reading. 4. Verifies no Urgent Required Reading present (red binder).

CUE: Alarm 1D34 is in due to a faulty conductivity cell E11-N001A. There has been a CARD written to address the problem. Conductivity is currently normal, and Chemistry is checking the conductivity each shift.

Alarm 4D78 is in due to a broken level switch N30-N095. There has been a CARD written to address the problem. The tank level is currently normal, and the Turbine Building Rounds NO is checking the level twice per shift.

CUE: SM acknowledges report of the problem with HPCI, and directs the examinee to complete the turnover. The concern with HPCI will be addressed when turnover is complete.

  • 5. Walk down COPs, and discuss any off-normal
  • 5. Walks down COPs, and discusses any off-condition, status of ESF equipment, reasons normal condition, status of ESF equipment, for lit annunciators, and IPCS alarms. reasons for lit annunciators, and IPCS alarms, and initials MOP01003.

Asks reasons for alarms 1D34 & 4D78.

Determines HPCI Aux Oil Pump CMC is improperly positioned and informs SM/CRS.

CUE: Currently, there are no non-triggered situation surveillances required.

  • 6. Discuss non-triggered situational
  • 6. Discusses non-triggered situational surveillance requirements. surveillance requirements, and initials MOP01003.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief Revision: 4 Page 5 ELEMENT STANDARD

  • 7. Verify qualification for position.
  • 7. Verifies qualifications listed in the Qualification Reporting Tool, and initials MOP01003.

CUE: End JPM when the items noted by an asterisk on the Shift Relief Checklist are completed.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief Revision: 4 Page 6 Evaluator Notes:

This JPM should be started at the CRS Desk in the Simulator.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief Revision: 4 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-419 Perform a CRS Short Term Relief Revision: 4 Page 8 Simulator Setup IC#:

IC-20 Malfunctions:

Number Title Value Delay Ramp C97MF0048 01D034 RHR HX Water Conductivity High 1 0 0 C97MF0709 04D078 Seal Oil Reservoir Tank Level Low 1 0 0 Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

1. Initialize the simulator and place in RUN.
2. Open and execute lesson 802_4101_419.lsn, or insert the malfunctions listed above.
3. Place E4101-C005, HPCI Turbine Aux Oil Pump, CMC switch in OFF RESET.
4. Acknowledge all alarms, and ensure plant conditions are stable.
5. Ensure the following items are available:

CRS shift Relief Checklist - MOP01003 Previous 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unit log (attached to JPM)

Required reading books LCO book Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Page 9 Cue Sheet: (JP-OP-802-4101-419)

Initial Conditions:

You are an extra SRO assigned to the shift.

You attended the shift turnover meeting this morning.

Plant conditions are stable and as you see them.

Initiating Cue(s):

The SM directs you to provide a Short Term Relief with the CRS.

All prerequisites are complete.

JOB PERFORMANCE MEASURE Page 10 TRAINING USE ONLY Fermi 2 Control Room Log Date Entry User Yesterday G. Neco relieved R. Valor as CRNSO, T. Sword relieved R. Kitchen as P603, P. Crabbe e52xxx 07:02 relieved A. Nightlight as CRS, M. L. Hopwick relieved J. Konners as STA Mode: 1 Reactor Power: 82 % 2807MWt Recirc Speeds: A: 62 % B: 63 % Core Flow: 77 MLB/HR RPV Pressure: 1001 PSIG RPV Level: 197 IN Torus Temp: 79 DEGF Torus Level: -0.6 IN DW Temp: 129 DEGF DW Press: 0.4 PSIG Condenser Pressure: 1.07 PSIA Generator Output: 923 MWe Yesterday N3000 Added hydrogen to the generator IAW 23.122 section 11.0, Initial pressure 70 e51xxx 15:42 PSIG Final Pressure 75 PSIG Yesterday Rel - S.Floyd relieved J.Koch as Radwaste Operator Assigned. Also Fred Seever is U.I. e50xxx 18:30 for ROA Yesterday R. Valor relieved G. Neco as CRNSO, R. Kitchen relieved T. Sword as P603, A. e56xxx 19:05 Nightlight relieved P. Crabbe as CRS, J. Konners relieved M. L. Hopwick as STA Mode: 1 Reactor Power: 82 % 2808MWt Recirc Speeds: A: 62 % B: 63 % Core Flow: 77 MLB/HR RPV Pressure: 1002 PSIG RPV Level: 197 IN Torus Temp: 80 DEGF Torus Level: -0.6 IN DW Temp: 129 DEGF DW Press: 0.4 PSIG Condenser Pressure: 1.06 PSIA Generator Output: 924 MWe Yesterday Started P4100C011 CW RESERVOIR WEST MAKEUP PUMP in accordance with e56xxx 19:20 23.131 section 6.8 - CW Reservoir Makeup Pump Operation Yesterday M. Adore relieved G. Almos as Shift Manager Shift assignments are in accordance with e57xxx 19:25 the shift assignment sheet.

Yesterday N3033 Added water to Stator Water Head Tank IAW 23.120 section 6.4 e56xxx 20:32 Yesterday Stopped P4100C010 CW RESERVOIR EAST MAKEUP PUMP in accordance with e56xxx 21:43 23.131 section 6.8 - CW Reservoir Makeup Pump Operation Yesterday N3000 Added hydrogen to the generator IAW 23.122 section 11.0, Initial pressure 70 e58xxx 23:28 PSIG Final Pressure 75 PSIG Today Started a planned reactivity change from 82% to 100% reactor power using a e59xxx 01:42 combination of Flow and Rods for Rod Pattern Adjustment Initial Recirc Speeds: A 62.00 B 63.00 Initial Core Flow is 77 Today Started P4100C010 CW RESERVOIR EAST MAKEUP PUMP in accordance with 23.131 e58xxx 02:32 section 6.8 - CW Reservoir Makeup Pump Operation Today N3000 Added hydrogen to the generator IAW 23.122 section 11.0, Initial pressure 71 e58xxx 04:39 PSIG Final Pressure 75 PSIG Today Verified reactor power at 95% is within 3% (of rated) of the value indicated in the Power e59xxx 04:45 vs. Steam Flow graph IAW 22.000.03 Today Stopped P4100C011 CW RESERVOIR WEST MAKEUP PUMP in accordance with e58xxx 05:08 23.131 section 6.8 - CW Reservoir Makeup Pump Operation Today Completed a planned reactivity change from 82% to 100% reactor power using Recirc e55xxx 05:38 Flow. Final Recirc Speeds: A 70.2 B 70.2 Final Core Flow is 84.8 Contacted CSS (Mitchell) and MOC (Scott).

Today Completed licensed operator walkdown and returned HPCI Aux Oil Pump to service. e59xxx 06:18 Today E4101 - Exit LCO 09-0573 for HPCI Aux Oil Pump Inoperable. e59xxx 06:20 Today Rel - J. Koch relieved S. Floyd as Radwaste Operator Assigned. e55xxx 06:30 Today R. Valor relieved G. Neco as CRNSO, R. Kitchen relieved T. Sword as P603, A. e56xxx 06:55 Nightlight relieved P. Crabbe as CRS, J. Konners relieved M. L. Hopwick as STA Mode: 1 Reactor Power: 99.5% 3430 MWt Recirc Speeds: A: 70.25% B: 70.25% Core Flow: 84.8 MLB/HR RPV Pressure: 1030 PSIG RPV Level: 197 IN Torus Temp: 78.8 DEGF Torus Level: 0.12 IN DW Temp: 135.5 DEGF DW Press: 0.52 PSIG Condenser Pressure: 1.36 PSIA Generator Output: 1153 MWe

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO JP-OP-802-4101-421 2 JPM Title Duration Page Verify Offsite Electrical Lineup 10 minutes 1 Examinee: SRO / RO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1. *11.
  • 2. *12.
  • 3. *13.
  • 4. 14.
  • 5. 15.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup Revision: 2 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to Adequate control of system No anticipation of results of prepare for job. Aware of maintained throughout task actions. Unaware or control control bands and but some improvements bands or not able to maintain maintained them. could be made such as them. Lack of knowledge of Configuration control better manual control or how to control system maintained. greater depth of knowledge parameters.

for anticipating system response.

