ML16355A015: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(9 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16355A015
| number = ML16355A015
| issue date = 12/15/2016
| issue date = 12/15/2016
| title = San Onofre Nuclear Generating Station, Units 1, 2 and 3, Independent Spent Fuel Storage Installation (ISFSI) - Amendment Applications 226, 273, and 258 Only Emergency Plan (Ioep) and ISFSl-Only Emergency Action Level Scheme (Ioeal)
| title = Independent Spent Fuel Storage Installation (ISFSI) - Amendment Applications 226, 273, and 258 Only Emergency Plan (Ioep) and ISFSl-Only Emergency Action Level Scheme (Ioeal)
| author name = Palmisano T J
| author name = Palmisano T
| author affiliation = Southern California Edison Co
| author affiliation = Southern California Edison Co
| addressee name =  
| addressee name =  
Line 12: Line 12:
| document type = Emergency Preparedness-Emergency Plan, Letter
| document type = Emergency Preparedness-Emergency Plan, Letter
| page count = 81
| page count = 81
| project =
| stage = Other
}}
}}


=Text=
=Text=
{{#Wiki_filter:I_ ;I CALIFORNIA EDISON*
{{#Wiki_filter:;I ~vi SO~T"'"" CALIFORNIA                                                               Thomas J. Palmisano
Thomas J. Palmisano Vice President Decommissioning  
    ~          EDISON*                                                                    Vice President Decommissioning &
& Chief Nuclear Officer An EDISON INTERNATIONAL Company December 15, 2016 U.S. Nuclear Regulatory Commission Attention:
Chief Nuclear Officer An EDISON INTERNATIONAL Company December 15, 2016 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 12-oL-//
Document Control Desk Washington, DC 20555-0001 12-oL-//  


==Subject:==
==Subject:==
 
Docket No. 50-361, 50-362, 50-206 Amendment Applications 226, 273, and 258 Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (IOEP) and ISFSl-Only Emergency Action Level Scheme (IOEAL)
Docket No. 50-361, 50-362, 50-206 Amendment Applications 226, 273, and 258 Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (IOEP) and ISFSl-Only Emergency Action Level Scheme (IOEAL) San Onofre Nuclear Generating  
San Onofre Nuclear Generating Station, Units 1, 2 and 3
: Station, Units 1, 2 and 3  


==References:==
==References:==
(1) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC}, dated June 28, 2013;  
(1) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC}, dated June 28, 2013;  


==Subject:==
==Subject:==
 
Docket No. 50-362, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating S~ation, Unit 3 (ADAMS Accession No. ML13183A391)
Docket No. 50-362, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating Unit 3 (ADAMS Accession No. ML 13183A391)  
(2) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC) dated July 22, 2013;  
(2) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC) dated July 22, 2013;  


==Subject:==
==Subject:==
 
Docket No. 50-361, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating Station, Unit 2 (ADAMS Accession Number ML13204A304)
Docket No. 50-361, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating  
: Station, Unit 2 (ADAMS Accession Number ML 13204A304)  
(3) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated September 23, 2014;  
(3) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated September 23, 2014;  


==Subject:==
==Subject:==
 
Docket Nos. 50-361 and 50-362, San Onofre Nuclear Generating Station, Units 2 and 3, Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML14269A033)
Docket Nos. 50-361 and 50-362, San Onofre Nuclear Generating  
: Station, Units 2 and 3, Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML 14269A033)  
(4) Letter from T.J. Wengert (NRC) to T.J. Palmisano (SCE) dated June 5, 2015;  
(4) Letter from T.J. Wengert (NRC) to T.J. Palmisano (SCE) dated June 5, 2015;  


==Subject:==
==Subject:==
San Onofre Nuclear Generating Station, Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation - Issuance of Amendments Re: Changes To The Emergency Plan (TAC NOS. MF3841, MF3842, and MF3843) (ADAMS Accession No.ML15126A461)
Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2
            . and 3, respectively. The proposed amendments would revise the SONGS Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action Level (EAL) scheme into an ISFSl-Only EAL (IOEAL) scheme. The proposed changes are b*eing submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4), 10 CFR 50, Appendix E, Section IV.B.2, and 10 CFR 72.44(f).
P.O. Box 128 San Clemente, CA 92674 (949) 368-6575 Fax: (949) 368-6183 tom.palmisano@sc.e.com I_


San Onofre Nuclear Generating
Document Control Desk                         2                           December 15, 2016 By letters dated June 28, 2013 (Reference 1) and July 22, 2013 (Reference 2), SCE submitted the certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1 )(ii). Consequently, as specified in 10 CFR 50.82(a)(2), the 10 CFR Part 50 licenses for SONGS Units 2 and 3 no longer authorize operation of the reactor, or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all Unit 2 and 3 spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019 (with a potential early finish date of mid-2018). In addition, SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase. Above-ground structures have been dismantled. Unit 1 fuel is stored in the Independent Spent Fuel Storage Installation and in the GE-Hitachi Morris facility. To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.
: Station, Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation
The proposed emergency plan continues to rely on previously granted exemptions from certain emergency planning requirements (Reference 4), as the basis for these exemptions has not changed and remains in effect. to this letter contains a description, technical analysis, significant hazards determination, and environmental considerations evaluation for the proposed amendment.
-Issuance of Amendments Re: Changes To The Emergency Plan (TAC NOS. MF3841, MF3842, and MF3843) (ADAMS Accession No.ML 15126A461)
Enclosures 1 and 2 to this letter provide the proposed emergency plan and the EAL bases document (including EAL scheme), respectively.
Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2 . and 3, respectively.
SCE requests approval of these amendment applications by November 30, 2017. Once approved, the amendment will be implemented within 60 days following SCE's submittal of a written certification to the NRC that all spent nuclear fuel assemblies have been transferred out of the spent fuel pools and placed in storage within the ISFSI.
The proposed amendments would revise the SONGS Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action Level (EAL) scheme into an ISFSl-Only EAL (IOEAL) scheme. The proposed changes are b*eing submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4),
In accordance with 10 CFR 50.91 (b), SCE is notifying the State of California of this request for license amendment by providing a copy of this letter and its enclosures.
10 CFR 50, Appendix E, Section IV.B.2, and 10 CFR 72.44(f).
P.O. Box 128 San Clemente, CA 92674 (949) 368-6575 Fax: (949) 368-6183 tom.palmisano@sc.e.com Document Control Desk 2 December 15, 2016 By letters dated June 28, 2013 (Reference  
: 1) and July 22, 2013 (Reference 2), SCE submitted the certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 1 O CFR 50.82(a)(1  
)(ii). Consequently, as specified in 1 O CFR 50.82(a)(2),
the 1 O CFR Part 50 licenses for SONGS Units 2 and 3 no longer authorize operation of the reactor, or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all Unit 2 and 3 spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019 (with a potential early finish date of mid-2018).
In addition, SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase. Above-ground structures have been dismantled.
Unit 1 fuel is stored in the Independent Spent Fuel Storage Installation and in the GE-Hitachi Morris facility.
To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.
The proposed emergency plan continues to rely on previously granted exemptions from certain emergency planning requirements (Reference 4), as the basis for these exemptions has not changed and remains in effect. Attachment 1 to this letter contains a description, technical  
: analysis, significant hazards determination, and environmental considerations evaluation for the proposed amendment.
Enclosures 1 and 2 to this letter provide the proposed emergency plan and the EAL bases document (including EAL scheme),
respectively.
SCE requests approval of these amendment applications by November 30, 2017. Once approved, the amendment will be implemented within 60 days following SCE's submittal of a written certification to the NRC that all spent nuclear fuel assemblies have been transferred out of the spent fuel pools and placed in storage within the ISFSI. In accordance with 1 O CFR 50.91 (b), SCE is notifying the State of California of this request for license amendment by providing a copy of this letter and its enclosures.
There are no new regulatory commitments in this letter or the enclosures.
There are no new regulatory commitments in this letter or the enclosures.
Please contact Mr. James Kay at (949) 368-7 418 if you have any questions or require additional information.
Please contact Mr. James Kay at (949) 368-7 418 if you have any questions or require additional information.
I declare under penalty of perjury that the foregoing is true and correct.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on ' z....(. .r/ '"2-c.. / G.. (Date) Sincerely, Document Control Desk 3 December 15, 2016 Attachments:
Executed on '     z....(.
Discussion of Change, Technical  
(Date)
: Analysis, Significant Hazards Determination and Environmental Considerations  
                          .r/'"2- c.. / G..
Sincerely, 07~
 
Document Control Desk                       3                               December 15, 2016 Attachments: Discussion of Change, Technical Analysis, Significant Hazards Determination and Environmental Considerations


==Enclosures:==
==Enclosures:==
: 1. ISFSl-Only Emergency Plan 2. ISFSl-Only Emergency Action Level Technical Bases Document cc: K. Kennedy, Regional Administrator, NRC Region IV M. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 S. Y. Hsu, California Department of Public Health, Radiologic Health Branch ATTACHMENT 1 LICENSE AMENDMENT REQUESTS 226, 273, and 258: ISFSl-ONL Y EMERGENCY PLAN (IOEP) AND EMERGENCY ACTION LEVEL (EAL) SCHEME DISCUSSION OF CHANGE, TECHNICAL  
: 1. ISFSl-Only Emergency Plan
: ANALYSIS, SIGNIFICANT HAZARDS DETERMINATION, AND ENVIRONMENTAL CONSIDERATIONS EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level {EAL) Scheme DISCUSSION OF CHANGE, TECHNICAL  
: 2. ISFSl-Only Emergency Action Level Technical Bases Document cc:   K. Kennedy, Regional Administrator, NRC Region IV M. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 S. Y. Hsu, California Department of Public Health, Radiologic Health Branch
: ANALYSIS, SIGNIFICANT HAZARDS DETERMINATION AND ENVIRONMENTAL CONSIDERATIONS 1.0 SUMMARY DESCRIPTION Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, respectively.
 
The proposed amendments would revise the Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action level (EAL) scheme into an IFSl-Only EAL (IOEAL) scheme. The proposed changes are being submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4),
ATTACHMENT 1 LICENSE AMENDMENT REQUESTS 226, 273, and 258:
10 CFR 50, Appendix E, Section IV.B.2, and 10 CFR 72.44(f).
ISFSl-ONLY EMERGENCY PLAN (IOEP)
By letters dated June 28, 2013 (Reference  
AND EMERGENCY ACTION LEVEL (EAL) SCHEME DISCUSSION OF CHANGE, TECHNICAL ANALYSIS, SIGNIFICANT HAZARDS DETERMINATION, AND ENVIRONMENTAL CONSIDERATIONS
: 1) and July 22, 2013 (Reference 2), SCE submitted the certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1  
 
)(ii). Consequently, as specified in 10 CFR 50.82(a)(2),
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level {EAL) Scheme DISCUSSION OF CHANGE, TECHNICAL ANALYSIS, SIGNIFICANT HAZARDS DETERMINATION AND ENVIRONMENTAL CONSIDERATIONS 1.0  
the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. In addition, SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase. Above-ground structures have been dismantled.
 
Unit 1 fuel is stored in the Independent Spent Fuel Storage Installation and in the GE-Hitachi Morris facility.
==SUMMARY==
DESCRIPTION Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, respectively. The proposed amendments would revise the Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action level (EAL) scheme into an IFSl-Only EAL (IOEAL) scheme. The proposed changes are being submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4), 10 CFR 50, Appendix E, Section IV.B.2, and 10 CFR 72.44(f).
By letters dated June 28, 2013 (Reference 1) and July 22, 2013 (Reference 2), SCE submitted the certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1 )(ii). Consequently, as specified in 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. In addition, SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase. Above-ground structures have been dismantled. Unit 1 fuel is stored in the Independent Spent Fuel Storage Installation and in the GE-Hitachi Morris facility.
To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.
To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.
The proposed IOEP is for the operation of the ISFSI. This plan would only be implemented after all spent fuel has been removed from the spent fuel pools and placed in dry storage within the ISFSI. Implementation of the IOEP would involve SONGS applying administrative controls for methods to control the potential dispersal of radiological source material.
The proposed IOEP is for the operation of the ISFSI. This plan would only be implemented after all spent fuel has been removed from the spent fuel pools and placed in dry storage within the ISFSI. Implementation of the IOEP would involve SONGS applying administrative controls for methods to control the potential dispersal of radiological source material.
The proposed IOEP continues to rely on previously granted exemptions from certain emergency planning requirements (Reference  
The proposed IOEP continues to rely on previously granted exemptions from certain emergency planning requirements (Reference 4) as the basis for these exemptions has not changed and remains in effect.
: 4) as the basis for these exemptions has not changed and remains in effect. There are no existing license amendment requests associated with the emergency plan currently docketed for SONGS. Therefore, no disposition of other license changes, as they relate to this license amendment  
There are no existing license amendment requests associated with the emergency plan currently docketed for SONGS. Therefore, no disposition of other license changes, as they relate to this license amendment request, is needed. Consistent with the condition that the proposed IOEP may be implemented only after all spent fuel has been removed from the spent fuel pool and placed in dry storage within the ISFSI, SCE License Amendment Applications 225, 272, and 257 (dockets 50-206, 50-361 and 50-362, respectively) (Reference 5), *proposed a revision to the Technical Specification 4.3, "Fuel Storage," stating spent fuel shall not be stored in the spent fuel pool.
: request, is needed. Consistent with the condition that the proposed IOEP may be implemented only after all spent fuel has been removed from the spent fuel pool and placed in dry storage within the ISFSI, SCE License Amendment Applications 225, 272, and 257 (dockets 50-206, 50-361 and 50-362, respectively)  
Page 1
(Reference 5), *proposed a revision to the Technical Specification 4.3, "Fuel Storage,"
 
stating spent fuel shall not be stored in the spent fuel pool. Page 1 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme 2.0 PROPOSED CHANGE The proposed amendment would modify the SONGS license by revising the emergency plan and the associated emergency action level (EAL) scheme. The proposed changes reduce the scope of onsite emergency planning requirements to reflect the reduced scope of potential radiological accidents with all spent fuel in dry cask storage within the ISFSI. After all spent fuel is in dry cask storage within the ISFSI, the number and severity of potential radiological accidents is less than when spent nuclear fuel was stored in the spent fuel pool. Therefore, the offsite radiological consequences of accidents possible at SONGS are substantially lower. There continues to be no need for offsite emergency response plans at SONGS because no design basis accident or reasonably conceivable beyond design basis accident can result in radioactive releases that exceed Environmental Protection Agency (EPA) Protective Action Guides (PAGs) (Reference  
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme
: 6) beyond the Exclusion Area Boundary (EAB). SCE has developed a methodology for determining when to apply administrative controls that would be adequate to limit potential dispersal of radioactive material during decontamination and dismantling of radioactive  
 
: systems, structures, and components contained in the operational nuclear Units. These administrative controls ensure that if a radiological release were to occur, it would not exceed two times the Offsite Dose Calculation Manual (ODCM) limits (2 x 1500 mrem/year) at the EAB for 60 minutes (and therefore not result in doses to the public above EPA PAGs beyond the EAB). For potential liquid radioactivity  
==2.0   PROPOSED CHANGE==
: releases, the SONGS UFSAR provides analysis for two events. For the Radioactive Waste System Leak or Failure (Release to Atmosphere),
 
the UFSAR states that consequences would be less than 100 mrem, which is below the acceptance criterion of 2 x 1500 mrem/year.
The proposed amendment would modify the SONGS license by revising the emergency plan and the associated emergency action level (EAL) scheme. The proposed changes reduce the scope of onsite emergency planning requirements to reflect the reduced scope of potential radiological accidents with all spent fuel in dry cask storage within the ISFSI. After all spent fuel is in dry cask storage within the ISFSI, the number and severity of potential radiological accidents is less than when spent nuclear fuel was stored in the spent fuel pool. Therefore, the offsite radiological consequences of accidents possible at SONGS are substantially lower.
For the Postulated Radioactive Releases Due to Liquid Tank Failures, the UFSAR states that there is no credible accident that results in releases exceeding 10 CFR 20 limits. As the ODCM limits are based on 10 CFR 20, any dose consequences from a liquid radioactivity release would also be below two times the ODCM limits at the EAB for 60 minutes (and therefore not result in doses to the public above EPA PAGs beyond the EAB). The current EAL scheme was approved for use at SONGS on June 5, 2015 (Reference 7), and is based upon NEI 99-01, Revision 6 (Reference 8). The proposed EAL scheme remains based on NEI 99-01, Revision 6, as appropriate for the ISFSl-only condition at SONGS. 2.1 Summary of Major Changes The major changes to the SONGS Emergency Plan are: 1. Removal of the various emergency actions related to the spent fuel pool. 2. Removal of non-ISFSI related emergency event types. 3. Replacement of the "Shift Manager" title with the ."ISFSI Shift Supervisor (ISS)" title as the position which assumes the Emergency Director's responsibilities.  
There continues to be no need for offsite emergency response plans at SONGS because no design basis accident or reasonably conceivable beyond design basis accident can result in radioactive releases that exceed Environmental Protection Agency (EPA) Protective Action Guides (PAGs) (Reference 6) beyond the Exclusion Area Boundary (EAB).
SCE has developed a methodology for determining when to apply administrative controls that would be adequate to limit potential dispersal of radioactive material during decontamination and dismantling of radioactive systems, structures, and components contained in the non-operational nuclear Units. These administrative controls ensure that if a radiological release were to occur, it would not exceed two times the Offsite Dose Calculation Manual (ODCM) limits (2 x 1500 mrem/year) at the EAB for 60 minutes (and therefore not result in doses to the public above EPA PAGs beyond the EAB).
For potential liquid radioactivity releases, the SONGS UFSAR provides analysis for two events.
For the Radioactive Waste System Leak or Failure (Release to Atmosphere), the UFSAR states that consequences would be less than 100 mrem, which is below the acceptance criterion of 2 x 1500 mrem/year. For the Postulated Radioactive Releases Due to Liquid Tank Failures, the UFSAR states that there is no credible accident that results in releases exceeding 10 CFR 20 limits. As the ODCM limits are based on 10 CFR 20, any dose consequences from a liquid radioactivity release would also be below two times the ODCM limits at the EAB for 60 minutes (and therefore not result in doses to the public above EPA PAGs beyond the EAB).
The current EAL scheme was approved for use at SONGS on June 5, 2015 (Reference 7), and is based upon NEI 99-01, Revision 6 (Reference 8). The proposed EAL scheme remains based on NEI 99-01, Revision 6, as appropriate for the ISFSl-only condition at SONGS.
2.1     Summary of Major Changes The major changes to the SONGS Emergency Plan are:
: 1. Removal of the various emergency actions related to the spent fuel pool.
: 2. Removal of non-ISFSI related emergency event types.
: 3. Replacement of the "Shift Manager" title with the ."ISFSI Shift Supervisor (ISS)" title as the position which assumes the Emergency Director's responsibilities.
: 4. Revision of the emergency response organization.
: 4. Revision of the emergency response organization.
Page2 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN {IOEP) and Emergency Action Level (EAL) Scheme The off-normal events and accidents addressed in the SONGS ISFSl-Only Emergency Plan are related to the dry storage of spent nuclear fuel at the ISFSI and include only off-normal,  
Page2
: accident, natural phenomena, and hypothetical events and consequences as presented in the NU HOMS Certificate of Compliance (CoC) 1029 (Amendments 0 and 1) Horizontal Modular Storage System Updated Final Safety Analysis Report (NU HOMS UFSAR), and in the HOL TEC CoC 1040 (Amendment 1 and Proposed Amendment  
 
: 2) HI-STORM System Final Safety Analysis Report (FSAR). After all fuel is removed from the SONGS spent fuel pools, there will no longer be any potential for the accidents previously described in the SONGS Emergency Plan that would increase risk to the health and safety of the public that specifically related to the storage of the spent fuel in the spent fuel pool. After the transfer of the spent fuel to the ISFSI, the spent fuel storage and handling systems will be removed from operation consistent with the PSDAR for SONGS dated September 23, 2014 (Reference 3). 2.2 Elimination of Spent Fuel Pool and Radioactive Release Initiating Conditions and EALs, The initiating conditions (ICs) and EALs associated with emergency classification in the current emergency plan are based on NEI 99-01, Revision  
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN {IOEP) and Emergency Action Level (EAL) Scheme The off-normal events and accidents addressed in the SONGS ISFSl-Only Emergency Plan are related to the dry storage of spent nuclear fuel at the ISFSI and include only off-normal, accident, natural phenomena, and hypothetical events and consequences as presented in the NU HOMS Certificate of Compliance (CoC) 1029 (Amendments 0 and 1) Horizontal Modular Storage System Updated Final Safety Analysis Report (NU HOMS UFSAR), and in the HOLTEC CoC 1040 (Amendment 1 and Proposed Amendment 2) HI-STORM System Final Safety Analysis Report (FSAR). After all fuel is removed from the SONGS spent fuel pools, there will no longer be any potential for the accidents previously described in the SONGS Emergency Plan that would increase risk to the health and safety of the public that specifically related to the storage of the spent fuel in the spent fuel pool. After the transfer of the spent fuel to the ISFSI, the spent fuel storage and handling systems will be removed from operation consistent with the PSDAR for SONGS dated September 23, 2014 (Reference 3).
: 6. Specifically, Appendix C of NEI 99-01 contains a set of ICs and EALs for permanently defueled nuclear power plants that had previously operated under a 10 CFR Part 50 license and have permanently ceased operations.
2.2     Elimination of Spent Fuel Pool and Radioactive Release Initiating Conditions and EALs, The initiating conditions (ICs) and EALs associated with emergency classification in the current emergency plan are based on NEI 99-01, Revision 6. Specifically, Appendix C of NEI 99-01 contains a set of ICs and EALs for permanently defueled nuclear power plants that had previously operated under a 10 CFR Part 50 license and have permanently ceased operations.
After all spent fuel has been removed from the spent fuel pool and placed in dry storage within the ISFSI, the NEI 99-01, Appendix C, ICs and EALs that are associated with the spent fuel pool are no longer required to be in the emergency plan. Additionally, certain ICs and EALs whose primary function is not associated with the spent fuel pool are also no longer required to be in the emergency plan when administrative controls are applied to limit the potential dispersal of radioactive material and the offsite consequences of uncontrolled effluent releases.
After all spent fuel has been removed from the spent fuel pool and placed in dry storage within the ISFSI, the NEI 99-01, Appendix C, ICs and EALs that are associated with the spent fuel pool are no longer required to be in the emergency plan. Additionally, certain ICs and EALs whose primary function is not associated with the spent fuel pool are also no longer required to be in the emergency plan when administrative controls are applied to limit the potential dispersal of radioactive material and the offsite consequences of uncontrolled effluent releases.
Therefore, the ICs listed in Table 1 below are being deleted from the currently approved emergency plan for SONGS. The I Cs being deleted are either associated only with spent fuel pool operation or are I Cs for which administrative controls to limit possible effluent releases have been established.
Therefore, the ICs listed in Table 1 below are being deleted from the currently approved emergency plan for SONGS. The ICs being deleted are either associated only with spent fuel pool operation or are ICs for which administrative controls to limit possible effluent releases have been established.
Table 1 -Emergency Plan Initiating Conditions Being Deleted ALERT UNUSUAL EVENT PD-AA 1 (all) PD-AU1 (all) Release of gaseous or liquid radioactivity Release of gaseous or liquid radioactivity greater resulting in offsite dose greater than 10 mrem than 2 times the ODCM limits for 60 minutes or TEDE or 50 mrem thyroid COE. longer. PD-AA2 (all) PD-AU2 (all) UNPLANNED rise in plant radiation levels that UNPLANNED rise in plant radiation levels. impedes plant access required to maintain spent fuel integrity  
Table 1 - Emergency Plan Initiating Conditions Being Deleted ALERT                                                 UNUSUAL EVENT PD-AA 1 (all)                                         PD-AU1 (all)
.. Page 3 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme Table 1 -Emergency Plan Initiating Conditions Being Deleted ALERT UNUSUAL EVENT PD-SU1 (all) UNPLANNED spent fuel pool temperature rise. PD-HA1 HOSTILE ACTION within the Vehicle Barrier System or airborne attack threat *.vithin 30 minutes.*
Release of gaseous or liquid radioactivity           Release of gaseous or liquid radioactivity greater resulting in offsite dose greater than 10 mrem       than 2 times the ODCM limits for 60 minutes or TEDE or 50 mrem thyroid COE.                         longer.
PD-HU1.3 A validated notification from the NRC providing PD-HA1.2 information of an aircraft threat A validated notification from NRC of an aircraft attack threat within 30 minutes of the site. PD-HU2 (all)** Hazardous event affecting SAFETY SYSTEM equipment necessary for spent fuel cooling.  
PD-AA2 (all)                                         PD-AU2 (all)
*Only the strike-thru portion is being deleted.  
UNPLANNED rise in plant radiation levels that         UNPLANNED rise in plant radiation levels.
**For an ISFSl-only  
impedes plant access required to maintain spent fuel integrity..
: facility, the condition addressed by PD-HU2 remains fully addressed by IC EU1 .1 (which is being retained in the emergency plan). The currently existing SONGS ICs and EALs not listed in Ta_ble 1 above are being retained.
Page 3
The EAL ICs being deleted include all ICs associated with the categories of abnormal radioactivity release and system malfunction.
 
These two categories apply only to spent fuel pool operation.
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme Table 1 - Emergency Plan Initiating Conditions Being Deleted ALERT                                                 UNUSUAL EVENT PD-SU1 (all)
One new EAL is being proposed in IC E-HU1, "Damage to a loaded cask CONFINEMENT BOUNDARY."
UNPLANNED spent fuel pool temperature rise.
The new EAL E-HU1 .2 provides threshold values for the AREVA ISFSI and the new HOLTEC ISFSI based on the generic AREVA and HOLTEC Technical Specification values provided in the respective Certificates of Compliance.
PD-HA1 HOSTILE ACTION within the Vehicle Barrier System or airborne attack threat *.vithin 30 minutes.*                                             PD-HU1.3 A validated notification from the NRC providing PD-HA1.2                                             information of an aircraft threat A validated notification from NRC of an aircraft attack threat within 30 minutes of the site.
The EAL ICs being retained in the emergency plan are appropriate to address the condition of an ISFSl-only facility (no fuel stored in the spent fuel pool). 2.3 Emergency Response Organization Revision A Resource Manager is provided to assist in assessing the event and obtaining needed resources.
PD-HU2 (all)**
The Resource Manager is required to be in contact with the Emergency Director within 2 hours of classification of an Unusual Event or ALERT. The Resource Manager augments the Emergency Director by assisting in assessing the emergency condition and coordinating required resources, including public information interface.
Hazardous event affecting SAFETY SYSTEM equipment necessary for spent fuel cooling.
Services provided to the Emergency Director by the Resource Manager can be provided remotely and do not necessitate an onsite response of the Resource Manager.
*Only the strike-thru portion is being deleted.
By responding  
**For an ISFSl-only facility, the condition addressed by PD-HU2 remains fully addressed by IC EU1 .1 (which is being retained in the emergency plan).
: remotely, the actual response time is decreased with no negative impact to services and functional responsibilities provided by the Resource Manager.
The currently existing SONGS ICs and EALs not listed in Ta_ble 1 above are being retained.
Page 4 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme Events that require entry into the ISFSl-Only Emergency Plan would be an extreme natural phenomenon (beyond design bases) or a security condition, either of which would negatively impact or restrict access to the site. Therefore, the Resource Manager's functional responsibilities would be performed in a timely manner by not requiring the Resource Manager to physically report to SONGS during a classified emergency.
The EAL ICs being deleted include all ICs associated with the categories of abnormal radioactivity release and system malfunction. These two categories apply only to spent fuel pool operation.
3.0 TECHNICAL ANALYSIS 3.1 Radiological Consequences of Design Basis Events The San Onofre site is located on the coast of Southern California in San Diego County, approximately 62 miles southeast of Los Angeles and 51 miles northwest of San Diego. The site is located entirely within the boundaries of the United States Marine Corps Base, Camp Pendleton, California, near the northeast end of the 18-mile shoreline.
One new EAL is being proposed in IC E-HU1, "Damage to a loaded cask CONFINEMENT BOUNDARY." The new EAL E-HU1 .2 provides threshold values for the AREVA ISFSI and the new HOLTEC ISFSI based on the generic AREVA and HOLTEC Technical Specification values provided in the respective Certificates of Compliance.
The population of the area within a 10-mile radius of the San Onofre Nuclear Generating Station is projected to increase from 59,024 in 1980 to 95,301 by 2020. The SONGS Units 2 and 3 Updated Final Safety Analysis Report (UFSAR),
The EAL ICs being retained in the emergency plan are appropriate to address the condition of an ISFSl-only facility (no fuel stored in the spent fuel pool).
Chapter 15, Accident  
2.3     Emergency Response Organization Revision A Resource Manager is provided to assist in assessing the event and obtaining needed resources. The Resource Manager is required to be in contact with the Emergency Director within 2 hours of classification of an Unusual Event or ALERT. The Resource Manager augments the Emergency Director by assisting in assessing the emergency condition and coordinating required resources, including public information interface. Services provided to the Emergency Director by the Resource Manager can be provided remotely and do not necessitate an onsite response of the Resource Manager. By responding remotely, the actual response time is decreased with no negative impact to services and functional responsibilities provided by the Resource Manager.
: Analyses, currently address the design basis accidents (OBA) and transient scenarios applicable to SONGS Units 2 and 3 in the permanently defueled condition with irradiated fuel stored in the SFP. Many of these postulated accidents are predicated on spent fuel being stored in the SFP. However, upon transfer of all irradiated fuel to storage in the ISFSI, the accident scenarios predicated on spent fuel storage in the SFP are no longer possible.
Page 4
The SONGS 1 Defueled Safety Analysis Report (DSAR), Chapter 8, Accident Analyses states that there are no remaining design-basis accidents for Unit 1, which is consistent with the condition that all spent fuel has already been removed from the Unit 1 spent fuel pool. The ISFSI is a passive system that does not rely on electrical power for heat transfer.
 
After removal of the spent fuel from the Units 2 and 3 spent fuel pools, there are no credible fuel related accidents Hor which Certified Fuel Handler, Shift Manager, or Certified Operator actions are required to prevent occurrence or mitigate the consequences.
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme Events that require entry into the ISFSl-Only Emergency Plan would be an extreme natural phenomenon (beyond design bases) or a security condition, either of which would negatively impact or restrict access to the site.
There is no credible accident resulting in radiological releases requiring offsite protective measures.
Therefore, the Resource Manager's functional responsibilities would be performed in a timely manner by not requiring the Resource Manager to physically report to SONGS during a classified emergency.
The robust design and construction of the spent fuel storage systems selected for use at the ISFSI prevents the release of radioactivity in the event of an off-normal or accident event as described in the ISFSI storage system safety analysis reports.
 
Leakage of fission products from a canister confinement boundary breach is *not considered to be a credible event, given the high integrity nature of the canisters' design and the additional protection afforded the canisters by the storage system. SCE plans to use the DEGON decommissioning method (immediate dismantling),
==3.0   TECHNICAL ANALYSIS==
in which the equipment, structures, and portions of the facility and site that contain radioactive contaminants are promptly removed and/or decontaminated to a level that permits termination of the license after cessation of operations (Reference 3). Administrative controls that are required to be in Page 5 EVALUATION OF THE PROPOSED AMENDMENT ISFSl*Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme place when decontamination and dismantlement activities of radioactive  
 
: systems, structures, and components are being performed are designed to minimize the likelihood of an off-normal event, and thereby the consequences of such an event. After all the spent fuel has been removed from the spent fuel pool, the radiological inventory (non-fuel) that remains at the reactor facility is primarily attributable to either stored liquid radioactive waste or activated reactor components and structural materials.
3.1     Radiological Consequences of Design Basis Events The San Onofre site is located on the coast of Southern California in San Diego County, approximately 62 miles southeast of Los Angeles and 51 miles northwest of San Diego. The site is located entirely within the boundaries of the United States Marine Corps Base, Camp Pendleton, California, near the northeast end of the 18-mile shoreline. The population of the area within a 10-mile radius of the San Onofre Nuclear Generating Station is projected to increase from 59,024 in 1980 to 95,301 by 2020.
For liquid radwaste, Chapter 15 of the UFSAR states that there is no credible accident that would exceed 10 CFR 20 limits. For activated reactor components and structural materials, there are no credible accident sequences that can mobilize a significant portion of this inventory for release.
The SONGS Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Chapter 15, Accident Analyses, currently address the design basis accidents (OBA) and transient scenarios applicable to SONGS Units 2 and 3 in the permanently defueled condition with irradiated fuel stored in the SFP. Many of these postulated accidents are predicated on spent fuel being stored in the SFP. However, upon transfer of all irradiated fuel to storage in the ISFSI, the accident scenarios predicated on spent fuel storage in the SFP are no longer possible. The SONGS 1 Defueled Safety Analysis Report (DSAR), Chapter 8, Accident Analyses states that there are no remaining design-basis accidents for Unit 1, which is consistent with the condition that all spent fuel has already been removed from the Unit 1 spent fuel pool. The ISFSI is a passive system that does not rely on electrical power for heat transfer. After removal of the spent fuel from the Units 2 and 3 spent fuel pools, there are no credible fuel related accidents Hor which Certified Fuel Handler, Shift Manager, or Certified Operator actions are required to prevent occurrence or mitigate the consequences. There is no credible accident resulting in radiological releases requiring offsite protective measures.
As a result, the potential accidents that could occur during the decommissioning of the reactor facility have negligible offsite and onsite radiological consequences.
The robust design and construction of the spent fuel storage systems selected for use at the ISFSI prevents the release of radioactivity in the event of an off-normal or accident event as described in the ISFSI storage system safety analysis reports. Leakage of fission products from a canister confinement boundary breach is *not considered to be a credible event, given the high integrity nature of the canisters' design and the additional protection afforded the canisters by the storage system.
SCE plans to use the DEGON decommissioning method (immediate dismantling), in which the equipment, structures, and portions of the facility and site that contain radioactive contaminants are promptly removed and/or decontaminated to a level that permits termination of the license after cessation of operations (Reference 3). Administrative controls that are required to be in Page 5
 
EVALUATION OF THE PROPOSED AMENDMENT ISFSl*Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme place when decontamination and dismantlement activities of radioactive systems, structures, and components are being performed are designed to minimize the likelihood of an off-normal event, and thereby the consequences of such an event.
After all the spent fuel has been removed from the spent fuel pool, the radiological inventory (non-fuel) that remains at the reactor facility is primarily attributable to either stored liquid radioactive waste or activated reactor components and structural materials. For liquid radwaste, Chapter 15 of the UFSAR states that there is no credible accident that would exceed 10 CFR 20 limits. For activated reactor components and structural materials, there are no credible accident sequences that can mobilize a significant portion of this inventory for release. As a result, the potential accidents that could occur during the decommissioning of the reactor facility have negligible offsite and onsite radiological consequences.
With all spent nuclear fuel in dry storage within the ISFSI, the radiological status of the facility required for implementing this proposed revision to the SONGS ISFSl-Only Emergency Plan (IOEP) is summarized as follows:
With all spent nuclear fuel in dry storage within the ISFSI, the radiological status of the facility required for implementing this proposed revision to the SONGS ISFSl-Only Emergency Plan (IOEP) is summarized as follows:
* The remaining radiological source term at SONGS is not likely to create an unplanned/unanticipated increase in radiation or in liquid or airborne radioactivity levels outside of the EAB that would result in doses to the public above ODCM limits at the EAB.
* The remaining radiological source term at SONGS is not likely to create an unplanned/unanticipated increase in radiation or in liquid or airborne radioactivity levels outside of the EAB that would result in doses to the public above ODCM limits at the EAB.
* Source term accumulation from activities during decontamination and dismantling of radioactive  
* Source term accumulation from activities during decontamination and dismantling of radioactive systems, structures, and components are administratively controlled at a level that would preclude the declaration of an Unusual Event (UE).
: systems, structures, and components are administratively controlled at a level that would preclude the declaration of an Unusual Event (UE).
* Necessary radiological support personnel will be administratively required to be onsite during active decontamination and dismantling of radioactive systems, structures, and components.
* Necessary radiological support personnel will be administratively required to be onsite during active decontamination and dismantling of radioactive  
The IOEP and certain initiating conditions (ICs) and emergency action levels (EALs), for which administrative controls to limit possible effluent releases will be established, do not apply to decontamination or dismantling of radioactive systems, structures, and components.
: systems, structures, and components.
* NUREG-0586 (Reference 9) supports this conclusion in the following statement.
The IOEP and certain initiating conditions (ICs) and emergency action levels (EALs), for which administrative controls to limit possible effluent releases will be established, do not apply to decontamination or dismantling of radioactive  
  "The staff has reviewed activities associated with decommissioning and determined that many decommissioning activities not involving spent fuel that are likely to result in radiological accidents are similar to activities conducted during the period of reactor operations. The radiological releases from potential accidents associated with these activities may be detectible. However, work procedures are designed to minimize the likelihood of an accident and the consequences of an accident, should one occur, and procedures will remain in place to protect health and safety while the possibility of significant radiological accident exists."
: systems, structures, and components.
* NUREG-0586 (Reference  
: 9) supports this conclusion in the following statement.  
"The staff has reviewed activities associated with decommissioning and determined that many decommissioning activities not involving spent fuel that are likely to result in radiological accidents are similar to activities conducted during the period of reactor operations.
The radiological releases from potential accidents associated with these activities may be detectible.  
: However, work procedures are designed to minimize the likelihood of an accident and the consequences of an accident, should one occur, and procedures will remain in place to protect health and safety while the possibility of significant radiological accident exists."
NUREG-0586 also makes the following supportive statement.
NUREG-0586 also makes the following supportive statement.
Page 6 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme "The staff has considered available information, including comments received on the draft of Supplement 1 of NUREG-0586, concerning the potential impacts of non-spent-fuel-related radiological accidents resulting from decommissioning.
Page 6
This information indicates, that with the mitigation procedures in place, the impacts of radiological accidents are neither detectable nor destabilizing.
 
Therefore, the staff makes the generic conclusion that impacts of spent-fuel-related radiological accidents are SMALL. The staff has considered mitigation and concludes that no additional measures are likely to be sufficiently beneficial to be warranted."
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme "The staff has considered available information, including comments received on the draft of Supplement 1 of NUREG-0586, concerning the potential impacts of non-spent-fuel-related radiological accidents resulting from decommissioning. This information indicates, that with the mitigation procedures in place, the impacts of radiological accidents are neither detectable nor destabilizing. Therefore, the staff makes the generic conclusion that impacts of non-spent-fuel-related radiological accidents are SMALL. The staff has considered mitigation and concludes that no additional measures are likely to be sufficiently beneficial to be warranted."
Accordingly, administrative controls that are designed to minimize the likelihood and consequence of an off-normal event would be implemented when decontamination or. dismantling activities of radioactive  
Accordingly, administrative controls that are designed to minimize the likelihood and consequence of an off-normal event would be implemented when decontamination or.
: systems, structures, and components are being performed.
dismantling activities of radioactive systems, structures, and components are being performed.
Implementation of the IOEP would involve SCE applying administrative controls for methods to control the potential dispersal of the radiological source material.
Implementation of the IOEP would involve SCE applying administrative controls for methods to control the potential dispersal of the radiological source material.
Administrative controls would potentially need to be applied duririg handling of: * . Radioactive materials collected on filter media and resins.
Administrative controls would potentially need to be applied duririg handling of:
  * . Radioactive materials collected on filter media and resins.
* Contaminated materials collected in shipping containers.
* Contaminated materials collected in shipping containers.
* Surface or fixed contamination on work areas that may create airborne radioactive material.  
* Surface or fixed contamination on work areas that may create airborne radioactive material.
*
  *
* Radioactive liquids within tanks Details of administrative control programs will be finalized in 2017. Administrative controls are expected to be similar to existing controls provided by the Radiation Protection Program and Fire Protection Program.
* Radioactive liquids within tanks Details of administrative control programs will be finalized in 2017. Administrative controls are expected to be similar to existing controls provided by the Radiation Protection Program and Fire Protection Program. Activities will be performed in accordance with procedures by individuals that have been trained to prevent the potential dispersal of radioactive material.
Activities will be performed in accordance with procedures by individuals that have been trained to prevent the potential dispersal of radioactive material.
Several examples of methods to control potential dispersal of the radiological source term include limitation on dispersal mechanisms that may cause a fire (e.g., limits on combustible material loading, use of fire watch to preclude fire, etc.), placement of a berm around a radioactive liquid storage tank, or packaging contents of a shipping container within a confined boundaries and ventilation controls.
Several examples of methods to control potential dispersal of the radiological source term include limitation on dispersal mechanisms that may cause a fire (e.g., limits on combustible material  
As discussed in the previously granted exemption from various emergency planning requirements contained in 10 CFR 50.47 and 10 CFR 50, Appendix E (Reference 4), an analysis of the potential radiological impact of a design basis accident at SONGS in a permanently defueled condition indicates tbat any releases beyond the EAB are below the EPA PAG exposure levels, as detailed in Reference 6. The basis for these exemptions has not changed and remains in effect for the proposed emergency plan changes.
: loading, use of fire watch to preclude fire, etc.), placement of a berm around a radioactive liquid storage tank, or packaging contents of a shipping container within a confined boundaries and ventilation controls.
3.2     Radiological Consequences of Postulated Events Under the previous facility condition of fuel stored within the spent fuel pool, the most severe postulated beyond design basis event involved a highly unlikely sequence of events that causes Page 7
As discussed in the previously granted exemption from various emergency planning requirements contained in 10 CFR 50.47 and 10 CFR 50, Appendix E (Reference 4), an analysis of the potential radiological impact of a design basis accident at SONGS in a permanently defueled condition indicates tbat any releases beyond the EAB are below the EPA PAG exposure levels, as detailed in Reference  
 
: 6. The basis for these exemptions has not changed and remains in effect for the proposed emergency plan changes.
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme heatup of the spent fuel, postulated to occur without heat transfer, such that the zircaloy fuel cladding reaches ignition temperature. The resultant zircaloy fire could lead to the release of large quantities of fission products to the atmosphere. However, after removal of the spent fuel from the spent fuel pool, the configuration of spent fuel stored in dry storage precludes the possibility of such a scenario.
3.2 Radiological Consequences of Postulated Events Under the previous facility condition of fuel stored within the spent fuel pool, the most severe postulated beyond design basis event involved a highly unlikely sequence of events that causes Page 7 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme heatup of the spent fuel, postulated to occur without heat transfer, such that the zircaloy fuel cladding reaches ignition temperature.
With this previously limiting beyond design basis scenario no longer possible, SCE assessed the following beyond design basis events associated with performance of decommissioning activities with all irradiated fuel stored in the SCE ISFSI. A summary of the assessments is provided below.
The resultant zircaloy fire could lead to the release of large quantities of fission products to the atmosphere.  
: 1. Cask Drop Event (Fuel Related Accident)
: However, after removal of the spent fuel from the spent fuel pool, the configuration of spent fuel stored in dry storage precludes the possibility of such a scenario.
SCE is the user of general licenses for the storage of spent fuel in an ISFSI at power reactor sites in accordance with the provisions of 10 CFR 72.210.and 10 CFR 72.212. The generally licensed ISFSI at SONGS is used for interim onsite dry storage of spent nuclear fuel assemblies in both the Transnuclear Standardized NUHOMS System (NU HOMS Certificate of Compliance (CoC) 1029 (Amendments 0 and 1)) and in the HOLTEC*
With this previously limiting beyond design basis scenario no longer possible, SCE assessed the following beyond design basis events associated with performance of decommissioning activities with all irradiated fuel stored in the SCE ISFSI. A summary of the assessments is provided below. 1. Cask Drop Event (Fuel Related Accident)
HI STORM System (HOLTEC CoC 1041 (Amendment 1 and Proposed Amendment 2)).
SCE is the user of general licenses for the storage of spent fuel in an ISFSI at power reactor sites in accordance with the provisions of 10 CFR 72.210.and 10 CFR 72.212. The generally licensed ISFSI at SONGS is used for interim onsite dry storage of spent nuclear fuel assemblies in both the Transnuclear Standardized NUHOMS System (NU HOMS Certificate of Compliance (CoC) 1029 (Amendments 0 and 1)) and in the HOLTEC* HI STORM System (HOL TEC CoC 1041 (Amendment 1 and Proposed Amendment 2)). As documented in the storage system safety analysis  
As documented in the storage system safety analysis reports, analysis of the normal and off-normal events, including drop events, determined that canister drops can be sustained without br:eaching the confinement boundary, preventing removal of spent fuel assemblies, or causing a criticality accident. There are no evaluated normal conditions or off-normal or accident events that result in damage to the canister producing a breach in the confinement boundary. Neither normal conditions of operation, nor off-normal events preclude retrieval of the fuel for transport and ultimate disposal.
: reports, analysis of the normal and off-normal events, including drop events, determined that canister drops can be sustained without br:eaching the confinement  
As documented in the storage system safety analysis reports, the canister drops can be sustained without breaching the confinement boundary.
: boundary, preventing removal of spent fuel assemblies, or causing a criticality accident.
There are no evaluated normal conditions or off-normal or accident events that result in damage to the canister producing a breach in the confinement boundary.
Neither normal conditions of operation, nor off-normal events preclude retrieval of the fuel for transport and ultimate disposal.
As documented in the storage system safety analysis  
: reports, the canister drops can be sustained without breaching the confinement boundary.  
: 2. Radioactive Material Handling Accident (Non-Fuel Related)
: 2. Radioactive Material Handling Accident (Non-Fuel Related)
The limiting non-fuel related event involves the release of radioactive material from either a liquid radioactivity storage tank or from a concentrated source, such as filters, resins, and open shipping containers (as discussed in NUREG-0586, Appendix I). For liquid releases, the SONGS UFSAR states that there are no credible accidents that could exceed 10 CFR 20 limits. For a concentrated solid source, the evaluated initiator for these events is a postulated fire. During SONGS decommissioning activities, after all spent fuel has been moved to the ISFSI, there would be no concentrated source of radioactive materials whose release to the environment could exceed two times the ODCM limit at the EAB (2 x 1500 mrem/year).\
The limiting non-fuel related event involves the release of radioactive material from either a liquid radioactivity storage tank or from a concentrated source, such as filters, resins, and open shipping containers (as discussed in NUREG-0586, Appendix I).
During decontamination and dismantlement activities, administrative controls would be applied to the handling of open containers or other packages containing  
For liquid releases, the SONGS UFSAR states that there are no credible accidents that could exceed 10 CFR 20 limits.
: filters, resins, and other dispersable materials generated during decommissioning activities such that a release Page 8 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme to the environment from concentrated sources of these radioactive materials would not exceed two times the ODCM limit at the EAB. 3. Accidents Initiated in External Events The effects of external events, such as aircraft  
For a concentrated solid source, the evaluated initiator for these events is a postulated fire.
: crashes, fires, floods, wind (including tornados),
During SONGS decommissioning activities, after all spent fuel has been moved to the ISFSI, there would be no concentrated source of radioactive materials whose release to the environment could exceed two times the ODCM limit at the EAB (2 x 1500 mrem/year).\
earthquakes, lightning, and physical security breaches on the ISFSI remain unchanged from the effects that were considered under the existing emergency plan. Externally initiated events are addressed by the proposed EALs. In summary, there continues to be a low likelihood of any postulated event resulting in radiological releases requiring offsite protective  
During decontamination and dismantlement activities, administrative controls would be applied to the handling of open containers or other packages containing filters, resins, and other dispersable materials generated during decommissioning activities such that a release Page 8
: measures, and there is no credible radioactive material event (non-fuel related) resulting in radiological releases requiring declaration of an emergency.
 
