ML13204A304

From kanterella
Jump to navigation Jump to search

Permanent Removal of Fuel from the Reactor Vessel
ML13204A304
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 07/22/2013
From: Peter Dietrich
Southern California Edison Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML13204A304 (2)


Text

SOUTHERN CALIFORNIA Peter T. Dietrich

..... EDISON Senior Vice President & Chief Nuclear Officer An EDISON INTERNATIONAL Company July 22, 2013 10 CFR 50.82(a)(1 )(ii)

U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555

Subject:

Docket No. 50-361 Permanent Removal of Fuel from the Reactor Vessel San Onofre Nuclear Generating Station Unit 2

Reference:

1. Letter from P. T. Dietrich (SCE) to the U. S. Nuclear Regulatory Commission (NRC) dated June 12, 2013 ;

Subject:

Certification of Permanent Cessation of Power Operations San Onofre Nuclear Generating Station, Units 2 and 3

2. Letter from P. T. Dietrich (SCE) to the U. S. Nuclear Regulatory Commission (NRC) dated June 28, 2013;

Subject:

Permanent Removal of Fuel from the Reactor Vessel, San Onofre Nuclear Generating Station Unit 3

Dear Sir or Madam:

Pursuant to 10 CFR 50.82(a)(1 )(i), Southern California Edison (SCE) has certified that it has permanently ceased power operation of San Onofre Nuclear Generating Station (SONGS) Unit 2 and 3 (Reference 1). Pursuant to 10 CFR 50.82(a)(1 )(ii) , Southern California Edison (SCE) hereby certifies that the fuel has been permanently removed from the Unit 2 reactor on July 18, 2013.

SCE understands that, pursuant to 10 CFR 50.82(a)(2), with these certifications SONGS Unit 2 license no longer authorizes operation of the reactor or emplacement or retention of fuel in the reactor vessel. As a result, we also understand that past and future regulations and generic communications directed solely to licensees authorized to operate a nuclear power reactor are no longer applicable to SONGS Unit 2.

SCE has previously certified that the fuel has been permanently removed from the Unit 3 reactor (Reference 2).

There are no new commitments contained in this letter.

P.O. Box 128 San Clemente, CA 92672 (949) 368-6255 PAX 86255 Fax: (949) 368-6183 Pete.Dietrich@sce.com

Document Control Desk July 22, 2013 If you have any questions regarding this matter, please feel free to contact Mr. Mark Morgan , Licensing Lead, at 949-368-6745.

I declare under penalty of perjury that the foregoing is true and correct.

?

Executed on JU\",

, IAI')

[J-/ "),

.....;:;..~-I-~~.,..

( ate)

Sincerely, cc: A. T. Howell III, Regional Administrator, NRC Region IV R. Hall, NRC Project Manager, San Onofre Units 2 and 3 B. Benney, NRC Project Manager, San Onofre Units 2 and 3 G. G. Warnick, NRC Senior Resident Inspector, San Onofre Units 2 and 3