{{#Wiki_filter:ROCHESTER GASANDELECTRICCORPORATION, R.E.GINNANUCLEARPOWERPLANTRevision17to:'ualityAssurance ProgramforStationOperation DOCKETNO.50-244December, 1991'2201070130 5'i1.220PDRADOCK05000244p.PDi~
{{#Wiki_filter:ROCHESTER GAS AND ELECTRIC CORPORATION, R.E. GINNA  NUCLEAR POWER PLANT Revision  17  to:
TABLEOFCONTENTSSectionTitlePacae2.3~4~6.QUALITYASSURANCE PROGRAMFORSTATIONOPERATION QualityAssurance Program.Organization DesignControlProcurement DocumentControl.Instructions, Procedures andDrawingsDocumentControl1013167.ControlofPurchased
Assurance Program
: Material, Equipment andServices188.Identification andControlofMaterials, PartsandComponents ControlofSpecialProcesses 222312.13.14.16.17.18..Inspection.
                                                  'uality for Station Operation DOCKET NO. 50-244 December,   1991
TestControlI'IControlofMeasuring andTestEquipment
'2201070130 5'i1.220 PDR  ADOCK 05000244 p                . PDi~
: Handling, StorageandShippingInspection, TestandOperating StatusNonconforming Materials, PartsandComponents Corrective ActionQualityAssurance RecordsAudits2426282930313334Revision17December1991
~'ISTOFTABLESTableNumberTitle1QualityAssurance ProgramProcedures SubjectL'istingProcurement DocumentRequirements AuditListPacae375152LISTOFFIGURESFiureNumberTitlePacaeI2-12-2I2-3Management Organization 56GinnaStationOrganization 58ElectricTransmission andDistribution 59Organization QualityPerformance Organization 572-52-6Engineering DivisionOrganization GinnaStationReviewandAuditsFunctions 6061Revision17December1991 UALITYASSURANCE PROGRAMFORSTATIONOPERATION ualitAssurance ProramTheQualityAssurance Programhasbeendeveloped bytheRochester GasandElectricCorporation toassuresafeandreliableoperation oftheR.E.Ginna'uclear PowerPlant.Thisprogramappliestoallactivities affecting thesafety'elatedfunctions ofthestructures, systems,andcomponents thatpreventormitigatetheconsequences ofpostulated accidents thatcouldcauseunduerisktothehealthandsafetyofthepublic.Thesequalityaffecting activities includeoperation, maintenance, repair,inservice inspection, procurement, refueling, modification, testandinspection.
Inaddition, theQualityAssurance Programappliestotheactivities associated withthepackaging oflicensedradioactive materials tobeshippedinaccordance with10CFRPart71excluding fabrication anddesignof.shipping casks.ThebasicRochester Gas=andElectricCorporation qualityassurance policyisestablished bytheChairmanoftheBoard,President andChiefExecutive Officer.Thispolicyisimplemented undertheoveralldirection oftheSeniorVicePresident, Production andEngineering, throughtheDepartment Manager,QualityPerformance; VicePresident-GinnaNuclearProduction; thePlantManager-Ginna Station;DivisionManager,Technical Services; andChiefEngineer, andheadsofothersupporting departments.
TheprogramisgovernedbyaGinnaStationQualityAssurance Manualwhichcontainstherequirements andassignment ofresponsibilities forimplementation oftheprogram.Themanualisprepared,
: reviewed, andmaintained byQualityPerformance andapprovedbytheSeniorVicePresident, Production andEngineering.
Theprogramisimplemented throughQualityAssurance/Quality Control,GinnaStation,Engineering, Production DivisionTraining, Materials Engineering andInspection
: Services, ElectricTransmission andDistribution, andPurchasing procedures.
Theseprocedures arepreparedandapprovedbytheresponsible organization andreviewedandconcurred withbyQualityPerformance.
Theprocedures arecontained inseparatemanualsmaintained bytheresponsible organization.
Theseprocedures arereviewedforadequacyatleastonceeverytwoyearsbytheresponsible organization.
Tablel-lprovidesalistingofthesubjectsandashortdescription ofthesubjectmatterwhichiscontained intheprocedures.
Revision17December, 1991 Organizational interfaces aredefinedandcontrolled bysectionsoftheQualityAssurance Manual.Organizational responsibilities aredescribed inSection2.TheQualityAssurance Programcoversallexisting-SeismicCategoryIandClass1Estructures, systems,andcomponents, including theirfoundations andsupports.
Activities affecting thequalityofthesestructures, systems,andcomponents arecontrolled toanextentconsistent withtheirsafetysignificance.
Adetailedlistingofthestructures, systemsandcomponents coveredbytheQualityAssurance ProgramandbasedonSection3.2oftheUpdatedFinalSafetyAnalysisReport,iscontained intheGinnaMasterEquipment Database.
Detailsofthesystemboundaries andthequalityclassi-ficationofwater-and-steam-containing components arecon-tainedonsystemflowdrawings.
Thelistingofstructures, systems,'and components coveredbytheQualityAssurance Programarepreparedandmaintained byNuclearEngineering Services.
Modifications oradditions toexistingstructures, systems,andcomponents aredesignated thesame'eismic classifica-tionastheexistingsystem..Newstructures, systems,andcomponents aredesignated aseismicclassification inaccordance withtheguidelines inUSNRCRegulatory Guide1.29,Revision3.Supervisory personnel areindoctrinated inqualityassurance
: policies, manuals,andprocedures toassuretheyunderstand thatthesearemandatory requirements whichmustbeimple-mentedandenforced.
Personnel responsible forperforming activities affecting quality.aretrainedandindoctrinated intherequirements, purpose,scope,andimplementation ofqualityrelatedmanualsandprocedures.
Refresher sessionsareheldperiodically andretraining isrequiredwheneveranewprocedure isissuedoramajorrevisionismadetoanexistingprocedure.
Trainingofpersonnel notintheQualityPerformance organization istheresponsibility ofeachdepartment performing anactivityaffecting quality.QualityPerformance assistsinestablishing trainingrequirements andassuresthatpersonnel aretrainedbya'uditing training.
Inadditiontotraininginqualityassurance, eachdepart-mentconductstraining, including on-the-job
: training, toRevision17December, 1991


theextentnecessary toassurethatpersonnel arequalified fortheirprimaryworkassignments.
TABLE OF CONTENTS Section                        Title                        Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program
TheVice-President, GinnaNuclearProduction isresponsible fortheformaltraining, qualification, licensing, andre-qualification ofoperators, asnecessary.
: 2.      . Organization 3 ~      Design Control                                      10 4 ~      Procurement Document Control                        13
Wherenecessary, personnel aretrainedinradiation protection, plantsafetyandsecurity.-
          .Instructions, Procedures  and Drawings
TheNuclearSafetyAuditandReviewBoardisrequiredtoreviewthestatusandadequacyoftheQualityAssurance Programatleastonceeverytwoyearstoassurethatitismeaningful andiseffectively complying withcorporate
: 6.       Document  Control                                  16
.policyand10CFR50,AppendixB.Thisreviewconsistsof-auditsorareviewequivalent toanauditperformed bycompanypersonnel oroutsideorganizations.
: 7.       Control of Purchased Material, Equipment            18 and Services
.TheQualityAssurance Programisdesignedtomeettherequirements ofTitle10oftheCodeofFederalRegulations, Part50,AppendixB,"QualityAssurance CriteriaforNuclearPowerPlants."Theprogramconformstothefollowing NRCRegulatory GuidesandANSIStandards:
: 8.       Identification and Control of Materials,           22 Parts and Components Control of Special Processes                        23
a~b.c~NRCRegulatory Guide1.8,Revision1,"Personnel Selec-tionandTraining."
          .Inspection.                                       24 Test Control                        I 26
NRCRegulatory Guide1.28',Revision2,"QualityAssur-anceProgramRequirements (DesignandConstruction)."
                            'I
AECRegulatory Guide1.30,Revision0,"QualityAssurance Requirements fortheInstallation, Inspection, andTestingofInstrumentation andElectricEquipment."
: 12.       Control of Measuring and Test Equipment
d.AECRegulatory Guide1.33,Revision0,"QualityAssurance ProgramRequirements (Operation),"
: 13.       Handling, Storage and Shipping                      28
andregulatory staffcommentsandsupplementary guidancecontained inthedocumententitled"Guidance onQualityAssurance Requirements DuringtheOperations PhaseofNuclearPowerPlants,"Revision0datedOctober1973(OrangeBook-Revision0)e.AECRegulatory Guide1.37,Revision0,"QualityAssurance Requirements forCleaningofFluidSystemsandAssociated Components ofWater-Cooled NuclearPowerPlants."Revision17December, 1991  
: 14.       Inspection, Test and Operating Status              29 Nonconforming Materials, Parts and Components      30
: 16.       Corrective Action                                  31
: 17.       Quality Assurance Records                          33
: 18.       Audits                                              34 Revision  17 December 1991


NRCRegulatory Guide1~38,Revision2,"QualityAssurance Requirements forPackaging,
~
: Shipping, Receiving, Storage,andHandlingofItemsforWater-CooledNuclearPowerPlants."g.NRCRegulatory Guide1.39,Revision2,"Housekeeping Requirements forWater-Cooled NuclearPowerPlants."h.NRCRegulatory Guide1.58,Revision1,"Qualification ofNuclearPowerPlantInspection, Examination andTestingPersonnel."
  'IST Table Number        Title OF TABLES 1
NRCRegulatory Guide1.64,Revision1,"QualityAssurance Requirements fortheDesignofNuclearPowerPlants."NRCRegulatory Guide1.74,Revision0,"QualityAssurance TermsandDefinitions".
Pacae Quality Assurance Program                  37 Procedures Subject L'isting Procurement Document Requirements           51 Audit List                                  52 LIST OF FIGURES Fi ure Number      Title                                Pacae I 2-1          Management  Organization                  56 2-2          Quality Performance Organization          57 I 2-3          Ginna Station Organization                58 Electric Transmission and Distribution    59 Organization 2-5          Engineering Division Organization          60 2-6          Ginna Station Review and Audits            61 Functions Revision  17 December 1991
k..NRCRegulatory Guide1.88,Revision2,"Collection, StorageandMaintenance ofNuclearPowerPlantRecords."
Note:Whenrecordstoragefacilities arenotdesignedinaccordance withtherequirements ofRegulatory Guide1.88,duplicate recordsarekeptintwoseparatestoragelocations inseparatebuildings whicharephysically isolatedfromeachother.moNRCRegulatory Guidel.ll6,RevisionO-R,"QualityAssurance Requirements forInstallation, Inspection, andTestingofMechanical Equipment andSystems."
NRCRegulatory Guide1.123,Revision1,"QualityAssurance Requirements forControlofProcurement ofItemsandServicesforNuclearPowerPlants."n.0~NRCRegulatory Guide1.144,Revision1,"Auditing ofQualityAssurance ProgramsforNuclearPowerPlants"NRCRegulatory Guide1.146,Revision0,"Qualification ofQualityAssurance ProgramAuditPersonnel forNuclearPowerPlants."Revision17December, 1991 2.Oranization Themajororganizations participating intheQualityAssur-anceProgramarePurchasing, Technical
: Services, GinnaNuclearProduction, ElectricTransmission andDistribution, QualityPerformance, thePlantOperations ReviewCommittee, andtheNuclearSafetyAuditandReviewBoard.Figure2-1isanorganizational chartshowingtheseorganizations and'theirrelationship tothecorporate organization.
Positions responsible fortheprincipal elementsofthequalityassurance programare:<ChairmanoftheBoard,President andChiefExecutive OfficerSeniorVicePresident, Production andEngineering VicePresident, Ginna'uclear Production DivisionManager,Technical ServicesandChiefEngineerDepartment Manager,NuclearEngineering ServicesDepartment Manger,QualityPerformance Manager,QualityAssurance Department Manager,Production andEngineering SystemsDepartment ManagerandPurchasing Agent,Materials-Management PlantManager,GinnaStationSuperintendent, GinnaSupportServicesSuperintendent, GinnaProduction Department Manager,Production DivisionTrainingManager,NuclearAssurance Department Superintendent, ElectricSubstations Department Department Superintendent, ElectricLaboratory andTelecommunications Manager,Materials Engineering andInspection ServicesInadditiontotheaboveindividuals, twoadvisorygroupsareutilizedtoreviewandauditplantoperations.
ThesegroupsarethePlantOperations ReviewCommittee andtheNuclearSafetyAuditandReviewBoard.ThePlantOperations ReviewCommittee actsinanadvisorycapacitytothePlantManager,GinnaStationandtheNuclearSafetyAuditandReviewBoardadvisestheSeniorVicePresident, Production andEngineering.
Thequalifications ofmembersandtheresponsibilities of=theseorganizations aredescribed inSection6.0,Technical Specifications, AppendixAtoProvisional Operating LicenseNo.DPR-l8.Revision17December, 1991 TheCha'irman oftheBoard,President andChiefExecutive OfficeroftheRochester GasandElectricCorporat'ion directedtheestablishment oftheQualityAssurance Programandi'ssuedthegoverning policystatement..
Hehasestablished theNuclearSafetyAuditandReviewBoardto'reviewandauditplantoperati;ons.
.TheChairmanoftheNuclearSafetyAuditandReviewBoardis'esponsible totheChairmanoftheBoard,President andChiefExecutive Officeronallactivities oftheNuclearSafetyAuditandReviewBoard.TheSeniorVicePresident, Production andEngineering reportstotheChairmanoftheBoard,President andChiefExecutive Officerandhascorporate responsibility foroperation ofGinnaStationinaccordance withapplicable regulatory requirements.
Inaddition, hehasoverallresponsibility andauthority fordirecting theQualityAssurance Programandshallberesponsible fortheapprovaloftheQualityAssurance Manual.Heisresponsible forestablishing thepoliciesandrequirements necessary toassuresafeandreliableoperation ofGinnaStation.Heisalsoresponsible forthoseitemsdelineated inSection6.0,Technical Specifications.
TheVicePresident, GinnaNuclearProduction isresponsible totheSeniorVicePresident, Production andEngineering fordirecting Ginnanuclearproduction activities andthosesupportactivities'ssociated withNuclearEngineering Services,'roduction SystemsandServices, Production DivisionTraining,'nd Corporate Radiation Protection.
ThePlantManager,GinnaStationisresponsible totheVicePresident, GinnaNuclearProduction fortheoverallon-sitesafeoperation ofGinnaStation.Heisresponsible fortheperformance ofallGinnaStationqualityaffecting activities inaccordance withtherequirements ofthequalityassurance program.Heisresponsible forproviding qualified personnel toperformtheseactivities inaccordance withapproveddrawings, specifications, andprocedures.
Heisalsoresponsible forthoseitemsdelineated inSection6.0,Technical Specifications.
TheSuperintendent, SupportServicesreportstothePlantManager,GinnaStationandisprimarily responsible fortheperformance ofmodification, plantmaintenance, andfire.protection'activities inaccordance withthe'requirements oftheQualityAssurance Program.Revision17December, 1991 TheSuperintendent, GinnaProduction reportstothePlantManager,GinnaStation,andisresponsible foroperations, healthphysicsandchemistry, refueling, resultsandtests,GinnaComputerSystemstechnical engineering, surveillance testingandoperational assessment inaccordance withtherequirements ofthequalityassurance'program.
ThePlantManager,GinnaStationandSuperintendents areassistedbyotherdesignated staffmembers,Figure2;3,'intheimplementation ofcertainQualityAssurance Programrequirements attheplant.Thesestaffmembersareassignedresponsibility fortesting,procurement, storageofmaterialandequipment, operation andteststatuscontrol,calibration andcontrolofmeasuring andtestequipment, maintenance ofmaterialhandlingequipment, andcontrolofallactivities involving operation,'aintenance, repair,~refueling andmodification.
TheDepartment Manager,Production DivisionTrainingisresponsible totheVicePresident, GinnaNuclearProduction formaintaining andimplementing anINPOaccredited trainingprogramand,inconjunction withMaterials Engineering andInspection
: Services, forproviding trainedandqualified welders,riggersandcraneoperators tosupportnuclearrelatedactivities."
TheDepartment Manager,Nuclear,Engineering Servicesisresponsible totheVicePresident, GinnaNuclearProduction fordesigning andconstructing majormodifications inaccordance withapplicable designbases,regulatory requirements, codesandstandards andfornuclearfuelmanagement'.
Asrequested byGinnaStation,heisalsoresponsible forreviewing uniquemaintenance andrepairprocedures formajorequipment.
TheDivisionManager,Technical ServicesandChiefEngineerisresponsible totheSeniorVicePresident, Production andEngineering fordirecting activities insupportofGinnaStation.Theseactivities includelongrangeplanningforlifeextension andlowlevelradwastedisposalstrategies, personnel supportforGinnaStationmaintenance activities, recordsretention, documentcontrol,chemistry andenvironmental requirements support.Inaddition, heprovidessupporttoNuclearEngineering Servicestoassistinadministration andtrainingassociated withprocedure changesandtoprovidecoordination forgenerating responses toauditsandinspections.
Revision17December, 1991 TheDepartment Manager,Production andEngineering Systemsisresponsible totheDivisionManager,,
Technical ServicesandChiefEngineerforproviding recordsmanagement anddocumentcontrolsupportservicesfornuclearrelatedactivities.
TheDepartment ManageryQualityPerformance isresponsible forestablishing theoverallQualityAssurance Program.Heisresponsible forassuringthatallplannedandsystematic
-actionsnecessary toprovideadequateconfidence thatGinnaStationwilloperatesafelyandreliablyareestablished andfollowed.
He'rovides management with'objective information concerning quality,independent oftheindividual orgroupdirectlyresponsible forperforming thespecificactivity.
Hehastheauthority andorganizational freedomtoassureallnecessary qualityactivities areperformed.
Inaddition, heisresponsible forspecialprocesses andthe'nservice inspection program.Heisresponsible for.maintaini'ng astaff,Figure2-2,fortheconductofstafftrainingandfordirecting itsactivities.
Thestaffassistsinthepreparation andmaintenance oftheQualityAssurance Manual.TheManager,QualityAssurance reportstotheDepartment Manager,QualityPerformance.
HeandtheQualityAssurance Staffareresponsible forformulating corporate qualityassurance policyandforassuringitsimplementation.
ThisincludeswritingQualityAssurance
: policies, assuringthattheprogramsatisfies therequirements of10CFR50,AppendixB,andformaintaining thetotalprogramuptodate..TheManager,QualityAssurance isalsoresponsible forestablishing andimplementing acomprehensive auditandsurveillance program,aswellasreviewing administrative procedures oftheorganizations participating intheQualityAssurance Program.Thestaffisalsoresponsible forauditingandsurveillance ofaspectsoftheQualityAssurance Programandforensuringsignificant conditions adversetoqualityarecorrected.
Theyareresponsible forassuringthatpropercodes,standards, andqualityrequirements arespecified indesign,procurement andinstallation documents.
Theyareresponsible forassuringthatthesuppliers ofsafety-related
: material, equipment andservicesareproperlyqualified, andtheyareresponsible forconducting auditsandsurveillances atthesesupplier's facilities.
Inaddition, thestaffassiststheManager,QualityAssurance, inthepreparation oftheauditschedule, auditstatusreportsandapplicable corrective actionreportsummaries.
Revision17December, 1991  