Conservatism Low threshold for Some opportunities existed Proceeds even when unsure identification of problems. to question before with unanswered questions.

Questioning attitude. Uses proceeding, High focus on High threshold for problem stop when unsure if task completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of related to plant operation.

generic fundamentals to Only relied on procedure for predict and monitor system operating knowledge.

response.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup Revision: 2 Page 3 JPM Information System:

S2000/S4000 - 120/345KV Switchyards Task:

57520 - Perform Control Room - Mode 1, 2, 3 Surveillances

References:

Required (R) / Available (A) 24.000.01, Situational Surveillances/LCO Action Tracking, Attachment 28b (R)

Tools and Equipment Required:

Marked up 24.000.01, Attachments 28a & 28b Initial Conditions:

You are the CRNSO.

The current time is 0500.

EDG-11 is out of service for maintenance.

The CRS has entered LCO 3.8.1 Action A.

Initiating Cue(s):

The CRS directs you to perform 24.000.01, Attachment 28b.

Terminating Cue(s):

24.000.01 Attachment 28b is completed.

Task Standard:

24.000.01, Attachment 28b, is completed correctly.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

N/A K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: GENERIC K/A STATEMENT:

2.1.29 Knowledge of how to conduct system lineups, such as valves, breakers, switches, etc.

(CFR 41.10 / 45.1 / 45.12)................................................................................................. 4.1 / 4.0 Maintenance Rule Safety Classification:

N/A Maintenance Rule Risk Significant? (Yes or No)

N/A Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup Revision: 2 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide examinee with Cue Sheet and marked up 24.000.01 Attachments 28a & 28b.

  • 1. [1.1.1] Record Bus 101 voltage.
  • 1. Records 120V Bus 101 voltage.
  • 2. [1.1.2] Verify indicated voltage is
  • 2. Records initials verifying voltage is approximately 120 VAC. ~120 VAC.
  • 3. [1.1.3] If indicated bus voltage is <116
  • 3. Records NA in the initials block.

VAC, notify the SM, otherwise NA.

CUE: If asked, inform examinee that Breaker GD was opened mid-shift at ITCs request.

  • 4. [1.1.4] Verify one the following lineups is
  • 4. Checks off the following boxes, and initials met: that at least one of the lineups is correct:

For Shoal Line supplying, Breaker GD For Radka Line supplying, Breaker is CLOSED. GK and GH are CLOSED.

For Radka Line supplying, Breaker For Swan Creek Line Supplying, GK and GH are CLOSED. Breakers GM and GH are CLOSED.

For Swan Creek Line Supplying, Breakers GM and GH are CLOSED.

  • 5. [1.1.5] Verify the following breakers are
  • 5. Checks off each box and initials that CLOSED: breakers are CLOSED.

TRANS 1 DEC POS A BKR CONTROL SS TRANS 64 PRI POS D BKR CONTROL

  • 6. [1.2] For Bus 102 supplying SST 64,
  • 6. This section is NA, therefore examinee perform the following: records NA on steps 1.2.1 through 1.2.5.
  • 7. [1.3] Verify at least one of the two
  • 7. Places a check mark next to step 1.3.1 conditions is met: and initials the Acceptance Criteria.

Steps 1.1.2, 1.1.4, and Step 1.1.5 were completed satisfactorily.

or Steps 1.2.2, 1.2.4, and Step 1.2.5 were completed satisfactorily.

  • 8. [1.4.1] Record Bus 301 voltage.
  • 8. Records 120V Bus 301 voltage.
  • 9. [1.4.2] Verify indicated voltage is
  • 9. Records initials verifying voltage is approximately 120 VAC. ~120 VAC.
  • 10. [1.4.3] If indicated bus voltage is <118.1 *10. Records NA in the initials block.

VAC, notify the SM, otherwise NA Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup Revision: 2 Page 5 ELEMENT STANDARD

  • 11. [1.4.4] Verify one the following lineups is *11. Checks off the following boxes, and initials met: that at least one of the lineups is correct:

For BRTN 2 Line supplying, Breaker For BRTN 2 Line supplying, Breaker DF is CLOSED. DF is CLOSED.

For BRTN 2 Line supplying, Breakers For BRTN 3 Line, Breaker BM is DM, CM, and CF are CLOSED with CLOSED Main Generator off line.

For BRTN 3 Line, Breaker BM is CLOSED For BRTN 3 Line, Breakers BT, CM and CF are CLOSED with Main Generator off line.

  • 13. [1.5] Verify Step 1.4.2 and Step 1.4.4 and *13. Records initials the Acceptance Criteria 1.4.5 were completed satisfactorily. block.
14. [1.6] Sign for completed and record 14. Records date and time of completion, and Name, Initials and Signature records Name, Initials and Signature.
15. Document on Attachment 28a that 15. Records Date and Time performed, Action 2 was performed by recording Initials and enters ID number on Date, Time, Initials and ID number. Attachment 28a, Action 2.

CUE: Terminate JPM when 24.000.01, Attachment 28b, is completed.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup Revision: 2 Page 6 Evaluator Notes:

This JPM can be performed in the Simulator or the Control Room.

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup Revision: 2 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-421 Verify Offsite Electrical Lineup Revision: 2 Page 8 Simulator Setup IC#:

IC-20 or any full power IC.

Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp R30RF0009 EDG 11 Control Mode Switch MPO 0 0 Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

1. Initialize to desired IC, and place the simulator in RUN.
2. Open Shoal Line Breaker GD.
3. Insert the remote function listed above.
4. Silence and acknowledge all alarms, and place the simulator in FREEZE.

Work Instruction WI 5.14 Job Performance Measures Rev 1 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-421)

Initial Conditions:

You are the CRNSO.

The current time is 0500.

EDG-11 is out of service for maintenance.

The CRS has entered LCO 3.8.1 Action A.

Initiating Cue(s):

The CRS directs you to perform 24.000.01, Attachment 28b.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO / RO / NO JP-OP-802-4101-441 1 JPM Title Duration Page Identify the Isolation Boundaries for a Clearance to 20 minutes 1 Replace a Pump Impeller Examinee: SRO / RO / NO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment 1.

  • 2.

3.

  • 4.
  • 5.
  • 6.
  • 7.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a Revision: 1 Pump Impeller Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to prepare Adequate control of system No anticipation of results of for job. Aware of control maintained throughout task actions. Unaware or control bands and maintained them. but some improvements bands or not able to maintain Configuration control could be made such as better them. Lack of knowledge of maintained. manual control or greater how to control system depth of knowledge for parameters.

anticipating system response.

Conservatism Low threshold for Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding, with unanswered questions.

Questioning attitude. Uses High focus on task High threshold for problem stop when unsure if completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of generic related to plant operation.

fundamentals to predict and Only relied on procedure for monitor system response. operating knowledge.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a Revision: 1 Pump Impeller Page 3 JPM Information System:

N/A Task:

20993 Perform Protective tagging as the Shift Foreman (Determines the limits of protection necessary and proper tag locations required to protect all aspects of the work).

References:

Required (R) / Available (A)

MOP12, Tagging and Protective Barrier System (R) 23.120, Stator Water Cooling (A)

M-5717-4, Generator Stator Winding Cooling System Functional Operating Sketch (A)

I-2341-24 Schematic Diagram, Stator Coolant Pump East & West (A)

Tools and Equipment Required:

Mechanical Piping Diagram, Electrical Diagram Initial Conditions:

You are the Control Room NSO.

A tagout has been requested to permit replacement of the East Stator Water Cooling Pump impeller.

The E-Tagging system is not available.

Initiating Cue(s):

In preparation for initiating a Safety Tagging Record (STR) to replace the impeller on the East Stator Water Cooling Pump, determine the limits of protection necessary and proper tag locations required to protect all aspects of the work order.

Terminating Cue(s):

The applicant provides the component isolation boundaries.

Task Standard:

The component isolation boundaries are identified per MOP12.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

N/A K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: Generic/Equipment Control K/A STATEMENT: 2.2.13 Knowledge of tagging and clearance procedures (4.1/4.3)

Maintenance Rule Safety Classification:

N/A Maintenance Rule Risk Significant? (Yes or No)

N/A Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a Revision: 1 Pump Impeller Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD CUE: Provide the applicant with a blank Safety Tagging Record to document his findings. If requested, provide copy of MOP12 and/or ODE-19.

