{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 24, 2014  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 24, 2014 Mr. Thomas D. Gatlin Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065
 
Mr. Thomas D. Gatlin Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065  


==SUBJECT:==
==SUBJECT:==
VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION  
VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION


==Dear Mr. Gatlin:==
==Dear Mr. Gatlin:==


The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Virgil C. Summer Nuclear Station during the weeks of weeks of August 4 - 8 and August 18 - 22, 2014. The inspection team will be led by Ryan Taylor, a Senior Project Inspector, from the NRC's Region II office. This inspection will be conducted in accordance with the baseline inspection procedure (IP) 71152, Problem Identification and Resolution, issued on January 13, 2013.  
The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Virgil C. Summer Nuclear Station during the weeks of weeks of August 4 - 8 and August 18 - 22, 2014. The inspection team will be led by Ryan Taylor, a Senior Project Inspector, from the NRCs Region II office. This inspection will be conducted in accordance with the baseline inspection procedure (IP) 71152, Problem Identification and Resolution, issued on January 13, 2013.
 
The biennial PI&R inspection and assessment of the licensees corrective action program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.
The biennial PI&R inspection and assessment of the licensee's corrective action program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.  
On June 23, 2014, Mr. Taylor confirmed, with Mr. Michael Moore of your staff, arrangements for the 2-week onsite inspection.
 
On June 23, 2014, Mr. Taylor confirmed, with Mr. Michael Moore of your staff, arrangements for the 2-week onsite inspection.  
 
The Enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than July 21, 2014. Contact Mr. Taylor with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
The Enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than July 21, 2014. Contact Mr. Taylor with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Taylor will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during T. Gatlin 2 the inspection; access to licensee computers; working space; arrangements for site access; and
If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Taylor will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during
 
other applicable information.
 
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document R oom, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Offi ce of Management and Budget control number.


T. Gatlin                                      2 the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Taylor at 404-997-4630.
Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Taylor at 404-997-4630.
Sincerely,        
Sincerely,
      /RA/  
                                                /RA/
 
Steven D. Rose, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket No. 50-395 License No. NPF-12
Steven D. Rose, Chief       Reactor Projects Branch 7 Division of Reactor Projects  
 
Docket No. 50-395 License No. NPF-12


==Enclosure:==
==Enclosure:==


Information Request for Virgil C. Summer Nuclear Station Problem Identification and Resolution Inspection cc: Distribution via Listserv
Information Request for Virgil C. Summer Nuclear Station Problem Identification and Resolution Inspection cc: Distribution via Listserv


SUNSI REVIEW COMPLETE     FORM 665 ATTACHED OFFICE RII:DRP RII:DRP     SIGNATURE RCT /RA/ SDR /RA/     NAME RTaylor SRose     DATE 6/24/2014 6/24/2014     E-MAIL COPY YES       NO YES       NO 3   Letter to Thomas D. Gatlin from Steven D. Rose dated June 22, 2014.  
SUNSI REVIEW COMPLETE     FORM 665 ATTACHED OFFICE                 RII:DRP       RII:DRP SIGNATURE             RCT /RA/     SDR /RA/
NAME                   RTaylor       SRose DATE                 6/24/2014     6/24/2014 E-MAIL COPY         YES     NO   YES     NO 3
Letter to Thomas D. Gatlin from Steven D. Rose dated June 22, 2014.


==SUBJECT:==
==SUBJECT:==
VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION DISTRIBUTION
VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION DISTRIBUTION:
: M. King, RII, DRP S. Ninh, RII, SR PE  
M. King, RII, DRP S. Ninh, RII, SR PE J. Reece, RII, SRI E. Coffman, RII, RI R. Taylor, RII, DRP S. Price, RII, EICS L. Douglas, RII EICS RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource
 