TheManager,QualityAssurance isagraduateengineerwithatleastsixyearsofresponsible experience, ofwhichtwoyearsareinqualityassurance andthreeyearsinthedesignoroperation ofnuclearpowerplants.TheManager,Materials Engineering andInspection Servicesisresponsible forsupervising anddirecting astaffwhichisresponsible forthedevelopment andqualification ofprocedures utilizedforspecialprocesses.
UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit  Assurance Pro ram The  Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation of the R. E. Ginna'uclear Power Plant.
Heisresponsible forproviding functional guidanceanddirection forthosemethods.Heisresponsible forestablishing theInservice Inspection Programandforcoordinating changesthereto.Heisalsoresponsible fortheroutinemaintenance ofliftingand'andling equipment andforthetestingandevaluation ofGinnaStationmaterials.
This program applies to all activities affecting the safety functions of the structures, systems, and components   'elated that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modification, test and inspection. In addition, the Quality Assurance Program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with 10 CFR Part 71 excluding fabrication and design of
TheManager,NuclearAssurance reportstotheDepartment Manager,QualityPerformance andisresponsible forassuringthatstationactivities affecting qualityareprescribed andcarriedoutinaccordance withapproveddrawings, specifica-tions,andprocedures.
  .shipping casks.
HeisamemberofthePlantOperations ReviewCommittee anddelegates thedaytodayqualityassurance andcontrolplanningandworkmonitoring responsibilities tohisstaffofQualityContxolEngineers andQC,Inspectors.
The  basic Rochester Gas= and Electric Corporation quality assurance policy is established by the Chairman of the Board, President and Chief Executive Officer. This policy is implemented under the overall direction of the Senior Vice President,     Production and Engineering, through the Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station; Division Manager, Technical Services; and Chief Engineer, and heads of other supporting departments.
TheQualityControlEngineers areresponsible forthereviewofdesignandinstallation documents andforthereviewofplantprocedures whichinvolvemaintenance, repair,refueling, modification, andtesting.NuclearAssurance isresponsible forthecoordination ofinspection activities andtheassurance thatinspection requirements areincludedinapprovedprocedures-andworkpackages.
The program is governed by a Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program. The manual  is prepared, reviewed, and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.
Thisincludesthereceiptinspection ofincomingmaterials, partsandcomponents andtheprocessing ofnonconformance reports.TheNuclearAssurance QualityControlInspectors alsoperformcompliance orientedsurveillance ofnuclearrelatedactivities.
The program    is implemented through Quality Assurance/Quality Control, Ginna Station, Engineering, Production Division Training, Materials Engineering and Inspection Services, Electric Transmission and Distribution, and Purchasing procedures. These procedures are prepared and approved by the responsible organization and reviewed and concurred with by Quality Performance. The procedures are contained in separate manuals maintained by the responsible organization.
TheDepartment ManagerandPurchasing Agent,Materials Management isresponsible fortheprocurement ofmaterials,
These procedures are reviewed for adequacy at least once every two years by the responsible organization. Table provides a listing of the subjects and a short description l-l of the subject matter which is contained in the procedures.
: services, andcomponents, fromqualified suppliers, inaccordance withapplicable commercial, technical, andqualityrequirements.
Revision  17 December, 1991
He'aintains alistingofqualified suppliers determined throughanevaluation madebyPurchasing, NuclearEngineering
: Services, QualityAssurance andtheotherinvolveddepartments asappropriate.
TheDepartment Superintendent, ElectricLaboratory andTelecommunications isresponsible forproviding astaff,Revision17December, 1991 Figure2-4,toperformroutinemaintenance andtestingservicesforGinnaStationmeters.Heisalsoresponsible forproviding laboratory testingofsomeelectrical equipment anddevices.TheDepartment Superintendent, ElectricSubstations Department isresponsible forproviding astaff,Figure2-4,toperformrelayengineering, maintenance andtestingservices.
Heisalsoresponsible fordesign,modification andconstruction activities atStation13Aandforsupporting theNuclearEngineering Servicesdesignandconstruction activities atGinna.Heisalsoresponsible forcoordinating andforproviding supportdocumentation foranydesignmodifications initiated withintheElectricTransmission andDistribution Division.
3~DesinControlDesignactivities areperformed by,Rochester GasandElectricCorporation personnel oraresubcontracted toorganizations providing servicestoRochester GasandElectric.
NuclearEngineering Servicesisresponsible forthedesignandcontrolofdesignactivities (including designinterfaces) formajormodifications ofstructures, systemsor-components.
Augmenting
.thiseffortisthedesignandtechnical supportprovidedbytheElectricSubstations Department forthesystemsandequipment, forwhichElectricTransmission andDistribution isresponsible formaintaining.
InthisregardtheysupportNuclearEngineering Servicesfordesignofsafetyrelatedmodifications.
GinnaStationisresponsible forthedesignandcontrolofdesignactivities forMinorm'odifications ofstructures, systems,orcomponents.
GinnaStationisalsoresponsible forclassifying stationoriginated modifications aseitherMajororMinor.NuclearEngineering Servicesreviewsandconcurswithmodifications beingclassified asMinor.Minormodifications typically involve(1)component changeswhichinvolvevendordesignandarelimitedtotheextentthatthechangedoesnotimpactexistingperformance requirements,
,(2)additions withinSeismicCategoryIbuildings whichperformnosafetyfunctions andwhichneitherinterface withSeismicCategoryIorClass1Eitemsnorwhosefailurecouldreducethefunctioning ofanysafetyrelatedcomponent Revision17December, 1991 requiredforsafeshutdownoftheplanttoanunacceptable
'evel,(3)changestoasafetyrelatedsystemdetermined not,tobemajor(e.g.,vents,drains,alarms,indicating lights,etc.).Designcontrolisimplemented bymeansofprocedures whichinclude:designconsiderations, designreviewrequirements; internalandexternalinterface controlconsiderations; designdocumentreview,approval,'istribution, control,andrevisionrequirements; andcorrective action.'esigncon-siderations include,asappropriate:
physics,stress,materials, thermal,hydraulic, radiation andaccidentanalyses; appropriate designbases,codes,standards andregulations; acceptability foroperation, maintenance andrepair;acceptance andrejection criteria; andqualitystandards andotherqualityassurance requirements.
Designverification utilizesvariousmethodssuchasformaldesignreviews,alternate calculations, ortests,asappropriate, toassuretheadequacyofthedesign.Thedesignofplantmodifications isverifiedbyanengineerotherthantheonewhoperformed theoriginaldesign.ForMajormodification design,thismaybedonebyNuclearEngineering Servicesdesignengineers orconsulting engineers asrequested.
ForMinormodification stationdesign,thismaybedonebyGinnaStation,NuclearEngineering Servicesdesignengineers orconsulting engineers, asappropriate.
Spareorreplacement partsmustatleastmeettheoriginalequipment's technical andqualityrequirements.
Forplantmodifications,
: standard, "off-the-shelf",
commercial orpre-viouslyapprovedmaterials, parts,andequipment areselectedandreviewedforsuitability ofapplication byadesignengineer.
Changestoamodification designarenormallyreviewedandapprovedinaccordance withthesameprocedures astheoriginalmodification design.Supplemental procedures areestablished forthereviewandapprovaloffieldchanges..Ingeneral,designchangesincluding fieldchanges,arereviewedandapprovedbytheorganizations orindividuals thatperformed, reviewedandapprovedtheoriginaldesign.Wherethis.isnotpractical, otherresponsible designorganizations orindividuals aredesignated, providedtheyhaveaccesstopertinent background information andarecom-petentinthespecificdesignarea.-11-Revision17December, 1991 Designverification andfieldchangesystemsaremethodsut'ilized todetect,documentandcorrectdesignprocesserrorsanddeficiencies.
Inaddition, thecorrective action'ystem, described inSection16,,isutilizedtocontrolanddocumentcorrective actiontoprecluderecurrence ofthosedesignprocesserrorsanddeficiencies whichareconsidered tobeasignificant condition adv'ersetoquality.QualityAssurance isresponsible forassuringthatdesigncontrolprocedures, whethertheworkisdonebyRochester GasandElectricorbyotherorganizations, arepreparedandimplemented andincorporate appropriate designcontrolpractices, checks,=andreviews.Designcontrolprocedures arereviewedtoassurethatanindependent verification isperformed.
Engineering andGinnaStationareresponsible forestablishing measuresforthepropercontrolofdesigndocuments andrevisions there-to, toassurethatdistribution istoresponsible individuals andinatimelymannertopreventinadvertent useofsuperseded designinformation.
Themeasuresincludetheuseofdocumentrevisionlevels,documenttransmittals, releasestamps,fieldchangerequestformsanddistribution lists.Designdocuments arecollected, stored,andmaintained inaccordance withSection6and17,asappropriate.
Design'documents includedes'igncriteria,
: analyses, specifications,
: drawings, designreviewrecords,andchangesthereto.QualityPerformance, throughpreparation assistance and/orreview,assuretheproperinclusion.
ofqualitystandards inthedesignofmajorandminormodifications.
QualityPerformance isalsoresponsible forassuringthatadequatetest,examination andinspection requirements areincludedinspecifications.
TheManager,QualityAssurance reviewsandapprovesanydeviations fromqualitystandards whentheyoccur.Plantmodifications arecontrolled bymeansofapplicable GinnaStation,Engineering, ElectricTransmission andDistribution, Materials Engineering andInspection
: Services, Production DivisionTrainingandQualityAssurance/Quality Controlprocedures.
Theseprocedures provideforthepreparation, review,andapprovalofdesigndocuments, safetyanalyses, andplantmodification procedures.
Plant~Revision17December, 1991 modifications arereviewedbythePlantOperations Review'ommittee andNuclearSafetyAuditandReviewBoardasrequiredbySection6.0,Technical Specifications.
4~Procurement DocumentControlProcurement documentcontrolappliestothecontrolofprocurement documents formaterials, parts,components, andservicesrequiredtoperformqualityaffecting activities.
Suchdocuments maybepreparedbyRochester GasandElectricorbyacontractor andincludepurchaserequisitions, purchaseorders,serviceagreements, contracts, specifications, anddrawings.
Procurement ofmaterials, parts,components, andservicesisinitiated bydepartment staffper'sonnel.
Procurement proce-dures'requirethatorganizations preparing procurement documents considerandinclude,asappropriate, theitemslistedinTable4-l.tProcurement documents, including thoserequesting spareorreplacement parts,initiated atGinnaStationarereviewedbyQualityPerformance andapprovedbythedesignated GinnaStationsupervision.
Procurement documents initiated inNuclearEngineering
: Services, Materials Engineering andInspection
: Services, ElectricTransmission andDistribution andQualityAssurance/Quality ControlarereviewedbyQualityPerformance andapprovedbydesignated departmental
'supervision.
Evidenceofreviewandapprovalofprocurement documents isrecordedonthe.documents andidentifies toPurchasing aprocurement methodwhichwillensurethattheselectedsupplieriscapableofproviding theitemorserviceinaccordance withtherequirements oftheprocurement documents.
Considerations usedinselecting asupplierandfordetermining thecorresponding procurement methodaredescribed inSection7.Afterpurchaserequisitions, serviceagreements, contracts, specifications, and,drawings havereceivedtherequiredre-viewsandapprovals, apurchaseorderisissued'yPurchasing totheselectedsupplierandcontrolled asdescribed inSection7.Thesedocuments aremaintained byPurchasing, bytheoriginating department, and/orbythereceiving locations, asappropriate, untilprocurement iscompleted.
Revision17December, 1991 Under.nocircumstances arepurchasing requirements altered.(exceptforquantityorpricing)during-orderplacement unlessreviewandconcurrence isobtainedfromthosewhowererequiredtoreview,concurwith,andapprovetheoriginaldocuments asdescribed above.Changesorrevisions toprocurement documents aresubjecttothesamereviewandapprovalrequirements astheoriginaldocuments.
Originating department technical reviewofprocurement documents includesverification ofapplicable regulatory, codeanddesignrequirements.
QualityPerformance reviewoftheaboveincludes-checkstoverifyproperinclusion ofthequalitystandards, qualityassurance programrequirements, methodofprocurement andtheapplicable acceptance criteria.
GinnaStationreviewsprocurement documents forspareorreplacement partstodetermine similarity, compati-'ility, andacceptance criteriaoftheoriginaldesign.QualityPerformance alsoreviewsprocurement documents forspareorreplacement partsforadequacyofthequalityrequirements.
Instructions Procedures andDrawinsEachRochester GasandElectriccompanyorganization, involvedinqualityrelatedactivities, isresponsible fordeveloping, reviewing, approving, andimplementing
.procedures asrequiredtoimplement theQualityAssurance Program.Theseprocedures coveractivities suchasdocumentcontrol,trainingofpersonnel, andresponsibilities anddutiesofpersonnel.
QualityPerformance reviewsandconcurswith=these procedures.
Table1-1providesasummaryofthesubjectmattercontained intheprocedures whichareusedtoimplement thequalityassurance program.Procurement documents requiresuppliers andcontractors tohaveappropriate instructions, procedures, specifications, anddrawings.
GinnaStationisresponsible forproviding andimplementing instructions andprocedures associated withoperation, maintenance, repair,in-service inspection, refueling, procurement, modification andtesting.Thisincludesinstructions andprocedures listedinUSAECRegulatory Guide.1.33foradministrative control;generalplantoperation; startup,operation, andshutdownofsafetyrelatedsystems;correction ofabnormal, offnormal,oralarmconditions; responsetoemergencies andothersignificant events;radioactivity control;controlofmeasuring andtestequipment; chemicalandradiochemical Revision17December, 1991 control;andfuelhandlingandrefueling.
GinnaStationisresponsible for-appropriate changestosuchdocuments uponreceiptofregulatory directives; instructions fromRoches-terGasandElectricmanagement, orthecompletion ofplantmodxfzcata.ons.
GonnaStationxsalsoresponsible forthepreparation andissuanceofthoseminormodification designdocuments notprovidedbyNuclearEngineering Servicesortheequipment supplier.
ElectricTransmission andDistribution isresponsible forthepreparation andimplementation ofrelayinspection andtestingprocedures asrequiredtodirectdetailedinspec-tionsandtestingactivities forwhichtheyar'eresponsible.
ElectricTransmission andDistribution alsoassistsinthepreparation ofroutinerelaymaintenance andtestingprocedures usedbytheirpersonnel intheannualGinnaStationprotective relaysurveillance program.NuclearEngineering Servicesisresponsible forproviding approvedspecifications, anddrawingsassociated withmajormodifications andwhenminormodifications necessitate drawingsohspecifications.
Thesedocuments requirethoseperforming theworktoobtain,understand, andcomplywithappropriate procedures, specifications anddrawings.
Engineering hasestablished procedures forrevisingdrawingsandspecifications.
Theseprocedures coverupdatingofas-builtdrawingsafterplantmodifications andtherevision,
: approval, distribution, andcontrolofalldrawingsandspecifications.
QualityPerformance isresponsible forthepreparation andimplementation ofinspection procedures utilizedfordetailedinspection activities forGinnaStation.Thisorganization isresponsible forproviding andforimplementing procedures forauditandsurveillance relatedactiviti'es.
Inaddition, itisresponsible forproviding andforimplementing instructions andprocedures associated withspecialprocesses, routinemaintenance andinspection ofcranesandhandlingequipment aswellasmaterials testingandinservice inspection.
Personspreparing andapproving documents areresponsible forassuringthatspecifications, instructions, procedures, anddrawingsincludeappropriate quantitative orqualitative acceptance criteriafordetermining thatimportant activities havebeensatisfactorily accomplished andassuringthatthedocuments arekeptcurrent.Indoctrination andtrainingofpersonnel isprovidedbythe-15-Revision17December, 1991 responsible organizations toensurethatqualityaffecting activities areconducted inaccordance withestablished documents.
Inaddition, QualityPerformance department surveillance andauditasdescribed inSection10andSection18areusedtoverifythatqualityaffecting activities arebeingperformed inaccordance withapprovedinstructions, procedures anddrawings.
DocumentControlProcedures areestablished tocontroltheissuanceofpro-cedures,instructions,
: drawings, andspecifications.
Standarddocumentcontrolrequirements arecontained intheQualityAssurance Manual.ThePlantManager,GinnaStationisresponsible forthecontrolofalldocuments issuedatGinnaStation.=
'lectricTransmission andDistribution andProduction DivisionTrainingareresponsible forthecontrolofdocuments issuedbytheirrespective organizations.
Production andEngineering Systemscontrolsthedistribution ofcontrolled manualsissuedfortheotherorganizations performing activities whichimplement thisQualityAssurance Program(Table1-1).Eachorganization controlling documents hasaseparateprocedure tocontroldocuments inaccordance withtherequirements oftheQualityAssurance Manual.TheQualityAssurance Manualdesignates responsibilities and'definesrequirements forthepreparation, reviewandapprovalofdocuments.
Eachdepartment responsible foranactivityisresponsible forproviding thenecessary reviewandapprovalofinstructions, procedures ordrawingstoassurethattheyareadequate, andincludeappropriate qualitative andquantitative requirements.
NuclearAssurance Quality'Control representatives, assignedtosupportdepartmental maintenance, repair,refueling andmodification activities, reviewgoverning procedures, priortouse,toassurequalityassurance requirements'are included.
ThePlantOperations ReviewCommittee hastheresponsibility forreviewing GinnaStationprocedures priortotheirapprovalasrequiredbySection6.0,Technical Specifications.
Detailedinspection, testandexamination procedures usedbyqualified personnel requirethereviewandconcurrence oftheresponsible technical personassociated with.thatactivity.
GinnaStation,Engineering, MaterialEngineering andInspection
: Services, Purchasing, Production DivisionTrainingandElectricTransmission andDistribution qualityassurance implementing procedures Revision17December, 1991 (Table1-1)requirethereviewandconcurrence ofQuality'erformance andtheapprovaloftheappropriate department supervisor.
QualityAssurance/Quality Controlprocedures areapprovedbytheDepartment Manager,QualityPerformance ordesignee.
TheQualityAssurance Manualrequiresthatdocuments becontrolled asappropriate, considering thetypeofdocumentinvolved, itsimportance tosafety,andtheintendeduseofthedocument.
Ztspecifies thetypesofdocuments whichmustbecontrolled; identifies thedifference betweencon-trolledanduncontrolled copiesofthesamedocument; includesthemethodforidentifying holdersofcontrolled copies;requiresthatonlycontrolled copiesofadocumentbeusedforofficialpurposes; requiresthatlistsofeffective revisions beissuedperiodically; requireslistsofdocumentholderstobemaintained bythedistributors; andrequiresthatdistributors transmitcontrolled documents usingapprovedformsinternally andexternally.
Typesofdocuments whicharecontrolled includeTechnical Specifications, UFSAR,QualityAssurance Manual,procedures (suchasengineering, purchasing, repair,maintenance, test,calibration, fuelhandling, modification, andadministrative),
specifications anddrawings.
Suppliers ofmaterials, equipment, andservicesarerequiredinprocure-mentdocuments toprovideforcontrolofdocuments, including manufacturing, inspection andtestinginstructions.
TheQualityAssurance Manualfurtherrequiresthateachorganization provideinitsprocedures formeasures:
toassurethatdocuments areavailable whenrequired; topro-perlyreviewandapprovedocuments suchasprocedures, instructions, specifications, ariddrawings; toprovidethesamereviewsandapprovals forchangestodocuments aswasrequiredoftheoriginaldocument; torequirethatorganiza-tionswhichreviewandapprovedocuments haveaccesstopertinent information andadequateknowledge oftheoriginaldocumentintent;toassurethatapprovedchangesarepromptlytransmitted forincorporation intodocuments; andtoassurethatobsoleteorsuperseded documents areeliminated fromthesystemandnotused.QualityPerformance isresponsible forreviewandconcurrence ofprocurement documents forallprocuring Revision17=December, 1991 organizations and,therefore, procurement documentcontrolrequirements.
QualityPerformance isresponsible forreview,inspection, surveillance, andaudit,asappropriate, ofdocumentcontrolsystemstoassureadequatesystemsareimplemented.
ControlofPurchased MaterialEuimentandServicesProcurement documents, supplierselection, planningforitemorserviceacceptance, controlofsupplierperformance andacceptance ofitemsandservicesarefivemajormeansusedincontrolling purchased
: material, equipment andservices.
Allprocurement isconducted inaccordance withprocurement documents asstatedinSection4;Allreviews,inspections, surveillances, andauditsareconducted bypersonnel whoarecompetent inestablishing whetherornotasupplieriscapableofproviding acceptable, qualityproducts.
Procurement planningisutilizedbytheprocuring organiza-tionsfordetermining themethodstobeusedforacceptance oftheitemorserviceaswellasrequirements forthecontrolofthesupplierperformance.
Sourceinspection (surveillance).,
certificate ofconformance, receiptinspec-tionandpostinstallation testaremethodswhichareconsidered foritemacceptance withreceiptinspection utilizedintheacceptance ofallitems.In.lieuofthesemethods,acceptance ofservicesisbased.oneitheroracombination of:(1)surveillance oftheactivityand(2)reviewofobjective evidenceforconformance totheprocure-mentdocumentrequirements (i.e.certifications, stressreportsetc.).Theextentoftheacceptance methodsandas-sociatedverification activities willvaryandbeafunctionoftherelativeimportance andcomplexity ofthepurchased itemorserviceandthesuppliers pastperformance.
Consideration forthecontrolofsupplierperformance includesthenecessity fordocumentsubmittals orsurveillance, andunderwhatsituation thesupplieristoreportnonconformances.
Resultsoftheplanningareincorporated intheprocurement documents.
Selection ofasupplierisbasedontheevaluation ofitscapability toprovidetheitemorservicesinaccordance withtherequirements oftheprocurement documents.
Theevaluation whichisaccomplished duringtheprocurement Revision17December, 1991
: planning, determines thenecessity forthesupplierselection tobefromtheapprovedsuppliers listmaintained byPurchasing.
Purchasing utilizestheapprovedsuppliers listastheselection sourceforthosesuppliers foundtohaveasatisfactory qualityassurance program.Theevaluation guidelines forsourceselection considers the.itemcomplexity, method(s) ofacceptance andforareplacement item,ifthesourceistoberestricted totheoriginalsupplier.
Forengineered andoff-the-shelf itemsprocuredfromsuppliers requiredtohaveaqualityassurance program,supplierselection isfromtheapprovedsuppliers listsoronewhoisintheprocessofbeingaddedtoalist,afterhavingitscapability evaluated topurchaser satisfaction.
Itemsorserviceswhichmeetindustrystandards andaretypically utilizedinapplications otherthannuclearmaybepurchased fromsuppliers notlistedontheapprovedsuppliers listprovidedthatitemacceptance canbebasedonacceptance ofstandardcommercial qualitywhichissupplemented, asnecessary, withsourcesurveillance, pre-orpost-installation tests,receipttests,commercial suppliertestreports,commercial suppliercertificates, orreceiptinspection.
Itemsorserviceswhichhavenuclearqualityrequirements whichnormallyrequirethesuppliertoimplement aqualityassurance programbutforwhichnosuchsuppliercanbepracticably utilizedmayalsobepurchased fromsuppliers notlisted,ontheapprovedsuppliers listprovidedthatverification ofnuclearqualitycanbeaccomplished bymethod'ssuchassourcesurveillance, pre-'rpost-installation tests,receipttests,suppliertestreports,suppliercertificates, orreceiptinspection asapprovedbyQualityAssurance.
Departmental procedures establish guidelines forsourceselection evaluations andfordocumenting theresultsthroughindication ofthecorresponding procurement method.Thepurchaserequisition willalsoidentifythesourcewhenreplacement partsaretobeprocuredfromtheoriginalequipment supplier.
Additionofasuppliertotheapprovedsuppliers listisbasedonsatisfactory evaluation ofthesupplier's capability byQualityAssurance, Purchasing andotherdepartments, asappropriate.
Forengineered items,NuclearEngineering Servicesisresponsible forevaluating theoveralldesignormanufacturing.
capability ofthesupplierincluding hisparticular technical abilitytoproducethedesign,service,item,orcomponent delineated intheprocurement documents.
'19-Revision17December, 1991 Aspartofthisreview,thesuppliersdesigncapabilities, machinery capabilities, handlingcapabilities, testingfacilities, servicecapabilities, andexperience arereviewed.
QualityAssurance i'sresponsible, forevaluating thesupplier's overallqualityassurance organization andprograminaccordance withapplicable codes,standards, applicable partsoflOCFR50AppendixB,andRochester GasandElectricCorporation requirements.
Thereviewincludesconsideration of:companyorganization, qualityassurance personnel qualifications, reviewandcontrolofdesigndocuments, manufacturing procedures, qualityassurance procedures, calibration practices, acceptance
: criteria, requiredqualityassurance records'and theirretention, andqualityassurance requirements andcontrols'mposed bythesupplieronhissubcontractors.
Supplierevaluation isconducted bymeansofprocedures orchecklists whichidentifyapplicable regulatory orcodequalityassurance
.requirements.
GinnaStation,QualityPerformance andElectricTransmission andDistribution evaluatethesuppliers ofinspection, test,andcalibration serviceswhichtheyintendtouse.Thedepartments responsible forperforming supplierevalu-ationsshalldocument'theirresultsinreportswhichdiscussareasinvestigated,
: findings, andconclusions.
Asapplicable, concurrence ofPurchasing, Nuclear'ngineering
: Services, QualityPerformance, GinnaStationandElectric~Transmission andDistribution isrequiredtoplaceasupplieronthequalified suppliers'ist.
Oneorganization canremoveasupplierfromthelistwithoutconcurrence of:theothers.Measuresareestablished byNuclearEngineering ServicesandQualityAssurance tocontrolsupplierperformance forengineered items.Thesemeasurestypically includetheprocessing ofchangeinformation, surveillance ofsupplieractivities andthecontrolofdocuments exchanged withthesupplier.
'naddition, eachdepartment procuring off-the-shelfitemsorservicesestablishes similarmeasuresforthecontrolofsupplierperformance.
Withtheexception ofprocessing changeinformation, theneedforandapplicable extentofpurchaser controlsofthesupplieraredetermined duringprocurement planning. Revision17December, 1991 QualityAssurance isre'sponsible fordetermining anddocumenting thedegreeofsuppliersurveillance (including review,inspection, oraudit)requiredduringdesign,fabrication, inspection, testing,andshipping, andforproviding therequiredsurveillance.
Theobjective ofsuppliersurveillance istoprovideasamplingreviewofthesupplier's qualityassurance programimplementation andofproductconformance withrespecttothepurchaseorderrequirements.
Forcomplexengineered items,Quality.Assurance andNuclearEngineering Servicesareresponsible forjointdevelopment ofsurveillance plansinadvanceofsurveillance tripstoidentifyareastobereviewed.
Theresultsofthesurveillance triparedocumented bymeansofinspection sheetsortripreportswhicharedistributed totheManager,QualityAssurance, andthedepartment whichinitiated theprocurement.
Whenadeviation frompurchaseorderrequirements isnoted,theQualityAssurance represen-tativehastheauthority toinformthevendorthataparticular itemisunacceptable, toissueanonconformance report,ortostopwork,ifnecessary.
QualityPerformance isresponsible for.surveillance ofGinnaStationsitecontractors toassurethattheymeetalltechnical andqualityrequirements.
Thereporting anddocumenting ofcontractor surveillance ismanagedinamannersimilartosuppliersurveillance.
Theverification methodsfortheacceptance ofitemsandservicesarespecified ontheattachedprocurement controlformduringprocurement planningandthepurchaserequisition preparation.
Department supervision isresponsible forreceiving andstoringitemspendingtheiracceptance.
Uponreceipt,thedepartment stockkeeper logstheitem,placesa"hold"tagon'heitem,andnotifiesQualityPerformance thattheitemhasarrived;QualityPerformance isresponsible forreceiptinspection atGinnaStationupondeliveryofitemsandassociated servicesformaintenance, repair,modification, andrefueling.
Thisinspection includestheuseofwrittenprocedures orchecklists toverifythattheitemsandservicesconformtotheprocurement documents (ifthishasnotbeenperformed bysourceinspections) andthatdocumentary evidenceofconformance isavailable attheplantpriortoinstallation oruse.Documentary evidencesufficient toidentifythe-21-Revision17December, 1991 codes,standards orspecifications metbythepurchased
: material, equipment, andservicesisretained.
Inthe'ventafinalsourceinspection for'theacceptance isconducted priortoreceiptbyRG&E,QualityPerformance performsaninspection forshippingdamageorlostpartsanda'ocument checktoassurethattherequireddocumentation hasbeenreviewedandiscomplete.
Areceiving inspection checklist iscompleted forallitemsreceivedtodocumenttheextentoftheinspection performed, including thedocuments checked,andtheinspection results.Iftheitemanddocumentation areadequate, QualityPerformance labelstheitemas"Accepted",
filesthedocumentation andreceiptinspection results,andreleasestheitemforstorageoruse.Iftheitemisnonconforming orthedocumentation isunsatisfactory, QualityPerformance initiates controlsontheiteminaccordance withSection15.Allitemsiss'uedmustbearanacceptance tagandhavedocu-mentation tosupporttheacceptability oftheitem;Intheeventthetraceability islostorthedocumentation reviewisunsatisfactory, theitembecomesnonconforming andmaynotbereleasedforuse.Identification andControlofMaterials PartsandTheidentification andcontrolofmaterials, parts,andcomponents isaccomplished inaccordance withwrittenrequirements andappli.estomaterial, parts,orcomponents in'nystageoffabrication, storage,orinstallation.
Identification andcontrolrequirements areestablished byeitheranexistingprocedure orrequirements documents whicharepreparedduringtheplanningstagesofaproject.Theidentification andcontrolrequirements coveritemssuchas:traceability toassociated documents suchasdrawings, specifications, purchaseorders,manufacturing testdataandinspection documents, andphysicalandchemicalmilltest'eports;specification ofthedegreeofidentification toprecludeadegradation oftheitem'sfunctional capability orquality;andtheproperidentification ofmaterialsg parts,andcomponents priortoreleaseformanufacturing,
: shipping, construction, andinstallation.
NuclearEngineering ServicesandQualityPerformance areresponsible forassuringthatdrawingsandspecifications containappropriate requirements fortheidentification and-22-Revision17December, 1991 controlofmaterials, parts,orcomponents, asappropriate; Suppliers arerequiredtoassurethatallrequireddocumentation foranitemisproperlyidentified andrelatedtotheitem.Eachitemis'equired tobephysically identified, eitherbymarkingontheitemorbytags.Physicalidentification bypurchaseordernumberisusedtothemaximumextentpossibleforrelatingan,itematanytimetoapplicable documentation.
Identification iseitherontheitemorrecordstraceable totheitem.Wherephysicalidentification isimpractical, physicalseparation, procedural control,orotherappropriate meansareemployed.
ThePlantManager,GinnaStationisresponsible formain-tainingidentification andcontrolofmaterials, parts,orcomponents
: received, stored,installed, andusedattheplant.Procedures coveringtheidentification andcontrolofmaterials, parts,andcomponents attheplantareapprovedbythePlantManager,GinnaStation.Theresponsible supervision ofotherdepartments whichreceivematerialwhichistobestoredawayfromthe-plant areresponsible forestablishing procedures foridentification andcontrolandformaintaining identification andcontrolofmaterial, parts,orcomponents, storedorusedintheirareaof.responsibility.
Intheeventthattraceability islostforaspecificitem,itishandledasnonconforming materialanddeviations andwaiversarecontrolled anddocumented inaccordance withSection15.ControlofSecialProcesses Writtenprocedures areestablished tocontrolspecialpro-cesses,suchaswelding,heattreating, andnondestructive examination toassurecompliance withapplicable codes,standards, anddesignspecifications.
Qualification of,personnel andspecialprocessprocedures complieswiththerequirements ofapplicable codesandstandards.
Whenspecialprocessqualification requirements arenotincludedinexistingcodesandstandards, theyaredescribed inprocedures whichgivedetailsofthespecialprocess,thepersonnel qualification requirements, theequipment necessary, andthe.specialprocessqualification requirements.
Initiators ofprocurement activities areresponsible forrequiring suppliers, inprocurement documents, tocontrolspecialprocesses inaccordance withtheaboverequirements. Revision17December, 1991  