NOTE: The applicant is not being graded on completion of the form, only that the required boundaries and tag locations are identified.

NOTE: If hard copies of the mechanical/electrical drawings are unavailable, a Fermi computer may be used to access the drawings (M-5717-4 or I-2341-24) as needed.

1. Using the associated electrical drawing, 1. Identifies the Power Supply Breaker as the identify the electrical isolation boundary. electrical isolation boundary.
  • 2. Identify the proper tag location for each
  • 2. Identifies Bus 72A Pos 4C, N3033C047 East component identified in the previous step. Stator Water Cooling Pump breaker should be in the disconnect position and RED TAGGED.
3. Using the associated mechanical drawing, 3. Identifies the following mechanical isolation identify the mechanical isolation boundaries. boundaries:

Suction Valve, N3033-F089A Discharge Valve, N3033-F070A Vent Valve, N3033-F907A Drain Valve, N3033-F067A

  • 4. Identify the required position of the Suction *4. Identifies the Suction Valve N3033-F089A Valve. should be Closed and RED TAGGED.
  • 5. Identify the required position of the Discharge *5. Identifies the Discharge Valve N3033-F070A Valve. should be Closed and RED TAGGED.
  • 6. Identify the required position of the Drain *6. Identifies the Drain Valve N3033-F067A Valve. should be Open and RED TAGGED.
  • 7. Identify the required position of the Vent *7. Identifies the Vent Valve N3033-F907A Valve. should be Open and RED TAGGED.

CUE: The JPM may be terminated when the applicant provides the component isolation boundaries.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a Revision: 1 Pump Impeller Page 5 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a Revision: 1 Pump Impeller Page 6 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-441 Identify the Isolation Boundaries for a Clearance to Replace a Revision: 1 Pump Impeller Page 7 Simulator Setup IC#:

Malfunctions:

Number Title Value Delay Ramp Remote Functions:

Number Title Value Delay Ramp Override Functions:

Number Title Value Delay Ramp Special Instructions:

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-441)

Initial Conditions:

You are the CRNSO.

A tag out has been requested to permit replacement of the East Stator Water Cooling Pump impeller.

The E-Tagging system is not available Initiating Cue(s):

In preparation for initiating a Safety Tagging Record (STR) to replace the impeller on the East Stator Water Cooling Pump, determine the limits of protection necessary and proper tag locations required to protect all aspects of the work order.

JOB PERFORMANCE MEASURE Job Position No. Revision SRO JP-OP-802-4101-443 0 Duration Page Activate ECOS in accordance with EP-290 15 minutes 1 Examinee: SRO Evaluator:

JPM Type: Normal / Alternate Path / Time Critical Start Time Evaluation Method: Perform / Walkthrough / Discuss Stop Time Location: Plant / Simulator / Classroom Total Time:

PERFORMANCE EVALUATION

SUMMARY

Element S U Comment Element S U Comment Element S U Comment

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.

OPERATOR FUNDAMENTALS OBSERVATION Monitor operator fundamentals during the JPM set. Rate each area based on the criteria by placing a checkmark in the appropriate column. Indicate the comment number associated with the observation.

Operator Meets all Opportunity for Does not meet Comment Fundamental Expectations Improvement Expectations Number Monitoring Control Conservatism Teamwork Knowledge OVERALL EVALUATOR COMMENTS:

______ PASS ______ FAIL Evaluator Signature / Date: /

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290 Revision: 0 Page 2 JPM Observation Criteria Opportunity for Fundamental Meets all Expectations Does not meet Expectations Improvement Monitoring Equipment status monitored Some monitoring was Did not recognize key at proper frequency, using performed but undue focus equipment status indicators, multiple means if available. on task or lack of system too much focus on single Understood which indications knowledge prevented ideal indications and ignored total were critical. monitoring. system status.

Control Task preview used to prepare Adequate control of system No anticipation of results of for job. Aware of control maintained throughout task actions. Unaware or control bands and maintained them. but some improvements bands or not able to maintain Configuration control could be made such as better them. Lack of knowledge of maintained. manual control or greater how to control system depth of knowledge for parameters.

anticipating system response.

Conservatism Low threshold for Some opportunities existed to Proceeds even when unsure identification of problems. question before proceeding, with unanswered questions.

Questioning attitude. Uses High focus on task High threshold for problem stop when unsure if completion without conditions.

needed. Sensitive to nuclear consideration for other safety. system affects.

Teamwork Routinely communicates Communicated most status Routinely takes action without system status changes to the and actions. Some informing the team.

team. Communicates actions improvement would be before taking them. warranted.

Knowledge Able to anticipate system Plant, system, or generic Unable to predict system response based on solid fundamental knowledge has response, unsure of generic system knowledge. Good some gaps. fundamentals concepts working knowledge of generic related to plant operation.

fundamentals to predict and Only relied on procedure for monitor system response. operating knowledge.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290 Revision: 0 Page 3 JPM Information System:

N/A Task:

73999 - Activate the Emergency Call Out System (ECOS)

References:

Required (R) / Available (A)

EP-290, Emergency Notifications (R)

Tools and Equipment Required:

Unplugged Telephone Initial Conditions:

You are the Work Control Supervisor.

It is back shift on a Saturday night.

A Site Area Emergency has been declared and you have reported to the Main Control Room as requested by the Shift Manager.

Initial notifications to County, State, and Ontario Provence have been completed.

Initiating Cue(s):

Activate ECOS using a phone in accordance with Enclosure E, of EP-290, Emergency Notifications.

Terminating Cue(s):

ECOS is activated.

Task Standard:

ECOS is activated using a phone in accordance with EP-290, Enclosure E.

Licensed Operator Exam Information (required for NRC exams)

Safety Function:

N/A K/A

Reference:

(from NUREG 1123)

K/A SYSTEM: Generic K/A STATEMENT:

2.4.43 - Knowledge of emergency communication systems and techniques. ............................ 3.2 / 3.8 Maintenance Rule Safety Classification:

No Maintenance Rule Risk Significant? (Yes or No)

No Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290 Revision: 0 Page 4 PERFORMANCE EVALUATION Start Time ELEMENT STANDARD NOTE: An unplugged telephone available for examinees use will allow more effective simulation of ECOS activation by SM phone.

CUE: Provide the examinee with the Cue Sheet. If necessary, provide the examinee with a current copy of EP-290.

  • 1. [3.1.1] Have ready the applicable Scenario ID
  • 1. Determines correct Scenario ID Number from Number from Table 1-1 for the corresponding Table 1-1 is 3.

classification.

  • 2. [3.1.2] Call the Remote Scenario Activation
  • 2. Dials [800] 380-0407 or [615] 986-3719.

phone number (800) 380-0407 or (615) 844-5611.

CUE: After the phone number has been dialed, state Welcome, enter your User ID Number followed by the # sign.

  • 3. [3.1.3] At the prompt for User ID, enter 65235,
  • 3. Enters 65235, followed by #.

then press #.

CUE: After the User ID and # have been entered, state Enter your Security PIN number, followed by the # sign.

CUE: If asked, the Security PIN number is 12345.

  • 4. [3.1.4] At the prompt for Security PIN, enter
  • 4. Enters 12345, followed by #.

the confidential PIN number, then press #.

CUE: After the Security PIN and # have been entered, state Enter the Scenario ID Number followed by the # sign.

  • 5. [3.1.5] At the prompt for Scenario ID, enter the
  • 5. Enters 3, followed by #.

associated Scenario ID from Table 1-1, and then press #.

NOTE: The system will go through a list of options from the program menu.

CUE: After the Scenario ID and # have been entered, state Listen to the following Options then press the appropriate number on the phone key pad:

Press 1 - to listen to the current scenario message [pre-recorded messages designed for Fermi 2 ERO] - or -

Press 2 - to re-record the scenario message. The system will give instructions on how to record and verify your message. - or -

Press 3 - to start the scenario. When you hear the response, "The scenario is building", exit the program by pressing #. - or -

Press 4 - to return to the main menu.

