ML16103A188: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(4 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16103A188
| number = ML16103A188
| issue date = 04/12/2016
| issue date = 04/12/2016
| title = 04/06/2016 Summary of Public Meeting Re Peach Bottom Atomic Power Station, Units 2 and 3
| title = Summary of Public Meeting Re Peach Bottom Atomic Power Station, Units 2 and 3
| author name = Schroeder D L
| author name = Schroeder D
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING SUMMARY
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING  


LICENSEE: EXELON GENERATION CO., LLC.
==SUMMARY==


FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3  
LICENSEE:      EXELON GENERATION CO., LLC.
FACILITY:       PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3


==SUBJECT:==
==SUBJECT:==
SUMMARY OF PUBLIC MEETING
On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.
A notice of the open house was issued on March 21, 2016, and was posted on the NRC's
external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349. ADAMS is accessible from the NRC Web page at:
http://www.nrc.gov/reading-rm/adams.html
. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights. 


==SUMMARY==
OF PUBLIC MEETING On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.
A notice of the open house was issued on March 21, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349.
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottom's performance and the role of the agency in ensuring safe plant operations.  
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
 
                                                      /RA/
          /RA/       ______________________
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115)
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects  
 
Enclosures  
 
Attendee List (ML16102A115)


ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottom's performance and the role of the agency in ensuring safe plant operations.  
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
      /RA/   Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects  
                                                                /RA/
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects


==Enclosures:==
==Enclosures:==


Attendee List (ML16102A115)
Attendee List (ML16102A115)
 
DISTRIBUTION w/encl: (via E-mail)       DSchroeder, DRP                      SSchmitt, DRP, AA DDorman, RA                             SBarber, DRP                         JBowen, RI, OEDO DLew, DRA                              ATurilin, DRP                       RidsNrrPMPeachBottom Res MScott, DRP                             BLin, DRP                           RidsNrrDorlLpl1-2 Res RMcKinley, DRP                         PMeier, DRP                         ROPreports Res RLorson, DRS                            JHeinly, DRP, SRI BSmith, DRS                            BSmith, DRP, RI DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive                           Publicly Available Sensitive                                Non-Publicly Available OFFICE   RI/DRP                 RI/DRP NAME     SBarber / GSB         DSchroeder/ DLS DATE     04/ 11 /16             04/ 11 /16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING
DISTRIBUTION w/encl: (via E-mail) DDorman, RA DLew, DRA  MScott, DRP RMcKinley, DRP RLorson, DRS BSmith, DRS DSchroeder, DRP SBarber, DRP ATurilin, DRP
 
BLin, DRP   PMeier, DRP JHeinly, DRP, SRI BSmith, DRP, RI SSchmitt, DRP, AA  JBowen, RI, OEDO    RidsNrrPMPeachBottom Res RidsNrrDorlLpl1-2 Res ROPreports Res DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No
.: ML16103A188 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP   NAME SBarber / GSB DSchroeder/ DLS   DATE 04/ 11 /16 04/ 11 /16  


UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA  19406-2713 April 12, 2016 MEETING SUMMARY
==SUMMARY==


LICENSEE: EXELON GENERATION CO., LLC.  
LICENSEE:       EXELON GENERATION CO., LLC.
 
FACILITY:       PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3  


==SUBJECT:==
==SUBJECT:==
SUMMARY OF PUBLIC MEETING
On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.
A notice of the open house was issued on March 21, 2016, and was posted on the NRC's
external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349. ADAMS is accessible from the NRC Web page at:
http://www.nrc.gov/reading-rm/adams.html
. The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights. 


==SUMMARY==
OF PUBLIC MEETING On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.
A notice of the open house was issued on March 21, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349.
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottom's performance and the role of the agency in ensuring safe plant operations.  
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
 
                                                      /RA/
          /RA/       ______________________
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115)
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects  
 
Enclosures  
 
Attendee List (ML16102A115)


ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottom's performance and the role of the agency in ensuring safe plant operations.  
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
      /RA/   Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects  
                                                                /RA/
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects


==Enclosures:==
==Enclosures:==


Attendee List (ML16102A115)
Attendee List (ML16102A115)
 
DISTRIBUTION w/encl: (via E-mail)       DSchroeder, DRP                      SSchmitt, DRP, AA DDorman, RA                             SBarber, DRP                         JBowen, RI, OEDO DLew, DRA                              ATurilin, DRP                       RidsNrrPMPeachBottom Res MScott, DRP                             BLin, DRP                           RidsNrrDorlLpl1-2 Res RMcKinley, DRP                         PMeier, DRP                         ROPreports Res RLorson, DRS                            JHeinly, DRP, SRI BSmith, DRS                            BSmith, DRP, RI DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive                           Publicly Available Sensitive                                Non-Publicly Available OFFICE   RI/DRP                 RI/DRP NAME     SBarber / GSB         DSchroeder/ DLS DATE     04/ 11 /16             04/ 11 /16}}
DISTRIBUTION w/encl: (via E-mail) DDorman, RA DLew, DRA  MScott, DRP RMcKinley, DRP RLorson, DRS BSmith, DRS DSchroeder, DRP SBarber, DRP ATurilin, DRP
 
BLin, DRP   PMeier, DRP JHeinly, DRP, SRI BSmith, DRP, RI SSchmitt, DRP, AA  JBowen, RI, OEDO    RidsNrrPMPeachBottom Res RidsNrrDorlLpl1-2 Res ROPreports Res DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No
.: ML16103A188 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP   NAME SBarber / GSB DSchroeder/ DLS   DATE 04/ 11 /16 04/ 11 /16}}

Latest revision as of 04:44, 5 February 2020

Summary of Public Meeting Re Peach Bottom Atomic Power Station, Units 2 and 3
ML16103A188
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 04/12/2016
From: Daniel Schroeder
Reactor Projects Region 1 Branch 4
To:
SCHROEDER, DL
Shared Package
ML16039A098 List:
References
Download: ML16103A188 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING

SUMMARY

LICENSEE: EXELON GENERATION CO., LLC.

FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.

A notice of the open house was issued on March 21, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115)

ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Attendee List (ML16102A115)

DISTRIBUTION w/encl: (via E-mail) DSchroeder, DRP SSchmitt, DRP, AA DDorman, RA SBarber, DRP JBowen, RI, OEDO DLew, DRA ATurilin, DRP RidsNrrPMPeachBottom Res MScott, DRP BLin, DRP RidsNrrDorlLpl1-2 Res RMcKinley, DRP PMeier, DRP ROPreports Res RLorson, DRS JHeinly, DRP, SRI BSmith, DRS BSmith, DRP, RI DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber / GSB DSchroeder/ DLS DATE 04/ 11 /16 04/ 11 /16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING

SUMMARY

LICENSEE: EXELON GENERATION CO., LLC.

FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

SUBJECT:

SUMMARY

OF PUBLIC MEETING On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.

A notice of the open house was issued on March 21, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349.

ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.

The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115)

ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.

Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:

www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.

A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.

/RA/

Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

Attendee List (ML16102A115)

DISTRIBUTION w/encl: (via E-mail) DSchroeder, DRP SSchmitt, DRP, AA DDorman, RA SBarber, DRP JBowen, RI, OEDO DLew, DRA ATurilin, DRP RidsNrrPMPeachBottom Res MScott, DRP BLin, DRP RidsNrrDorlLpl1-2 Res RMcKinley, DRP PMeier, DRP ROPreports Res RLorson, DRS JHeinly, DRP, SRI BSmith, DRS BSmith, DRP, RI DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber / GSB DSchroeder/ DLS DATE 04/ 11 /16 04/ 11 /16