J. Reece, RII, SRI E. Coffman, RII, RI R. Taylor, RII, DRP S. Price, RII, EICS L. Douglas, RII EICS RIDSNRRDIRS  


PUBLIC RidsNrrPMSummer Resource Enclosure INFORMATION REQUEST FOR VIRGIL C. SUMMER NUCLEAR STATION PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (August 4 - 8, and August 18 - 22, 2014)   Note: Unless otherwise noted, the information requested below corresponds to documents generated since October 1, 2012. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
INFORMATION REQUEST FOR VIRGIL C. SUMMER NUCLEAR STATION PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (August 4 - 8, and August 18 - 22, 2014)
Note: Unless otherwise noted, the information requested below corresponds to documents generated since October 1, 2012. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program (CAP). This should include procedures related to:
: 1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program (CAP). This should include procedures related to:
(a)  Corrective action process (b) Cause evaluation (c)  Operating experience program (d)  Employee concerns program (e)  Self-assessment program (f)  Maintenance rule program and implementing procedures (g)  Operability determination process (h)  Degraded/non-conforming condition process (e.g., RIS 2013-20)
(a)  Corrective action process (b) Cause evaluation (c)  Operating experience program (d)  Employee concerns program (e)  Self-assessment program (f)  Maintenance rule program and implementing procedures (g)  Operability determination process (h)  Degraded/non-conforming condition process (e.g., RIS 2013-20)
(i)  System health process or equivalent equipment reliability improvement programs (j)  Preventive maintenance deferral and condition report (CR) extension process If any of the procedures requested above were revised after October 1, 2012, please provide (or have available) copies of all revisions during the onsite inspection.
(i)  System health process or equivalent equipment reliability improvement programs (j)  Preventive maintenance deferral and condition report (CR) extension process If any of the procedures requested above were revised after October 1, 2012, please provide (or have available) copies of all revisions during the onsite inspection.
: 2. List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions.
: 2. List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions.
: 3. List of all CRs initiated including the following information for each CR:  
: 3. List of all CRs initiated including the following information for each CR:
 
(a)  CR Number (b)  Brief, but complete problem description (c)  Priority or level (d)  Affected system (e)  Affected component (f)  Responsible plant department (g)  CR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).
(a)  CR Number (b)  Brief, but complete problem description (c)  Priority or level (d)  Affected system (e)  Affected component (f)  Responsible plant department (g)  CR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).
CR #             Problem           Priority System    Component       Org     Status CRXXX         A RHR Pump               2        RHR        2-RHR-      ENG      Open failed flow criteria                             PMP-A per SR 5.0.5.4 Enclosure
CR # Problem  PrioritySystem Component Org Status CRXXX "A" RHR Pump failed flow criteria  


per SR 5.0.5.4 2 RHR 2-RHR-PMP-A ENG Open 2  Enclosure 4. List of outstanding corrective actions including the following information for each action:
2
(a) Corrective action number (b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.) (c) Brief, but complete corrective action description (d) Associated problem identification process (PIP) number (e) Corrective action initiation date (f) Number of Extensions (g) Corrective action due date (h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).
: 4.     List of outstanding corrective actions including the following information for each action:
Corrective Action # Type Description PIP Initiation Date Extensions Due Date StatusAR0034 CAPR Revise Procedure NGK-003-4585 PIP0058 01/05/12 2 06/15/12Closed
(a) Corrective action number (b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)
: 5. List of control room deficiencies with a brief description and corresponding CR and/or work order (WO) number.
(c) Brief, but complete corrective action description (d) Associated problem identification process (PIP) number (e) Corrective action initiation date (f) Number of Extensions (g) Corrective action due date (h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).
: 6. List of operator workarounds and operator burdens with a brief description and corresponding CR number.
Corrective Type           Description         PIP     Initiation Extensions       Due       Status Action #                                                  Date                     Date AR0034        CAPR Revise                   PIP0058   01/05/12         2       06/15/12 Closed Procedure NGK-003-4585
: 7. List of all currently extended CRs or overdue, sorted by initiation date , with the following information:  
: 5.     List of control room deficiencies with a brief description and corresponding CR and/or work order (WO) number.
 