  • 6. [3.1.6] Press the appropriate number on the
  • 6. Presses 3.

phone key pad.

CUE: After the number 3 has been entered, state The Scenario is building.

  • 7. [3.1.6] When the system reports that the
  • 7. Presses #, and hangs up the phone.

scenario is building exit the program by pressing the # sign.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290 Revision: 0 Page 5 ELEMENT STANDARD NOTE: ECOS is programmed to immediately call [734] 586-5235 at the Shift Manager's desk for "emergency" or "test" activations.

CUE: After the phone has been hung up, state The phone is ringing.

When the applicant answers the phone, states Enter the last 5 digits of your SAP Employee Number.

  • 8. [4.2] Answer the call, and when prompted for
  • 8. Enters 11111, followed by #.

the last five digits of your SAP Employee Number, enter 11111, then press #.

CUE: After 11111 and # have been entered, state ECOS is activated.

CUE: End JPM when ECOS is activated.

______ SATISFACTORY ______ UNSATISFACTORY Stop Time

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290 Revision: 0 Page 6 Evaluator Notes:

ENSURE ALL INDUSTRIAL AND PERSONNEL SAFETY PRACTICES ARE USED AND ENFORCED AT ALL TIMES.

Generic Notes and Cues:

None System Specific Notes and Cues:

None Task Performance and Cues:

The Elements of this JPM are step by step in accordance with the procedure. The Standard is that the procedure is performed as written. The Cues are as listed above for indication or as each step is completed the appropriate information is reported to the examinee.

Critical Steps:

Critical Tasks are identified by asterisk (*) and bolded steps on the cover sheet. Verify that the latest revision of the procedure is used and critical tasks are correctly identified.

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290 Revision: 0 Page 7 FOLLOW-UP DOCUMENTATION QUESTIONS Reason for follow-up question(s):

Question:

Reference:

Response

Question:

Reference

Response

Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE JPM Title No.: JP-OP-802-4101-443 Activate ECOS in accordance with EP-290 Revision: 0 Page 8 Simulator Setup IC#:

N/A Malfunctions:

Number Title Value Delay Ramp N/A Remote Functions:

Number Title Value Delay Ramp N/A Override Functions:

Number Title Value Delay Ramp N/A Special Instructions:

N/A Work Instruction WI 5.14 Job Performance Measures Rev 2 Attachment 1

JOB PERFORMANCE MEASURE Cue Sheet: (JP-OP-802-4101-443)

Initial Conditions:

You are the Work Control Supervisor.

It is back shift on a Saturday night.

A Site Area Emergency has been declared and you have reported to the Main Control Room as requested by the Shift Manager.

Initial notifications to County, State, and Ontario Provence have been completed.

Initiating Cue(s):

Activate ECOS using a phone in accordance with Enclosure E, of EP-290, Emergency Notifications.

Appendix D Scenario Outline Form ES-D-1 Facility: Fermi 2 Scenario No. 1 Op-Test No: 2013-1 Examiners: C. Moore Operators:

D. McNeil C. Phillips Initial Conditions: IC-20, MOL, 100% Rx. Power Turnover: _ The plant has been operating at 100 % Reactor power for the last 205 days. #2 GSW is OOS for motor replacement. Expected return to service is two weeks. B CRD Pump is OOS for oil replacement on gear reducer. Return to service is expected tomorrow.

Event Malf. No. Event Event No. Type* Description 1 NGADN302 C(BOP) #2 TCV Unitized Actuator Failure (Oil Leak) - 4D2 1C002TVSP C(SRO) 2 R(ATC) Reduce Reactor Power < 93% to lock down #2 TCV R(SRO) 3 N(BOP) Lock Down #2 TCV - 23.109, Main Turbine N(SRO)

C11MF1106 C(ATC) CR 58-39 Individual SCRAM from half scram during 4

  1. 2TCV lockdown and blown fuse. Disarm CR due to badly C(SRO) damaged fuse clip.

CRS enter TS 3.1.3, Control rod operability - one rod inop and inserted.

C93RF0001 NA Earthquake - AOP 20.000.01 - AOP Actions 5

C97MF1087 6 E51MF0010 C(All) RCIC Steam Leak. Auto Isolation Fails. Manual isolation Successful. EOP 29.100.01 Sheet 5 (CT 1)

EOPRF0024 CRS enter TS 3.5.3, RCIC EOPRF0025 N20MF0023 M(All) Loss of Feedwater - AOP 20107.01 - Mode Switch to S/D 7

EOP 29.100.01 Sheet 1 - RPV Control N20MF0024 N20MF0025 E41MF0011 C(All) Loss of High Pressure Feed Sources - Lower RPV pressure 8

to feed with HFP.

N21MF0011 Inhibit ADS (CT -2)

N21MF0038

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D, 38 of 39

Appendix D Scenario Outline Form ES-D-1 Facility: Fermi 2 Scenario No. 1 Op-Test No: 2013-1 Examiners: C. Moore Operators:

D. McNeil B. Palagi Initial Conditions: IC-20, MOL, 100% Rx. Power Event Malf. No. Event Event No. Type* Description 9 B31MF0066 M(All) Leak in drywell - EOP 29.100.01 Sheet 2 - Primary Containment Control Emergency Depressurization EOP 29.100.01 Sheet 3 -

(CT-3) 10 E21RF0005 C(BOP) Auto Start Failure - Div. 1 Core Spray C(SRO) 11 E11MF0016 C(ATC) Containment Spray Valve Failure E1150-F016A C(SRO) Spray Drywell (CT 4)

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D, 38 of 39

Appendix D Scenario Outline Form ES-D-1 Facility: Fermi 2 Scenario No. 2 Op-Test No: 2013-2 Examiners: C. Moore Operators:

D. McNeil C. Phillips Initial Conditions: IC-15 (55% Power)

Turnover: _ Reactor power is 55%. A plant startup is in progress following a planned shutdown for repairs to Main Transformer 2A. The startup is currently on hold, awaiting chemistry results on heater drains. CW Pump #5 is OOS for motor replacement Event Malf. No. Event Event No. Type* Description C102C11_P C(ATC) Trip of A CRD Pump (B CRD Fails) AOP 20.106.01 - restart 1

S_N001A_S A CRD.

C(SRO)

TFCLOSE C11MF1117 TS 3.1.5 2 TEAJSPECI C(BOP) High Vibration/High Amps #6 Drywell Cooling Fan - 8D45 FIC_F78875 C(SRO) - Shutdown Fan 3TFF B21MF0025 C(All) C SRV Open - AOP 20.000.25 - SRV closes when fuses 3

pulled TS 3.4.3 4 N(BOP) Torus Cooling - 23.205 N(SRO)

NMRDFU_ M(All) Loss of Steam Jet Air Ejectors/Loss of Vacuum - AOP 5

11CC 20.125.01 Mode Switch to Shutdown 6 C11MF0001 M(All) ATWS - EOP 29.100.01 Sheet 1 and 1A Inhibit ADS (CT 1)

C71MF0006 Terminate and Prevent (CT 2)

C41MF0003 C(ATC) SLC Pumps Trip 7

C41MF0004 C(SRO) 29.ESP.02 - Alternate Boron Injection 8 EOPRF0007 NA Insert Control Rods (CT 3) thru 29.ESP.10 EOPRF0014 29.ESP.11 9 B21MF0028 C(All) F SRV fails Open - EOP 29.100.01Sheet 2 - High Torus Temp

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D, 38 of 39

Appendix D Scenario Outline Form ES-D-1 Facility: Fermi 2 Scenario No. 3 Op-Test No: 2013-3 Examiners: C. Moore Operators:

D. McNeil C. Phillips Initial Conditions: IC-13, MOL, 25% Rx. Power Turnover: Reactor power is currently about 25% Power. The plant startup is on hold due to an oil leak on A Core Spray Pump. A Core Spray Pump is OOS for repair. Return to service is expected late this afternoon. Following A Core Spray Pump RTS the startup will continue. _

Event Malf. No. Event Event No. Type* Description 1 C51MF0003 C(ATC) APRM Downscale - Bypass APRM 3 C(SRO)