QualityPerformance personnel areresponsible forreviewing procurement documents toensurethatrequirements forcontrolofspecialprocesses areincluded.
Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual. Organizational responsibilities are described in Section 2.
Rochester GasandElectricprocedures forspecialprocesses areprepared,
The Quality Assurance Program covers all existing- Seismic Category I and Class 1E structures, systems, and components, including their foundations and supports. Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance. A detailed listing of the structures, systems and components covered by the Quality Assurance Program and based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in the Ginna Master Equipment Database.
: reviewed, andapproved'y Materials Engineering andInspection Services.
Details of the system boundaries and the quality classi-fication of water-and-steam-containing components are con-tained on system flow drawings. The listing of structures, systems,'and components covered by the Quality Assurance Program are prepared and maintained by Nuclear Engineering Services.
Specialprocessprocedures submitted bysuppliers andcontractors arereviewedandconcurred withbyMaterials Engineering andInspection Services.
Modifications or additions to existing structures, systems, and components are designated the same'eismic classifica-tion as the existing system.. New structures, systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.
TheManager,NuclearAssurance andGinnaStationMaintenance Managersareresponsible forassuringthatpersonnel per-formingspecialprocesses undertheircognizance arequali-fiedandareusingqualified procedures inaccordance withapplicable codes,specifications, andstandards.
Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure they understand that these are mandatory requirements which must be imple-activities affecting quality. are trained and for mented and enforced. Personnel responsible      performing indoctrinated in the requirements, purpose, scope, and implementation of quality related manuals and procedures. Refresher sessions are held periodically and retraining is required whenever a new procedure is issued or a major revision is made to an existing procedure. Training of personnel not in the Quality Performance organization is the responsibility of each department performing an activity affecting quality.
WithintheQualityPerformance Department, theManager,Materials Engineering andInspection Servicesisresponsible for'the'ualification ofNDEpersonnel andprocedures.
Quality Performance assists in establishing training requirements and assures that personnel are trained by a'uditing training.
TheManager,Materials Engineering andInspection Servicesisresponsible forthequalification ofweldingprocedures andthetrainingandqualification ofwelders.Recordsforpersonnel andprocedures todemonstrate thatrequiredqualifications havebeenobtainedandkeptcurrentaremaintained byProduction andEngineering Systems.-
In addition to training in quality assurance, each depart-ment conducts training, including on-the-job training, to Revision  17 December, 1991
QualityPerformance performssurveillance, inspections, andauditsofspecialprocesses performed byRochester GasandElectricorcontractors toassureeffective compliance withprocedures.
InsectionProcedures preparedforthecontrolofactivities includeinspection requirements andholdpointsasrequiredbydrawings, instructions, requirements documents, specifi-cations,codes,standards, orregulatory requirements.
Forclarification andtodistinguish frompreventive maintenance inspections, thefollowing controlsareassociated withthequalityassurance functioninspections andreferredtoasverification inspections.
Instructions forconducting detailedverification inspections arecontained ininspection procedures.
Theseinspection procedures andallsupporting specifications anddrawingsareprovidedtoinspection personnel forusepriortoperforming theinspection.
Inspection requirements andholdpointsareutilizedtoverifyconformance ofactivities tothedocumented instructions, specifications, anddrawingsfor-24-Revision17December, 1991 accomplishing theactivity.
Inspection procedures includetheidentification ofqualitycharacteristics tobeinspected, adescription ofthemethodofinspection tobeused,theidentification ofthegroupresponsible forper-formingtheinspection, theacceptance andrejection
: criteria, therequirements fortherecording ofinspection results,andtherequirements forproviding evidenceofcompletion andcertification oftheinspection activity.
Verification inspections areperformed byqualified inspec-tionpersonnel whoareindependent ofthepersonnel performing thework.Outsidecontractors arerequiredbyprocurement documents tohaveandfollowsimilarprocedures andtouseindependent inspectors.
Inspectors aresufficiently trainedtoadequately evaluatetheactivitytheyareinspecting.
QualityPerformance personnel areresponsible forperforming verification inspections, asrequired, during'plant operation, maintenance, repair,in-service inspection, refueling, modification, andtestingwhentheworkisperformed byRochester GasandElectricpersonnel.
Whentheworkisperformed by.outsidecontractors, QualityPerformance isresponsible forsurveillance ofthesubcontractor's inspection activities.
Inspection equipment iscalibrated andcontrolled inaccordance withSection12.Calibration statusisverifiedbyinspection personnel priortoperforming aninspection operation.
Intheeventaninspection ofprocessed materialorproductsisimpossible orimpractical, indirectcontrol,bymonitoring processing methods,equipment, andpersonnel isprovided.
Bothinspection andprocessmonitoring arerequiredwhencontrolisinadequate withoutboth.QualityPerformance isresponsible fortheverifying adequateinclusion ofinspection requirements inspecifications.
TheManager,NuclearAssurance isresponsible forassuringthatadequateinspection requirements andholdpointsareincludedinmaintenance, repair,refueling, modification andtestinginstructions andprocedures.
Heisalsoresponsible fortheassignment ofqualified personnel requiredfortheperformance ofverification inspections andqualitycontrolsurveillances ofqualityaffecting activities.
TheManager,NuclearAssurance isalsoresponsible forassuringthatadequateinspection requirements areincluded-25-Revision17December, 1991  


inprocedures, instructions and/orchecklists controlling maintenance, modification andrepairactivities andrelatedfabrication processes forGinnaStation.Withtheexception ofthatwhichpertainstoPumpandValveTesting,theManager,Materials Engineering andInspection Servicesisresponsible forestablishing therequirements fortheInservice Inspection Program.NuclearEngineering Servicesisresponsible forestablishing therequirements fortheInservice PumpandValveTestingProgram.Theprogramforinservice inspection ofthereactorcoolantsystemandothersafetyrelatedsystemsiscontained inSection4.2,Technical Specifications.
the extent necessary to assure that personnel are qualified for their primary work assignments.
TestControl'Checksortestingperformed toverify'he adequacyofcorrective orpreventive maintenance shallbeperformed toapprovedinstructions, procedures, ordrawings.
The Vice-President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of operators, as necessary. Where necessary, personnel are trained in radiation protection, plant safety and security.-
Whenevertestingisrequiredtodemonstrate thatamaterial, part,component, orsystemwillperformsatisfactorily inservice,atestprogramisinstituted employing writtenandapprovedprocedures whichareinaccordance withbasicrequirements established inTechnical Specifications, draw-ings,instructions, procurement documents, specifications, codes,standards, andregulatory requirements.
The  Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that meaningful and is effectively complying with corporate it.
Thetestprogramrequirestheidentification,'ontrol, anddocumen-tationofalltests,and-thepreparation ofwrittenproce-duresrequiredforsatisfactory accomplishment ofthetesting.Togetherthewrittenprocedures andchecklists forthetestingprograminclude:necessary testequipment andcalibration requirements; materialrequirements; testpersonnel requirements; prerequisite plantandequipment conditions; limitingconditions; detailedperformance instructions forthetestingmethodandtestequipment instrumentation; acceptance andrejection criteria; instruc-ttionsfordisposition ofdeviations; datacollection requirements; andtestresultapproval.
is policy and 10CFR50, Appendix B. This review consists of audits or a review equivalent to an audit performed by company personnel or outside organizations.
ThePlantManager,GinnaStationisresponsible forthestatio'ntestprogram,whichincludesthesurveillance testprogramrequiredbySection4.0,Technical Specifications andtestingassociated withmodifications.
  .The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:
Testprocedures arepreparedbytheplantstaff,reviewedbythePlantOperations ReviewCommittee andQualityPerformance, andapprovedbythePlantManager,GinnaStation.ThePlantManager,GinnaStationisresponsible Revision17December, 1991 forthecorrectandtimely'performance oftherequiredtestsutilizing writtenandapprovedprocedures.
a ~  NRC Regulatory Guide 1.8, Revision 1, "Personnel Selec-tion  and Training."
Whencontractors areemployedfortests,thecontractor isrequiredtoperformtestinginaccordance with.itsqualityassurance programrequirements.
: b. NRC  Regulatory Guide 1.28', Revision 2, "Quality Assur-ance Program Requirements (Design and Construction)."
Alltestresultsarerequiredtobedocumented,
c ~  AEC  Regulatory Guide 1.30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment."
: reviewed, andapprovedbythoseresponsible forperforming thetest.Whenrequested byGinnaStation,ElectricTransmission andDistribution performstestactivities todetermine thecauseofprotective relaymalfunctions.
: d. AEC Regulatory Guide 1.33, Revision 0, "Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants," Revision 0 dated October 1973 (Orange Book  Revision 0)
Thesetestactivities areperformed inaccordance withapprovedprocedures byqualified personnel..
: e. AEC Regulatory Guide 1.37, Revision 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants."
NuclearEngineering ServicesandQualityPerformance areresponsible forassuringthatrequiredtestsformajormodifications areincludedinspecifications.
Revision  17 December, 1991
NuclearEngineering ServicesandElectricTransmission andDistribution assistance inthepreparation ofmodification-relatedtestprocedures maybeprovidedtotheGinnaStationstaff.TheGinnaStationTechnical Managerisresponsible fortheadequateinclusion oftestrequirements inminormodification designdocuments andforreviewing modification-related testresultsforacceptability todesignrequirements.
Reviewsofminormodification designbyQualityPerformance verifiesadequateinclusion oftestrequi'rements.
ControlofMeasurinandTestEuimentThecalibration andcontrolsystemformeasuring andtestequipment includescalibration procedures, establishment ofcalibration frequencies, andmaintenance andcontrolrequirements ofmeasuring andtestinstruments, tools,gauges,shopstandards, andnondestructive testequipment whicharetobeusedinthemeasurement, inspection, andmonitoring ofcomponents, systems,andstructures.
Calibra-tionprocedures includestep-by-step methodsforcalibration andrequirements forinstrument accuracy.
Calibration frequency isbasedonrequiredaccuracy, degreeofusage,stability characteristics, manufacturer's recommendations, experience, andotherconditions affecting measurement capability.
Controlofmeasuring andtestequipment requires:
arecallsystemassuringtimelycalibration ofequipment; asystemproviding uniqueidentification ofequipment, traceability tocalibration testdata,andidentification ofthenext-27-Revision17December, 1991  


calibration dateontheequipment; asystemproviding trace-abilityof=shopstandards tonationally recognized standards (wherenationalstandards donotexist,procedures containinstructions todocumentthebasisforcalibration) andperiodicrevalidation ofshopstandards; asystemproviding forrecordstobemaintained whichindicatethecompletestatusofallitems,underthecalibration systemincluding themaintenance, calibration results,abnormalities, andlastandfuturecalibration dates;andasystemcontrolling thepurchaserequirements ofnewequipment tobeenteredintothecalibration andcontrolsystemincluding require-mentsforaccuracy, stability, andrepeatability undernormaluseconditions.
NRC  Regulatory Guide 1 38, Revision 2, "Quality
Intheeventameasuring instrument (i.e.shoporfieldstandard) isfoundoutofcalibration, aninvestigation isconducted, todetermine thevalidityofpreviousmeasurements.
                              ~
ThePlantManager,GinnaStationisresponsible fortheprocedures andprogramrequiredtoassurecontrolandcali-brationofmeasuring andtestequipment atGinna"Stationinaccordance withtheaboverequirements.
Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants."
Instruments specified inSection4.l,Technical Specifications, areincludedintheprogram.Tools,gauges,andinstruments necessary formaintenance, inspection, andtestarecali-bratedandcontrolled inaccordance withstationprocedures.
: g. NRC  Regulatory Guide 1.39, Revision 2, "Housekeeping Requirements  for Water-Cooled Nuclear Power Plants."
Measuring, testorinspection equipment usedbyNuclearAssurance QualityControlisincludedintheprogram.TheManager,Materials Engineering andInspection Servicesand,Department Superintendent, Electrical Laboratory andTelecommunicati'ons areresponsible forestablishing aprogramandthepreparation ofprocedures forthecontrolandcalibration ofmeasuring andtestequipment usedbytheirrespective organizations.
: h. NRC  Regulatory Guide 1.58, Revision 1, "Qualification of Nuclear  Power Plant Inspection, Examination and Testing Personnel."
HandlinStoraeandShiinGinnaStationSupervision isresponsible fordeveloping andimplementing procedures forthehandling, storage,shipping, preservation, andcleaningofmaterialandequipment delivered toorlocatedatGinnaStation.ElectricTransmission andDistribution, andMaterials Engineering andInspection Servicesareresponsible forpreparing andimplementing procedures forthehandling, storage,shipping, preservation, and.cleaning ofmaterialandequipment delivered toorlocatedintheirworkareas.Inaddition, theManager,Materials Engineering andInspection Servicesisresponsible forpreparing andimplementing procedures fortheroutinemaintenance andinspection ofliftingand-28-Revision17December, 1991 handlingequipment.
NRC Regulatory Guide 1.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants."
Undernormalcircumstances, manufac-turer'sspecificwritteninstructions andrecomme'ndations andpurchasespecification requirements areinvokedforcleanliness, preservation, specialha'ndling, andstoragewithrespecttoenvironmental requirements.
NRC Regulatory Guide 1.74, Revision 0, "Quality Assurance Terms and Definitions".
Intheabsenceof,orinadditionto,specificmanufacturer requirements, themanagement mayinvokeadditional requirements in'accordance withdepartment procedures.
: k.  . NRC  Regulatory Guide 1.88, Revision 2, "Collection, Storage and Maintenance of Nuclear Power Plant Records."
The,Department Manager,NuclearEngineering Servicesisresponsible forspecifying inprocurement documents andinengineering specifications thatwrittenprocedures beused,asappropriate, forthehandling,
Note:      When  record storage facilities are not designed in accordance with the requirements of Regulatory Guide 1.88, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.
: shipping, storage,clean-ing,andpreservation ofmaterials andequipment procuredformajormodifications.
NRC Regulatory Guide  l.ll6, Revision O-R, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems."
These.procedures arepreparedbycontractors, bythestationstaff,orbystaffmembersof.ElectricTransmission andDistribution asappropriate.
mo    NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants."
Rochester GasandElectricprocedures arereviewedandapprovedasdescribed inSection6.Inthepreparation ofprocurement documents, department procedures, andcontractor procedures, consideration ofhandling,
: n. NRC  Regulatory Guide 1.144, Revision 1, "Auditing of Quality Assurance Programs for Nuclear    Power Plants" 0 ~  NRC  Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants."
: shipping, storage,cleanliness, andpreservation isgiventoallmaterialandequipment throughout variousstages'of manufacturing andinstallation priortooperational acceptance.
Revision  17 December, 1991
PQualityPerformance isresponsible forreviewofengineering speci'fications toassurethatproperhandling, storing,andshippingrequirements havebeenspecified.
: 2. Or  anization The major organizations participating in the Quality Assur-ance Program are Purchasing, Technical Services, Ginna Nuclear Production, Electric Transmission and Distribution, Quality Performance, the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board. Figure 2-1 is an organizational chart showing these organizations and
QualityPerformance isresponsible forexamination ofhandling, storage,andshippingactivities bysuppliers, Rochester GasandElectricpersonnel, andcontractors.
    'their relationship to the corporate    organization.
Insection'estand0eratinStatusEquipment orsystemsnotreadyfornormalserviceare'clearlyidentified byuseoftags,controllogs,andothersuitablemeanstoindicatethestatusinapositivemanner.Theidentification issufficient topositively indicatethestatusoftheparticular equipment orsystembeingisolated.
Positions responsible for the principal elements of the quality assurance  program are:
The.PlantManager,GinnaStationisresponsible forindicat-ingthestatusofoperating equipment orsystemstoberemovedfromserviceformaintenance, repair,ormodifica-tioninaccordance withtheapprovedElectricSystemOperating Rules.ThePlantManagerdesignates personnel whohavestationholdingauthority. Revision17December, 1991 Personnel whohavestationholdingauthority areresponsible fordirecting thestatuschangeofequipment andsystemsinaccordance withtheapprovedstationholdingprocedures.
Chairman  of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna'uclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services Department Manger, Quality Performance Manager, Quality Assurance Department Manager, Production and Engineering Systems Department Manager and Purchasing Agent, Materials-Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production
Systemstatusisindicated throughtheuseofholdtags,blocktagsandcorresponding controllogs.Equipment orsysteminspection andteststatusareindicated byuseoftesttags,.labels,orworkinspection andteststatussheets.Writtenprocedures controltheuseofholdtags,testtags,andlabels.ISystems,components,"
<          Department Manager, Production Division Training Manager, Nuclear Assurance Department Superintendent, Electric Substations Department Department Superintendent, Electric Laboratory and Telecommunications Manager,   Materials Engineering and Inspection Services In addition to the above individuals, two advisory groups are utilized to review and audit plant operations. These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board. The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering. The qualifications of members and the responsibilities of=these organizations are described in Section 6.0, Technical Specifications, Appendix A to Provisional Operating License No. DPR-l8.
andequipment whicharefoundtobeunacceptable duringoraftertestingareclearlyidentified.
Revision  17 December, 1991
Fuelhandlingoperations involving fuelassemblies orotherradioactive sourcesareidentified and,controlled bytheuseoftags,stamps,orothersuitablemeans.Maintenance, repair,ormodification ofcomponents, systems,orstructures utilizesprocedures, travelers, datasheets,instructions orchecklists toindicatestatusofthework,inspections ortestsandcorresponding acceptance orrejec-tionforaparticular component, system,orstructure.
Thesejobcontrolformsarepreparedbythejobsupervisor andreviewedbyNuclearAssurance QualityControlpersonnel andmaintained atadesignated controllocationtoindicatethestatusandthecompletion ofrequiredinspections andtests.QualityPerformance monitorsthestatuschangeofGinnaStationactivities fortheirimplementation ofapprovedprocedures andassuresthatinspection resultsareproperlydocumented.
MaterialEngineering andInspection Servicesestablishes theprocedures forimplementing theinspection, statussheetsutilizedduringinservice inspection.
Nonconformin Materials PartsandComonentsProcedures areestablished forthecontrol,evaluation anddisposition ofdeficient
: material, parts,andcomponents.
Materials, parts,orcomponents whichdonotconformtothedrawingorspecification requirements areidentified andreported.
RG&Epersonnel areresponsible forinitiating nonconformance reportsandinitiating dispositions.
NuclearAssurance QualityControlpersonnel areresponsible forinspecting andapproving closeoutofnonconformance reports.-30-Revision17December, 1991 Priortoinstallation oruse,nonconforming itemsgenerally remaininaholdareauntilanapproveddisposition hasbeenimplemented.
Nonconforming itemsmaybereleasedforinstallation tomeetcriticalfabrication schedules providedcontrolsareestablished to'revent inadvertent usepriortoimplementing thenonconformance-,disposition.
Afterinstallation oruse,nonconforming items.areidentified andcontrolled untilapproveddisposition hasbeenimplemented.
Nonconformances identified atasupplier's facilityandreportedtoRG6E,whichhavesupplierrecommended dispositions ofuse-as-is, orrepair,arenormallyprocessed bythedepartment originating theprocurement.
Organizations whichspecifytherequirement beingdispositioned areresponsible forreviewing andapproving thesupplierrecommended disposition.
Itemsarerepairedandreworkedinaccordance withapprovedprocedures andcurrentdrawings.
Therepairorreworkmustbeverifiedasacceptable byaninspection oftheaffecteditemorprocesswhichisatleastequaltotheoriginalinspection method.Itemswhichareaccepted"use-as-is" arefullydocumented withthedrawingorspecification requirement andtechnical justification foracceptance.
Allsuchitemsareapprovedpriortousebythecognizant organization havingresponsi-bilityfortherequirement.
Inaddition, those"use-as-is" nonconformances whichalsodeviatefromaDesignCriteriarequirement shallrequireadditional approvaloftheSeniorVicePresident, Production andEngineering.
NuclearAssurance QualityControlpersonnel providenonconformance statusinformation periodically.
QualityPerformance andotherorganizations analyzenonconformance r'eportdataforadverse'trendsandprocessperiodicreportstomanagement.
Adversetrendsformabasisforsupplierre-.,evaluation orforothercorrective action.16.Corrective ActionSignificant conditions adversetoqualitysuchasfailures, malfunctions, deficiencies, deviations, defective materialandequipment, andnonconformances arereportedanddocumented.
Significant conditions adversetoqualityincludeconditions affecting safety,conditions whichcouldresultinplantshutdown, highmaintenance items,andoperating procedure deficiencies.
Onceidentified, the-31-Revision17December, 1991  


condition, thecauseofthecondition, andthecorrective actiontakenshallbedocumented.
The Cha'irman of the Board, President and Chief Executive Officer of the Rochester  Gas and Electric Corporat'ion directed the establishment of the Quality Assurance Program and i'ssued the governing policy statement.. He has established the Nuclear Safety Audit and Review Board to
Significant conditions adversetoqualitymaybeidentified byanyonenotingthecondition andreportedtoGinnaStation'forreviewand,ifappropriate, theinitiation ofanappropriate corrective actionreport.Whenasignificant condition adversetoqualityatGinnaStationisidentified, QualityPerformance,evaluates theeffectofcontinuing theactivity.
'review and audit plant operati;ons. . The Chairman of the Nuclear Safety Audit and Review Board is'esponsible to the Chairman of the Board, President and Chief Executive Officer on all activities of the Nuclear Safety Audit and Review Board.
Ifcontinuing theactivitywouldobscureorpreclude-identification andcorrection ofthedeficiency, continuing theactivitywouldincreasetheextentofthedeficiency orleadtoanunsafecondition, stopworkactionistaken.QualityPerformance Supervision hasauthority tostopworkon,maintenance, repair,inservice inspection, refueling, modification, testingorinspection deficiencies atGinnaStation,aswellasotherlocations.
The  Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements. In addition, he has overall responsibility and authority for directing the Quality Assurance Program and shall be responsible for the approval of the Quality Assurance Manual. He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station. He is also responsible for those items delineated in Section 6.0, Technical Specifications.
QualityPerformance mayrecommend stopworkactiontothePlantManager,GinnaStationonoperating deficiencies.
The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing Ginna nuclear production activities and those support activities'ssociated with Nuclear Engineering Services,'roduction Systems and Services, Production Division Training,'nd Corporate Radiation Protection.
TheManager,QualityAssurance hastheauthority tostopworkforconditions identified inPurchasing, NuclearEngine'ering
The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the overall on-site safe operation of Ginna Station. He is responsible for the performance of all Ginna Station quality affecting activities in accordance with the requirements of the quality assurance program. He is responsible for providing qualified personnel to perform these activities in accordance with approved drawings, specifications, and procedures. He is also responsible for those items delineated in Section 6.0, Technical Specifications.
: Services, Materials Engineering andInspection
The Superintendent, Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of modification, plant maintenance, and fire.
: Services, ElectricTransmission andDistribution orcognizant suppl'ier associations.
protection'activities in accordance with the'requirements of the Quality Assurance Program.
ThePlantOperations ReviewCommittee reviewsallCorrective ActionReportsinitiated atGinnaStationandmayrecommend additional corrective actioniftheactiondoesnotresultinadequateresolution.
Revision  17 December,   1991
Corrective actionreportcommittees ofaff'ected RG&Emanagement, reviewinitiated reportstodetermine causeandtodevelopacorrective actionplans,resolvetheidentified concernandtoprecluderecurrence.
Conditions adversetoqualitywhichinvolvedesigndefi-cienciesorarecommended corrective actionwhichinvolvesadesignchangearereviewedbyGinnaStationorEngineering asapplicable.
Thecognizant organization determines thecauseofthecondition andrecommends corrective actiontoprecluderepetition.
QualityAssurance reviewsallcorrective actionreportstoassurethatthecauseofthecondition hasbeendetermined andthatcorrective actionhasbeentakentoprecluderepe-tition.-32-Revision17December, 1991  