3.3 ISFSl-Only Emergency Plan The SONGS ISFSl-Only Emergency Plan (IOEP) is provided in Enclosure 1 to this submittal for NRC review and approval.
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme to the environment from concentrated sources of these radioactive materials would not exceed two times the ODCM limit at the EAB.
This proposed emergency plan is associated with EALs for events related to the ISFSI. The IOEP addresses the applicable regulations stipulated in 10 CFR 50.47, "Emergency Plans" (as exempted),
: 3. Accidents Initiated in External Events The effects of external events, such as aircraft crashes, fires, floods, wind (including tornados), earthquakes, lightning, and physical security breaches on the ISFSI remain unchanged from the effects that were considered under the existing emergency plan.
10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" (as exempted),
Externally initiated events are addressed by the proposed EALs.
and 10 CFR 72.32, "Emergency Plan," and is consistent with the applicable guidelines established in NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
In summary, there continues to be a low likelihood of any postulated event resulting in radiological releases requiring offsite protective measures, and there is no credible radioactive material event (non-fuel related) resulting in radiological releases requiring declaration of an emergency.
The IOEP describes the station's plan for responding to emergencies that may arise at SONGS while all spent nuclear fuel is in dry storage within an ISFSI. Currently, irradiated fuel is stored both in the ISFSI and in the spent fuel pool (SFP). After all fuel at SONGS is in dry storage within the ISFSI, the number and severity of potential radiological accidents is .significantly less than when fuel was also stored in the SFP. As provided in the ISFSI storage system Final Safety Analysis Reports (FSARs),
3.3     ISFSl-Only Emergency Plan The SONGS ISFSl-Only Emergency Plan (IOEP) is provided in Enclosure 1 to this submittal for NRC review and approval. This proposed emergency plan is associated with EALs for events related to the ISFSI. The IOEP addresses the applicable regulations stipulated in 10 CFR 50.47, "Emergency Plans" (as exempted), 10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" (as exempted), and 10 CFR 72.32, "Emergency Plan," and is consistent with the applicable guidelines established in NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."
the analyses of the potential radiological impacts of postulated off-normal, natural phenomenon, and accident  
The IOEP describes the station's plan for responding to emergencies that may arise at SONGS while all spent nuclear fuel is in dry storage within an ISFSI. Currently, irradiated fuel is stored both in the ISFSI and in the spent fuel pool (SFP). After all fuel at SONGS is in dry storage within the ISFSI, the number and severity of potential radiological accidents is .significantly less than when fuel was also stored in the SFP.
. events in an ISFSl-only condition indicate that any releases beyond the Exclusion Area Boundary (EAB) would result in a dose to the public below the radiation limits established in 10 CFR 72.106(b).
As provided in the ISFSI storage system Final Safety Analysis Reports (FSARs), the analyses of the potential radiological impacts of postulated off-normal, natural phenomenon, and accident
Areas where exposure levels could potentially warrant pre-planned response measures are generally limited to the ISFSI pad and nearby vicinity; for this reason radiological emergency planning is focused in this area. The EAB is the area surrounding the ISFSI in which SCE has the authority to determine all activities including exclusion or removal of personnel and property from the area. The analyses of the radiological impact of potential accidents at the ISFSI conclude that any releases beyond the EAB are expected to be less than the EPA PAGs. Based on the reduced number and consequences of potential radiological events at SONGS with all spent nuclear fuel in dry storage within the ISFSI, there will continue to be no need for Page 9 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme offsite emergency response plans for the protection of the public beyond the EAB. Additionally, the scope of the onsite emergency preparedness organization and corresponding requirements in the emergency plan may be reduced without an undue risk to the public health and safety. The analysis of the potential radiological impact of an accident in a condition with all irradiated fuel stored in the ISFSI indicates that any releases beyond the EAB are below the EPA PAG exposure levels, as detailed in Reference  
. events in an ISFSl-only condition indicate that any releases beyond the Exclusion Area Boundary (EAB) would result in a dose to the public below the radiation limits established in 10 CFR 72.106(b). Areas where exposure levels could potentially warrant pre-planned response measures are generally limited to the ISFSI pad and nearby vicinity; for this reason radiological emergency planning is focused in this area.
: 6. Exposure levels, which warrant pre-planned response  
The EAB is the area surrounding the ISFSI in which SCE has the authority to determine all activities including exclusion or removal of personnel and property from the area. The analyses of the radiological impact of potential accidents at the ISFSI conclude that any releases beyond the EAB are expected to be less than the EPA PAGs.
: measures, are limited to onsite areas. For this reason, radiological emergency planning is focused onsite. 3.4 ISFSl-Only Emergency Action Levels Enclosure 2 provides the site-specific EAL technical bases document, which contains the proposed SONGS ISFSl-Only Emergency Action Level (IOEAL) scheme for NRC review and approval.
Based on the reduced number and consequences of potential radiological events at SONGS with all spent nuclear fuel in dry storage within the ISFSI, there will continue to be no need for Page 9
The current SONGS EAL scheme was approved by NRC on June 5, 2015 (Reference 7). The new ISFSI EAL scheme is to be implemented by the SONGS ISFSl-Only Emergency Plan (provided in Enclosure 1 ). Deletions from the currently approved EAL scheme are listed in Section 2.2, "Elimination of Spent Fuel Pool Initiating Events and EALs," Table 1, "Emergency Plan Initiating Conditions Being Deleted,"
 
above. Operating Modes and Applicability The proposed EALs are only applicable after the final spent nuclear fuel assembly has been transferred out of the spent fuel pool and placed in storage within the ISFSI. State and Local Government Review of Proposed Changes State and local emergency management officials are advised of EAL changes that are implemented.
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme offsite emergency response plans for the protection of the public beyond the EAB. Additionally, the scope of the onsite emergency preparedness organization and corresponding requirements in the emergency plan may be reduced without an undue risk to the public health and safety.
Following NRC approval and prior to implementation, SCE will provide an overview of the new classification scheme to State and local emergency management officials in accordance with 10 CFR Part 50, Appendix E, Section IV.B.1. 4.0 SUMMARY By letters dated June 28, 2013 (Reference  
The analysis of the potential radiological impact of an accident in a condition with all irradiated fuel stored in the ISFSI indicates that any releases beyond the EAB are below the EPA PAG exposure levels, as detailed in Reference 6. Exposure levels, which warrant pre-planned response measures, are limited to onsite areas. For this reason, radiological emergency planning is focused onsite.
: 1) and July 22, 2013 (Reference 2), SCE submitted a certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1  
3.4     ISFSl-Only Emergency Action Levels provides the site-specific EAL technical bases document, which contains the proposed SONGS ISFSl-Only Emergency Action Level (IOEAL) scheme for NRC review and approval. The current SONGS EAL scheme was approved by NRC on June 5, 2015 (Reference 7). The new ISFSI EAL scheme is to be implemented by the SONGS ISFSl-Only Emergency Plan (provided in Enclosure 1).
)(ii). Consequently, as specified in 10 CFR 50.82(a)(2),
Deletions from the currently approved EAL scheme are listed in Section 2.2, "Elimination of Spent Fuel Pool Initiating Events and EALs," Table 1, "Emergency Plan Initiating Conditions Being Deleted," above.
the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. SONGS Unit 1 spent fuel has previously been removed from the Unit 1 spent fuel pool and is now in dry storage.
Operating Modes and Applicability The proposed EALs are only applicable after the final spent nuclear fuel assembly has been transferred out of the spent fuel pool and placed in storage within the ISFSI.
To reflect the reduced scope of potential radiological Page 10 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN CIOEP) and Emergency Action Level (EAL) Scheme accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.
State and Local Government Review of Proposed Changes State and local emergency management officials are advised of EAL changes that are implemented. Following NRC approval and prior to implementation, SCE will provide an overview of the new classification scheme to State and local emergency management officials in accordance with 10 CFR Part 50, Appendix E, Section IV.B.1.
This proposed amendment would revise both the emergency plan and the EAL scheme appropriate for the condition of the station wherein all spent nuclear fuel is in dry storage within the ISFSI. The new emergency plan and EAL scheme are being submitted to the NRC for approval prior to implementation, as required under Section IV.8.2 of Appendix E to 10 CFR Part 50. Additionally, 10 CFR 50.54( q)( 4) and 1 O CFR 72.44(f) require that the proposed changes receive prior approval by the NRC because they are considered to reduce the effectiveness of the plan. The proposed emergency plan does not meet all standards of 10 CFR 50.47(b) and requirements of 10 CFR 50, Appendix E. However, SCE was granted exemptions from portions of 10 CFR 50.47(b),
4.0  
10 CFR 50.47(c)(2),
 
and 10 CFR 50, Appendix E, Section IV, by letter dated June 4, 2014 (Reference 4). The basis for these exemptions has not changed and remains in effect for the proposed emergency plan changes.
==SUMMARY==
With the granted exemptions, the emergency plan, as revised, will continue to meet the remaining applicable requirements in 10 CFR 50, Appendix E and the planning standards of§ 50.47(b).
 
5.0 REGULATORY ANALYSIS 5.1 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, respectively.
By letters dated June 28, 2013 (Reference 1) and July 22, 2013 (Reference 2), SCE submitted a certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1 )(ii). Consequently, as specified in 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. SONGS Unit 1 spent fuel has previously been removed from the Unit 1 spent fuel pool and is now in dry storage. To reflect the reduced scope of potential radiological Page 10
The proposed amendments would revise the Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action Level (EAL) into an ISFl-Only EAL (IOEAL) scheme. The proposed changes are being submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4),
 
10 CFR 50, Appendix E, Section IV.8.2, and 10 CFR 72.44(f).
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN CIOEP) and Emergency Action Level (EAL) Scheme accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.
By letters dated June 28, 2013 (Reference  
This proposed amendment would revise both the emergency plan and the EAL scheme appropriate for the condition of the station wherein all spent nuclear fuel is in dry storage within the ISFSI. The new emergency plan and EAL scheme are being submitted to the NRC for approval prior to implementation, as required under Section IV.8.2 of Appendix E to 10 CFR Part 50. Additionally, 10 CFR 50.54( q)( 4) and 10 CFR 72.44(f) require that the proposed changes receive prior approval by the NRC because they are considered to reduce the effectiveness of the plan.
: 1) and July 22, 2013 (Reference 2), SCE submitted a certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1)(ii).
The proposed emergency plan does not meet all standards of 10 CFR 50.47(b) and requirements of 10 CFR 50, Appendix E. However, SCE was granted exemptions from portions of 10 CFR 50.47(b), 10 CFR 50.47(c)(2), and 10 CFR 50, Appendix E, Section IV, by letter dated June 4, 2014 (Reference 4). The basis for these exemptions has not changed and remains in effect for the proposed emergency plan changes. With the granted exemptions, the emergency plan, as revised, will continue to meet the remaining applicable requirements in 10 CFR 50, Appendix E and the planning standards of§ 50.47(b).
Consequently, as specified in 10 CFR 50.82(a)(2),
 
the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. SONGS Unit 1 spent fuel has previously been removed from the Unit 1 spent fuel pool and is now in dry storage.
==5.0   REGULATORY ANALYSIS==
To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.
 
SCE has evaluated the proposed amendments to determine if a significant hazards consideration is involved by focusing on the three standards set forth in 1 O CFR 50.92, "Issuance of Amendment,"
5.1     No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, respectively. The proposed amendments would revise the Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action Level (EAL) into an ISFl-Only EAL (IOEAL) scheme. The proposed changes are being submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4), 10 CFR 50, Appendix E, Section IV.8.2, and 10 CFR 72.44(f).
as discussed below: Page 11 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN {IOEP) and Emergency Action Level (EAL) Scheme 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
By letters dated June 28, 2013 (Reference 1) and July 22, 2013 (Reference 2), SCE submitted a certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1)(ii). Consequently, as specified in 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. SONGS Unit 1 spent fuel has previously been removed from the Unit 1 spent fuel pool and is now in dry storage. To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.
Response:
SCE has evaluated the proposed amendments to determine if a significant hazards consideration is involved by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:
No The proposed amendments would modify the SONGS Units 1, 2 and 3 licenses by revising the emergency plan and revising the EAL scheme. The SONGS units have permanently ceased operation and are permanently defueled.
Page 11
The proposed amendments are conditioned on all spent nuclear fuel being removed from wet storage in the spent fuel pools and placed in dry storage within an ISFSI. Occurrence of postulated accidents associated with spent fuel stored in a spent fuel pool is no longer credible in a spent fuel pool devoid of such fuel. The proposed amendments have no effect on plant systems, structures, and components (SSCs) and no effect on the capaQility of any plant SSC to perform its design function.
 
The proposed amendments would not increase the likelihood of the malfunction of any plant SSC. The proposed amendments would have no effect on any of the previously evaluated accidents in the SONGS Updated Final Safety Analysis Report (UFSAR).
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN {IOEP) and Emergency Action Level (EAL) Scheme
Since SONGS has permanently ceased operation, the generation of fission products has ceased and the remaining source term continues to decay. This continues to significantly reduce the consequences of previously postulated accidents.
: 1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Therefore, the proposed amendments do not involve a significant increase in the consequences of a previously evaluated accident.  
Response: No The proposed amendments would modify the SONGS Units 1, 2 and 3 licenses by revising the emergency plan and revising the EAL scheme. The SONGS units have permanently ceased operation and are permanently defueled. The proposed amendments are conditioned on all spent nuclear fuel being removed from wet storage in the spent fuel pools and placed in dry storage within an ISFSI. Occurrence of postulated accidents associated with spent fuel stored in a spent fuel pool is no longer credible in a spent fuel pool devoid of such fuel. The proposed amendments have no effect on plant systems, structures, and components (SSCs) and no effect on the capaQility of any plant SSC to perform its design function. The proposed amendments would not increase the likelihood of the malfunction of any plant SSC. The proposed amendments would have no effect on any of the previously evaluated accidents in the SONGS Updated Final Safety Analysis Report (UFSAR).
Since SONGS has permanently ceased operation, the generation of fission products has ceased and the remaining source term continues to decay. This continues to significantly reduce the consequences of previously postulated accidents. Therefore, the proposed amendments do not involve a significant increase in the consequences of a previously evaluated accident.
: 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
: 2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?
Response:
Response: No The proposed amendments constitute a revision of the emergency planning function commensurate with the ongoing and anticipated reduction in radiological source term at SONGS.
No The proposed amendments constitute a revision of the emergency planning function commensurate with the ongoing and anticipated reduction in radiological source term at SONGS. The proposed amendments do not involve a physical alteration of the plant. No new or different types of equipment will be installed and there are no physical modifications to existing equipment as a result of the proposed amendments.
The proposed amendments do not involve a physical alteration of the plant. No new or different types of equipment will be installed and there are no physical modifications to existing equipment as a result of the proposed amendments. Similarly, the proposed amendments would not physically change any SSCs involved in the mitigation of any postulated accidents. Thus, no new initiators or precursors of a new or different kind of accident are created. Furthermore, the proposed amendments do not create the possibility of a new failure mode associated with any equipment or personnel failures. The credible events for the ISFSI remain unchanged.
Similarly, the proposed amendments would not physically change any SSCs involved in the mitigation of any postulated accidents.
Thus, no new initiators or precursors of a new or different kind of accident are created.
Furthermore, the proposed amendments do not create the possibility of a new failure mode associated with any equipment or personnel failures.
The credible events for the ISFSI remain unchanged.
Therefore, the proposed amendments do not create the possibility of a new or different kind of accident from any previously evaluated.
Therefore, the proposed amendments do not create the possibility of a new or different kind of accident from any previously evaluated.
Page 12 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEPl and Emergency Action Level (EAL) Scheme 3. Does the proposed amendment involve a significant reduction in a margin of safety? Response:
Page 12
No Because the 10 CFR Part 50 licenses for SONGS no longer authorize operation of the reactors or emplacement or retention of fuel into the reactor vessels, as specified in 1 O CFR 50.82(a)(2),
 
the occurrence of postulated accidents associated with reactor operation is no longer credible.
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEPl and Emergency Action Level (EAL) Scheme
With all nuclear spent fuel transferred out of wet storage from the spent fuel pools and placed in dry storage within the ISFSI, a fuel handling accident is no longer credible.
: 3. Does the proposed amendment involve a significant reduction in a margin of safety?
There are no longer credible events that would result in any releases beyond the EAB exceeding the EPA PAG exposure levels, as detailed in the EPA's "Protective Action Guide and Planning Guidance for Radiological Incidents,"
Response: No Because the 10 CFR Part 50 licenses for SONGS no longer authorize operation of the reactors or emplacement or retention of fuel into the reactor vessels, as specified in 10 CFR 50.82(a)(2), the occurrence of postulated accidents associated with reactor operation is no longer credible. With all nuclear spent fuel transferred out of wet storage from the spent fuel pools and placed in dry storage within the ISFSI, a fuel handling accident is no longer credible. There are no longer credible events that would result in any releases beyond the EAB exceeding the EPA PAG exposure levels, as detailed in the EPA's "Protective Action Guide and Planning Guidance for Radiological Incidents," Draft for Interim Use and Public Comment dated March 2013 (PAG Manual).
Draft for Interim Use and Public Comment dated March 2013 (PAG Manual).
The proposed amendments do not involve a change in the plant's design, configuration, or operation. The proposed amendments do not affect either the way in which the plant structures, systems, and components perform their safety function or their design margins.
The proposed amendments do not involve a change in the plant's design, configuration, or operation.
The proposed amendments do not affect either the way in which the plant structures,  
: systems, and components perform their safety function or their design margins.
Because there is no change to the physical design of the plant, there is no change to any of these margins.
Because there is no change to the physical design of the plant, there is no change to any of these margins.
Therefore, the proposed amendments do not involve a significant reduction in a margin of safety.
Therefore, the proposed amendments do not involve a significant reduction in a margin of safety.
* Based on the above, SCE concludes that the proposed amendments present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c),
* Based on the above, SCE concludes that the proposed amendments present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.
and, accordingly, a finding of "no significant hazards consideration" is justified.
5.2       Applicable Regulatory Requirements/Criteria The regulatory requirements, as exempted, are discussed below.
5.2 Applicable Regulatory Requirements/Criteria The regulatory requirements, as exempted, are discussed below. Title 10 of the Code of Federal Regulations (10 CFR), Section 50.47, "Emergency plans," sets forth emergency plan requirements for nuclear power plant facilities.
Title 10 of the Code of Federal Regulations (10 CFR), Section 50.47, "Emergency plans," sets forth emergency plan requirements for nuclear power plant facilities. The regulations in 10 CFR 50.47(a)(1 )(i) state, in part, "No initial operating license for a nuclear power reactor will be issued unless a finding is made by the NRC that there is reasonable assurance that adequate protective measures can and will be taken in the event 'of a radiological emergency."
The regulations in 10 CFR 50.47(a)(1  
)(i) state, in part, "No initial operating license for a nuclear power reactor will be issued unless a finding is made by the NRC that there is reasonable assurance that adequate protective measures can and will be taken in the event 'of a radiological emergency."
Section 50.47(b) establishes the standards that emergency response plans must meet for NRC staff to make a positive finding that there is reasonable assurance that the licensee can and will take adequate protective measures in the event of a radiological emergency.
Section 50.47(b) establishes the standards that emergency response plans must meet for NRC staff to make a positive finding that there is reasonable assurance that the licensee can and will take adequate protective measures in the event of a radiological emergency.
* Planning Standard (1) of Section 50.47(b) states, in part: "[E]ach principal response organization has staff to respond and to augment its initial response on a continuous basis."
* Planning Standard (1) of Section 50.47(b) states, in part: "[E]ach principal response organization has staff to respond and to augment its initial response on a continuous basis."
* Page 13 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme
* Page 13
* Planning Standard (2) of Section 50.47(b) states, in part: "On-shift facility licensee responsibilities for emergency response are unambiguously  
 
: defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available  
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme
.... "
* Planning Standard (2) of Section 50.47(b) states, in part: "On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available .... "
* Planning Standard (4) of Section 50.47(b) requires that a licensee's emergency response plan contain the following:  
* Planning Standard (4) of Section 50.47(b) requires that a licensee's emergency response plan contain the following: "A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee."
"A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee."
* Planning Standard (8) of Section 50.47(b) states, in part: "Adequate emergency facilities and equipment to support the emergency response are provided and maintained."
* Planning Standard (8) of Section 50.47(b) states, in part: "Adequate emergency facilities and equipment to support the emergency response are provided and maintained."
10 CFR 50.54(q)(4) specifies the process for revising emergency plans where the changes reduce the effectiveness ofthe plan. This regulation states the following:  
10 CFR 50.54(q)(4) specifies the process for revising emergency plans where the changes reduce the effectiveness ofthe plan. This regulation states the following:
"The changes to a licensee's emergency plan that reduce the effectiveness of the plan as defined in paragraph (q)(1 )(iv) of this section may not be implemented without prior approval by the NRC." Section IV.A of Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities,"
  "The changes to a licensee's emergency plan that reduce the effectiveness of the plan as defined in paragraph (q)(1 )(iv) of this section may not be implemented without prior approval by the NRC."
to 10 CFR Part 50, states, in part: "The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization  
Section IV.A of Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," to 10 CFR Part 50, states, in part: "The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization .... "
.... " Section IV.C.1 of Appendix E requires each emergency plan to define the emergency classification levels that determine the extent of the participation of the emergency response organization.
Section IV.C.1 of Appendix E requires each emergency plan to define the emergency classification levels that determine the extent of the participation of the emergency response organization.
Section IV.E of Appendix  
Section IV.E of Appendix Estates, in part: "Adequate provisions shall be made and described for emergency facilities and equipment. ... "
: Estates, in part: "Adequate provisions shall be made and described for emergency facilities and equipment.  
As proscribed in 10 CFR 72.13, "Applicability", the applicable emergency plan requirements for an Independent Spent Fuel Storage Installation associated with a general license are specified in 10 CFR 72.32(c) and (d).
... " As proscribed in 10 CFR 72.13, "Applicability",
The proposed emergency plan continues to rely on previously granted exemptions from certain emergency planning requirements (Reference 4) as the basis for these exemptions has not changed and remains in effect.
the applicable emergency plan requirements for an Independent Spent Fuel Storage Installation associated with a general license are specified in 10 CFR 72.32(c) and (d). The proposed emergency plan continues to rely on previously granted exemptions from certain emergency planning requirements (Reference  
In November 2012, NEI published NEI 99-01, Revision 6 (Reference 8). NRC endorsed NEI 99-01, Revision 6, by letter dated March 28, 2013 (Reference 10). The changes being requested herein are based on Revision 6 to NEI 99-01. The proposed changes are conservatively being considered as a change to the EAL scheme development methodology. Pursuant to 10 CFR Part 50, Appendix E, Section IV.B.2, a revision to an entire EAL scheme must be approved by the NRC before implementation.                                                       '
: 4) as the basis for these exemptions has not changed and remains in effect. In November 2012, NEI published NEI 99-01, Revision 6 (Reference 8). NRC endorsed NEI 99-01, Revision 6, by letter dated March 28, 2013 (Reference 10). The changes being requested herein are based on Revision 6 to NEI 99-01. The proposed changes are conservatively being considered as a change to the EAL scheme development methodology.
Page 14 c
Pursuant to 10 CFR Part 50, Appendix E, Section IV.B.2, a revision to an entire EAL scheme must be approved by the NRC before implementation.  
 
' Page 14 c 5.3 Precedent EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme Similar changes to emergency plans and associated emergency action levels for plants that have transitioned to ISFSl-only status were approved by NRG for the La Crosse Boiling Water Reactor facility on September 8, 2014 (Reference  
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme 5.3      Precedent Similar changes to emergency plans and associated emergency action levels for plants that have transitioned to ISFSl-only status were approved by NRG for the La Crosse Boiling Water Reactor facility on September 8, 2014 (Reference 11) and for the Zion facility on May 14, 2015 (Reference 12).
: 11) and for the Zion facility on May 14, 2015 (Reference 12).
* 5.4     Conclusion Based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.
* 5.4 Conclusion Based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public. 6.0 ENVIRONMENTAL CONSIDERATION A review has determined that the proposed amendments would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement.  
 
: However, the proposed amendments do not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released  
==6.0   ENVIRONMENTAL CONSIDERATION==
: offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
 
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9).
A review has determined that the proposed amendments would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendments do not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.
Therefore, pursuant to 10 CFR 51.22(b),
Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed.
no environmental impact statement or environmental assessment need be prepared in connection with the proposed.
amendments.
amendments.
7 .0 REFERENCES  
7 .0   REFERENCES


==References:==
==References:==
Line 276: Line 258:


==Subject:==
==Subject:==
Docket No. 50-362, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating Station, Unit 3 (ADAMS Accession No. ML13183A391)
(2) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRG) dated July 22, 2013;
==Subject:==
Docket No. 50-361, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating Station, Unit 2 (ADAMS Accession Number ML13204A304)
Page 15


Docket No. 50-362, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating  
EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme (3) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated September 23, 2014;
: Station, Unit 3 (ADAMS Accession No. ML 13183A391)  
 
(2) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRG) dated July 22, 2013;  
==Subject:==
Docket Nos. 50-361 and 50-362, San Onofre Nuclear Generating Station, Units 2 and 3, Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML14269A033)                                       *
(4) Letterfrom T.J. Wengert (NRC) to T.J. Palmisano (SCE) dated June 4, 2015;  


==Subject:==
==Subject:==


Docket No. 50-361, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating  
San Onofre Nuclear Generating Station, Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - Exemptions from Certain Emergency Planning~Requirements and Related Safety Evaluation (TAC Nos. MF3835, MF3836, and MF3837) (ADAMS Accession No. ML15082A204)
: Station, Unit 2 (ADAMS Accession Number ML 13204A304)
(5) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated XXXXX
Page 15 EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme (3) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated September 23, 2014;


==Subject:==
==Subject:==
 
Amendment Applications 225, 272 and 258, ISFSl-only Technical Specifications, San Onofre Nuclear Generating Station, Units 1, 2 and 3 (6) U.S. Environmental Protection Agency, "Protective Action Guide and Planning Guidance for Radiological Incidents," Draft for Interim Use and Public Comment dated March 2013 (PAG Manual)
Docket Nos. 50-361 and 50-362, San Onofre Nuclear Generating  
(7) Letter from T. J. Wengert (NRC) to T. J. Palmisano (SCE) dated June 5, 2015;  
: Station, Units 2 and 3, Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML 14269A033)  
* (4) Letterfrom T.J. Wengert (NRC) to T.J. Palmisano (SCE) dated June 4, 2015;  


==Subject:==
==Subject:==


San Onofre Nuclear Generating  
San Onofre Nuclear Generating Station, Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation - Issuance of Amendments Re: Changes to the Emergency Action Level Scheme (TAC Nos. MF3838, MF3839, and MF3840) (ADAMS Accession No. ML15105A349)
: Station, Units 1, 2, and 3 and Independent Spent Fuel Storage Installation  
(8) Nuclear Energy Institute (NEI) 99-01, Revision 6, "Methodology for Development of Emergency Action Levels for Non Passive Reactors," November 2012. [ADAMS Accession No. ML12326A805]
-Exemptions from Certain Emergency and Related Safety Evaluation (TAC Nos. MF3835, MF3836, and MF3837) (ADAMS Accession No. ML 15082A204)  
(9) NUREG-0586, "Generic Environmental Impact Statement of Decommissioning of Nuclear Facilities," Supplement 1, Volume 1, November 2002.
(5) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated XXXXX
(10) Letter from Mark Thaggard (NRC) to Susan Perkins-Grew (NEI), "U.S. Nuclear Regulatory Commission Review and Endorsement of NEI 99-01, Revision 6, Dated November, 2012 (TAC No. D92368)," dated March 28, 2013. [ADAMS Accession No. ML12346A463]
(11) Letter from U.S. Nuclear Regulatory Commission to Dairyland Power Cooperative (La Crosse Boiling Water Reactor), "Issuance of Amendment Relating to the Dairyland Power Cooperative La Crosse Boiling Water Reactor Request for Changes to the Emergency Planning Requirements (TAC No. J52956)," dated September 8, 2014.
[ADAMS Accession No. ML14155A112]
(12) Letter from U.S. Nuclear Regulatory Commission to Zion Solutions LLC (Zion Nuclear Power Station), "Issuance of Amendments Relating to the Emergency Planning Requirements for Zion Nuclear Power Station, Units 1 and 2 {TAC Nos. J52992 and J52993)," dated May 14, 2015.
Page 16


==Subject:==
ENCLOSURE 1 ISFSl-ONLY EMERGENCY PLAN SAN ONOFRE NUCLEAR GENERATING STATION


Amendment Applications 225, 272 and 258, ISFSl-only Technical Specifications, San Onofre Nuclear Generating  
IOEP-1                        SONGS ISFSl-Only Emergency Plan San Onofre Nuclear Generating Station (SONGS)
: Station, Units 1, 2 and 3 (6) U.S. Environmental Protection Agency, "Protective Action Guide and Planning Guidance for Radiological Incidents,"
Independent Spent Fuel Storage Installation {ISFSI)
Draft for Interim Use and Public Comment dated March 2013 (PAG Manual) (7) Letter from T. J. Wengert (NRC) to T. J. Palmisano (SCE) dated June 5, 2015;
Only Emergency Plan Revision 0


==Subject:==
IOEP-1                                                                              SONGS ISFSl-Only Emergency Plan TABLE OF CONTENTS Section                                                                                                                                          Page PART I  ....................................................................................................................................... 1


San Onofre Nuclear Generating
==1.0    INTRODUCTION==
: Station, Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation
............................................................................................................ 1 1.1    PURPOSE ....................................................................................................................................1 1.2    SCOPE .........................................................................................................................................1 2.0    DISCUSSION ................................................................................................................. 2 2.1     OVERVIEW OF ISFSI ONLY EMERGENCY PLAN (IOEP) .....................~ ................................... 2 2.2    FACILITY DESCRIPTION ............................................................................................................2 2.3   
-Issuance of Amendments Re: Changes to the Emergency Action Level Scheme (TAC Nos. MF3838, MF3839, and MF3840) (ADAMS Accession No. ML 15105A349)
(8) Nuclear Energy Institute (NEI) 99-01, Revision 6, "Methodology for Development of Emergency Action Levels for Non Passive Reactors,"
November 2012. [ADAMS Accession No. ML 12326A805]
(9) NUREG-0586, "Generic Environmental Impact Statement of Decommissioning of Nuclear Facilities,"
Supplement 1, Volume 1, November 2002. (10) Letter from Mark Thaggard (NRC) to Susan Perkins-Grew (NEI), "U.S. Nuclear Regulatory Commission Review and Endorsement of NEI 99-01, Revision 6, Dated November, 2012 (TAC No. D92368),"
dated March 28, 2013. [ADAMS Accession No. ML 12346A463]
(11) Letter from U.S. Nuclear Regulatory Commission to Dairyland Power Cooperative (La Crosse Boiling Water Reactor),
"Issuance of Amendment Relating to the Dairyland Power Cooperative La Crosse Boiling Water Reactor Request for Changes to the Emergency Planning Requirements (TAC No. J52956),"
dated September 8, 2014. [ADAMS Accession No. ML 14155A 112] (12) Letter from U.S. Nuclear Regulatory Commission to Zion Solutions LLC (Zion Nuclear Power Station),
"Issuance of Amendments Relating to the Emergency Planning Requirements for Zion Nuclear Power Station, Units 1 and 2 {TAC Nos. J52992 and J52993),"
dated May 14, 2015. Page 16 ENCLOSURE 1 ISFSl-ONL Y EMERGENCY PLAN SAN ONOFRE NUCLEAR GENERATING STATION IOEP-1 SONGS ISFSl-Only Emergency Plan San Onofre Nuclear Generating Station (SONGS) Independent Spent Fuel Storage Installation
{ISFSI) Only Emergency Plan Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan TABLE OF CONTENTS Section Page PART I .......................................................................................................................................
1


==1.0 INTRODUCTION==
==SUMMARY==
OF EMERGENCY ACTIONS ....................................................................................3


............................................................................................................
==3.0    REFERENCES==
1 1.1 PURPOSE ....................................................................................................................................
............................................................................................................... 4 4.0    DEFINITIONS AND ABBREVIATIONS ......................................................................... 6 4.1     DEFINITIONS ..............................................................................................................................6 4.2    ABBREVIATIONS ......................................................................................................................10 PART II  ..................................................................................................................................... 11 1.0     ASSIGNMENT OF RESPONSIBILITY (ORGANIZATION CONTROL) ....................... 11 1.1    EMERGENCY RESPONSE AND RESPONSIBILITIES ............................................................. 11 1.2    OFFSITE RESPONSE ORGANIZATIONS (OR0) ..................................................................... 12 2.0    EMERGENCY RESPONSE ORGANIZATION (ER0) .................................................. 13 2.1    ON-SHIFT POSITIONS ..............................................................................................................13 2.2     AUGMENTED POSITION ..........................................................................................................14 2.3    SUPPLEMENTAL PERSONNEL ...............................................................................................14 2.4    FUNCTIONAL RESPONSIBILITIES .......................................................................................... 15 3.0    EMERGENCY RESPONSE SUPPORT AND RESOURCES ....................................... 16 4.0    EMERGENCY CLASSIFICATION SYSTEM ................................................................ 17 4.1    UNUSUAL EVENT .....................................................................................................................1t 4.2     ALERT ........................................................................................................................................17 4.3     EMERGENCY ACTION LEVELS AND POSTULATED ACCIDENTS ........................................ 18 5.0    NOTIFICATION METHODS AND PROCEDURES ...................................................... 19 6.0    EMERGENCY COMMUNICATIONS .............................. ~ ............................................. 21 7.0    PUBLIC INFORMATION .............................................................................................. 22 8.0    EMERGENCY FACILITY AND EQUIPMENT .............................................................. 23 8.1    EMERGENCY RESPONSE FACILITY ......................................................................................23 8.2    EMERGENCY EQUIPMENT ......................................................................................................23 ii                                                                  Revision 0
1 1.2 SCOPE .........................................................................................................................................
1 2.0 DISCUSSION
.................................................................................................................
2 2.1 OVERVIEW OF ISFSI ONLY EMERGENCY PLAN (IOEP) ..................... ...................................
2 2.2 FACILITY DESCRIPTION
............................................................................................................
2 2.3 SUMMARY OF EMERGENCY ACTIONS ....................................................................................
3


==3.0 REFERENCES==
IOEP-1                                                                            SONGS ISFSl-Only Emergency Plan TABLE OF CONTENTS (continued)
Section                                                                                                                                  Page 9.0     ACCIDENT ASSESSMENT ......................................................................................... 24 10.0    PROTECTIVE ACTIONS ............................................................................................. 25 11.0    RADIOLOGICAL EXPOSURE CONTROL .................................................................. 26 12.0    MEDICAL AND HEALTH SUPPORT ........................................................................... 28 13.0    EMERGENCY TERMINATION AND RECOVERY ....................................................... 29 14.0    EXERCISE AND DRILLS ............................................................................................. 30 15.0    RADIOLOGICAL EMERGENCY RESPONSE TRAINING ........................................... 33 15.1    EMERGENCY RESPONSE PERSONNEL TRAINING .............................................................. 33 15.2    SUPPORT ORGANIZATIONS TRAINING .................................................................................35 16.0    MAINTAINING EMERGENCY PREPAREDNESS ....................................................... 36 16.1    EMERGENCY PREPAREDNESS RESPONSIBILITIES ............................................................36 16.2    REVIEW AND UPDATING OF THE IOEP .................................................................................37 PART Ill ..................................................................................................................................... 38 APPENDIX A            Emergency Equipment, Supplies, and Reference Materials .................... 38 APPENDIX B            Cross Reference IOEP Section to Planning Standards I Requirements I Criteria and Procedures ............................................................................... 39 APPENDIXC            List of Letters and Memoranda of Agreement ............................................ 40 iii                                                            Revision 0


...............................................................................................................
IOEP-1                                                         SONGS ISFSl-Only Emergency Plan PARTI
4 4.0 DEFINITIONS AND ABBREVIATIONS
.........................................................................
6 4.1 DEFINITIONS
..............................................................................................................................
6 4.2 ABBREVIATIONS
......................................................................................................................
10 PART II .....................................................................................................................................
11 1.0 ASSIGNMENT OF RESPONSIBILITY (ORGANIZATION CONTROL)
.......................
11 1.1 EMERGENCY RESPONSE AND RESPONSIBILITIES
.............................................................
11 1.2 OFFSITE RESPONSE ORGANIZATIONS (OR0) .....................................................................
12 2.0 EMERGENCY RESPONSE ORGANIZATION (ER0) ..................................................
13 2.1 ON-SHIFT POSITIONS
..............................................................................................................
13 2.2 AUGMENTED POSITION
..........................................................................................................
14 2.3 SUPPLEMENTAL PERSONNEL
...............................................................................................
14 2.4 FUNCTIONAL RESPONSIBILITIES
..........................................................................................
15 3.0 EMERGENCY RESPONSE SUPPORT AND RESOURCES
.......................................
16 4.0 EMERGENCY CLASSIFICATION SYSTEM ................................................................
17 4.1 UNUSUAL EVENT .....................................................................................................................
1 t 4.2 ALERT ........................................................................................................................................
17 4.3 EMERGENCY ACTION LEVELS AND POSTULATED ACCIDENTS
........................................
18 5.0 NOTIFICATION METHODS AND PROCEDURES
......................................................
19 6.0 EMERGENCY COMMUNICATIONS
.............................. .............................................
21 7 .0 PUBLIC INFORMATION
..............................................................................................
22 8.0 EMERGENCY FACILITY AND EQUIPMENT
..............................................................
23 8.1 EMERGENCY RESPONSE FACILITY
......................................................................................
23 8.2 EMERGENCY EQUIPMENT
......................................................................................................
23 ii Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan TABLE OF CONTENTS (continued)
Section Page 9.0 ACCIDENT ASSESSMENT
.........................................................................................
24 10.0 PROTECTIVE ACTIONS .............................................................................................
25 11.0 RADIOLOGICAL EXPOSURE CONTROL ..................................................................
26 12.0 MEDICAL AND HEALTH SUPPORT ...........................................................................
28 13.0 EMERGENCY TERMINATION AND RECOVERY
.......................................................
29 14.0 EXERCISE AND DRILLS .............................................................................................
30 15.0 RADIOLOGICAL EMERGENCY RESPONSE TRAINING
...........................................
33 15.1 EMERGENCY RESPONSE PERSONNEL TRAINING
..............................................................
33 15.2 SUPPORT ORGANIZATIONS TRAINING
.................................................................................
35 16.0 MAINTAINING EMERGENCY PREPAREDNESS
.......................................................
36 16.1 EMERGENCY PREPAREDNESS RESPONSIBILITIES
............................................................
36 16.2 REVIEW AND UPDATING OF THE IOEP .................................................................................
37 PART Ill .....................................................................................................................................
38 APPENDIX A APPENDIX B APPENDIXC Emergency Equipment,
: Supplies, and Reference Materials
....................
38 Cross Reference IOEP Section to Planning Standards I Requirements I Criteria and Procedures
...............................................................................
39 List of Letters and Memoranda of Agreement
............................................
40 iii Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan PARTI  


==1.0 INTRODUCTION==
==1.0   INTRODUCTION==


The San Onofre Nuclear Generating Station (SONGS) is owned by Southern California Edison (SCE), San Diego Gas and Electric (SDG&E) and the cities of Anaheim and Riverside, California.
The San Onofre Nuclear Generating Station (SONGS) is owned by Southern California Edison (SCE), San Diego Gas and Electric (SDG&E) and the cities of Anaheim and Riverside, California.
SCE is authorized to act as agent for the co-participants and has exclusive responsibility for the operation of the facility.
SCE is authorized to act as agent for the co-participants and has exclusive responsibility for the operation of the facility.
The SONGS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) Only Emergency Plan (IOEP) describes the plan for responding to emergencies that may arise at the station's ISFSI. In this condition, no reactor operations can take place and all irradiated fuel is removed from the Spent Fuel Pools (SFPs). This IOEP addresses the risks associated with SONGS' ISFSl-Only conditions.
The SONGS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) Only Emergency Plan (IOEP) describes the plan for responding to emergencies that may arise at the station's ISFSI.
As provided in the ISFSI storage system Final Safety Analysis Reports (FSARs),
In this condition, no reactor operations can take place and all irradiated fuel is removed from the Spent Fuel Pools (SFPs). This IOEP addresses the risks associated with SONGS' ISFSl-Only conditions.
the analyses of the potential radiological impacts of postulated off-normal, natural phenomenon, and accident events in an ISFSl-Only condition indicates that any releases beyond the EXCLUSION AREA BOUNDARY (EAB) would result in a DOSE to the public below the radiation limits established in 10 CFR 72.106(b).
As provided in the ISFSI storage system Final Safety Analysis Reports (FSARs), the analyses of the potential radiological impacts of postulated off-normal, natural phenomenon, and accident events in an ISFSl-Only condition indicates that any releases beyond the EXCLUSION AREA BOUNDARY (EAB) would result in a DOSE to the public below the radiation limits established in 10 CFR 72.106(b). Areas where exposure levels could potentially warrant pre-planned response measures are generally limited to the ISFSI pad and nearby vicinity; for this reason radiological emergency planning is focused on this area.
Areas where exposure levels could potentially warrant pre-planned response measures are generally limited to the ISFSI pad and nearby vicinity; for this reason radiological emergency planning is focused on this area. 1.1 PURPOSE The purpose of the IOEP is to assure an adequate level of preparedness to cope with a spectrum of emergencies.
1.1   PURPOSE The purpose of the IOEP is to assure an adequate level of preparedness to cope with a spectrum of emergencies. This Plan integrates the necessary elements to provide effective emergency response considering cooperation and coordination of organizations expected to respond to emergencies.
This Plan integrates the necessary elements to provide effective emergency response considering cooperation and coordination of organizations expected to respond to emergencies.
1.2   SCOPE The SONGS IOEP is developed to respond to potential radiological emergencies at the SONGS ISFSI. Because there are no postulated off-normal, natural phenomenon, or accident events that would result in OFFSITE DOSE consequences that are large enough to require OFFSITE emergency planning, the overall scope of this Plan delineates the actions necessary to safeguard ONSITE personnel. The concepts presented in this Plan address the applicable regulations stipulated in 10 CFR 50.47, "Emergency Plans" and 10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities". The Plan is consistent with the applicable guidelines established in NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" and NEI 99-01, "Development of Emergency Action Levels for Non-Passive Reactors" Rev. 6.
1.2 SCOPE The SONGS IOEP is developed to respond to potential radiological emergencies at the SONGS ISFSI. Because there are no postulated off-normal, natural phenomenon, or accident events that would result in OFFSITE DOSE consequences that are large enough to require OFFSITE emergency  
Exemptions from selected portions of 10 CFR 50.47 and 10 CFR 50 Appendix E for SONGS were granted by the Nuclear Regulatory Commission (NRC) on June 4, 2015 (ADAMS Accession Number: ML15082A204).
: planning, the overall scope of this Plan delineates the actions necessary to safeguard ONSITE personnel.
The concepts presented in this Plan address the applicable regulations stipulated in 10 CFR 50.47, "Emergency Plans" and 10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities".
The Plan is consistent with the applicable guidelines established in NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" and NEI 99-01, "Development of Emergency Action Levels for Non-Passive Reactors" Rev. 6. Exemptions from selected portions of 10 CFR 50.47 and 1 O CFR 50 Appendix E for SONGS were granted by the Nuclear Regulatory Commission (NRC) on June 4, 2015 (ADAMS Accession Number: ML 15082A204).
The IOEP revision 0 was approved per NRC Safety Evaluation dated [insert date prior to issuing].
The IOEP revision 0 was approved per NRC Safety Evaluation dated [insert date prior to issuing].
1 Revision O
1                                             Revision O
IOEP-1 SONGS ISFSl-Only Emergency Plan 2.0 DISCUSSION 2.1 OVERVIEW OF ISFSI ONLY EMERGENCY PLAN (IOEP) In the event of an emergency at the SONGS ISFSI, actions are required to identify and assess the nature of the emergency and to respond in a manner that protects the health and safety of the public and ONSITE personnel.
This Plan describes the organization and responsibilities for implementing emergency measures.
It describes interfaces with OFFSITE government agencies (Federal, State and local) which may be notified in the event of an emergency, and may provide assistance.
Fire, rescue and ambulance services are provided by the United States Marine Corps Camp Pendleton Fire Department (USMC CPFD).Law enforcement services are provided by the Federal Bureau of Investigation (FBI) and local public entities.
Medical services are provided by Mission Hospital Regional Medical Center in Mission Viejo, California.
Because there are no postulated events that would result in OFFSITE DOSE consequences that are large enough to require OFFSITE emergency
: planning, emergencies are divided into two emergency CLASSIFICATION levels: UNUSUAL EVENT (UE) and ALERT. SONGS is responsible for planning and implementing emergency measures associated with the SONGS ISFSI. This Plan is provided to meet this responsibility.
To carry out specific emergency measures discussed in this Plan, detailed implementing procedures are established and maintained.
In addition to the description of activities and steps that can be implemented during a potential emergency, this Plan also provides a general description of the steps taken to recover from an emergency situation.
It also describes the training, drills, exercises,
: planning, and coordination appropriate to maintain an adequate level of EMERGENCY PREPAREDNESS.
2.2 FACILITY DESCRIPTION SONGS has permanently ceased power operations and all Units 2 and 3 irradiated fuel has been removed from the SFPs and placed into dry storage within the SONGS ISFSI. SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase. Above-ground structures have been dismantled.
Unit 1 fuel is stored in the SONGS ISFSI and in the GE-Hitachi Morris facility.
By letter dated June 12, 2013, SCE certified its intention to permanently cease power operations at SONGS Units 2 and 3 as of June 7, 2013, pursuant to 10 CFR 50.82(a)(1)(i).
By letters dated June 28, 2013 and July 22, 2013, SCE certified permanent removal offuel from the Unit 2 and Unit 3 reactor vessels, pursuant to 10 CFR 50.82(a)(1
)(ii). The 10 CFR 50 licenses for SONGS Units 2 and 3 no longer authorize operation of the reactors, or emplacement or retention of fuel into the reactor vessels, as specified in 10 CFR 50.82(a)(2).
The San Onofre ISFSI is located on the coast of southern California in San Diego County, near the border with Orange County. The site is located entirely within the boundaries of the United States Marine Corps Base, Camp Pendleton, California.
There is public access between the beaches north and south of the station. Interstate Highway 5 and the Atchison, Topeka, and Santa Fe Railway pass within 1000 feet of the station.
2 Revision O
IOEP-1 SONGS ISFSl-Only Emergency Plan 2.3 SUMMARY OF EMERGENCY ACTIONS This Plan is activated by the ISFSI Shift Supervisor, who assumes the position of EMERGENCY DIRECTOR (ED) upon DECLARATION of an emergency based upon CLASSIFICATION of an event according to the EMERGENCY ACTION LEVEL (EAL) criteria.
The emergency measures described in the subsequent sections and implementing procedures are implemented in accordance with the CLASSIFICATION and nature of the emergency at the direction of the ED. Regulatory authorities and OFFSITE support organizations are notified in accordance with this Plan. The ED has authority and responsibility for control and mitigation of the emergency, including emergency response resources, coordination of radiological ASSESSMENT ACTIVITIES, recovery implementation, and coordination of emergency response activities.
The following sections of this Plan describe the detailed plans and actions of the SONGS EMERGENCY RESPONSE ORGANIZATION (ERO), including interfaces with OFFSITE support organizations.
3 Revision O
IOEP-1 SONGS ISFSl-Only Emergency Plan


==3.0 REFERENCES==
IOEP-1                                                            SONGS ISFSl-Only Emergency Plan 2.0  DISCUSSION 2.1  OVERVIEW OF ISFSI ONLY EMERGENCY PLAN (IOEP)
In the event of an emergency at the SONGS ISFSI, actions are required to identify and assess the nature of the emergency and to respond in a manner that protects the health and safety of the public and ONSITE personnel.
This Plan describes the organization and responsibilities for implementing emergency measures. It describes interfaces with OFFSITE government agencies (Federal, State and local) which may be notified in the event of an emergency, and may provide assistance. Fire, rescue and ambulance services are provided by the United States Marine Corps Camp Pendleton Fire Department (USMC CPFD).Law enforcement services are provided by the Federal Bureau of Investigation (FBI) and local public entities. Medical services are provided by Mission Hospital Regional Medical Center in Mission Viejo, California.
Because there are no postulated events that would result in OFFSITE DOSE consequences that are large enough to require OFFSITE emergency planning, emergencies are divided into two emergency CLASSIFICATION levels: UNUSUAL EVENT (UE) and ALERT.
SONGS is responsible for planning and implementing emergency measures associated with the SONGS ISFSI. This Plan is provided to meet this responsibility. To carry out specific emergency measures discussed in this Plan, detailed implementing procedures are established and maintained.
In addition to the description of activities and steps that can be implemented during a potential emergency, this Plan also provides a general description of the steps taken to recover from an emergency situation. It also describes the training, drills, exercises, planning, and coordination appropriate to maintain an adequate level of EMERGENCY PREPAREDNESS.
2.2  FACILITY DESCRIPTION SONGS has permanently ceased power operations and all Units 2 and 3 irradiated fuel has been removed from the SFPs and placed into dry storage within the SONGS ISFSI.
SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase.
Above-ground structures have been dismantled. Unit 1 fuel is stored in the SONGS ISFSI and in the GE-Hitachi Morris facility.
By letter dated June 12, 2013, SCE certified its intention to permanently cease power operations at SONGS Units 2 and 3 as of June 7, 2013, pursuant to 10 CFR 50.82(a)(1)(i). By letters dated June 28, 2013 and July 22, 2013, SCE certified permanent removal offuel from the Unit 2 and Unit 3 reactor vessels, pursuant to 10 CFR 50.82(a)(1 )(ii). The 10 CFR 50 licenses for SONGS Units 2 and 3 no longer authorize operation of the reactors, or emplacement or retention of fuel into the reactor vessels, as specified in 10 CFR 50.82(a)(2).
The San Onofre ISFSI is located on the coast of southern California in San Diego County, near the border with Orange County. The site is located entirely within the boundaries of the United States Marine Corps Base, Camp Pendleton, California. There is public access between the beaches north and south of the station. Interstate Highway 5 and the Atchison, Topeka, and Santa Fe Railway pass within 1000 feet of the station.
2                                          Revision O


References consulted in the writing of this Plan are listed in this section.
IOEP-1                                                          SONGS ISFSl-Only Emergency Plan 2.
With exception of regulatory requirements, inclusion of material on this list does not imply adherence to all criteria or guidance stated in each individual reference.
 