TS 3.3.1.1 Tracking 2 P42MF0005 C(BOP) RBCCW Pump Trip - AOP 20.127.01 - Start Standby C(SRO) RBCCW Pump 3 B21MF004 C(BOP) Drywell Pressure Transmitter Failure C(SRO) TS 3.3.1.1, 3.3.6.1, 3.3.6.2, 3.3.7.1( Drywell Pressure Instrumentation) 4 N30MF0038 M(All) MTLO Pump Failures - Trip Main Turbine - AOP 20.109.01 N30MF0039 C11MF0004 C(ATC) A CRD Flow Control Failure - AOP 20.106.03 5

C(SRO) 6 E41MF0007 M(All) HPCI Steam Leak - Failure to isolate - E4150-F600 Breaker Trips E41RF0033 EOP 29.100.01 Sheet 5, Secondary Containment - >MSO Temperature - Mode Switch to Shutdown (CT 1)

EOP 29.100.01 Sheet 1 RPV Control 7 NA N(SRO) Torus Cooling N(ATC) 8 TA20TEN2 M(All) Two Areas > MSO Temperature due to HPCI watertight door 06ZOUT not closed - EOP 29.100.01 Sheet 3 - Emergency Depressurization (CT 2) 9 B21MF0030 C(BOP) SRV H Failure during ED - Open One other SRV C(SRO) 10 E41RF0033 NA Energize MOV/close E41-F600 - isolate steam leak (CT 3)

  • (N)ormal, (R)eactivity, (I)nstrument, (C)omponent, (M)ajor Appendix D, 38 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 1 Event No.: N/A Page 1 of 9 Event

Description:

Overview Initial Conditions:

The plant has been operating at 100 % Reactor power for the last 205 days. #2 GSW is OOS for motor replacement. Expected return to service is two weeks. B CRD Pump is OOS for oil replacement on gear reducer. Return to service is expected tomorrow. Plans for the shift are to maintain full power.

The objectives of this scenario are to:

1. Recognize, respond to, and take the required actions for an instrument / equipment failures requiring the use of operator and Tech Spec actions.
2. Recognize and respond to a Unitized Actuator Failure.
3. Recognize and respond to a Seismic Event.
4. Recognize and respond to a RCIC Steam Leak
5. Recognize and respond to Loss of High Pressure Feed Sources
6. Recognize and respond to LOCA conditions.
7. Operate RHR in all modes for Primary Containment Control.
8. Execute steps in Primary Containment Control and operate the RHR System to control Drywell and Torus Temperature and Pressure.
9. Execute the steps of RPV Control for level (L) and pressure (P).
10. Direct and supervise the Shift team during Normal, Abnormal, and Emergency operations.

The crew will be required to respond to the following order of events:

Failure #2 TCV Unitized Actuator - Oil leak Reactor Power reduction to <93% Power Individual Control Rod Scram Earthquake RCIC Steam Leak Loss of Feedwater/Loss of High Pressure Feed Sources Leak in Drywell Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 1 Event No.: 1 Page 2 of 9 Event

Description:

  1. 2 HPCV Unitized Actuator Failure Time Position Applicant's Actions or Behavior T+1m MALF: NG12N3021LSEN236BTFCLOSE #2 TCV UA LL Alarm SRO Respond to 4D2, Unitized Actuator Throttle Vlv Fault Briefs crew on actions for UA Failure Briefs Power Reduction to lock-down UA.

ATC Monitors plant conditions.

BOP Respond to 4D2, Unitized Actuator Throttle Vlv Fault Direct operator to investigate #2 HPCV Unitized Actuator ROLE PLAY: Report leak inside UA enclosure. Cannot see where leak is coming from, oil spray obscuring window. No leakage outside UA enclosure. Standing by in low dose area.

ROLE PLAY: if update requested, report conditions unchanged Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 1 Event No.: 2 Page 3 of 9 Event

Description:

Power Reduction to <93%

Time Position Applicant's Actions or Behavior T+5m SRO Directs power reduction to <93% per SOP 23.109 prerequisite for closing #2 HPCV.

Monitors power reduction to <93%

Plant announcement of power reduction.

ATC Monitors plant conditions.

Lower reactor power by reduction of reactor recirculation pump speed per SOP 23.138.01.

Reports power less than 93% when completed.

May request rounds operator monitor Recirc oil temperatures BOP Monitors plant conditions Brief lockdown of #2 HPCV per 23.109 Brief Shutdown of Unitized Actuator per 23.110 Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 1 Event No.: 3, 4 Page 4 of 9 Event

Description:

CR 58-39 Individual SCRAM Time Position Applicant's Actions or Behavior T+15m MALF: C11MF1106 Scram CR 58-39 SRO Direct #2 HPCV Lockdown Direct Shutdown of #2 HPCV UA Brief actions for individual rod scram Contact SNE about individual rod scram Direct CR 58-39 disarmed after fuse clip damage reported.

Enter TS 3.1.3, Control Rod Operability.

ATC Monitors plant conditions.

Reports half scram, rod drift alarm and individual rod scram CR 58-39 Dispatch operator to check HCU 58-39.

ROLE PLAY: Rounds operator reports both Scram Valves open at HCU 58-39. Nothing else is abnormal.

Dispatch operator to check fuses for CR 58-39.

ROLE PLAY: Report blown fuse and severely damaged and charred fuse clips on A side for 58-39 Reset half scram and verifies scram signal clears.

Directs rounds operator to disarm CR 58-39 per 23.106 BOP Monitors plant conditions.

Perform #2 HPCV lock-down per 23.109 Perform #2 HPCV UA shutdown per 23.110 Directs rounds operator to close TBCCW Valve for shutdown UA ROLE PLAY: Rounds operator reports TBCCW valve to #2 HPCV Unitized Actuator closed May dispatch RTC to assist rounds operator to check fuses.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 1 Event No.: 5 Page 5 of 9 Event

Description:

Seismic Event Time Position Applicant's Actions or Behavior T+35m MALF: C97MF1087 CD69 - Seismic System Event/Trouble (Earthquake)

MALF: C93RF0001 Earthquake Sound SRO Responds to Seismic Event and enters 20.000.01, Acts of Nature.

Briefs Crew on Seismic event.

Makes Hi-Com announcement of event Directs Monitoring the following for abnormal values:

Reactor Vessel Level.

Reactor Vessel Pressure.

Reactor Power.

Drywell Pressure.

Torus Water Level.

Drywell Unidentified Leakage.

Process Radiation Monitors.

Spent Fuel Pool Water Level.

Spent Fuel Pool Temperature.

Directs seismic event actions for Condition AC.

May contact offsite agencies to confirm Earthquake ROLE PLAY: if contacted as offsite agency, confirm earthquake at 0.02G horizontal and vertical.

ATC Monitors Power, Pressure and Level as directed by SRO for the seismic event.

May dispatch operators to perform visual inspection of plant systems BOP Responds to alarm 6D69, Seismic Event/Trouble Dispatches an operator to the relay room to check status of Seismic Panel indications (RR H11-P831) per 23.612 ROLE PLAY: Operator reports from the relay room that seismic event has occurred with an indication of 0.02 G Horizontal and 0.02G Vertical Reports Relay Room indications of 0.02 G. horizontal and 0.02G vertical.

Starts all RHRSW MDCT Fans and checks for proper Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 1 Event No.: 5 Page 5 of 9 Event

Description:

Seismic Event running indications.

ROLE PLAY: When directed, report satisfactory operation of MDCT fans following start.

Directs rounds operator to reset D1 and D2 CCHVAC Purge Compressors.

ROLE PLAY: When directed, after about 5 min, report D1 and D2 CCHVAC Purge Compressors are reset.

May dispatch operators to perform visual inspection of plant systems ROLE PLAY: As part of seismic walk down prior to triggering steam leak, Rounds Operator report 1 foot steam plume from packing gland area of E5150-F045.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 1 Event No.: 6 Page 6 of 9 Event

Description:

RCIC Steam Leak.

Time Position Applicant's Actions or Behavior T+45m MALF: E51MF0010, RCIC Steam Leak SRO Respond to 1D66 Respond to 1D70 Enter 29.100.01 Sheet 5 Determine rising room temperature in RCIC/Core Spray room.

