ES-201 Facility:
Date of Examination:
Developed:
Written:
Facility:
NRC:
//
Operating:
Facility:
NRC:
Days from Exam Target Date*
Chief Examiner's Initials
-240 09/12/2020 JD 1/24/2020
-210 10/12/2020 JD 1/24/2020
-210 10/12/2020 JD 1/24/2020 (exam sec. only);
JD 5/28/2020
-210 10/12/2020 JD 2/10/2020
-210 10/12/2020 JD 6/01/2020
-195 10/27/2020 JD 1/24/2020 (Draft);
JD 2/7/2020 (Rev 0)
-150 12/11/2020 JD 4/16/2020
-136 12/25/2020 JD 4/30/2020
-75 02/26/2021 03/02/2021*
JD 03/02/2021 (Operating Test)
-75 02/26/2021 01/20/2021**
JD 1/08/2021 (Written Exam)
-60 03/11/2021 JD 3/11/2021
-50 03/21/2021 JD 1/20/2021 (Written);
JD 3/11/2021 (Op Test)
-35 04/05/2021 JD 1/22/2021 (Written);
JD 3/16/2021 (Op Test)
-35 04/05/2021 JD 4/05/2021
-30 04/10/2021 JD 4/09/2021
-14 04/26/2021 JD 4/26/2021
-7 05/03/2021 JD 5/03/2021
-7 05/03/2021 JD 5/03/2021
-7 05/03/2021 JD 5/03/2021
-7 05/03/2021 JD 5/03/2021
-7 05/03/2021 JD 5/03/2021
- 17. Request facility licensee management feedback on the examination (C.2.l).
- 18. Final applications reviewed; one or two (if more than 10) applications audited to confirm qualifications/eligibility; and examination approval and waiver/excusal letters sent (C.2.k; ; ES-202, C.3.j; ES-204).
- 19. Proctoring/written exam administration guidelines reviewed with facility licensee (C.3.k).
- 20. Approved scenarios and job performance measures distributed to NRC examiners (C.3.i).
- 12. Written exam and operating test reviews completed (C.3.f).
13b. The NRC and the facility licensee conduct exam preparatory week.
- 14. Preliminary license applications and waiver/excusal requests, as applicable (NRC Form 398) due (C.1.m; C.2.i; ES-202).
- 15. Final license applications and waiver/excusal requests, as applicable (NRC Form 398), due and Form ES-201-4 prepared (C.1.m; C.2.k; ES-202).
- 16. Written examinations and operating tests approved by the NRC supervisor (C.2.j-k; C.3.h).
13a. Examination review results discussed between the NRC and facility licensee (C.1.i; C.1.k-l; C.2.h; C.3.g).
- 7. Operating test outline(s) and other checklists due, including Forms ES-201-2, ES-201-3, ES-301-1, ES-301-2, ES-301-5, and ES-D-1, as applicable (C.1.e-f; C.3.d-e).
- 8. Operating test outline(s) reviewed by the facility licensee and feedback provided to the NRC (C.2.h; C.3.d-e). (Operating Test outlines prepared by NRC.)
- 9. Proposed examinations (written, JPMs, and scenarios, as applicable) and outlines (Forms ES-301-1, ES-301-2, ES-D-1, ES-401-1/2 or ES-401N-1/2, and ES-401-3 or ES-401N-3);
supporting documentation (including Forms ES-301-3, ES-301-4, ES-301-5, ES-301-6, ES-401-6, ES-401N-6, and any Form ES-201-2 and ES-201-3 updates); and reference materials due (C.1.e-h; C.3.d). *Target date adjusted by Chief Examiner in coordination with Licensee.
- 10. Examinations prepared by the NRC are approved by the NRC supervisor and forwarded for facility licensee review (C.1.i; C.2.h; C.3.f-g); Form ES-401-6. (Written Exam prepared by NRC.)
- Target date adjusted for NRC developed exam.
- 11. Preliminary waiver/excusal requests due (C.1.m; C.2.c; ES-202).
Task Description (Reference)
- 1. Examination administration date confirmed (C.1.a; C.2.a-b). For NRC-prepared exams, arrangements are made for the facility to submit reference materials (C.1.e; C.3.c; Attachment 3).
Form ES-201-1 05/10/2021 Fermi Power Plant, Unit 2 Examination Preparation Checklist
- 2. NRC examiners and facility contact assigned (C.1.d; C.2.f).
- 3. Facility contact briefed on security and other requirements (C.2.c). As applicable, the facility contact submits to the NRC any prescreened K/As for elimination from the written examination outline, with a description of the facilitys prescreening process (ES-401, D.1.b).
- 4. Reference material due for NRC-prepared exams (C.1.e; C.3.c; Attachment 3).
- 5. Corporate notification letter sent (C.2.e).
- 6. NRC-developed written examination outline (ES-401-1/2 or ES-401N-1/2 and ES-401-3 or ES-401N-3) sent to facility contact (must be on the exam security agreement) (C.1.e-f; C.2.h; C.3.d-e).
Exam Date:
05/10/2021
- Target dates are based on facility prepared examinations and the examination date identified in the corporate notification letter. These dates are for planning purposes and may be adjusted on a case by case basis in coordination with the facility licensee. (Exam date changed from 5/10/2021 to 5/24/2021 due to COVID impact.)