: 6.     List of operator workarounds and operator burdens with a brief description and corresponding CR number.
a) CR number b) Priority or Significance c) CR title and short description
: 7.     List of all currently extended CRs or overdue, sorted by initiation date, with the following information:
: 8. List of all CRs that have been voided or cancelled. Please provide the following information for each CR:  
a) CR number b) Priority or Significance c) CR title and short description
 
: 8.     List of all CRs that have been voided or cancelled. Please provide the following information for each CR:
a) CR number b) Brief, but complete problem description c) Reason voided or cancelled
a) CR number b) Brief, but complete problem description c) Reason voided or cancelled
: 9. List of all structures, systems, and components (SSCs) that were classified as (a)(1) in accordance with the Maintenance Rule since October 1, 2012. Please include the following information for each system in (a)(1):
: 9.     List of all structures, systems, and components (SSCs) that were classified as (a)(1) in accordance with the Maintenance Rule since October 1, 2012. Please include the following information for each system in (a)(1):
(a) Date of classification in (a)(1) (b) Reason for being placed in (a)(1)
(a) Date of classification in (a)(1)
(c) Planned actions and their status Enclosure 10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems. Please include actions completed and current status.
(b) Reason for being placed in (a)(1)
: 11. List of corrective maintenance work orders. Please include the following information for each work order: 
(c) Planned actions and their status Enclosure
 
(a)  WO number  (b)  Brief, but complete work description  (c)  Affected system and components (c)  Date of initiation (d)  Date of completion (if completed)


3
: 10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems.
Please include actions completed and current status.
: 11. List of corrective maintenance work orders. Please include the following information for each work order:
(a)  WO number (b)  Brief, but complete work description (c)  Affected system and components (c)  Date of initiation (d)  Date of completion (if completed)
If possible, provide this list in a format compatible with spreadsheet software (example shown below)
If possible, provide this list in a format compatible with spreadsheet software (example shown below)
Work Order # Description System Component Initiation Date Due Date StatusWO01345 Replace breaker 2A-BKR-08-BB4 for 2A SI Pump. SI 2A-SI-PMP, BKR-08-BB4 01/05/12 03/15/12 Closed
Work         Description         System     Component     Initiation   Due      Status Order #                                                          Date     Date WO01345      Replace breaker           SI     2A-SI-PMP,     01/05/12   03/15/12 Closed 2A-BKR-08-BB4                      BKR-08-BB4 for 2A SI Pump.
: 12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and licensee-identified violations.
: 12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and licensee-identified violations.
: 13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) issued.
: 13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) issued.
: 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.) and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.), evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., CR number) for the documents that evaluated the  
: 14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)
 
and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.), evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., CR number) for the documents that evaluated the aforementioned OE information.
aforementioned OE information.
: 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the CAP.
: 15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the CAP.
: 16. Copies of all department self-assessments for those programs related to the CAP (e.g., Operating Experience, Maintenance Rule, etc.).
: 16. Copies of all department self-assessments for those programs related to the CAP (e.g., Operating Experience, Maintenance Rule, etc.).
: 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.
: 17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.
: 18. Copy of the latest CAP statistics (if exists) such as the number of CRs initiated by department, human performance errors by depar tment, and others as may be available.  
: 18. Copy of the latest CAP statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available.
Enclosure


4 Enclosure 19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
4
: 20. List of CRs related to equipment aging issues in the top ten risk-significant systems since October 1, 2009, (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, environmental qualification, etc.). Please provide the following information for each CR:
: 19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
a) CR number b) Priority c) CR problem description
: 20. List of CRs related to equipment aging issues in the top ten risk-significant systems since October 1, 2009, (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, environmental qualification, etc.). Please provide the following information for each CR:
a) CR number b) Priority c) CR problem description
: 21. If performed, please provide any recent self-assessment of the site safety culture.
: 21. If performed, please provide any recent self-assessment of the site safety culture.
: 22. Copies of CAP documents related to crosscutting issues (human performance, PI&R, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods.
: 22. Copies of CAP documents related to crosscutting issues (human performance, PI&R, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods.
: 23. List of all root cause evaluations with a brief description.
: 23. List of all root cause evaluations with a brief description.
: 24. Copy of Probabilistic Risk Assessment importance measures report, if available.
: 24. Copy of Probabilistic Risk Assessment importance measures report, if available.
: 25. System Health Reports, system design basis documents, and system description information for the top ten risk-significant systems.}}
: 25. System Health Reports, system design basis documents, and system description information for the top ten risk-significant systems.
Enclosure}}