Enter 29.100.01 Sheet 5, Secondary Containment Control May direct RCIC isolation.

Validate isolation of leak by monitoring for lowering room temperatures Enter TS 3.5.3 RCIC ATC Monitors plant conditions.

BOP Respond to 1D66 Respond to 1D70 Monitor RCIC system and determine RCIC Automatic isolation did NOT occur.

Manually isolate RCIC System by closing E5150-F007 and E5150-F008 (CT-1)

Validate isolation of leak by monitoring for lowering room temperatures Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 1 Event No.: 7 Page 6 of 9 Event

Description:

Loss of Feedwater Time Position Applicant's Actions or Behavior T+55m MALF: N20MF0023 C HFP Trip MALF: N20MF0024 E HFP Trip MALF: N20MF0025 W HFP Trip SRO Directs Mode Switch to Shutdown per AOP 20.107.01 Directs Scram reports from ATC and BOP.

Enters EOP 29.100.01, Sheet 1, RPV Control Establishes Level band of 173 to 214 inches and pressure band of 900 to 1050 psig.

ATC Places Reactor Mode Switch in Shutdown Provides Scram report.

Verifies all control rods are fully inserted.

BOP Provides scram report.

May dispatch operator to HFPs to investigate ROLE PLAY: If dispatched to HFP, after about 3 min, report nothing visible with HFPs.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 1 Event No.: 8 Page 7 of 9 Event

Description:

Loss of High Pressure Feed Sources Time Position Applicant's Actions or Behavior T+55m MALF: E41MF0011, HPCI Exhaust Check Valve Failure MALF: N21MF0011, A SBFW Pump Trip MALF: N21MF0038, B SBFW Pump Shaft Shear SRO Directs ATC to perform Scram Procedure AOP 20.000.21 Expands Level band to 0 to 214 inches Directs ADS inhibited Briefs crew on options and intended course of action Directs start of SLC Pump Directs attempted restart of HFPs Directs RPV pressure lowered with Bypass Valves or Pressure Regulator to feed with W HFP ATC May report HPCI unavailable due to isolation Starts A or B SLC Pump Attempts HFPs start, W HFP starts Lowers RPV pressure with Bypass Valves or Pressure Regulator to feed with W HFP BOP Reports Both SBFW Pumps unavailable Reports HPCI unavailable due to isolation Inhibits ADS - (CT-2)

Attempts HFPs start, W HFP starts Lowers RPV pressure with Bypass Valves or Pressure Regulator to feed with W HFP May dispatch operator to SBFW Pumps ROLE PLAY: If dispatched to SBFW pumps, after about 3 min, report nothing visible with A or B SBFW Pump.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 1 Event No.: 9 Page 8 of 9 Event

Description:

Recirculation Loop Rupture, ED, Level recovery Time Position Applicant's Actions or Behavior MALF: B31MF0066, Recirc Loop Rupture A T+65m MALF: E21RF0005, Auto Start Failure - Div. 1 CS SRO Enters EOP 29.100.01 Sheet 2, Primary Containment Control Establishes Level band of 173 to 214 inches, expands band to 0 to 214 inches.

Conduct EOP Brief Conduct Brief for Emergency Depressurization Enter 29.100.01, Sheet 3, Emergency Depressurization At TAF, Direct 5 ADS SRVs opened. - (CT-3)

Directs placing RHR in Torus Cooling and Torus Spray.

Directs level band of 173 to 214 following ED ATC Reports rising Drywell Pressure Coordinate with BOP to shutdown/operate LP Pumps to restore and maintain RPV water level 173 to 214 inches Places RHR in Torus Cooling and Torus Spray as directed ROLE PLAY If dispatched, after 5 min report, report D 1(D2) Radiation Monitor Sample Pump in service.

BOP Reports rising Drywell Pressure Reports unable to maintain RPV level with available high pressure sources.

Reports Division 1 Core Spray Pumps failed to start, manually starts/align Division 1 Core Spray Pumps Opens 5 SRVs as directed- (CT-3)

Coordinate with ATC to shutdown/operate LP Pumps to restore and maintain RPV water level 173 to 214 inches ROLE PLAY If dispatched, after 5 min report, report D 1(D2) Radiation Monitor Sample Pump in service.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 1 Event No.: 10 Page 9 of 9 Event

Description:

Containment Cooling and Failures Time Position Applicant's Actions or Behavior T+75m MALF: E11MF0016 - Containment Spray Valve Failure E1150-F16A SRO Directs placing RHR in Torus Cooling and Torus Spray.

When Torus Pressure reached 9 psig directs Drywell Spray after securing the A Recirc Pump and stopping all Drywell Cooling Fans- (CT-4)

Directs securing Drywell and Torus Sprays before Drywell and Torus Pressure reach 0 psig, Monitors DWSIL curve prior to spraying drywell Directs Drywell Spray on Division 2 RHR ATC Shuts down the A Reactor Recirc pump Shuts down all drywell cooling fans Places RHR in Torus Cooling and Torus Spray Reports failure of E11-F016A Places RHR D2 in Drywell Spray- (CT-4)

Secures Torus and Drywell Sprays before Drywell and Torus pressure reach 0 psig.

ROLE PLAY If dispatched to E1150-F16A breaker, after 3 min report, acrid burned insulation smell near MCC (72C-3A-5D)

ROLE PLAY If dispatched, after 3 min report, report D 1(D2) Radiation Monitor Sample Pump in service.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 BOP Places RHR in Torus Cooling and Torus Spray.

Reports failure of E11-F016A Places RHR Div. 2 in Drywell Spray- (CT-4)

Secures Torus and Drywell Sprays before Drywell and Torus pressure reach 0 psig.

ROLE PLAY If dispatched, after 5 min report, report D 1(D2) Radiation Monitor Sample Pump in service.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-2 Scenario No.: 2 Event No.: N/A Page 1 of 8 Event

Description:

Overview Initial Conditions:

Reactor power is 55%. A plant startup is in progress following a planned shutdown for repairs to Main Transformer 2A. The startup is currently on hold, awaiting chemistry results on heater drains. CW Pump #5 is OOS for motor replacement. The refurbished motor arrived on-site yesterday and is currently being installed. RTS is expected late tomorrow.

The objectives of this scenario are to:

1. Recognize, respond to, and take the required actions for an instrument / equipment failures requiring the use of operator and Tech Spec actions.
2. Recognize and respond to a CRD Pump Trip.
3. Recognize and respond to a failure of #6 Drywell Cooling Fan.
4. Recognize and respond to a failure of SRV and F
5. Recognize and respond to a Loss of Vacuum due to loss of all SJAE.
6. Recognize and respond to ATWS conditions.
7. Execute steps in Primary Containment Control and operate the RHR System to control Torus Temperature and Pressure.
8. Execute the steps of RPV Control-ATWS for level (L) pressure (P),and power(Q)
9. Direct and supervise the Shift team during Normal, Abnormal, and Emergency operations.

The crew will be required to respond to the following order of events:

CRD pump trip.(AOP 20.106.01)

  1. 6 DWC Fan Failure SRV C Fails Open (AOP 20.000.02)

Loss of SJAE/loss of Vacuum (AOP 20.125.01)

ATWS (EOP 29.100.01 Sheet 1 and 1A) Both SLC Pumps Trip Terminate and Prevent SRV F fail open - EOP 29.100.01 Sheet 2 High Torus Temperature Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-2 Scenario No.: 2 Event No.: 1 Page 2 of 8 Event

Description:

CRD Hydraulic Pump Trips Time Position Applicant's Actions or Behavior

+2 min MALF: C102C11_PS_N001A_STFCLOSE, CRD Pump A Trip SRO Enters AOP 20.106.01, CRD Hydraulic System Failure Briefs crew on CRD Pump Trip Enters TS 3.1.5, Control Rod Scram Accumulators, Condition B Directs restart of A CRD pump ATC Places CRD Flow Controller in MANUAL Closes CRD Flow Control Valve Closes CRD Pressure Control Valve Reports failure of B CRD Pump Re-starts A CRD Pump Adjusts CRD flow and pressure to 37-63 gpm and differential pressure to 255-265 psid.