Corrective actionsummaryreportsaresubmitted todepartmental supervision tokeepthemawareofsignificant
The  Superintendent,   Ginna Production reports to the Plant Manager, Ginna  Station,   and is responsible for operations, health physics and chemistry, refueling, results and tests, Ginna Computer Systems technical engineering, surveillance testing and operational assessment in accordance with the requirements of the quality assurance'program.
~conditions adversetoquality,relatedcausesandcorrective actionbeingtaken.SeniorManagement isadvisedofthecausesandactionsofthemoresignificant Corrective ActionReports.17.ualitAssurance RecordsQualityAssurance isresponsible forestablishing thebasicrequirements forqualityassurance recordretention andmaintenance.
The  Plant Manager, Ginna Station and Superintendents are assisted by other designated staff members, Figure 2;3, 'in the implementation of certain Quality Assurance Program requirements at the plant. These staff members are assigned responsibility for testing, procurement, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, maintenance of material handling equipment, and control of all activities involving operation,'aintenance, repair,         ~
Production andEngineering Systems,asdirectedbytheDivisionManager,Technical ServicesandChiefEngineer, isresponsible fortheretention andmaintenance ofrecords.QualityPerformance, Purchasing, ResearchandScience,andElectricTransmission andDistribution departments areresponsible forassuringthemaintenance andretention ofrecordswhichtheyoriginate.
refueling and modification.
Thismaybeaccomplished eitherbyretaining therecordsintheirdepartment, orbyforwarding.
The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an INPO accredited training program and, in conjunction with Materials Engineering and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related activities."
themtotheappropriate Production andEngineering Systemsrecordretention locations.
The Department Manager,     Nuclear, Engineering Services is responsible to the Vice President, Ginna Nuclear Production for designing and constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management'. As requested by Ginna Station, he is also responsible for reviewing unique maintenance and repair procedures  for major  equipment.
Eachorganization retaining recordsisresponsible for'preparation, review,app'roval, andimplementation ofspecificqualityassurance recordprocedures fortheirareasofresponsibility inaccordance
The  Division Manager, Technical Services      and Chief Engineer is responsible to the Senior Vice President, Production         and Engineering for directing activities in support of Ginna Station. These activities include long range planning for life extension and low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention, document control, chemistry and environmental requirements support. In addition, he provides support to Nuclear Engineering Services to assist in administration and training associated with procedure changes and to provide coordination for generating responses to audits and inspections.
'withtheserequirements.
Revision  17 December, 1991
Therecordswhichfallwithinqualityassurance recordrequirements includethoserecordsrequiredbySection6.10oftheTechnical Specifications andtheQualityAssurance Program.Allrecordsassociated withtheoperation, maintenance, repair,inservice inspection, refueling, modification, inspection andtestingofstructures, systems,andcomponents covered-bythequalityassurance programareincluded.
Records,initiated atGinnaStationincludeoperating logs;theresultsofinspections, tests,andthemonitoring ofplantactivities;
: drawings, procurement documents andmaterialanalyses; calibration procedures andreports;andNonconformance andCorrective ActionReports.Recordsofthequalification ofpersonnel, procedures, andequipment forspecialprocesses andtheresultsofreviewsaremaintained attheappropriate Production andEngineering, Systemsrecordretention location.
Inspection andtestrecordscontainadescription ofthetypeoftestorinspection
: activity, evidenceofcompletion oftheactivity, results,thenameoftheinspector ordata-33-Revision17December, 1991
: recorder, theacceptance orrejection oftheactivity, andarecordofanynonconformances.
Therequirements andresponsibilities forrecordaccessibility and,transmittal aredescribed intheQualityAssurance Manualsectionsasappropriate.
Requirements,and responsibilities forpreparation, inspection, identification, review,storage,retrieval, maintenance, andtheretention'f qualityassurance recordsareinaccordance withapplicable qualityassurance recordprocedures, codes,standards, andprocurement documents.
~Recordsareavailable toauthorized personnel.
-Removalofrecordsfromstorageisdocumented andaccountability ismaintained by,theresponsible recordcontrolactivity.
Recordsareeitherstoredinrecordstoragefacilities whicharedesignedtopreventdestruction ofrecordsduetofire,flooding, theft,anddeterioration bytemperature orhumidityconditions; or,duplicate recordsarekeptintwoseparatestoragelocations inseparatebuildings whicharephysically isolatedfromeachother.Recordkeepingprocedures provideforreceiving, classifying,
: indexing, labeling, andpreparing recordsforstorage.Theprocedures establish retention requirements, accessibility, controlofobsoleterecorddestruction, andcontrolforissuanceandreturnofallrecords.Production andEngineering Systemsisresponsible formaintaining plantoperating recordsasrequiredinSection6.10,Technical Specifications.
Production andEngineering Systemsisalsoresponsible formaintaining off-siteprepareddesignrecords,suchasspecifications,
: drawings, designreviewreports,anddesigncontroldocumentationI qualityassurance records,suchasauditreportsandsurveillance reports;purchasing records,suchassupplierqualifications, bidevaluations, andpurchaseorders.AuditsCompliance withallaspectsoftheQualityAssurance Programandtheeffectiveness oftheprogramisdetermined byauditsandsurveillances ofallorganizations performing qualityaffecting activities.
QualityAssurance isresponsible for-34-Revision17December, 1991 conducting auditsofthoseorganizations andactivities involvedinthequalityassurance programonaplanned,periodicbasis.Auditintervals arebasedonthestatusandsafetyimportance ofactivities beingperformed, aswellasgroupperformance.
andrelatedmanagement concerns.
Table18-1isalistoftheactivities tobeexaminedbyauditineachoftheaudits.Frequencies arebased.onthelevelofactivityineacharea.Auditschedules areestab-lishedtoassurethateachoftheactivities areauditedatthefrequency specified inSection6.0.Technical Speci-fications.
Additional auditsorsurveillances areconducted asrequiredbyspecialconditions, circumstances ortoaddressmanagement concerns.
Eachaudit.requires thedevelopment ofanauditplantoprovideinformation abouttheaudit;suchasthefunctional areastobeaudited,thenames,ofthosewhowillperform,theaudit,thescheduling arrangements, andthemethodofreporting findingsandrecommendations.
Auditplanningandperformance utilizeperformance basedtechniques thatwillfacilitate effectivenes's assessments aswellascompliance verification.
Theauditsareperformed inaccor'dance withwrittenprocedures orchecklists byappropriately trainedpersonnel nothavingdirectresponsibilities intheareasbeingaudited.Audit,resultsaredocumented andreportedtothesupervisor'nd divisionheadhavingresponsibility intheareaauditedandtheNuclearSafetyAuditandReviewBoard.Withinaspecified periodoftime,thepersonhavingsupervisory responsibi'lity intheareaauditedisrequiredtoreviewtheauditresults,takenecessary actiontocorrectthe"deficiencies identified bytheaudit,anddocumentandreportthe'orrective action.QualityAssurance isresponsible fordeveloping auditplansandauditchecklists, designating and,training auditpersonnel, andconducting audits.Auditsmaybeconducted byQualityAssurance engineers orotherqualified personnel, suchastechnical specialists fromothercompanydepartments andoutsideconsultants.
Auditsofmajorcontractors, subcontractors, andsuppliers areconducted duringtheearlystagesofdesignandprocure-ment,asrequired, toevaluatetheirqualityassurance Revision17December, 1991 pxogramforcompliance withallaspectsoftheprocurement documents.
Auditsareconducted, asrequired, toassurethatmajorcontractors, subcontractors, andsuppliers areauditingtheirsuppliers'uality assurance programsinaccordance withprocurement documents.
Duringtheadditional auditsareperformed, asrequired, toassureallqualityassurance programrequirements areproperlyimple-mentedinaccordance withprocurement documents.
QualityPerformance performsregularanalysesofauditandQualityAssurance surveillance resultstoevaluatequalitytrends.Resultsoftheseanalysesareprovidedtomanagement fortheirregularreview.-36-Revision17December, 1991  


Table1-1QualityAssurance ProgramProcedures SubjectListingAppendixBCriteriaualitAssurance ualitControlProcedures Indoctrination ofQualityAssurance/Quality ControlandSupervisory Personnel Management ReviewoftheQualityAssurance ProgramPeriodicReviewofQualityAssurance/Quality ControlProcedures TrainingofQualityAssurance/Quality ControlPersonnel QualityAssurance/Qu'ality ControlGroupOrganization andResponsibilities QualityAssurance ReviewofRochester GasandElectricDesignCriteriaQualityAssurance ReviewofRochester GasandElectricEngineering Specifications QualityAssurance ReviewofArchitect/Engineer's DesignDocuments
The Department Manager,  Production and Engineering Systems is responsible to the Division Manager,, Technical Services and Chief Engineer for providing records management and document control support services for nuclear related activities.
~~~~~~~~~~Preparation, ReviewandApprovalofComputerSoftwareProduction Evaluations IIX.XIXRequisitioning QualityAssurance/Quality ControlServicesXVQualityReviewofRochester GasandElectricProcurement Documents IVPreparation, ReviewandApprovalofRochester GasandElectricQ.A.Specifications Preparation, ReviewandApprovalofGinnaStationQualityAssurance ManualPreparation,,
The Department Managery Quality Performance is responsible for establishing the overall Quality Assurance Program. He is responsible for assuring that all planned and systematic
ReviewandApprovalofQualityAssurance/Quality ControlProcedures Preparation, ReviewandApprovaloftheQualityControlgroupVerification Inspection ProgramProcedures Revision17December, 1991  
-actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed. He'rovides management with 'objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.
He has the authority and organizational freedom to assure all necessary quality activities are performed. In addition, he is responsible for special processes and the
'nservice inspection program. He is responsible for.
maintaini'ng a staff, Figure 2-2, for the conduct of staff training and for directing its activities. The staff assists in the preparation  and maintenance of the Quality Assurance Manual.
The Manager, Quality Assurance reports to the Department Manager, Quality Performance. He and the Quality Assurance Staff are responsible  for formulating corporate quality assurance policy and  for assuring its implementation. This includes writing Quality Assurance policies, assuring that the program satisfies the requirements of 10CFR50, Appendix B, and for maintaining the total program up to date.. The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program. The staff is also responsible for auditing and surveillance of aspects of the Quality Assurance Program and for ensuring significant conditions adverse to quality are corrected. They are responsible for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents. They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified, and they are responsible for conducting audits and surveillances at these supplier's facilities. In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule, audit status reports and applicable corrective action report summaries.
Revision  17 December, 1991


Table1-1(cont'd)ualitAssurance ualitControlProcedures AppendixBCriteria=
The Manager,   Quality Assurance is a graduate engineer with at least six years of responsible experience, of which two years are in quality assurance and three years in the design or operation of nuclear power plants.
ReviewofDepartmental Procedures Preparation, ReviewandApprovalofProcedure Deviation RequestsbyQualityAssurance/Quality ControlEvaluation
The Manager, Materials Engineering and Inspection Services is responsible for supervising and directing a staff which is responsible for the development and qualification of procedures utilized for special processes. He is responsible for providing functional guidance and direction for those methods. He is responsible for establishing the Inservice Inspection Program and for coordinating changes thereto. He is also responsible for the routine maintenance of lifting and'andling equipment and for the testing and evaluation of Ginna Station materials.
'ofSuppliers byQualityAssurance SupplierSurveillance ControlofSupplierPerformance QualityAssurance Evaluation ofBids!Conducting Commercial GradeSupplierSurveysDocumentDeficiency ReportsInspection andSurveillance Activities Qualification ofSurveillance andInspection Personnel QualityAssurance ReviewofNonconformance ReportsPreparation, ReviewandProcessing ofCorrective ActionReportsbyQualityAssurance VI'.VIIVIIVIIVIIVIIQualification ofAuditingPersonnel AuditScheduling andPlanningPerformance ofQualityAssurance AuditsReporting andFollow-Up ofAudit.FindingsConductofQualityAssurance DuringandinFollow-Up ofUSNRCandManagement AuditsResponsetoAuditsandSurveillances Qualifications ofSurveillance Personnel XVIIIXVIIIXVIIIXVIIIXVIIIXVIIIXVIII-38-Revision17December, 1991 Table1-1(cont'd)ualitAssurance ualitControlProcedures AppendixBCriteria,QualityPerformance Surveillance ProgramXVIIIQualification ofCommercial GradeSupplierSurveyPersonnel XVIII-39-Revision17December, 1991  
The Manager, Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifica-tions, and procedures. He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance and control planning and work monitoring responsibilities to his staff of Quality Contxol Engineers and QC,Inspectors. The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing. Nuclear Assurance is responsible for the coordination of inspection activities and the assurance that inspection requirements are included in approved procedures-and work packages. This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports. The Nuclear Assurance Quality Control Inspectors also perform compliance oriented surveillance of nuclear related activities.
The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements. He'aintains a listing of qualified suppliers determined through an evaluation made by Purchasing, Nuclear Engineering Services, Quality Assurance and  the other involved departments as appropriate.
The Department Superintendent, Electric Laboratory and Telecommunications is responsible for providing a staff, Revision  17 December, 1991


Table1-1(cont'd)Materials EnineerinInsectionServicesAppendixBCriteriaIndoctrination andTrainingMaterials Engineering andInspection ServicesOrganization andResponsibilities Preparation, ReviewandApprovalofPurchaseRequisitions andRelatedProcurement Documents QualityMaterials Engineering andInspection ServicesProcedures IVQualityMaterials'ngineering andInspection ServicesProcedure Deviation RequestPreparation, ReviewandApprovalofMaterialHandlingEquipment Instructions ControlandDistribution ofDocuments Regulating SafetyRelatedActivities
Figure 2-4, to perform routine maintenance and testing services for Ginna Station meters. He is also responsible for providing laboratory testing of some electrical equipment and devices.
~~~~~\ReceiptandAcceptance ofPurchased Materials Preparation, ReviewandApprovalofSupplierEvaluation VIVIIVIIWeldingProcedure Preparation ReviewandApprovalWeldingProcedure Qualification HeatTreatingProcedures WelderQualification andCurrencyNondestructive Examination Procedures Nondestructive Examination Procedures ManualNondestructive Examination Personnel Qualification Inservice Inspection ProgramandPlansIX~IXIXIXIXIXIXX-40-Revision17December, 1991 0
The Department  Superintendent, Electric Substations Department  is responsible for providing a staff, Figure 2-4, to perform relay engineering, maintenance and testing services. He is also responsible for design, modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna. He is also responsible for coordinating and for providing support documentation for any design modifications initiated within the Electric Transmission and Distribution Division.
Table1-1(cont'd)Materials EnineerinandInsectionServicesAppendixBCriteriaIncorporating, GinnaModificat'ions intoInservice Inspection ProgramXTestControlXITestPersonnel Qualifications XICalibration andControlofNondestructive Examination Instruments
3 ~  Desi n Control Design  activities  are performed by, Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.
,XIIInspection andMaintenance ofMaterialHandlingEquipment XIIIOverheadandGantryCranesInspection andMaintenance ofPortableLiftingandHandlingEquipment Underhung Cranes,JibCranesandMonorailSystemsSlingsand-Related Apparatus Classification andTrainingofMaterialHandlingEquipment Personnel MobileHydraulic CranesInspection andMaintenance ofJacksForkliftLoadingForksXIIIXIIIXIIIXIII.XIIIXIIIXIIIXIIITrainingandQualification-ofCraneOperators LiftingDevicesintheContainment VesselControlandDisposition ofNonconforming
Nuclear Engineering Services is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or- components.
: Material, PartsandComponents Corrective ActionatMaterials Engineering andInspection ServicesQualityMaterials Engineering andInspection ServicesRecordsXIIIXIIIXVIXVII-41-Revision17December, 1991 GinnaProcedures Table1-1(cont'd)AppendixBCriteriaMaterials Engineering andInspection ServicesResponsetoInternalAuditsGinnaQualityAssurance ProgramImplementation, TrainingofGinnaPersonnel GinnaAdministrative andEngineering StaffResponsibilities GinnaModification ProjectOrganization PlantOperations ReviewCommittee Operating Procedure ControlofStationModification XVIIIStationModification Installation Acceptance andCompletion Preparation, ReviewandApprovalofDesignDocuments Preparation, ReviewandApprovalofMinorModification SafetyAnalysisControlofProcurement Documents forPurchased Materials, Parts,Components andServicesRequisition ServicesfromGeneralMaintenance IVIVPlantProcedures Plant-Procedure ControlandDistribution ControlofEngineering Documents VIVIVendorManualControlReceiptandAcceptance ofPurchased Materials SupplierQualification Technical Evaluation ControlofPurchased ServicesControlofAcceptedMaterial, PartsandComponents VIVIIVIIVII'III-42-Revision17December, 1991 GinnaProcedures Table1-1(cont'd)AppendixBCriteriaIdentification andMarkingofMaterialControlofWelding,HeatTreatingandNondestructive Examination VIIIIXWeldingEquipment Performance Verification Nondestructive Examination IXIXPreventive Maintenance ProgramsforElectrical, Mechanical andValvesInservice Inspection.
Augmenting .this effort is the design and technical support provided by the Electric Substations Department for the systems and equipment, for which Electric Transmission and Distribution is responsible for maintaining. In this regard they support Nuclear Engineering Services for design of safety related modifications.
Environmentally Qualified Equipment Maintenance ProgramX,XIVXPerformance ofTestsQualification ofTestPersonnel XIXITest,StatusControl~~Calibration andControlofMeasuring andTestEquipmentg Installed PlantInstruments andEquipment Maintenance andInspection ofMaterialHandlingEquipment ControlofMaterialHandlingandHandlingEquipment StorageandPreservation ofMaterials ControlofHeavyLoadsatGinnaElectricSystemOperating RulesBypassofSafetyFunctionorJumper'Control ControlofTemporary Modifications ControlandDisposition ofNonconforming Materials IssueofNonconformance ReportsXIVXIIXIIIXIIIXIIIXIIIXIVXIVXIVRevision17-.December, 1991 GinnaProcedures Table1-1(cont'd)AppendixBCriteriaConditions AdversetoQuality)WorkControlSystemGinnaRecordsXVIIRecordStorageFacilityandEquipment IMaintenance and.History ProgramGinnaStationResponsetoInternalAuditsXVIIXVIIXVIIIRevision17December, 1991 Table1-1(cont'd)EnineerinProcedures AppendixBCriteriaIndoctrination andTrainingEngineering Department Organization andResponsibilities Preparation, ReviewandApprovalofDesignInputDocuments Preparation, ReviewandApprovalofDesignAnalysesPreparation, ReviewandApprovalofEngineering'rawings IIIPreparati'on, ReviewandApprovalofSpecifications.
Ginna Station is responsible for the design and control of design activities for Minor m'odifications of structures, systems, or components. Ginna Station is also responsible for classifying station originated modifications as either Major or Minor. Nuclear Engineering Services reviews and concurs with modifications being classified as Minor. Minor modifications typically involve (1) component changes which involve vendor design and are limited to the extent that the change does not impact existing performance requirements,
DesignVerification Preparation, ReviewandApprovalofSafetyAnalysesReviewandApprovalofArchitect EngineerorConsultant DesignDocuments Preparation, ReviewandApprovalofFieldChangeRequestsPurchaseRequisition Engineering Procedures Engineering Procedure Deviation RequestDistribution andControlo'fDocuments bytheControlNumberMethodIVVXControlofDocuments bytheListofCurrentRevisions MethodVXDistribution ofDocuments bytheListofCorrespondence Procedures Receipt,ControlandDistribution ofDrawingsandApertureCardsSupplierEvaluation VIVXVXI-45-Revision17December, 1991 Table1-1(cont'd)EnineerinProcedures AppendixBCriteriaPreparation, RevievandApprovalofBidRequests, BidEvaluations andRecommendations forAvardVXIEngineering RevievofNonconforming Materials, PartsorComponents Initiating andResponding toCorrective ActionReportsRecordsEngineering ResponsetoAuditsXVIXXVIII-46-Revision17December, 1991 Table1-1(cont'd)Purchasin Procedures AppendixBCriteriaPeriodicReviewofPurchasing Procedures Indoctrination andTrainingofPurchasing Personnel Purchasing Department Organization andResponsibilities Preparation, Review,ApprovalandIssuanceofPurchaseOrdersandChangestoPurchaseOrdersRequestsforBidsandBidEvaluation Purchasing Procedures Purchasing Procedure Deviation RequestSupplierEvaluation Establishment andMaintenance ofQualified Suppliers ListSupplier, Nonconformance ReportProcessing Purchasing Department ResponsetoCorrective ActionReportsandCorrective ActionReporting Purchasing RecordsPurchasing ResponsetoAuditsIVIVVIIVIIXVIXVIIXVIII-47-Revision17December, 1991 Table1-1(cont'd)AppendixBProduction DivisionTraininProcedures CriteriaTheProduction DivisionTrainingProcedures Manualiscurrently underdevelopment.
    ,(2) additions within Seismic Category I buildings which perform no safety functions and which neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component Revision  17 December, 1991
Intheinterimtheyareusing.appropriate GinnaStationProcedures.
TheGinnaStationProcedures willbereplacedbyProduction DivisionTrainingProcedures astheseprocedures areapprovedandissued.QAProgramsectionsapplyingtoProduction DivisionTrainingare1~2~5g6/8~13'6~17'8'48-Revision17December, 1991 Table1-1(cont'd)ElectricTransmission Procedures andDistribution AppendixBProcedures CriteriaQualityAssurance ProgramImplementation forIElectricTransmission andDistribution Department TrainingofElectricTransmission andDistribution Personnel ElectricTransmission andDistribution Organization Design/Modification Activities ControlControlofProcurement Documents forPurchased Parts,Components andServicesPreparation, Review,andApprovalofElectricTransmission andDistribution andLaboratory Procedures VControlofElectricTransmission andDistribution Procedures, Schedules andTestFormBooksSupplierQualification Technical Evaluation ReceiptandAcceptance ofInstrumentation andStandards Equipment IUVI..VIIVIIControlofPurchased ServicesforElectricMeterandLabVIIIdentification andControlofMaterials, PartsandComponents Performance ofTestsatGinnaStationPerformance ofTestsattheElectrical Laboratory Qualification ofTestPersonnel VIIIXIXIXICalibration andControloftestInstruments XII.Handling, StorageandShippingIInspection andTestStatusatElectricMeterandLaboratory XIIIXIV-49-Revision17December, 1991  


Table1-1(cont'd)ElectricTransmission andDistribution Procedures AppendixBCriteriaControlandDisposition ofNonconforming PartsandComponents Initiating andProcessing ofCorrective ActionReportsControlofQualityAssurance RecordsResponsetoAuditsXVXVIIXVIII-50-Revision17December, 1991  
required for safe shutdown of the plant to an unacceptable (3) changes to a safety related system determined not 'evel,
,to be major (e.g., vents, drains, alarms, indicating lights, etc.).
Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval,'istribution, control, and revision requirements; and corrective action. 'esign con-siderations include, as appropriate: physics, stress, materials, thermal, hydraulic, radiation and accident analyses; appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; and quality standards and other quality assurance requirements. Design verification utilizes various methods such as formal design reviews, alternate calculations, or tests, as appropriate, to assure the adequacy of the design.
The design of plant modifications is verified by an engineer other than the one who performed the original design. For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested. For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers or consulting engineers, as appropriate.
Spare or replacement parts must at least meet the original equipment's technical and quality requirements. For plant modifications, standard, "off-the-shelf", commercial or pre-viously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.
Changes to a modification design are normally reviewed and approved in accordance with the same procedures as the original modification design. Supplemental procedures are established for the review and approval of field changes.
.In general, design changes including field changes, are reviewed and approved by the organizations or individuals that performed, reviewed and approved the original design.
Where this. is not practical, other responsible design organizations or individuals are designated, provided they have access to pertinent background information and are com-petent in the specific design area.
Revision  17 December, 1991


TABLE4-1Procurement DocumentReuirements Itemstobeconsidered forinclusion inprocurement documents include:1.ScoeofWork-Detailedstatement oftheworktobeperformed.
Design verification and field change systems are methods ut'ilized to detect, document and correct  design process errors and deficiencies. In addition, the corrective described in Section 16,, is utilized to control and action'ystem, document corrective action to preclude recurrence of those design process errors and deficiencies which are considered to be a significant condition adv'erse to quality.
2~"Technical Reuirements
Quality Assurance is responsible for assuring that design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices,  checks,= and reviews. Design control procedures are reviewed to assure that an independent verification is performed.
-byreference tospecificdrawings, specifications, codes,regulations, procedures orinstructions, including revisions, thatdescribetheitemsorservicestobefurnished.
Engineering and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions there-to, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information. The measures include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.
Alsoidentified.
Design documents are collected, stored, and maintained in accordance with Section 6 and 17, as appropriate.        Design
shallbetest,inspection andacceptance requirements, andanyspecialrequirements forsuchactivities asdesigning, identification, fabrication,
'documents include des'ign criteria, analyses, specifications, drawings, design review records, and changes thereto.
: cleaning, erecting, packaging,
Quality Performance, through preparation assistance and/or review, assure the proper inclusion. of quality standards in the design of major and minor modifications. Quality Performance is also responsible for assuring that adequate test, examination and inspection requirements are included in specifications. The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.
: handling, shipping, extendedstorageandshelflife.ualitAssurance ProramReuirements
Plant modifications are controlled by means of applicable Ginna Station, Engineering, Electric Transmission and Distribution, Materials Engineering and Inspection Services, Production Division Training and Quality Assurance/Quality Control procedures. These procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures. Plant                  ~
-whichrequirethesuppliertohaveadocumented qualityassurance programthatimplements portionsorallof10CFR50AppendixBaswellasapplicable qualityassurance programrequirements ofothernationally recognized codesandstandards.
Revision    17 December,  1991
Alsoincludedshallbetherequirement thatthesupplierincorporate appropriate qualityassurance programrequirements insubtierprocurement documents.
 