3.1 1 O CFR 20, "Standards for Protection Against Radiation" 3.2 10 CFR 50.47, "Emergency Plans" 3.3 10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" 3.4 10 CFR 72.13, "Applicability" 3.5 1 O CFR 72.32, "Emergency Plans" 3.6 10 CFR 72.44, "License conditions"
==SUMMARY==
: 3. 7 10 CFR 72.106, "Controlled area of an ISFSI or MRS" 3.8 NUREG-1140, Final Report published January 1988, "A Regulatory Analysis on Emergency Preparedness for Fuel Cycle and Other Radioactive Material Licensees" 3.9 NUREG-0586, "Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities" 3.10 NUREG-0654/FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" (November 1980) 3.11 NUREG-0728, Report to Congress, "NRC Incident Response Plan" 3.12 US NRC Regulatory Guide 1.101, "Emergency Planning and Preparedness for Nuclear Power Reactors",
OF EMERGENCY ACTIONS This Plan is activated by the ISFSI Shift Supervisor, who assumes the position of EMERGENCY DIRECTOR (ED) upon DECLARATION of an emergency based upon CLASSIFICATION of an event according to the EMERGENCY ACTION LEVEL (EAL) criteria. The emergency measures described in the subsequent sections and implementing procedures are implemented in accordance with the CLASSIFICATION and nature of the emergency at the direction of the ED. Regulatory authorities and OFFSITE support organizations are notified in accordance with this Plan. The ED has authority and responsibility for control and mitigation of the emergency, including emergency response resources, coordination of radiological ASSESSMENT ACTIVITIES, recovery implementation, and coordination of emergency response activities. The following sections of this Plan describe the detailed plans and actions of the SONGS EMERGENCY RESPONSE ORGANIZATION (ERO), including interfaces with OFFSITE support organizations.
revision 4, July, 2003 3.13 NRC Information Notice No. 85-44, "Emergency Communication System Monthly Test" 3.14 NRC Information Notice No. 90-08, "KR-85 Hazards From Decayed Fuel" 3.15 EPA 400-R-92-001, "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents",
3                                           Revision O
October 1991 3.16 American Nuclear Insurers Bulletin
 
#58 (1981), "Accident Notification Procedures for Liability Insured" 4 Revision 0
IOEP-1                                                          SONGS ISFSl-Only Emergency Plan
IOEP-1 SONGS ISFSl-Only Emergency Plan 3.17 NRC letter dated June 4, 2015, SAN ONOFRE NUCLEAR GENERATING
 
: STATION, UNITS 1, 2, AND 3 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION
==3.0  REFERENCES==
-EXEMPTIONS FROM CERTAIN EMERGENCY PLANNING REQUIREMENTS AND RELATED SAFETY EVALUATION (TAC NOS. MF3835, MF3836, AND MF3837).  
 
(ADAMS Accession Nos: Letter ML 15082A204; Exemption:
References consulted in the writing of this Plan are listed in this section. With exception of regulatory requirements, inclusion of material on this list does not imply adherence to all criteria or guidance stated in each individual reference.
ML 15082A143 on June 4, 2015). 3.18 San Onofre 2&3 Defueled Safety Analysis Report 3.19 Advanced NUHOMS Horizontal Modular Storage System for Irradiated Nuclear Fuel Certificates of Compliance, Final Safety Analysis Reports and Technical Specifications 3.20 HI-STORM UMAX Canister Storage System Certificates of Compliance, Final Safety Analysis Reports and Technical Specifications 3.21 NEI 99-01, Rev. 6, "Development of Emergency Action Levels for Non-Passive Reactors" 3.22 Environmental Protection Agency, "Protective Action Guide and Planning Guidance for Radiological Incidents,"
3.1  10 CFR 20, "Standards for Protection Against Radiation" 3.2  10 CFR 50.47, "Emergency Plans" 3.10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" 3.4  10 CFR 72.13, "Applicability" 3.5  10 CFR 72.32, "Emergency Plans" 3.6  10 CFR 72.44, "License conditions"
Draft for Interim Use and Public Comment (March 2013) 5 Revision O
: 3. 7  10 CFR 72.106, "Controlled area of an ISFSI or MRS" 3.8  NUREG-1140, Final Report published January 1988, "A Regulatory Analysis on Emergency Preparedness for Fuel Cycle and Other Radioactive Material Licensees" 3.9  NUREG-0586, "Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities" 3.10  NUREG-0654/FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" (November 1980) 3.11  NUREG-0728, Report to Congress, "NRC Incident Response Plan" 3.12  US NRC Regulatory Guide 1.101, "Emergency Planning and Preparedness for Nuclear Power Reactors", revision 4, July, 2003 3.13  NRC Information Notice No. 85-44, "Emergency Communication System Monthly Test" 3.14  NRC Information Notice No. 90-08, "KR-85 Hazards From Decayed Fuel" 3.15  EPA 400-R-92-001, "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents", October 1991 3.16  American Nuclear Insurers Bulletin #58 (1981), "Accident Notification Procedures for Liability Insured" 4                                              Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan 4.0 DEFINITIONS AND ABBREVIATIONS 4.1 DEFINITIONS This section provides definitions that are used in this document.
 
Terms capitalized in the text of the definitions indicate that they are defined elsewhere in this section.
IOEP-1                                                      SONGS ISFSl-Only Emergency Plan 3.17  NRC letter dated June 4, 2015, SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION -EXEMPTIONS FROM CERTAIN EMERGENCY PLANNING REQUIREMENTS AND RELATED SAFETY EVALUATION (TAC NOS. MF3835, MF3836, AND MF3837). (ADAMS Accession Nos: Letter ML15082A204; Exemption: ML15082A143 on June 4, 2015).
Accident Assessment
3.18  San Onofre 2&3 Defueled Safety Analysis Report 3.19  Advanced NUHOMS Horizontal Modular Storage System for Irradiated Nuclear Fuel Certificates of Compliance, Final Safety Analysis Reports and Technical Specifications 3.20  HI-STORM UMAX Canister Storage System Certificates of Compliance, Final Safety Analysis Reports and Technical Specifications 3.21  NEI 99-01, Rev. 6, "Development of Emergency Action Levels for Non-Passive Reactors" 3.22  Environmental Protection Agency, "Protective Action Guide and Planning Guidance for Radiological Incidents," Draft for Interim Use and Public Comment (March 2013) 5                                      Revision O
-Accident assessment consists of a variety of actions taken to determine the nature, effects and severity of an accident.
 
Accountability -A procedural or discretionary PROTECTIVE ACTION taken for all persons within the ISFSI PROTECTED AREA, which involves the gathering of personnel into pre-designated areas, and the subsequent verification that the location of these personnel is known. Alert -Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to station personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA PROTECTIVE ACTION Guideline exposure levels. ALARA -Acronym for "As Low as Reasonably Achievable,"
IOEP-1                                                          SONGS ISFSl-Only Emergency Plan 4.0  DEFINITIONS AND ABBREVIATIONS 4.1  DEFINITIONS This section provides definitions that are used in this document. Terms capitalized in the text of the definitions indicate that they are defined elsewhere in this section.
a basic concept of radiation protection that specifies that radioactive discharges from nuclear plants and radiation exposure to personnel be kept as far below regulation limits as feasible.
Accident Assessment - Accident assessment consists of a variety of actions taken to determine the nature, effects and severity of an accident.
Annual -Frequency of occurrence is met if performed within 1.25 times a 12 month interval as measured from the previous performance.
Accountability - A procedural or discretionary PROTECTIVE ACTION taken for all persons within the ISFSI PROTECTED AREA, which involves the gathering of personnel into pre-designated areas, and the subsequent verification that the location of these personnel is known.
This definition does not apply to the term "annual" when it relates to the conduct of the EMERGENCY PREPAREDNESS Exercise and off-year Drill. The Exercise and off-year Drill are performed within the calendar year. Assessment Activities
Alert - Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to station personnel or damage to ISFSI equipment because of HOSTILE ACTION.
-Actions taken during or after an emergency for the purpose of obtaining and processing the information that will be used to make the decisions to implement specific emergency measures.
Any releases are expected to be limited to small fractions of the EPA PROTECTIVE ACTION Guideline exposure levels.
Biennial
ALARA - Acronym for "As Low as Reasonably Achievable," a basic concept of radiation protection that specifies that radioactive discharges from nuclear plants and radiation exposure to personnel be kept as far below regulation limits as feasible.
-Occurring every two years. Classification
Annual - Frequency of occurrence is met if performed within 1.25 times a 12 month interval as measured from the previous performance. This definition does not apply to the term "annual" when it relates to the conduct of the EMERGENCY PREPAREDNESS Exercise and off-year Drill. The Exercise and off-year Drill are performed within the calendar year.
-The comparison of conditions, indications and reports associated with an off-normal, natural phenomenon or accident event to the approved emergency classification system to determine the most accurate EMERGENCY ACTION LEVEL. Command and Control -When in Command and Control of the event, the designated individual has overall responsibility for the SONGS emergency response efforts.
Assessment Activities - Actions taken during or after an emergency for the purpose of obtaining and processing the information that will be used to make the decisions to implement specific emergency measures.
Controlled Area -The area immediately surrounding the SONGS ISFSI for which SCE exercises authority over its use and within which ISFSI operations are performed.
Biennial - Occurring every two years.
The ISFSI Controlled Area is bounded within the EAB. 6 Revision 0
Classification - The comparison of conditions, indications and reports associated with an off-normal, natural phenomenon or accident event to the approved emergency classification system to determine the most accurate EMERGENCY ACTION LEVEL.
IOEP-1 SONGS ISFSl-Only Emergency Plan Corrective Action -Those emergency measures taken to lesson or terminate an emergency situation to prevent an uncontrolled release of radioactive
Command and Control - When in Command and Control of the event, the designated individual has overall responsibility for the SONGS emergency response efforts.
: material, or to reduce the magnitude of a release.
Controlled Area - The area immediately surrounding the SONGS ISFSI for which SCE exercises authority over its use and within which ISFSI operations are performed. The ISFSI Controlled Area is bounded within the EAB.
Corrective actions include, but are not limited to, equipment repair or shutdown, installation of emergency structures, firefighting, repair, and damage control.
6                                            Revision 0
Declaration
 
-Official determination by the EMERGENCY DIRECTOR that conditions at the ISFSI meet the criteria for an EMERGENCY ACTION LEVEL warranting CLASSIFICATION of an emergency at the UNUSUAL EVENT or ALERT emergency CLASSIFICATION level. Decontamination
IOEP-1                                                          SONGS ISFSl-Only Emergency Plan Corrective Action - Those emergency measures taken to lesson or terminate an emergency situation to prevent an uncontrolled release of radioactive material, or to reduce the magnitude of a release. Corrective actions include, but are not limited to, equipment repair or shutdown, installation of emergency structures, firefighting, repair, and damage control.
-The reduction or removal of radioactive material contamination from a structure, area, material, object, or person. Decontamination may be accomplished by (1) treating the surface so as to remove or decrease the contamination, (2) letting the material stand so that the radioactivity is decreased as a result of natural decay, and (3) covering the contamination.
Declaration - Official determination by the EMERGENCY DIRECTOR that conditions at the ISFSI meet the criteria for an EMERGENCY ACTION LEVEL warranting CLASSIFICATION of an emergency at the UNUSUAL EVENT or ALERT emergency CLASSIFICATION level.
Design Basis Accident (OBA) -Credible accident events as analyzed in the ISFSI storage system Final Safety Analysis Reports (FSARs).
Decontamination - The reduction or removal of radioactive material contamination from a structure, area, material, object, or person. Decontamination may be accomplished by (1) treating the surface so as to remove or decrease the contamination, (2) letting the material stand so that the radioactivity is decreased as a result of natural decay, and (3) covering the contamination.
Dose -A generic term that means absorbed dose, dose equivalent, effective dose equivalent, deep dose equivalent, committed dose equivalent, committed effective dose equivalent, or TOTAL EFFECTIVE DOSE EQUIVALENT.
Design Basis Accident (OBA) - Credible accident events as analyzed in the ISFSI storage system Final Safety Analysis Reports (FSARs).
Dose Rate -The amount of ionizing (or nuclear) radiation to which an individual would be exposed per unit of time. As it would apply to dose rate to a person; it is usually expressed as rems per hour or in submultiples of this unit, such as millirems per hour. The dose rate is commonly used to indicate the level of radioactivity in a contaminated area. Emergency Action Levels (EALs) -A pre-determined, site-specific, observable threshold for an INITIATING CONDITION that when met or exceeded places the station in a given emergency CLASSIFICATION level. Emergency Director (ED) -The Director of the facility in COMMAND AND CONTROL of the event. The ISFSI Shift Supervisor fills the role of ED throughout an event. Emergency Preparedness (EP) -A state of readiness that provides reasonable assurance that adequate protective measures can and will be taken upon implementation of the Emergency Plan in the event of a radiological emergency.
Dose - A generic term that means absorbed dose, dose equivalent, effective dose equivalent, deep dose equivalent, committed dose equivalent, committed effective dose equivalent, or TOTAL EFFECTIVE DOSE EQUIVALENT.
Also, the SCE organization responsible for the Emergency Preparedness program.
Dose Rate - The amount of ionizing (or nuclear) radiation to which an individual would be exposed per unit of time. As it would apply to dose rate to a person; it is usually expressed as rems per hour or in submultiples of this unit, such as millirems per hour. The dose rate is commonly used to indicate the level of radioactivity in a contaminated area.
Emergency Plan Implementing Procedures (EPIPs) -Specific procedures describing actions needed to implement the IOEP and describing the methods established to maintain and monitor the IOEP. Emergency Response Facility (ERF) -The security center of the station from which the ISFSI can be monitored.
Emergency Action Levels (EALs) - A pre-determined, site-specific, observable threshold for an INITIATING CONDITION that when met or exceeded places the station in a given emergency CLASSIFICATION level.
The facility containing the communication equipment necessary for both normal and emergency conditions.
Emergency Director (ED) - The Director of the facility in COMMAND AND CONTROL of the event.
It is operated under the direction of the ISS/ED and serves as the primary location for event CLASSIFICATION, emergency DECLARATION and Notifications to OFFSITE agencies, ASSESSMENT ACTIVITIES, and CORRECTIVE ACTION direction.
The ISFSI Shift Supervisor fills the role of ED throughout an event.
Emergency Response Organization (ERO) -Organization of personnel who may be called upon during an emergency to perform duties to mitigate accident conditions at SONGS.
Emergency Preparedness (EP) - A state of readiness that provides reasonable assurance that adequate protective measures can and will be taken upon implementation of the Emergency Plan in the event of a radiological emergency. Also, the SCE organization responsible for the Emergency Preparedness program.
* Emergency Response Personnel  
Emergency Plan Implementing Procedures (EPIPs) - Specific procedures describing actions needed to implement the IOEP and describing the methods established to maintain and monitor the IOEP.
-Personnel who may be called upon during an emergency to perform duties to mitigate accident conditions at SONGS. 7 Revision 0
Emergency Response Facility (ERF) - The security center of the station from which the ISFSI can be monitored. The facility containing the communication equipment necessary for both normal and emergency conditions. It is operated under the direction of the ISS/ED and serves as the primary location for event CLASSIFICATION, emergency DECLARATION and Notifications to OFFSITE agencies, ASSESSMENT ACTIVITIES, and CORRECTIVE ACTION direction.
IOEP-1 SONGS ISFSl-Only Emergency Plan Essential Personnel  
Emergency Response Organization (ERO) - Organization of personnel who may be called upon during an emergency to perform duties to mitigate accident conditions at SONGS.
-SONGS personnel that either have assigned emergency response duties, are security personnel, are required for maintaining the safe operation of the ISFSI, or are personnel either identified as essential by the ISS/ED or performing critical tasks under the direction of the ISS/ED. Exclusion Area -The area surrounding the reactor where the licensee has the authority to determine all activities, including exclusion or removal of personnel and property (1 O CFR 100.3). The Exclusion Area is determined as an area of such size that an individual located at any point on its boundary for two hours immediately following onset of the postulated fission product release would not receive a total radiation DOSE to the whole body in excess of 25 rem or a total radiation DOSE in excess of 300 rem to the thyroid from iodine exposure  
* Emergency Response Personnel - Personnel who may be called upon during an emergency to perform duties to mitigate accident conditions at SONGS.
[10 CFR 100.11 (a)(1 )]. In accordance to the letter dated March 31, 2014 (ADAMS Accession No. ML 14092A332),
7                                           Revision 0
SONGS analyses demonstrate that the radiological consequences of design basis accidents at SONGS will not exceed the 1 rem limit of the EPA PAGs at the EXCLUSION AREA BOUNDARY.
 
Exclusion Area Boundary (EAB) -For SONGS, the Exclusion Area Boundary (EAB) is roughly formed by two semicircles with radii of 1967.5 ft. each, centered on the Unit 2 Containment dome and a point 134 ft. southeast of the Unit 3 Containment dome, with a tangent connecting the landward arcs and seaward arcs of the two semicircles.
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan Essential Personnel - SONGS personnel that either have assigned emergency response duties, are security personnel, are required for maintaining the safe operation of the ISFSI, or are personnel either identified as essential by the ISS/ED or performing critical tasks under the direction of the ISS/ED.
The EAB is depicted in SONGS 2 & 3 DSAR Figure 2.1-5. Hostage -A person(s) held as leverage against the station to ensure that demands will be met by the station.
Exclusion Area - The area surrounding the reactor where the licensee has the authority to determine all activities, including exclusion or removal of personnel and property (1 O CFR 100.3).
Hostile Action -An act toward the SONGS ISFSI or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end. This includes attack by air, land or water using guns, explosives, PROJECTILES,  
The Exclusion Area is determined as an area of such size that an individual located at any point on its boundary for two hours immediately following onset of the postulated fission product release would not receive a total radiation DOSE to the whole body in excess of 25 rem or a total radiation DOSE in excess of 300 rem to the thyroid from iodine exposure [10 CFR 100.11 (a)(1 )]. In accordance to the letter dated March 31, 2014 (ADAMS Accession No. ML14092A332), SONGS analyses demonstrate that the radiological consequences of design basis accidents at SONGS will not exceed the 1 rem limit of the EPA PAGs at the EXCLUSION AREA BOUNDARY.
: vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included.
Exclusion Area Boundary (EAB) - For SONGS, the Exclusion Area Boundary (EAB) is roughly formed by two semicircles with radii of 1967.5 ft. each, centered on the Unit 2 Containment dome and a point 134 ft. southeast of the Unit 3 Containment dome, with a tangent connecting the landward arcs and seaward arcs of the two semicircles. The EAB is depicted in SONGS 2 & 3 DSAR Figure 2.1-5.
Hostile Action should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the SONGS ISFSI. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals within the VEHICLE BARRIER SYSTEM boundary).  
Hostage - A person(s) held as leverage against the station to ensure that demands will be met by the station.
(NEI 99-01, Rev. 6) Hostile Force -One or more individuals who are engaged in a determined  
Hostile Action - An act toward the SONGS ISFSI or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end.
: assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing,  
This includes attack by air, land or water using guns, explosives, PROJECTILES, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included.
: maiming, or causing destruction.  
Hostile Action should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the SONGS ISFSI. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals within the VEHICLE BARRIER SYSTEM boundary). (NEI 99-01, Rev. 6)
(NEI 99-01, Rev. 6) Independent Spent Fuel Storage Installation (ISFSI) -A complex designed and constructed for the interim storage of spent nuclear fuel, solid reactor-related Greater Than Class C (GTCC) waste, and other radioactive materials associated with spent fuel and reactor-related GTCC waste storage (10 CFR 72.3). Initiating Condition -A predetermined condition where either the potential exists for an emergency or such an emergency has occurred.
Hostile Force - One or more individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction. (NEI 99-01, Rev. 6)
Independent Spent Fuel Storage Installation (ISFSI) - A complex designed and constructed for the interim storage of spent nuclear fuel, solid reactor-related Greater Than Class C (GTCC) waste, and other radioactive materials associated with spent fuel and reactor-related GTCC waste storage (10 CFR 72.3).
Initiating Condition - A predetermined condition where either the potential exists for an emergency or such an emergency has occurred.
Integrated Drill -A drill that incorporates multiple demonstration requirements to be conducted in connection with one another.
Integrated Drill -A drill that incorporates multiple demonstration requirements to be conducted in connection with one another.
Local Government Agencies  
Local Government Agencies - Orange County and San Diego County.
-Orange County and San Diego County. Offsite -The area around the station that lies beyond the EAB. Onsite -The area around the station that lies within the EAB. 8 Revision 0
Offsite - The area around the station that lies beyond the EAB.
IOEP-1 SONGS ISFSl-Only Emergency Plan Projectile  
Onsite - The area around the station that lies within the EAB.
-An object directed toward the SONGS ISFSI that could cause concern for its continued capability, reliability, or personnel safety. Protected Area (PA) -That ONSITE area within the ISFSI security boundary as defined in SONGS's Security Plan. Protective Actions -Those emergency measures taken for the purpose of preventing or minimizing radiological, or other hazard, exposures to affected population groups. Quarterly  
8                                             Revision 0
-Frequency of occurrence is met if performed within 1.25 times a 92 day interval as measured from the previous performance.
 
Radiologically Controlled Area (RCA) -An area in which radioactive material is present and the potential exists for the spread of radioactive contamination.
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan Projectile - An object directed toward the SONGS ISFSI that could cause concern for its continued capability, reliability, or personnel safety.
The area will be posted for the purpose of protecting individuals against undue risks from exposure to radiation and radioactive materials.
Protected Area (PA) - That ONSITE area within the ISFSI security boundary as defined in SONGS's Security Plan.
Site Boundary  
Protective Actions - Those emergency measures taken for the purpose of preventing or minimizing radiological, or other hazard, exposures to affected population groups.
-The SONGS property line, which is also the legally surveyed Site Boundary, and the location of major structures of the facilities are delineated in the SONGS 2 & 3 DSAR Figure 2.1-1. The site, comprising 83.63 acres, is approximately 4500 feet long and 800 feet wide. Staffed Warning Point -Offsite agency location that is staffed 24 hours per day such as 911 centers or other staffed watch locations.
Quarterly - Frequency of occurrence is met if performed within 1.25 times a 92 day interval as measured from the previous performance.
Total Effective Dose Equivalent (TEDE) -The sum of the deep DOSE equivalent (for external exposure) and the committed effective DOSE equivalent (for internal exposure) and 4 days of deposition exposure.
Radiologically Controlled Area (RCA) - An area in which radioactive material is present and the potential exists for the spread of radioactive contamination. The area will be posted for the purpose of protecting individuals against undue risks from exposure to radiation and radioactive materials.
Unusual Event (UE) -Events are in process or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated.
Site Boundary - The SONGS property line, which is also the legally surveyed Site Boundary, and the location of major structures of the facilities are delineated in the SONGS 2 & 3 DSAR Figure 2.1-1. The site, comprising 83.63 acres, is approximately 4500 feet long and 800 feet wide.
No releases of radioactive material requiring OFFSITE response or monitoring are expected unless further degradation of safety systems occurs. 9 Revision 0
Staffed Warning Point - Offsite agency location that is staffed 24 hours per day such as 911 call-centers or other staffed watch locations.
IOEP-1 SONGS ISFSl-Only Emergency Plan 4.2 ABBREVIATIONS ALARA -As Low as Reasonably Achievable Cal OES -California Governor's Office of Emergency Services CFR -Code of Federal Regulations OBA -Design Basis Accident EALs -Emergency Action Levels ED -Emergency Director EP -Emergency Preparedness EPIPs -Emergency Plan Implementing Procedures ERF -Emergency Response Facility ERO -Emergency Response Organization EAB -Exclusion Area Boundary ISFSI -Independent Spent Fuel Storage Installation IOEP -ISFSl-Only Emergency Plan NRC -Nuclear Regulatory Commission.
Total Effective Dose Equivalent (TEDE) - The sum of the deep DOSE equivalent (for external exposure) and the committed effective DOSE equivalent (for internal exposure) and 4 days of deposition exposure.
PA -Protected Area RCA -Radiologically Controlled Area TEDE -Total Effective Dose Equivalent UE -Unusual Event 10 Revision 0
Unusual Event (UE) - Events are in process or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring OFFSITE response or monitoring are expected unless further degradation of safety systems occurs.
IOEP-1 SONGS ISFSl-Only Emergency Plan PART II 1.0 ASSIGNMENT OF RESPONSIBILITY  
9                                             Revision 0
{ORGANIZATION CONTROL)
 
Planning Standard 50.47(b)(1)  
IOEP-1                                                     SONGS ISFSl-Only Emergency Plan 4.2   ABBREVIATIONS ALARA - As Low as Reasonably Achievable Cal OES - California Governor's Office of Emergency Services CFR - Code of Federal Regulations OBA - Design Basis Accident EALs - Emergency Action Levels ED - Emergency Director EP - Emergency Preparedness EPIPs - Emergency Plan Implementing Procedures ERF - Emergency Response Facility ERO - Emergency Response Organization EAB - Exclusion Area Boundary ISFSI - Independent Spent Fuel Storage Installation IOEP - ISFSl-Only Emergency Plan NRC - Nuclear Regulatory Commission.
(as exempted in Reference  
PA - Protected Area RCA - Radiologically Controlled Area TEDE - Total Effective Dose Equivalent UE - Unusual Event 10                                 Revision 0
: 17) -Primary responsibilities for emergency response by the nuclear facility licensee and by State and local organizations have been assigned, the emergency responsibilities of the various supporting organizations have been specifically established, and each principal response organization has staff to respond and to augment its initial response on a continuous basis. 1.1 EMERGENCY RESPONSE AND RESPONSIBILITIES The ISFSI Shift Supervisor (ISS) is at the station 24 hours a day and is the senior management position at the station during off-hours.
 
This position is responsible for monitoring ISFSI conditions and managing the activities for the ISFSI Security Staff. The individual in charge of the SONGS emergency response is given the title of EMERGENCY DIRECTOR (ED). When an off-normal, natural phenomenon, or accident event becomes apparent, the ISS shall assess the condition and declare an emergency if warranted.
IOEP-1                                                             SONGS ISFSl-Only Emergency Plan PART II 1.0   ASSIGNMENT OF RESPONSIBILITY {ORGANIZATION CONTROL)
When an emergency is declared the ISS assumes the positon of the EMERGENCY DIRECTOR (ED). During an emergency, the EMERGENCY RESPONSE ORGANIZATION (ERO) replaces the normal station organization.
Planning Standard 50.47(b)(1) (as exempted in Reference 17) - Primary responsibilities for emergency response by the nuclear facility licensee and by State and local organizations have been assigned, the emergency responsibilities of the various supporting organizations have been specifically established, and each principal response organization has staff to respond and to augment its initial response on a continuous basis.
The ERO provides the following functions:
1.1     EMERGENCY RESPONSE AND RESPONSIBILITIES The ISFSI Shift Supervisor (ISS) is at the station 24 hours a day and is the senior management position at the station during off-hours. This position is responsible for monitoring ISFSI conditions and managing the activities for the ISFSI Security Staff.
The individual in charge of the SONGS emergency response is given the title of EMERGENCY DIRECTOR (ED). When an off-normal, natural phenomenon, or accident event becomes apparent, the ISS shall assess the condition and declare an emergency if warranted. When an emergency is declared the ISS assumes the positon of the EMERGENCY DIRECTOR (ED).
During an emergency, the EMERGENCY RESPONSE ORGANIZATION (ERO) replaces the normal station organization. The ERO provides the following functions:
* Control and operation of station activities
* Control and operation of station activities
* Mitigation of the emergency condition
* Mitigation of the emergency condition
Line 540: Line 428:
* Radiological monitoring
* Radiological monitoring
* Emergency notifications to Federal, State and LOCAL GOVERNMENT AGENCIES
* Emergency notifications to Federal, State and LOCAL GOVERNMENT AGENCIES
* Coordination of emergency support for firefighting, security and rescue/first aid The on-shift personnel are available 24 hours per day. The on-shift personnel can perform all required response  
* Coordination of emergency support for firefighting, security and rescue/first aid The on-shift personnel are available 24 hours per day. The on-shift personnel can perform all required response actions, including manning of communications, until individuals arrive to augment shift personnel. The ERO maintains the depth and capability for continuous 24-hour coverage of the emergency response for a protracted period.
: actions, including manning of communications, until individuals arrive to augment shift personnel.
11                                           Revision 0 I
The ERO maintains the depth and capability for continuous 24-hour coverage of the emergency response for a protracted period. 11 Revision 0 I I I I I J IOEP-1 SONGS ISFSl-Only Emergency Plan 1.2 OFFSITE RESPONSE ORGANIZATIONS (ORO) Agreements are maintained with OFFSITE organizations who do not take part in the organizational control of the emergency, that provide assistance when called upon during an emergency or during the recovery phase. These agreements identify the emergency measures to be provided, the mutually accepted criteria for implementation, and the arrangements for exchange of information.
I I
The actual letters and memoranda of agreement are maintained in Emergency Preparedness files. These organizations provide services of: a. Fire protection;  
I I
: b. Rescue operations;  
J
: c. Ambulance services;  
 
: d. Medical and hospital services;  
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan 1.2   OFFSITE RESPONSE ORGANIZATIONS (ORO)
Agreements are maintained with OFFSITE organizations who do not take part in the organizational control of the emergency, that provide assistance when called upon during an emergency or during the recovery phase. These agreements identify the emergency measures to be provided, the mutually accepted criteria for implementation, and the arrangements for exchange of information.
The actual letters and memoranda of agreement are maintained in Emergency Preparedness files.
These organizations provide services of:
: a. Fire protection;
: b. Rescue operations;
: c. Ambulance services;
: d. Medical and hospital services;
: e. Law enforcement.
: e. Law enforcement.
State and LOCAL GOVERNMENT AGENCY response will be in accordance with each agency's plans and procedures, and commensurate with the hazard posed by the emergency.
State and LOCAL GOVERNMENT AGENCY response will be in accordance with each agency's plans and procedures, and commensurate with the hazard posed by the emergency.
United States Marine Corps Camp Pendleton Fire Department USMC CPFD provides fire response per Agreement.
United States Marine Corps Camp Pendleton Fire Department USMC CPFD provides fire response per Agreement.
United States Marine Corps Camp Pendleton Fire Department USMC CPFD provides rescue operations for Agreement.
United States Marine Corps Camp Pendleton Fire Department USMC CPFD provides rescue operations for Agreement.
United States Marine Corps Camp Pendleton Fire Department Agreement for prompt ambulance transport of personnel is maintained with USMC CPFD. Such service is available on a 24 hour per day basis. Mission Hospital Regional Medical Center Agreement for hospital and medical services is maintained with Mission Hospital Regional Medical Center. This facility is equipped and qualified for receiving and treating contaminated and/or injured persons requiring immediate hospital care. Law Enforcement Law enforcement services are provided by the FBI and local public entities per the Security Plan. 12 Revision O
United States Marine Corps Camp Pendleton Fire Department Agreement for prompt ambulance transport of personnel is maintained with USMC CPFD. Such service is available on a 24 hour per day basis.
IOEP-1 SONGS ISFSl-Only Emergency Plan 2.0 EMERGENCY RESPONSE ORGANIZATION (ERO) Planning Standard 50.47(b)(2)  
Mission Hospital Regional Medical Center Agreement for hospital and medical services is maintained with Mission Hospital Regional Medical Center. This facility is equipped and qualified for receiving and treating contaminated and/or injured persons requiring immediate hospital care.
-On-shift facility licensee responsibilities for emergency response are unambiguously  
Law Enforcement Law enforcement services are provided by the FBI and local public entities per the Security Plan.
: defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
12                                           Revision O
2.1 ON-SHIFT POSITIONS SONGS has personnel on-shift at all times that provide the initial response to an event. Members of the on-shift organization are trained on their responsibilities and duties in the event of an emergency and are capable of performing all necessary response actions until the augmentation personnel arrive or the event is terminated.
 
The normal shift staffing assignments include the roles and responsibilities for their emergency response functions.
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan 2.0     EMERGENCY RESPONSE ORGANIZATION (ERO)
The relationship between normal and emergency response positions for the shift personnel is unchanged when an event occurs. (See Table 2-1) ISFSI Shift Supervisor (ISS)/EMERGENCY DIRECTOR (ED) The ISFSI Shift Supervisor (ISS) is the on-shift individual who makes the initial event CLASSIFICATION and assumes the role of ED upon emergency DECLARATION, and has the authority and responsibility to immediately and unilaterally initiate any emergency actions.
Planning Standard 50.47(b)(2) - On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.
If the ISS is unavailable or incapacitated, another on-shift person qualified as ED will assume the ED duties. The ED has the authority to suspend any security measure described in the Physical Security Plan as necessary to facilitate response to emergency conditions.
2.1     ON-SHIFT POSITIONS SONGS has personnel on-shift at all times that provide the initial response to an event. Members of the on-shift organization are trained on their responsibilities and duties in the event of an emergency and are capable of performing all necessary response actions until the augmentation personnel arrive or the event is terminated. The normal shift staffing assignments include the roles and responsibilities for their emergency response functions. The relationship between normal and emergency response positions for the shift personnel is unchanged when an event occurs. (See Table 2-1)
ISFSI Shift Supervisor (ISS)/EMERGENCY DIRECTOR (ED)
The ISFSI Shift Supervisor (ISS) is the on-shift individual who makes the initial event CLASSIFICATION and assumes the role of ED upon emergency DECLARATION, and has the authority and responsibility to immediately and unilaterally initiate any emergency actions. If the ISS is unavailable or incapacitated, another on-shift person qualified as ED will assume the ED duties.
The ED has the authority to suspend any security measure described in the Physical Security Plan as necessary to facilitate response to emergency conditions.
The Non-delegable responsibilities of the ED include the following:
The Non-delegable responsibilities of the ED include the following:
* Event CLASSIFICATION and emergency DECLARATION
* Event CLASSIFICATION and emergency DECLARATION
* Decision to notify OFFSITE agencies
* Decision to notify OFFSITE agencies
* Authorization for the use of EPA-400 emergency exposure controls (emergency worker DOSE limits that exceed 1 O CFR 20 occupational exposure limits) Key delegable responsibilities of the ED include the following:
* Authorization for the use of EPA-400 emergency exposure controls (emergency worker DOSE limits that exceed 10 CFR 20 occupational exposure limits)
Key delegable responsibilities of the ED include the following:
* Management of available station resources
* Management of available station resources
* Initiation of assessment and mitigative/CORRECTIVE ACTIONS
* Initiation of assessment and mitigative/CORRECTIVE ACTIONS
Line 569: Line 468:
* Augmentation of the EMERGENCY RESPONSE ORGANIZATION as deemed necessary
* Augmentation of the EMERGENCY RESPONSE ORGANIZATION as deemed necessary
* Notification of SCE corporate officers and the SCE Corporate Communications Department
* Notification of SCE corporate officers and the SCE Corporate Communications Department
* Notification of OFFSITE agencies (State and LOCAL GOVERNMENT  
* Notification of OFFSITE agencies (State and LOCAL GOVERNMENT AGENCIES, Marine Corps Base Camp Pendleton and NRC) 13                                             Revision 0
: AGENCIES, Marine Corps Base Camp Pendleton and NRC) 13 Revision 0
 
IOEP-1 SONGS ISFSl-Only Emergency Plan Security Station Security is administered by the Security Plan and reports to the ED when implementing the IOEP. Security personnel assist the ED as directed.
IOEP-1                                                         SONGS ISFSl-Only Emergency Plan Security Station Security is administered by the Security Plan and reports to the ED when implementing the IOEP. Security personnel assist the ED as directed.
2.2 AUGMENTED POSITION The ERO is responsible for implementing the actions described in this Plan. The ERO is made up of on-shift personnel (described in section 2.1 ), augmented by the Resource Manager.
2.2   AUGMENTED POSITION The ERO is responsible for implementing the actions described in this Plan. The ERO is made up of on-shift personnel (described in section 2.1 ), augmented by the Resource Manager. Supplemental personnel are contacted as needed.
Supplemental personnel are contacted as needed. Resource Manager The Resource Manager will be in contact with the ED within two hours of CLASSIFICATION.
Resource Manager The Resource Manager will be in contact with the ED within two hours of CLASSIFICATION. The Resource Manager will augment the ED by assisting in assessment of the emergency conditions (refer to Table 2-1) and coordinating required resources, including public information interface. The Resource Manager does not need to physically report to SONGS to perform their responsibilities.
The Resource Manager will augment the ED by assisting in assessment of the emergency conditions (refer to Table 2-1) and coordinating required resources, including public information interface.
The Resource Manager does not need to physically report to SONGS to perform their responsibilities.
Supplemental personnel shall report at the discretion of the ED and/or the Resource Manager.
Supplemental personnel shall report at the discretion of the ED and/or the Resource Manager.
2.3 SUPPLEMENTAL PERSONNEL Additional personnel resources may be directed to report to SONGS to provide support as needed to assess radiological conditions, conduct maintenance and repair activities, develop and implement CORRECTIVE ACTION plans, and assist with recovery actions.
2.3   SUPPLEMENTAL PERSONNEL Additional personnel resources may be directed to report to SONGS to provide support as needed to assess radiological conditions, conduct maintenance and repair activities, develop and implement CORRECTIVE ACTION plans, and assist with recovery actions. The supplemental personnel are available from SONGS staff and SCE, and can be requested from various contractors.
The supplemental personnel are available from SONGS staff and SCE, and can be requested from various contractors.
14                                           Revision O
14 Revision O
 
IOEP-1 SONGS ISFSl-Only Emergency Plan 2.4 FUNCTIONAL RESPONSIBILITIES Table 2-1 below lists the functional responsibilities of on-shift and augmented positions that fulfill emergency staffing capabilities.
IOEP-1                                                             SONGS ISFSl-Only Emergency Plan 2.4     FUNCTIONAL RESPONSIBILITIES Table 2-1 below lists the functional responsibilities of on-shift and augmented positions that fulfill emergency staffing capabilities.
TABLE 2-1 EMERGENCY RESPONSE ORGANIZATION Staffing and Responsibility FUNCTIONAL AREA LOCATION SHIFT STAFFING AUGMENTED OFFSITE RESPONSE One (1) Assessment of Condition EMERGENCY ISFSI Shift Supervisor I One (1) RESPONSE FACILITY EMERGENCY Resource Manager DIRECTOR (a) Emergency Direction EMERGENCY EMERGENCY  
TABLE 2-1 EMERGENCY RESPONSE ORGANIZATION Staffing and Responsibility AUGMENTED OFFSITE FUNCTIONAL AREA                   LOCATION                 SHIFT STAFFING
---and Control RESPONSE FACILITY DIRECTOR (a) Notifications I EMERGENCY EMERGENCY Communications RESPONSE FACILITY DIRECTOR (a) ---Radiological ACCIDENT EMERGENCY ISFSI Shift Supervisor I Resource Manager (b) ASSESSMENT and PROTECTIVE RESPONSE FACILITY I EMERGENCY One (1) or more On Scene DIRECTOR (a) ACTIONS RP Support (c) CORRECTIVE EMERGENCY EMERGENCY Resource Manager (b) I ACTIONS RESPONSE FACILITY I DIRECTOR (a) Supplemental I Support On Scene Personnel Firefighting On Scene Per Fire Protection OFFSITE Response Program Plan Organization Rescue On Scene ---OFFSITE Response Organization First Aid On Scene Shift Personnel  
 
---Security Per Security Plan Per Security Plan ---(a) One person comprising the on-shift minimum staff. May perform concurrent functions.  
===RESPONSE===
(b) One person comprising the augmented ERO. May perform concurrent functions.  
One (1)
(c) For a declared emergency involving radiological consequences (E-HU1),
EMERGENCY               ISFSI Shift Supervisor I           One (1)
a minimum of one person trained in radiological monitoring and assessment will report to the SONGS ISFSI within four hours of the emergency DECLARATION.
Assessment of Condition RESPONSE FACILITY               EMERGENCY               Resource Manager DIRECTOR (a)
15 Revision 0
Emergency Direction             EMERGENCY                     EMERGENCY and Control             RESPONSE FACILITY               DIRECTOR (a)
IOEP-1 SONGS ISFSl-Only Emergency Plan 3.0 EMERGENCY RESPONSE SUPPORT AND RESOURCES Planning Standard 50.47(b)(3)  
Notifications I             EMERGENCY                     EMERGENCY Communications           RESPONSE FACILITY DIRECTOR (a)
(as exempted in Reference  
Radiological ACCIDENT                                                                 Resource Manager (b)
: 17) -Arrangements for requesting and effectively using assistance resources have been made and other organizations capable of augmenting the planned response have been identified.
EMERGENCY               ISFSI Shift Supervisor I ASSESSMENT and RESPONSE FACILITY I               EMERGENCY PROTECTIVE                                                                        One (1) or more On Scene                 DIRECTOR (a)
Letters and Memoranda of Agreement for OFFSITE organizations that have pre-agreed arrangements to support ONSITE response actions are maintained on file. No other specific assistance has been pre-identified.
ACTIONS                                                                           RP Support (c)
Fire, Ambulance and Local Law Enforcement Agency response is at the request and direction of the ED as previously discussed in Part II, Section 1.2 of this Plan. The ED is authorized to request Federal assistance as needed. The Nuclear Regulatory Commission (NRC) will act as the lead Federal agency providing coordination and support in response to a nuclear incident.
EMERGENCY                                           Resource Manager (b) I CORRECTIVE                                                EMERGENCY RESPONSE FACILITY I                                     Supplemental I Support ACTIONS                                                DIRECTOR (a)
16 Revision O
On Scene                                               Personnel Per Fire Protection     OFFSITE Response Firefighting                  On Scene Program Plan               Organization OFFSITE Response Rescue                     On Scene                         ---                 Organization First Aid                 On Scene                 Shift Personnel                   ---
IOEP-1 SONGS ISFSl-Only Emergency Plan 4.0 EMERGENCY CLASSIFICATION SYSTEM Planning Standard 50.47(b)(4)  
Security               Per Security Plan           Per Security Plan                 ---
(as exempted in Reference  
(a)     One person comprising the on-shift minimum staff. May perform concurrent functions.
: 17) -A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee.
(b)     One person comprising the augmented ERO. May perform concurrent functions.
SONGS utilizes NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non-Passive Reactors" as its basis for classifying emergencies.
(c)     For a declared emergency involving radiological consequences (E-HU1), a minimum of one person trained in radiological monitoring and assessment will report to the SONGS ISFSI within four hours of the emergency DECLARATION.
The CLASSIFICATION system referenced in NEI 99-01, Rev. 6 has been endorsed by the NRC and offers a standard method for classifying emergencies.
15                                         Revision 0
EALs are addressed in site procedures and the ISFSl-Only Emergency Plan* Emergency Action Level Technical Bases Manual (IOEP-2).
 