Places CRD flow controller in auto May direct operators to investigate CRD pump trip ROLE PLAY: When dispatched to pump, after 3 min, (check current status on panel display) report nothing abnormal at A CRD Pump, report motor rotating on B CRD, pump is not rotating.

ROLE PLAY: At A CRD Pump, report good start when pump re-started.

BOP Monitors plant conditions.

May direct operators to investigate CRD pump trip.

ROLE PLAY: ROLE PLAY: When dispatched to pump, after 3 min, (check current status on panel display) report nothing abnormal at A CRD Pump, report motor rotating on B CRD, pump is not rotating.

May direct operator to Relay Room to C11-R018, CRD Temperature Recorder, (RR H21-P007) to check for high temperatures and clear alarm 3D13.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 ROLE PLAY: Report that several CRDMs (38-31, 26-27, 34-43) were in alarm (>300 deg. F) but that all temperatures are now trending down.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-2 Scenario No.: 2 Event No.: 2 Page 3 of 8 Event

Description:

High Vibration/High Amps #6 Drywell Cooling Fan Time Position Applicant's Actions or Behavior

+15 min MALF: TEAJSPECIFIC_F788753TFF, #6 Drywell Cooling Fan vibration alarm SRO Respond to 8D45, Div 1 Drywell Fan Brg Vib High Briefs crew on intended actions Directs BOP to shutdown #6 Drywell Cooling Fan ATC Monitors plant conditions.

BOP Respond to 8D45, Div 1 Drywell Fan Brg Vib High Reports High Vibration Alarm (8D45) and high amps on #6 DWC fan.

Shutdown #6 Drywell Cooling Fan Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-2 Scenario No.: 2 Event No.: 3 Page 4 of 8 Event

Description:

C SRV Failure Time Position Applicant's Actions or Behavior

+25 min MALF: B21MF00 - C SRV Fails Open SRO Respond to 1D61, SRV OPEN Enter AOP 20.000.25, Failed Safety Relief Valve Conduct AOP Brief Direct fuses for SRV C pulled Direct RHR placed in Torus Cooling Enter TS 3.4.3, SRV, One valve inoperable ATC Monitors plant conditions.

May direct operator to monitor SRV Tailpipe temperatures at B21-R614 (RR H11-P614)

ROLE PLAY: When dispatched, after about 3 min, report (if SRV still open) C SRV tailpipe temperature is 320 degrees, (if SRV closed) report SRV C tailpipe temperature is 275 degrees and slowly lowering.

Report plant conditions indicate SRV closed BOP Respond to 1D61, SRV OPEN Depress OPEN pushbutton, and then CLOSE pushbutton. Report SRV still open.

Dispatch operator to pull fuses for SRV C per Enclosure A in AOP 20.000.25.

Place RHR in Torus Cooling ROLE PLAY: if dispatched, after about 5 min, report standing by to pull fuses for SRV C.

Direct operator to pull fuses for SRV C ROLE PLAY: (trigger step) report fuses for SRV C removed.

Report plant conditions indicate SRV closed.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-2 Scenario No.: 2 Event No.: 4 Page 5 of 8 Event

Description:

Loss of SJAE/Loss of Vacuum.

Time Position Applicant's Actions or Behavior

+35 min MALF: NMRDFU_11CC, Loss of Steam Jet Air Ejectors - Fuse Failure SRO Respond to numerous alarms on H11-P806 panel Enter AOP 21.125.01, Loss of Condenser Vacuum Direct attempt to restart any Steam Jet Air Ejectors Announce event over Hi-Com Conduct AOP Brief Direct Mode Switch to Shutdown prior to 2.8 psia ATC Monitors plant conditions Place Mode Switch in Shutdown BOP Respond to numerous alarms on H11-P806 panel Reports SJAE have tripped Attempt to restore SJAE Report SJAE will not start Reports vacuum degrading Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-2 Scenario No.: 2 Event No.: 5,6 Page 6 of 8 Event

Description:

ATWS.

Time Position Applicant's Actions or Behavior

+45min MALF: C11MF0001, Rods Stuck MALF: C71MF0006, Total Scram Failure MALF: C41MF0003, A SLC Pump Trip MALF: C41MF0004, B SLC Pump Trip SRO Directs Scram reports from ATC and BOP.

Enters EOP Sheet 1, RPV Control and Sheet 1A RPV Control - ATWS Directs FS/Q 1 thru 8 Directs ADS inhibited (CT-1)

Directs SLC injection Directs Alternate Boron Injection (29.ESP.02)

Directs 29.ESP.11 and bypass and restore DW Pneumatics Directs 29.ESP.10 and insert rods with 29.ESP.03 (CT-3)

Directs Terminate and Prevent for level (CT-2)

Directs RPV water level band of 50 to 100 inches Conducts EOP Brief ATC Reports failure to scram Verifies Mode Switch in Shutdown Depress manual scram pushbuttons Provides Scram report.

Perform FS/Q 1 thru 8 Reports FS/Q 1 thru 8 complete Reports both SLC Pumps tripped and RWCU isolated Directs operators to perform 29.ESP.02 Directs 29.ESP 10 and inserts rods with 29.ESP.03(CT-3)

ROLE PLAY: When dispatched (trigger step), after about 10 min, report 29.ESP.10 is complete.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-2 Scenario No.: 2 Event No.: 5,6 Page 6 of 8 Event

Description:

ATWS.

BOP Provides scram report.

Inhibits ADS (CT-1)

Directs operators to perform 29.ESP.11 Bypass/restore DW Pneumatics ROLE PLAY: When dispatched (trigger step), after about 10 min, report 29.ESP.11 is complete.

Performs Terminate and Prevent for level (CT-2)

Maintains RPV water level band of 50 to 100 inches Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-2 Scenario No.: 2 Event No.: 7 Page 7 of 8 Event

Description:

Containment Cooling Time Position Applicant's Actions or Behavior

+60 min MALF: B21MF0028, SRV F Open SRO Enters - EOP 29.100.01Sheet 2 - High Torus Temperature Directs placing RHR in Torus Cooling May direct Drywell Cooling Fans restarted Directs RPV water level Band at 173 to 214 inches after all rods in May direct ATC to AOP 20.000.21 Reactor Scram Direct fuses removed for SRV F ATC Continues Control Rod insertion per 29.ESP.03 When 29.ESP.10 is complete, lines up to drain SDV When SDV drained, re-initiate ARI Reports all rods in Perform 20.000.21 if directed May places RHR in Torus Cooling BOP Places RHR in Torus Cooling Maintains RPV level band 50 to 100 inches Restore RPV water level to 173 to 214 inches after rods in Direct operator remove fuses for SRV F ROLE PLAY: if dispatched, after about 5 min, report standing by to pull fuses for SRV F.

Directs operator to pull fuses ROLE PLAY: (trigger step) report fuses for SRV F removed.

Plant conditions indicate SRV closed (fuses pulled)

Reports SRV F Closed (closes when RPV pressure <900psig)

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-3 Scenario No.: 3 Event No.: N/A Page 1 of 8 Event

Description:

Overview Initial Conditions:

Reactor power is currently about 25% Power. The plant startup is on hold due to an oil leak on A Core Spray Pump. A Core Spray Pump is OOS for repair. Return to service is expected late this afternoon.

Following A Core Spray Pump RTS the startup will continue.

The objectives of this scenario are to:

1. Recognize, respond to, and take the required actions for an instrument / equipment failures requiring the use of operator and Tech Spec actions.
2. Recognize and respond to an APRM Downscale.
3. Recognize and respond to an RBCCW Pump Trip.
4. Recognize and resond to a Drywell Pressure Instument Failure.
5. Recognize and respond to a MTLO Pump Failure/Trip of MainTurbine
6. Recognize and respond to a CRD Flow Control Valve Failure
7. Recognize and respond to HPCI Steam Leak/Failure to Isolate.
8. Recognize and respond to SRV Failure
9. Execute the steps of RPV Control for level (L) and pressure (P).
10. Execute the steps of Secondary Containment Control for Area Temperatures
11. Direct and supervise the Shift team during Normal, Abnormal, and Emergency operations.

