ML21327A106

From kanterella
Jump to navigation Jump to search
Proposed Exam Submittal Letter
ML21327A106
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/16/2021
From: Joseph Demarshall
NRC/RGN-III/DRS/OLB
To:
Demarshall J
Shared Package
ML20055D852 List:
References
NRC-21-0017
Download: ML21327A106 (3)


Text

DTE Electric Company 6400 N. Dixie Highway Newport, MI 48166 Confidential Material Enclosed - Withhold Under 10 CFR 2.390 March 1, 2021 10 CFR 55.40 NRC-21-0017 Ms. Patricia J. Pelke, Chief, Operations Branch Division of Reactor Safety Region III U.S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, Illinois 60532-4352 Fermi 2 Power Plant NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Fermi 2 Initial Licensed Operator Examination Materials Enclosed please find the proposed examination materials for the upcoming Fermi 2 Initial License Examination that is scheduled to begin the week of May 10, 2021. The following items are enclosed:

  • Modified Examination Outlines (modified during the examination development process)
  • Three (3) Simulator Scenarios
  • Supporting Reference Material
  • Quality Verification Checklists from NUREG-1021, Revision 11 The examination materials were developed using the appropriate guidance contained in NUREG-1021, Operator Licensing Examination Standards for Power Reactors, Revision 11.

The examination materials shall be withheld from public disclosure until after the examinations are complete.

We look forward to working with you and your examination team during the examination development and administration process. If you have any questions or comments regarding the contents of the items listed above, please contact Mr. Andrew Pullam, Director - Nuclear Training, at (734) 586-4055.

This enclosure contains confidential material. Upon separation from the subsequent pages, this cover sheet is DECONTROLLED.

USNRC NRC-21-0017 Page 2 Confidential Material Enclosed - Withhold Under 10 CFR 2.390 No new commitments are being made in this submittal.

Sincerely, Andrew Pullam Director - Nuclear Training

Enclosure:

Fermi 2 Initial Licensed Operator Examination Materials cc: [w/o enclosure(s)]

NRC Project Manager Reactor Projects Chief, Branch 5, Region III NRC Resident Office This enclosure contains confidential material. Upon separation from the subsequent pages, this cover sheet is DECONTROLLED.

Confidential Material Enclosed - Withhold Under 10 CFR 2.390 Enclosure to NRC-21-0017 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 Fermi 2 Initial Licensed Operator Examination Materials This enclosure contains confidential material. Upon separation from the subsequent pages, this cover sheet is DECONTROLLED.