ML21327A427
| ML21327A427 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/16/2021 |
| From: | Joseph Demarshall NRC/RGN-III/DRS/OLB |
| To: | DTE Energy |
| Demarshall J | |
| Shared Package | |
| ML20055D900 | List: |
| References | |
| NRC-21-0039 | |
| Download: ML21327A427 (4) | |
Text
DTE Energy Company 6400 North Dixie Highway Newport, MI 48166 DTYE Confidential Material Enclosed - Withhold Under 10 CFR 2.390 June 14, 2021 10 CFR 55.40 NRC-21-0039 Ms. Patricia J. Pelke Chief, Operations Branch Division of Reactor Safety Region III U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Fermi2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Fermi 2 Initial Licensed Operator Post-Exam Submittal Enclosed please find the post-exam submittal package for the Fermi 2 Initial License Examination that was delivered December 8, 2020. The following items are enclosed in the post-exam submittal package.
A photocopy of each applicant's ungraded answer sheet Each applicant's original answer sheet (graded)
The master examination with answer key, annotated with any changes made during exam administration Candidate questions and proctor responses during written exam administration Post written exam candidate comments with explanation of acceptance or rejection by Fermi 2 management Written exam seating chart Completed Form ES-403-1, Written Examination Grading Quality Checklist Confidential Material Enclosed - Withhold Under 10 CFR 2.390 This enclosure contains confidential material. Upon separation from the rest of the enclosure, this enclosure cover sheet is DECONTROLLED.
USNRC NRC-21-0039 Page 2 Confidential Material Enclosed - Withhold Under 10 CFR 2.390 Written examination performance analysis per MNT16, Systematic Approach to Training Process (SAT).
- Completed original Form ES-201-3, Examination Security Agreement The examination materials were developed using the appropriate guidance contained in NUREG-1021, "Operator Licensing Examination Standards for Power Reactors,"
Revision 11.
If you have any questions or comments regarding the contents of the items listed above, please contact Mr. Justin Angel - Director, Nuclear Training at (734) 586-4055.
Sincerely, Justin Angel K'r-"
Director - Nuclear Training Enclosure (Confidential): Post Exam Submittal Package (Confidential) cc:
[w/o Enclosure]
NRC Project Manager Reactor Projects Chief, Branch 5, Region III NRC Resident Office Document Control Desk, Washington DC Confidential Material Enclosed - Withhold Under 10 CFR 2.390 The enclosure to this letter contains confidential material.
Upon separation from the enclosure, this cover letter is DECONTROLLED.
Enclosure to NRC-21-0039 Post Exam Submittal Package (Confidential)
This enclosure contains confidential material. Upon separation from the rest of the enclosure, this enclosure cover sheet is DECONTROLLED.
Post-Exam Comments for Fermi 2 2021 ILT NRC Exam.
Date: 6/2/2021 Exam Team Members: S. Schmus, J. Vanbrunt, Andrew Spencer Examinees: J. Moore, G. Pezzino All questions were reviewed and no changes to the exam or any of its questions are necessary due to the post-exam review.