The crew will be required to respond to the following order of events:

APRM downscale (TS 3.3.1.1)

RBCCW Pump Trip Drywell Pressure Instrument Failure (TS 3.3.1.1,3.3.6.1,3.3.6.2, 3.3.7.1)

MTLO Pump Failure - Trip Main Turbine.

CRD Flow Control Valve Failure HPCI Steam Leak - Failure to Isolate - >MSO Temp - Scram Two Areas >MSO Temperature - ED SRV H Failure to open Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 3 Event No.: 1 Page 2 of 8 Event

Description:

APRM downscale Time Position Applicant's Actions or Behavior

+2 min MALF: C51MF0003, APRM Downscale SRO Respond to 3D98 Enter TS 3.3.1.1 Tracking Direct APRM 3 bypassed ATC Respond to 3D98 Report APRM 3 reading downscale Bypass APRM 3 Dispatch operator to Relay Room to check APRM 3 ROLE PLAY: Report APRM 3 reading downscale, nothing else abnormal.

BOP Monitors plant conditions.

May direct operator to Relay Room to Check APRM 3 ROLE PLAY: Report APRM 3 reading downscale, nothing else abnormal.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 3 Event No.: 2 Page 3 of 8 Event

Description:

RBCCW Pump Trip Time Position Applicant's Actions or Behavior MALF: P42MF0005, RBCCW Pump Trip

+10 min SRO Respond to 2D104,2D119 Enter AOP 20.127.01, Loss of RBCCW Direct Start of Standby RBCCW Pump Direct EECW restored to Standby ATC Monitors Power, Pressure and Level May dispatch operator to check C RBCCW Pump May dispatch operator to check C RBCCW Breaker(72F-2D)

ROLE PLAY: When dispatched to pump, after about 3 min, report nothing abnormal at C RBCCW pump. Report good start on South Pump ROLE PLAY: When dispatched to breaker (72F-2D), after about 3 min, report breaker tripped on overload.

BOP Respond to 2D104,2D119 Reports C RBCCW Tripped Start Standby RBCCW Pump Dispatch operator to check C RBCCW Pump Dispatch operator to check C RBCCW Breaker(72F-2D)

Restore EECW to Standby per SOP ROLE PLAY: When dispatched to pump, after about 3 min, report nothing abnormal at C RBCCW pump. Report good start on South Pump.

ROLE PLAY: When dispatched to breaker (72F-2D), after about 3 min, report breaker tripped on overload.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.: 2013-1 Scenario No.: 3 Event No.: 3 Page 4 of 8 Event

Description:

Drywell Pressure Instrumentation Failure Time Position Applicant's Actions or Behavior

+30 min MALF: B21MF0004 Drywell Pressure Transmitter Failure SRO Respond to 3D81 Enter TS 3.3.1.1, 3.3.6.1, 3.3.6.2,3.3.7.1 9 (Drywell Pressure Instrumentation)

Brief crew on TS impact ATC Respond to 3D81 Monitors Power, Pressure and Level May dispatch operator to Testability Cabinets to check drywell pressure instrumentation.

ROLE PLAY: When dispatched to Testability, after about 3 min, report C71-N650A reading downscale, all other channels reading normal.

BOP Respond to 3D81 Monitor drywell pressure Will dispatch operator to Testability Cabinets to check drywell pressure instrumentation.

ROLE PLAY: When dispatched to Testability, after about 3 min, report C71-N650A reading downscale, all other channels reading normal.

Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 3 Event No.: 4 Page 5 of 8 Event

Description:

. MTLO Pump Failures/Trip MainTurbine Time Position Applicant's Actions or Behavior MALF: N30MF0038, Trip A MTLO Pump

+40 min MALF: N30MF0039, Trip B MTLO Pump SRO Respond to multiple alarms on H11P804 Directs check of bearing oil pressure Directs Main Turbine tripped.

Enter AOP 20.109.01, Main Turbine Trip Direct S MTLO pump shutdown Plant announcement of Main Turbine trip Direct shutdown procedure per SOP 23.109 ATC Monitor plant conditions May make plant announcement of Main Turbine trip BOP Respond to multiple alarms on H11P804 Report N MTLO Pump has tripped. S MTLO Running with high fluctuating amps, Emergency Pump also running.

Reports bearing oil pressure Trip Main Turbine Shutdowns S MTLO pump.

Perform turbine shutdown procedure per SOP 23.109 ROLE PLAY: When dispatched to MTLO Pumps, after about 3 min, report North Pump is OFF, motor very warm.

South Pump vibrating ROLE PLAY: When dispatched to MTLO Pump Breakers Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 3 Event No.: 5 Page 6 of 9 Event

Description:

. CRD Flow Control Valve Failure Time Position Applicant's Actions or Behavior MALF: C11MF0004, A CRD Flow Control Valve Failure

+50 min SRO Respond to alarms on H11P603 Enter AOP 20.106.03 Conducts AOP Brief Directs swap to B FCV ATC Respond to alarms on H11P603 Report A CRD failed closed Directs operator to A FCV ROLE PLAY: When dispatched, after about 3 mins, report broken air line on A FCV.

Directs operator thru each step in AOP for swap to B FCV ROLE PLAY: When directed perform steps and report steps during swap over to B FCV Report B FCV in service Direct operator to monitor CRD temps (3D13)

ROLE PLAY: When dispatched, after about 3 min, report 2 CRDM (26-31 and 38-27) >250F (peaked at 295F), now below 250F. Ready to reset alarm???

BOP Monitor plant conditions May direct operator to CRD FCV May direct operator to RR to monitor CRD temps Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 3 Event No.: 6 Page 7 of 8 Event

Description:

HPCI Steam Leak/Failure to Isolate.

Time Position Applicant's Actions or Behavior

+65 min MALF: E41MF0007, HPCI Steam Leak MALF: E41MF0008, Failure E41-F002 MALF: E41RF0033 E41-F600 Breaker Trip SRO ROLE PLAY: Report 1 foot steam plume from packing gland on E4150-F001.

Respond to 1D66, 1D70 Enter 29.100.01 Sheet 5, Secondary Containment Control Directs Isolation of HPCI Brief Actions for Steam Leak/Scram.

Direct Mode Switch to Shutdown prior to MSO Temperature.(CT-1)

Directs Scram report from ATC and BOP Enter 29.100.01 Sheet 1, RPV Control Direct 173 to 214 inches level band and 900 to 1050 psig pressure band May direct ATC to perform AOP 20.000.21 ATC Places Reactor Mode Switch in Shutdown when directed (CT 1)

Provides Scram report.

Verifies all control rods are fully inserted.

Perform actions in AOP 20.000.21 BOP Respond to 1D70, 1D66 Reports failure of HPCI to isolate - E41-F600 failed to close Provides scram report.

Dispatch operator to check MCC for E41-F600.(2PB1-1C)

Maintains level and pressure as directed Appendix D, Page 39 of 39

Appendix D Required Operator Actions Form ES-D-2 Op-Test No.:2013-1 Scenario No.: 3 Event No.: 7,8.9,10 Page 8 of 8 Event

Description:

>MSO temperature 2nd Area, ED, Isolate Steam Leak.

Time Position Applicant's Actions or Behavior

+75 min MALF: TA20TEN206ZOUT, Leak to 2nd Area MALF: B21MF0030, SRV H Failure SRO Brief for rising temperature in second area From 29.100.01 Sheet 5, Directs Open 5 SRVs ADS preferred(CT-2)

Direct RHR in Torus Cooling Confirm leak isolation by observing lowering room temperatures (CT 3)

ATC May report rising temperature in second area Place RHR in Torus Cooling May confirm lowering temperatures after E41-F600 closed BOP May report rising temperature in second area Opens 5 SRVs. Reports SRV H did not open. One other SRV opened. (CT 2)

Place RHR in Torus Cooling ROLE PLAY: When dispatched to E41-F600, report (after ED) that fuses are blown, getting new fuses.

ROLE PLAY: After blown fuse report, wait 3 min and report new fuses installed standing by to close breaker for E41-F600.

Direct operator to close breaker for E41-F600 ROLE PLAY: (trigger step) report breaker closed.

Report E41-F600 closed - leak isolated (CT 3)

May confirm lowering temperatures after E41-F600 closed Appendix D, Page 39 of 39