This Plan addresses two (2) CLASSIFICATIONS of emergencies (UNUSUAL EVENT and ALERT), which represent a hierarchy of emergencies based on potential accidents that could occur at the SONGS ISFSI. Once indications are available that an EAL is met, the event is assessed and classified, and the corresponding emergency CLASSIFICATION level is promptly declared as soon as possible.
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan 3.0     EMERGENCY RESPONSE SUPPORT AND RESOURCES Planning Standard 50.47(b)(3) (as exempted in Reference 17) - Arrangements for requesting and effectively using assistance resources have been made and other organizations capable of augmenting the planned response have been identified.
4.1 UNUSUAL EVENT Events are in progress or have occurred which indicate a potential degradation of the level of safety of the SONGS ISFSI or indicate a security threat to facility protection has been initiated.
Letters and Memoranda of Agreement for OFFSITE organizations that have pre-agreed arrangements to support ONSITE response actions are maintained on file.
No release of radioactive material requiring OFFSITE response or monitoring are expected.
No other specific assistance has been pre-identified.
State and LOCAL GOVERNMENT  
Fire, Ambulance and Local Law Enforcement Agency response is at the request and direction of the ED as previously discussed in Part II, Section 1.2 of this Plan.
: AGENCIES, Marine Corps Base Camp Pendleton and the NRC are notified of an UNUSUAL EVENT. The purpose of the UNUSUAL EVENT CLASSIFICATION is to bring the on-shift staff to a state of readiness and to provide for systematic handling of event information and its related decision making. 4.2 ALERT Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the SONGS ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA PAG exposure levels. As in the case of the UNUSUAL EVENT, the ALERT CLASSIFICATION includes emergency situations which are not expected to threaten the public, but for which notification of the State and LOCAL GOVERNMENT  
The ED is authorized to request Federal assistance as needed. The Nuclear Regulatory Commission (NRC) will act as the lead Federal agency providing coordination and support in response to a nuclear incident.
: AGENCIES, Marine Corps Base Camp Pendleton and the NRC is required.
16                                       Revision O
17 Revision 0
 
IOEP-1 SONGS ISFSl-Only Emergency Plan 4.3 EMERGENCY ACTION LEVELS AND POSTULATED ACCIDENTS Both emergency CLASSIFICATION levels are characterized by EALs consisting of specific instrument readings and/or observations which are used to tell the SONGS ISS that an INITIATING CONDITION has been met. These EALs are used to assure that the initial CLASSIFICATION of emergencies can be accomplished  
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan 4.0     EMERGENCY CLASSIFICATION SYSTEM Planning Standard 50.47(b)(4) (as exempted in Reference 17) -A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee.
: rapidly, allowing for the prompt identification of the nature of mitigating activities needed. EALs and INITIATING CONDITIONS are provided under the following categories for the SONGS ISFSI:
SONGS utilizes NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non- Passive Reactors" as its basis for classifying emergencies. The CLASSIFICATION system referenced in NEI 99-01, Rev. 6 has been endorsed by the NRC and offers a standard method for classifying emergencies. EALs are addressed in site procedures and the ISFSl-Only Emergency Plan*
Emergency Action Level Technical Bases Manual (IOEP-2).
This Plan addresses two (2) CLASSIFICATIONS of emergencies (UNUSUAL EVENT and ALERT),
which represent a hierarchy of emergencies based on potential accidents that could occur at the SONGS ISFSI. Once indications are available that an EAL is met, the event is assessed and classified, and the corresponding emergency CLASSIFICATION level is promptly declared as soon as possible.
4.1     UNUSUAL EVENT Events are in progress or have occurred which indicate a potential degradation of the level of safety of the SONGS ISFSI or indicate a security threat to facility protection has been initiated. No release of radioactive material requiring OFFSITE response or monitoring are expected. State and LOCAL GOVERNMENT AGENCIES, Marine Corps Base Camp Pendleton and the NRC are notified of an UNUSUAL EVENT.
The purpose of the UNUSUAL EVENT CLASSIFICATION is to bring the on-shift staff to a state of readiness and to provide for systematic handling of event information and its related decision making.
4.2     ALERT Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the SONGS ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION.
Any releases are expected to be limited to small fractions of the EPA PAG exposure levels.
As in the case of the UNUSUAL EVENT, the ALERT CLASSIFICATION includes emergency situations which are not expected to threaten the public, but for which notification of the State and LOCAL GOVERNMENT AGENCIES, Marine Corps Base Camp Pendleton and the NRC is required.
17                                           Revision 0
 
IOEP-1                                                       SONGS ISFSl-Only Emergency Plan 4.3   EMERGENCY ACTION LEVELS AND POSTULATED ACCIDENTS Both emergency CLASSIFICATION levels are characterized by EALs consisting of specific instrument readings and/or observations which are used to tell the SONGS ISS that an INITIATING CONDITION has been met. These EALs are used to assure that the initial CLASSIFICATION of emergencies can be accomplished rapidly, allowing for the prompt identification of the nature of mitigating activities needed.
EALs and INITIATING CONDITIONS are provided under the following categories for the SONGS ISFSI:
* ISFSI Malfunction
* ISFSI Malfunction
* Hazards and Other Conditions The applicable ISFSI Storage System FSARs describe the DESIGN BASIS ACCIDENTS (DBAs) applicable to the SONGS ISFSI, along with the radiological DOSE calculation results.
* Hazards and Other Conditions The applicable ISFSI Storage System FSARs describe the DESIGN BASIS ACCIDENTS (DBAs) applicable to the SONGS ISFSI, along with the radiological DOSE calculation results. Specific guidance for classifying emergencies is found in site procedures and the ISFSl-Only Emergency Plan Emergency Action Level Technical Bases Manual (IOEP-2).
Specific guidance for classifying emergencies is found in site procedures and the ISFSl-Only Emergency Plan Emergency Action Level Technical Bases Manual (IOEP-2).
EALs shall be reviewed with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton on an ANNUAL basis.
EALs shall be reviewed with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton on an ANNUAL basis. 18 Revision O
18                                           Revision O
IOEP-1 SONGS ISFSl-Only Emergency Plan 5.0 NOTIFICATION METHODS AND PROCEDURES Planning Standard 50.47(b)(5)  
 
(as exempted in Reference  
IOEP-1                                                             SONGS ISFSl-Only Emergency Plan 5.0     NOTIFICATION METHODS AND PROCEDURES Planning Standard 50.47(b)(5) (as exempted in Reference 17) - Procedures have been established for notification, by the licensee, of State and local response organizations and for notification of emergency personnel by all organizations; the content of initial and followup messages to response organizations has been established.
: 17) -Procedures have been established for notification, by the licensee, of State and local response organizations and for notification of emergency personnel by all organizations; the content of initial and followup messages to response organizations has been established.
Notification and Mobilization of SONGS EMERGENCY RESPONSE PERSONNEL EPIPs are established to alert and notify ONSITE EMERGENCY RESPONSE PERSONNEL of the initial CLASSIFICATION or any escalation of an emergency by verbal announcement over portable radios. Each emergency CLASSIFICATION may result in augmentation personnel being notified to respond. Call trees may be utilized to make this notification.
Notification and Mobilization of SONGS EMERGENCY RESPONSE PERSONNEL EPIPs are established to alert and notify ONSITE EMERGENCY RESPONSE PERSONNEL of the initial CLASSIFICATION or any escalation of an emergency by verbal announcement over portable radios. Each emergency CLASSIFICATION may result in augmentation personnel being notified to respond.
Call trees may be utilized to make this notification.
Bases for Notification of OFFSITE Agencies SONGS, in cooperation with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, has established mutually agreeable methods and procedures for notification of OFFSITE response organizations consistent with the approved emergency CLASSIFICATION and action level scheme. Notifications to OFFSITE agencies include a means of verification.
Bases for Notification of OFFSITE Agencies SONGS, in cooperation with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, has established mutually agreeable methods and procedures for notification of OFFSITE response organizations consistent with the approved emergency CLASSIFICATION and action level scheme. Notifications to OFFSITE agencies include a means of verification.
Commercial telephone is the communication process used to notify the State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton of a declared emergency.
Commercial telephone is the communication process used to notify the State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton of a declared emergency.
Notification to the State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton is required within 60 minutes of emergency DECLARATION, escalation, or change in radiological release status. The following OFFSITE agencies, at a minimum, will receive emergency messages:
Notification to the State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton is required within 60 minutes of emergency DECLARATION, escalation, or change in radiological release status.
The following OFFSITE agencies, at a minimum, will receive emergency messages:
* State of California
* State of California
* Orange County
* Orange County
* San Diego County
* San Diego County
* Marine Corps Base Camp Pendleton Follow-up messages will be made to these agencies approximately every 2 hours utilizing a notification form. SONGS, in coordination with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, has established the content of the emergency messages to be sent from SONGS. These messages shall contain the following information if it is known and appropriate:
* Marine Corps Base Camp Pendleton Follow-up messages will be made to these agencies approximately every 2 hours utilizing a notification form.
* Location of incident (SONGS),
SONGS, in coordination with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, has established the content of the emergency messages to be sent from SONGS. These messages shall contain the following information if it is known and appropriate:
and name and telephone number (or communications channel identification) of caller.
* Location of incident (SONGS), and name and telephone number (or communications channel identification) of caller.
* Date I time of incident.
* Date I time of incident.
* Class of emergency and EAL.
* Class of emergency and EAL.
* SONGS emergency response actions underway.
* SONGS emergency response actions underway.
* Request for any needed ONSITE support by OFFSITE agencies.
* Request for any needed ONSITE support by OFFSITE agencies.
19 Revision 0
19                                           Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan
 
IOEP-1                                                         SONGS ISFSl-Only Emergency Plan
* Prognosis for worsening or termination of event based upon facility (instrumentation or response team) information.
* Prognosis for worsening or termination of event based upon facility (instrumentation or response team) information.
NRC Event Notification The NRC is notified immediately following notification of the appropriate State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, and not later than 60 minutes after the time of initial emergency DECLARATION, escalation, termination or entry into the recovery phase. Notification to the NRC is the responsibility of the ED. Communications with the NRC Operations Center will be performed primarily via commercial telephone.
NRC Event Notification The NRC is notified immediately following notification of the appropriate State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, and not later than 60 minutes after the time of initial emergency DECLARATION, escalation, termination or entry into the recovery phase. Notification to the NRC is the responsibility of the ED. Communications with the NRC Operations Center will be performed primarily via commercial telephone. Satellite phone may be used as the back-up means of communication.
Satellite phone may be used as the back-up means of communication.
Support Organizations Medical, rescue, and firefighting support services are notified for assistance, using commercial telephone, as the situation dictates.
Support Organizations  
: Medical, rescue, and firefighting support services are notified for assistance, using commercial telephone, as the situation dictates.
American Nuclear Insurers (ANI) is notified at an ALERT DECLARATION with requests for assistance as necessary.
American Nuclear Insurers (ANI) is notified at an ALERT DECLARATION with requests for assistance as necessary.
20 Revision O
20                                           Revision O
IOEP-1 SONGS ISFSl-Only Emergency Plan 6.0 EMERGENCY COMMUNICATIONS Planning Standard 50.47(b)(6)  
 
(as exempted in Reference  
IOEP-1                                                             SONGS ISFSl-Only Emergency Plan 6.0     EMERGENCY COMMUNICATIONS Planning Standard 50.47(b)(6) (as exempted in Reference 17) - Provisions exist for prompt communications among principal response organizations to emergency personnel.
: 17) -Provisions exist for prompt communications among principal response organizations to emergency personnel.
Reliable Communications SONGS has reliable primary and backup communication systems installed. Communications with all organizations will be performed primarily via commercial telephone. Satellite phone may be used as the back-up means of communication.
Reliable Communications SONGS has reliable primary and backup communication systems installed.
Communications with all organizations will be performed primarily via commercial telephone.
Satellite phone may be used as the back-up means of communication.
SONGS maintains the capability to make initial notifications to the designated State and local QFFSITE agencies and Marine Corps Base Camp Pendleton STAFFED WARNING POINTS on a 24 hour per day basis. Communications will be performed primarily via commercial telephone.
SONGS maintains the capability to make initial notifications to the designated State and local QFFSITE agencies and Marine Corps Base Camp Pendleton STAFFED WARNING POINTS on a 24 hour per day basis. Communications will be performed primarily via commercial telephone.
Satellite phone may be used as the back-up means of communication.
Satellite phone may be used as the back-up means of communication.
Communications with the California Governor's Office of Emergency Services (Cal OES), Orange County, San Diego County, and Marine Corps Base Camp Pendleton are provided from the ERF. ERO notification may be performed by the use of call trees. ONSITE communications amongst the ERO is by use of portable radios. Communications with the NRC Operations Center are provided from the ERF. Coordinated communications exist with ambulance and hospital services.
Communications with the California Governor's Office of Emergency Services (Cal OES), Orange County, San Diego County, and Marine Corps Base Camp Pendleton are provided from the ERF.
The communication systems listed in Table 6-1 below provide 24-hour ONSITE and OFFSITE communications capability.
ERO notification may be performed by the use of call trees. ONSITE communications amongst the ERO is by use of portable radios.
Communication systems are tested to verify proper operation at the testing frequency specified in the table below. Communication systems that are listed with a testing frequency of "Frequent Use" indicates that the associated equipment is normally used at a sufficiently high regularity (e.g., multiple times each day), such that separate additional testing is not needed. Functionality is verified through normal (frequent) use of the system. TABLE 6-1 Communication Systems Communication System Commercial telephone system Portable radios Mobile communications devices (cellular or satellite phones) Testing Frequency Frequent Use Frequent Use QUARTERLY*
Communications with the NRC Operations Center are provided from the ERF.
* Performance of drill requirements specified in Section 14 satisfies the testing frequency 21 Revision O
Coordinated communications exist with ambulance and hospital services.
IOEP-1 SONGS ISFSl-Only Emergency Plan 7.0 PUBLIC INFORMATION Planning Standard 50.47(b)(7)  
The communication systems listed in Table 6-1 below provide 24-hour ONSITE and OFFSITE communications capability. Communication systems are tested to verify proper operation at the testing frequency specified in the table below. Communication systems that are listed with a testing frequency of "Frequent Use" indicates that the associated equipment is normally used at a sufficiently high regularity (e.g., multiple times each day), such that separate additional testing is not needed. Functionality is verified through normal (frequent) use of the system.
(as exempted in Reference  
TABLE 6-1 Communication Systems Communication System                                       Testing Frequency Commercial telephone system                                                               Frequent Use Portable radios                                                                           Frequent Use Mobile communications devices (cellular or satellite phones)                             QUARTERLY*
: 17) -The principal points of contact with the news media for dissemination of information during an emergency are established in advance, and procedures for coordinated dissemination of information to the public are established.
* Performance of drill requirements specified in Section 14 satisfies the testing frequency 21                                           Revision O
 
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan 7.0   PUBLIC INFORMATION Planning Standard 50.47(b)(7) (as exempted in Reference 17) - The principal points of contact with the news media for dissemination of information during an emergency are established in advance, and procedures for coordinated dissemination of information to the public are established.
As the principle point of contact for the dissemination of information during an event at the station, SCE Corporate Communications Department personnel will be notified of a declared emergency.
As the principle point of contact for the dissemination of information during an event at the station, SCE Corporate Communications Department personnel will be notified of a declared emergency.
SCE Corporate Communications Department will monitor media activity and coordinate with senior management disseminating public information per communication protocols.
SCE Corporate Communications Department will monitor media activity and coordinate with senior management disseminating public information per communication protocols. As necessary, news conference(s) can be conducted at the site or other coordinated location. SCE Corporate Communications Department personnel, or senior SONGS management will represent the facility as the spokesperson. If an event occurs at the SONGS ISFSI, information will be disseminated to the public in a timely manner.
As necessary, news conference(s) can be conducted at the site or other coordinated location.
The SCE Corporate Communications Department personnel address any misinformation related to a declared emergency.
SCE Corporate Communications Department personnel, or senior SONGS management will represent the facility as the spokesperson.
22                                         Revision O
If an event occurs at the SONGS ISFSI, information will be disseminated to the public in a timely manner. The SCE Corporate Communications Department personnel address any misinformation related to a declared emergency.
 
22 Revision O
IOEP-1                                                         SONGS ISFSl-Only Emergency Plan 8.0   EMERGENCY FACILITY AND EQUIPMENT Planning Standard 50.47(b)(8) - Adequate emergency facilities and equipment to support the emergency response are provided and maintained.
IOEP-1 SONGS ISFSl-Only Emergency Plan 8.0 EMERGENCY FACILITY AND EQUIPMENT Planning Standard 50.47(b)(8)  
This section of the Plan identifies and describes the emergency response facilities, the communication systems, the assessment facilities and equipment, the first aid and medical facilities, and protective equipment and supplies that can be utilized during an emergency.
-Adequate emergency facilities and equipment to support the emergency response are provided and maintained.
8.1   EMERGENCY RESPONSE FACILITY EMERGENCY RESPONSE FACILITY (ERF) is staffed in accordance with Section 2.0. The ERF is open on a continuous basis. There is no activation needed.
This section of the Plan identifies and describes the emergency response facilities, the communication  
The emergency COMMAND AND CONTROL functions are managed within the ERF. Within the ERF, the ED (or other personnel as directed) can assess conditions, evaluate the magnitude and potential consequences of abnormal conditions, initiate preventative and CORRECTIVE ACTIONS; and perform notifications.
: systems, the assessment facilities and equipment, the first aid and medical facilities, and protective equipment and supplies that can be utilized during an emergency.
Radiological conditions as a result of DBAs specified in the ISFSI storage system FSARs do not inhibit staffing of the ERF.
8.1 EMERGENCY RESPONSE FACILITY EMERGENCY RESPONSE FACILITY (ERF) is staffed in accordance with Section 2.0. The ERF is open on a continuous basis. There is no activation needed. The emergency COMMAND AND CONTROL functions are managed within the ERF. Within the ERF, the ED (or other personnel as directed) can assess conditions, evaluate the magnitude and potential consequences of abnormal conditions, initiate preventative and CORRECTIVE ACTIONS; and perform notifications.
8.2   EMERGENCY EQUIPMENT This section describes the monitoring instruments used to initiate emergency measures and provide continuing assessment of conditions throughout the course of an emergency.
Radiological conditions as a result of DBAs specified in the ISFSI storage system FSARs do not inhibit staffing of the ERF. 8.2 EMERGENCY EQUIPMENT This section describes the monitoring instruments used to initiate emergency measures and provide continuing assessment of conditions throughout the course of an emergency.
Portable Radiation and Contamination Monitoring Instruments Portable radiation and contamination monitoring instruments and sampling equipment normally utilized and maintained by the station are available for emergency use.
Portable Radiation and Contamination Monitoring Instruments Portable radiation and contamination monitoring instruments and sampling equipment normally utilized and maintained by the station are available for emergency use. Communication Systems Communication systems are identified and tested as described in Section 6. Emergency Supplies Emergency kit contents listed in Appendix A are inspected, inventoried, and operationally checked at least QUARTERLY and anytime a kit is opened and used. Sufficient reserves of instruments/equipment are provided to replace those which are removed from emergency kits for calibration or repair. Calibration of instruments has been established at intervals recommended by instrument suppliers, or as required by Federal regulations.
Communication Systems Communication systems are identified and tested as described in Section 6.
First Aid Facilities First aid supplies and equipment are located at the SONGS ISFSI. Qualified personnel are available 24 hours per day to provide medical treatment as referenced in Section 12. 23 Revision 0
Emergency Supplies Emergency kit contents listed in Appendix A are inspected, inventoried, and operationally checked at least QUARTERLY and anytime a kit is opened and used. Sufficient reserves of instruments/equipment are provided to replace those which are removed from emergency kits for calibration or repair. Calibration of instruments has been established at intervals recommended by instrument suppliers, or as required by Federal regulations.
IOEP-1 SONGS ISFSl-Only Emergency Plan 9.0 ACCIDENT ASSESSMENT Planning Standard 50.47(b)(9)  
First Aid Facilities First aid supplies and equipment are located at the SONGS ISFSI. Qualified personnel are available 24 hours per day to provide medical treatment as referenced in Section 12.
(as exempted in Reference  
23                                         Revision 0
: 17) -Adequate  
 
: methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use. The ASSESSMENT ACTIVITIES required to evaluate a particular emergency depend on the specific nature and CLASSIFICATION of the emergency.
IOEP-1                                                         SONGS ISFSl-Only Emergency Plan 9.0   ACCIDENT ASSESSMENT Planning Standard 50.47(b)(9) (as exempted in Reference 17) -Adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use.
The ED is responsible for the initial measurement of ISFSI DOSE RATES after an off-normal, natural phenomena, or accident event. The EALs identify the parameter value to determine the emergency condition.
The ASSESSMENT ACTIVITIES required to evaluate a particular emergency depend on the specific nature and CLASSIFICATION of the emergency. The ED is responsible for the initial measurement of ISFSI DOSE RATES after an off-normal, natural phenomena, or accident event.
CLASSIFICATION of events is performed by the ED in accordance with the EAL scheme. If the measured ISFSI DOSE RATES exceed the EAL threshold, the ED then performs a radioactive release assessment in the vicinity of the affected storage module or cask. After completing the assessment, the ED contacts the Resource Manager to assist in interpreting the radioactive release assessment results.
The EALs identify the parameter value to determine the emergency condition. CLASSIFICATION of events is performed by the ED in accordance with the EAL scheme.
Notification of a radiological release assessment is in accordance with Section 5.0. 24 Revision O
If the measured ISFSI DOSE RATES exceed the EAL threshold, the ED then performs a radioactive release assessment in the vicinity of the affected storage module or cask. After completing the assessment, the ED contacts the Resource Manager to assist in interpreting the radioactive release assessment results.
IOEP-1 SONGS ISFSl-Only Emergency Plan 10.0 PROTECTIVE ACTIONS Planning Standard 50.47(b)(10)  
Notification of a radiological release assessment is in accordance with Section 5.0.
(as exempted in Reference 17)-A range of protective actions has been developed for emergency workers and the public. PROTECTIVE ACTIONS for ONSITE personnel are provided for their health and safety. Implementation guidelines for ONSITE PROTECTIVE ACTIONS are provided in EPIPs. Additionally, the EPIPs provide for a range of PROTECTIVE ACTIONS (e.g. relocation of personnel and personnel take cover) to protect ONSITE personnel during HOSTILE ACTIONS.
24                                         Revision O
ACCOUNTABILITY ACCOUNTABILITY should be considered and used as a PROTECTIVE ACTION whenever a site wide risk to health or safety exists and prudence dictates.
 
If personnel ACCOUNTABILITY is required, at the direction of the ED all individuals at the site (including employees without emergency assignments,  
IOEP-1                                                             SONGS ISFSl-Only Emergency Plan 10.0   PROTECTIVE ACTIONS Planning Standard 50.47(b)(10) (as exempted in Reference 17)-A range of protective actions has been developed for emergency workers and the public.
: visitors, and contractor personnel) shall be notified of the emergency.
PROTECTIVE ACTIONS for ONSITE personnel are provided for their health and safety.
ACCOUNTABILITY of all personnel inside the ISFSI PROTECTED AREA (PA) should be accomplished within 60 minutes after emergency DECLARATION and maintained thereafter.
Implementation guidelines for ONSITE PROTECTIVE ACTIONS are provided in EPIPs.
If personnel are unaccounted for, teams shall be dispatched to locate the personnel.
Additionally, the EPIPs provide for a range of PROTECTIVE ACTIONS (e.g. relocation of personnel and personnel take cover) to protect ONSITE personnel during HOSTILE ACTIONS.
Non-ESSENTIAL PERSONNEL located outside of the ISFSI PA but within the SITE BOUNDARY will be directed to report to an assembly area or exit the site, as appropriate.
ACCOUNTABILITY ACCOUNTABILITY should be considered and used as a PROTECTIVE ACTION whenever a site wide risk to health or safety exists and prudence dictates. If personnel ACCOUNTABILITY is required, at the direction of the ED all individuals at the site (including employees without emergency assignments, visitors, and contractor personnel) shall be notified of the emergency.
The ED is responsible for controlling access to the site when the IOEP is activated.
ACCOUNTABILITY of all personnel inside the ISFSI PROTECTED AREA (PA) should be accomplished within 60 minutes after emergency DECLARATION and maintained thereafter. If personnel are unaccounted for, teams shall be dispatched to locate the personnel.
25 Revision O
Non-ESSENTIAL PERSONNEL located outside of the ISFSI PA but within the SITE BOUNDARY will be directed to report to an assembly area or exit the site, as appropriate. The ED is responsible for controlling access to the site when the IOEP is activated.
IOEP-1 SONGS ISFSl-Only Emergency Plan 11.0 RADIOLOGICAL EXPOSURE CONTROL Planning Standard 50.47(b)(11)  
25                                           Revision O
-Means for controlling radiological exposures, in an emergency, are established for emergency workers.
 
The means for controlling radiological exposures shall include exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides. SONGS maintains a radiological exposure control program to assure that protection against radiological  
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan 11.0   RADIOLOGICAL EXPOSURE CONTROL Planning Standard 50.47(b)(11) - Means for controlling radiological exposures, in an emergency, are established for emergency workers. The means for controlling radiological exposures shall include exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides.
: exposure, as set forth in 10 CFR Part 20 is provided.
SONGS maintains a radiological exposure control program to assure that protection against radiological exposure, as set forth in 10 CFR Part 20 is provided. This program is implemented through the "Radiological Protection Standard" which covers both normal and emergency radiation protection measures.
This program is implemented through the "Radiological Protection Standard" which covers both normal and emergency radiation protection measures.
Means for controlling radiological exposures in an emergency are established for emergency workers. The means for controlling radiological exposures shall include exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides.
Means for controlling radiological exposures in an emergency are established for emergency workers.
Exposure Guidelines During an emergency, DOSES above normal occupational radiation exposure limits may be authorized by the ED for activities such as saving a life, preservation of valuable equipment, or controlling exposure. Table 11-1 contains the guidelines for emergency exposure criteria, which is consistent with the EPA's, "Protective Action Guide and Planning Guidance for Radiological Incidents," Table 2-2, "Response Worker Guidelines".
The means for controlling radiological exposures shall include exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides. Exposure Guidelines During an emergency, DOSES above normal occupational radiation exposure limits may be authorized by the ED for activities such as saving a life, preservation of valuable equipment, or controlling exposure.
* Radiation Protection The purpose of a Radiation Protection Program is to assure that radiation DOSES received by personnel are kept as low as reasonably achievable and do not exceed the prescribed limits for both normal and emergency conditions. The established measures to provide this assurance include access control, personnel monitoring, and contamination control.
Table 11-1 contains the guidelines for emergency exposure  
Access Control During a declared emergency, radiological surveys of the ISFSI area will be performed to determine the actual extent of the radiological conditions. As necessary, the ED will ensure RCAs and access controls are established to prevent personnel from entering the area. Recovery and CORRECTIVE ACTIONS will be planned and executed in a manner that minimizes exposure to personnel.
: criteria, which is consistent with the EPA's, "Protective Action Guide and Planning Guidance for Radiological Incidents,"
Table 2-2, "Response Worker Guidelines".
* Radiation Protection The purpose of a Radiation Protection Program is to assure that radiation DOSES received by personnel are kept as low as reasonably achievable and do not exceed the prescribed limits for both normal and emergency conditions.
The established measures to provide this assurance include access control, personnel monitoring, and contamination control.
Access Control During a declared emergency, radiological surveys of the ISFSI area will be performed to determine the actual extent of the radiological conditions.
As necessary, the ED will ensure RCAs and access controls are established to prevent personnel from entering the area. Recovery and CORRECTIVE ACTIONS will be planned and executed in a manner that minimizes exposure to personnel.
Contaminated areas are isolated with appropriate radiological protection and access control.
Contaminated areas are isolated with appropriate radiological protection and access control.
Personnel leaving contaminated areas are monitored for radioactive contamination.  
Personnel leaving contaminated areas are monitored for radioactive contamination. Supplies, instruments, and equipment that are in contaminated areas or have been brought into contaminated areas will be monitored prior to removal.
: Supplies, instruments, and equipment that are in contaminated areas or have been brought into contaminated areas will be monitored prior to removal.
Restricted areas and contaminated items will be returned to normal use when contamination levels have been returned to acceptable levels. Contamination control criteria for returning areas and items to normal use are contained in the station procedures.
Restricted areas and contaminated items will be returned to normal use when contamination levels have been returned to acceptable levels. Contamination control criteria for returning areas and items to normal use are contained in the station procedures.
26 Revision 0
26                                           Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan Personnel Exposure Monitoring Personal dosimeters are utilized to monitor the exposure of personnel during normal or emergency conditions.
 
Adequate supplies of dosimeters are maintained for use during an emergency.
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan Personnel Exposure Monitoring Personal dosimeters are utilized to monitor the exposure of personnel during normal or emergency conditions. Adequate supplies of dosimeters are maintained for use during an emergency.
Procedures describe in detail the types of personal dosimeter  
Procedures describe in detail the types of personal dosimeter devices, the manner in which they are to be used, who is to wear them, and how they are tb be cared for.
: devices, the manner in which they are to be used, who is to wear them, and how they are tb be cared for. Emergency worker DOSE records are maintained in accordance with station procedures Contamination Control Various contamination control measures are utilized.
Emergency worker DOSE records are maintained in accordance with station procedures Contamination Control Various contamination control measures are utilized. These include access control measures and means for the DECONTAMINATION of personnel, areas, and equipment. These activities are addressed in facility procedures and are briefly described below. All personnel are monitored for radioactive contamination prior to leaving the RCA. During normal or emergency conditions, contamination should be removed from any part of a person's body prior to their leaving the RCA.
These include access control measures and means for the DECONTAMINATION of personnel, areas, and equipment.
All personnel DECONTAMINATION, even during an emergency, will be performed under the supervision of personnel trained in radiological monitoring and assessment and in accordance with established procedures.
These activities are addressed in facility procedures and are briefly described below. All personnel are monitored for radioactive contamination prior to leaving the RCA. During normal or emergency conditions, contamination should be removed from any part of a person's body prior to their leaving the RCA. All personnel DECONTAMINATION, even during an emergency, will be performed under the supervision of personnel trained in radiological monitoring and assessment and in accordance with established procedures.
Portable contamination monitoring instruments are available to frisk personnel for potential contamination.
Portable contamination monitoring instruments are available to frisk personnel for potential contamination.
Documentation of surveys, contamination, and DECONTAMINATION activities shall be maintained in accordance with station procedures.
Documentation of surveys, contamination, and DECONTAMINATION activities shall be maintained in accordance with station procedures.
Guideline DOSE Limit (Rem TEDE) 5 10 (a) 25 (b) > 25 (b) Table 11-1 Response Worker Guidelines Activity Condition All occupational exposures All Emergency Workers may be authorized up to 5 Rem Emergency Exposure for the emergency; however all reasonably achievable actions should be taken to minimize DOSE. Attempts should be made to keep exposures within 1 O CFR 20 limits. Protecting valuable property Lower DOSE not practicable.
Table 11-1 Response Worker Guidelines Guideline DOSE Limit                      Activity                                     Condition (Rem TEDE) 5          All occupational exposures           All Emergency Workers may be authorized up to 5 Rem Emergency Exposure for the emergency; however all reasonably achievable actions should be taken to minimize DOSE. Attempts should be made to keep exposures within 10 CFR 20 limits.
necessary for public welfare Lifesaving or protection of large Lower DOSE not practicable.
10 (a)        Protecting valuable property         Lower DOSE not practicable.
populations Lifesaving or protection of large Only on a voluntary basis to persons fully aware populations of the risks involved.
necessary for public welfare 25 (b)        Lifesaving or protection of large     Lower DOSE not practicable.
Limit DOSE to the lens of the eye to 3 times the above values and DOSES to any other organ (including skin and body extremities) to 10 times the above values. (a) For potential DOSES >5 rem, medical monitoring programs should be considered.  
populations
(b) In the case of a very large incident, may need to consider raising the property and lifesaving response worker guidelines to prevent further loss of life and massive spread of destruction.
    > 25 (b)        Lifesaving or protection of large     Only on a voluntary basis to persons fully aware populations                           of the risks involved.
27 Revision O
Limit DOSE to the lens of the eye to 3 times the above values and DOSES to any other organ (including skin and body extremities) to 10 times the above values.
IOEP-1 SONGS ISFSl-Only Emergency Plan 12.0 MEDICAL AND HEAL TH SUPPORT Planning Standard 50.47(b)(12)-Arrangements are made for medical seNices for contaminated injured individuals.
(a)     For potential DOSES >5 rem, medical monitoring programs should be considered.
(b)     In the case of a very large incident, may need to consider raising the property and lifesaving response worker guidelines to prevent further loss of life and massive spread of destruction.
27                                         Revision O
 
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan 12.0   MEDICAL AND HEALTH SUPPORT Planning Standard 50.47(b)(12)-Arrangements are made for medical seNices for contaminated injured individuals.
Medical assistance is available ON SITE and OFFSITE for treatment of SONGS ISFSI personnel.
Medical assistance is available ON SITE and OFFSITE for treatment of SONGS ISFSI personnel.
Various means of transportation are available to transport individuals for radiological and radiological injuries.
Various means of transportation are available to transport individuals for radiological and non-radiological injuries.
The individuals and organizations providing emergency medical assistance as identified in this section either have the capability for evaluation of radiation exposure and uptake or they are provided this capability from SCE in the form of personnel and/or equipment.
The individuals and organizations providing emergency medical assistance as identified in this section either have the capability for evaluation of radiation exposure and uptake or they are provided this capability from SCE in the form of personnel and/or equipment. SCE assures that persons providing these services are adequately prepared to handle contaminated individuals through detailed training classes, drills and exercises. Letters of Agreement with OFFSITE organizations and individuals for medical support are listed in Appendix C.
SCE assures that persons providing these services are adequately prepared to handle contaminated individuals through detailed training  
ONSITE First Aid First aid assistance at the SONGS ISFSI is designed to handle a wide range of injuries. This task is accomplished by ONSITE individuals trained in basic first aid procedures.
: classes, drills and exercises.
Medical Transportation Transportation of injured personnel is available via local emergency medical services, SONGS vehicles, or private vehicles. When personnel are transported to Mission Hospital Regional Medical Center (MHRMC) while in a contaminated condition, a person trained in radiological monitoring will be dispatched to monitor and maintain radiological controls.
Letters of Agreement with OFFSITE organizations and individuals for medical support are listed in Appendix C. ONSITE First Aid First aid assistance at the SONGS ISFSI is designed to handle a wide range of injuries.
OFFSITE Medical Support The MHRMC in Mission Viejo, California, has medical facilities capable of handling various types of injuries. MHRMC is capable of treating patients with injuries of a non-radiological or radiological nature.
This task is accomplished by ONSITE individuals trained in basic first aid procedures.
28                                         Revision 0
Medical Transportation Transportation of injured personnel is available via local emergency medical services, SONGS vehicles, or private vehicles.
 
When personnel are transported to Mission Hospital Regional Medical Center (MHRMC) while in a contaminated condition, a person trained in radiological monitoring will be dispatched to monitor and maintain radiological controls.
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan 13.0   EMERGENCY TERMINATION AND RECOVERY Planning Standard 50.47(b)(13) - General plans for recovery and reentry are developed.
OFFSITE Medical Support The MHRMC in Mission Viejo, California, has medical facilities capable of handling various types of injuries.
MHRMC is capable of treating patients with injuries of a non-radiological or radiological nature. 28 Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan 13.0 EMERGENCY TERMINATION AND RECOVERY Planning Standard 50.47(b)(13)  
-General plans for recovery and reentry are developed.
SCE has established general plans described in the following sections to conduct recovery from potential emergencies at the SONGS ISFSI. The recovery organization will be based on the normal SONGS organization and would function with the senior management position being responsible for site activities.
SCE has established general plans described in the following sections to conduct recovery from potential emergencies at the SONGS ISFSI. The recovery organization will be based on the normal SONGS organization and would function with the senior management position being responsible for site activities.
Emergency Termination and Notification Termination of an emergency status is the responsibility of the ED. The ED is also responsible for providing notification of the emergency termination and initiation of Recovery operations to the NRC, State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, the SONGS ERO and other organizations that may be providing ONSITE support.
Emergency Termination and Notification Termination of an emergency status is the responsibility of the ED. The ED is also responsible for providing notification of the emergency termination and initiation of Recovery operations to the NRC, State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, the SONGS ERO and other organizations that may be providing ONSITE support.
Recovery Operations Recovery operations begin immediately following emergency termination and will address the specific emergency circumstances.
Recovery Operations Recovery operations begin immediately following emergency termination and will address the specific emergency circumstances. Recovery planning includes equipment to be repaired or replaced, licensing implications, special training requirements, OFFSITE support, and determination of causes and consequences. Site procedures addressing Recovery operations provide an outline for a short term Recovery plan.
Recovery planning includes equipment to be repaired or replaced, licensing implications, special training requirements, OFFSITE support, and determination of causes and consequences.
The senior management position shall be responsible for the development and implementation of the Recovery plan and shall provide for detailed monitoring of the implementation and status reporting. The senior management position also has the authority to revise or halt activities as circumstances dictate.
Site procedures addressing Recovery operations provide an outline for a short term Recovery plan. The senior management position shall be responsible for the development and implementation of the Recovery plan and shall provide for detailed monitoring of the implementation and status reporting.
The senior management position also has the authority to revise or halt activities as circumstances dictate.
The ISFSI recovery will be terminated by the SONGS senior management position after the ISFSI has been returned to a stable condition.
The ISFSI recovery will be terminated by the SONGS senior management position after the ISFSI has been returned to a stable condition.
29 Revision 0
29                                           Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan 14.0 EXERCISE AND DRILLS Planning Standard 50.47(b)(14)  
 
-Periodic exercises are (will be) conducted to evaluate major portions of emergency response capabilities, periodic drills are (will be) conducted to develop and maintain key skills, and deficiencies identified as a result of exercises or drills are (will be) corrected.
IOEP-1                                                             SONGS ISFSl-Only Emergency Plan 14.0   EXERCISE AND DRILLS Planning Standard 50.47(b)(14) - Periodic exercises are (will be) conducted to evaluate major portions of emergency response capabilities, periodic drills are (will be) conducted to develop and maintain key skills, and deficiencies identified as a result of exercises or drills are (will be) corrected.
Exercise and Drill SONGS conducts a BIENNIAL Exercise to test the adequacy of timing and content of implementing procedures and methods; to test emergency equipment and communication networks; and to ensure that emergency personnel are familiar with their duties. Each exercise will be evaluated by station evaluators and possibly Federal evaluators.
Exercise and Drill SONGS conducts a BIENNIAL Exercise to test the adequacy of timing and content of implementing procedures and methods; to test emergency equipment and communication networks; and to ensure that emergency personnel are familiar with their duties. Each exercise will be evaluated by station evaluators and possibly Federal evaluators. SONGS will invite Federal, State, and LOCAL GOVERNMENT AGENCIES to participate or observe scheduled exercises upon request.
SONGS will invite Federal, State, and LOCAL GOVERNMENT AGENCIES to participate or observe scheduled exercises upon request.
For alternating years, an INTEGRATED DRILL is conducted for the purpose of testing, developing, and maintaining the proficiency of emergency responders. BIENNIAL Exercises and alternate year INTEGRATED DRILLS will allow the ERO to demonstrate the following principal functional areas:
For alternating years, an INTEGRATED DRILL is conducted for the purpose of testing, developing, and maintaining the proficiency of emergency responders.
Exercise and drill scenarios are developed to provide reasonable assurance that anticipatory responses will not result from preconditioning of participants. Exercise and drill scenarios, as appropriate, emphasize coordination among ONSITE and OFFSITE response organizations.
BIENNIAL Exercises and alternate year INTEGRATED DRILLS will allow the ERO to demonstrate the following principal functional areas: Exercise and drill scenarios are developed to provide reasonable assurance that anticipatory responses will not result from preconditioning of participants.
Exercise and drill scenarios, as appropriate, emphasize coordination among ONSITE and OFFSITE response organizations.
Exercise and drills allow free play for decision making. The scenarios for use in exercises and drills include, at a minimum, the following:
Exercise and drills allow free play for decision making. The scenarios for use in exercises and drills include, at a minimum, the following:
* The basic objective(s) of each drill and exercise and appropriate evaluation criteria;
* The basic objective(s) of each drill and exercise and appropriate evaluation criteria;
* The date(s),
* The date(s), time period, place(s), and participating organizations;
time period, place(s),
and participating organizations;
* The simulated events;
* The simulated events;
* A time schedule of real and simulated initiating events;
* A time schedule of real and simulated initiating events;
* A narrative summary describing the conduct of the exercises or drills to include such things as simulated casualties, OFFSITE fire department assistance, rescue of personnel, use of protective clothing; and,
* A narrative summary describing the conduct of the exercises or drills to include such things as simulated casualties, OFFSITE fire department assistance, rescue of personnel, use of protective clothing; and,
* A description of the arrangements for and advance materials to be provided to official observers.
* A description of the arrangements for and advance materials to be provided to official observers.
The scenario should be varied from year to year such that all major elements of the plans and preparedness organizations are tested. 30 Revision O
The scenario should be varied from year to year such that all major elements of the plans and preparedness organizations are tested.
IOEP-1 SONGS ISFSl-Only Emergency Plan Equipment and Proficiency Drills Drills are conducted to provide supervised instruction, training and practice opportunities for ERO members.
30                                           Revision O
Drills may be performed as part of the BIENNIAL  
 
: exercise, INTEGRATED DRILL or as an independent drill. A drill may be a component of an exercise.
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan Equipment and Proficiency Drills Drills are conducted to provide supervised instruction, training and practice opportunities for ERO members. Drills may be performed as part of the BIENNIAL exercise, INTEGRATED DRILL or as an independent drill. A drill may be a component of an exercise. Drills are supervised and evaluated by qualified personnel. Drills are conducted, in addition to the exercise at the frequencies indicated below:
Drills are supervised and evaluated by qualified personnel.
Communication Drills A communications drill with State and LOCAL GOVERNMENT AGENCIES is conducted ANNUALLY. A communications drill with NRG Headquarters is conducted ANNUALLY.
Drills are conducted, in addition to the exercise at the frequencies indicated below: Communication Drills A communications drill with State and LOCAL GOVERNMENT AGENCIES is conducted ANNUALLY.
A communications drill with NRG Headquarters is conducted ANNUALLY.
Communication drills include the aspect of understanding the content of messages.
Communication drills include the aspect of understanding the content of messages.
Fire Drills A fire drill is conducted in accordance with SONGS Fire Protection Program.
Fire Drills A fire drill is conducted in accordance with SONGS Fire Protection Program.
Medical Emergency Drills A medical emergency drill, involving a simulated contaminated individual, which contains provisions for participation by local support services organizations (i.e., ambulance and support hospital),
Medical Emergency Drills A medical emergency drill, involving a simulated contaminated individual, which contains provisions for participation by local support services organizations (i.e., ambulance and support hospital), is conducted ANNUALLY. The OFFSITE portions of the medical drill may be performed as part of the required BIENNIAL exercise or INTEGRATED DRILL.
is conducted ANNUALLY.
Radiation Protection Drills A Radiation Protection drill is conducted ANNUALLY.
The OFFSITE portions of the medical drill may be performed as part of the required BIENNIAL exercise or INTEGRATED DRILL. Radiation Protection Drills A Radiation Protection drill is conducted ANNUALLY.
Augmentation Drills An unannounced augmentation drill is conducted ANNUALLY. This drill involves implementation of the ERO callout system procedure and documentation of the estimated response time for each responder. This drill demonstrates the capability to augment the ED after an emergency is declared.
Augmentation Drills An unannounced augmentation drill is conducted ANNUALLY.
Critique and Evaluation Critiques shall be scheduled at the conclusion of each exercise or alternate year INTEGRATED DRILL to evaluate the performance of the organization. The ability of EMERGENCY RESPONSE PERSONNEL to self-evaluate weaknesses and identify areas for improvement is the key to successful exercise I drill conduct.
This drill involves implementation of the ERO callout system procedure and documentation of the estimated response time for each responder.
Exercise and drill objectives are evaluated against measurable demonstration criteria. Following the conclusion of each exercise or drill, a critique, including participants and evaluators, is conducted to evaluate the ability of the ERO to implement the IOEP and its implementing procedures.
This drill demonstrates the capability to augment the ED after an emergency is declared.
Official observers from the NRG should observe, evaluate, and critique the required exercises.
Critique and Evaluation Critiques shall be scheduled at the conclusion of each exercise or alternate year INTEGRATED DRILL to evaluate the performance of the organization.
A formal evaluation in the form of a written critique report is prepared following an exercise or drill involving the evaluation of designated objectives. The report evaluates and documents the ability of the ERO to respond to a simulated emergency situation. The report will also contain reference to CORRECTIVE ACTION documents and recommendations.
The ability of EMERGENCY RESPONSE PERSONNEL to self-evaluate weaknesses and identify areas for improvement is the key to successful exercise I drill conduct.
31                                             Revision O
Exercise and drill objectives are evaluated against measurable demonstration criteria.
 
Following the conclusion of each exercise or drill, a critique, including participants and evaluators, is conducted to evaluate the ability of the ERO to implement the IOEP and its implementing procedures.
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan The critique process is used as the means for evaluating observer and participant comments to identify areas of ERO performance and the EMERGENCY PREPAREDNESS Program that require improvement, including emergency plan procedural changes. The Emergency Planning Coordinator is responsible for ensuring that items identified in the critique are correctly dispositioned, appropriate assignment of responsibility is made and that CORRECTIVE ACTIONS are implemented in accordance with the CORRECTIVE ACTION Program.
Official observers from the NRG should observe,  
32                                               Revision 0
: evaluate, and critique the required exercises.
 