Latest revision as of 19:22, 5 February 2020

Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection
ML14175A576
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/24/2014
From: Steven Rose
Reactor Projects Branch 7
To: Gatlin T
South Carolina Electric & Gas Co
References
Download: ML14175A576 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 June 24, 2014 Mr. Thomas D. Gatlin Vice President - Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88 Jenkinsville, SC 29065

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION

Dear Mr. Gatlin:

The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a problem identification and resolution (PI&R) inspection at your Virgil C. Summer Nuclear Station during the weeks of weeks of August 4 - 8 and August 18 - 22, 2014. The inspection team will be led by Ryan Taylor, a Senior Project Inspector, from the NRCs Region II office. This inspection will be conducted in accordance with the baseline inspection procedure (IP) 71152, Problem Identification and Resolution, issued on January 13, 2013.

The biennial PI&R inspection and assessment of the licensees corrective action program (CAP) complements and expands upon the resident baseline inspections of routine daily screening of all corrective action program issues, quarterly focused issue reviews, and semiannual trend PI&R reviews.

On June 23, 2014, Mr. Taylor confirmed, with Mr. Michael Moore of your staff, arrangements for the 2-week onsite inspection.

The Enclosure lists documents that will be needed prior to the inspection. Please have the referenced information available no later than July 21, 2014. Contact Mr. Taylor with any questions concerning the requested information. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for inspection preparation.

If additional documents are needed, they will be requested when identified. Prior to the onsite inspection, Mr. Taylor will discuss with your staff the following inspection support administrative details: availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection; method of tracking inspector requests during

T. Gatlin 2 the inspection; access to licensee computers; working space; arrangements for site access; and other applicable information.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter, and its Enclosure, will be available electronically for public inspection in the NRC Public Document Room, or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access Management System (ADAMS),

accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, under control number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement, unless the requesting document displays a currently valid Office of Management and Budget control number.

Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Taylor at 404-997-4630.

Sincerely,

/RA/

Steven D. Rose, Chief Reactor Projects Branch 7 Division of Reactor Projects Docket No. 50-395 License No. NPF-12

Enclosure:

Information Request for Virgil C. Summer Nuclear Station Problem Identification and Resolution Inspection cc: Distribution via Listserv

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE RCT /RA/ SDR /RA/

NAME RTaylor SRose DATE 6/24/2014 6/24/2014 E-MAIL COPY YES NO YES NO 3

Letter to Thomas D. Gatlin from Steven D. Rose dated June 22, 2014.

SUBJECT:

VIRGIL C. SUMMER NUCLEAR STATION - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION FOR NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION DISTRIBUTION:

M. King, RII, DRP S. Ninh, RII, SR PE J. Reece, RII, SRI E. Coffman, RII, RI R. Taylor, RII, DRP S. Price, RII, EICS L. Douglas, RII EICS RIDSNRRDIRS PUBLIC RidsNrrPMSummer Resource

INFORMATION REQUEST FOR VIRGIL C. SUMMER NUCLEAR STATION PROBLEM IDENTIFICATION AND RESOLUTION INSPECTION (August 4 - 8, and August 18 - 22, 2014)

Note: Unless otherwise noted, the information requested below corresponds to documents generated since October 1, 2012. Please provide the requested documents in electronic format. If the information is not available in electronic format, please contact the inspection team leader to coordinate other available methods to provide the information.

1. Copies of the corporate and site level procedures and sub-tier procedures associated with the corrective action program (CAP). This should include procedures related to:

(a) Corrective action process (b) Cause evaluation (c) Operating experience program (d) Employee concerns program (e) Self-assessment program (f) Maintenance rule program and implementing procedures (g) Operability determination process (h) Degraded/non-conforming condition process (e.g., RIS 2013-20)

(i) System health process or equivalent equipment reliability improvement programs (j) Preventive maintenance deferral and condition report (CR) extension process If any of the procedures requested above were revised after October 1, 2012, please provide (or have available) copies of all revisions during the onsite inspection.

2. List of top ten risk-significant systems, top ten risk-significant components for each one of the top ten risk-significant systems, and top ten risk-significant operator manual actions.
3. List of all CRs initiated including the following information for each CR:

(a) CR Number (b) Brief, but complete problem description (c) Priority or level (d) Affected system (e) Affected component (f) Responsible plant department (g) CR completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).