RihtofAccess-toincludethefacilities andrecordsofthesupplier.
modifications are reviewed by the Plant Operations and Nuclear Safety Audit and Review Board  Review'ommittee as required by Section 6.0, Technical Specifications.
forsourceinspection andauditbythePurchaser orpartiesdesignated bythepurchaser.
4 ~  Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.
Alsoincludedshallbeprovisions fortheidentification ofwitnessandholdpointsandtheminimumtimeofadvancenotice.*5.Documentation Reuirements
Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase orders, service agreements, contracts, specifications, and drawings.
-Submittal approvalandretention requirements fordocuments suchasqualityassurance manuals,specialprocessandtestprocedures, materials records,calculations andanalyses.
Procurement of materials, parts, components, and services is initiated by department staff per'sonnel. Procurement proce-dures 'require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-l.
*6.Nonconformance
Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision. Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Electric Transmission and Distribution t     and Quality Assurance/Quality Control are reviewed by Quality Performance and approved by designated departmental
-Requirements forreporting anddisposition ofnonconformance toprocurement requirements.
      'supervision.
I'-ItemsreviewedbyQualityAssurance orQualityControl.-51-Revision17December, 1991 0
Evidence of review and approval of procurement documents is recorded on the .documents and identifies to Purchasing a procurement method which will ensure that the selected supplier is capable of providing the item or service in accordance with the requirements of the procurement documents. Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.
Table18-1AuditListAuditTitleCorrective ActionAuditToicAreasCorrective Actionassociated withdeficiencies occurring infacility, equipment, structures, systemsormethods.ofoperation.
After purchase requisitions, service agreements, contracts, specifications, and,drawings have received the required re-views and approvals, a purchase order is issued'y Purchasing to the selected supplier and controlled as described in Section 7. These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.
Operational Assessment Nonconformance Control*OutageActivities Refueling andSpecialNuclearMaterialISIImplementation ISTProgramandImplementation Surveillance TestandLCOsMaintenance Modification Installation SafetySecurityRadiation Protection andALARA*HealthPhysics,Chemistry and~~Radwaste*FireandSafetyrRadwasteShippingandProcessControlProgramandimplementing procedures Radioactive Effluents andOffsiteDoseCalculation Manualandimplementing procedures Radiation Protection andALARAHP/Chemistry Measuring andTextEquipment Chemistry ProgramRadiological Environmental Monitoring ProgramFireProtection Programandimplementing procedures FireProtection andLossPrevention Program-52-Revision17December, 1991 AuditTitleTable18-1(con't)AuditListAuditToicAreasInstructions, Procedures, and,DocumentControlIndependent Inspecti'ons andAuditsFireSystemsFireSurveillance FireBrigadeTrainingFireBrigadeEquipment SafetyProgramHousekeeping DrawingControlVendorManualControlProcedure ControlRecordsControlSecurity*Operations SecurityPlanandImplementing procedures GuardTrainingandQualification FitnessforDutyProgramLimitingConditions forOperation Surveillance TestingOperatorPerformance Operations Administration PORCActivities NSARBActivities Materials Engineering andInspection
Revision                  17 December,                 1991
'Services ISXProgramNDEQualifications WeldingQualifications MHEProgramMiscellaneous QAControls*Maintenance andTestingPreventive Maintenance ProgramPlanningandScheduling WorkOrderImplementation Post-Maintenance TestingWorkOrderCloseoutandEquipment HistoryControlofMeasuring andTestEquipment Revision17December, 1991 AuditTitleTable18-1(con't)AuditListAuditToicAreasTechnical Specification Surveillance NuclearEmergency ResponsePlanTraining/performance and.qualifications oftheoperating andtechnical staffNuclearEmergency ResponsePlanandProcedures OffsiteAgencyInterface ResponsePersonnel TrainingEmergency Information PlanLicensedOperatorAuxiliary OperatorChemistry Technician Maintenance Radiation Protection Technician ResultsandTestTechnician
 
-QCInspector ShiftTechnical AdvisorTechnical StaffandManagersEngineering Department TrainingGeneralEmployeeTrainingProcurement Configuration ControlProcurement Evaluations Procurement DocumentControlControlofPurchased ItemsandServicesHandling, Storage,andShippingHazardous MaterialControlPr'ogramMajorModification DesignMinorModification DesignInstallation PlanningControlofAs-BuiltConfiguration Licensing Activities Temporary Modifications Revision17December, 1991 AuditTitleTable18-1(con't)AuditToicAreasElectricTransmission andDistribution ElectricMaterandLaboratory ElectricSubstations
Under. no circumstances    are purchasing requirements altered.
*Notedauditswillalsoaddressrelevantactivities toverify'onformance offacilityoperation toallprovisions contained inTechnical Specifications andapplicable licenseconditions. Revision17December, 1991 I
(except for quantity or pricing) during- order placement unless review and concurrence is obtained from those who were required to review, concur with, and approve the original documents as described above. Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.
R.E.GINNANUCLEARPOWERPLANTMANAGEMENT ORGANIZATION CHARTLINESOFSUPKRVISIOM ANDASllNISTRATION LINESOf'OJddJNICATIOM CHAIRNANOFTHEBOARD,PRESIDENT ANDCHIEFEXECUTIVE OFFICERSENIORVICEPRESIDENT CASdELEC'fRIC DISTRIBUTION ANDCUSTOMERSERVICESSENIORVICEPRESIDENT PRODUCTION dENGINEERING SOIIORVICEPRESIDENT>
Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements.      Quality Performance review of the above includes- checks to verify proper inclusion of the quality standards, quality assurance program requirements, method of procurement and the applicable acceptance criteria. Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, and acceptance criteria of the original design.     compati-'ility, Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.
CONTROLLER dCHIEFFINANCIAL OFFICERVICEPRESIDENT KJPLOYEERELATIONS, PUBLICAFFAIRSANDMATERIALWNAGIKNTVICEPRESIDENT CINMANUCLEARPRODUCTION VICEPRESIDENT
Instructions      Procedures    and Drawin s Each Rochester    Gas and Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing          .
~SECRETARY AJCTREASURER DKPARTITANtMANAGERANDPI%CHASING AGENTMATERIALS WMAGKJKNT DIVISIONWJIAGERELECTRICTRANSMISSION dDISTRIBUTION OEPARtEENT MANAGEROJALITYPERFORMANCE DIVISIONHANACERTECHNICAL SERVICESANOCHIEFENGINEER~~~IC~~DEPARAKNt MANAGERRISKWNAGEJM:Nt DIRECtOROFSECURITYDEPARTJKNT SXKRINTENOENT ELECTRICLABJJCTELE-COJ4ANJICATIONSDEPARTIKNT QUEERINTENDENT ELKCTRICQSSTATTONSDIVISIONIlANAGKR~DUALITYASSURANCE MANAGERMATERIALS ENGINEERING dINSPECTION SERVICESDEPARTJCITT MANAGERRESEARCHdSCIKNCEDEPARTIKNT IlANAGERPRODUCTION dENGINEERING SYSTEMSDEPARTlCNT WJJACERNUCLEAREIJGINEERINCSERVICESDEPARllCNT MANAGERPROJNM:TIONDIVISIONTRAININGnWW~..~PORCCINMAS'fATfONUQftfftf04ftfV.fffO'.ftf0'LOLKJPROCJWOKNTSERVICESEWLOYEKRELATIONS
procedures as required to implement the Quality Assurance Program. These procedures    cover  activities  such as document control, training of personnel, and responsibilities and duties of personnel. Quality Performance reviews and concurs with=these procedures.         Table 1-1 provides a summary of the subject matter contained in the procedures which are used to implement the quality assurance program.
%TERCAI.IBRATIONdMAINTENANCE AJNKLECTRICLABSERVICKSDESIGN.TECH5&PNT,ROTATINGKOUIPSKNT HAINTKNANCK
Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.
~RELAYTESTdCONSTRUC'f IONSERVICESMATERIALS KNGIJlECRINC,NOE,ISIdldlKINSPSERVICESMANAGERNUCLEARASSJJRANCE QUALITYCONTROLANDDUALITYENGINKRINCSERVICESDUALITYASSURANCE PROC&#xc3;KJKNT, AIRJITdQNJVEILLANCKSERVICESKNVIROSCNTJL SCIENCEdLABORATORY CHEMISTRY
Ginna  Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modification and testing. This includes instructions and procedures listed in USAEC Regulatory Guide. 1.33 for administrative control; general plant operation; startup, operation, and shutdown of safety related systems; correction of abnormal, off normal, or alarm conditions; response to emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical Revision    17 December,              1991
: SERVICES, RESEARCHdDEVKLOPJKNT SUPERVISOR
 
~PRO%ETWNAGDEMTSERVICESDUALITYSERVICES, PRJLMCTWMAGGKNTSERVICES.
control; and fuel handling and refueling. Ginna Station is responsible for -appropriate changes to such documents upon receipt of regulatory directives; instructions from Roches-ter Gas and Electric management, or the completion of plant modxfzcata.ons. Gonna Station xs also responsible for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.
AINJIN.SERV.,BUDGETdCOSTRECORDSHAMACEJKMT, TECNICALINFORMATION CENTER.CHIS.IMFORllATION
Electric Transmission and Distribution is responsible for the preparation and implementation of relay inspection and testing procedures as required to direct detailed inspec-tions and testing activities for which they ar'e responsible.
: SERVICES, DIVISIONSYSTDlSDEPARTMENT SUPERINTENDENT GENERALHAINTEMANCK FIELDdSHOPFABRICATION SERVICESDESIGN,CONSTRUCTION, LICDJSINC,FlKLAMAAGKJENT dTECHNICAL SUPPORtSKRVICESTRAININGSERVICESDIRECTORCORPORATE RADIATION PROTECTION CORPORATE WC.THPHYSICSAJNINUCLEARDKRGKNCYPLANNINGSTATIONOPERATIONS.
Electric Transmission and Distribution also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.
MAINTENANCE, HPdCJMMSTRYCONTROL,TECHNICAL IVOR(,TESTING,MATERIALCONTROL,PROCUREJENT, LIASONENCINEERINC,FIREPROTEC'tIOJI aSAFETY.OPERATIONAL ASSESQKNT, COINERSYSTEMSSKKRVISORNUCLEARSECURITYSECIWITYSERVICESFigure2-1 QUALITYPERFORMANCE ORGANIZATION DEPARTMENT MANAGERQUALITYPERFORMANCE IIMANAGERQUALITYASSURANCE MANAGERNUCLEARASSURANCE MANAGERMATERIALS ENGINEERIHG CIIHSPECTIOH SERVICESSENIORANALYSTQUALITYPERFORMANCE ANALYSESAHDPROGRAMSUPPORTamIDID04IDI~5DImr.ID0IQUALITYASSURANCE ENGINEERS STAFFQUALITYCONTROLENGINEERS QUALITYCONTROLFOREMANTECHNICIANS
Nuclear Engineering Services is responsible for providing approved specifications, and drawings associated with major modifications and when minor modifications necessitate drawings oh specifications. These documents require those performing the work to obtain, understand, and comply with appropriate procedures, specifications and drawings.
&INSPECTORS MATERIAL5MATERIALHAHDLINGENGINEERS 5FOREMENSTAFFSTAFFFigure2-2 GINNANUCLEARPRODUCTION ORGANIZATION VICEPRESIDENT GINNANUCLEARPRODUCTIOH PLANTMANAGERGINNASTATIONDEPARTMENT MANAGERPRODUCTION DIVISIONTRAININGDEPARTMENT MANAGERNUCLEARENGINEERING SERVICESUQIDID0(6v.IVl(0IDIRECTORCORPORATE RADIATION PROTECTION CORPORATE HEALTHPHYSICSNUCLEAREMERGENCY PLANNINGSUPERINTENDENT GINHAPRODUCTION OPERATIONS*
Engineering has established procedures for revising drawings and specifications. These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.
HEALTHPHYSICS8CHEMISTRY TECHNICAL ENGINEERING~
Quality Performance is responsible for the preparation and implementation of inspection procedures utilized for detailed inspection activities for Ginna Station. This organization is responsible for providing and for implementing procedures for audit and surveillance related activiti'es. In addition,  it is responsible for providing and for implementing instructions and procedures associated with special processes, routine maintenance and inspection of cranes and handling equipment as well as materials testing and inservice inspection.
OPERATIONAL ASSESSMENT COMPUTERSYSTEMSCORRECTIVE ACTIONSAFETYOUTAGEPLANNIHGMATERIALS
Persons preparing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.
&PROCUREMENT 0SUPERINTENDENT GINNASUPPORTSERVICESMECHANICAL MAINTENANCE ELECTRICAL ANDl&CMAINTENAHCE MAINTENANCE PLANNING&SCHEDULIHG FIREPROTECTION MOOIFICATIONSUPPORT*HNEHRCSAVERAGETEMPERATURE
Indoctrination and training of personnel is provided by the Revision  17 December,  1991
>200FANSTAANDCOHTROLROOMFOREMANAREADDED'OTHEREQUIREDCOHTROLROOMSHIFTCOMPLEMENT INITIALLICENSEDOPERATOROPERATORREQUALAUXOPERATORSTAINITIALSTAREQUALCHEMISTRY TECHRADPROTECTIOH TECHNICIAN
 
: COHTRACT, RADIATIONTECHELECTRICAL MAINT.MECHANICAL MAINT.I&CTECHNICIAN R&TTECHNICIAN TECHSTAFFAHDMANAGERSTRAININGCOURSESDESIGHCONSTRUCTION LICENSIKG FUELMANAGEMENT TECHHICALSUPPORTSERVICES
responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents. In addition, Quality Performance department surveillance and audit as described in Section 10 and Section 18 are used to verify that quality affecting activities are being performed in accordance with approved instructions, procedures  and drawings.
: ELECTRIC, TRANSMISSION ANDDISTRIBUTION DIVISIONDIVISIOHHAHAGERELECTRICTRANSHISSIOH 5DISTRIBUTION IUlIDEPARTHENT SUPERINTENDENT ELECTRICLABORATORY 8TELECOHHUNI CATIOHSGAS8ELECTRICHETEROPERATIONS DEPARTHENT SUPERINTENDEHT ELECTRICSUBSTATIOHS LABORATORY SERVICESQUALITYSERVICESCOORDINATOR CONSTRUCTION RELAYTESTHAHAGERENGINEERIHGHAHAGERSUBSTATION HAIHTENANCE axTD(D04IDr-5IDTD0LONOTE:Chartisabbreviated toshowonlykeypositions involvedinimplementing QAprogramandtherfore, doesnotshowallpositions inthedivision.
Document  Control Procedures are established to control the issuance of pro-cedures, instructions, drawings, and specifications.
ENGINEERING QUALITYSERVICESHAIHTEHAHCE ANDTESTTRAVELING OPERATORS Figure2-4 TECHNICAL SERVICESDIVISIONORGANIZATION DIVISIONMAHAGERTECHNICAL SERVICESAHDCHIEFENGINEERIOIDEPARTMENT SUPERINTENDENT GENERALMAINTEHANCE DEPARTMENT MANAGERPRODUCTION AHDENGINEERING SYSTEMSDEPARTMENT MANAGERRESEARCH4SCIENCEDEPARTMENT MANAGERGEHERALENGINEERING SERVICESSUPERVISOR PROJECTMANAGEMEHT SERVICESUgIDIDneIDI~5IJI5'~ID0IManagerShopOperations ManagerFieldServiceOperationsManagerAchinistrative ServicesandProjectPlanningManagerInspection/Lend SurveyandBuildingServicesDivisionSystemsRecordsManagement Fossil/Hydro systemsTechnical Information CenterManagerEnvironmental ScienceManagerChemistry ServicesSupervisor Enviroanental Laboratory SeniorEnvirormental AnalystResearch&,Development ProgramFossilEngineering HydroEngineering FacilityEngineering RealEstateManagement BudgetandCostProjectManagement ServicesDocwentPreparation RSecretarial ServicesDualityServicesFigure2-5 GZNNASTATIONREVIEWANDAUDITFUNCTIONS NSARBQUALITYPERFORMANCE PORC~~0~~~~~~~~~00~~~~~~~~~~~~~~~~~t~~~~~~~~~~~~~~~~~~~~~~~~~~~0~~~~~MATERIALS ELECTRICENGINEERING TRANSMISSION ANDINSPECTION ANDSERVICESDISTRIBUTION PURCHASING PRODUCTION DIVISIONTRAININGENGINEERING GINNASTATIONREVIEWo~~~~~~~~~~AUDITSFigure2-6.}}
Standard document control requirements are contained in the Quality Assurance Manual. The Plant Manager, Ginna Station is responsible for the control of all documents issued at Ginna Station.=  'lectric Transmission and Distribution and Production Division Training are responsible for the control of documents issued by their respective organizations.
Production and Engineering Systems controls the distribution of controlled manuals issued for the other organizations performing activities which implement this Quality Assurance Program (Table 1-1). Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.
The Quality Assurance Manual designates responsibilities and
'defines requirements for the preparation, review and approval of documents. Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequate, and include appropriate qualitative and quantitative requirements. Nuclear Assurance Quality'Control representatives, assigned to support departmental maintenance, repair, refueling and modification activities, review governing procedures, prior to use, to assure quality assurance requirements'are included. The Plant Operations Review Committee has the responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical Specifications. Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with. that activity. Ginna Station, Engineering, Material Engineering and Inspection Services, Purchasing, Production Division Training and Electric Transmission and Distribution quality assurance implementing procedures Revision  17 December,  1991
 
(Table 1-1) require the review and concurrence of Quality and the approval of the appropriate department 'erformance supervisor.
Quality Assurance/Quality Control procedures are approved by the Department Manager, Quality Performance or designee.
The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document. Zt specifies the types of documents which must be controlled; identifies the difference between con-trolled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.
Types of documents which are controlled include Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and administrative), specifications and drawings. Suppliers of materials, equipment, and services are required in procure-ment documents to provide for control of documents, including manufacturing, inspection and testing instructions.
The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when required; to pro-perly review and approve documents such as procedures, instructions, specifications, arid drawings; to provide the same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent; to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.
Quality Performance is responsible for review and concurrence of procurement documents for all procuring Revision  17=
December,  1991
 
organizations and, therefore, procurement document control requirements.
Quality Performance is responsible for review, inspection, surveillance, and audit, as appropriate, of document control systems to assure adequate systems are implemented.
Control of Purchased Material E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.
All procurement is conducted in accordance    with procurement documents as stated in Section 4; All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.
Procurement planning is utilized by the procuring organiza-tions for determining the methods to be used for acceptance of the item or service as well as requirements for the control of the supplier performance. Source inspection (surveillance)., certificate of conformance, receipt inspec-tion and post installation test are methods which are considered for item acceptance with receipt inspection utilized in the acceptance of all items. In .lieu of these methods, acceptance of services is based. on either or a combination of: (1) surveillance of the activity and (2) review of objective evidence for conformance to the procure-ment document requirements (i.e. certifications, stress reports etc.). The extent of the acceptance methods and as-sociated verification activities will vary and be a function of the relative importance and complexity of the purchased item or service and the suppliers past performance.
Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and under what situation the supplier is to report nonconformances.
Results of the planning are incorporated in the procurement documents.
Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents. The evaluation which is accomplished during the procurement Revision  17 December,  1991
 
planning, determines the necessity for the supplier selection to be from the approved suppliers list maintained by Purchasing. Purchasing utilizes the approved suppliers list as the selection  source for those suppliers found to have a satisfactory quality assurance program. The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement item,  if the source is to be restricted to the original supplier. For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is from the approved suppliers lists or one who is in the process of being added to a list, after having its capability evaluated to purchaser satisfaction. Items or services which meet industry standards and are typically utilized in applications other than nuclear may be purchased from suppliers not listed on the approved suppliers list provided that item acceptance can be based on acceptance of standard commercial    quality which  is supplemented, as necessary, with source surveillance, pre- or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection. Items or services which have nuclear quality requirements which normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed, on the approved suppliers list provided that verification of nuclear quality can be accomplished by method's such as source surveillance, pre-'r post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance.
Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of the corresponding procurement method.
The purchase requisition will also identify the source when replacement parts are to be procured from the original equipment supplier.
Addition of  a supplier to the approved suppliers list is based on  satisfactory evaluation of the supplier's capability by Quality Assurance, Purchasing and other departments,  as appropriate.
For engineered items, Nuclear Engineering Services is responsible for evaluating the overall design or manufacturing. capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the procurement documents.
                            '19-Revision  17 December,  1991
 
As  part of this review, the supplier s design capabilities, machinery  capabilities, handling capabilities, testing facilities, service capabilities, and experience are reviewed.
Quality Assurance i's responsible, for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas and Electric Corporation requirements. The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, acceptance criteria, required quality assurance records'and their retention, and quality assurance requirements and controls'mposed by the supplier on his subcontractors. Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assurance      .
requirements.
Ginna  Station, Quality Performance and Electric Transmission and  Distribution evaluate the suppliers of inspection, test, and  calibration services which they intend to use.
The departments responsible for performing supplier evalu-ations shall document 'their results in reports which discuss areas investigated, findings, and conclusions. As applicable, concurrence of Purchasing, Nuclear'ngineering Services, Quality Performance, Ginna Station and Electric
~
Transmission and Distribution is required to place a supplier on the qualified suppliers'ist. One organization can remove a  supplier from the list without  concurrence of
: the others.
Measures  are established by Nuclear Engineering Services and Quality Assurance to control supplier performance for engineered items. These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the
                'n supplier.      addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance. With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.
Revision  17 December,  1991
 
Quality Assurance is re'sponsible for determining and documenting the degree of supplier surveillance (including review, inspection, or audit) required during design, fabrication, inspection, testing, and shipping, and for providing the required surveillance. The objective of supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements. For complex engineered items, Quality
.Assurance and Nuclear Engineering Services are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.
The  results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement. When a deviation from purchase order requirements is noted, the Quality Assurance represen-tative has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report, or to stop work, if necessary.
Quality Performance is responsible for. surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements. The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.
The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.
Department supervision is responsible for receiving and storing items pending their acceptance. Upon receipt, the department stockkeeper logs the item, places a "hold" tag item, and notifies Quality Performance that the item has on'he arrived; Quality Performance is responsible for receipt inspection at Ginna Station upon delivery of items and associated services for maintenance, repair, modification, and refueling. This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use. Documentary evidence sufficient to identify the Revision  17 December,  1991
 
codes, standards or specifications met by the purchased material, equipment, and services is retained. In the'vent a final source inspection for 'the acceptance is conducted prior to receipt by RG&E, Quality Performance performs an inspection for shipping damage or lost parts and a'ocument check to assure that the required documentation has been reviewed and is complete. A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.
If the item and documentation are adequate, Quality Performance labels the item as "Accepted", files the documentation and receipt inspection results, and releases the item for storage or use. If the item is nonconforming or the documentation is unsatisfactory, Quality Performance initiates controls on the item in accordance with Section 15.
All items iss'ued must bear an acceptance tag and have docu-mentation to support the acceptability of the item; In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.
Identification  and Control of Materials  Parts  and The  identification and control of materials, parts, and components  is accomplished in accordance with written requirements and appli.es to material, parts, or components in'ny stage of fabrication, storage, or installation.
Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project. The identification and control requirements cover items such as:
traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test specification of the degree of identification to    'eports; preclude a degradation of the item's functional capability or quality; and the proper identification of materialsg parts, and components prior to release for manufacturing, shipping, construction, and installation.
Nuclear Engineering Services and Quality Performance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and Revision  17 December,  1991
 
control of materials, parts, or components, as appropriate; Suppliers are required to assure that all required documentation for an item is properly identified and related to the item. Each item is'equired to be physically identified, either by marking on the item or by tags.
Physical identification by purchase order number is used to the maximum extent possible for relating an, item at any time to applicable documentation. Identification is either on the item or records traceable to the item. Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.
The Plant Manager, Ginna Station is responsible for main-taining identification and control of materials, parts, or components received, stored, installed, and used at the plant. Procedures covering the identification and control of materials, parts, and components at the plant are approved by the Plant Manager, Ginna Station. The responsible supervision of other departments which receive material which is to be stored away from the-plant are responsible for establishing procedures for identification and control and for maintaining identification and control of material, parts, or components, stored or used in their area of. responsibility.
In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.
Control of S ecial Processes Written procedures are established to control special pro-cesses, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications. Qualification of
, personnel and special process procedures complies with the requirements of applicable codes and standards. When special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the .special process qualification requirements.
Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.
Revision  17 December,  1991
 
Quality Performance personnel are responsible for reviewing procurement documents to ensure that requirements for control of special processes are included.
Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved'y Materials Engineering and Inspection Services. Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.
The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel per-forming special processes under their cognizance are quali-fied and are using qualified procedures in accordance with applicable codes, specifications, and standards. Within the Quality Performance Department, the Manager, Materials Engineering and Inspection Services is responsible for 'the of NDE personnel and procedures. The Manager, 'ualification Materials Engineering and Inspection Services is responsible for the qualification of welding procedures and the training and qualification of welders. Records for personnel and procedures to demonstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.-
Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure effective compliance with procedures.
Ins ection Procedures  prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifi-cations, codes, standards, or regulatory requirements. For clarification and to distinguish from preventive maintenance inspections, the following controls are associated with the quality assurance function inspections and referred to as verification inspections. Instructions for conducting detailed verification inspections are contained in inspection procedures. These inspection procedures and all supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection. Inspection requirements and hold points are utilized to verify conformance of activities to the documented  instructions, specifications,  and drawings  for Revision  17 December,  1991
 
accomplishing the activity. Inspection procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for per-forming the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.
Verification inspections are performed by qualified inspec-tion personnel who are independent of the personnel performing the work. Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors. Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.
Quality Performance personnel are responsible for performing verification inspections, as required, during'plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and Electric personnel. When the work is performed by. outside contractors, Quality Performance is responsible for surveillance of the subcontractor's inspection activities. Inspection equipment is calibrated and controlled in accordance with Section 12.
Calibration status is verified by inspection personnel prior to performing an inspection operation.
In the event an inspection of processed material or products is impossible or impractical, indirect control, by monitoring processing methods, equipment, and personnel is provided.
Both inspection and process monitoring are required when control is inadequate without both.
Quality Performance is responsible for the verifying adequate inclusion of inspection requirements in specifications.
The Manager,  Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points    are included in maintenance, repair, refueling, modification and testing instructions and procedures. He is also responsible for the assignment of qualified personnel required for the performance of verification inspections and quality control surveillances of quality affecting activities.
The Manager, Nuclear Assurance is also responsible for assuring that adequate inspection requirements are included Revision  17 December,  1991
 
in procedures, instructions and/or checklists controlling maintenance, modification and repair activities and related fabrication processes for Ginna Station.
With the exception of that which pertains to Pump and Valve Testing, the Manager, Materials Engineering and Inspection Services is responsible for establishing the requirements for the Inservice Inspection Program. Nuclear Engineering Services is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program. The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.
Test Control
  'Checks or  testing performed to verify'he adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings.
Whenever testing is required to demonstrate that a material, part, component, or system will perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established in Technical Specifications, draw-ings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements. The test program requires the identification,'ontrol, and documen-tation of all tests, and -the preparation of written proce-dures required for satisfactory accomplishment of the testing. Together the written procedures and checklists for the testing program include: necessary test equipment and calibration requirements; material requirements; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instruc-t  tions for disposition of deviations; data collection requirements;    and test result approval.
The Plant Manager, Ginna Station is responsible for the statio'n test program, which includes the surveillance test program required by Section 4.0, Technical Specifications and testing associated with modifications.
Test procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved by the Plant Manager, Ginna Station. The  Plant Manager, Ginna Station is responsible Revision  17 December,  1991
 
for the correct and timely 'performance of the required tests utilizing written  and approved procedures. When contractors are employed for tests, the contractor is required to perform testing in accordance with.its quality assurance program requirements. All test results are required to be documented, reviewed, and approved by those responsible for performing the test.
When requested by Ginna Station, Electric Transmission and Distribution performs test activities to determine the cause of protective relay malfunctions. These test activities are performed in accordance with approved procedures by qualified personnel..
Nuclear Engineering Services and Quality Performance are responsible for assuring that required tests for major modifications are included in specifications. Nuclear Engineering Services and Electric Transmission and Distribution assistance in the preparation of modification-related test procedures may be provided to the Ginna Station staff. The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements. Reviews of minor modification design by Quality Performance verifies adequate inclusion of test requi'rements.
Control of Measurin    and Test  E ui ment The  calibration and control system for measuring and test equipment includes  calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures. Calibra-tion procedures include step-by-step methods for calibration and requirements for instrument accuracy. Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other conditions affecting measurement capability.
Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration test data, and identification of the next Revision  17 December,  1991
 
calibration date  on the equipment; a system providing trace-ability  of=shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items, under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates; and a system controlling the purchase requirements of new equipment to be entered into the calibration and control system including require-ments for accuracy, stability, and repeatability under normal use conditions. In the event a measuring instrument (i.e. shop or field standard) is found out of calibration, an investigation is conducted, to determine the validity of previous measurements.
The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and cali-bration of measuring and test equipment at Ginna" Station in accordance with the above requirements.      Instruments specified in Section 4.l, Technical Specifications, are included in the program. Tools, gauges, and instruments necessary for maintenance, inspection, and test are cali-brated and controlled in accordance with station procedures.
Measuring, test or inspection equipment used by Nuclear Assurance Quality Control is included in the program.
The Manager, Materials Engineering and Inspection Services and, Department Superintendent, Electrical Laboratory and Telecommunicati'ons are responsible for establishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective organizations.
Handlin      Stora e and Shi in Ginna  Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station. Electric Transmission and Distribution, and Materials Engineering and Inspection Services are responsible for preparing and implementing procedures for the handling, storage, shipping, preservation, and .cleaning of material and equipment delivered to or located in their work areas. In addition, the Manager, Materials Engineering and Inspection Services is responsible for preparing and implementing procedures for the routine maintenance and inspection of lifting and Revision  17 December,  1991
 
handling equipment. Under normal circumstances, manufac-turer's specific written instructions  and recomme'ndations and purchase  specification requirements are invoked for cleanliness, preservation, special ha'ndling, and storage with respect to environmental requirements. In the absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in
'accordance with department procedures.
The, Department Manager,  Nuclear Engineering Services is responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, clean-ing, and preservation of materials and equipment procured for major modifications. These. procedures are prepared by contractors, by the station staff, or by staff members of.
Electric Transmission and Distribution as appropriate.
Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.
In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages'of manufacturing and installation prior to operational acceptance.
P Quality Performance is responsible for review of engineering speci'fications to assure that proper handling, storing, and shipping requirements have been specified. Quality Performance is responsible for examination of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.
Ins ection 'est and 0 eratin Status Equipment or systems not ready for normal service are
'clearly identified by use of tags, control logs, and other suitable means to indicate the status in a positive manner.
The identification is sufficient to positively indicate the status of the particular equipment or system being isolated.
The. Plant Manager, Ginna Station is responsible for indicat-ing the status of operating equipment or systems to be removed from service for maintenance, repair, or modifica-tion in accordance with the approved Electric System Operating Rules. The Plant Manager designates personnel who have station holding authority.
Revision  17 December,  1991
 
Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.
System status is indicated through the use of hold tags, block tags and corresponding control logs.
Equipment or system inspection and test status are indicated by use of test tags, .labels, or work inspection and test status sheets. Written procedures control the use of hold tags, test tags, and labels.
I Systems, components," and equipment which are found to be unacceptable during or after testing are clearly identified.
Fuel handling operations involving fuel assemblies or other radioactive sources are identified and,controlled by the use of tags, stamps, or other suitable means.
Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejec-tion for a particular component, system, or structure.
These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a designated control location to indicate the status and the completion of required inspections and tests.
Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and assures that inspection results are properly documented. Material Engineering and Inspection Services establishes the procedures for implementing the inspection, status sheets utilized during inservice inspection.
Nonconformin Materials Parts and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.
Materials, parts, or components which do not conform to the drawing or specification requirements are identified and reported. RG&E personnel are responsible for initiating nonconformance reports and initiating dispositions. Nuclear Assurance Quality Control personnel are responsible for inspecting and approving closeout of nonconformance reports.
Revision  17 December,  1991
 
Prior to installation or use, nonconforming items generally remain in a hold area until an approved disposition has been implemented. Nonconforming items may be released for installation to meet critical fabrication schedules provided controls are established to'revent inadvertent use prior to implementing the nonconformance-,disposition. After installation or use, nonconforming items .are identified and controlled until approved disposition has been implemented.
Nonconformances identified at a supplier's facility and reported to RG6E, which have supplier recommended dispositions of use-as-is, or repair, are normally processed by the department originating the procurement.
Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.
Items are repaired and reworked in accordance with approved procedures and current drawings. The repair or rework must be verified as acceptable by an inspection of the affected item or process which is at least equal to the original inspection method.
Items which are accepted "use-as-is" are fully documented with the drawing or specification requirement and technical justification for acceptance. All such items are approved prior to use by the cognizant organization having responsi-bility for the requirement. In addition, those "use-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Senior Vice President, Production and Engineering.
Nuclear Assurance Quality Control personnel provide nonconformance status information periodically. Quality Performance and other organizations analyze nonconformance r'eport data for adverse 'trends and process periodic reports to management. Adverse trends form a basis for supplier re-.,
evaluation or for other corrective action.
: 16. Corrective Action Significant conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are reported and documented. Significant conditions adverse to quality include conditions affecting safety, conditions which could result in plant shutdown, high maintenance items, and operating procedure deficiencies. Once identified, the Revision  17 December,  1991
 
condition, the cause of the condition, and the corrective action taken shall be documented.
Significant conditions adverse to quality may be identified by anyone noting the condition and reported to Ginna Station
'for review and, if appropriate, the initiation of an appropriate corrective action report.
When a significant condition adverse to quality at Ginna Station is identified, Quality Performance,evaluates the effect of continuing the activity. If continuing the activity would obscure or preclude -identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken. Quality Performance Supervision has authority to stop work on, maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies at Ginna Station, as well as other locations. Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.
The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engine'ering Services, Materials Engineering and Inspection Services, Electric Transmission and Distribution or cognizant suppl'ier associations.
The Plant Operations Review Committee reviews all Corrective Action Reports initiated at Ginna Station and may recommend additional corrective action if the action does not result in adequate resolution. Corrective action report committees of aff'ected RG&E management, review initiated reports to determine cause and to develop a corrective action plans, resolve the identified concern and to preclude recurrence.
Conditions adverse to quality which involve design defi-ciencies or a recommended corrective action which involves a design change are reviewed by Ginna Station or Engineering as applicable. The cognizant organization determines the cause of the condition and recommends corrective action to preclude repetition.
Quality Assurance reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repe-tition.
Revision  17 December,  1991
 
Corrective action summary reports are submitted to departmental supervision to keep them aware of significant
    ~
conditions adverse to quality, related causes and corrective action being taken. Senior Management is advised of the causes and actions of the more significant Corrective Action Reports.
: 17.      ualit  Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance. Production and Engineering Systems, as directed by the Division Manager, Technical Services and Chief Engineer, is responsible for the retention and maintenance of records. Quality Performance, Purchasing, Research  and Science, and Electric Transmission and Distribution departments are responsible for assuring the maintenance and retention of records which they originate.
This may be accomplished either by retaining the records in their department, or by forwarding. them to the appropriate Production and Engineering Systems record retention locations. Each organization retaining records is responsible for 'preparation, review, app'roval, and implementation of specific quality assurance record procedures for their areas of responsibility in accordance
      'with these requirements. The records which fall within quality assurance record requirements include those records required by Section 6.10 of the Technical Specifications and the Quality Assurance Program. All records associated with the operation, maintenance, repair, inservice inspection, refueling, modification, inspection and testing of structures, systems, and components covered -by the quality assurance program are included.
Records, initiated at Ginna Station include operating logs; the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses; calibration procedures and reports; and Nonconformance and Corrective Action Reports. Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering, Systems record retention location.
Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data Revision  17 December,  1991
 
recorder, the acceptance or rejection of the activity, and a record of any nonconformances.
The requirements and responsibilities for record accessibility and,transmittal are described in the Quality Assurance Manual sections as appropriate. Requirements,and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and the retention'f quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents. Records are available
                                        ~
to authorized personnel.
-Removal of records from storage is documented and accountability is maintained by, the responsible record control activity.
Records are either stored in record storage facilities which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.
Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage. The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.
Production and Engineering Systems is responsible for maintaining plant operating records as required in Section 6.10, Technical Specifications.
Production and Engineering Systems is also responsible for maintaining off-site prepared design records, such as specifications, drawings, design review reports, and design control documentationI quality assurance records, such as audit reports and surveillance reports; purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.
Audits Compliance with  all aspects of the Quality Assurance Program and  the effectiveness of the program is determined by audits and  surveillances of all organizations performing quality affecting activities. Quality Assurance is responsible for Revision  17 December,  1991
 
conducting audits of those organizations and activities involved in the quality assurance program on a planned, periodic basis. Audit intervals are based on the status and safety importance of activities being performed, as well as group performance. and related management concerns.
Table 18-1 is a list of the activities to be examined by audit in each of the audits. Frequencies are based .on the level of activity in each area. Audit schedules are estab-lished to assure that each of the activities are audited at the frequency specified in Section 6.0. Technical Speci-fications. Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concerns.
Each audit .requires the development of an audit plan to provide information about the audit; such as the functional areas to be audited, the names, of those who will perform, the audit, the scheduling arrangements, and the method of reporting findings and recommendations. Audit planning and performance utilize performance based techniques that will facilitate effectivenes's assessments as well as compliance verification. The audits are performed in accor'dance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.
Audit, results are documented and reported to the division head having responsibility in the area audited supervisor'nd and  the Nuclear Safety Audit and Review Board. Within a specified period of time, the person having supervisory responsibi'lity in the area audited is required to review the audit results, take necessary action to correct the" deficiencies identified by the audit, and document and report the'orrective action.
Quality Assurance is responsible for developing audit plans and audit checklists, designating and,training audit personnel, and conducting audits.
Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.
Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procure-ment, as required, to evaluate their quality assurance Revision              17 December,              1991
 
pxogram for compliance with all aspects of the procurement documents. Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents. During the additional audits are performed, as required, to assure all quality assurance program requirements are properly imple-mented in accordance with procurement documents.
Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends. Results of these analyses are provided to management for their regular review.
Revision  17 December,  1991
 
Table 1-1 Quality Assurance Program Procedures Subject Listing Appendix    B ualit Assurance ualit Control Procedures                  Criteria Indoctrination of Quality Assurance/Quality Control and Supervisory Personnel Training of Quality Assurance/Quality Control Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Quality Assurance/Qu'ality Control Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and                          IIX Electric Design Criteria Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Quality Assurance Review of Architect/Engineer's                    . XIX Design Documents
    ~
Preparation, Review and Approval of Computer Software
          ~          ~
Production Evaluations
        ~              ~
Requisitioning Quality Assurance/Quality Control                      XV Services Quality Review of Rochester      Gas and                              IV Electric Procurement      Documents Preparation,      Review and Approval  of Rochester Gas and Electric    Q.A. Specifications Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation,, Review and Approval of Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision  17 December,  1991
 
Table 1-1 (cont'd)
Appendix    B ualit  Assurance  ualit  Control Procedures          Criteria=
Review  of Departmental Procedures                                VI'.
Preparation, Review and Approval of Procedure Deviation Requests by Quality Assurance/Quality Control Evaluation 'of Suppliers by Quality Assurance Supplier Surveillance                                            VII Control of Supplier Performance                                  VII Quality Assurance Evaluation of Bids                              VII Conducting Commercial Grade Supplier Surveys                      VII Document Deficiency Reports                                      VII Inspection and Surveillance Activities Qualification of Surveillance and Inspection Personnel Quality Assurance Review of Nonconformance Reports Preparation, Review and Processing of Corrective Action Reports by Quality Assurance Qualification of Auditing Personnel                              XVIII Audit Scheduling and Planning                                    XVIII Performance of Quality Assurance Audits                          XVIII Reporting and Follow-Up of Audit. Findings                        XVIII Conduct of Quality Assurance During and in                        XVIII Follow-Up of USNRC and Management Audits Response to Audits and Surveillances                              XVIII Qualifications of Surveillance Personnel                          XVIII Revision    17 December,  1991
 
Table 1-1 (cont'd)
Appendix    B ualit  Assurance ualit  Control Procedures          Criteria
, Quality Performance Surveillance Program                        XVIII Qualification of Commercial Grade Supplier Survey Personnel XVIII Revision  17 December,  1991
 
Table 1-1 (cont'd)
Appendix  B Materials En  ineerin    Ins ection Services          Criteria Indoctrination and    Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase                        IV Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures Quality Materials'ngineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material Handling Equipment Instructions Control and Distribution of Documents Regulating                    VI Safety Related Activities
                    ~  ~  ~
                \
Receipt and Acceptance of Purchased Materials                      VII Preparation, Review and Approval of Supplier
          ~        ~
VII Evaluation Welding Procedure Preparation Review and Approval                  IX Welding Procedure Qualification                                  ~
IX Heat Treating Procedures                                            IX Welder  Qualification    and Currency                              IX Nondestructive Examination Procedures                              IX Nondestructive Examination Procedures Manual                        IX Nondestructive Examination Personnel Qualification                  IX Inservice Inspection Program      and Plans                        X Revision  17 December,  1991
 
0 Table 1-1 (cont'd)
Appendix    B Materials En ineerin and Ins ection Services          Criteria Incorporating, Ginna Modificat'ions into Inservice              X Inspection Program Test Control                                                    XI Test Personnel Qualifications                                    XI Calibration and Control of Nondestructive                        XII Examination Instruments Inspection and Maintenance of Material Handling                  XIII Equipment Overhead and Gantry Cranes                                        XIII Inspection and Maintenance    of Portable Lifting                XIII and Handling Equipment Underhung Cranes,  Jib  Cranes and Monorail Systems              XIII Slings and-Related Apparatus                                      XIII.
Classification and Training of Material Handling                  XIII Equipment Personnel Mobile Hydraulic Cranes                                          XIII Inspection and Maintenance of Jacks                              XIII Forklift Loading  Forks                                          XIII Training  and Qualification- of Crane Operators                  XIII Lifting Devices in the Containment Vessel                        XIII Control and Disposition of Nonconforming Material, Parts and Components Corrective Action at Materials Engineering and                    XVI Inspection Services Quality Materials Engineering Services Records and  Inspection                XVII
                                  -4 1-Revision  17 December,  1991
 
Table 1-1 (cont'd)
Appendix        B Ginna Procedures                                      Criteria Materials Engineering and Inspection Services                  XVIII Response to Internal Audits Ginna Quality Assurance Program Implementation, Training of Ginna Personnel Ginna Administrative and Engineering Staff Responsibilities Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Control of Station Modification Station Modification Installation Acceptance and Completion Preparation, Review and Approval  of Design  Documents Preparation, Review and Approval  of Minor Modification Safety Analysis Control of Procurement Documents  for Purchased Materials, Parts, Components and  Services                      IV Requisition Services from General  Maintenance                  IV Plant Procedures Plant -Procedure Control and Distribution                      VI Control of Engineering Documents                                VI Vendor Manual Control                                          VI Receipt and Acceptance of Purchased Materials                  VII Supplier Qualification Technical Evaluation                    VII Control of Purchased Services                                  VII Control of Accepted Material, Parts and Components                  'III Revision  17 December,  1991
 
Table 1-1 (cont'd)
Appendix    B Ginna Procedures                                        Criteria Identification    and Marking  of Material                        VIII Control of Welding, Heat Treating and                            IX Nondestructive Examination Welding Equipment Performance    Verification                    IX Nondestructive Examination                                        IX Preventive Maintenance Programs    for Electrical, Mechanical and Valves Inservice Inspection.                                      X, XIV Environmentally Qualified Equipment Maintenance                  X Program Performance of Tests                                              XI Qualification of Test Personnel                                  XI Test, Status Control                                              XIV Calibration and Control of Measuring and Test Equipmentg
    ~    ~
XII Installed Plant Instruments and Equipment Maintenance and Inspection of Material Handling                  XIII Equipment Control of Material Handling and Handling Equipment              XIII Storage and Preservation of Materials                            XIII Control of Heavy Loads at Ginna                                  XIII Electric    System Operating Rules                                XIV Bypass  of Safety Function or Jumper'Control                      XIV Control of Temporary Modifications                                XIV Control and Disposition of Nonconforming Materials Issue of Nonconformance Reports Revision 17-.
December,  1991
 
Table 1-1 (cont'd)
Appendix  B Ginna Procedures                                Criteria Conditions Adverse to Quality
) Work Control System Ginna Records                                            XVII Record Storage  Facility and Equipment                    XVII I
Maintenance and.History Program                          XVI I Ginna Station Response to Internal Audits                XVIII Revision  17 December,  1991
 
Table 1-1 (cont'd)
Appendix  B En  ineerin Procedures                                  Criteria Indoctrination and Training Engineering Department Organization and Responsibilities Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses Preparation, Review and Approval of Engineering'rawings          III Preparati'on, Review and Approval of Specifications.
Design  Verification Preparation,  Review and Approval  of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation,  Review and Approval  of Field  Change Requests Purchase Requisition                                              IV Engineering Procedures Engineering Procedure Deviation Request Distribution  and Control o'f Documents by                      VX the  Control Number Method Control of Documents by the List of                              VX Current Revisions Method Distribution of Documents by the List of Correspondence  Procedures                                      VI Receipt, Control and Distribution of Drawings and Aperture Cards                                                    VX Supplier Evaluation                                              VXI Revision  17 December,  1991
 
Table 1-1 (cont'd)
Appendix    B En  ineerin  Procedures                                Criteria Preparation, Reviev and Approval of Bid Requests,                VXI Bid Evaluations and Recommendations for Avard Engineering Reviev of Nonconforming Materials, Parts or Components Initiating  and Responding  to Corrective Action Reports Records                                                          XVIX Engineering Response to Audits                                  XVIII Revision  17 December,  1991
 
Table 1-1 (cont'd)
Appendix  B Purchasin  Procedures                              Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities Preparation, Review, Approval and Issuance of                IV Purchase Orders and Changes  to Purchase Orders Requests  for Bids  and Bid Evaluation                        IV Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation                                          VII Establishment and Maintenance of Qualified                    VII Suppliers List Supplier, Nonconformance Report Processing Purchasing Department Response to Corrective                  XVI Action Reports and Corrective Action Reporting Purchasing Records                                            XVII Purchasing Response to Audits                                XVIII Revision  17 December,  1991
 
Table 1-1 (cont'd)
Appendix  B Production Division Trainin Procedures              Criteria The Production Division Training Procedures Manual is currently under development. In the interim they are using    .
appropriate Ginna Station Procedures. The Ginna Station Procedures will be replaced by Production Division Training Procedures as these procedures are approved and issued. QA Program sections applying to Production Division Training are 1~ 2~  5g 6/ 8~ 13'6~ 17'8
                              '48-Revision  17 December,  1991
 
Table 1-1 (cont'd)
Electric Transmission Procedures    and Distribution Appendix B Procedures                                              Criteria Quality Assurance Program Implementation for                      I Electric Transmission and Distribution Department Training of Electric Transmission and Distribution Personnel Electric Transmission    and Distribution Organization Design/Modification Activities Control Control of Procurement Documents for Purchased                    IU Parts, Components and Services Preparation, Review, and Approval of Electric Transmission and Distribution and Laboratory Procedures V
Control of Electric Transmission and Distribution                VI ..
Procedures,  Schedules  and Test Form Books Supplier Qualification Technical Evaluation                      VII Receipt and Acceptance of Instrumentation and                    VII Standards Equipment Control of Purchased Services for Electric Meter and Lab          VII Identification  and  Control of Materials, Parts and            VIII Components Performance of Tests at Ginna Station                            XI Performance of Tests    at the Electrical Laboratory              XI Qualification of Test Personnel                                  XI Calibration and Control of test Instruments                      XII
.Handling, Storage and Shipping                                    XIII I
Inspection and Test Status at Electric Meter and                  XIV Laboratory Revision  17 December,  1991
 
Table 1-1 (cont'd)
Electric Transmission  and  Distribution          Appendix  B Procedures                                          Criteria Control and Disposition of Nonconforming Parts and            XV Components Initiating  and Processing  of Corrective Action Reports Control of Quality Assurance Records                          XVII Response to Audits                                            XVIII Revision  17 December,  1991
 
TABLE 4-1 Procurement Document Re uirements Items to be considered      for inclusion in  procurement documents include:
: 1. Sco e  of Work  Detailed statement    of the work to  be performed.
2 ~  Technical  Re uirements  by reference to specific drawings, specifications, codes, regulations, procedures or instructions, including revisions, that describe the items or services to be furnished. Also identified. shall be test, inspection  and acceptance  requirements, and any special requirements for such    activities  as designing, identification, fabrication, cleaning, erecting, packaging, handling, shipping, extended storage and shelf life.
ualit Assurance Pro ram Re uirements  which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards. Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements in subtier
"            procurement documents.
Ri  ht of Access - to include the facilities and records of the supplier. for source inspection and audit by the Purchaser or parties designated by the purchaser. Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.
        *5. Documentation Re uirements  Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.
      *6. Nonconformance  Requirements for reporting and disposition of nonconformance to procurement requirements.
I '
Items reviewed by Quality Assurance or Quality Control.
Revision  17 December,  1991
 
0 Table 18-1 Audit List Audit Title                          Audit To ic Areas Corrective Action                    Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods. of operation.
Operational Assessment Nonconformance Control
*Outage Activities                  Refueling and Special Nuclear Material ISI Implementation IST Program and Implementation Surveillance Test and    LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA
*Health Physics, Chemistry and
              ~      ~
Radwaste  Shipping and Process Radwaste                          Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program
*Fire and  Safety                  Fire Protection Program and r                                implementing procedures Fire Protection and Loss Prevention Program Revision  17 December,  1991
 
Table 18-1 (con't)
Audit List Audit Title                            Audit  To  ic Areas Independent Inspecti'ons and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety Program Housekeeping Instructions, Procedures,              Drawing Control and, Document Control            Vendor Manual Control Procedure Control Records Control Security                              Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program
*Operations                            Limiting Conditions for Operation Surveillance Testing Operator Performance Operations Administration PORC  Activities NSARB  Activities Materials Engineering and              ISX Program Inspection 'Services              NDE  Qualifications Welding Qualifications MHE  Program Miscellaneous  QA  Controls
*Maintenance and Testing              Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment History Control of Measuring and Test Equipment Revision  17 December,  1991
 
Table 18-1 (con't)
Audit List Audit  Title                              Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response Plan            Nuclear Emergency Response Plan and Procedures Offsite Agency Interface Response Personnel Training Emergency Information Plan Training/performance    and.              Licensed Operator qualifications of  the                    Auxiliary Operator operating and technical      staff        Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General Employee Training Procurement                                Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Pr'ogram Configuration Control                      Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision  17 December,  1991
 
Table 18-1 (con't)
Audit Title                          Audit  To ic Areas Electric Transmission                Electric Mater and Laboratory and Distribution                Electric Substations
* Noted audits  will also address relevant activities to verify of facility operation to all provisions contained in 'onformance Technical Specifications and applicable license conditions.
Revision  17 December,  1991
 
I R.E. GINNA          NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART CHAIRNAN OF THE BOARD, LINES  OF SUPKRVISIOM AND    ASllNISTRATION                                            PRESIDENT AND CHIEF EXECUTIVE OFFICER LINES Of'OJddJNICATIOM SENIOR                                                                SENIOR VICE PRESIDENT                                                                      SOII OR VICE PRESIDENT                                                          PRODUCTION d ENGINEERING                                                              VICE PRESIDENT>
CAS d ELEC'fRIC                                                                                                                                                    CONTROLLER  d DISTRIBUTION                                                                                                                                                  CHIEF FINANCIAL AND CUSTOMER                                                                                                                                                        OFFICER SERVICES VICE PRESIDENT                          VICE PRESIDENT ~
VICE PRESIDENT                                                                                                                                              CINMA                              SECRETARY AJC KJPLOYEE RELATIONS,                                                                                                                                      NUCLEAR PRODUCTION                          TREASURER PUBLIC AFFAIRS AND MATERIAL WNAGIKNT DIVISION WJIAGER                                                          DIVISION HANACER                                  ~ ~ ~ I  C ~ ~                          DEPARAKNt ELECTRIC                                                            TECHNICAL SERVICES                                                                          MANAGER DKPAR TITAN t                TRANSMISSION                  OEPARtEENT MANAGER                    ANO CHIEF ENGINEER                                                                            RISK MANAGER AND                d DISTRIBUTION                        OJALITY                                                                                                                      WNAGEJM:Nt PI%CHASING                                                      PERFORMANCE AGENT MATERIALS WMAGKJKNT                                                                                                                                                                                      DIRECtOR OF SECURITY DEPARTJKNT          DEPARTIKNT      IlANAGKR              MANAGER      DEPARTJCITT            DEPARTIKNT      DEPARTlCNT            DEPARllCNT  nW W~ S'fATfON
                                                                                                                                                                                                    ..~PORC SXKR INTENOENT      QUEER INTENDENT ~  DUALITY              MATERIALS      MANAGER                IlANAGER        WJJACER              MANAGER    CINMA ELECTRIC LAB          ELKCTRIC      ASSURANCE            ENGINEERING      RESEARCH            PRODUCTION  d      NUCLEAR                      I PROJNM:T ON JJC TELE-        QSSTAT TONS                          d INSPECTION      d SCIKNCE              ENGINEERING    EIJG I NEER INC          DIVISION I
COJ4ANJ I CAT ONS      DIVISION                              SERVICES                              SYSTEMS      SERVICES                TRAINING PROC JWOKNT      %TER                DESIGN.        DUALITY              MATERIALS      KNVIROSCNTJL          RECORDS        DESIGN,              TRAINING        STATION                  SKKRVISOR SERVICES          CAI.I BRAT  ION      TECH  5&PNT,  ASSURANCE            KNGIJlECR INC,  SCIENCE d              HAMACEJKMT,    CONSTRUCTION,        SERVICES        OPERATIONS.                NUCLEAR d MAINTENANCE        ROTATING      PROC&#xc3;KJKNT,          NOE,            LABORATORY            TECNICAL      L I CDJS  INC,                        MAINTENANCE,              SECURITY AJN KLECTRIC        KOUIPSKNT      AIRJIT d              ISI d          CHEMISTRY              INFORMATION    FlKL                                  HP d LAB SERVICKS        HAINTKNANCK~  QNJVE ILLANCK        ldlK INSP      SERVICES,              CENTER. CHIS. AMAAGKJENT      d                    CJMMSTRY UQ                                                RELAY TEST d CONSTRUC'f ION SERVICES              SERVICES        RESEARCH  d DEVKLOPJKNT IMFORllATION SERVICES, TECHNICAL SUPPORt DIRECTOR CORPORATE CONTROL, TECHNICAL ftf ftf    EWLOYEK                                SERVICES                                                                    DIVISION      SKRVICES              RADIATION      IVOR(,                  SECIWITY 0 4          RELATIONS                                                                                                          SYSTDlS                              PROTECTION    TESTING,                SERVICES ftf  V.                                                                          MANAGER                                                                                            MATERIAL O'.fff                                                                          NUCLEAR ASSJJRANCE              SUPERVISOR PRO%ET
                                                                                                                    ~                                              CORPORATE WC.TH CONTROL, PROCUREJENT, LIASON ftf  0                                                                                                  WNAGDEMT                DEPARTMENT                        PHYSICS AJNI    ENCI NEER INC, SERVICES              SUPERINTENDENT                        NUCLEAR        FIRE GENERAL                          DKRGKNCY        PROTEC'tIOJI QUALITY                                          HAINTEMANCK                          PLANNING        a SAFETY.
CONTROL AND                                                                                            OPERATIONAL DUALITY                    DUALITY                                                                    ASSESQKNT,
'LO                                                                          ENGINKRINC                SERVICES,                                                                  COINER LKJ                                                                          SERVICES                  PRJLMCT                FIELD d  SHOP                                      SYSTEMS WMAGGKNT              FABRICATION SERVICES.              SERVICES AINJIN. SERV.,
BUDGET  d COST Figure 2-1
 