A formal evaluation in the form of a written critique report is prepared following an exercise or drill involving the evaluation of designated objectives.
IOEP-1                                                         SONGS ISFSl-Only Emergency Plan 15.0   RADIOLOGICAL EMERGENCY RESPONSE TRAINING Planning Standard 50.47(b)(15) - Radiological emergency response training is provided to those who may be called on to assist in an emergency.
The report evaluates and documents the ability of the ERO to respond to a simulated emergency situation.
15.1   EMERGENCY RESPONSE PERSONNEL TRAINING Requirements for EMERGENCY PREPAREDNESS training are specified in the EMERGENCY PREPAREDNESS Training Program. This program identifies the level and the depth to which individuals are to be trained.
The report will also contain reference to CORRECTIVE ACTION documents and recommendations.
EMERGENCY PREPAREDNESS Training Program The training for ERO personnel is developed from the position-specific responsibilities as defined in this Plan. Members of the ERO receive initial training and ANNUAL retraining. They also receive recurring Emergency Plan-related training ANNUALLY through General Employee Training and position-specific training as appropriate.
31 Revision O
Specific training requirements for ERO and supplemental personnel are delineated below:
IOEP-1 SONGS ISFSl-Only Emergency Plan The critique process is used as the means for evaluating observer and participant comments to identify areas of ERO performance and the EMERGENCY PREPAREDNESS Program that require improvement, including emergency plan procedural changes.
ISFSI Shift Supervisors/EMERGENCY DIRECTORS and Resource Managers Trained such that proficiency is maintained on the topics listed below. These subjects shall be covered as a minimum initially and on an ANNUAL basis.
The Emergency Planning Coordinator is responsible for ensuring that items identified in the critique are correctly dispositioned, appropriate assignment of responsibility is made and that CORRECTIVE ACTIONS are implemented in accordance with the CORRECTIVE ACTION Program.
32 Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan 15.0 RADIOLOGICAL EMERGENCY RESPONSE TRAINING Planning Standard 50.47(b)(15)  
-Radiological emergency response training is provided to those who may be called on to assist in an emergency.
15.1 EMERGENCY RESPONSE PERSONNEL TRAINING Requirements for EMERGENCY PREPAREDNESS training are specified in the EMERGENCY PREPAREDNESS Training Program.
This program identifies the level and the depth to which individuals are to be trained.
EMERGENCY PREPAREDNESS Training Program The training for ERO personnel is developed from the position-specific responsibilities as defined in this Plan. Members of the ERO receive initial training and ANNUAL retraining.
They also receive recurring Emergency Plan-related training ANNUALLY through General Employee Training and position-specific training as appropriate.
Specific training requirements for ERO and supplemental personnel are delineated below: ISFSI Shift Supervisors/EMERGENCY DIRECTORS and Resource Managers Trained such that proficiency is maintained on the topics listed below. These subjects shall be covered as a minimum initially and on an ANNUAL basis.
* Emergency CLASSIFICATION
* Emergency CLASSIFICATION
* State and LOCAL GOVERNMENT  
* State and LOCAL GOVERNMENT AGENCIES, Marine Corps Base Camp Pendleton, and NRC notifications
: AGENCIES, Marine Corps Base Camp Pendleton, and NRC notifications
* ERO activation
* ERO activation
* DOSE RATE meter operation
* DOSE RATE meter operation
Line 800: Line 680:
* Emergency exposure control
* Emergency exposure control
* PROTECTIVE ACTIONS for ONSITE personnel
* PROTECTIVE ACTIONS for ONSITE personnel
* ISFSI DBAs Personnel Responsible for ACCIDENT ASSESSMENT The skills and knowledge required to perform monitoring of the ISFSI are provided to personnel qualified as ISS/ED. Resource Managers who assist with ACCIDENT ASSESSMENT, CORRECTIVE  
* ISFSI DBAs Personnel Responsible for ACCIDENT ASSESSMENT The skills and knowledge required to perform monitoring of the ISFSI are provided to personnel qualified as ISS/ED.
: ACTIONS, PROTECTIVE  
Resource Managers who assist with ACCIDENT ASSESSMENT, CORRECTIVE ACTIONS, PROTECTIVE ACTIONS, and related activities receive appropriate training.
: ACTIONS, and related activities receive appropriate training.
33                                         Revision 0
33 Revision 0
 
IOEP-1 SONGS ISFSl-Only Emergency Plan Radiological Assessment Personnel Resource Managers who assist with radiological assessment, CORRECTIVE  
IOEP-1                                                         SONGS ISFSl-Only Emergency Plan Radiological Assessment Personnel Resource Managers who assist with radiological assessment, CORRECTIVE ACTIONS, PROTECTIVE ACTIONS, and related activities receive appropriate training.
: ACTIONS, PROTECTIVE  
Radiation Protection Technicians who may be called to supplement the ERO are trained in the course of their normal work to be able to provide support for radiological ACCIDENT ASSESSMENT and PROTECTIVE ACTIONS. Support activities include access control; radiological coverage (e.g., monitoring, surveys, and support) for personnel conducting repairs, CORRECTIVE ACTIONS, search and rescue, first aid, firefighting, contaminated injury response (including transport); as well as providing personnel monitoring and dosimetry.
: ACTIONS, and related activities receive appropriate training.
Fire Control Teams Station personnel are trained to report any fire to the ISS, then use available fire protection equipment within their level of competency. Responding USMC CPFD personnel are invited to receive training, as outlined in Section 15.2.
Radiation Protection Technicians who may be called to supplement the ERO are trained in the course of their normal work to be able to provide support for radiological ACCIDENT ASSESSMENT and PROTECTIVE ACTIONS.
Medical Support Personnel Mission Hospital Regional Medical Center personnel are invited to receive training, as outlined in Section 15.2.
Support activities include access control; radiological coverage (e.g., monitoring,  
Security and Law Enforcement Personnel Station Security personnel are trained in accordance with the Security Plan. Local Law Enforcement Agency personnel are invited to receive training, as outlined in Section 15.2.
: surveys, and support) for personnel conducting  
First Aid and Rescue Teams Selected individuals assigned on-shift ERO responsibility receive first aid training equivalent to Red Cross Adult First Aid/CPR/AED). Station personnel are trained to report any injury or medical emergency to the ISS, then provide first aid treatment within their level of competency. Responding USMC CPFD personnel are invited to receive training as outlined in Section 15.2.
: repairs, CORRECTIVE  
Personnel who are badged for unescorted ISFSI PA access receive initial and ANNUAL refresher training on general station procedures and policies. This training includes required actions to be taken if an emergency is declared at the SONGS ISFSI.
: ACTIONS, search and rescue, first aid, firefighting, contaminated injury response (including transport);
Personnel assigr:ied to work at the station who do not require unescorted ISFSI PA access, including visitors, receive information on the actions to be taken if an emergency is declared at the SONGS ISFSI.
as well as providing personnel monitoring and dosimetry.
34                                             Revision O
Fire Control Teams Station personnel are trained to report any fire to the ISS, then use available fire protection equipment within their level of competency.
 
Responding USMC CPFD personnel are invited to receive training, as outlined in Section 15.2. Medical Support Personnel Mission Hospital Regional Medical Center personnel are invited to receive training, as outlined in Section 15.2. Security and Law Enforcement Personnel Station Security personnel are trained in accordance with the Security Plan. Local Law Enforcement Agency personnel are invited to receive training, as outlined in Section 15.2. First Aid and Rescue Teams Selected individuals assigned on-shift ERO responsibility receive first aid training equivalent to Red Cross Adult First Aid/CPR/AED).
IOEP-1                                                         SONGS ISFSl-Only Emergency Plan 15.2 SUPPORT ORGANIZATIONS TRAINING Training is made available to support organizations that may be called upon to provide assistance in the event of an emergency.
Station personnel are trained to report any injury or medical emergency to the ISS, then provide first aid treatment within their level of competency.
Non-SONGS organizations that may provide specialized services during an emergency (i.e., law enforcement, firefighting, rescue, medical services, and transport of injured personnel) are provided or offered site-specific emergency response training, ANNUALLY.
Responding USMC CPFD personnel are invited to receive training as outlined in Section 15.2. Personnel who are badged for unescorted ISFSI PA access receive initial and ANNUAL refresher training on general station procedures and policies.
The training made available is structured to meet the needs of that organization with respect to the nature of their support. Training topics such as event notification, basic radiation protection, and interface activities between the OFFSITE organization and SONGS are made available.
This training includes required actions to be taken if an emergency is declared at the SONGS ISFSI. Personnel assigr:ied to work at the station who do not require unescorted ISFSI PA access, including  
35                                             Revision O
: visitors, receive information on the actions to be taken if an emergency is declared at the SONGS ISFSI. 34 Revision O
 
IOEP-1 SONGS ISFSl-Only Emergency Plan 15.2 SUPPORT ORGANIZATIONS TRAINING Training is made available to support organizations that may be called upon to provide assistance in the event of an emergency.
IOEP-1                                                       SONGS ISFSl-Only Emergency Plan 16.0   MAINTAINING EMERGENCY PREPAREDNESS Planning Standard 50.47(b)(16) - Responsibilities for plan development and review and for distribution of emergency plans are established, and planners are properly trained.
Non-SONGS organizations that may provide specialized services during an emergency (i.e., law enforcement, firefighting, rescue, medical services, and transport of injured personnel) are provided or offered site-specific emergency response  
16.1   EMERGENCY PREPAREDNESS RESPONSIBILITIES SONGS ISFSI Senior Management Position Southern California Edison (SCE) is responsible for the maintenance of SONGS EMERGENCY PREPAREDNESS Program. The issuance and control of this Plan and the activities associated with EMERGENCY PREPAREDNESS at SONGS shall be the overall responsibility of the SONGS ISFSI Senior Management Position.
: training, ANNUALLY.
The training made available is structured to meet the needs of that organization with respect to the nature of their support.
Training topics such as event notification, basic radiation protection, and interface activities between the OFFSITE organization and SONGS are made available.
35 Revision O
IOEP-1 SONGS ISFSl-Only Emergency Plan 16.0 MAINTAINING EMERGENCY PREPAREDNESS Planning Standard 50.47(b)(16)  
-Responsibilities for plan development and review and for distribution of emergency plans are established, and planners are properly trained.
16.1 EMERGENCY PREPAREDNESS RESPONSIBILITIES SONGS ISFSI Senior Management Position Southern California Edison (SCE) is responsible for the maintenance of SONGS EMERGENCY PREPAREDNESS Program.
The issuance and control of this Plan and the activities associated with EMERGENCY PREPAREDNESS at SONGS shall be the overall responsibility of the SONGS ISFSI Senior Management Position.
Emergency Planning Coordinator Responsible for the following tasks:
Emergency Planning Coordinator Responsible for the following tasks:
* Maintaining and updating this IOEP and associated procedures, and documenting reviews and revisions
* Maintaining and updating this IOEP and associated procedures, and documenting reviews and revisions
Line 842: Line 714:
* Maintaining current knowledge of changes in Federal regulations and other guidance that impact emergency planning activities
* Maintaining current knowledge of changes in Federal regulations and other guidance that impact emergency planning activities
* Submit IOEP and related controlled document revisions to the NRC
* Submit IOEP and related controlled document revisions to the NRC
* Responsible for ensuring an independent audit of the EMERGENCY PREPAREDNESS Program is conducted to meet the requirements of 1 O CFR 50.54(t).
* Responsible for ensuring an independent audit of the EMERGENCY PREPAREDNESS Program is conducted to meet the requirements of 10 CFR 50.54(t).
36 Revision O
36                                         Revision O
IOEP-1 SONGS ISFSl-Only Emergency Plan The individual assigned as the Emergency Planning Coordinator receives training in order to maintain an adequate knowledge of regulations, planning techniques and the latest applications of emergency equipment and supplies.
 
This training may include:
IOEP-1                                                           SONGS ISFSl-Only Emergency Plan The individual assigned as the Emergency Planning Coordinator receives training in order to maintain an adequate knowledge of regulations, planning techniques and the latest applications of emergency equipment and supplies. This training may include:
* Courses specific or related to EMERGENCY PREPAREDNESS
* Courses specific or related to EMERGENCY PREPAREDNESS
* Observation of or participation in drills and/or exercises at other stations
* Observation of or participation in drills and/or exercises at other stations
* Participation in industry review and evaluation programs
* Participation in industry review and evaluation programs
* Participation in regional or national EMERGENCY PREPAREDNESS  
* Participation in regional or national EMERGENCY PREPAREDNESS seminars, committees, workshops or forums
: seminars, committees, workshops or forums
* 10 CFR 50.54(q) and 10 CFR 72.44(f) Evaluation Qualification and/or Training 16.2 REVIEW AND UPDATING OF THE IOEP It is important that a state of EMERGENCY PREPAREDNESS be maintained at all times. The IOEP is reviewed ANNUALLY and updated, as needed. The ANNUAL IOEP review/update includes required changes identified during audits, assessments, training, drills, and exercises.
* 10 CFR 50.54(q) and 10 CFR 72.44(f)
Any needed changes shall be incorporated in the IOEP, IOEP Emergency Action Level Technical Bases Manual, and appropriate implementing procedures. The IOEP, IOEP Emergency Action Level Technical Bases Manual, and EPIPs are distributed on a controlled basis.
Evaluation Qualification and/or Training 16.2 REVIEW AND UPDATING OF THE IOEP It is important that a state of EMERGENCY PREPAREDNESS be maintained at all times. The IOEP is reviewed ANNUALLY and updated, as needed. The ANNUAL IOEP review/update includes required changes identified during audits, assessments,  
Changes to the IOEP, IOEP Emergency Action Level Technical Bases Manual, and EPIPs are subject to evaluation under 10 CFR 50.54(q) and 10 CFR 72.44(f).
: training, drills, and exercises.
Any needed changes shall be incorporated in the IOEP, IOEP Emergency Action Level Technical Bases Manual, and appropriate implementing procedures.
The IOEP, IOEP Emergency Action Level Technical Bases Manual, and EPIPs are distributed on a controlled basis. Changes to the IOEP, IOEP Emergency Action Level Technical Bases Manual, and EPIPs are subject to evaluation under 1 O CFR 50.54(q) and 10 CFR 72.44(f).
EMERGENCY ACTION LEVELS (EALs) State and LOCAL GOVERNMENT AGENCY Review The EALs shall be made available for review with State and LOCAL GOVERNMENT AGENCIES ANNUALLY.
EMERGENCY ACTION LEVELS (EALs) State and LOCAL GOVERNMENT AGENCY Review The EALs shall be made available for review with State and LOCAL GOVERNMENT AGENCIES ANNUALLY.
Implementing and Supporting Procedures EPIPs provide specific instructions to be taken for each emergency CLASSIFICATION including responsibilities, notification of OFFSITE emergency organizations, and mobilization of the ERO. These procedures provide specific instructions to personnel for response to events and actions required to administer the EMERGENCY PREPAREDNESS Program.
Implementing and Supporting Procedures EPIPs provide specific instructions to be taken for each emergency CLASSIFICATION including responsibilities, notification of OFFSITE emergency organizations, and mobilization of the ERO.
EPIPs are updated as appropriate, in consideration of improvement opportunities identified during exercises, drills and training Changes to these procedures are subject to evaluation under 10 CFR 50.54(q) and 10 CFR 72.44(f).
These procedures provide specific instructions to personnel for response to events and actions required to administer the EMERGENCY PREPAREDNESS Program. EPIPs are updated as appropriate, in consideration of improvement opportunities identified during exercises, drills and training Changes to these procedures are subject to evaluation under 10 CFR 50.54(q) and 10 CFR 72.44(f).
Emergency Response Directory Names and telephone numbers of the ERO, support personnel and applicable supporting OFFSITE organizations shall be reviewed and updated at least QUARTERLY.
Emergency Response Directory Names and telephone numbers of the ERO, support personnel and applicable supporting OFFSITE organizations shall be reviewed and updated at least QUARTERLY.
Letters and Memoranda of Agreement  
Letters and Memoranda of Agreement ANNUALLY, each Letter of Agreement or Memoranda with support organizations are reviewed and verified current in order to assure the availability of assistance from each supporting organization.
: ANNUALLY, each Letter of Agreement or Memoranda with support organizations are reviewed and verified current in order to assure the availability of assistance from each supporting organization.
37                                         Revision O
37 Revision O
 
IOEP-1 SONGS ISFSl-Only Emergency Plan PART Ill APPENDIX A Emergency Equipment,  
IOEP-1                                                       SONGS ISFSl-Only Emergency Plan PART Ill APPENDIX A Emergency Equipment, Supplies, and Reference Materials EMERGENCY RESPONSE FACILITY Procedures I Reference Material ISFSl-Only Emergency Plan (IOEP-1)
: Supplies, and Reference Materials EMERGENCY RESPONSE FACILITY Procedures I Reference Material ISFSl-Only Emergency Plan (IOEP-1)
ISFSl-Only EAL Technical Bases Manual (IOEP-2)
ISFSl-Only EAL Technical Bases Manual (IOEP-2)
Emergency Response Directory (ERO) EMERGENCY PLAN IMPLEMENTING PROCEDURES Equipment Communications equipment (portable radios, cell phone, satellite phone) Portable radiation monitoring equipment Portable emergency lighting Medical emergency response bag Dosimeters Equipment I Supplies Contamination control supplies DECONTAMINATION control supplies Protective clothing 38 Revision O
Emergency Response Directory (ERO)
IOEP-1 SONGS ISFSl-Only Emergency Plan APPENDIX B Cross Reference IOEP Section to Planning Standards I Requirements I Criteria and Procedures Table B-1 IOEP Planning Planning NUREG-0654, Section II Part II Standard Requirement Evaluation Procedure Section (10 CFR 50.47)**
EMERGENCY PLAN IMPLEMENTING PROCEDURES Equipment Communications equipment (portable radios, cell phone, satellite phone)
(Appendix E.IV)** Criteria 1.0 (b)(1) A.1, 2, 4, 7 A S0123-Vlll-ADMIN-1, S0123-Vlll-ER0-1 2.0 (b)(2) A.1, 2, 4; C.1 8 S0123-Vlll-ER0-1 3.0 (b)(3) A.6, 7 c S0123-Vlll-ADMIN-1 4.0 (b)(4) 8.1, 2; C.1, 2 D S0123-Vlll-ER0-1 5.0 (b)(5) A.6, 7; C.1; D.1,3; E E S0123-Vlll-ER0-1 6.0 (b)(6) C.1; D.1, 3; E F S0123-Vlll-ER0-1 7.0 (b)(7) Exempt G S0123-Vlll-ER0-1 8.0 (b)(8) E;G H S0123-Vlll-ADMIN-1, S0123-Vll l-ER0-1 9.0 (b)(9) A.4; 8.1; C.2; E I S0123-Vlll-ER0-1 10.0 (b)(10) C.1; E J S0123-Vlll-ER0-1 11.0 (b)(11) E K S0123-Vlll-ER0-1 12.0 (b)(12) A.6, 7; E L S0123-Vlll-ADMIN-1
Portable radiation monitoring equipment Portable emergency lighting Medical emergency response bag Dosimeters Equipment I Supplies Contamination control supplies DECONTAMINATION control supplies Protective clothing 38                                     Revision O


S0123-Vlll-ER0-1 13.0 (b)(13) H M S0123-Vlll-ER0-1 14.0 (b)(14) E9; F N SO 123-VI I I-ADM I N-1 15.0 (b)(15) F 0 S0123-Vlll-ADMIN-1 16.0 (b)(16) G p S0123-Vlll-ADMIN-1  
IOEP-1                                                    SONGS ISFSl-Only Emergency Plan APPENDIX B Cross Reference IOEP Section to Planning Standards I Requirements I Criteria and Procedures Table B-1 NUREG-0654, IOEP          Planning          Planning Section II Part II        Standard        Requirement                                  Procedure Evaluation Section    (10 CFR 50.47)**  (Appendix E.IV)**
Criteria A.1, 2, 4, 7                          S0123-Vlll-ADMIN-1, 1.0            (b)(1)                                  A S0123-Vlll-ER0-1 2.0            (b)(2)    A.1, 2, 4; C.1              8        S0123-Vlll-ER0-1 3.0            (b)(3)    A.6, 7                      c        S0123-Vlll-ADMIN-1 4.0            (b)(4)    8.1, 2; C.1, 2              D        S0123-Vlll-ER0-1 5.0            (b)(5)    A.6, 7; C.1; D.1,3; E        E        S0123-Vlll-ER0-1 6.0            (b)(6)    C.1; D.1, 3; E              F        S0123-Vlll-ER0-1 7.0            (b)(7)    Exempt                      G        S0123-Vlll-ER0-1 E;G                                    S0123-Vlll-ADMIN-1, 8.0            (b)(8)                                  H S0123-Vll l-ER0-1 9.0            (b)(9)    A.4; 8.1; C.2; E              I        S0123-Vlll-ER0-1 10.0          (b)(10)    C.1; E                      J        S0123-Vlll-ER0-1 11.0          (b)(11)    E                            K        S0123-Vlll-ER0-1 A.6, 7; E                              S0123-Vlll-ADMIN-1 12.0          (b)(12)                                  L S0123-Vlll-ER0-1 13.0           (b)(13)     H                           M         S0123-Vlll-ER0-1 14.0           (b)(14)     E9; F                       N         SO 123-VI II-ADM IN-1 15.0           (b)(15)     F                           0         S0123-Vlll-ADMIN-1 16.0           (b)(16)     G                           p         S0123-Vlll-ADMIN-1
**Refer to the SONGS exemptions from portions of 10 CFR 50.47 and Appendix E for applicability.
**Refer to the SONGS exemptions from portions of 10 CFR 50.47 and Appendix E for applicability.
39 Revision 0
39                                       Revision 0
IOEP-1 SONGS ISFSl-Only Emergency Plan APPENDIX C List of Letters and Memoranda of Agreement Organization Mission Hospital Regional Medical Center Marine Corps Base Camp Pendleton Applicable To Medical Treatment, including Contaminated Injured Person Firefighting I Search & Rescue I Transport, including Contaminated Injured Person The actual letters and memoranda of agreement are maintained in Emergency Preparedness files. 40 Revision O
ENCLOSURE 2 ISFSl-ONL Y EMERGENCY ACTION LEVEL BASIS DOCUMENT (INCLUDES EMERGENCY ACTION LEVEL SCHEME) SAN ONOFRE NUCLEAR GENERATING STATION IOEP-2 EAL Technical Bases Manual San Onofre Nuclear Generating Station (SONGS) Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan Emergency Action Level Technical Bases Manual Revision 0
IOEP-2 EAL Technical Bases Manual TABLE OF CONTENTS Section


==1.0 INTRODUCTION==
IOEP-1                                                     SONGS ISFSl-Only Emergency Plan APPENDIX C List of Letters and Memoranda of Agreement Organization                                      Applicable To Mission Hospital Regional Medical Center              Medical Treatment, including Contaminated Injured Person Marine Corps Base                                    Firefighting I Search & Rescue I Transport, Camp Pendleton                                        including Contaminated Injured Person The actual letters and memoranda of agreement are maintained in Emergency Preparedness files.
40                                        Revision O


................................................................................................................................
ENCLOSURE 2 ISFSl-ONLY EMERGENCY ACTION LEVEL BASIS DOCUMENT (INCLUDES EMERGENCY ACTION LEVEL SCHEME)
1 1.1 PURPOSE ...............................................................................................................................
SAN ONOFRE NUCLEAR GENERATING STATION
1 1.2 EMERGENCY CLASSIFICATION LEVELS (ECLS} ..............................................................
2 1.3 INITIATING CONDITIONS (ICS) ............................................................................................
3 1.4 EMERGENCY ACTION LEVELS (EALS) ..............................................................................
3 1.5 EAL TECHNICAL BASES MANUAL CONTENT ...................................................................
.4 2.0 DEFINITIONS AND ABBREVIATIONS
.............................................................................................
5 2.1 DEFINITIONS
.........................................................................................................................
5 2.2 ABBREVIATIONS
..................................................................................................................
7 3.0 EAL MATRIX TABLE ........................................................................................................................
8 4.0 EAL TECHNICAL BASES .................................................................................................................
9 4.1 PD-HA 1 ..................................................................................................................................
9 4.2 PD-HU1 ................................................................................................................................
10 4.3 PD-HA3 ................................................................................................................................
11 4.4 PD-HU3 ................................................................................................................................
12 4.5 E-HU1 ...................................................................................................................................
13 ii Revision O
IOEP-2 EAL Technical Bases Manual


==1.0 INTRODUCTION==
IOEP-2                            EAL Technical Bases Manual San Onofre Nuclear Generating Station (SONGS)
Independent Spent Fuel Storage Installation (ISFSI)
Only Emergency Plan Emergency Action Level Technical Bases Manual Revision 0


1.1 PURPOSE This document contains the Nuclear Regulatory Commission (NRC) approved set of INITIATING CONDITIONS (ICs), their associated EMERGENCY ACTION LEVEL (EAL) thresholds, and their site-specific technical bases, for the San Onofre Nuclear Generating Station (SONGS) INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI),
IOEP-2                                                                                        EAL Technical Bases Manual TABLE OF CONTENTS Section
using the EAL development methodology found in NEI 99-01 Revision  
 
: 6. Any changes to this document will be made in accordance with the requirements of 1 O CFR 50.54(q) and 10 CFR 72.44(f).
==1.0    INTRODUCTION==
Personnel responsible for emergency classification and declaration may use this document as a technical reference and an aid in EAL interpretation.
................................................................................................................................1 1.1  PURPOSE ............................................................................................................................... 1 1.2  EMERGENCY CLASSIFICATION LEVELS (ECLS} ..............................................................2 1.3  INITIATING CONDITIONS (ICS) ............................................................................................3 1.4  EMERGENCY ACTION LEVELS (EALS) ..............................................................................3 1.5  EAL TECHNICAL BASES MANUAL CONTENT ................................................................... .4 2.0    DEFINITIONS AND ABBREVIATIONS .............................................................................................5 2.1  DEFINITIONS .........................................................................................................................5 2.2  ABBREVIATIONS ..................................................................................................................7 3.0    EAL MATRIX TABLE ........................................................................................................................8 4.0    EAL TECHNICAL BASES .................................................................................................................9 4.1  PD-HA 1 ..................................................................................................................................9 4.2  PD-HU1 ................................................................................................................................10 4.3  PD-HA3 ................................................................................................................................11 4.4  PD-HU3 ................................................................................................................................12 4.5  E-HU1 ...................................................................................................................................13 ii                                                                              Revision O
1 The primary tool for determining the EMERGENCY CLASSIFICATION LEVEL is the EAL Matrix Table in this manual, also available on form EP(123) EAL, Emergency Action Levels. The user of the EAL Matrix Table may (but is not required to) consult the Emergency Action Level Technical Bases Manual in order to obtain additional information concerning the EALs being considered for classification of an emergency.
 
This document is also used to facilitate review of any proposed changes to the SONGS ISFSl-Only EALs. The SONGS ISFSI is essentially an interim spent fuel storage facility where the spent fuel is surrounded by inert gas inside a container called a canister.
IOEP-2                                                                      EAL Technical Bases Manual
The canisters used at SONGS are stainless steel cylinders that are welded closed. The fuel is cooled by natural airflow around the canister.
 
The fuel was moved to dry storage after several years in spent fuel pools, so the heat given off by the fuel has significantly decreased.
==1.0    INTRODUCTION==
Each canister is surrounded by additional steel, concrete, or other material to provide physical protection, structural integrity, and additional radiation shielding to workers and members of the public. These primary functions of the ISFSI are the focus of the ISFSl-Only I Cs and EALs. SCE was granted exemptions from portions of 10 CFR 50.47(b),
 
10 CFR 50.47(c)(2),
1.1     PURPOSE This document contains the Nuclear Regulatory Commission (NRC) approved set of INITIATING CONDITIONS (ICs), their associated EMERGENCY ACTION LEVEL (EAL) thresholds, and their site-specific technical bases, for the San Onofre Nuclear Generating Station (SONGS)
and 10 CFR 50 Appendix E, Section IV. The basis for these exemptions has not changed and remains in effect for the ISFSl-Only Emergency Plan (IOEP). The changes to this Technical Bases Manual reflect the lowered radiological source term and risks associated with ISFSI storage relative to reactor at power operation or storage in spent fuel pools. Source terms and accident analyses associated with design basis accidents are documented in the dry storage systems' Final Safety Analysis Reports (FSARs).
INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI), using the EAL development methodology found in NEI 99-01 Revision 6.
With regard to event recognition and classification, regulations specific to the declaration of emergencies are provided in planning standard 10 CFR 50.47(b)(4),
Any changes to this document will be made in accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f).
10 CFR 50 Appendix E.IV.B, and 10 CFR 72.32(a)(3).
Personnel responsible for emergency classification and declaration may use this document as a technical reference and an aid in EAL interpretation. 1 The primary tool for determining the EMERGENCY CLASSIFICATION LEVEL is the EAL Matrix Table in this manual, also available on form EP(123) EAL, Emergency Action Levels. The user of the EAL Matrix Table may (but is not required to) consult the Emergency Action Level Technical Bases Manual in order to obtain additional information concerning the EALs being considered for classification of an emergency.
1 Emergency event declaration is required to be made as soon as conditions warranting classification are present and recognizable, but within 30 minutes in all cases of conditions being present.
This document is also used to facilitate review of any proposed changes to the SONGS ISFSl-Only EALs.
Use of this document for assistance is not intended to delay event declaration.
The SONGS ISFSI is essentially an interim spent fuel storage facility where the spent fuel is surrounded by inert gas inside a container called a canister. The canisters used at SONGS are stainless steel cylinders that are welded closed. The fuel is cooled by natural airflow around the canister. The fuel was moved to dry storage after several years in spent fuel pools, so the heat given off by the fuel has significantly decreased. Each canister is surrounded by additional steel, concrete, or other material to provide physical protection, structural integrity, and additional radiation shielding to workers and members of the public. These primary functions of the ISFSI are the focus of the ISFSl-Only ICs and EALs.
1 Revision O
SCE was granted exemptions from portions of 10 CFR 50.47(b), 10 CFR 50.47(c)(2), and 10 CFR 50 Appendix E, Section IV. The basis for these exemptions has not changed and remains in effect for the ISFSl-Only Emergency Plan (IOEP). The changes to this Technical Bases Manual reflect the lowered radiological source term and risks associated with ISFSI storage relative to reactor at power operation or storage in spent fuel pools. Source terms and accident analyses associated with design basis accidents are documented in the dry storage systems' Final Safety Analysis Reports (FSARs).
IOEP-2 EAL Technical Bases Manual The NRC, by letter to Nuclear Energy Institute (NEI) dated 03/28/13(ML12346A463),
With regard to event recognition and classification, regulations specific to the declaration of emergencies are provided in planning standard 10 CFR 50.47(b)(4), 10 CFR 50 Appendix E.IV.B, and 10 CFR 72.32(a)(3).
documented its review of the draft version of NEI 99-01, Revision 6, dated November 2012 (ML 12326A805),
1 Emergency event declaration is required to be made as soon as conditions warranting classification are present and recognizable, but within 30 minutes in all cases of conditions being present. Use of this document for assistance is not intended to delay event declaration.
and found it acceptable for use by licensees seeking to upgrade their EMERGENCY ACTION LEVELS (EALs) in accordance with 10 CFR 50 Appendix E. The regulatory and technical analysis for this endorsement can be retrieved through ADAMS Accession No. ML 13008A736.
1                                                     Revision O
1.2 EMERGENCY CLASSIFICATION LEVELS (ECLS) As defined in NUREG-0654/FEMA-REP-1, nuclear power plant emergencies are separated into four ECLs:
 
IOEP-2                                                               EAL Technical Bases Manual The NRC, by letter to Nuclear Energy Institute (NEI) dated 03/28/13(ML12346A463), documented its review of the draft version of NEI 99-01, Revision 6, dated November 2012 (ML12326A805), and found it acceptable for use by licensees seeking to upgrade their EMERGENCY ACTION LEVELS (EALs) in accordance with 10 CFR 50 Appendix E. The regulatory and technical analysis for this endorsement can be retrieved through ADAMS Accession No. ML13008A736.
1.2   EMERGENCY CLASSIFICATION LEVELS (ECLS)
As defined in NUREG-0654/FEMA-REP-1, nuclear power plant emergencies are separated into four ECLs:
* UNUSUAL EVENT (UE)
* UNUSUAL EVENT (UE)
* ALERT
* ALERT
* Site Area Emergency
* Site Area Emergency
* General Emergency The ECLs are escalated from least severe to most severe according to the relative threat to the health and safety of the public and emergency workers.
* General Emergency The ECLs are escalated from least severe to most severe according to the relative threat to the health and safety of the public and emergency workers. An ECL is determined to be met by identifying abnormal conditions and then comparing them to ICs through EAL threshold values as discussed below. When multiple EALs are met, event declaration is based in the highest ECL reached.
An ECL is determined to be met by identifying abnormal conditions and then comparing them to ICs through EAL threshold values as discussed below. When multiple EALs are met, event declaration is based in the highest ECL reached.
The ISFSI Only ICs and EALs within this document use the two lower of the four ECLs. The source terms and release motive forces associated with an ISFSI are not sufficient to require declaration of a Site Area Emergency or General Emergency.
The ISFSI Only I Cs and EALs within this document use the two lower of the four ECLs. The source terms and release motive forces associated with an ISFSI are not sufficient to require declaration of a Site Area Emergency or General Emergency.
2                                               Revision 0
2 Revision 0
 
IOEP-2 EAL Technical Bases Manual 1.3 INITIATING CONDITIONS (ICS) An IC is a general description of an event or condition that aligns with the definition of one of the four ECLs by virtue of the potential or actual effects or consequences.
IOEP-2                                                                   EAL Technical Bases Manual 1.3   INITIATING CONDITIONS (ICS)
Each IC is given a unique identification code consisting of a hyphenated letter combination, a separate letter and one number. The hyphenated letter combination identifies the recognition  
An IC is a general description of an event or condition that aligns with the definition of one of the four ECLs by virtue of the potential or actual effects or consequences.
: category, the separate letter identifies the ECL, and the number identifies the sequence of the IC within the recognition category.
Each IC is given a unique identification code consisting of a hyphenated letter combination, a separate letter and one number. The hyphenated letter combination identifies the recognition category, the separate letter identifies the ECL, and the number identifies the sequence of the IC within the recognition category. The EAL identification codes are developed as follows:
The EAL identification codes are developed as follows:
Permanently Defueled Recognition Category Applicable to ISFSI
Permanently Defueled Recognition Category Applicable to ISFSI
* PD-H -Hazards and Other Conditions Affecting Plant Safety ISFSI Recognition Category
* PD-H - Hazards and Other Conditions Affecting Plant Safety ISFSI Recognition Category
* E-H-Hazards and Other Conditions Affecting ISFSI ISFSI Only ECLs (lowest to highest)
* E-H- Hazards and Other Conditions Affecting ISFSI ISFSI Only ECLs (lowest to highest)
* U -UNUSUAL EVENT
* U - UNUSUAL EVENT
* A-ALERT For an ISFSl-Only  
* A-ALERT For an ISFSl-Only station, the UNUSUAL EVENT ICs provide for an increased awareness of abnormal conditions while the ALERT ICs are specific to actual or potential impacts to spent fuel.
: station, the UNUSUAL EVENT ICs provide for an increased awareness of abnormal conditions while the ALERT I Cs are specific to actual or potential impacts to spent fuel. Security and Judgment ICs and EALs were included to provide a basis for classifying events that cannot be readily classified based on observable events or physical conditions alone. 1.4 EMERGENCY ACTION LEVELS (EALS)
Security and Judgment ICs and EALs were included to provide a basis for classifying events that cannot be readily classified based on observable events or physical conditions alone.
An EAL is a pre-determined, site-specific, observable threshold for an IC that, when met or exceeded, places the ISFSI in a given ECL. EAL thresholds may utilize a variety of criteria including instrument readings and status indications; observable events; and entry into particular procedures.
1.4   EMERGENCY ACTION LEVELS (EALS)
EALs are individually identified by the IC identification code followed by the EAL number, such as E-HU1 .1 for damage to a loaded canister CONFINEMENT BOUNDARY or PD-HA1 .1 for a HOSTILE ACTION within the VEHICLE BARRIER SYSTEM (VBS). All EAL classification assessments shall be based upon valid indications, reports or conditions.
An EAL is a pre-determined, site-specific, observable threshold for an IC that, when met or exceeded, places the ISFSI in a given ECL.
A valid indication, report, or condition, is one that has been verified through appropriate means such that there is no doubt regarding the indicator's operability, the condition's existence, or the report's accuracy.
EAL thresholds may utilize a variety of criteria including instrument readings and status indications; observable events; and entry into particular procedures.
3 Revision 0
EALs are individually identified by the IC identification code followed by the EAL number, such as E-HU1 .1 for damage to a loaded canister CONFINEMENT BOUNDARY or PD-HA1 .1 for a HOSTILE ACTION within the VEHICLE BARRIER SYSTEM (VBS).
IOEP-2 1.5 EAL TECHNICAL BASES MANUAL CONTENT EAL Matrix Table EAL Technical Bases Manual This manual contains an EAL Matrix Table that addresses all of the recognition categories for the ISFSI EAL thresholds.
All EAL classification assessments shall be based upon valid indications, reports or conditions. A valid indication, report, or condition, is one that has been verified through appropriate means such that there is no doubt regarding the indicator's operability, the condition's existence, or the report's accuracy.
The EAL Matrix Table is designed as an evaluation tool that organizes the ECLs from the highest (ALERT) on the left to the lowest (UNUSUAL EVENT) on the right. Evaluating the EALs for each EGL from highest to lowest reduces the possibility that an event will be under classified.
3                                                 Revision 0
All EALs are to be reviewed for applicability prior to event declaration.
 
IOEP-2                                                               EAL Technical Bases Manual 1.5   EAL TECHNICAL BASES MANUAL CONTENT EAL Matrix Table This manual contains an EAL Matrix Table that addresses all of the recognition categories for the ISFSI EAL thresholds.
The EAL Matrix Table is designed as an evaluation tool that organizes the ECLs from the highest (ALERT) on the left to the lowest (UNUSUAL EVENT) on the right. Evaluating the EALs for each EGL from highest to lowest reduces the possibility that an event will be under classified. All EALs are to be reviewed for applicability prior to event declaration.
Other user aids, such as wallcharts, may be developed from the EAL Matrix Table to support evaluation of abnormal conditions in other human factored formats.
Other user aids, such as wallcharts, may be developed from the EAL Matrix Table to support evaluation of abnormal conditions in other human factored formats.
EAL Documentation Format Each EAL within the technical bases manual is documented in the following manner:
EAL Documentation Format Each EAL within the technical bases manual is documented in the following manner:
Line 953: Line 807:
* EAL Threshold Value(s)
* EAL Threshold Value(s)
* Basis
* Basis
* Basis Reference(s) 4 Revision O
* Basis Reference(s) 4                                                 Revision O
IOEP-2 EAL Technical Bases Manual 2.0 DEFINITIONS AND ABBREVIATIONS 2.1 DEFINITIONS Advanced Horizontal Storage Module (AHSM) -The Transnuclear AHSM is a reinforced concrete structure for storage of a loaded DRY SHIELDED CANISTER (DSC) at a spent fuel storage facility.
 
Alert -Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels. Confinement Boundary  
IOEP-2                                                                 EAL Technical Bases Manual 2.0   DEFINITIONS AND ABBREVIATIONS 2.1   DEFINITIONS Advanced Horizontal Storage Module (AHSM) - The Transnuclear AHSM is a reinforced concrete structure for storage of a loaded DRY SHIELDED CANISTER (DSC) at a spent fuel storage facility.
-The barrier(s) between spent fuel and the environment once the spent fuel is processed for dry storage.
Alert - Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION.
As applied to the SONGS ISFSI, the CONFINEMENT BOUNDARY is defined by the inner surface of the sealed Transnuclear DSC or Holtec MUL Tl-PURPOSE CANISTER (MPG). Dry Shielded Canister (DSC) -A Transnuclear welded pressure vessel that provides confinement of intact or damaged fuel assemblies in an inert atmosphere.
Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.
Emergency Action Level (EAL) -A pre-determined, site-specific, observable threshold for an INITIATING CONDITION that, when met or exceeded, places the station in a given EGL. Emergency Classification Level (ECL) -One of a set of names or titles established by the US Nuclear Regulatory Commission (NRG) for grouping off-normal events or conditions according to potential or actual effects or consequences, and the resulting onsite and offsite response actions.
Confinement Boundary - The barrier(s) between spent fuel and the environment once the spent fuel is processed for dry storage. As applied to the SONGS ISFSI, the CONFINEMENT BOUNDARY is defined by the inner surface of the sealed Transnuclear DSC or Holtec MULTl-PURPOSE CANISTER (MPG).
Dry Shielded Canister (DSC) - A Transnuclear welded pressure vessel that provides confinement of intact or damaged fuel assemblies in an inert atmosphere.
Emergency Action Level (EAL) - A pre-determined, site-specific, observable threshold for an INITIATING CONDITION that, when met or exceeded, places the station in a given EGL.
Emergency Classification Level (ECL) - One of a set of names or titles established by the US Nuclear Regulatory Commission (NRG) for grouping off-normal events or conditions according to potential or actual effects or consequences, and the resulting onsite and offsite response actions.
The EMERGENCY CLASSIFICATION LEVELS applicable to the SONGS ISFSI, in ascending order of severity, are:
The EMERGENCY CLASSIFICATION LEVELS applicable to the SONGS ISFSI, in ascending order of severity, are:
* UE
* UE
* ALERT Hostage -A person(s) held as leverage against the station to ensure demands will be met by the station.
* ALERT Hostage - A person(s) held as leverage against the station to ensure demands will be met by the station.
Hostile Action -An act toward the SONGS ISFSI or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end. This includes attack by air, land, or water using guns, explosives, PROJECTILES,  
Hostile Action - An act toward the SONGS ISFSI or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end.
: vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included.
This includes attack by air, land, or water using guns, explosives, PROJECTILES, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included.
HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the SONGS ISFSI. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals within the VBS boundary).
HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the SONGS ISFSI. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals within the VBS boundary).
Hostile Force -One or more individuals who are engaged in a determined  
Hostile Force - One or more individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.
: assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing,  
Independent Spent Fuel Storage Installation (ISFSI) - A complex that is designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.
: maiming, or causing destruction.
5                                                 Revision 0
Independent Spent Fuel Storage Installation (ISFSI) -A complex that is designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.
 
5 Revision 0
IOEP-2                                                                 EAL Technical Bases Manual Initiating Condition (IC) - An event or condition that aligns with the definition of one of the two applicable ECLs by virtue of the potential or actual effects or consequences.
IOEP-2 EAL Technical Bases Manual Initiating Condition (IC) -An event or condition that aligns with the definition of one of the two applicable ECLs by virtue of the potential or actual effects or consequences.
Multi-Purpose Canister (MPC) - Holtec MPCs are the sealed spent nuclear fuel canisters which provide the CONFINEMENT BOUNDARY for the contained radioactive materials.
Multi-Purpose Canister (MPC) -Holtec MPCs are the sealed spent nuclear fuel canisters which provide the CONFINEMENT BOUNDARY for the contained radioactive materials.
Projectile - An object directed toward the SONGS ISFSI that could cause concern for its continued capability, reliability, or personnel safety.
Projectile  
Protected Area - That onsite area within the security boundary as defined in the station's Security Plan.
-An object directed toward the SONGS ISFSI that could cause concern for its continued capability, reliability, or personnel safety. Protected Area -That onsite area within the security boundary as defined in the station's Security Plan. Security Condition  
Security Condition - Any security event as listed in the approved security contingency plan that constitutes a threat/compromise to site security, threat/risk to site personnel, or a potential degradation to the level of safety. A SECURITY CONDITION does not involve a Hostile Action.
-Any security event as listed in the approved security contingency plan that constitutes a threat/compromise to site security, threat/risk to site personnel, or a potential degradation to the level of safety. A SECURITY CONDITION does not involve a Hostile Action. Transfer Cask -Containers designed to contain the Transnuclear DSC or Holtec MPC during and after loading of spent fuel assemblies, prior to and during unloading, and to transfer the DSC or MPC to or from the Transnuclear AHSM or Holtec VERTICAL VENTILATED MODULE (WM). Unusual Event (UE) -Events are in progress or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated.
Transfer Cask - Containers designed to contain the Transnuclear DSC or Holtec MPC during and after loading of spent fuel assemblies, prior to and during unloading, and to transfer the DSC or MPC to or from the Transnuclear AHSM or Holtec VERTICAL VENTILATED MODULE (WM).
No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of occurs. Vehicle Barrier System (VBS) -Vehicle control measures (passive or active) used to protect against the malevolent use of a land vehicle.
Unusual Event (UE) - Events are in progress or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of occurs.
The VBS consists of both active and passive components, terrain features, man-made structural  
Vehicle Barrier System (VBS) - Vehicle control measures (passive or active) used to protect against the malevolent use of a land vehicle. The VBS consists of both active and passive components, terrain features, man-made structural features, and vehicle access checkpoints as defined in the SONGS Security Plan.
: features, and vehicle access checkpoints as defined in the SONGS Security Plan. Vertical Ventilated Module (WM) -The Holtec WM is a subterranean type overpack, which receives and contains the sealed Holtec MPC for interim spent fuel storage at an ISFSI. The Holtec WM supports the MPC in a vertical orientation and provides gamma and neutron shielding, and also provides air flow through cooling passages to promote heat transfer from the MPC to the environs.
Vertical Ventilated Module (WM) - The Holtec WM is a subterranean type overpack, which receives and contains the sealed Holtec MPC for interim spent fuel storage at an ISFSI. The Holtec WM supports the MPC in a vertical orientation and provides gamma and neutron shielding, and also provides air flow through cooling passages to promote heat transfer from the MPC to the environs.
6 Revision 0
6                                                   Revision 0
IOEP-2 2.2 ABBREVIATIONS AHSM -Advanced Horizontal Storage Module CFR -Code of Federal Regulations DSC -Dry Shielded Canister EAL -Emergency Action Level ECL -Emergency Classification Level ED -Emergency Director EPA -Environmental Protection Agency FAA -Federal Aviation Administration FBI -Federal Bureau of Investigation FEMA -Federal Emergency Management Agency FSAR -Final Safety Analysis Report IC -Initiating Condition ISFSI -Independent Spent Fuel Storage Installation ISS -ISFSI Shift Supervisor MPC -Multi-Purpose Canister mR -milli-Roentgen Equivalent Man NEI -Nuclear Energy Institute NORAD -North American Aerospace Defense Command NRC -Nuclear Regulatory Commission SCE -Southern California Edison SONGS -San Onofre Nuclear Generating Station SSS -Security Shift Supervisor UE -Unusual Event VBS -Vehicle Barrier System WM -Vertical Ventilated Module 7 EAL Technical Bases Manual Revision 0
 
IOEP-2 3.0 EAL MATRIX TABLE PD-HA1 HOSTILE ACTION within the VBS boundary.
IOEP-2                                                   EAL Technical Bases Manual 2.2 ABBREVIATIONS AHSM - Advanced Horizontal Storage Module CFR - Code of Federal Regulations DSC - Dry Shielded Canister EAL - Emergency Action Level ECL - Emergency Classification Level ED - Emergency Director EPA - Environmental Protection Agency FAA - Federal Aviation Administration FBI - Federal Bureau of Investigation FEMA - Federal Emergency Management Agency FSAR - Final Safety Analysis Report IC - Initiating Condition ISFSI - Independent Spent Fuel Storage Installation ISS - ISFSI Shift Supervisor MPC - Multi-Purpose Canister mR - milli-Roentgen Equivalent Man NEI - Nuclear Energy Institute NORAD - North American Aerospace Defense Command NRC - Nuclear Regulatory Commission SCE - Southern California Edison SONGS - San Onofre Nuclear Generating Station SSS - Security Shift Supervisor UE - Unusual Event VBS - Vehicle Barrier System WM - Vertical Ventilated Module 7                               Revision 0
PD-HA1.1 A HOSTILE ACTION is occurring or has occurred within the VBS boundary as re orted b the SSS. PD-HA3 Other conditions exist which in the judgment of the ISS/ED warrant declaration of an ALERT. PD-HA3.1 Other conditions exist which in the judgment of the ISS/ED indicate that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guide ex osure levels. EAL Technical Bases Manual PD-HU1 Confirmed SECURITY CONDITION or threat. PD-HU1.1 A SECURITY CONDITION that does not involve a HOSTILE ACTION as reported by the SSS. PD-HU1 .2 Notification of a credible security threat directed at the site. PD-HU3 Other conditions exist which in the judgment of the ISS/ED warrant declaration of an UNUSUAL EVENT. PD-HU3.1 Other conditions exist which in the judgment of the ISS/ED indicate that events are in progress or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to the ISFSI has been initiated.
 