CR # Problem Priority System Component Org Status CRXXX A RHR Pump 2 RHR 2-RHR- ENG Open failed flow criteria PMP-A per SR 5.0.5.4 Enclosure

2

4. List of outstanding corrective actions including the following information for each action:

(a) Corrective action number (b) Corrective action type (e.g., corrective action to prevent recurrence, enhancement, maintenance rule evaluation, etc.)

(c) Brief, but complete corrective action description (d) Associated problem identification process (PIP) number (e) Corrective action initiation date (f) Number of Extensions (g) Corrective action due date (h) Completion status If possible, provide this list in a format compatible with spreadsheet software (example shown below).

Corrective Type Description PIP Initiation Extensions Due Status Action # Date Date AR0034 CAPR Revise PIP0058 01/05/12 2 06/15/12 Closed Procedure NGK-003-4585

5. List of control room deficiencies with a brief description and corresponding CR and/or work order (WO) number.
6. List of operator workarounds and operator burdens with a brief description and corresponding CR number.
7. List of all currently extended CRs or overdue, sorted by initiation date, with the following information:

a) CR number b) Priority or Significance c) CR title and short description

8. List of all CRs that have been voided or cancelled. Please provide the following information for each CR:

a) CR number b) Brief, but complete problem description c) Reason voided or cancelled

9. List of all structures, systems, and components (SSCs) that were classified as (a)(1) in accordance with the Maintenance Rule since October 1, 2012. Please include the following information for each system in (a)(1):

(a) Date of classification in (a)(1)

(b) Reason for being placed in (a)(1)

(c) Planned actions and their status Enclosure

3

10. List of Maintenance Preventable Functional Failures (MPFF) of risk significant systems.

Please include actions completed and current status.

11. List of corrective maintenance work orders. Please include the following information for each work order:

(a) WO number (b) Brief, but complete work description (c) Affected system and components (c) Date of initiation (d) Date of completion (if completed)

If possible, provide this list in a format compatible with spreadsheet software (example shown below)

Work Description System Component Initiation Due Status Order # Date Date WO01345 Replace breaker SI 2A-SI-PMP, 01/05/12 03/15/12 Closed 2A-BKR-08-BB4 BKR-08-BB4 for 2A SI Pump.

12. Corrective action closeout packages, including CRs with description of corrective actions, for all NRC findings and licensee-identified violations.
13. Corrective action closeout packages, including CRs with description of corrective actions, for all licensee event reports (LERs) issued.
14. List of all NRC generic communications (e.g., Information Notices, Generic Letters, etc.)

and industry operating experience (OE) documents (e.g., Part 21 reports, vendor information letters, information from other sites, etc.), evaluated by the site for applicability to the station, regardless of the determination of applicability. Please include the reference number (e.g., CR number) for the documents that evaluated the aforementioned OE information.

15. Copies of all quality assurance audits and/or assessments issued, including the last two audits/assessments of the CAP.
16. Copies of all department self-assessments for those programs related to the CAP (e.g., Operating Experience, Maintenance Rule, etc.).
17. Copy of the most recent integrated plant trend report, departmental trend report(s), and corrective action trend report, including any human performance and equipment reliability trends.
18. Copy of the latest CAP statistics (if exists) such as the number of CRs initiated by department, human performance errors by department, and others as may be available.

Enclosure

4

19. Copies of any minutes of meetings by the offsite safety review boards/groups. In addition, please provide a list of routine meetings involving the CAP to be held while team is onsite.
20. List of CRs related to equipment aging issues in the top ten risk-significant systems since October 1, 2009, (e.g., system erosion and/or corrosion problems; electronic component aging or obsolescence of circuit boards, power supplies, relays, environmental qualification, etc.). Please provide the following information for each CR:

a) CR number b) Priority c) CR problem description

21. If performed, please provide any recent self-assessment of the site safety culture.
22. Copies of CAP documents related to crosscutting issues (human performance, PI&R, and safety conscious work environment) identified via trending, self-assessments, safety review committee or other oversight methods.
23. List of all root cause evaluations with a brief description.
24. Copy of Probabilistic Risk Assessment importance measures report, if available.
25. System Health Reports, system design basis documents, and system description information for the top ten risk-significant systems.

Enclosure