ML16103A188: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(5 intermediate revisions by the same user not shown) | |||
Line 2: | Line 2: | ||
| number = ML16103A188 | | number = ML16103A188 | ||
| issue date = 04/12/2016 | | issue date = 04/12/2016 | ||
| title = | | title = Summary of Public Meeting Re Peach Bottom Atomic Power Station, Units 2 and 3 | ||
| author name = Schroeder D | | author name = Schroeder D | ||
| author affiliation = NRC/RGN-I/DRP/PB4 | | author affiliation = NRC/RGN-I/DRP/PB4 | ||
| addressee name = | | addressee name = | ||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING | ||
FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 | ==SUMMARY== | ||
LICENSEE: EXELON GENERATION CO., LLC. | |||
FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 | |||
==SUBJECT:== | ==SUBJECT:== | ||
On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015. | ==SUMMARY== | ||
OF PUBLIC MEETING On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015. | |||
A notice of the open house was issued on March 21, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349. | |||
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. | |||
The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights. | |||
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: | |||
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | |||
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations. | |||
/RA/ | |||
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115) | |||
ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights. | |||
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: | Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: | ||
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach | www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | ||
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations. | |||
/RA/ | |||
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects | |||
==Enclosures:== | ==Enclosures:== | ||
Attendee List (ML16102A115) | Attendee List (ML16102A115) | ||
DISTRIBUTION w/encl: | DISTRIBUTION w/encl: (via E-mail) DSchroeder, DRP SSchmitt, DRP, AA DDorman, RA SBarber, DRP JBowen, RI, OEDO DLew, DRA ATurilin, DRP RidsNrrPMPeachBottom Res MScott, DRP BLin, DRP RidsNrrDorlLpl1-2 Res RMcKinley, DRP PMeier, DRP ROPreports Res RLorson, DRS JHeinly, DRP, SRI BSmith, DRS BSmith, DRP, RI DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber / GSB DSchroeder/ DLS DATE 04/ 11 /16 04/ 11 /16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING | ||
==SUMMARY== | |||
FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 | LICENSEE: EXELON GENERATION CO., LLC. | ||
FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3 | |||
==SUBJECT:== | ==SUBJECT:== | ||
On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015. | ==SUMMARY== | ||
OF PUBLIC MEETING On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015. | |||
A notice of the open house was issued on March 21, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349. | |||
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. | |||
The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights. | |||
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: | |||
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | |||
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations. | |||
/RA/ | |||
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115) | |||
ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights. | |||
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: | Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at: | ||
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach | www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | ||
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations. | |||
/RA/ | |||
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects | |||
==Enclosures:== | ==Enclosures:== | ||
Attendee List (ML16102A115) | Attendee List (ML16102A115) | ||
DISTRIBUTION w/encl: | DISTRIBUTION w/encl: (via E-mail) DSchroeder, DRP SSchmitt, DRP, AA DDorman, RA SBarber, DRP JBowen, RI, OEDO DLew, DRA ATurilin, DRP RidsNrrPMPeachBottom Res MScott, DRP BLin, DRP RidsNrrDorlLpl1-2 Res RMcKinley, DRP PMeier, DRP ROPreports Res RLorson, DRS JHeinly, DRP, SRI BSmith, DRS BSmith, DRP, RI DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber / GSB DSchroeder/ DLS DATE 04/ 11 /16 04/ 11 /16}} |
Latest revision as of 03:44, 5 February 2020
ML16103A188 | |
Person / Time | |
---|---|
Site: | Peach Bottom |
Issue date: | 04/12/2016 |
From: | Daniel Schroeder Reactor Projects Region 1 Branch 4 |
To: | |
SCHROEDER, DL | |
Shared Package | |
ML16039A098 | List: |
References | |
Download: ML16103A188 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING
SUMMARY
LICENSEE: EXELON GENERATION CO., LLC.
FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
SUBJECT:
SUMMARY
OF PUBLIC MEETING On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.
A notice of the open house was issued on March 21, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349.
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
/RA/
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115)
ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
/RA/
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects
Enclosures:
Attendee List (ML16102A115)
DISTRIBUTION w/encl: (via E-mail) DSchroeder, DRP SSchmitt, DRP, AA DDorman, RA SBarber, DRP JBowen, RI, OEDO DLew, DRA ATurilin, DRP RidsNrrPMPeachBottom Res MScott, DRP BLin, DRP RidsNrrDorlLpl1-2 Res RMcKinley, DRP PMeier, DRP ROPreports Res RLorson, DRS JHeinly, DRP, SRI BSmith, DRS BSmith, DRP, RI DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber / GSB DSchroeder/ DLS DATE 04/ 11 /16 04/ 11 /16 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BLVD., SUITE 100 KING OF PRUSSIA, PA 19406-2713 April 12, 2016 MEETING
SUMMARY
LICENSEE: EXELON GENERATION CO., LLC.
FACILITY: PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3
SUBJECT:
SUMMARY
OF PUBLIC MEETING On April 6, 2016, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Peach Bottom Inn in Delta, PA. The NRC conducted the Annual Assessment Meeting to discuss its assessment of the safety performance at Peach Bottom Atomic Power Station for 2015.
A notice of the open house was issued on March 21, 2016, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML16081A349.
ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and handouts and met with members of the public to discuss its assessment of the safety performance of Peach Bottom (PB) Units 2 and 3 for the period of January 1 through December 31, 2015, as documented in our letter dated March 2, 2016 (ADAMS Accession No. ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
/RA/
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects Enclosures Attendee List (ML16102A115)
ML16060A376). The NRC poster boards presented included background on the Reactor Oversight Process (ROP) and PB performance highlights.
Additional information relative to the NRC's Annual Assessment Process and the safety performance of Peach Bottom Units 2 and 3 can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
A member of the public, a State official, and Exelon officials attended the open-house and were offered the opportunity to question the NRC regarding Peach Bottoms performance and the role of the agency in ensuring safe plant operations.
/RA/
Daniel L. Schroeder, Chief Projects Branch 4 Division of Reactor Projects
Enclosures:
Attendee List (ML16102A115)
DISTRIBUTION w/encl: (via E-mail) DSchroeder, DRP SSchmitt, DRP, AA DDorman, RA SBarber, DRP JBowen, RI, OEDO DLew, DRA ATurilin, DRP RidsNrrPMPeachBottom Res MScott, DRP BLin, DRP RidsNrrDorlLpl1-2 Res RMcKinley, DRP PMeier, DRP ROPreports Res RLorson, DRS JHeinly, DRP, SRI BSmith, DRS BSmith, DRP, RI DOC NAME: G:\DRP\BRANCH4\Communications\Public Meetings\2016\2016 PB Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML16103A188 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME SBarber / GSB DSchroeder/ DLS DATE 04/ 11 /16 04/ 11 /16