No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation occurs. E-HU1 Damage to a loaded canister CONFINEMENT BOUNDARY.
IOEP-2                                                               EAL Technical Bases Manual 3.0   EAL MATRIX TABLE PD-HA1 HOSTILE ACTION within the           PD-HU1 Confirmed SECURITY CONDITION or threat.
E-HU1 .1 Damage to a loaded Transnuclear canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:
VBS boundary.
PD-HU1.1 A SECURITY CONDITION that does not involve a PD-HA1.1 A HOSTILE ACTION is                          HOSTILE ACTION as reported by the SSS.
occurring or has occurred PD-HU1 .2 Notification of a credible security threat directed at the within the VBS boundary as site.
re orted b the SSS.
PD-HA3 Other conditions exist which in    PD-HU3 Other conditions exist which in the judgment of the the judgment of the ISS/ED warrant        ISS/ED warrant declaration of an UNUSUAL EVENT.
declaration of an ALERT.
PD-HU3.1   Other conditions exist which in the judgment of the PD-HA3.1 Other conditions exist which                ISS/ED indicate that events are in progress or have in the judgment of the ISS/ED            occurred which indicate a potential degradation of the indicate that events are in              level of safety of the ISFSI or indicate a security threat progress or have occurred                to the ISFSI has been initiated. No releases of which involve an actual or                radioactive material requiring offsite response or potential substantial                    monitoring are expected unless further degradation degradation of the level of              occurs.
safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guide ex osure levels.
E-HU1 Damage to a loaded canister CONFINEMENT BOUNDARY.
E-HU1 .1   Damage to a loaded Transnuclear canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:
* 520 mR/hr (gamma) 3 feet from the surface at the top centerline.
* 520 mR/hr (gamma) 3 feet from the surface at the top centerline.
* 190 mR/hr (gamma) 3 feet from the surface of the neutron shield at the mid-height centerline.
* 190 mR/hr (gamma) 3 feet from the surface of the neutron shield at the mid-height centerline.
E-HU1.2 Damage to a loaded Holtec canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:
E-HU1.2   Damage to a loaded Holtec canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:
8
* 60 mR/hr (gamma + neutron) on the top of the closure lid of a WM, measured in accordance with the EAL Technical Basis.
* 60 mR/hr (gamma + neutron) on the top of the closure lid of a WM, measured in accordance with the EAL Technical Basis.
* 7000 mR/hr (gamma + neutron) on the side of a TRANSFER CASK, measured in accordance with the EAL Technical Basis. Revision 0
* 7000 mR/hr (gamma + neutron) on the side of a TRANSFER CASK, measured in accordance with the EAL Technical Basis.
IOEP-2 EAL Technical Bases Manual 4.0 EAL TECHNICAL BASES 4.1 PD-HA1 I Initiating Condition:
8                                                    Revision 0
 
IOEP-2                                                                   EAL Technical Bases Manual 4.0     EAL TECHNICAL BASES 4.1     PD-HA1 I Initiating Condition:
HOSTILE ACTION within the VBS boundary.
HOSTILE ACTION within the VBS boundary.
EAL: PD-HA 1.1. A HOSTILE ACTION is occurring or has occurred within the VBS boundary as reported by the I Basis: Security Shift Supervisor.
EAL:
This IC addresses the occurrence of a HOSTILE ACTION within the VBS boundary.
PD-HA 1.1. A HOSTILE ACTION is occurring or has occurred within the VBS boundary as reported by the Security Shift Supervisor.
This event will require rapid response and assistance due to the possibility of the attack progressing to the ISFSI PROTECTED AREA Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].
I Basis:
As time and conditions allow, these events require a heightened state of readiness by the staff and implementation of onsite protective measures (e.g., evacuation, dispersal or sheltering).
This IC addresses the occurrence of a HOSTILE ACTION within the VBS boundary. This event will require rapid response and assistance due to the possibility of the attack progressing to the ISFSI PROTECTED AREA Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].
The ALERT declaration will also heighten the awareness of Offsite Response Organizations, allowing them to be better prepared should it be necessary to consider further actions.
As time and conditions allow, these events require a heightened state of readiness by the staff and implementation of onsite protective measures (e.g., evacuation, dispersal or sheltering). The ALERT declaration will also heighten the awareness of Offsite Response Organizations, allowing them to be better prepared should it be necessary to consider further actions.
This IC does not apply to incidents that are accidental events, acts of civil disobedience, or otherwise are not a ACTION perpetrated by a HOSTILE FORCE. Examples include the crash of a small aircraft, shots from hunters, physical disputes between employees, etc. Reporting of these types of events is adequately addressed by the requirements of 10 CFR § 73. 71 or 10 CFR § 50.72. EAL #1 is applicable for any HOSTILE ACTION occurring, or that has occurred, within the VBS boundary.
This IC does not apply to incidents that are accidental events, acts of civil disobedience, or otherwise are not a HOSTl~E ACTION perpetrated by a HOSTILE FORCE. Examples include the crash of a small aircraft, shots from hunters, physical disputes between employees, etc.
Reporting of these types of events is adequately addressed by the requirements of 10 CFR § 73. 71 or 10 CFR § 50.72.
EAL #1 is applicable for any HOSTILE ACTION occurring, or that has occurred, within the VBS boundary.
This includes any action directed against the ISFSI that is located within the VBS boundary.
This includes any action directed against the ISFSI that is located within the VBS boundary.
In some cases, it may not be readily apparent if an aircraft impact within the VBS boundary was intentional (i.e., a HOSTILE ACTION).
In some cases, it may not be readily apparent if an aircraft impact within the VBS boundary was intentional (i.e., a HOSTILE ACTION). It is expected, although not certain, that notification by an appropriate Federal agency to the site would clarify this point. In this case, the appropriate federal agency is intended to be NORAD, FBI, FM or NRC. The emergency declaration, including one based on other ICs/EALs, should not be unduly delayed while awaiting notification by a Federal agency.
It is expected, although not certain, that notification by an appropriate Federal agency to the site would clarify this point. In this case, the appropriate federal agency is intended to be NORAD, FBI, FM or NRC. The emergency declaration, including one based on other ICs/EALs, should not be unduly delayed while awaiting notification by a Federal agency. Additional SONGS Site-Specific Bases Information:
Additional SONGS Site-Specific Bases Information:
None. I Basis  
None.
I Basis  


==Reference:==
==Reference:==
: 1. NEI 99-01 Rev 6, PD-HA 1 9 Revision 0
: 1.     NEI 99-01 Rev 6, PD-HA 1 9                                                 Revision 0
IOEP-2 EAL Technical Bases Manual 4.2 PD-HU1 I Initiating Condition:
 
Confirmed SECURITY CONDITION or threat. EALs: PD-HU1 .1. A SECURITY CONDITION that does not involve a HOSTILE ACTION as reported by the Security Shift Supervisor.
IOEP-2                                                                   EAL Technical Bases Manual 4.2     PD-HU1 I Initiating Condition:
PD-HU1 .2. Notification of a credible securit threat directed at the site. Basis: This IC addresses events that pose a threat to station personnel or the spent fuel, and thus represent a potential degradation in the level of station safety. Security events which do not meet one of these EALs are adequately addressed by the requirements of 10 CFR § 73. 71 or 10 CFR § 50. 72. Security events assessed as HOSTILE ACTIONS are classifiable under IC PD-HA1. Timely and accurate communications between SSS and the ISS is essential for proper classification of a security-related event. Classification of these events will initiate appropriate threat-related notifications to station personnel and Offsite Response Organizations.
Confirmed SECURITY CONDITION or threat.
Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].
EALs:
EAL #1 references Security Shift Supervisor because these are the individuals trained to confirm that a security event is occurring or has occurred.
PD-HU1 .1. A SECURITY CONDITION that does not involve a HOSTILE ACTION as reported by the Security Shift Supervisor.
Training on security event confirmation and classification is controlled due to the nature of Safeguards and 10 CFR § 2.390 information.
PD-HU1 .2. Notification of a credible securit threat directed at the site.
EAL #2 addresses the receipt of a credible security threat. The credibility of the threat is assessed in accordance with Security procedures.
Basis:
Credible security threat includes a HOSTILE ACTION within the SITE BOUNDARY outside of the VBS boundary.
This IC addresses events that pose a threat to station personnel or the spent fuel, and thus represent a potential degradation in the level of station safety. Security events which do not meet one of these EALs are adequately addressed by the requirements of 10 CFR § 73. 71 or 10 CFR § 50. 72. Security events assessed as HOSTILE ACTIONS are classifiable under IC PD-HA1.
Escalation of the ECL would be via IC PD-HA 1. Additional SONGS Site-Specific Bases Information:
Timely and accurate communications between SSS and the ISS is essential for proper classification of a security-related event. Classification of these events will initiate appropriate threat-related notifications to station personnel and Offsite Response Organizations. Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].
None. I Basis  
EAL #1 references Security Shift Supervisor because these are the individuals trained to confirm that a security event is occurring or has occurred. Training on security event confirmation and classification is controlled due to the nature of Safeguards and 10 CFR § 2.390 information.
EAL #2 addresses the receipt of a credible security threat. The credibility of the threat is assessed in accordance with Security procedures. Credible security threat includes a HOSTILE ACTION within the SITE BOUNDARY outside of the VBS boundary.
Escalation of the ECL would be via IC PD-HA 1.
Additional SONGS Site-Specific Bases Information:
None.
I Basis  


==Reference:==
==Reference:==
: 1. NEI 99-01 Rev 6, PD-HU1 10 Revision O
: 1.     NEI 99-01 Rev 6, PD-HU1 10                                                     Revision O
IOEP-2 EAL Technical Bases Manual 4.3 PD-HA3 I Initiating Condition:
 
Other conditions exist which in the judgment of the ISS/ED warrant declaration of an ALERT. EAL: PD-HA3.1.
IOEP-2                                                                 EAL Technical Bases Manual 4.3     PD-HA3 I Initiating Condition:
Other conditions exist which in the judgment of the ISS/ED indicate that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are ex ected to be limited to small fractions of the EPA Protective Action Guide ex osure levels. Basis: This IC addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the ISS/ED to fall under the ECL description for an ALERT. Additional SONGS Site-Specific Bases Information:
Other conditions exist which in the judgment of the ISS/ED warrant declaration of an ALERT.
None. I Basis Reference(s):  
EAL:
: 1. NEI 99-01 Rev 6, PD-HA3 2. EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents 11 Revision O
PD-HA3.1. Other conditions exist which in the judgment of the ISS/ED indicate that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are ex ected to be limited to small fractions of the EPA Protective Action Guide ex osure levels.
IOEP-2 EAL Technical Bases Manual 4.4 PD-HU3 I Initiating Condition:
Basis:
Other conditions exist which in the judgment of the ISS/ED warrant declaration of a UE. EAL: PD-HU3.1.
This IC addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the ISS/ED to fall under the ECL description for an ALERT.
Other conditions exist which in the judgment of the ISS/ED indicate that events are in progress or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated.
Additional SONGS Site-Specific Bases Information:
No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation occurs. I Basis: This IC addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the ISS/ED to fall under the ECL description for a UE. Additional SONGS Site-Specific Bases Information:
None.
None. I Basis  
I Basis Reference(s):
: 1. NEI 99-01 Rev 6, PD-HA3
: 2. EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents 11                                                   Revision O
 
IOEP-2                                                                     EAL Technical Bases Manual 4.4     PD-HU3 I Initiating Condition:
Other conditions exist which in the judgment of the ISS/ED warrant declaration of a UE.
EAL:
PD-HU3.1. Other conditions exist which in the judgment of the ISS/ED indicate that events are in progress or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation occurs.
I Basis:
This IC addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the ISS/ED to fall under the ECL description for a UE.
Additional SONGS Site-Specific Bases Information:
None.
I Basis  


==Reference:==
==Reference:==
: 1. NEI 99-01 Rev 6, PD-HU3 12 Revision 0
: 1. NEI 99-01 Rev 6, PD-HU3 12                                                 Revision 0
IOEP-2 EAL Technical Bases Manual 4.5 E-HU1 I Initiating Condition:
 
IOEP-2                                                                     EAL Technical Bases Manual 4.5     E-HU1 I Initiating Condition:
Damage to a loaded canister CONFINEMENT BOUNDARY.
Damage to a loaded canister CONFINEMENT BOUNDARY.
EAL: E-HU1 .1. Damage to a loaded Transnuclear canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:
EAL:
E-HU1 .1. Damage to a loaded Transnuclear canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:
* 520 mR/hr (gamma) 3 feet from the surface at the top centerline.
* 520 mR/hr (gamma) 3 feet from the surface at the top centerline.
* 190 mR/hr (gamma) 3 feet from the surface of the neutron shield at the midheight centerline.
* 190 mR/hr (gamma) 3 feet from the surface of the neutron shield at the midheight centerline.
E-HU1 .2. Damage to a loaded Holtec canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:
E-HU1 .2. Damage to a loaded Holtec canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:
* 60 mR/hr (gamma + neutron) on the top of the closure lid of a WM. A minimum of four (4) dose rate measurements shall be taken on the top of the WM. These measurements shall be taken approximately 90 degrees apart around the circumference of the lid, approximately 18 inches radially inward from the edge of the lid.
* 7000 mR/hr (gamma + neutron) on the side of a TRANSFER CASK. A minimum of four (4) dose rate measurements shall be taken on the side of the TRANSFER CASK, approximately at the cask mid-height plane. The measurement locations shall be approximately 90 degrees apart around the circumference of the cask. Dose rates shall be measured between the radial ribs of the water jacket.
I Basis:
I Basis:
* 60 mR/hr (gamma + neutron) on the top of the closure lid of a WM. A minimum of four (4) dose rate measurements shall be taken on the top of the WM. These measurements shall be taken approximately 90 degrees apart around the circumference of the lid, approximately 18 inches radially inward from the edge of the lid.
This IC addresses an event that results in damage to the CONFINEMENT BOUNDARY of a storage canister containing spent fuel. It applies to irradiated fuel that is licensed for dry storage beginning at the point that the loaded storage canister is sealed. The issues of concern are the creation of a potential or actual release path to the environment, degradation of one or more fuel assemblies due to environmental factors, and configuration changes which could cause challenges in removing the canister or fuel from storage.
* 7000 mR/hr (gamma + neutron) on the side of a TRANSFER CASK. A minimum of four (4) dose rate measurements shall be taken on the side of the TRANSFER CASK, approximately at the cask mid-height plane. The measurement locations shall be approximately 90 degrees apart around the circumference of the cask. Dose rates shall be measured between the radial ribs of the water jacket. This IC addresses an event that results in damage to the CONFINEMENT BOUNDARY of a storage canister containing spent fuel. It applies to irradiated fuel that is licensed for dry storage beginning at the point that the loaded storage canister is sealed. The issues of concern are the creation of a potential or actual release path to the environment, degradation of one or more fuel assemblies due to environmental  
The existence of "damage" is determined by radiological survey. The EAL threshold values, which are a technical specification multiple of "2 times", are used here to distinguish between non-emergency and emergency conditions. The emphasis for this classification is the degradation in the level of safety of the spent fuel canister and not the magnitude of the associated dose or dose rate. It is recognized that in the case of extreme damage to a loaded canister, the fact that the "on-contact" dose rate limit is exceeded may be determined based on measurement of a dose rate at some distance from the canister.
: factors, and configuration changes which could cause challenges in removing the canister or fuel from storage.
Security-related events for ISFSls are covered under ICs PD-HU1 and PD-HA1.
The existence of "damage" is determined by radiological survey. The EAL threshold values, which are a technical specification multiple of "2 times", are used here to distinguish between non-emergency and emergency conditions.
Additional SONGS Site-Specific Bases Information:
The emphasis for this classification is the degradation in the level of safety of the spent fuel canister and not the magnitude of the associated dose or dose rate. It is recognized that in the case of extreme damage to a loaded canister, the fact that the "on-contact" dose rate limit is exceeded may be determined based on measurement of a dose rate at some distance from the canister.
Security-related events for ISFSls are covered under I Cs PD-HU1 and PD-HA1. Additional SONGS Site-Specific Bases Information:
SONGS Transnuclear storage canister Technical Specifications are based on values three feet from the top and mid-height surfaces.
SONGS Transnuclear storage canister Technical Specifications are based on values three feet from the top and mid-height surfaces.
13 Revision 0
13                                                   Revision 0
IOEP-2 EAL Technical Bases Manual I Basis Reference(s):  
 
: 1. NEI 99-01 Rev 6, E-HU1 2. Certificate of Compliance No. 1029, Appendix A, Technical Specifications for the Advanced NUHOMS System 5.2.4.d 3. Certificate of Compliance No. 1040, Appendix A, Technical Specifications for the Hi-Storm UMAX Canister Storage System 5.3.4 14 Revision 0 I I}}
IOEP-2                                                           EAL Technical Bases Manual I Basis Reference(s):
: 1. NEI 99-01 Rev 6, E-HU1
: 2. Certificate of Compliance No. 1029, Appendix A, Technical Specifications for the Advanced NUHOMS System 5.2.4.d
: 3. Certificate of Compliance No. 1040, Appendix A, Technical Specifications for the Hi-Storm UMAX Canister Storage System 5.3.4 I
I 14                                               Revision 0}}

Latest revision as of 21:24, 4 February 2020

Independent Spent Fuel Storage Installation (ISFSI) - Amendment Applications 226, 273, and 258 Only Emergency Plan (Ioep) and ISFSl-Only Emergency Action Level Scheme (Ioeal)
ML16355A015
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/15/2016
From: Thomas J. Palmisano
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML16355A015 (81)


Text

I ~vi SO~T"'"" CALIFORNIA Thomas J. Palmisano

~ EDISON* Vice President Decommissioning &

Chief Nuclear Officer An EDISON INTERNATIONAL Company December 15, 2016 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 12-oL-//

Subject:

Docket No. 50-361, 50-362, 50-206 Amendment Applications 226, 273, and 258 Independent Spent Fuel Storage Installation (ISFSI) Only Emergency Plan (IOEP) and ISFSl-Only Emergency Action Level Scheme (IOEAL)

San Onofre Nuclear Generating Station, Units 1, 2 and 3

References:

(1) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC}, dated June 28, 2013;

Subject:

Docket No. 50-362, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating S~ation, Unit 3 (ADAMS Accession No. ML13183A391)

(2) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRC) dated July 22, 2013;

Subject:

Docket No. 50-361, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating Station, Unit 2 (ADAMS Accession Number ML13204A304)

(3) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated September 23, 2014;

Subject:

Docket Nos. 50-361 and 50-362, San Onofre Nuclear Generating Station, Units 2 and 3, Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML14269A033)

(4) Letter from T.J. Wengert (NRC) to T.J. Palmisano (SCE) dated June 5, 2015;

Subject:

San Onofre Nuclear Generating Station, Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation - Issuance of Amendments Re: Changes To The Emergency Plan (TAC NOS. MF3841, MF3842, and MF3843) (ADAMS Accession No.ML15126A461)

Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2

. and 3, respectively. The proposed amendments would revise the SONGS Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action Level (EAL) scheme into an ISFSl-Only EAL (IOEAL) scheme. The proposed changes are b*eing submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4), 10 CFR 50, Appendix E, Section IV.B.2, and 10 CFR 72.44(f).

P.O. Box 128 San Clemente, CA 92674 (949) 368-6575 Fax: (949) 368-6183 tom.palmisano@sc.e.com I_

Document Control Desk 2 December 15, 2016 By letters dated June 28, 2013 (Reference 1) and July 22, 2013 (Reference 2), SCE submitted the certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1 )(ii). Consequently, as specified in 10 CFR 50.82(a)(2), the 10 CFR Part 50 licenses for SONGS Units 2 and 3 no longer authorize operation of the reactor, or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all Unit 2 and 3 spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019 (with a potential early finish date of mid-2018). In addition, SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase. Above-ground structures have been dismantled. Unit 1 fuel is stored in the Independent Spent Fuel Storage Installation and in the GE-Hitachi Morris facility. To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.

The proposed emergency plan continues to rely on previously granted exemptions from certain emergency planning requirements (Reference 4), as the basis for these exemptions has not changed and remains in effect. to this letter contains a description, technical analysis, significant hazards determination, and environmental considerations evaluation for the proposed amendment.

Enclosures 1 and 2 to this letter provide the proposed emergency plan and the EAL bases document (including EAL scheme), respectively.

SCE requests approval of these amendment applications by November 30, 2017. Once approved, the amendment will be implemented within 60 days following SCE's submittal of a written certification to the NRC that all spent nuclear fuel assemblies have been transferred out of the spent fuel pools and placed in storage within the ISFSI.

In accordance with 10 CFR 50.91 (b), SCE is notifying the State of California of this request for license amendment by providing a copy of this letter and its enclosures.

There are no new regulatory commitments in this letter or the enclosures.

Please contact Mr. James Kay at (949) 368-7 418 if you have any questions or require additional information.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on ' z....(.

(Date)

.r/'"2- c.. / G..

Sincerely, 07~

Document Control Desk 3 December 15, 2016 Attachments: Discussion of Change, Technical Analysis, Significant Hazards Determination and Environmental Considerations

Enclosures:

1. ISFSl-Only Emergency Plan
2. ISFSl-Only Emergency Action Level Technical Bases Document cc: K. Kennedy, Regional Administrator, NRC Region IV M. Vaaler, NRC Project Manager, SONGS Units 1, 2 and 3 S. Y. Hsu, California Department of Public Health, Radiologic Health Branch

ATTACHMENT 1 LICENSE AMENDMENT REQUESTS 226, 273, and 258:

ISFSl-ONLY EMERGENCY PLAN (IOEP)

AND EMERGENCY ACTION LEVEL (EAL) SCHEME DISCUSSION OF CHANGE, TECHNICAL ANALYSIS, SIGNIFICANT HAZARDS DETERMINATION, AND ENVIRONMENTAL CONSIDERATIONS

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level {EAL) Scheme DISCUSSION OF CHANGE, TECHNICAL ANALYSIS, SIGNIFICANT HAZARDS DETERMINATION AND ENVIRONMENTAL CONSIDERATIONS 1.0

SUMMARY

DESCRIPTION Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, respectively. The proposed amendments would revise the Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action level (EAL) scheme into an IFSl-Only EAL (IOEAL) scheme. The proposed changes are being submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4), 10 CFR 50, Appendix E, Section IV.B.2, and 10 CFR 72.44(f).

By letters dated June 28, 2013 (Reference 1) and July 22, 2013 (Reference 2), SCE submitted the certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1 )(ii). Consequently, as specified in 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. In addition, SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase. Above-ground structures have been dismantled. Unit 1 fuel is stored in the Independent Spent Fuel Storage Installation and in the GE-Hitachi Morris facility.

To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.

The proposed IOEP is for the operation of the ISFSI. This plan would only be implemented after all spent fuel has been removed from the spent fuel pools and placed in dry storage within the ISFSI. Implementation of the IOEP would involve SONGS applying administrative controls for methods to control the potential dispersal of radiological source material.

The proposed IOEP continues to rely on previously granted exemptions from certain emergency planning requirements (Reference 4) as the basis for these exemptions has not changed and remains in effect.

There are no existing license amendment requests associated with the emergency plan currently docketed for SONGS. Therefore, no disposition of other license changes, as they relate to this license amendment request, is needed. Consistent with the condition that the proposed IOEP may be implemented only after all spent fuel has been removed from the spent fuel pool and placed in dry storage within the ISFSI, SCE License Amendment Applications 225, 272, and 257 (dockets 50-206, 50-361 and 50-362, respectively) (Reference 5), *proposed a revision to the Technical Specification 4.3, "Fuel Storage," stating spent fuel shall not be stored in the spent fuel pool.

Page 1

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme

2.0 PROPOSED CHANGE

The proposed amendment would modify the SONGS license by revising the emergency plan and the associated emergency action level (EAL) scheme. The proposed changes reduce the scope of onsite emergency planning requirements to reflect the reduced scope of potential radiological accidents with all spent fuel in dry cask storage within the ISFSI. After all spent fuel is in dry cask storage within the ISFSI, the number and severity of potential radiological accidents is less than when spent nuclear fuel was stored in the spent fuel pool. Therefore, the offsite radiological consequences of accidents possible at SONGS are substantially lower.

There continues to be no need for offsite emergency response plans at SONGS because no design basis accident or reasonably conceivable beyond design basis accident can result in radioactive releases that exceed Environmental Protection Agency (EPA) Protective Action Guides (PAGs) (Reference 6) beyond the Exclusion Area Boundary (EAB).

SCE has developed a methodology for determining when to apply administrative controls that would be adequate to limit potential dispersal of radioactive material during decontamination and dismantling of radioactive systems, structures, and components contained in the non-operational nuclear Units. These administrative controls ensure that if a radiological release were to occur, it would not exceed two times the Offsite Dose Calculation Manual (ODCM) limits (2 x 1500 mrem/year) at the EAB for 60 minutes (and therefore not result in doses to the public above EPA PAGs beyond the EAB).

For potential liquid radioactivity releases, the SONGS UFSAR provides analysis for two events.

For the Radioactive Waste System Leak or Failure (Release to Atmosphere), the UFSAR states that consequences would be less than 100 mrem, which is below the acceptance criterion of 2 x 1500 mrem/year. For the Postulated Radioactive Releases Due to Liquid Tank Failures, the UFSAR states that there is no credible accident that results in releases exceeding 10 CFR 20 limits. As the ODCM limits are based on 10 CFR 20, any dose consequences from a liquid radioactivity release would also be below two times the ODCM limits at the EAB for 60 minutes (and therefore not result in doses to the public above EPA PAGs beyond the EAB).

The current EAL scheme was approved for use at SONGS on June 5, 2015 (Reference 7), and is based upon NEI 99-01, Revision 6 (Reference 8). The proposed EAL scheme remains based on NEI 99-01, Revision 6, as appropriate for the ISFSl-only condition at SONGS.

2.1 Summary of Major Changes The major changes to the SONGS Emergency Plan are:

1. Removal of the various emergency actions related to the spent fuel pool.
2. Removal of non-ISFSI related emergency event types.
3. Replacement of the "Shift Manager" title with the ."ISFSI Shift Supervisor (ISS)" title as the position which assumes the Emergency Director's responsibilities.
4. Revision of the emergency response organization.

Page2

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN {IOEP) and Emergency Action Level (EAL) Scheme The off-normal events and accidents addressed in the SONGS ISFSl-Only Emergency Plan are related to the dry storage of spent nuclear fuel at the ISFSI and include only off-normal, accident, natural phenomena, and hypothetical events and consequences as presented in the NU HOMS Certificate of Compliance (CoC) 1029 (Amendments 0 and 1) Horizontal Modular Storage System Updated Final Safety Analysis Report (NU HOMS UFSAR), and in the HOLTEC CoC 1040 (Amendment 1 and Proposed Amendment 2) HI-STORM System Final Safety Analysis Report (FSAR). After all fuel is removed from the SONGS spent fuel pools, there will no longer be any potential for the accidents previously described in the SONGS Emergency Plan that would increase risk to the health and safety of the public that specifically related to the storage of the spent fuel in the spent fuel pool. After the transfer of the spent fuel to the ISFSI, the spent fuel storage and handling systems will be removed from operation consistent with the PSDAR for SONGS dated September 23, 2014 (Reference 3).

2.2 Elimination of Spent Fuel Pool and Radioactive Release Initiating Conditions and EALs, The initiating conditions (ICs) and EALs associated with emergency classification in the current emergency plan are based on NEI 99-01, Revision 6. Specifically, Appendix C of NEI 99-01 contains a set of ICs and EALs for permanently defueled nuclear power plants that had previously operated under a 10 CFR Part 50 license and have permanently ceased operations.

After all spent fuel has been removed from the spent fuel pool and placed in dry storage within the ISFSI, the NEI 99-01, Appendix C, ICs and EALs that are associated with the spent fuel pool are no longer required to be in the emergency plan. Additionally, certain ICs and EALs whose primary function is not associated with the spent fuel pool are also no longer required to be in the emergency plan when administrative controls are applied to limit the potential dispersal of radioactive material and the offsite consequences of uncontrolled effluent releases.

Therefore, the ICs listed in Table 1 below are being deleted from the currently approved emergency plan for SONGS. The ICs being deleted are either associated only with spent fuel pool operation or are ICs for which administrative controls to limit possible effluent releases have been established.

Table 1 - Emergency Plan Initiating Conditions Being Deleted ALERT UNUSUAL EVENT PD-AA 1 (all) PD-AU1 (all)

Release of gaseous or liquid radioactivity Release of gaseous or liquid radioactivity greater resulting in offsite dose greater than 10 mrem than 2 times the ODCM limits for 60 minutes or TEDE or 50 mrem thyroid COE. longer.

PD-AA2 (all) PD-AU2 (all)

UNPLANNED rise in plant radiation levels that UNPLANNED rise in plant radiation levels.

impedes plant access required to maintain spent fuel integrity..

Page 3

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme Table 1 - Emergency Plan Initiating Conditions Being Deleted ALERT UNUSUAL EVENT PD-SU1 (all)

UNPLANNED spent fuel pool temperature rise.

PD-HA1 HOSTILE ACTION within the Vehicle Barrier System or airborne attack threat *.vithin 30 minutes.* PD-HU1.3 A validated notification from the NRC providing PD-HA1.2 information of an aircraft threat A validated notification from NRC of an aircraft attack threat within 30 minutes of the site.

PD-HU2 (all)**

Hazardous event affecting SAFETY SYSTEM equipment necessary for spent fuel cooling.

  • Only the strike-thru portion is being deleted.
    • For an ISFSl-only facility, the condition addressed by PD-HU2 remains fully addressed by IC EU1 .1 (which is being retained in the emergency plan).

The currently existing SONGS ICs and EALs not listed in Ta_ble 1 above are being retained.

The EAL ICs being deleted include all ICs associated with the categories of abnormal radioactivity release and system malfunction. These two categories apply only to spent fuel pool operation.

One new EAL is being proposed in IC E-HU1, "Damage to a loaded cask CONFINEMENT BOUNDARY." The new EAL E-HU1 .2 provides threshold values for the AREVA ISFSI and the new HOLTEC ISFSI based on the generic AREVA and HOLTEC Technical Specification values provided in the respective Certificates of Compliance.

The EAL ICs being retained in the emergency plan are appropriate to address the condition of an ISFSl-only facility (no fuel stored in the spent fuel pool).

2.3 Emergency Response Organization Revision A Resource Manager is provided to assist in assessing the event and obtaining needed resources. The Resource Manager is required to be in contact with the Emergency Director within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of classification of an Unusual Event or ALERT. The Resource Manager augments the Emergency Director by assisting in assessing the emergency condition and coordinating required resources, including public information interface. Services provided to the Emergency Director by the Resource Manager can be provided remotely and do not necessitate an onsite response of the Resource Manager. By responding remotely, the actual response time is decreased with no negative impact to services and functional responsibilities provided by the Resource Manager.

Page 4

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme Events that require entry into the ISFSl-Only Emergency Plan would be an extreme natural phenomenon (beyond design bases) or a security condition, either of which would negatively impact or restrict access to the site.

Therefore, the Resource Manager's functional responsibilities would be performed in a timely manner by not requiring the Resource Manager to physically report to SONGS during a classified emergency.

3.0 TECHNICAL ANALYSIS

3.1 Radiological Consequences of Design Basis Events The San Onofre site is located on the coast of Southern California in San Diego County, approximately 62 miles southeast of Los Angeles and 51 miles northwest of San Diego. The site is located entirely within the boundaries of the United States Marine Corps Base, Camp Pendleton, California, near the northeast end of the 18-mile shoreline. The population of the area within a 10-mile radius of the San Onofre Nuclear Generating Station is projected to increase from 59,024 in 1980 to 95,301 by 2020.

The SONGS Units 2 and 3 Updated Final Safety Analysis Report (UFSAR), Chapter 15, Accident Analyses, currently address the design basis accidents (OBA) and transient scenarios applicable to SONGS Units 2 and 3 in the permanently defueled condition with irradiated fuel stored in the SFP. Many of these postulated accidents are predicated on spent fuel being stored in the SFP. However, upon transfer of all irradiated fuel to storage in the ISFSI, the accident scenarios predicated on spent fuel storage in the SFP are no longer possible. The SONGS 1 Defueled Safety Analysis Report (DSAR), Chapter 8, Accident Analyses states that there are no remaining design-basis accidents for Unit 1, which is consistent with the condition that all spent fuel has already been removed from the Unit 1 spent fuel pool. The ISFSI is a passive system that does not rely on electrical power for heat transfer. After removal of the spent fuel from the Units 2 and 3 spent fuel pools, there are no credible fuel related accidents Hor which Certified Fuel Handler, Shift Manager, or Certified Operator actions are required to prevent occurrence or mitigate the consequences. There is no credible accident resulting in radiological releases requiring offsite protective measures.

The robust design and construction of the spent fuel storage systems selected for use at the ISFSI prevents the release of radioactivity in the event of an off-normal or accident event as described in the ISFSI storage system safety analysis reports. Leakage of fission products from a canister confinement boundary breach is *not considered to be a credible event, given the high integrity nature of the canisters' design and the additional protection afforded the canisters by the storage system.

SCE plans to use the DEGON decommissioning method (immediate dismantling), in which the equipment, structures, and portions of the facility and site that contain radioactive contaminants are promptly removed and/or decontaminated to a level that permits termination of the license after cessation of operations (Reference 3). Administrative controls that are required to be in Page 5

EVALUATION OF THE PROPOSED AMENDMENT ISFSl*Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme place when decontamination and dismantlement activities of radioactive systems, structures, and components are being performed are designed to minimize the likelihood of an off-normal event, and thereby the consequences of such an event.

After all the spent fuel has been removed from the spent fuel pool, the radiological inventory (non-fuel) that remains at the reactor facility is primarily attributable to either stored liquid radioactive waste or activated reactor components and structural materials. For liquid radwaste, Chapter 15 of the UFSAR states that there is no credible accident that would exceed 10 CFR 20 limits. For activated reactor components and structural materials, there are no credible accident sequences that can mobilize a significant portion of this inventory for release. As a result, the potential accidents that could occur during the decommissioning of the reactor facility have negligible offsite and onsite radiological consequences.

With all spent nuclear fuel in dry storage within the ISFSI, the radiological status of the facility required for implementing this proposed revision to the SONGS ISFSl-Only Emergency Plan (IOEP) is summarized as follows:

  • The remaining radiological source term at SONGS is not likely to create an unplanned/unanticipated increase in radiation or in liquid or airborne radioactivity levels outside of the EAB that would result in doses to the public above ODCM limits at the EAB.
  • Source term accumulation from activities during decontamination and dismantling of radioactive systems, structures, and components are administratively controlled at a level that would preclude the declaration of an Unusual Event (UE).
  • Necessary radiological support personnel will be administratively required to be onsite during active decontamination and dismantling of radioactive systems, structures, and components.

The IOEP and certain initiating conditions (ICs) and emergency action levels (EALs), for which administrative controls to limit possible effluent releases will be established, do not apply to decontamination or dismantling of radioactive systems, structures, and components.

  • NUREG-0586 (Reference 9) supports this conclusion in the following statement.

"The staff has reviewed activities associated with decommissioning and determined that many decommissioning activities not involving spent fuel that are likely to result in radiological accidents are similar to activities conducted during the period of reactor operations. The radiological releases from potential accidents associated with these activities may be detectible. However, work procedures are designed to minimize the likelihood of an accident and the consequences of an accident, should one occur, and procedures will remain in place to protect health and safety while the possibility of significant radiological accident exists."

NUREG-0586 also makes the following supportive statement.

Page 6

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme "The staff has considered available information, including comments received on the draft of Supplement 1 of NUREG-0586, concerning the potential impacts of non-spent-fuel-related radiological accidents resulting from decommissioning. This information indicates, that with the mitigation procedures in place, the impacts of radiological accidents are neither detectable nor destabilizing. Therefore, the staff makes the generic conclusion that impacts of non-spent-fuel-related radiological accidents are SMALL. The staff has considered mitigation and concludes that no additional measures are likely to be sufficiently beneficial to be warranted."

Accordingly, administrative controls that are designed to minimize the likelihood and consequence of an off-normal event would be implemented when decontamination or.

dismantling activities of radioactive systems, structures, and components are being performed.

Implementation of the IOEP would involve SCE applying administrative controls for methods to control the potential dispersal of the radiological source material.

Administrative controls would potentially need to be applied duririg handling of:

  • . Radioactive materials collected on filter media and resins.
  • Contaminated materials collected in shipping containers.
  • Surface or fixed contamination on work areas that may create airborne radioactive material.
  • Radioactive liquids within tanks Details of administrative control programs will be finalized in 2017. Administrative controls are expected to be similar to existing controls provided by the Radiation Protection Program and Fire Protection Program. Activities will be performed in accordance with procedures by individuals that have been trained to prevent the potential dispersal of radioactive material.

Several examples of methods to control potential dispersal of the radiological source term include limitation on dispersal mechanisms that may cause a fire (e.g., limits on combustible material loading, use of fire watch to preclude fire, etc.), placement of a berm around a radioactive liquid storage tank, or packaging contents of a shipping container within a confined boundaries and ventilation controls.

As discussed in the previously granted exemption from various emergency planning requirements contained in 10 CFR 50.47 and 10 CFR 50, Appendix E (Reference 4), an analysis of the potential radiological impact of a design basis accident at SONGS in a permanently defueled condition indicates tbat any releases beyond the EAB are below the EPA PAG exposure levels, as detailed in Reference 6. The basis for these exemptions has not changed and remains in effect for the proposed emergency plan changes.

3.2 Radiological Consequences of Postulated Events Under the previous facility condition of fuel stored within the spent fuel pool, the most severe postulated beyond design basis event involved a highly unlikely sequence of events that causes Page 7

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme heatup of the spent fuel, postulated to occur without heat transfer, such that the zircaloy fuel cladding reaches ignition temperature. The resultant zircaloy fire could lead to the release of large quantities of fission products to the atmosphere. However, after removal of the spent fuel from the spent fuel pool, the configuration of spent fuel stored in dry storage precludes the possibility of such a scenario.

With this previously limiting beyond design basis scenario no longer possible, SCE assessed the following beyond design basis events associated with performance of decommissioning activities with all irradiated fuel stored in the SCE ISFSI. A summary of the assessments is provided below.

1. Cask Drop Event (Fuel Related Accident)

SCE is the user of general licenses for the storage of spent fuel in an ISFSI at power reactor sites in accordance with the provisions of 10 CFR 72.210.and 10 CFR 72.212. The generally licensed ISFSI at SONGS is used for interim onsite dry storage of spent nuclear fuel assemblies in both the Transnuclear Standardized NUHOMS System (NU HOMS Certificate of Compliance (CoC) 1029 (Amendments 0 and 1)) and in the HOLTEC*

HI STORM System (HOLTEC CoC 1041 (Amendment 1 and Proposed Amendment 2)).

As documented in the storage system safety analysis reports, analysis of the normal and off-normal events, including drop events, determined that canister drops can be sustained without br:eaching the confinement boundary, preventing removal of spent fuel assemblies, or causing a criticality accident. There are no evaluated normal conditions or off-normal or accident events that result in damage to the canister producing a breach in the confinement boundary. Neither normal conditions of operation, nor off-normal events preclude retrieval of the fuel for transport and ultimate disposal.

As documented in the storage system safety analysis reports, the canister drops can be sustained without breaching the confinement boundary.

2. Radioactive Material Handling Accident (Non-Fuel Related)

The limiting non-fuel related event involves the release of radioactive material from either a liquid radioactivity storage tank or from a concentrated source, such as filters, resins, and open shipping containers (as discussed in NUREG-0586, Appendix I).

For liquid releases, the SONGS UFSAR states that there are no credible accidents that could exceed 10 CFR 20 limits.

For a concentrated solid source, the evaluated initiator for these events is a postulated fire.

During SONGS decommissioning activities, after all spent fuel has been moved to the ISFSI, there would be no concentrated source of radioactive materials whose release to the environment could exceed two times the ODCM limit at the EAB (2 x 1500 mrem/year).\

During decontamination and dismantlement activities, administrative controls would be applied to the handling of open containers or other packages containing filters, resins, and other dispersable materials generated during decommissioning activities such that a release Page 8

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme to the environment from concentrated sources of these radioactive materials would not exceed two times the ODCM limit at the EAB.

3. Accidents Initiated in External Events The effects of external events, such as aircraft crashes, fires, floods, wind (including tornados), earthquakes, lightning, and physical security breaches on the ISFSI remain unchanged from the effects that were considered under the existing emergency plan.

Externally initiated events are addressed by the proposed EALs.

In summary, there continues to be a low likelihood of any postulated event resulting in radiological releases requiring offsite protective measures, and there is no credible radioactive material event (non-fuel related) resulting in radiological releases requiring declaration of an emergency.

3.3 ISFSl-Only Emergency Plan The SONGS ISFSl-Only Emergency Plan (IOEP) is provided in Enclosure 1 to this submittal for NRC review and approval. This proposed emergency plan is associated with EALs for events related to the ISFSI. The IOEP addresses the applicable regulations stipulated in 10 CFR 50.47, "Emergency Plans" (as exempted), 10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" (as exempted), and 10 CFR 72.32, "Emergency Plan," and is consistent with the applicable guidelines established in NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."

The IOEP describes the station's plan for responding to emergencies that may arise at SONGS while all spent nuclear fuel is in dry storage within an ISFSI. Currently, irradiated fuel is stored both in the ISFSI and in the spent fuel pool (SFP). After all fuel at SONGS is in dry storage within the ISFSI, the number and severity of potential radiological accidents is .significantly less than when fuel was also stored in the SFP.

As provided in the ISFSI storage system Final Safety Analysis Reports (FSARs), the analyses of the potential radiological impacts of postulated off-normal, natural phenomenon, and accident

. events in an ISFSl-only condition indicate that any releases beyond the Exclusion Area Boundary (EAB) would result in a dose to the public below the radiation limits established in 10 CFR 72.106(b). Areas where exposure levels could potentially warrant pre-planned response measures are generally limited to the ISFSI pad and nearby vicinity; for this reason radiological emergency planning is focused in this area.

The EAB is the area surrounding the ISFSI in which SCE has the authority to determine all activities including exclusion or removal of personnel and property from the area. The analyses of the radiological impact of potential accidents at the ISFSI conclude that any releases beyond the EAB are expected to be less than the EPA PAGs.

Based on the reduced number and consequences of potential radiological events at SONGS with all spent nuclear fuel in dry storage within the ISFSI, there will continue to be no need for Page 9

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme offsite emergency response plans for the protection of the public beyond the EAB. Additionally, the scope of the onsite emergency preparedness organization and corresponding requirements in the emergency plan may be reduced without an undue risk to the public health and safety.

The analysis of the potential radiological impact of an accident in a condition with all irradiated fuel stored in the ISFSI indicates that any releases beyond the EAB are below the EPA PAG exposure levels, as detailed in Reference 6. Exposure levels, which warrant pre-planned response measures, are limited to onsite areas. For this reason, radiological emergency planning is focused onsite.

3.4 ISFSl-Only Emergency Action Levels provides the site-specific EAL technical bases document, which contains the proposed SONGS ISFSl-Only Emergency Action Level (IOEAL) scheme for NRC review and approval. The current SONGS EAL scheme was approved by NRC on June 5, 2015 (Reference 7). The new ISFSI EAL scheme is to be implemented by the SONGS ISFSl-Only Emergency Plan (provided in Enclosure 1).

Deletions from the currently approved EAL scheme are listed in Section 2.2, "Elimination of Spent Fuel Pool Initiating Events and EALs," Table 1, "Emergency Plan Initiating Conditions Being Deleted," above.

Operating Modes and Applicability The proposed EALs are only applicable after the final spent nuclear fuel assembly has been transferred out of the spent fuel pool and placed in storage within the ISFSI.

State and Local Government Review of Proposed Changes State and local emergency management officials are advised of EAL changes that are implemented. Following NRC approval and prior to implementation, SCE will provide an overview of the new classification scheme to State and local emergency management officials in accordance with 10 CFR Part 50, Appendix E, Section IV.B.1.

4.0

SUMMARY

By letters dated June 28, 2013 (Reference 1) and July 22, 2013 (Reference 2), SCE submitted a certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1 )(ii). Consequently, as specified in 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. SONGS Unit 1 spent fuel has previously been removed from the Unit 1 spent fuel pool and is now in dry storage. To reflect the reduced scope of potential radiological Page 10

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN CIOEP) and Emergency Action Level (EAL) Scheme accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.

This proposed amendment would revise both the emergency plan and the EAL scheme appropriate for the condition of the station wherein all spent nuclear fuel is in dry storage within the ISFSI. The new emergency plan and EAL scheme are being submitted to the NRC for approval prior to implementation, as required under Section IV.8.2 of Appendix E to 10 CFR Part 50. Additionally, 10 CFR 50.54( q)( 4) and 10 CFR 72.44(f) require that the proposed changes receive prior approval by the NRC because they are considered to reduce the effectiveness of the plan.

The proposed emergency plan does not meet all standards of 10 CFR 50.47(b) and requirements of 10 CFR 50, Appendix E. However, SCE was granted exemptions from portions of 10 CFR 50.47(b), 10 CFR 50.47(c)(2), and 10 CFR 50, Appendix E, Section IV, by letter dated June 4, 2014 (Reference 4). The basis for these exemptions has not changed and remains in effect for the proposed emergency plan changes. With the granted exemptions, the emergency plan, as revised, will continue to meet the remaining applicable requirements in 10 CFR 50, Appendix E and the planning standards of§ 50.47(b).

5.0 REGULATORY ANALYSIS

5.1 No Significant Hazards Consideration Pursuant to 10 CFR 50.90, Southern California Edison (SCE) is submitting Amendment Applications 226, 273, and 258 for San Onofre Nuclear Generating Station (SONGS) Units 1, 2 and 3, respectively. The proposed amendments would revise the Permanently Defueled Emergency Plan (PDEP) into an ISFSl-Only Emergency Plan (IOEP) and revise the Emergency Action Level (EAL) into an ISFl-Only EAL (IOEAL) scheme. The proposed changes are being submitted to the NRC for approval prior to implementation, as required under 10 CFR 50.54(q)(4), 10 CFR 50, Appendix E, Section IV.8.2, and 10 CFR 72.44(f).

By letters dated June 28, 2013 (Reference 1) and July 22, 2013 (Reference 2), SCE submitted a certification of permanent removal of fuel from the reactor vessels for SONGS Units 2 and 3, pursuant to 10 CFR 50.82(a)(1)(ii). Consequently, as specified in 10 CFR 50.82(a)(2), the 10 CFR Part 50 license for SONGS no longer authorizes operation of the reactor or emplacement or retention of fuel into the reactor vessel. The Post-Shutdown Decommissioning Activities Report (PSDAR) for SONGS dated September 23, 2014 (Reference 3), documented that SCE expects to have all spent fuel transferred to the Independent Spent Fuel Storage Installation (ISFSI) in 2019. SONGS Unit 1 spent fuel has previously been removed from the Unit 1 spent fuel pool and is now in dry storage. To reflect the reduced scope of potential radiological accidents with spent fuel in dry cask storage within the ISFSI, SCE proposes a new EAL scheme and corresponding emergency plan changes.

SCE has evaluated the proposed amendments to determine if a significant hazards consideration is involved by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of Amendment," as discussed below:

Page 11

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN {IOEP) and Emergency Action Level (EAL) Scheme

1. Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?

Response: No The proposed amendments would modify the SONGS Units 1, 2 and 3 licenses by revising the emergency plan and revising the EAL scheme. The SONGS units have permanently ceased operation and are permanently defueled. The proposed amendments are conditioned on all spent nuclear fuel being removed from wet storage in the spent fuel pools and placed in dry storage within an ISFSI. Occurrence of postulated accidents associated with spent fuel stored in a spent fuel pool is no longer credible in a spent fuel pool devoid of such fuel. The proposed amendments have no effect on plant systems, structures, and components (SSCs) and no effect on the capaQility of any plant SSC to perform its design function. The proposed amendments would not increase the likelihood of the malfunction of any plant SSC. The proposed amendments would have no effect on any of the previously evaluated accidents in the SONGS Updated Final Safety Analysis Report (UFSAR).

Since SONGS has permanently ceased operation, the generation of fission products has ceased and the remaining source term continues to decay. This continues to significantly reduce the consequences of previously postulated accidents. Therefore, the proposed amendments do not involve a significant increase in the consequences of a previously evaluated accident.

2. Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously evaluated?

Response: No The proposed amendments constitute a revision of the emergency planning function commensurate with the ongoing and anticipated reduction in radiological source term at SONGS.

The proposed amendments do not involve a physical alteration of the plant. No new or different types of equipment will be installed and there are no physical modifications to existing equipment as a result of the proposed amendments. Similarly, the proposed amendments would not physically change any SSCs involved in the mitigation of any postulated accidents. Thus, no new initiators or precursors of a new or different kind of accident are created. Furthermore, the proposed amendments do not create the possibility of a new failure mode associated with any equipment or personnel failures. The credible events for the ISFSI remain unchanged.

Therefore, the proposed amendments do not create the possibility of a new or different kind of accident from any previously evaluated.