QUALITY PERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE I
MANAGER              MANAGER                        MANAGER          SENIOR ANALYST I
QUALITY              NUCLEAR                MATERIALS ENGINEERIHG  QUALITY PERFORMANCE ASSURANCE          ASSURANCE                CI  IHSPECTIOH SERVICES    ANALYSES AHD PROGRAM SUPPORT QUALITY    QUALITY          QUALITY              MATERIAL 5 ASSURANCE    CONTROL          CONTROL          MATERIAL HAHDLING          STAFF ENGINEERS  ENGINEERS          FOREMAN          ENGINEERS 5  FOREMEN am ID ID 0 4 ID I ~
5 DI mr.
ID 0      STAFF                      TECHNICIANS              STAFF
                                    & INSPECTORS I
Figure 2-2
 
GINNA NUCLEAR PRODUCTION ORGANIZATION VICE PRESIDENT GINNA NUCLEAR PRODUCTIOH PLANT MANAGER                        DEPARTMENT    DEPARTMENT MANAGER GINNA STATION                          MANAGER          NUCLEAR PRODUCTION      ENGINEERING DIVISION TRAINING      SERVICES DIRECTOR        SUPERINTENDENT    CORRECTIVE        SUPERINTENDENT CORPORATE      GINHA PRODUCTION    ACTION            GINNA SUPPORT  INITIAL LICENSED  DESIGH I RADIATION                                                SERVICES    OPERATOR Vl PROTECTION                        SAFETY                                              CONSTRUCTION (0
I                                                                      OPERATOR REQUAL OPERATIONS*        OUTAGE              MECHANICAL                      LICENSIKG PLANNIHG            MAINTENANCE  AUX OPERATOR CORPORATE      HEALTH PHYSICS 8                                                        FUEL MANAGEMENT HEALTH        CHEMISTRY          MATERIALS &        ELECTRICAL    STA INITIAL PHYSICS                            PROCUREMENT        AND l&C                        TECHHI CAL TECHNICAL                              MAINTENAHCE  STA REQUAL        SUPPORT SERVICES NUCLEAR        ENGINEERING~
EMERGENCY                                              MAINTENANCE  CHEMISTRY TECH PLANNING      OPERATIONAL                            PLANNING &
ASSESSMENT                              SCHEDULIHG    RAD PROTECTIOH TECHNICIAN UQ                      COMPUTER SYSTEMS                        FIRE PROTECTION    COHTRACT, 6
(
ID ID 0 v.
I MOOI F CATION RADIATION TECH SUPPORT      ELECTRICAL MAINT.
0
* HNEH  RCS AVERAGE TEMPERATURE > 200    F                    MECHANICAL MAINT.
AN STA AND COHTROL ROOM FOREMAN ARE  ADDED'O THE REQUIRED COHTROL ROOM SHIFT COMPLEMENT                I&C TECHNICIAN R&T TECHNICIAN TECH STAFF AHD MANAGERS TRAINING COURSES
 
ELECTRIC, TRANSMISSION                      AND      DISTRIBUTION DIVISION D I VIS IOH HAHAGER ELECTRIC TRANSHISSIOH 5 DISTRIBUTION DEPARTHENT                  GAS 8 ELECTRIC                  DEPARTHENT SUPERINTENDENT                    HETER                      SUPERINTENDEHT I
Ul    ELECTRIC LABORATORY 8              OPERATIONS                ELECTRIC SUBSTATIOHS TELECOHHUNICAT IOHS I
LABORATORY            QUALITY          CONSTRUCTION                    HAHAGER                HAHAGER SERVICES            SERVICES                                        ENGINEER IHG            SUBSTATION COORDINATOR        RELAY TEST                                            HAIHTENANCE ax TD (D 0 4 ID r-                                                                                      ENGINEERING 5 ID                                                                                                    HAIHTEHAHCE TD 0            NOTE: Chart is abbreviated to show only                                                AND TEST key positions involved in implementing QA program and therfore, does not show                                        QUALITY  TRAVELING LO all positions in the division.                                              SERVICES  OPERATORS Figure 2-4
 
TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MAHAGER TECHNICAL SERVICES AHD CHIEF ENGINEER I
O I
DEPARTMENT    DEPARTMENT MANAGER    DEPARTMENT    DEPARTMENT MANAGER  SUPERVISOR SUPERINTENDENT    PRODUCTION AHD        MANAGER            GEHERAL        PROJECT GENERAL        ENGINEERING        RESEARCH 4        ENGINEERING      MANAGEMEHT MAINTEHANCE        SYSTEMS            SCIENCE          SERVICES        SERVICES Manager          Division          Manager            Fossil      Budget and Cost Shop Operations      Systems        Environmental      Engineering Science                            Project Manager          Records                                Hydro          Management Field Service      Management          Manager          Engineering        Services Ug ID ID Operat i ons                        Chemistry neI ID    ~      Manager Fossil/Hydro systems Services          Facility Engineering Docwent Preparation  R 55' IJI    Achinistrative                          Supervisor                        Secretarial
      ~
Services        Technical        Enviroanental      Real Estate      Services ID 0        and Project      Information        Laboratory        Management Planning          Center                                                Duality Senior                            Services Manager                          Envirormental Inspection/Lend                          Analyst Survey and                          Research &,
I Building                          Development Services                            Program Figure 2-5
 
GZNNA STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY PERFORMANCE                                                          PORC
          ~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~
MATERIALS                     ELECTRIC                                      PRODUCTION ENGINEERING                  TRANSMISSION               PURCHASING               DIVISION                ENGINEERING              GINNA STATION AND INSPECTION                        AND                                          TRAINING SERVICES                  DISTRIBUTION REVIEW o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~     AUDITS Figure 2-6.}}

Latest revision as of 09:46, 4 February 2020

Rev 17 to QA Program for Station Operation.
ML17262A720
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/31/1991
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17262A719 List:
References
NUDOCS 9201070130
Download: ML17262A720 (80)


Text

ROCHESTER GAS AND ELECTRIC CORPORATION, R.E. GINNA NUCLEAR POWER PLANT Revision 17 to:

Assurance Program

'uality for Station Operation DOCKET NO. 50-244 December, 1991

'2201070130 5'i1.220 PDR ADOCK 05000244 p . PDi~

TABLE OF CONTENTS Section Title Pacae QUALITY ASSURANCE PROGRAM FOR STATION OPERATION Quality Assurance Program

2. . Organization 3 ~ Design Control 10 4 ~ Procurement Document Control 13

.Instructions, Procedures and Drawings

6. Document Control 16
7. Control of Purchased Material, Equipment 18 and Services
8. Identification and Control of Materials, 22 Parts and Components Control of Special Processes 23

.Inspection. 24 Test Control I 26

'I

12. Control of Measuring and Test Equipment
13. Handling, Storage and Shipping 28
14. Inspection, Test and Operating Status 29 Nonconforming Materials, Parts and Components 30
16. Corrective Action 31
17. Quality Assurance Records 33
18. Audits 34 Revision 17 December 1991

~

'IST Table Number Title OF TABLES 1

Pacae Quality Assurance Program 37 Procedures Subject L'isting Procurement Document Requirements 51 Audit List 52 LIST OF FIGURES Fi ure Number Title Pacae I 2-1 Management Organization 56 2-2 Quality Performance Organization 57 I 2-3 Ginna Station Organization 58 Electric Transmission and Distribution 59 Organization 2-5 Engineering Division Organization 60 2-6 Ginna Station Review and Audits 61 Functions Revision 17 December 1991

UALITY ASSURANCE PROGRAM FOR STATION OPERATION ualit Assurance Pro ram The Quality Assurance Program has been developed by the Rochester Gas and Electric Corporation to assure safe and reliable operation of the R. E. Ginna'uclear Power Plant.

This program applies to all activities affecting the safety functions of the structures, systems, and components 'elated that prevent or mitigate the consequences of postulated accidents that could cause undue risk to the health and safety of the public. These quality affecting activities include operation, maintenance, repair, inservice inspection, procurement, refueling, modification, test and inspection. In addition, the Quality Assurance Program applies to the activities associated with the packaging of licensed radioactive materials to be shipped in accordance with 10 CFR Part 71 excluding fabrication and design of

.shipping casks.

The basic Rochester Gas= and Electric Corporation quality assurance policy is established by the Chairman of the Board, President and Chief Executive Officer. This policy is implemented under the overall direction of the Senior Vice President, Production and Engineering, through the Department Manager, Quality Performance; Vice President-Ginna Nuclear Production; the Plant Manager-Ginna Station; Division Manager, Technical Services; and Chief Engineer, and heads of other supporting departments.

The program is governed by a Ginna Station Quality Assurance Manual which contains the requirements and assignment of responsibilities for implementation of the program. The manual is prepared, reviewed, and maintained by Quality Performance and approved by the Senior Vice President, Production and Engineering.

The program is implemented through Quality Assurance/Quality Control, Ginna Station, Engineering, Production Division Training, Materials Engineering and Inspection Services, Electric Transmission and Distribution, and Purchasing procedures. These procedures are prepared and approved by the responsible organization and reviewed and concurred with by Quality Performance. The procedures are contained in separate manuals maintained by the responsible organization.

These procedures are reviewed for adequacy at least once every two years by the responsible organization. Table provides a listing of the subjects and a short description l-l of the subject matter which is contained in the procedures.

Revision 17 December, 1991

Organizational interfaces are defined and controlled by sections of the Quality Assurance Manual. Organizational responsibilities are described in Section 2.

The Quality Assurance Program covers all existing- Seismic Category I and Class 1E structures, systems, and components, including their foundations and supports. Activities affecting the quality of these structures, systems, and components are controlled to an extent consistent with their safety significance. A detailed listing of the structures, systems and components covered by the Quality Assurance Program and based on Section 3.2 of the Updated Final Safety Analysis Report, is contained in the Ginna Master Equipment Database.

Details of the system boundaries and the quality classi-fication of water-and-steam-containing components are con-tained on system flow drawings. The listing of structures, systems,'and components covered by the Quality Assurance Program are prepared and maintained by Nuclear Engineering Services.

Modifications or additions to existing structures, systems, and components are designated the same'eismic classifica-tion as the existing system.. New structures, systems, and components are designated a seismic classification in accordance with the guidelines in USNRC Regulatory Guide 1.29, Revision 3.

Supervisory personnel are indoctrinated in quality assurance policies, manuals, and procedures to assure they understand that these are mandatory requirements which must be imple-activities affecting quality. are trained and for mented and enforced. Personnel responsible performing indoctrinated in the requirements, purpose, scope, and implementation of quality related manuals and procedures. Refresher sessions are held periodically and retraining is required whenever a new procedure is issued or a major revision is made to an existing procedure. Training of personnel not in the Quality Performance organization is the responsibility of each department performing an activity affecting quality.

Quality Performance assists in establishing training requirements and assures that personnel are trained by a'uditing training.

In addition to training in quality assurance, each depart-ment conducts training, including on-the-job training, to Revision 17 December, 1991

the extent necessary to assure that personnel are qualified for their primary work assignments.

The Vice-President, Ginna Nuclear Production is responsible for the formal training, qualification, licensing, and re-qualification of operators, as necessary. Where necessary, personnel are trained in radiation protection, plant safety and security.-

The Nuclear Safety Audit and Review Board is required to review the status and adequacy of the Quality Assurance Program at least once every two years to assure that meaningful and is effectively complying with corporate it.

is policy and 10CFR50, Appendix B. This review consists of audits or a review equivalent to an audit performed by company personnel or outside organizations.

.The Quality Assurance Program is designed to meet the requirements of Title 10 of the Code of Federal Regulations, Part 50, Appendix B, "Quality Assurance Criteria for Nuclear Power Plants." The program conforms to the following NRC Regulatory Guides and ANSI Standards:

a ~ NRC Regulatory Guide 1.8, Revision 1, "Personnel Selec-tion and Training."

b. NRC Regulatory Guide 1.28', Revision 2, "Quality Assur-ance Program Requirements (Design and Construction)."

c ~ AEC Regulatory Guide 1.30, Revision 0, "Quality Assurance Requirements for the Installation, Inspection, and Testing of Instrumentation and Electric Equipment."

d. AEC Regulatory Guide 1.33, Revision 0, "Quality Assurance Program Requirements (Operation)," and regulatory staff comments and supplementary guidance contained in the document entitled "Guidance on Quality Assurance Requirements During the Operations Phase of Nuclear Power Plants," Revision 0 dated October 1973 (Orange Book Revision 0)
e. AEC Regulatory Guide 1.37, Revision 0, "Quality Assurance Requirements for Cleaning of Fluid Systems and Associated Components of Water-Cooled Nuclear Power Plants."

Revision 17 December, 1991

NRC Regulatory Guide 1 38, Revision 2, "Quality

~

Assurance Requirements for Packaging, Shipping, Receiving, Storage, and Handling of Items for Water-Cooled Nuclear Power Plants."

g. NRC Regulatory Guide 1.39, Revision 2, "Housekeeping Requirements for Water-Cooled Nuclear Power Plants."
h. NRC Regulatory Guide 1.58, Revision 1, "Qualification of Nuclear Power Plant Inspection, Examination and Testing Personnel."

NRC Regulatory Guide 1.64, Revision 1, "Quality Assurance Requirements for the Design of Nuclear Power Plants."

NRC Regulatory Guide 1.74, Revision 0, "Quality Assurance Terms and Definitions".

k. . NRC Regulatory Guide 1.88, Revision 2, "Collection, Storage and Maintenance of Nuclear Power Plant Records."

Note: When record storage facilities are not designed in accordance with the requirements of Regulatory Guide 1.88, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.

NRC Regulatory Guide l.ll6, Revision O-R, "Quality Assurance Requirements for Installation, Inspection, and Testing of Mechanical Equipment and Systems."

mo NRC Regulatory Guide 1.123, Revision 1, "Quality Assurance Requirements for Control of Procurement of Items and Services for Nuclear Power Plants."

n. NRC Regulatory Guide 1.144, Revision 1, "Auditing of Quality Assurance Programs for Nuclear Power Plants" 0 ~ NRC Regulatory Guide 1.146, Revision 0, "Qualification of Quality Assurance Program Audit Personnel for Nuclear Power Plants."

Revision 17 December, 1991

2. Or anization The major organizations participating in the Quality Assur-ance Program are Purchasing, Technical Services, Ginna Nuclear Production, Electric Transmission and Distribution, Quality Performance, the Plant Operations Review Committee, and the Nuclear Safety Audit and Review Board. Figure 2-1 is an organizational chart showing these organizations and

'their relationship to the corporate organization.

Positions responsible for the principal elements of the quality assurance program are:

Chairman of the Board, President and Chief Executive Officer Senior Vice President, Production and Engineering Vice President, Ginna'uclear Production Division Manager, Technical Services and Chief Engineer Department Manager, Nuclear Engineering Services Department Manger, Quality Performance Manager, Quality Assurance Department Manager, Production and Engineering Systems Department Manager and Purchasing Agent, Materials-Management Plant Manager, Ginna Station Superintendent, Ginna Support Services Superintendent, Ginna Production

< Department Manager, Production Division Training Manager, Nuclear Assurance Department Superintendent, Electric Substations Department Department Superintendent, Electric Laboratory and Telecommunications Manager, Materials Engineering and Inspection Services In addition to the above individuals, two advisory groups are utilized to review and audit plant operations. These groups are the Plant Operations Review Committee and the Nuclear Safety Audit and Review Board. The Plant Operations Review Committee acts in an advisory capacity to the Plant Manager, Ginna Station and the Nuclear Safety Audit and Review Board advises the Senior Vice President, Production and Engineering. The qualifications of members and the responsibilities of=these organizations are described in Section 6.0, Technical Specifications, Appendix A to Provisional Operating License No. DPR-l8.

Revision 17 December, 1991

The Cha'irman of the Board, President and Chief Executive Officer of the Rochester Gas and Electric Corporat'ion directed the establishment of the Quality Assurance Program and i'ssued the governing policy statement.. He has established the Nuclear Safety Audit and Review Board to

'review and audit plant operati;ons. . The Chairman of the Nuclear Safety Audit and Review Board is'esponsible to the Chairman of the Board, President and Chief Executive Officer on all activities of the Nuclear Safety Audit and Review Board.

The Senior Vice President, Production and Engineering reports to the Chairman of the Board, President and Chief Executive Officer and has corporate responsibility for operation of Ginna Station in accordance with applicable regulatory requirements. In addition, he has overall responsibility and authority for directing the Quality Assurance Program and shall be responsible for the approval of the Quality Assurance Manual. He is responsible for establishing the policies and requirements necessary to assure safe and reliable operation of Ginna Station. He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The Vice President, Ginna Nuclear Production is responsible to the Senior Vice President, Production and Engineering for directing Ginna nuclear production activities and those support activities'ssociated with Nuclear Engineering Services,'roduction Systems and Services, Production Division Training,'nd Corporate Radiation Protection.

The Plant Manager, Ginna Station is responsible to the Vice President, Ginna Nuclear Production for the overall on-site safe operation of Ginna Station. He is responsible for the performance of all Ginna Station quality affecting activities in accordance with the requirements of the quality assurance program. He is responsible for providing qualified personnel to perform these activities in accordance with approved drawings, specifications, and procedures. He is also responsible for those items delineated in Section 6.0, Technical Specifications.

The Superintendent, Support Services reports to the Plant Manager, Ginna Station and is primarily responsible for the performance of modification, plant maintenance, and fire.

protection'activities in accordance with the'requirements of the Quality Assurance Program.

Revision 17 December, 1991

The Superintendent, Ginna Production reports to the Plant Manager, Ginna Station, and is responsible for operations, health physics and chemistry, refueling, results and tests, Ginna Computer Systems technical engineering, surveillance testing and operational assessment in accordance with the requirements of the quality assurance'program.

The Plant Manager, Ginna Station and Superintendents are assisted by other designated staff members, Figure 2;3, 'in the implementation of certain Quality Assurance Program requirements at the plant. These staff members are assigned responsibility for testing, procurement, storage of material and equipment, operation and test status control, calibration and control of measuring and test equipment, maintenance of material handling equipment, and control of all activities involving operation,'aintenance, repair, ~

refueling and modification.

The Department Manager, Production Division Training is responsible to the Vice President, Ginna Nuclear Production for maintaining and implementing an INPO accredited training program and, in conjunction with Materials Engineering and Inspection Services, for providing trained and qualified welders, riggers and crane operators to support nuclear related activities."

The Department Manager, Nuclear, Engineering Services is responsible to the Vice President, Ginna Nuclear Production for designing and constructing major modifications in accordance with applicable design bases, regulatory requirements, codes and standards and for nuclear fuel management'. As requested by Ginna Station, he is also responsible for reviewing unique maintenance and repair procedures for major equipment.

The Division Manager, Technical Services and Chief Engineer is responsible to the Senior Vice President, Production and Engineering for directing activities in support of Ginna Station. These activities include long range planning for life extension and low level radwaste disposal strategies, personnel support for Ginna Station maintenance activities, records retention, document control, chemistry and environmental requirements support. In addition, he provides support to Nuclear Engineering Services to assist in administration and training associated with procedure changes and to provide coordination for generating responses to audits and inspections.

Revision 17 December, 1991

The Department Manager, Production and Engineering Systems is responsible to the Division Manager,, Technical Services and Chief Engineer for providing records management and document control support services for nuclear related activities.

The Department Managery Quality Performance is responsible for establishing the overall Quality Assurance Program. He is responsible for assuring that all planned and systematic

-actions necessary to provide adequate confidence that Ginna Station will operate safely and reliably are established and followed. He'rovides management with 'objective information concerning quality, independent of the individual or group directly responsible for performing the specific activity.

He has the authority and organizational freedom to assure all necessary quality activities are performed. In addition, he is responsible for special processes and the

'nservice inspection program. He is responsible for.

maintaini'ng a staff, Figure 2-2, for the conduct of staff training and for directing its activities. The staff assists in the preparation and maintenance of the Quality Assurance Manual.

The Manager, Quality Assurance reports to the Department Manager, Quality Performance. He and the Quality Assurance Staff are responsible for formulating corporate quality assurance policy and for assuring its implementation. This includes writing Quality Assurance policies, assuring that the program satisfies the requirements of 10CFR50, Appendix B, and for maintaining the total program up to date.. The Manager, Quality Assurance is also responsible for establishing and implementing a comprehensive audit and surveillance program, as well as reviewing administrative procedures of the organizations participating in the Quality Assurance Program. The staff is also responsible for auditing and surveillance of aspects of the Quality Assurance Program and for ensuring significant conditions adverse to quality are corrected. They are responsible for assuring that proper codes, standards, and quality requirements are specified in design, procurement and installation documents. They are responsible for assuring that the suppliers of safety-related material, equipment and services are properly qualified, and they are responsible for conducting audits and surveillances at these supplier's facilities. In addition, the staff assists the Manager, Quality Assurance, in the preparation of the audit schedule, audit status reports and applicable corrective action report summaries.

Revision 17 December, 1991

The Manager, Quality Assurance is a graduate engineer with at least six years of responsible experience, of which two years are in quality assurance and three years in the design or operation of nuclear power plants.

The Manager, Materials Engineering and Inspection Services is responsible for supervising and directing a staff which is responsible for the development and qualification of procedures utilized for special processes. He is responsible for providing functional guidance and direction for those methods. He is responsible for establishing the Inservice Inspection Program and for coordinating changes thereto. He is also responsible for the routine maintenance of lifting and'andling equipment and for the testing and evaluation of Ginna Station materials.

The Manager, Nuclear Assurance reports to the Department Manager, Quality Performance and is responsible for assuring that station activities affecting quality are prescribed and carried out in accordance with approved drawings, specifica-tions, and procedures. He is a member of the Plant Operations Review Committee and delegates the day to day quality assurance and control planning and work monitoring responsibilities to his staff of Quality Contxol Engineers and QC,Inspectors. The Quality Control Engineers are responsible for the review of design and installation documents and for the review of plant procedures which involve maintenance, repair, refueling, modification, and testing. Nuclear Assurance is responsible for the coordination of inspection activities and the assurance that inspection requirements are included in approved procedures-and work packages. This includes the receipt inspection of incoming materials, parts and components and the processing of nonconformance reports. The Nuclear Assurance Quality Control Inspectors also perform compliance oriented surveillance of nuclear related activities.

The Department Manager and Purchasing Agent, Materials Management is responsible for the procurement of materials, services, and components, from qualified suppliers, in accordance with applicable commercial, technical, and quality requirements. He'aintains a listing of qualified suppliers determined through an evaluation made by Purchasing, Nuclear Engineering Services, Quality Assurance and the other involved departments as appropriate.

The Department Superintendent, Electric Laboratory and Telecommunications is responsible for providing a staff, Revision 17 December, 1991

Figure 2-4, to perform routine maintenance and testing services for Ginna Station meters. He is also responsible for providing laboratory testing of some electrical equipment and devices.

The Department Superintendent, Electric Substations Department is responsible for providing a staff, Figure 2-4, to perform relay engineering, maintenance and testing services. He is also responsible for design, modification and construction activities at Station 13A and for supporting the Nuclear Engineering Services design and construction activities at Ginna. He is also responsible for coordinating and for providing support documentation for any design modifications initiated within the Electric Transmission and Distribution Division.

3 ~ Desi n Control Design activities are performed by, Rochester Gas and Electric Corporation personnel or are subcontracted to organizations providing services to Rochester Gas and Electric.

Nuclear Engineering Services is responsible for the design and control of design activities (including design interfaces) for major modifications of structures, systems or- components.

Augmenting .this effort is the design and technical support provided by the Electric Substations Department for the systems and equipment, for which Electric Transmission and Distribution is responsible for maintaining. In this regard they support Nuclear Engineering Services for design of safety related modifications.

Ginna Station is responsible for the design and control of design activities for Minor m'odifications of structures, systems, or components. Ginna Station is also responsible for classifying station originated modifications as either Major or Minor. Nuclear Engineering Services reviews and concurs with modifications being classified as Minor. Minor modifications typically involve (1) component changes which involve vendor design and are limited to the extent that the change does not impact existing performance requirements,

,(2) additions within Seismic Category I buildings which perform no safety functions and which neither interface with Seismic Category I or Class 1E items nor whose failure could reduce the functioning of any safety related component Revision 17 December, 1991

required for safe shutdown of the plant to an unacceptable (3) changes to a safety related system determined not 'evel,

,to be major (e.g., vents, drains, alarms, indicating lights, etc.).

Design control is implemented by means of procedures which include: design considerations, design review requirements; internal and external interface control considerations; design document review, approval,'istribution, control, and revision requirements; and corrective action. 'esign con-siderations include, as appropriate: physics, stress, materials, thermal, hydraulic, radiation and accident analyses; appropriate design bases, codes, standards and regulations; acceptability for operation, maintenance and repair; acceptance and rejection criteria; and quality standards and other quality assurance requirements. Design verification utilizes various methods such as formal design reviews, alternate calculations, or tests, as appropriate, to assure the adequacy of the design.

The design of plant modifications is verified by an engineer other than the one who performed the original design. For Major modification design, this may be done by Nuclear Engineering Services design engineers or consulting engineers as requested. For Minor modification station design, this may be done by Ginna Station, Nuclear Engineering Services design engineers or consulting engineers, as appropriate.

Spare or replacement parts must at least meet the original equipment's technical and quality requirements. For plant modifications, standard, "off-the-shelf", commercial or pre-viously approved materials, parts, and equipment are selected and reviewed for suitability of application by a design engineer.

Changes to a modification design are normally reviewed and approved in accordance with the same procedures as the original modification design. Supplemental procedures are established for the review and approval of field changes.

.In general, design changes including field changes, are reviewed and approved by the organizations or individuals that performed, reviewed and approved the original design.

Where this. is not practical, other responsible design organizations or individuals are designated, provided they have access to pertinent background information and are com-petent in the specific design area.

