DTE Energy Company 6400 North Dixie Highway Newport, MI 48166 DTYE Confidential Material Enclosed - Withhold Under 10 CFR 2.390 June 14, 2021 10 CFR 55.40 NRC-21-0039 Ms. Patricia J. Pelke Chief, Operations Branch Division of Reactor Safety Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Fermi2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Fermi 2 Initial Licensed Operator Post-Exam Submittal Enclosed please find the post-exam submittal package for the Fermi 2 Initial License Examination that was delivered December 8, 2020. The following items are enclosed in the post-exam submittal package.

" A photocopy of each applicant's ungraded answer sheet

" Each applicant's original answer sheet (graded)

" The master examination with answer key, annotated with any changes made during exam administration

" Candidate questions and proctor responses during written exam administration

" Post written exam candidate comments with explanation of acceptance or rejection by Fermi 2 management

" Written exam seating chart

  • Completed Form ES-403-1, Written Examination Grading Quality Checklist Confidential Material Enclosed - Withhold Under 10 CFR 2.390 This enclosure contains confidential material. Upon separation from the rest of the enclosure, this enclosure cover sheet is DECONTROLLED.

USNRC NRC-21-0039 Page 2 Confidential Material Enclosed - Withhold Under 10 CFR 2.390

  • Written examination performance analysis per MNT16, Systematic Approach to Training Process (SAT).
  • Completed original Form ES-201-3, Examination Security Agreement The examination materials were developed using the appropriate guidance contained in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors,"

Revision 11.

If you have any questions or comments regarding the contents of the items listed above, please contact Mr. Justin Angel - Director, Nuclear Training at (734) 586-4055.

Sincerely, Justin Angel K'r-"

Director - Nuclear Training '

Enclosure (Confidential): Post Exam Submittal Package (Confidential) cc: [w/o Enclosure]

NRC Project Manager Reactor Projects Chief, Branch 5, Region III NRC Resident Office Document Control Desk, Washington DC Confidential Material Enclosed - Withhold Under 10 CFR 2.390 The enclosure to this letter contains confidential material.

Upon separation from the enclosure, this cover letter is DECONTROLLED.

Enclosure to NRC-21-0039 Post Exam Submittal Package (Confidential)

This enclosure contains confidential material. Upon separation from the rest of the enclosure, this enclosure cover sheet is DECONTROLLED.

Post-Exam Comments for Fermi 2 2021 ILT NRC Exam.

Date: 6/2/2021 Exam Team Members: S. Schmus, J. Vanbrunt, Andrew Spencer Examinees: J. Moore, G. Pezzino All questions were reviewed and no changes to the exam or any of its questions are necessary due to the post-exam review.