Page 12

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEPl and Emergency Action Level (EAL) Scheme

3. Does the proposed amendment involve a significant reduction in a margin of safety?

Response: No Because the 10 CFR Part 50 licenses for SONGS no longer authorize operation of the reactors or emplacement or retention of fuel into the reactor vessels, as specified in 10 CFR 50.82(a)(2), the occurrence of postulated accidents associated with reactor operation is no longer credible. With all nuclear spent fuel transferred out of wet storage from the spent fuel pools and placed in dry storage within the ISFSI, a fuel handling accident is no longer credible. There are no longer credible events that would result in any releases beyond the EAB exceeding the EPA PAG exposure levels, as detailed in the EPA's "Protective Action Guide and Planning Guidance for Radiological Incidents," Draft for Interim Use and Public Comment dated March 2013 (PAG Manual).

The proposed amendments do not involve a change in the plant's design, configuration, or operation. The proposed amendments do not affect either the way in which the plant structures, systems, and components perform their safety function or their design margins.

Because there is no change to the physical design of the plant, there is no change to any of these margins.

Therefore, the proposed amendments do not involve a significant reduction in a margin of safety.

  • Based on the above, SCE concludes that the proposed amendments present no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and, accordingly, a finding of "no significant hazards consideration" is justified.

5.2 Applicable Regulatory Requirements/Criteria The regulatory requirements, as exempted, are discussed below.

Title 10 of the Code of Federal Regulations (10 CFR), Section 50.47, "Emergency plans," sets forth emergency plan requirements for nuclear power plant facilities. The regulations in 10 CFR 50.47(a)(1 )(i) state, in part, "No initial operating license for a nuclear power reactor will be issued unless a finding is made by the NRC that there is reasonable assurance that adequate protective measures can and will be taken in the event 'of a radiological emergency."

Section 50.47(b) establishes the standards that emergency response plans must meet for NRC staff to make a positive finding that there is reasonable assurance that the licensee can and will take adequate protective measures in the event of a radiological emergency.

  • Planning Standard (1) of Section 50.47(b) states, in part: "[E]ach principal response organization has staff to respond and to augment its initial response on a continuous basis."
  • Page 13

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme

  • Planning Standard (2) of Section 50.47(b) states, in part: "On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available .... "
  • Planning Standard (4) of Section 50.47(b) requires that a licensee's emergency response plan contain the following: "A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee."
  • Planning Standard (8) of Section 50.47(b) states, in part: "Adequate emergency facilities and equipment to support the emergency response are provided and maintained."

10 CFR 50.54(q)(4) specifies the process for revising emergency plans where the changes reduce the effectiveness ofthe plan. This regulation states the following:

"The changes to a licensee's emergency plan that reduce the effectiveness of the plan as defined in paragraph (q)(1 )(iv) of this section may not be implemented without prior approval by the NRC."

Section IV.A of Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities," to 10 CFR Part 50, states, in part: "The organization for coping with radiological emergencies shall be described, including definition of authorities, responsibilities, and duties of individuals assigned to the licensee's emergency organization .... "

Section IV.C.1 of Appendix E requires each emergency plan to define the emergency classification levels that determine the extent of the participation of the emergency response organization.

Section IV.E of Appendix Estates, in part: "Adequate provisions shall be made and described for emergency facilities and equipment. ... "

As proscribed in 10 CFR 72.13, "Applicability", the applicable emergency plan requirements for an Independent Spent Fuel Storage Installation associated with a general license are specified in 10 CFR 72.32(c) and (d).

The proposed emergency plan continues to rely on previously granted exemptions from certain emergency planning requirements (Reference 4) as the basis for these exemptions has not changed and remains in effect.

In November 2012, NEI published NEI 99-01, Revision 6 (Reference 8). NRC endorsed NEI 99-01, Revision 6, by letter dated March 28, 2013 (Reference 10). The changes being requested herein are based on Revision 6 to NEI 99-01. The proposed changes are conservatively being considered as a change to the EAL scheme development methodology. Pursuant to 10 CFR Part 50, Appendix E, Section IV.B.2, a revision to an entire EAL scheme must be approved by the NRC before implementation. '

Page 14 c

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme 5.3 Precedent Similar changes to emergency plans and associated emergency action levels for plants that have transitioned to ISFSl-only status were approved by NRG for the La Crosse Boiling Water Reactor facility on September 8, 2014 (Reference 11) and for the Zion facility on May 14, 2015 (Reference 12).

  • 5.4 Conclusion Based on the considerations discussed above, (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the Commission's regulations, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.

6.0 ENVIRONMENTAL CONSIDERATION

A review has determined that the proposed amendments would change a requirement with respect to installation or use of a facility component located within the restricted area, as defined in 10 CFR 20, or would change an inspection or surveillance requirement. However, the proposed amendments do not involve (i) a significant hazards consideration, (ii) a significant change in the types or significant increase in the amounts of any effluent that may be released offsite, or (iii) a significant increase in individual or cumulative occupational radiation exposure.

Accordingly, the proposed amendment meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(9). Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed.

amendments.

7 .0 REFERENCES

References:

(1) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRG), dated June 28, 2013;

Subject:

Docket No. 50-362, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating Station, Unit 3 (ADAMS Accession No. ML13183A391)

(2) Letter from P. T. Dietrich (SCE) to Document Control Desk (NRG) dated July 22, 2013;

Subject:

Docket No. 50-361, Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating Station, Unit 2 (ADAMS Accession Number ML13204A304)

Page 15

EVALUATION OF THE PROPOSED AMENDMENT ISFSl-Only Emergency PLAN (IOEP) and Emergency Action Level (EAL) Scheme (3) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated September 23, 2014;

Subject:

Docket Nos. 50-361 and 50-362, San Onofre Nuclear Generating Station, Units 2 and 3, Post-Shutdown Decommissioning Activities Report (ADAMS Accession No. ML14269A033) *

(4) Letterfrom T.J. Wengert (NRC) to T.J. Palmisano (SCE) dated June 4, 2015;

Subject:

San Onofre Nuclear Generating Station, Units 1, 2, and 3 and Independent Spent Fuel Storage Installation - Exemptions from Certain Emergency Planning~Requirements and Related Safety Evaluation (TAC Nos. MF3835, MF3836, and MF3837) (ADAMS Accession No. ML15082A204)

(5) Letter from T. J. Palmisano (SCE) to Document Control Desk (NRC) dated XXXXX

Subject:

Amendment Applications 225, 272 and 258, ISFSl-only Technical Specifications, San Onofre Nuclear Generating Station, Units 1, 2 and 3 (6) U.S. Environmental Protection Agency, "Protective Action Guide and Planning Guidance for Radiological Incidents," Draft for Interim Use and Public Comment dated March 2013 (PAG Manual)

(7) Letter from T. J. Wengert (NRC) to T. J. Palmisano (SCE) dated June 5, 2015;

Subject:

San Onofre Nuclear Generating Station, Units 1, 2, and 3 and the Independent Spent Fuel Storage Installation - Issuance of Amendments Re: Changes to the Emergency Action Level Scheme (TAC Nos. MF3838, MF3839, and MF3840) (ADAMS Accession No. ML15105A349)

(8) Nuclear Energy Institute (NEI) 99-01, Revision 6, "Methodology for Development of Emergency Action Levels for Non Passive Reactors," November 2012. [ADAMS Accession No. ML12326A805]

(9) NUREG-0586, "Generic Environmental Impact Statement of Decommissioning of Nuclear Facilities," Supplement 1, Volume 1, November 2002.

(10) Letter from Mark Thaggard (NRC) to Susan Perkins-Grew (NEI), "U.S. Nuclear Regulatory Commission Review and Endorsement of NEI 99-01, Revision 6, Dated November, 2012 (TAC No. D92368)," dated March 28, 2013. [ADAMS Accession No. ML12346A463]

(11) Letter from U.S. Nuclear Regulatory Commission to Dairyland Power Cooperative (La Crosse Boiling Water Reactor), "Issuance of Amendment Relating to the Dairyland Power Cooperative La Crosse Boiling Water Reactor Request for Changes to the Emergency Planning Requirements (TAC No. J52956)," dated September 8, 2014.

[ADAMS Accession No. ML14155A112]

(12) Letter from U.S. Nuclear Regulatory Commission to Zion Solutions LLC (Zion Nuclear Power Station), "Issuance of Amendments Relating to the Emergency Planning Requirements for Zion Nuclear Power Station, Units 1 and 2 {TAC Nos. J52992 and J52993)," dated May 14, 2015.

Page 16

ENCLOSURE 1 ISFSl-ONLY EMERGENCY PLAN SAN ONOFRE NUCLEAR GENERATING STATION

IOEP-1 SONGS ISFSl-Only Emergency Plan San Onofre Nuclear Generating Station (SONGS)

Independent Spent Fuel Storage Installation {ISFSI)

Only Emergency Plan Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan TABLE OF CONTENTS Section Page PART I ....................................................................................................................................... 1

1.0 INTRODUCTION

............................................................................................................ 1 1.1 PURPOSE ....................................................................................................................................1 1.2 SCOPE .........................................................................................................................................1 2.0 DISCUSSION ................................................................................................................. 2 2.1 OVERVIEW OF ISFSI ONLY EMERGENCY PLAN (IOEP) .....................~ ................................... 2 2.2 FACILITY DESCRIPTION ............................................................................................................2 2.3

SUMMARY

OF EMERGENCY ACTIONS ....................................................................................3

3.0 REFERENCES

............................................................................................................... 4 4.0 DEFINITIONS AND ABBREVIATIONS ......................................................................... 6 4.1 DEFINITIONS ..............................................................................................................................6 4.2 ABBREVIATIONS ......................................................................................................................10 PART II ..................................................................................................................................... 11 1.0 ASSIGNMENT OF RESPONSIBILITY (ORGANIZATION CONTROL) ....................... 11 1.1 EMERGENCY RESPONSE AND RESPONSIBILITIES ............................................................. 11 1.2 OFFSITE RESPONSE ORGANIZATIONS (OR0) ..................................................................... 12 2.0 EMERGENCY RESPONSE ORGANIZATION (ER0) .................................................. 13 2.1 ON-SHIFT POSITIONS ..............................................................................................................13 2.2 AUGMENTED POSITION ..........................................................................................................14 2.3 SUPPLEMENTAL PERSONNEL ...............................................................................................14 2.4 FUNCTIONAL RESPONSIBILITIES .......................................................................................... 15 3.0 EMERGENCY RESPONSE SUPPORT AND RESOURCES ....................................... 16 4.0 EMERGENCY CLASSIFICATION SYSTEM ................................................................ 17 4.1 UNUSUAL EVENT .....................................................................................................................1t 4.2 ALERT ........................................................................................................................................17 4.3 EMERGENCY ACTION LEVELS AND POSTULATED ACCIDENTS ........................................ 18 5.0 NOTIFICATION METHODS AND PROCEDURES ...................................................... 19 6.0 EMERGENCY COMMUNICATIONS .............................. ~ ............................................. 21 7.0 PUBLIC INFORMATION .............................................................................................. 22 8.0 EMERGENCY FACILITY AND EQUIPMENT .............................................................. 23 8.1 EMERGENCY RESPONSE FACILITY ......................................................................................23 8.2 EMERGENCY EQUIPMENT ......................................................................................................23 ii Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan TABLE OF CONTENTS (continued)

Section Page 9.0 ACCIDENT ASSESSMENT ......................................................................................... 24 10.0 PROTECTIVE ACTIONS ............................................................................................. 25 11.0 RADIOLOGICAL EXPOSURE CONTROL .................................................................. 26 12.0 MEDICAL AND HEALTH SUPPORT ........................................................................... 28 13.0 EMERGENCY TERMINATION AND RECOVERY ....................................................... 29 14.0 EXERCISE AND DRILLS ............................................................................................. 30 15.0 RADIOLOGICAL EMERGENCY RESPONSE TRAINING ........................................... 33 15.1 EMERGENCY RESPONSE PERSONNEL TRAINING .............................................................. 33 15.2 SUPPORT ORGANIZATIONS TRAINING .................................................................................35 16.0 MAINTAINING EMERGENCY PREPAREDNESS ....................................................... 36 16.1 EMERGENCY PREPAREDNESS RESPONSIBILITIES ............................................................36 16.2 REVIEW AND UPDATING OF THE IOEP .................................................................................37 PART Ill ..................................................................................................................................... 38 APPENDIX A Emergency Equipment, Supplies, and Reference Materials .................... 38 APPENDIX B Cross Reference IOEP Section to Planning Standards I Requirements I Criteria and Procedures ............................................................................... 39 APPENDIXC List of Letters and Memoranda of Agreement ............................................ 40 iii Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan PARTI

1.0 INTRODUCTION

The San Onofre Nuclear Generating Station (SONGS) is owned by Southern California Edison (SCE), San Diego Gas and Electric (SDG&E) and the cities of Anaheim and Riverside, California.

SCE is authorized to act as agent for the co-participants and has exclusive responsibility for the operation of the facility.

The SONGS INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI) Only Emergency Plan (IOEP) describes the plan for responding to emergencies that may arise at the station's ISFSI.

In this condition, no reactor operations can take place and all irradiated fuel is removed from the Spent Fuel Pools (SFPs). This IOEP addresses the risks associated with SONGS' ISFSl-Only conditions.

As provided in the ISFSI storage system Final Safety Analysis Reports (FSARs), the analyses of the potential radiological impacts of postulated off-normal, natural phenomenon, and accident events in an ISFSl-Only condition indicates that any releases beyond the EXCLUSION AREA BOUNDARY (EAB) would result in a DOSE to the public below the radiation limits established in 10 CFR 72.106(b). Areas where exposure levels could potentially warrant pre-planned response measures are generally limited to the ISFSI pad and nearby vicinity; for this reason radiological emergency planning is focused on this area.

1.1 PURPOSE The purpose of the IOEP is to assure an adequate level of preparedness to cope with a spectrum of emergencies. This Plan integrates the necessary elements to provide effective emergency response considering cooperation and coordination of organizations expected to respond to emergencies.

1.2 SCOPE The SONGS IOEP is developed to respond to potential radiological emergencies at the SONGS ISFSI. Because there are no postulated off-normal, natural phenomenon, or accident events that would result in OFFSITE DOSE consequences that are large enough to require OFFSITE emergency planning, the overall scope of this Plan delineates the actions necessary to safeguard ONSITE personnel. The concepts presented in this Plan address the applicable regulations stipulated in 10 CFR 50.47, "Emergency Plans" and 10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities". The Plan is consistent with the applicable guidelines established in NUREG-0654/FEMA-REP-1, Revision 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" and NEI 99-01, "Development of Emergency Action Levels for Non-Passive Reactors" Rev. 6.

Exemptions from selected portions of 10 CFR 50.47 and 10 CFR 50 Appendix E for SONGS were granted by the Nuclear Regulatory Commission (NRC) on June 4, 2015 (ADAMS Accession Number: ML15082A204).

The IOEP revision 0 was approved per NRC Safety Evaluation dated [insert date prior to issuing].

1 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 2.0 DISCUSSION 2.1 OVERVIEW OF ISFSI ONLY EMERGENCY PLAN (IOEP)

In the event of an emergency at the SONGS ISFSI, actions are required to identify and assess the nature of the emergency and to respond in a manner that protects the health and safety of the public and ONSITE personnel.

This Plan describes the organization and responsibilities for implementing emergency measures. It describes interfaces with OFFSITE government agencies (Federal, State and local) which may be notified in the event of an emergency, and may provide assistance. Fire, rescue and ambulance services are provided by the United States Marine Corps Camp Pendleton Fire Department (USMC CPFD).Law enforcement services are provided by the Federal Bureau of Investigation (FBI) and local public entities. Medical services are provided by Mission Hospital Regional Medical Center in Mission Viejo, California.

Because there are no postulated events that would result in OFFSITE DOSE consequences that are large enough to require OFFSITE emergency planning, emergencies are divided into two emergency CLASSIFICATION levels: UNUSUAL EVENT (UE) and ALERT.

SONGS is responsible for planning and implementing emergency measures associated with the SONGS ISFSI. This Plan is provided to meet this responsibility. To carry out specific emergency measures discussed in this Plan, detailed implementing procedures are established and maintained.

In addition to the description of activities and steps that can be implemented during a potential emergency, this Plan also provides a general description of the steps taken to recover from an emergency situation. It also describes the training, drills, exercises, planning, and coordination appropriate to maintain an adequate level of EMERGENCY PREPAREDNESS.

2.2 FACILITY DESCRIPTION SONGS has permanently ceased power operations and all Units 2 and 3 irradiated fuel has been removed from the SFPs and placed into dry storage within the SONGS ISFSI.

SONGS Unit 1 has been permanently shut down since 1993 and is in the decommissioning phase.

Above-ground structures have been dismantled. Unit 1 fuel is stored in the SONGS ISFSI and in the GE-Hitachi Morris facility.

By letter dated June 12, 2013, SCE certified its intention to permanently cease power operations at SONGS Units 2 and 3 as of June 7, 2013, pursuant to 10 CFR 50.82(a)(1)(i). By letters dated June 28, 2013 and July 22, 2013, SCE certified permanent removal offuel from the Unit 2 and Unit 3 reactor vessels, pursuant to 10 CFR 50.82(a)(1 )(ii). The 10 CFR 50 licenses for SONGS Units 2 and 3 no longer authorize operation of the reactors, or emplacement or retention of fuel into the reactor vessels, as specified in 10 CFR 50.82(a)(2).

The San Onofre ISFSI is located on the coast of southern California in San Diego County, near the border with Orange County. The site is located entirely within the boundaries of the United States Marine Corps Base, Camp Pendleton, California. There is public access between the beaches north and south of the station. Interstate Highway 5 and the Atchison, Topeka, and Santa Fe Railway pass within 1000 feet of the station.

2 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 2.3

SUMMARY

OF EMERGENCY ACTIONS This Plan is activated by the ISFSI Shift Supervisor, who assumes the position of EMERGENCY DIRECTOR (ED) upon DECLARATION of an emergency based upon CLASSIFICATION of an event according to the EMERGENCY ACTION LEVEL (EAL) criteria. The emergency measures described in the subsequent sections and implementing procedures are implemented in accordance with the CLASSIFICATION and nature of the emergency at the direction of the ED. Regulatory authorities and OFFSITE support organizations are notified in accordance with this Plan. The ED has authority and responsibility for control and mitigation of the emergency, including emergency response resources, coordination of radiological ASSESSMENT ACTIVITIES, recovery implementation, and coordination of emergency response activities. The following sections of this Plan describe the detailed plans and actions of the SONGS EMERGENCY RESPONSE ORGANIZATION (ERO), including interfaces with OFFSITE support organizations.

3 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan

3.0 REFERENCES

References consulted in the writing of this Plan are listed in this section. With exception of regulatory requirements, inclusion of material on this list does not imply adherence to all criteria or guidance stated in each individual reference.

3.1 10 CFR 20, "Standards for Protection Against Radiation" 3.2 10 CFR 50.47, "Emergency Plans" 3.3 10 CFR 50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" 3.4 10 CFR 72.13, "Applicability" 3.5 10 CFR 72.32, "Emergency Plans" 3.6 10 CFR 72.44, "License conditions"

3. 7 10 CFR 72.106, "Controlled area of an ISFSI or MRS" 3.8 NUREG-1140, Final Report published January 1988, "A Regulatory Analysis on Emergency Preparedness for Fuel Cycle and Other Radioactive Material Licensees" 3.9 NUREG-0586, "Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities" 3.10 NUREG-0654/FEMA-REP-1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" (November 1980) 3.11 NUREG-0728, Report to Congress, "NRC Incident Response Plan" 3.12 US NRC Regulatory Guide 1.101, "Emergency Planning and Preparedness for Nuclear Power Reactors", revision 4, July, 2003 3.13 NRC Information Notice No. 85-44, "Emergency Communication System Monthly Test" 3.14 NRC Information Notice No. 90-08, "KR-85 Hazards From Decayed Fuel" 3.15 EPA 400-R-92-001, "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents", October 1991 3.16 American Nuclear Insurers Bulletin #58 (1981), "Accident Notification Procedures for Liability Insured" 4 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan 3.17 NRC letter dated June 4, 2015, SAN ONOFRE NUCLEAR GENERATING STATION, UNITS 1, 2, AND 3 AND INDEPENDENT SPENT FUEL STORAGE INSTALLATION -EXEMPTIONS FROM CERTAIN EMERGENCY PLANNING REQUIREMENTS AND RELATED SAFETY EVALUATION (TAC NOS. MF3835, MF3836, AND MF3837). (ADAMS Accession Nos: Letter ML15082A204; Exemption: ML15082A143 on June 4, 2015).

3.18 San Onofre 2&3 Defueled Safety Analysis Report 3.19 Advanced NUHOMS Horizontal Modular Storage System for Irradiated Nuclear Fuel Certificates of Compliance, Final Safety Analysis Reports and Technical Specifications 3.20 HI-STORM UMAX Canister Storage System Certificates of Compliance, Final Safety Analysis Reports and Technical Specifications 3.21 NEI 99-01, Rev. 6, "Development of Emergency Action Levels for Non-Passive Reactors" 3.22 Environmental Protection Agency, "Protective Action Guide and Planning Guidance for Radiological Incidents," Draft for Interim Use and Public Comment (March 2013) 5 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 4.0 DEFINITIONS AND ABBREVIATIONS 4.1 DEFINITIONS This section provides definitions that are used in this document. Terms capitalized in the text of the definitions indicate that they are defined elsewhere in this section.

Accident Assessment - Accident assessment consists of a variety of actions taken to determine the nature, effects and severity of an accident.

Accountability - A procedural or discretionary PROTECTIVE ACTION taken for all persons within the ISFSI PROTECTED AREA, which involves the gathering of personnel into pre-designated areas, and the subsequent verification that the location of these personnel is known.

Alert - Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to station personnel or damage to ISFSI equipment because of HOSTILE ACTION.

Any releases are expected to be limited to small fractions of the EPA PROTECTIVE ACTION Guideline exposure levels.

ALARA - Acronym for "As Low as Reasonably Achievable," a basic concept of radiation protection that specifies that radioactive discharges from nuclear plants and radiation exposure to personnel be kept as far below regulation limits as feasible.

Annual - Frequency of occurrence is met if performed within 1.25 times a 12 month interval as measured from the previous performance. This definition does not apply to the term "annual" when it relates to the conduct of the EMERGENCY PREPAREDNESS Exercise and off-year Drill. The Exercise and off-year Drill are performed within the calendar year.

Assessment Activities - Actions taken during or after an emergency for the purpose of obtaining and processing the information that will be used to make the decisions to implement specific emergency measures.

Biennial - Occurring every two years.

Classification - The comparison of conditions, indications and reports associated with an off-normal, natural phenomenon or accident event to the approved emergency classification system to determine the most accurate EMERGENCY ACTION LEVEL.

Command and Control - When in Command and Control of the event, the designated individual has overall responsibility for the SONGS emergency response efforts.

Controlled Area - The area immediately surrounding the SONGS ISFSI for which SCE exercises authority over its use and within which ISFSI operations are performed. The ISFSI Controlled Area is bounded within the EAB.

6 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan Corrective Action - Those emergency measures taken to lesson or terminate an emergency situation to prevent an uncontrolled release of radioactive material, or to reduce the magnitude of a release. Corrective actions include, but are not limited to, equipment repair or shutdown, installation of emergency structures, firefighting, repair, and damage control.

Declaration - Official determination by the EMERGENCY DIRECTOR that conditions at the ISFSI meet the criteria for an EMERGENCY ACTION LEVEL warranting CLASSIFICATION of an emergency at the UNUSUAL EVENT or ALERT emergency CLASSIFICATION level.

Decontamination - The reduction or removal of radioactive material contamination from a structure, area, material, object, or person. Decontamination may be accomplished by (1) treating the surface so as to remove or decrease the contamination, (2) letting the material stand so that the radioactivity is decreased as a result of natural decay, and (3) covering the contamination.

Design Basis Accident (OBA) - Credible accident events as analyzed in the ISFSI storage system Final Safety Analysis Reports (FSARs).

Dose - A generic term that means absorbed dose, dose equivalent, effective dose equivalent, deep dose equivalent, committed dose equivalent, committed effective dose equivalent, or TOTAL EFFECTIVE DOSE EQUIVALENT.

Dose Rate - The amount of ionizing (or nuclear) radiation to which an individual would be exposed per unit of time. As it would apply to dose rate to a person; it is usually expressed as rems per hour or in submultiples of this unit, such as millirems per hour. The dose rate is commonly used to indicate the level of radioactivity in a contaminated area.

Emergency Action Levels (EALs) - A pre-determined, site-specific, observable threshold for an INITIATING CONDITION that when met or exceeded places the station in a given emergency CLASSIFICATION level.

Emergency Director (ED) - The Director of the facility in COMMAND AND CONTROL of the event.

The ISFSI Shift Supervisor fills the role of ED throughout an event.

Emergency Preparedness (EP) - A state of readiness that provides reasonable assurance that adequate protective measures can and will be taken upon implementation of the Emergency Plan in the event of a radiological emergency. Also, the SCE organization responsible for the Emergency Preparedness program.

Emergency Plan Implementing Procedures (EPIPs) - Specific procedures describing actions needed to implement the IOEP and describing the methods established to maintain and monitor the IOEP.

Emergency Response Facility (ERF) - The security center of the station from which the ISFSI can be monitored. The facility containing the communication equipment necessary for both normal and emergency conditions. It is operated under the direction of the ISS/ED and serves as the primary location for event CLASSIFICATION, emergency DECLARATION and Notifications to OFFSITE agencies, ASSESSMENT ACTIVITIES, and CORRECTIVE ACTION direction.

Emergency Response Organization (ERO) - Organization of personnel who may be called upon during an emergency to perform duties to mitigate accident conditions at SONGS.

  • Emergency Response Personnel - Personnel who may be called upon during an emergency to perform duties to mitigate accident conditions at SONGS.

7 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan Essential Personnel - SONGS personnel that either have assigned emergency response duties, are security personnel, are required for maintaining the safe operation of the ISFSI, or are personnel either identified as essential by the ISS/ED or performing critical tasks under the direction of the ISS/ED.

Exclusion Area - The area surrounding the reactor where the licensee has the authority to determine all activities, including exclusion or removal of personnel and property (1 O CFR 100.3).

The Exclusion Area is determined as an area of such size that an individual located at any point on its boundary for two hours immediately following onset of the postulated fission product release would not receive a total radiation DOSE to the whole body in excess of 25 rem or a total radiation DOSE in excess of 300 rem to the thyroid from iodine exposure [10 CFR 100.11 (a)(1 )]. In accordance to the letter dated March 31, 2014 (ADAMS Accession No. ML14092A332), SONGS analyses demonstrate that the radiological consequences of design basis accidents at SONGS will not exceed the 1 rem limit of the EPA PAGs at the EXCLUSION AREA BOUNDARY.

Exclusion Area Boundary (EAB) - For SONGS, the Exclusion Area Boundary (EAB) is roughly formed by two semicircles with radii of 1967.5 ft. each, centered on the Unit 2 Containment dome and a point 134 ft. southeast of the Unit 3 Containment dome, with a tangent connecting the landward arcs and seaward arcs of the two semicircles. The EAB is depicted in SONGS 2 & 3 DSAR Figure 2.1-5.

Hostage - A person(s) held as leverage against the station to ensure that demands will be met by the station.

Hostile Action - An act toward the SONGS ISFSI or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end.

This includes attack by air, land or water using guns, explosives, PROJECTILES, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included.

Hostile Action should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the SONGS ISFSI. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals within the VEHICLE BARRIER SYSTEM boundary). (NEI 99-01, Rev. 6)

Hostile Force - One or more individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction. (NEI 99-01, Rev. 6)

Independent Spent Fuel Storage Installation (ISFSI) - A complex designed and constructed for the interim storage of spent nuclear fuel, solid reactor-related Greater Than Class C (GTCC) waste, and other radioactive materials associated with spent fuel and reactor-related GTCC waste storage (10 CFR 72.3).

Initiating Condition - A predetermined condition where either the potential exists for an emergency or such an emergency has occurred.

Integrated Drill -A drill that incorporates multiple demonstration requirements to be conducted in connection with one another.

Local Government Agencies - Orange County and San Diego County.

Offsite - The area around the station that lies beyond the EAB.

Onsite - The area around the station that lies within the EAB.

8 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan Projectile - An object directed toward the SONGS ISFSI that could cause concern for its continued capability, reliability, or personnel safety.

Protected Area (PA) - That ONSITE area within the ISFSI security boundary as defined in SONGS's Security Plan.

Protective Actions - Those emergency measures taken for the purpose of preventing or minimizing radiological, or other hazard, exposures to affected population groups.

Quarterly - Frequency of occurrence is met if performed within 1.25 times a 92 day interval as measured from the previous performance.

Radiologically Controlled Area (RCA) - An area in which radioactive material is present and the potential exists for the spread of radioactive contamination. The area will be posted for the purpose of protecting individuals against undue risks from exposure to radiation and radioactive materials.

Site Boundary - The SONGS property line, which is also the legally surveyed Site Boundary, and the location of major structures of the facilities are delineated in the SONGS 2 & 3 DSAR Figure 2.1-1. The site, comprising 83.63 acres, is approximately 4500 feet long and 800 feet wide.

Staffed Warning Point - Offsite agency location that is staffed 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day such as 911 call-centers or other staffed watch locations.

Total Effective Dose Equivalent (TEDE) - The sum of the deep DOSE equivalent (for external exposure) and the committed effective DOSE equivalent (for internal exposure) and 4 days of deposition exposure.

Unusual Event (UE) - Events are in process or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring OFFSITE response or monitoring are expected unless further degradation of safety systems occurs.

9 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan 4.2 ABBREVIATIONS ALARA - As Low as Reasonably Achievable Cal OES - California Governor's Office of Emergency Services CFR - Code of Federal Regulations OBA - Design Basis Accident EALs - Emergency Action Levels ED - Emergency Director EP - Emergency Preparedness EPIPs - Emergency Plan Implementing Procedures ERF - Emergency Response Facility ERO - Emergency Response Organization EAB - Exclusion Area Boundary ISFSI - Independent Spent Fuel Storage Installation IOEP - ISFSl-Only Emergency Plan NRC - Nuclear Regulatory Commission.

PA - Protected Area RCA - Radiologically Controlled Area TEDE - Total Effective Dose Equivalent UE - Unusual Event 10 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan PART II 1.0 ASSIGNMENT OF RESPONSIBILITY {ORGANIZATION CONTROL)

Planning Standard 50.47(b)(1) (as exempted in Reference 17) - Primary responsibilities for emergency response by the nuclear facility licensee and by State and local organizations have been assigned, the emergency responsibilities of the various supporting organizations have been specifically established, and each principal response organization has staff to respond and to augment its initial response on a continuous basis.

1.1 EMERGENCY RESPONSE AND RESPONSIBILITIES The ISFSI Shift Supervisor (ISS) is at the station 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day and is the senior management position at the station during off-hours. This position is responsible for monitoring ISFSI conditions and managing the activities for the ISFSI Security Staff.

The individual in charge of the SONGS emergency response is given the title of EMERGENCY DIRECTOR (ED). When an off-normal, natural phenomenon, or accident event becomes apparent, the ISS shall assess the condition and declare an emergency if warranted. When an emergency is declared the ISS assumes the positon of the EMERGENCY DIRECTOR (ED).

During an emergency, the EMERGENCY RESPONSE ORGANIZATION (ERO) replaces the normal station organization. The ERO provides the following functions:

  • Control and operation of station activities
  • Mitigation of the emergency condition
  • Protection of ONSITE personnel
  • Event CLASSIFICATION and emergency DECLARATION
  • Radiological monitoring
  • Emergency notifications to Federal, State and LOCAL GOVERNMENT AGENCIES
  • Coordination of emergency support for firefighting, security and rescue/first aid The on-shift personnel are available 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day. The on-shift personnel can perform all required response actions, including manning of communications, until individuals arrive to augment shift personnel. The ERO maintains the depth and capability for continuous 24-hour coverage of the emergency response for a protracted period.

11 Revision 0 I

I I

I I

J

IOEP-1 SONGS ISFSl-Only Emergency Plan 1.2 OFFSITE RESPONSE ORGANIZATIONS (ORO)

Agreements are maintained with OFFSITE organizations who do not take part in the organizational control of the emergency, that provide assistance when called upon during an emergency or during the recovery phase. These agreements identify the emergency measures to be provided, the mutually accepted criteria for implementation, and the arrangements for exchange of information.

The actual letters and memoranda of agreement are maintained in Emergency Preparedness files.

These organizations provide services of:

a. Fire protection;
b. Rescue operations;
c. Ambulance services;
d. Medical and hospital services;
e. Law enforcement.

State and LOCAL GOVERNMENT AGENCY response will be in accordance with each agency's plans and procedures, and commensurate with the hazard posed by the emergency.

United States Marine Corps Camp Pendleton Fire Department USMC CPFD provides fire response per Agreement.

United States Marine Corps Camp Pendleton Fire Department USMC CPFD provides rescue operations for Agreement.

United States Marine Corps Camp Pendleton Fire Department Agreement for prompt ambulance transport of personnel is maintained with USMC CPFD. Such service is available on a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day basis.

Mission Hospital Regional Medical Center Agreement for hospital and medical services is maintained with Mission Hospital Regional Medical Center. This facility is equipped and qualified for receiving and treating contaminated and/or injured persons requiring immediate hospital care.

Law Enforcement Law enforcement services are provided by the FBI and local public entities per the Security Plan.

12 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 2.0 EMERGENCY RESPONSE ORGANIZATION (ERO)

Planning Standard 50.47(b)(2) - On-shift facility licensee responsibilities for emergency response are unambiguously defined, adequate staffing to provide initial facility accident response in key functional areas is maintained at all times, timely augmentation of response capabilities is available and the interfaces among various onsite response activities and offsite support and response activities are specified.

2.1 ON-SHIFT POSITIONS SONGS has personnel on-shift at all times that provide the initial response to an event. Members of the on-shift organization are trained on their responsibilities and duties in the event of an emergency and are capable of performing all necessary response actions until the augmentation personnel arrive or the event is terminated. The normal shift staffing assignments include the roles and responsibilities for their emergency response functions. The relationship between normal and emergency response positions for the shift personnel is unchanged when an event occurs. (See Table 2-1)

ISFSI Shift Supervisor (ISS)/EMERGENCY DIRECTOR (ED)

The ISFSI Shift Supervisor (ISS) is the on-shift individual who makes the initial event CLASSIFICATION and assumes the role of ED upon emergency DECLARATION, and has the authority and responsibility to immediately and unilaterally initiate any emergency actions. If the ISS is unavailable or incapacitated, another on-shift person qualified as ED will assume the ED duties.

The ED has the authority to suspend any security measure described in the Physical Security Plan as necessary to facilitate response to emergency conditions.

The Non-delegable responsibilities of the ED include the following:

  • Event CLASSIFICATION and emergency DECLARATION
  • Decision to notify OFFSITE agencies
  • Authorization for the use of EPA-400 emergency exposure controls (emergency worker DOSE limits that exceed 10 CFR 20 occupational exposure limits)

Key delegable responsibilities of the ED include the following:

  • Management of available station resources
  • Initiation of assessment and mitigative/CORRECTIVE ACTIONS
  • Initiation of ONSITE PROTECTIVE ACTIONS
  • Decision to call for OFFSITE law enforcement, firefighting or ambulance assistance
  • Augmentation of the EMERGENCY RESPONSE ORGANIZATION as deemed necessary
  • Notification of SCE corporate officers and the SCE Corporate Communications Department
  • Notification of OFFSITE agencies (State and LOCAL GOVERNMENT AGENCIES, Marine Corps Base Camp Pendleton and NRC) 13 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan Security Station Security is administered by the Security Plan and reports to the ED when implementing the IOEP. Security personnel assist the ED as directed.

2.2 AUGMENTED POSITION The ERO is responsible for implementing the actions described in this Plan. The ERO is made up of on-shift personnel (described in section 2.1 ), augmented by the Resource Manager. Supplemental personnel are contacted as needed.

Resource Manager The Resource Manager will be in contact with the ED within two hours of CLASSIFICATION. The Resource Manager will augment the ED by assisting in assessment of the emergency conditions (refer to Table 2-1) and coordinating required resources, including public information interface. The Resource Manager does not need to physically report to SONGS to perform their responsibilities.

Supplemental personnel shall report at the discretion of the ED and/or the Resource Manager.

2.3 SUPPLEMENTAL PERSONNEL Additional personnel resources may be directed to report to SONGS to provide support as needed to assess radiological conditions, conduct maintenance and repair activities, develop and implement CORRECTIVE ACTION plans, and assist with recovery actions. The supplemental personnel are available from SONGS staff and SCE, and can be requested from various contractors.

14 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 2.4 FUNCTIONAL RESPONSIBILITIES Table 2-1 below lists the functional responsibilities of on-shift and augmented positions that fulfill emergency staffing capabilities.

TABLE 2-1 EMERGENCY RESPONSE ORGANIZATION Staffing and Responsibility AUGMENTED OFFSITE FUNCTIONAL AREA LOCATION SHIFT STAFFING

RESPONSE

One (1)

EMERGENCY ISFSI Shift Supervisor I One (1)

Assessment of Condition RESPONSE FACILITY EMERGENCY Resource Manager DIRECTOR (a)

Emergency Direction EMERGENCY EMERGENCY and Control RESPONSE FACILITY DIRECTOR (a)

Notifications I EMERGENCY EMERGENCY Communications RESPONSE FACILITY DIRECTOR (a)

Radiological ACCIDENT Resource Manager (b)

EMERGENCY ISFSI Shift Supervisor I ASSESSMENT and RESPONSE FACILITY I EMERGENCY PROTECTIVE One (1) or more On Scene DIRECTOR (a)

ACTIONS RP Support (c)

EMERGENCY Resource Manager (b) I CORRECTIVE EMERGENCY RESPONSE FACILITY I Supplemental I Support ACTIONS DIRECTOR (a)

On Scene Personnel Per Fire Protection OFFSITE Response Firefighting On Scene Program Plan Organization OFFSITE Response Rescue On Scene --- Organization First Aid On Scene Shift Personnel ---

Security Per Security Plan Per Security Plan ---

(a) One person comprising the on-shift minimum staff. May perform concurrent functions.

(b) One person comprising the augmented ERO. May perform concurrent functions.

(c) For a declared emergency involving radiological consequences (E-HU1), a minimum of one person trained in radiological monitoring and assessment will report to the SONGS ISFSI within four hours of the emergency DECLARATION.

15 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan 3.0 EMERGENCY RESPONSE SUPPORT AND RESOURCES Planning Standard 50.47(b)(3) (as exempted in Reference 17) - Arrangements for requesting and effectively using assistance resources have been made and other organizations capable of augmenting the planned response have been identified.

Letters and Memoranda of Agreement for OFFSITE organizations that have pre-agreed arrangements to support ONSITE response actions are maintained on file.

No other specific assistance has been pre-identified.

Fire, Ambulance and Local Law Enforcement Agency response is at the request and direction of the ED as previously discussed in Part II, Section 1.2 of this Plan.

The ED is authorized to request Federal assistance as needed. The Nuclear Regulatory Commission (NRC) will act as the lead Federal agency providing coordination and support in response to a nuclear incident.

16 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 4.0 EMERGENCY CLASSIFICATION SYSTEM Planning Standard 50.47(b)(4) (as exempted in Reference 17) -A standard emergency classification and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee.

SONGS utilizes NEI 99-01, Revision 6, "Development of Emergency Action Levels for Non- Passive Reactors" as its basis for classifying emergencies. The CLASSIFICATION system referenced in NEI 99-01, Rev. 6 has been endorsed by the NRC and offers a standard method for classifying emergencies. EALs are addressed in site procedures and the ISFSl-Only Emergency Plan*

Emergency Action Level Technical Bases Manual (IOEP-2).

This Plan addresses two (2) CLASSIFICATIONS of emergencies (UNUSUAL EVENT and ALERT),

which represent a hierarchy of emergencies based on potential accidents that could occur at the SONGS ISFSI. Once indications are available that an EAL is met, the event is assessed and classified, and the corresponding emergency CLASSIFICATION level is promptly declared as soon as possible.

4.1 UNUSUAL EVENT Events are in progress or have occurred which indicate a potential degradation of the level of safety of the SONGS ISFSI or indicate a security threat to facility protection has been initiated. No release of radioactive material requiring OFFSITE response or monitoring are expected. State and LOCAL GOVERNMENT AGENCIES, Marine Corps Base Camp Pendleton and the NRC are notified of an UNUSUAL EVENT.

The purpose of the UNUSUAL EVENT CLASSIFICATION is to bring the on-shift staff to a state of readiness and to provide for systematic handling of event information and its related decision making.

4.2 ALERT Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the SONGS ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION.

Any releases are expected to be limited to small fractions of the EPA PAG exposure levels.

As in the case of the UNUSUAL EVENT, the ALERT CLASSIFICATION includes emergency situations which are not expected to threaten the public, but for which notification of the State and LOCAL GOVERNMENT AGENCIES, Marine Corps Base Camp Pendleton and the NRC is required.

17 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan 4.3 EMERGENCY ACTION LEVELS AND POSTULATED ACCIDENTS Both emergency CLASSIFICATION levels are characterized by EALs consisting of specific instrument readings and/or observations which are used to tell the SONGS ISS that an INITIATING CONDITION has been met. These EALs are used to assure that the initial CLASSIFICATION of emergencies can be accomplished rapidly, allowing for the prompt identification of the nature of mitigating activities needed.

EALs and INITIATING CONDITIONS are provided under the following categories for the SONGS ISFSI:

  • Hazards and Other Conditions The applicable ISFSI Storage System FSARs describe the DESIGN BASIS ACCIDENTS (DBAs) applicable to the SONGS ISFSI, along with the radiological DOSE calculation results. Specific guidance for classifying emergencies is found in site procedures and the ISFSl-Only Emergency Plan Emergency Action Level Technical Bases Manual (IOEP-2).

EALs shall be reviewed with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton on an ANNUAL basis.

18 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 5.0 NOTIFICATION METHODS AND PROCEDURES Planning Standard 50.47(b)(5) (as exempted in Reference 17) - Procedures have been established for notification, by the licensee, of State and local response organizations and for notification of emergency personnel by all organizations; the content of initial and followup messages to response organizations has been established.

Notification and Mobilization of SONGS EMERGENCY RESPONSE PERSONNEL EPIPs are established to alert and notify ONSITE EMERGENCY RESPONSE PERSONNEL of the initial CLASSIFICATION or any escalation of an emergency by verbal announcement over portable radios. Each emergency CLASSIFICATION may result in augmentation personnel being notified to respond. Call trees may be utilized to make this notification.

Bases for Notification of OFFSITE Agencies SONGS, in cooperation with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, has established mutually agreeable methods and procedures for notification of OFFSITE response organizations consistent with the approved emergency CLASSIFICATION and action level scheme. Notifications to OFFSITE agencies include a means of verification.

Commercial telephone is the communication process used to notify the State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton of a declared emergency.

Notification to the State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton is required within 60 minutes of emergency DECLARATION, escalation, or change in radiological release status.

The following OFFSITE agencies, at a minimum, will receive emergency messages:

  • Orange County
  • San Diego County
  • Marine Corps Base Camp Pendleton Follow-up messages will be made to these agencies approximately every 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> utilizing a notification form.

SONGS, in coordination with State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, has established the content of the emergency messages to be sent from SONGS. These messages shall contain the following information if it is known and appropriate:

  • Location of incident (SONGS), and name and telephone number (or communications channel identification) of caller.
  • Date I time of incident.
  • Class of emergency and EAL.
  • SONGS emergency response actions underway.
  • Request for any needed ONSITE support by OFFSITE agencies.

19 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan

  • Prognosis for worsening or termination of event based upon facility (instrumentation or response team) information.

NRC Event Notification The NRC is notified immediately following notification of the appropriate State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, and not later than 60 minutes after the time of initial emergency DECLARATION, escalation, termination or entry into the recovery phase. Notification to the NRC is the responsibility of the ED. Communications with the NRC Operations Center will be performed primarily via commercial telephone. Satellite phone may be used as the back-up means of communication.

Support Organizations Medical, rescue, and firefighting support services are notified for assistance, using commercial telephone, as the situation dictates.

American Nuclear Insurers (ANI) is notified at an ALERT DECLARATION with requests for assistance as necessary.

20 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 6.0 EMERGENCY COMMUNICATIONS Planning Standard 50.47(b)(6) (as exempted in Reference 17) - Provisions exist for prompt communications among principal response organizations to emergency personnel.

Reliable Communications SONGS has reliable primary and backup communication systems installed. Communications with all organizations will be performed primarily via commercial telephone. Satellite phone may be used as the back-up means of communication.

SONGS maintains the capability to make initial notifications to the designated State and local QFFSITE agencies and Marine Corps Base Camp Pendleton STAFFED WARNING POINTS on a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day basis. Communications will be performed primarily via commercial telephone.

Satellite phone may be used as the back-up means of communication.

Communications with the California Governor's Office of Emergency Services (Cal OES), Orange County, San Diego County, and Marine Corps Base Camp Pendleton are provided from the ERF.

ERO notification may be performed by the use of call trees. ONSITE communications amongst the ERO is by use of portable radios.

Communications with the NRC Operations Center are provided from the ERF.

Coordinated communications exist with ambulance and hospital services.

The communication systems listed in Table 6-1 below provide 24-hour ONSITE and OFFSITE communications capability. Communication systems are tested to verify proper operation at the testing frequency specified in the table below. Communication systems that are listed with a testing frequency of "Frequent Use" indicates that the associated equipment is normally used at a sufficiently high regularity (e.g., multiple times each day), such that separate additional testing is not needed. Functionality is verified through normal (frequent) use of the system.

TABLE 6-1 Communication Systems Communication System Testing Frequency Commercial telephone system Frequent Use Portable radios Frequent Use Mobile communications devices (cellular or satellite phones) QUARTERLY*

  • Performance of drill requirements specified in Section 14 satisfies the testing frequency 21 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 7.0 PUBLIC INFORMATION Planning Standard 50.47(b)(7) (as exempted in Reference 17) - The principal points of contact with the news media for dissemination of information during an emergency are established in advance, and procedures for coordinated dissemination of information to the public are established.

As the principle point of contact for the dissemination of information during an event at the station, SCE Corporate Communications Department personnel will be notified of a declared emergency.

SCE Corporate Communications Department will monitor media activity and coordinate with senior management disseminating public information per communication protocols. As necessary, news conference(s) can be conducted at the site or other coordinated location. SCE Corporate Communications Department personnel, or senior SONGS management will represent the facility as the spokesperson. If an event occurs at the SONGS ISFSI, information will be disseminated to the public in a timely manner.

The SCE Corporate Communications Department personnel address any misinformation related to a declared emergency.

22 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 8.0 EMERGENCY FACILITY AND EQUIPMENT Planning Standard 50.47(b)(8) - Adequate emergency facilities and equipment to support the emergency response are provided and maintained.

This section of the Plan identifies and describes the emergency response facilities, the communication systems, the assessment facilities and equipment, the first aid and medical facilities, and protective equipment and supplies that can be utilized during an emergency.

8.1 EMERGENCY RESPONSE FACILITY EMERGENCY RESPONSE FACILITY (ERF) is staffed in accordance with Section 2.0. The ERF is open on a continuous basis. There is no activation needed.

The emergency COMMAND AND CONTROL functions are managed within the ERF. Within the ERF, the ED (or other personnel as directed) can assess conditions, evaluate the magnitude and potential consequences of abnormal conditions, initiate preventative and CORRECTIVE ACTIONS; and perform notifications.

Radiological conditions as a result of DBAs specified in the ISFSI storage system FSARs do not inhibit staffing of the ERF.

8.2 EMERGENCY EQUIPMENT This section describes the monitoring instruments used to initiate emergency measures and provide continuing assessment of conditions throughout the course of an emergency.

Portable Radiation and Contamination Monitoring Instruments Portable radiation and contamination monitoring instruments and sampling equipment normally utilized and maintained by the station are available for emergency use.

Communication Systems Communication systems are identified and tested as described in Section 6.

Emergency Supplies Emergency kit contents listed in Appendix A are inspected, inventoried, and operationally checked at least QUARTERLY and anytime a kit is opened and used. Sufficient reserves of instruments/equipment are provided to replace those which are removed from emergency kits for calibration or repair. Calibration of instruments has been established at intervals recommended by instrument suppliers, or as required by Federal regulations.

First Aid Facilities First aid supplies and equipment are located at the SONGS ISFSI. Qualified personnel are available 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day to provide medical treatment as referenced in Section 12.

23 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan 9.0 ACCIDENT ASSESSMENT Planning Standard 50.47(b)(9) (as exempted in Reference 17) -Adequate methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use.

The ASSESSMENT ACTIVITIES required to evaluate a particular emergency depend on the specific nature and CLASSIFICATION of the emergency. The ED is responsible for the initial measurement of ISFSI DOSE RATES after an off-normal, natural phenomena, or accident event.

The EALs identify the parameter value to determine the emergency condition. CLASSIFICATION of events is performed by the ED in accordance with the EAL scheme.

If the measured ISFSI DOSE RATES exceed the EAL threshold, the ED then performs a radioactive release assessment in the vicinity of the affected storage module or cask. After completing the assessment, the ED contacts the Resource Manager to assist in interpreting the radioactive release assessment results.

Notification of a radiological release assessment is in accordance with Section 5.0.

24 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 10.0 PROTECTIVE ACTIONS Planning Standard 50.47(b)(10) (as exempted in Reference 17)-A range of protective actions has been developed for emergency workers and the public.

PROTECTIVE ACTIONS for ONSITE personnel are provided for their health and safety.

Implementation guidelines for ONSITE PROTECTIVE ACTIONS are provided in EPIPs.

Additionally, the EPIPs provide for a range of PROTECTIVE ACTIONS (e.g. relocation of personnel and personnel take cover) to protect ONSITE personnel during HOSTILE ACTIONS.

ACCOUNTABILITY ACCOUNTABILITY should be considered and used as a PROTECTIVE ACTION whenever a site wide risk to health or safety exists and prudence dictates. If personnel ACCOUNTABILITY is required, at the direction of the ED all individuals at the site (including employees without emergency assignments, visitors, and contractor personnel) shall be notified of the emergency.

ACCOUNTABILITY of all personnel inside the ISFSI PROTECTED AREA (PA) should be accomplished within 60 minutes after emergency DECLARATION and maintained thereafter. If personnel are unaccounted for, teams shall be dispatched to locate the personnel.

Non-ESSENTIAL PERSONNEL located outside of the ISFSI PA but within the SITE BOUNDARY will be directed to report to an assembly area or exit the site, as appropriate. The ED is responsible for controlling access to the site when the IOEP is activated.

25 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 11.0 RADIOLOGICAL EXPOSURE CONTROL Planning Standard 50.47(b)(11) - Means for controlling radiological exposures, in an emergency, are established for emergency workers. The means for controlling radiological exposures shall include exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides.

SONGS maintains a radiological exposure control program to assure that protection against radiological exposure, as set forth in 10 CFR Part 20 is provided. This program is implemented through the "Radiological Protection Standard" which covers both normal and emergency radiation protection measures.

Means for controlling radiological exposures in an emergency are established for emergency workers. The means for controlling radiological exposures shall include exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides.

Exposure Guidelines During an emergency, DOSES above normal occupational radiation exposure limits may be authorized by the ED for activities such as saving a life, preservation of valuable equipment, or controlling exposure. Table 11-1 contains the guidelines for emergency exposure criteria, which is consistent with the EPA's, "Protective Action Guide and Planning Guidance for Radiological Incidents," Table 2-2, "Response Worker Guidelines".

  • Radiation Protection The purpose of a Radiation Protection Program is to assure that radiation DOSES received by personnel are kept as low as reasonably achievable and do not exceed the prescribed limits for both normal and emergency conditions. The established measures to provide this assurance include access control, personnel monitoring, and contamination control.

Access Control During a declared emergency, radiological surveys of the ISFSI area will be performed to determine the actual extent of the radiological conditions. As necessary, the ED will ensure RCAs and access controls are established to prevent personnel from entering the area. Recovery and CORRECTIVE ACTIONS will be planned and executed in a manner that minimizes exposure to personnel.

Contaminated areas are isolated with appropriate radiological protection and access control.

Personnel leaving contaminated areas are monitored for radioactive contamination. Supplies, instruments, and equipment that are in contaminated areas or have been brought into contaminated areas will be monitored prior to removal.

Restricted areas and contaminated items will be returned to normal use when contamination levels have been returned to acceptable levels. Contamination control criteria for returning areas and items to normal use are contained in the station procedures.

26 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan Personnel Exposure Monitoring Personal dosimeters are utilized to monitor the exposure of personnel during normal or emergency conditions. Adequate supplies of dosimeters are maintained for use during an emergency.

Procedures describe in detail the types of personal dosimeter devices, the manner in which they are to be used, who is to wear them, and how they are tb be cared for.

Emergency worker DOSE records are maintained in accordance with station procedures Contamination Control Various contamination control measures are utilized. These include access control measures and means for the DECONTAMINATION of personnel, areas, and equipment. These activities are addressed in facility procedures and are briefly described below. All personnel are monitored for radioactive contamination prior to leaving the RCA. During normal or emergency conditions, contamination should be removed from any part of a person's body prior to their leaving the RCA.

All personnel DECONTAMINATION, even during an emergency, will be performed under the supervision of personnel trained in radiological monitoring and assessment and in accordance with established procedures.

Portable contamination monitoring instruments are available to frisk personnel for potential contamination.

Documentation of surveys, contamination, and DECONTAMINATION activities shall be maintained in accordance with station procedures.

Table 11-1 Response Worker Guidelines Guideline DOSE Limit Activity Condition (Rem TEDE) 5 All occupational exposures All Emergency Workers may be authorized up to 5 Rem Emergency Exposure for the emergency; however all reasonably achievable actions should be taken to minimize DOSE. Attempts should be made to keep exposures within 10 CFR 20 limits.

10 (a) Protecting valuable property Lower DOSE not practicable.

necessary for public welfare 25 (b) Lifesaving or protection of large Lower DOSE not practicable.

populations

> 25 (b) Lifesaving or protection of large Only on a voluntary basis to persons fully aware populations of the risks involved.

Limit DOSE to the lens of the eye to 3 times the above values and DOSES to any other organ (including skin and body extremities) to 10 times the above values.

(a) For potential DOSES >5 rem, medical monitoring programs should be considered.

(b) In the case of a very large incident, may need to consider raising the property and lifesaving response worker guidelines to prevent further loss of life and massive spread of destruction.

27 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 12.0 MEDICAL AND HEALTH SUPPORT Planning Standard 50.47(b)(12)-Arrangements are made for medical seNices for contaminated injured individuals.

Medical assistance is available ON SITE and OFFSITE for treatment of SONGS ISFSI personnel.

Various means of transportation are available to transport individuals for radiological and non-radiological injuries.

The individuals and organizations providing emergency medical assistance as identified in this section either have the capability for evaluation of radiation exposure and uptake or they are provided this capability from SCE in the form of personnel and/or equipment. SCE assures that persons providing these services are adequately prepared to handle contaminated individuals through detailed training classes, drills and exercises. Letters of Agreement with OFFSITE organizations and individuals for medical support are listed in Appendix C.

ONSITE First Aid First aid assistance at the SONGS ISFSI is designed to handle a wide range of injuries. This task is accomplished by ONSITE individuals trained in basic first aid procedures.

Medical Transportation Transportation of injured personnel is available via local emergency medical services, SONGS vehicles, or private vehicles. When personnel are transported to Mission Hospital Regional Medical Center (MHRMC) while in a contaminated condition, a person trained in radiological monitoring will be dispatched to monitor and maintain radiological controls.

OFFSITE Medical Support The MHRMC in Mission Viejo, California, has medical facilities capable of handling various types of injuries. MHRMC is capable of treating patients with injuries of a non-radiological or radiological nature.

28 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan 13.0 EMERGENCY TERMINATION AND RECOVERY Planning Standard 50.47(b)(13) - General plans for recovery and reentry are developed.

SCE has established general plans described in the following sections to conduct recovery from potential emergencies at the SONGS ISFSI. The recovery organization will be based on the normal SONGS organization and would function with the senior management position being responsible for site activities.

Emergency Termination and Notification Termination of an emergency status is the responsibility of the ED. The ED is also responsible for providing notification of the emergency termination and initiation of Recovery operations to the NRC, State and LOCAL GOVERNMENT AGENCIES and Marine Corps Base Camp Pendleton, the SONGS ERO and other organizations that may be providing ONSITE support.

Recovery Operations Recovery operations begin immediately following emergency termination and will address the specific emergency circumstances. Recovery planning includes equipment to be repaired or replaced, licensing implications, special training requirements, OFFSITE support, and determination of causes and consequences. Site procedures addressing Recovery operations provide an outline for a short term Recovery plan.

The senior management position shall be responsible for the development and implementation of the Recovery plan and shall provide for detailed monitoring of the implementation and status reporting. The senior management position also has the authority to revise or halt activities as circumstances dictate.

The ISFSI recovery will be terminated by the SONGS senior management position after the ISFSI has been returned to a stable condition.

29 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan 14.0 EXERCISE AND DRILLS Planning Standard 50.47(b)(14) - Periodic exercises are (will be) conducted to evaluate major portions of emergency response capabilities, periodic drills are (will be) conducted to develop and maintain key skills, and deficiencies identified as a result of exercises or drills are (will be) corrected.

Exercise and Drill SONGS conducts a BIENNIAL Exercise to test the adequacy of timing and content of implementing procedures and methods; to test emergency equipment and communication networks; and to ensure that emergency personnel are familiar with their duties. Each exercise will be evaluated by station evaluators and possibly Federal evaluators. SONGS will invite Federal, State, and LOCAL GOVERNMENT AGENCIES to participate or observe scheduled exercises upon request.

For alternating years, an INTEGRATED DRILL is conducted for the purpose of testing, developing, and maintaining the proficiency of emergency responders. BIENNIAL Exercises and alternate year INTEGRATED DRILLS will allow the ERO to demonstrate the following principal functional areas:

Exercise and drill scenarios are developed to provide reasonable assurance that anticipatory responses will not result from preconditioning of participants. Exercise and drill scenarios, as appropriate, emphasize coordination among ONSITE and OFFSITE response organizations.

Exercise and drills allow free play for decision making. The scenarios for use in exercises and drills include, at a minimum, the following:

  • The basic objective(s) of each drill and exercise and appropriate evaluation criteria;
  • The date(s), time period, place(s), and participating organizations;
  • The simulated events;
  • A narrative summary describing the conduct of the exercises or drills to include such things as simulated casualties, OFFSITE fire department assistance, rescue of personnel, use of protective clothing; and,
  • A description of the arrangements for and advance materials to be provided to official observers.

The scenario should be varied from year to year such that all major elements of the plans and preparedness organizations are tested.

30 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan Equipment and Proficiency Drills Drills are conducted to provide supervised instruction, training and practice opportunities for ERO members. Drills may be performed as part of the BIENNIAL exercise, INTEGRATED DRILL or as an independent drill. A drill may be a component of an exercise. Drills are supervised and evaluated by qualified personnel. Drills are conducted, in addition to the exercise at the frequencies indicated below:

Communication Drills A communications drill with State and LOCAL GOVERNMENT AGENCIES is conducted ANNUALLY. A communications drill with NRG Headquarters is conducted ANNUALLY.

Communication drills include the aspect of understanding the content of messages.

Fire Drills A fire drill is conducted in accordance with SONGS Fire Protection Program.

Medical Emergency Drills A medical emergency drill, involving a simulated contaminated individual, which contains provisions for participation by local support services organizations (i.e., ambulance and support hospital), is conducted ANNUALLY. The OFFSITE portions of the medical drill may be performed as part of the required BIENNIAL exercise or INTEGRATED DRILL.

Radiation Protection Drills A Radiation Protection drill is conducted ANNUALLY.

Augmentation Drills An unannounced augmentation drill is conducted ANNUALLY. This drill involves implementation of the ERO callout system procedure and documentation of the estimated response time for each responder. This drill demonstrates the capability to augment the ED after an emergency is declared.

Critique and Evaluation Critiques shall be scheduled at the conclusion of each exercise or alternate year INTEGRATED DRILL to evaluate the performance of the organization. The ability of EMERGENCY RESPONSE PERSONNEL to self-evaluate weaknesses and identify areas for improvement is the key to successful exercise I drill conduct.

Exercise and drill objectives are evaluated against measurable demonstration criteria. Following the conclusion of each exercise or drill, a critique, including participants and evaluators, is conducted to evaluate the ability of the ERO to implement the IOEP and its implementing procedures.

Official observers from the NRG should observe, evaluate, and critique the required exercises.

A formal evaluation in the form of a written critique report is prepared following an exercise or drill involving the evaluation of designated objectives. The report evaluates and documents the ability of the ERO to respond to a simulated emergency situation. The report will also contain reference to CORRECTIVE ACTION documents and recommendations.

31 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan The critique process is used as the means for evaluating observer and participant comments to identify areas of ERO performance and the EMERGENCY PREPAREDNESS Program that require improvement, including emergency plan procedural changes. The Emergency Planning Coordinator is responsible for ensuring that items identified in the critique are correctly dispositioned, appropriate assignment of responsibility is made and that CORRECTIVE ACTIONS are implemented in accordance with the CORRECTIVE ACTION Program.

32 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan 15.0 RADIOLOGICAL EMERGENCY RESPONSE TRAINING Planning Standard 50.47(b)(15) - Radiological emergency response training is provided to those who may be called on to assist in an emergency.

15.1 EMERGENCY RESPONSE PERSONNEL TRAINING Requirements for EMERGENCY PREPAREDNESS training are specified in the EMERGENCY PREPAREDNESS Training Program. This program identifies the level and the depth to which individuals are to be trained.

EMERGENCY PREPAREDNESS Training Program The training for ERO personnel is developed from the position-specific responsibilities as defined in this Plan. Members of the ERO receive initial training and ANNUAL retraining. They also receive recurring Emergency Plan-related training ANNUALLY through General Employee Training and position-specific training as appropriate.

Specific training requirements for ERO and supplemental personnel are delineated below:

ISFSI Shift Supervisors/EMERGENCY DIRECTORS and Resource Managers Trained such that proficiency is maintained on the topics listed below. These subjects shall be covered as a minimum initially and on an ANNUAL basis.

  • Emergency CLASSIFICATION
  • State and LOCAL GOVERNMENT AGENCIES, Marine Corps Base Camp Pendleton, and NRC notifications
  • DOSE RATE meter operation
  • Radioactive release assessment
  • Emergency exposure control
  • PROTECTIVE ACTIONS for ONSITE personnel
  • ISFSI DBAs Personnel Responsible for ACCIDENT ASSESSMENT The skills and knowledge required to perform monitoring of the ISFSI are provided to personnel qualified as ISS/ED.

Resource Managers who assist with ACCIDENT ASSESSMENT, CORRECTIVE ACTIONS, PROTECTIVE ACTIONS, and related activities receive appropriate training.

33 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan Radiological Assessment Personnel Resource Managers who assist with radiological assessment, CORRECTIVE ACTIONS, PROTECTIVE ACTIONS, and related activities receive appropriate training.

Radiation Protection Technicians who may be called to supplement the ERO are trained in the course of their normal work to be able to provide support for radiological ACCIDENT ASSESSMENT and PROTECTIVE ACTIONS. Support activities include access control; radiological coverage (e.g., monitoring, surveys, and support) for personnel conducting repairs, CORRECTIVE ACTIONS, search and rescue, first aid, firefighting, contaminated injury response (including transport); as well as providing personnel monitoring and dosimetry.

Fire Control Teams Station personnel are trained to report any fire to the ISS, then use available fire protection equipment within their level of competency. Responding USMC CPFD personnel are invited to receive training, as outlined in Section 15.2.

Medical Support Personnel Mission Hospital Regional Medical Center personnel are invited to receive training, as outlined in Section 15.2.

Security and Law Enforcement Personnel Station Security personnel are trained in accordance with the Security Plan. Local Law Enforcement Agency personnel are invited to receive training, as outlined in Section 15.2.

First Aid and Rescue Teams Selected individuals assigned on-shift ERO responsibility receive first aid training equivalent to Red Cross Adult First Aid/CPR/AED). Station personnel are trained to report any injury or medical emergency to the ISS, then provide first aid treatment within their level of competency. Responding USMC CPFD personnel are invited to receive training as outlined in Section 15.2.

Personnel who are badged for unescorted ISFSI PA access receive initial and ANNUAL refresher training on general station procedures and policies. This training includes required actions to be taken if an emergency is declared at the SONGS ISFSI.

Personnel assigr:ied to work at the station who do not require unescorted ISFSI PA access, including visitors, receive information on the actions to be taken if an emergency is declared at the SONGS ISFSI.

34 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 15.2 SUPPORT ORGANIZATIONS TRAINING Training is made available to support organizations that may be called upon to provide assistance in the event of an emergency.

Non-SONGS organizations that may provide specialized services during an emergency (i.e., law enforcement, firefighting, rescue, medical services, and transport of injured personnel) are provided or offered site-specific emergency response training, ANNUALLY.

The training made available is structured to meet the needs of that organization with respect to the nature of their support. Training topics such as event notification, basic radiation protection, and interface activities between the OFFSITE organization and SONGS are made available.

35 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan 16.0 MAINTAINING EMERGENCY PREPAREDNESS Planning Standard 50.47(b)(16) - Responsibilities for plan development and review and for distribution of emergency plans are established, and planners are properly trained.

16.1 EMERGENCY PREPAREDNESS RESPONSIBILITIES SONGS ISFSI Senior Management Position Southern California Edison (SCE) is responsible for the maintenance of SONGS EMERGENCY PREPAREDNESS Program. The issuance and control of this Plan and the activities associated with EMERGENCY PREPAREDNESS at SONGS shall be the overall responsibility of the SONGS ISFSI Senior Management Position.

Emergency Planning Coordinator Responsible for the following tasks:

  • Maintaining and updating this IOEP and associated procedures, and documenting reviews and revisions
  • Coordinating the IOEP with other station programs and procedures
  • Overseeing EMERGENCY PREPAREDNESS Training Program and ensuring that proper records are maintained to document training of the ERO
  • Performing and documenting appropriate evaluations of the EMERGENCY PREPAREDNESS Program and of declared emergency events
  • Ensuring that the ERO are notified of updates to the IOEP or EPIPs
  • Ensuring that the OFFSITE Response Organizations are notified of updates to the IOEP
  • Ensuring that all Letters and Memoranda of Agreement with support organizations are reviewed ANNUALLY and updated as needed
  • Maintaining current knowledge of changes in Federal regulations and other guidance that impact emergency planning activities
  • Submit IOEP and related controlled document revisions to the NRC

36 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan The individual assigned as the Emergency Planning Coordinator receives training in order to maintain an adequate knowledge of regulations, planning techniques and the latest applications of emergency equipment and supplies. This training may include:

  • Observation of or participation in drills and/or exercises at other stations
  • Participation in industry review and evaluation programs
  • 10 CFR 50.54(q) and 10 CFR 72.44(f) Evaluation Qualification and/or Training 16.2 REVIEW AND UPDATING OF THE IOEP It is important that a state of EMERGENCY PREPAREDNESS be maintained at all times. The IOEP is reviewed ANNUALLY and updated, as needed. The ANNUAL IOEP review/update includes required changes identified during audits, assessments, training, drills, and exercises.

Any needed changes shall be incorporated in the IOEP, IOEP Emergency Action Level Technical Bases Manual, and appropriate implementing procedures. The IOEP, IOEP Emergency Action Level Technical Bases Manual, and EPIPs are distributed on a controlled basis.

Changes to the IOEP, IOEP Emergency Action Level Technical Bases Manual, and EPIPs are subject to evaluation under 10 CFR 50.54(q) and 10 CFR 72.44(f).

EMERGENCY ACTION LEVELS (EALs) State and LOCAL GOVERNMENT AGENCY Review The EALs shall be made available for review with State and LOCAL GOVERNMENT AGENCIES ANNUALLY.

Implementing and Supporting Procedures EPIPs provide specific instructions to be taken for each emergency CLASSIFICATION including responsibilities, notification of OFFSITE emergency organizations, and mobilization of the ERO.

These procedures provide specific instructions to personnel for response to events and actions required to administer the EMERGENCY PREPAREDNESS Program. EPIPs are updated as appropriate, in consideration of improvement opportunities identified during exercises, drills and training Changes to these procedures are subject to evaluation under 10 CFR 50.54(q) and 10 CFR 72.44(f).

Emergency Response Directory Names and telephone numbers of the ERO, support personnel and applicable supporting OFFSITE organizations shall be reviewed and updated at least QUARTERLY.

Letters and Memoranda of Agreement ANNUALLY, each Letter of Agreement or Memoranda with support organizations are reviewed and verified current in order to assure the availability of assistance from each supporting organization.

37 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan PART Ill APPENDIX A Emergency Equipment, Supplies, and Reference Materials EMERGENCY RESPONSE FACILITY Procedures I Reference Material ISFSl-Only Emergency Plan (IOEP-1)

ISFSl-Only EAL Technical Bases Manual (IOEP-2)

Emergency Response Directory (ERO)

EMERGENCY PLAN IMPLEMENTING PROCEDURES Equipment Communications equipment (portable radios, cell phone, satellite phone)

Portable radiation monitoring equipment Portable emergency lighting Medical emergency response bag Dosimeters Equipment I Supplies Contamination control supplies DECONTAMINATION control supplies Protective clothing 38 Revision O

IOEP-1 SONGS ISFSl-Only Emergency Plan APPENDIX B Cross Reference IOEP Section to Planning Standards I Requirements I Criteria and Procedures Table B-1 NUREG-0654, IOEP Planning Planning Section II Part II Standard Requirement Procedure Evaluation Section (10 CFR 50.47)** (Appendix E.IV)**

Criteria A.1, 2, 4, 7 S0123-Vlll-ADMIN-1, 1.0 (b)(1) A S0123-Vlll-ER0-1 2.0 (b)(2) A.1, 2, 4; C.1 8 S0123-Vlll-ER0-1 3.0 (b)(3) A.6, 7 c S0123-Vlll-ADMIN-1 4.0 (b)(4) 8.1, 2; C.1, 2 D S0123-Vlll-ER0-1 5.0 (b)(5) A.6, 7; C.1; D.1,3; E E S0123-Vlll-ER0-1 6.0 (b)(6) C.1; D.1, 3; E F S0123-Vlll-ER0-1 7.0 (b)(7) Exempt G S0123-Vlll-ER0-1 E;G S0123-Vlll-ADMIN-1, 8.0 (b)(8) H S0123-Vll l-ER0-1 9.0 (b)(9) A.4; 8.1; C.2; E I S0123-Vlll-ER0-1 10.0 (b)(10) C.1; E J S0123-Vlll-ER0-1 11.0 (b)(11) E K S0123-Vlll-ER0-1 A.6, 7; E S0123-Vlll-ADMIN-1 12.0 (b)(12) L S0123-Vlll-ER0-1 13.0 (b)(13) H M S0123-Vlll-ER0-1 14.0 (b)(14) E9; F N SO 123-VI II-ADM IN-1 15.0 (b)(15) F 0 S0123-Vlll-ADMIN-1 16.0 (b)(16) G p S0123-Vlll-ADMIN-1

    • Refer to the SONGS exemptions from portions of 10 CFR 50.47 and Appendix E for applicability.

39 Revision 0

IOEP-1 SONGS ISFSl-Only Emergency Plan APPENDIX C List of Letters and Memoranda of Agreement Organization Applicable To Mission Hospital Regional Medical Center Medical Treatment, including Contaminated Injured Person Marine Corps Base Firefighting I Search & Rescue I Transport, Camp Pendleton including Contaminated Injured Person The actual letters and memoranda of agreement are maintained in Emergency Preparedness files.

40 Revision O

ENCLOSURE 2 ISFSl-ONLY EMERGENCY ACTION LEVEL BASIS DOCUMENT (INCLUDES EMERGENCY ACTION LEVEL SCHEME)

SAN ONOFRE NUCLEAR GENERATING STATION

IOEP-2 EAL Technical Bases Manual San Onofre Nuclear Generating Station (SONGS)

Independent Spent Fuel Storage Installation (ISFSI)

Only Emergency Plan Emergency Action Level Technical Bases Manual Revision 0

IOEP-2 EAL Technical Bases Manual TABLE OF CONTENTS Section

1.0 INTRODUCTION

................................................................................................................................1 1.1 PURPOSE ............................................................................................................................... 1 1.2 EMERGENCY CLASSIFICATION LEVELS (ECLS} ..............................................................2 1.3 INITIATING CONDITIONS (ICS) ............................................................................................3 1.4 EMERGENCY ACTION LEVELS (EALS) ..............................................................................3 1.5 EAL TECHNICAL BASES MANUAL CONTENT ................................................................... .4 2.0 DEFINITIONS AND ABBREVIATIONS .............................................................................................5 2.1 DEFINITIONS .........................................................................................................................5 2.2 ABBREVIATIONS ..................................................................................................................7 3.0 EAL MATRIX TABLE ........................................................................................................................8 4.0 EAL TECHNICAL BASES .................................................................................................................9 4.1 PD-HA 1 ..................................................................................................................................9 4.2 PD-HU1 ................................................................................................................................10 4.3 PD-HA3 ................................................................................................................................11 4.4 PD-HU3 ................................................................................................................................12 4.5 E-HU1 ...................................................................................................................................13 ii Revision O

IOEP-2 EAL Technical Bases Manual

1.0 INTRODUCTION

1.1 PURPOSE This document contains the Nuclear Regulatory Commission (NRC) approved set of INITIATING CONDITIONS (ICs), their associated EMERGENCY ACTION LEVEL (EAL) thresholds, and their site-specific technical bases, for the San Onofre Nuclear Generating Station (SONGS)

INDEPENDENT SPENT FUEL STORAGE INSTALLATION (ISFSI), using the EAL development methodology found in NEI 99-01 Revision 6.

Any changes to this document will be made in accordance with the requirements of 10 CFR 50.54(q) and 10 CFR 72.44(f).

Personnel responsible for emergency classification and declaration may use this document as a technical reference and an aid in EAL interpretation. 1 The primary tool for determining the EMERGENCY CLASSIFICATION LEVEL is the EAL Matrix Table in this manual, also available on form EP(123) EAL, Emergency Action Levels. The user of the EAL Matrix Table may (but is not required to) consult the Emergency Action Level Technical Bases Manual in order to obtain additional information concerning the EALs being considered for classification of an emergency.

This document is also used to facilitate review of any proposed changes to the SONGS ISFSl-Only EALs.

The SONGS ISFSI is essentially an interim spent fuel storage facility where the spent fuel is surrounded by inert gas inside a container called a canister. The canisters used at SONGS are stainless steel cylinders that are welded closed. The fuel is cooled by natural airflow around the canister. The fuel was moved to dry storage after several years in spent fuel pools, so the heat given off by the fuel has significantly decreased. Each canister is surrounded by additional steel, concrete, or other material to provide physical protection, structural integrity, and additional radiation shielding to workers and members of the public. These primary functions of the ISFSI are the focus of the ISFSl-Only ICs and EALs.

SCE was granted exemptions from portions of 10 CFR 50.47(b), 10 CFR 50.47(c)(2), and 10 CFR 50 Appendix E, Section IV. The basis for these exemptions has not changed and remains in effect for the ISFSl-Only Emergency Plan (IOEP). The changes to this Technical Bases Manual reflect the lowered radiological source term and risks associated with ISFSI storage relative to reactor at power operation or storage in spent fuel pools. Source terms and accident analyses associated with design basis accidents are documented in the dry storage systems' Final Safety Analysis Reports (FSARs).

With regard to event recognition and classification, regulations specific to the declaration of emergencies are provided in planning standard 10 CFR 50.47(b)(4), 10 CFR 50 Appendix E.IV.B, and 10 CFR 72.32(a)(3).

1 Emergency event declaration is required to be made as soon as conditions warranting classification are present and recognizable, but within 30 minutes in all cases of conditions being present. Use of this document for assistance is not intended to delay event declaration.

1 Revision O

IOEP-2 EAL Technical Bases Manual The NRC, by letter to Nuclear Energy Institute (NEI) dated 03/28/13(ML12346A463), documented its review of the draft version of NEI 99-01, Revision 6, dated November 2012 (ML12326A805), and found it acceptable for use by licensees seeking to upgrade their EMERGENCY ACTION LEVELS (EALs) in accordance with 10 CFR 50 Appendix E. The regulatory and technical analysis for this endorsement can be retrieved through ADAMS Accession No. ML13008A736.

1.2 EMERGENCY CLASSIFICATION LEVELS (ECLS)

As defined in NUREG-0654/FEMA-REP-1, nuclear power plant emergencies are separated into four ECLs:

  • UNUSUAL EVENT (UE)
  • ALERT
  • Site Area Emergency
  • General Emergency The ECLs are escalated from least severe to most severe according to the relative threat to the health and safety of the public and emergency workers. An ECL is determined to be met by identifying abnormal conditions and then comparing them to ICs through EAL threshold values as discussed below. When multiple EALs are met, event declaration is based in the highest ECL reached.

The ISFSI Only ICs and EALs within this document use the two lower of the four ECLs. The source terms and release motive forces associated with an ISFSI are not sufficient to require declaration of a Site Area Emergency or General Emergency.

2 Revision 0

IOEP-2 EAL Technical Bases Manual 1.3 INITIATING CONDITIONS (ICS)

An IC is a general description of an event or condition that aligns with the definition of one of the four ECLs by virtue of the potential or actual effects or consequences.

Each IC is given a unique identification code consisting of a hyphenated letter combination, a separate letter and one number. The hyphenated letter combination identifies the recognition category, the separate letter identifies the ECL, and the number identifies the sequence of the IC within the recognition category. The EAL identification codes are developed as follows:

Permanently Defueled Recognition Category Applicable to ISFSI

  • PD-H - Hazards and Other Conditions Affecting Plant Safety ISFSI Recognition Category
  • E-H- Hazards and Other Conditions Affecting ISFSI ISFSI Only ECLs (lowest to highest)
  • U - UNUSUAL EVENT
  • A-ALERT For an ISFSl-Only station, the UNUSUAL EVENT ICs provide for an increased awareness of abnormal conditions while the ALERT ICs are specific to actual or potential impacts to spent fuel.

Security and Judgment ICs and EALs were included to provide a basis for classifying events that cannot be readily classified based on observable events or physical conditions alone.

1.4 EMERGENCY ACTION LEVELS (EALS)

An EAL is a pre-determined, site-specific, observable threshold for an IC that, when met or exceeded, places the ISFSI in a given ECL.

EAL thresholds may utilize a variety of criteria including instrument readings and status indications; observable events; and entry into particular procedures.

EALs are individually identified by the IC identification code followed by the EAL number, such as E-HU1 .1 for damage to a loaded canister CONFINEMENT BOUNDARY or PD-HA1 .1 for a HOSTILE ACTION within the VEHICLE BARRIER SYSTEM (VBS).

All EAL classification assessments shall be based upon valid indications, reports or conditions. A valid indication, report, or condition, is one that has been verified through appropriate means such that there is no doubt regarding the indicator's operability, the condition's existence, or the report's accuracy.

3 Revision 0

IOEP-2 EAL Technical Bases Manual 1.5 EAL TECHNICAL BASES MANUAL CONTENT EAL Matrix Table This manual contains an EAL Matrix Table that addresses all of the recognition categories for the ISFSI EAL thresholds.

The EAL Matrix Table is designed as an evaluation tool that organizes the ECLs from the highest (ALERT) on the left to the lowest (UNUSUAL EVENT) on the right. Evaluating the EALs for each EGL from highest to lowest reduces the possibility that an event will be under classified. All EALs are to be reviewed for applicability prior to event declaration.

Other user aids, such as wallcharts, may be developed from the EAL Matrix Table to support evaluation of abnormal conditions in other human factored formats.

EAL Documentation Format Each EAL within the technical bases manual is documented in the following manner:

  • IC Identification Number
  • INITIATING CONDITION
  • EAL Threshold Value(s)
  • Basis
  • Basis Reference(s) 4 Revision O

IOEP-2 EAL Technical Bases Manual 2.0 DEFINITIONS AND ABBREVIATIONS 2.1 DEFINITIONS Advanced Horizontal Storage Module (AHSM) - The Transnuclear AHSM is a reinforced concrete structure for storage of a loaded DRY SHIELDED CANISTER (DSC) at a spent fuel storage facility.

Alert - Events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION.

Any releases are expected to be limited to small fractions of the EPA Protective Action Guideline exposure levels.

Confinement Boundary - The barrier(s) between spent fuel and the environment once the spent fuel is processed for dry storage. As applied to the SONGS ISFSI, the CONFINEMENT BOUNDARY is defined by the inner surface of the sealed Transnuclear DSC or Holtec MULTl-PURPOSE CANISTER (MPG).

Dry Shielded Canister (DSC) - A Transnuclear welded pressure vessel that provides confinement of intact or damaged fuel assemblies in an inert atmosphere.

Emergency Action Level (EAL) - A pre-determined, site-specific, observable threshold for an INITIATING CONDITION that, when met or exceeded, places the station in a given EGL.

Emergency Classification Level (ECL) - One of a set of names or titles established by the US Nuclear Regulatory Commission (NRG) for grouping off-normal events or conditions according to potential or actual effects or consequences, and the resulting onsite and offsite response actions.

The EMERGENCY CLASSIFICATION LEVELS applicable to the SONGS ISFSI, in ascending order of severity, are:

  • ALERT Hostage - A person(s) held as leverage against the station to ensure demands will be met by the station.

Hostile Action - An act toward the SONGS ISFSI or its personnel that includes the use of violent force to destroy equipment, take HOSTAGES, and/or intimidate the licensee to achieve an end.

This includes attack by air, land, or water using guns, explosives, PROJECTILES, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included.

HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the SONGS ISFSI. Non-terrorism-based EALs should be used to address such activities (i.e., this may include violent acts between individuals within the VBS boundary).

Hostile Force - One or more individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destruction.

Independent Spent Fuel Storage Installation (ISFSI) - A complex that is designed and constructed for the interim storage of spent nuclear fuel and other radioactive materials associated with spent fuel storage.

5 Revision 0

IOEP-2 EAL Technical Bases Manual Initiating Condition (IC) - An event or condition that aligns with the definition of one of the two applicable ECLs by virtue of the potential or actual effects or consequences.

Multi-Purpose Canister (MPC) - Holtec MPCs are the sealed spent nuclear fuel canisters which provide the CONFINEMENT BOUNDARY for the contained radioactive materials.

Projectile - An object directed toward the SONGS ISFSI that could cause concern for its continued capability, reliability, or personnel safety.

Protected Area - That onsite area within the security boundary as defined in the station's Security Plan.

Security Condition - Any security event as listed in the approved security contingency plan that constitutes a threat/compromise to site security, threat/risk to site personnel, or a potential degradation to the level of safety. A SECURITY CONDITION does not involve a Hostile Action.

Transfer Cask - Containers designed to contain the Transnuclear DSC or Holtec MPC during and after loading of spent fuel assemblies, prior to and during unloading, and to transfer the DSC or MPC to or from the Transnuclear AHSM or Holtec VERTICAL VENTILATED MODULE (WM).

Unusual Event (UE) - Events are in progress or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of occurs.

Vehicle Barrier System (VBS) - Vehicle control measures (passive or active) used to protect against the malevolent use of a land vehicle. The VBS consists of both active and passive components, terrain features, man-made structural features, and vehicle access checkpoints as defined in the SONGS Security Plan.

Vertical Ventilated Module (WM) - The Holtec WM is a subterranean type overpack, which receives and contains the sealed Holtec MPC for interim spent fuel storage at an ISFSI. The Holtec WM supports the MPC in a vertical orientation and provides gamma and neutron shielding, and also provides air flow through cooling passages to promote heat transfer from the MPC to the environs.

6 Revision 0

IOEP-2 EAL Technical Bases Manual 2.2 ABBREVIATIONS AHSM - Advanced Horizontal Storage Module CFR - Code of Federal Regulations DSC - Dry Shielded Canister EAL - Emergency Action Level ECL - Emergency Classification Level ED - Emergency Director EPA - Environmental Protection Agency FAA - Federal Aviation Administration FBI - Federal Bureau of Investigation FEMA - Federal Emergency Management Agency FSAR - Final Safety Analysis Report IC - Initiating Condition ISFSI - Independent Spent Fuel Storage Installation ISS - ISFSI Shift Supervisor MPC - Multi-Purpose Canister mR - milli-Roentgen Equivalent Man NEI - Nuclear Energy Institute NORAD - North American Aerospace Defense Command NRC - Nuclear Regulatory Commission SCE - Southern California Edison SONGS - San Onofre Nuclear Generating Station SSS - Security Shift Supervisor UE - Unusual Event VBS - Vehicle Barrier System WM - Vertical Ventilated Module 7 Revision 0

IOEP-2 EAL Technical Bases Manual 3.0 EAL MATRIX TABLE PD-HA1 HOSTILE ACTION within the PD-HU1 Confirmed SECURITY CONDITION or threat.

VBS boundary.

PD-HU1.1 A SECURITY CONDITION that does not involve a PD-HA1.1 A HOSTILE ACTION is HOSTILE ACTION as reported by the SSS.

occurring or has occurred PD-HU1 .2 Notification of a credible security threat directed at the within the VBS boundary as site.

re orted b the SSS.

PD-HA3 Other conditions exist which in PD-HU3 Other conditions exist which in the judgment of the the judgment of the ISS/ED warrant ISS/ED warrant declaration of an UNUSUAL EVENT.

declaration of an ALERT.

PD-HU3.1 Other conditions exist which in the judgment of the PD-HA3.1 Other conditions exist which ISS/ED indicate that events are in progress or have in the judgment of the ISS/ED occurred which indicate a potential degradation of the indicate that events are in level of safety of the ISFSI or indicate a security threat progress or have occurred to the ISFSI has been initiated. No releases of which involve an actual or radioactive material requiring offsite response or potential substantial monitoring are expected unless further degradation degradation of the level of occurs.

safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are expected to be limited to small fractions of the EPA Protective Action Guide ex osure levels.

E-HU1 Damage to a loaded canister CONFINEMENT BOUNDARY.

E-HU1 .1 Damage to a loaded Transnuclear canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:

  • 520 mR/hr (gamma) 3 feet from the surface at the top centerline.
  • 190 mR/hr (gamma) 3 feet from the surface of the neutron shield at the mid-height centerline.

E-HU1.2 Damage to a loaded Holtec canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:

  • 60 mR/hr (gamma + neutron) on the top of the closure lid of a WM, measured in accordance with the EAL Technical Basis.
  • 7000 mR/hr (gamma + neutron) on the side of a TRANSFER CASK, measured in accordance with the EAL Technical Basis.

8 Revision 0

IOEP-2 EAL Technical Bases Manual 4.0 EAL TECHNICAL BASES 4.1 PD-HA1 I Initiating Condition:

HOSTILE ACTION within the VBS boundary.

EAL:

PD-HA 1.1. A HOSTILE ACTION is occurring or has occurred within the VBS boundary as reported by the Security Shift Supervisor.

I Basis:

This IC addresses the occurrence of a HOSTILE ACTION within the VBS boundary. This event will require rapid response and assistance due to the possibility of the attack progressing to the ISFSI PROTECTED AREA Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].

As time and conditions allow, these events require a heightened state of readiness by the staff and implementation of onsite protective measures (e.g., evacuation, dispersal or sheltering). The ALERT declaration will also heighten the awareness of Offsite Response Organizations, allowing them to be better prepared should it be necessary to consider further actions.

This IC does not apply to incidents that are accidental events, acts of civil disobedience, or otherwise are not a HOSTl~E ACTION perpetrated by a HOSTILE FORCE. Examples include the crash of a small aircraft, shots from hunters, physical disputes between employees, etc.

Reporting of these types of events is adequately addressed by the requirements of 10 CFR § 73. 71 or 10 CFR § 50.72.

EAL #1 is applicable for any HOSTILE ACTION occurring, or that has occurred, within the VBS boundary.

This includes any action directed against the ISFSI that is located within the VBS boundary.

In some cases, it may not be readily apparent if an aircraft impact within the VBS boundary was intentional (i.e., a HOSTILE ACTION). It is expected, although not certain, that notification by an appropriate Federal agency to the site would clarify this point. In this case, the appropriate federal agency is intended to be NORAD, FBI, FM or NRC. The emergency declaration, including one based on other ICs/EALs, should not be unduly delayed while awaiting notification by a Federal agency.

Additional SONGS Site-Specific Bases Information:

None.

I Basis

Reference:

1. NEI 99-01 Rev 6, PD-HA 1 9 Revision 0

IOEP-2 EAL Technical Bases Manual 4.2 PD-HU1 I Initiating Condition:

Confirmed SECURITY CONDITION or threat.

EALs:

PD-HU1 .1. A SECURITY CONDITION that does not involve a HOSTILE ACTION as reported by the Security Shift Supervisor.

PD-HU1 .2. Notification of a credible securit threat directed at the site.

Basis:

This IC addresses events that pose a threat to station personnel or the spent fuel, and thus represent a potential degradation in the level of station safety. Security events which do not meet one of these EALs are adequately addressed by the requirements of 10 CFR § 73. 71 or 10 CFR § 50. 72. Security events assessed as HOSTILE ACTIONS are classifiable under IC PD-HA1.

Timely and accurate communications between SSS and the ISS is essential for proper classification of a security-related event. Classification of these events will initiate appropriate threat-related notifications to station personnel and Offsite Response Organizations. Security plans and terminology are based on the guidance provided by NEI 03-12, Template for the Security Plan, Training and Qualification Plan, Safeguards Contingency Plan [and Independent Spent Fuel Storage Installation Security Program].

EAL #1 references Security Shift Supervisor because these are the individuals trained to confirm that a security event is occurring or has occurred. Training on security event confirmation and classification is controlled due to the nature of Safeguards and 10 CFR § 2.390 information.

EAL #2 addresses the receipt of a credible security threat. The credibility of the threat is assessed in accordance with Security procedures. Credible security threat includes a HOSTILE ACTION within the SITE BOUNDARY outside of the VBS boundary.

Escalation of the ECL would be via IC PD-HA 1.

Additional SONGS Site-Specific Bases Information:

None.

I Basis

Reference:

1. NEI 99-01 Rev 6, PD-HU1 10 Revision O

IOEP-2 EAL Technical Bases Manual 4.3 PD-HA3 I Initiating Condition:

Other conditions exist which in the judgment of the ISS/ED warrant declaration of an ALERT.

EAL:

PD-HA3.1. Other conditions exist which in the judgment of the ISS/ED indicate that events are in progress or have occurred which involve an actual or potential substantial degradation of the level of safety of the ISFSI or a security event that involves probable life threatening risk to site personnel or damage to ISFSI equipment because of HOSTILE ACTION. Any releases are ex ected to be limited to small fractions of the EPA Protective Action Guide ex osure levels.

Basis:

This IC addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the ISS/ED to fall under the ECL description for an ALERT.

Additional SONGS Site-Specific Bases Information:

None.

I Basis Reference(s):

1. NEI 99-01 Rev 6, PD-HA3
2. EPA-400, Manual of Protective Action Guides and Protective Actions for Nuclear Incidents 11 Revision O

IOEP-2 EAL Technical Bases Manual 4.4 PD-HU3 I Initiating Condition:

Other conditions exist which in the judgment of the ISS/ED warrant declaration of a UE.

EAL:

PD-HU3.1. Other conditions exist which in the judgment of the ISS/ED indicate that events are in progress or have occurred which indicate a potential degradation of the level of safety of the ISFSI or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation occurs.

I Basis:

This IC addresses unanticipated conditions not addressed explicitly elsewhere but that warrant declaration of an emergency because conditions exist which are believed by the ISS/ED to fall under the ECL description for a UE.

Additional SONGS Site-Specific Bases Information:

None.

I Basis

Reference:

1. NEI 99-01 Rev 6, PD-HU3 12 Revision 0

IOEP-2 EAL Technical Bases Manual 4.5 E-HU1 I Initiating Condition:

Damage to a loaded canister CONFINEMENT BOUNDARY.

EAL:

E-HU1 .1. Damage to a loaded Transnuclear canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:

  • 520 mR/hr (gamma) 3 feet from the surface at the top centerline.
  • 190 mR/hr (gamma) 3 feet from the surface of the neutron shield at the midheight centerline.

E-HU1 .2. Damage to a loaded Holtec canister CONFINEMENT BOUNDARY as indicated by dose rates greater than EITHER of the following:

  • 60 mR/hr (gamma + neutron) on the top of the closure lid of a WM. A minimum of four (4) dose rate measurements shall be taken on the top of the WM. These measurements shall be taken approximately 90 degrees apart around the circumference of the lid, approximately 18 inches radially inward from the edge of the lid.
  • 7000 mR/hr (gamma + neutron) on the side of a TRANSFER CASK. A minimum of four (4) dose rate measurements shall be taken on the side of the TRANSFER CASK, approximately at the cask mid-height plane. The measurement locations shall be approximately 90 degrees apart around the circumference of the cask. Dose rates shall be measured between the radial ribs of the water jacket.

I Basis:

This IC addresses an event that results in damage to the CONFINEMENT BOUNDARY of a storage canister containing spent fuel. It applies to irradiated fuel that is licensed for dry storage beginning at the point that the loaded storage canister is sealed. The issues of concern are the creation of a potential or actual release path to the environment, degradation of one or more fuel assemblies due to environmental factors, and configuration changes which could cause challenges in removing the canister or fuel from storage.

The existence of "damage" is determined by radiological survey. The EAL threshold values, which are a technical specification multiple of "2 times", are used here to distinguish between non-emergency and emergency conditions. The emphasis for this classification is the degradation in the level of safety of the spent fuel canister and not the magnitude of the associated dose or dose rate. It is recognized that in the case of extreme damage to a loaded canister, the fact that the "on-contact" dose rate limit is exceeded may be determined based on measurement of a dose rate at some distance from the canister.

Security-related events for ISFSls are covered under ICs PD-HU1 and PD-HA1.

Additional SONGS Site-Specific Bases Information:

SONGS Transnuclear storage canister Technical Specifications are based on values three feet from the top and mid-height surfaces.

13 Revision 0

IOEP-2 EAL Technical Bases Manual I Basis Reference(s):

1. NEI 99-01 Rev 6, E-HU1
2. Certificate of Compliance No. 1029, Appendix A, Technical Specifications for the Advanced NUHOMS System 5.2.4.d
3. Certificate of Compliance No. 1040, Appendix A, Technical Specifications for the Hi-Storm UMAX Canister Storage System 5.3.4 I

I 14 Revision 0