Revision 17 December, 1991

Design verification and field change systems are methods ut'ilized to detect, document and correct design process errors and deficiencies. In addition, the corrective described in Section 16,, is utilized to control and action'ystem, document corrective action to preclude recurrence of those design process errors and deficiencies which are considered to be a significant condition adv'erse to quality.

Quality Assurance is responsible for assuring that design control procedures, whether the work is done by Rochester Gas and Electric or by other organizations, are prepared and implemented and incorporate appropriate design control practices, checks,= and reviews. Design control procedures are reviewed to assure that an independent verification is performed.

Engineering and Ginna Station are responsible for establishing measures for the proper control of design documents and revisions there-to, to assure that distribution is to responsible individuals and in a timely manner to prevent inadvertent use of superseded design information. The measures include the use of document revision levels, document transmittals, release stamps, field change request forms and distribution lists.

Design documents are collected, stored, and maintained in accordance with Section 6 and 17, as appropriate. Design

'documents include des'ign criteria, analyses, specifications, drawings, design review records, and changes thereto.

Quality Performance, through preparation assistance and/or review, assure the proper inclusion. of quality standards in the design of major and minor modifications. Quality Performance is also responsible for assuring that adequate test, examination and inspection requirements are included in specifications. The Manager, Quality Assurance reviews and approves any deviations from quality standards when they occur.

Plant modifications are controlled by means of applicable Ginna Station, Engineering, Electric Transmission and Distribution, Materials Engineering and Inspection Services, Production Division Training and Quality Assurance/Quality Control procedures. These procedures provide for the preparation, review, and approval of design documents, safety analyses, and plant modification procedures. Plant ~

Revision 17 December, 1991

modifications are reviewed by the Plant Operations and Nuclear Safety Audit and Review Board Review'ommittee as required by Section 6.0, Technical Specifications.

4 ~ Procurement Document Control Procurement document control applies to the control of procurement documents for materials, parts, components, and services required to perform quality affecting activities.

Such documents may be prepared by Rochester Gas and Electric or by a contractor and include purchase requisitions, purchase orders, service agreements, contracts, specifications, and drawings.

Procurement of materials, parts, components, and services is initiated by department staff per'sonnel. Procurement proce-dures 'require that organizations preparing procurement documents consider and include, as appropriate, the items listed in Table 4-l.

Procurement documents, including those requesting spare or replacement parts, initiated at Ginna Station are reviewed by Quality Performance and approved by the designated Ginna Station supervision. Procurement documents initiated in Nuclear Engineering Services, Materials Engineering and Inspection Services, Electric Transmission and Distribution t and Quality Assurance/Quality Control are reviewed by Quality Performance and approved by designated departmental

'supervision.

Evidence of review and approval of procurement documents is recorded on the .documents and identifies to Purchasing a procurement method which will ensure that the selected supplier is capable of providing the item or service in accordance with the requirements of the procurement documents. Considerations used in selecting a supplier and for determining the corresponding procurement method are described in Section 7.

After purchase requisitions, service agreements, contracts, specifications, and,drawings have received the required re-views and approvals, a purchase order is issued'y Purchasing to the selected supplier and controlled as described in Section 7. These documents are maintained by Purchasing, by the originating department, and/or by the receiving locations, as appropriate, until procurement is completed.

Revision 17 December, 1991

Under. no circumstances are purchasing requirements altered.

(except for quantity or pricing) during- order placement unless review and concurrence is obtained from those who were required to review, concur with, and approve the original documents as described above. Changes or revisions to procurement documents are subject to the same review and approval requirements as the original documents.

Originating department technical review of procurement documents includes verification of applicable regulatory, code and design requirements. Quality Performance review of the above includes- checks to verify proper inclusion of the quality standards, quality assurance program requirements, method of procurement and the applicable acceptance criteria. Ginna Station reviews procurement documents for spare or replacement parts to determine similarity, and acceptance criteria of the original design. compati-'ility, Quality Performance also reviews procurement documents for spare or replacement parts for adequacy of the quality requirements.

Instructions Procedures and Drawin s Each Rochester Gas and Electric company organization, involved in quality related activities, is responsible for developing, reviewing, approving, and implementing .

procedures as required to implement the Quality Assurance Program. These procedures cover activities such as document control, training of personnel, and responsibilities and duties of personnel. Quality Performance reviews and concurs with=these procedures. Table 1-1 provides a summary of the subject matter contained in the procedures which are used to implement the quality assurance program.

Procurement documents require suppliers and contractors to have appropriate instructions, procedures, specifications, and drawings.

Ginna Station is responsible for providing and implementing instructions and procedures associated with operation, maintenance, repair, in-service inspection, refueling, procurement, modification and testing. This includes instructions and procedures listed in USAEC Regulatory Guide. 1.33 for administrative control; general plant operation; startup, operation, and shutdown of safety related systems; correction of abnormal, off normal, or alarm conditions; response to emergencies and other significant events; radioactivity control; control of measuring and test equipment; chemical and radiochemical Revision 17 December, 1991

control; and fuel handling and refueling. Ginna Station is responsible for -appropriate changes to such documents upon receipt of regulatory directives; instructions from Roches-ter Gas and Electric management, or the completion of plant modxfzcata.ons. Gonna Station xs also responsible for the preparation and issuance of those minor modification design documents not provided by Nuclear Engineering Services or the equipment supplier.

Electric Transmission and Distribution is responsible for the preparation and implementation of relay inspection and testing procedures as required to direct detailed inspec-tions and testing activities for which they ar'e responsible.

Electric Transmission and Distribution also assists in the preparation of routine relay maintenance and testing procedures used by their personnel in the annual Ginna Station protective relay surveillance program.

Nuclear Engineering Services is responsible for providing approved specifications, and drawings associated with major modifications and when minor modifications necessitate drawings oh specifications. These documents require those performing the work to obtain, understand, and comply with appropriate procedures, specifications and drawings.

Engineering has established procedures for revising drawings and specifications. These procedures cover updating of as-built drawings after plant modifications and the revision, approval, distribution, and control of all drawings and specifications.

Quality Performance is responsible for the preparation and implementation of inspection procedures utilized for detailed inspection activities for Ginna Station. This organization is responsible for providing and for implementing procedures for audit and surveillance related activiti'es. In addition, it is responsible for providing and for implementing instructions and procedures associated with special processes, routine maintenance and inspection of cranes and handling equipment as well as materials testing and inservice inspection.

Persons preparing and approving documents are responsible for assuring that specifications, instructions, procedures, and drawings include appropriate quantitative or qualitative acceptance criteria for determining that important activities have been satisfactorily accomplished and assuring that the documents are kept current.

Indoctrination and training of personnel is provided by the Revision 17 December, 1991

responsible organizations to ensure that quality affecting activities are conducted in accordance with established documents. In addition, Quality Performance department surveillance and audit as described in Section 10 and Section 18 are used to verify that quality affecting activities are being performed in accordance with approved instructions, procedures and drawings.

Document Control Procedures are established to control the issuance of pro-cedures, instructions, drawings, and specifications.

Standard document control requirements are contained in the Quality Assurance Manual. The Plant Manager, Ginna Station is responsible for the control of all documents issued at Ginna Station.= 'lectric Transmission and Distribution and Production Division Training are responsible for the control of documents issued by their respective organizations.

Production and Engineering Systems controls the distribution of controlled manuals issued for the other organizations performing activities which implement this Quality Assurance Program (Table 1-1). Each organization controlling documents has a separate procedure to control documents in accordance with the requirements of the Quality Assurance Manual.

The Quality Assurance Manual designates responsibilities and

'defines requirements for the preparation, review and approval of documents. Each department responsible for an activity is responsible for providing the necessary review and approval of instructions, procedures or drawings to assure that they are adequate, and include appropriate qualitative and quantitative requirements. Nuclear Assurance Quality'Control representatives, assigned to support departmental maintenance, repair, refueling and modification activities, review governing procedures, prior to use, to assure quality assurance requirements'are included. The Plant Operations Review Committee has the responsibility for reviewing Ginna Station procedures prior to their approval as required by Section 6.0, Technical Specifications. Detailed inspection, test and examination procedures used by qualified personnel require the review and concurrence of the responsible technical person associated with. that activity. Ginna Station, Engineering, Material Engineering and Inspection Services, Purchasing, Production Division Training and Electric Transmission and Distribution quality assurance implementing procedures Revision 17 December, 1991

(Table 1-1) require the review and concurrence of Quality and the approval of the appropriate department 'erformance supervisor.

Quality Assurance/Quality Control procedures are approved by the Department Manager, Quality Performance or designee.

The Quality Assurance Manual requires that documents be controlled as appropriate, considering the type of document involved, its importance to safety, and the intended use of the document. Zt specifies the types of documents which must be controlled; identifies the difference between con-trolled and uncontrolled copies of the same document; includes the method for identifying holders of controlled copies; requires that only controlled copies of a document be used for official purposes; requires that lists of effective revisions be issued periodically; requires lists of document holders to be maintained by the distributors; and requires that distributors transmit controlled documents using approved forms internally and externally.

Types of documents which are controlled include Technical Specifications, UFSAR, Quality Assurance Manual, procedures (such as engineering, purchasing, repair, maintenance, test, calibration, fuel handling, modification, and administrative), specifications and drawings. Suppliers of materials, equipment, and services are required in procure-ment documents to provide for control of documents, including manufacturing, inspection and testing instructions.

The Quality Assurance Manual further requires that each organization provide in its procedures for measures: to assure that documents are available when required; to pro-perly review and approve documents such as procedures, instructions, specifications, arid drawings; to provide the same reviews and approvals for changes to documents as was required of the original document; to require that organiza-tions which review and approve documents have access to pertinent information and adequate knowledge of the original document intent; to assure that approved changes are promptly transmitted for incorporation into documents; and to assure that obsolete or superseded documents are eliminated from the system and not used.

Quality Performance is responsible for review and concurrence of procurement documents for all procuring Revision 17=

December, 1991

organizations and, therefore, procurement document control requirements.

Quality Performance is responsible for review, inspection, surveillance, and audit, as appropriate, of document control systems to assure adequate systems are implemented.

Control of Purchased Material E ui ment and Services Procurement documents, supplier selection, planning for item or service acceptance, control of supplier performance and acceptance of items and services are five major means used in controlling purchased material, equipment and services.

All procurement is conducted in accordance with procurement documents as stated in Section 4; All reviews, inspections, surveillances, and audits are conducted by personnel who are competent in establishing whether or not a supplier is capable of providing acceptable, quality products.

Procurement planning is utilized by the procuring organiza-tions for determining the methods to be used for acceptance of the item or service as well as requirements for the control of the supplier performance. Source inspection (surveillance)., certificate of conformance, receipt inspec-tion and post installation test are methods which are considered for item acceptance with receipt inspection utilized in the acceptance of all items. In .lieu of these methods, acceptance of services is based. on either or a combination of: (1) surveillance of the activity and (2) review of objective evidence for conformance to the procure-ment document requirements (i.e. certifications, stress reports etc.). The extent of the acceptance methods and as-sociated verification activities will vary and be a function of the relative importance and complexity of the purchased item or service and the suppliers past performance.

Consideration for the control of supplier performance includes the necessity for document submittals or surveillance, and under what situation the supplier is to report nonconformances.

Results of the planning are incorporated in the procurement documents.

Selection of a supplier is based on the evaluation of its capability to provide the item or services in accordance with the requirements of the procurement documents. The evaluation which is accomplished during the procurement Revision 17 December, 1991

planning, determines the necessity for the supplier selection to be from the approved suppliers list maintained by Purchasing. Purchasing utilizes the approved suppliers list as the selection source for those suppliers found to have a satisfactory quality assurance program. The evaluation guidelines for source selection considers the item complexity, method(s) of acceptance and for a replacement item, if the source is to be restricted to the original supplier. For engineered and off-the-shelf items procured from suppliers required to have a quality assurance program, supplier selection is from the approved suppliers lists or one who is in the process of being added to a list, after having its capability evaluated to purchaser satisfaction. Items or services which meet industry standards and are typically utilized in applications other than nuclear may be purchased from suppliers not listed on the approved suppliers list provided that item acceptance can be based on acceptance of standard commercial quality which is supplemented, as necessary, with source surveillance, pre- or post-installation tests, receipt tests, commercial supplier test reports, commercial supplier certificates, or receipt inspection. Items or services which have nuclear quality requirements which normally require the supplier to implement a quality assurance program but for which no such supplier can be practicably utilized may also be purchased from suppliers not listed, on the approved suppliers list provided that verification of nuclear quality can be accomplished by method's such as source surveillance, pre-'r post-installation tests, receipt tests, supplier test reports, supplier certificates, or receipt inspection as approved by Quality Assurance.

Departmental procedures establish guidelines for source selection evaluations and for documenting the results through indication of the corresponding procurement method.

The purchase requisition will also identify the source when replacement parts are to be procured from the original equipment supplier.

Addition of a supplier to the approved suppliers list is based on satisfactory evaluation of the supplier's capability by Quality Assurance, Purchasing and other departments, as appropriate.

For engineered items, Nuclear Engineering Services is responsible for evaluating the overall design or manufacturing. capability of the supplier including his particular technical ability to produce the design, service, item, or component delineated in the procurement documents.

'19-Revision 17 December, 1991

As part of this review, the supplier s design capabilities, machinery capabilities, handling capabilities, testing facilities, service capabilities, and experience are reviewed.

Quality Assurance i's responsible, for evaluating the supplier's overall quality assurance organization and program in accordance with applicable codes, standards, applicable parts of 10CFR50 Appendix B, and Rochester Gas and Electric Corporation requirements. The review includes consideration of: company organization, quality assurance personnel qualifications, review and control of design documents, manufacturing procedures, quality assurance procedures, calibration practices, acceptance criteria, required quality assurance records'and their retention, and quality assurance requirements and controls'mposed by the supplier on his subcontractors. Supplier evaluation is conducted by means of procedures or checklists which identify applicable regulatory or code quality assurance .

requirements.

Ginna Station, Quality Performance and Electric Transmission and Distribution evaluate the suppliers of inspection, test, and calibration services which they intend to use.

The departments responsible for performing supplier evalu-ations shall document 'their results in reports which discuss areas investigated, findings, and conclusions. As applicable, concurrence of Purchasing, Nuclear'ngineering Services, Quality Performance, Ginna Station and Electric

~

Transmission and Distribution is required to place a supplier on the qualified suppliers'ist. One organization can remove a supplier from the list without concurrence of

the others.

Measures are established by Nuclear Engineering Services and Quality Assurance to control supplier performance for engineered items. These measures typically include the processing of change information, surveillance of supplier activities and the control of documents exchanged with the

'n supplier. addition, each department procuring off-the-shelf items or services establishes similar measures for the control of supplier performance. With the exception of processing change information, the need for and applicable extent of purchaser controls of the supplier are determined during procurement planning.

Revision 17 December, 1991

Quality Assurance is re'sponsible for determining and documenting the degree of supplier surveillance (including review, inspection, or audit) required during design, fabrication, inspection, testing, and shipping, and for providing the required surveillance. The objective of supplier surveillance is to provide a sampling review of the supplier's quality assurance program implementation and of product conformance with respect to the purchase order requirements. For complex engineered items, Quality

.Assurance and Nuclear Engineering Services are responsible for joint development of surveillance plans in advance of surveillance trips to identify areas to be reviewed.

The results of the surveillance trip are documented by means of inspection sheets or trip reports which are distributed to the Manager, Quality Assurance, and the department which initiated the procurement. When a deviation from purchase order requirements is noted, the Quality Assurance represen-tative has the authority to inform the vendor that a particular item is unacceptable, to issue a nonconformance report, or to stop work, if necessary.

Quality Performance is responsible for. surveillance of Ginna Station site contractors to assure that they meet all technical and quality requirements. The reporting and documenting of contractor surveillance is managed in a manner similar to supplier surveillance.

The verification methods for the acceptance of items and services are specified on the attached procurement control form during procurement planning and the purchase requisition preparation.

Department supervision is responsible for receiving and storing items pending their acceptance. Upon receipt, the department stockkeeper logs the item, places a "hold" tag item, and notifies Quality Performance that the item has on'he arrived; Quality Performance is responsible for receipt inspection at Ginna Station upon delivery of items and associated services for maintenance, repair, modification, and refueling. This inspection includes the use of written procedures or checklists to verify that the items and services conform to the procurement documents (if this has not been performed by source inspections) and that documentary evidence of conformance is available at the plant prior to installation or use. Documentary evidence sufficient to identify the Revision 17 December, 1991

codes, standards or specifications met by the purchased material, equipment, and services is retained. In the'vent a final source inspection for 'the acceptance is conducted prior to receipt by RG&E, Quality Performance performs an inspection for shipping damage or lost parts and a'ocument check to assure that the required documentation has been reviewed and is complete. A receiving inspection checklist is completed for all items received to document the extent of the inspection performed, including the documents checked, and the inspection results.

If the item and documentation are adequate, Quality Performance labels the item as "Accepted", files the documentation and receipt inspection results, and releases the item for storage or use. If the item is nonconforming or the documentation is unsatisfactory, Quality Performance initiates controls on the item in accordance with Section 15.

All items iss'ued must bear an acceptance tag and have docu-mentation to support the acceptability of the item; In the event the traceability is lost or the documentation review is unsatisfactory, the item becomes nonconforming and may not be released for use.

Identification and Control of Materials Parts and The identification and control of materials, parts, and components is accomplished in accordance with written requirements and appli.es to material, parts, or components in'ny stage of fabrication, storage, or installation.

Identification and control requirements are established by either an existing procedure or requirements documents which are prepared during the planning stages of a project. The identification and control requirements cover items such as:

traceability to associated documents such as drawings, specifications, purchase orders, manufacturing test data and inspection documents, and physical and chemical mill test specification of the degree of identification to 'eports; preclude a degradation of the item's functional capability or quality; and the proper identification of materialsg parts, and components prior to release for manufacturing, shipping, construction, and installation.

Nuclear Engineering Services and Quality Performance are responsible for assuring that drawings and specifications contain appropriate requirements for the identification and Revision 17 December, 1991

control of materials, parts, or components, as appropriate; Suppliers are required to assure that all required documentation for an item is properly identified and related to the item. Each item is'equired to be physically identified, either by marking on the item or by tags.

Physical identification by purchase order number is used to the maximum extent possible for relating an, item at any time to applicable documentation. Identification is either on the item or records traceable to the item. Where physical identification is impractical, physical separation, procedural control, or other appropriate means are employed.

The Plant Manager, Ginna Station is responsible for main-taining identification and control of materials, parts, or components received, stored, installed, and used at the plant. Procedures covering the identification and control of materials, parts, and components at the plant are approved by the Plant Manager, Ginna Station. The responsible supervision of other departments which receive material which is to be stored away from the-plant are responsible for establishing procedures for identification and control and for maintaining identification and control of material, parts, or components, stored or used in their area of. responsibility.

In the event that traceability is lost for a specific item, it is handled as nonconforming material and deviations and waivers are controlled and documented in accordance with Section 15.

Control of S ecial Processes Written procedures are established to control special pro-cesses, such as welding, heat treating, and nondestructive examination to assure compliance with applicable codes, standards, and design specifications. Qualification of

, personnel and special process procedures complies with the requirements of applicable codes and standards. When special process qualification requirements are not included in existing codes and standards, they are described in procedures which give details of the special process, the personnel qualification requirements, the equipment necessary, and the .special process qualification requirements.

Initiators of procurement activities are responsible for requiring suppliers, in procurement documents, to control special processes in accordance with the above requirements.

Revision 17 December, 1991

Quality Performance personnel are responsible for reviewing procurement documents to ensure that requirements for control of special processes are included.

Rochester Gas and Electric procedures for special processes are prepared, reviewed, and approved'y Materials Engineering and Inspection Services. Special process procedures submitted by suppliers and contractors are reviewed and concurred with by Materials Engineering and Inspection Services.

The Manager, Nuclear Assurance and Ginna Station Maintenance Managers are responsible for assuring that personnel per-forming special processes under their cognizance are quali-fied and are using qualified procedures in accordance with applicable codes, specifications, and standards. Within the Quality Performance Department, the Manager, Materials Engineering and Inspection Services is responsible for 'the of NDE personnel and procedures. The Manager, 'ualification Materials Engineering and Inspection Services is responsible for the qualification of welding procedures and the training and qualification of welders. Records for personnel and procedures to demonstrate that required qualifications have been obtained and kept current are maintained by Production and Engineering Systems.-

Quality Performance performs surveillance, inspections, and audits of special processes performed by Rochester Gas and Electric or contractors to assure effective compliance with procedures.

Ins ection Procedures prepared for the control of activities include inspection requirements and hold points as required by drawings, instructions, requirements documents, specifi-cations, codes, standards, or regulatory requirements. For clarification and to distinguish from preventive maintenance inspections, the following controls are associated with the quality assurance function inspections and referred to as verification inspections. Instructions for conducting detailed verification inspections are contained in inspection procedures. These inspection procedures and all supporting specifications and drawings are provided to inspection personnel for use prior to performing the inspection. Inspection requirements and hold points are utilized to verify conformance of activities to the documented instructions, specifications, and drawings for Revision 17 December, 1991

accomplishing the activity. Inspection procedures include the identification of quality characteristics to be inspected, a description of the method of inspection to be used, the identification of the group responsible for per-forming the inspection, the acceptance and rejection criteria, the requirements for the recording of inspection results, and the requirements for providing evidence of completion and certification of the inspection activity.

Verification inspections are performed by qualified inspec-tion personnel who are independent of the personnel performing the work. Outside contractors are required by procurement documents to have and follow similar procedures and to use independent inspectors. Inspectors are sufficiently trained to adequately evaluate the activity they are inspecting.

Quality Performance personnel are responsible for performing verification inspections, as required, during'plant operation, maintenance, repair, in-service inspection, refueling, modification, and testing when the work is performed by Rochester Gas and Electric personnel. When the work is performed by. outside contractors, Quality Performance is responsible for surveillance of the subcontractor's inspection activities. Inspection equipment is calibrated and controlled in accordance with Section 12.

Calibration status is verified by inspection personnel prior to performing an inspection operation.

In the event an inspection of processed material or products is impossible or impractical, indirect control, by monitoring processing methods, equipment, and personnel is provided.

Both inspection and process monitoring are required when control is inadequate without both.

Quality Performance is responsible for the verifying adequate inclusion of inspection requirements in specifications.

The Manager, Nuclear Assurance is responsible for assuring that adequate inspection requirements and hold points are included in maintenance, repair, refueling, modification and testing instructions and procedures. He is also responsible for the assignment of qualified personnel required for the performance of verification inspections and quality control surveillances of quality affecting activities.

The Manager, Nuclear Assurance is also responsible for assuring that adequate inspection requirements are included Revision 17 December, 1991

in procedures, instructions and/or checklists controlling maintenance, modification and repair activities and related fabrication processes for Ginna Station.

With the exception of that which pertains to Pump and Valve Testing, the Manager, Materials Engineering and Inspection Services is responsible for establishing the requirements for the Inservice Inspection Program. Nuclear Engineering Services is responsible for establishing the requirements for the Inservice Pump and Valve Testing Program. The program for inservice inspection of the reactor coolant system and other safety related systems is contained in Section 4.2, Technical Specifications.

Test Control

'Checks or testing performed to verify'he adequacy of corrective or preventive maintenance shall be performed to approved instructions, procedures, or drawings.

Whenever testing is required to demonstrate that a material, part, component, or system will perform satisfactorily in service, a test program is instituted employing written and approved procedures which are in accordance with basic requirements established in Technical Specifications, draw-ings, instructions, procurement documents, specifications, codes, standards, and regulatory requirements. The test program requires the identification,'ontrol, and documen-tation of all tests, and -the preparation of written proce-dures required for satisfactory accomplishment of the testing. Together the written procedures and checklists for the testing program include: necessary test equipment and calibration requirements; material requirements; test personnel requirements; prerequisite plant and equipment conditions; limiting conditions; detailed performance instructions for the testing method and test equipment instrumentation; acceptance and rejection criteria; instruc-t tions for disposition of deviations; data collection requirements; and test result approval.

The Plant Manager, Ginna Station is responsible for the statio'n test program, which includes the surveillance test program required by Section 4.0, Technical Specifications and testing associated with modifications.

Test procedures are prepared by the plant staff, reviewed by the Plant Operations Review Committee and Quality Performance, and approved by the Plant Manager, Ginna Station. The Plant Manager, Ginna Station is responsible Revision 17 December, 1991

for the correct and timely 'performance of the required tests utilizing written and approved procedures. When contractors are employed for tests, the contractor is required to perform testing in accordance with.its quality assurance program requirements. All test results are required to be documented, reviewed, and approved by those responsible for performing the test.

When requested by Ginna Station, Electric Transmission and Distribution performs test activities to determine the cause of protective relay malfunctions. These test activities are performed in accordance with approved procedures by qualified personnel..

Nuclear Engineering Services and Quality Performance are responsible for assuring that required tests for major modifications are included in specifications. Nuclear Engineering Services and Electric Transmission and Distribution assistance in the preparation of modification-related test procedures may be provided to the Ginna Station staff. The Ginna Station Technical Manager is responsible for the adequate inclusion of test requirements in minor modification design documents and for reviewing modification-related test results for acceptability to design requirements. Reviews of minor modification design by Quality Performance verifies adequate inclusion of test requi'rements.

Control of Measurin and Test E ui ment The calibration and control system for measuring and test equipment includes calibration procedures, establishment of calibration frequencies, and maintenance and control requirements of measuring and test instruments, tools, gauges, shop standards, and nondestructive test equipment which are to be used in the measurement, inspection, and monitoring of components, systems, and structures. Calibra-tion procedures include step-by-step methods for calibration and requirements for instrument accuracy. Calibration frequency is based on required accuracy, degree of usage, stability characteristics, manufacturer's recommendations, experience, and other conditions affecting measurement capability.

Control of measuring and test equipment requires: a recall system assuring timely calibration of equipment; a system providing unique identification of equipment, traceability to calibration test data, and identification of the next Revision 17 December, 1991

calibration date on the equipment; a system providing trace-ability of=shop standards to nationally recognized standards (where national standards do not exist, procedures contain instructions to document the basis for calibration) and periodic revalidation of shop standards; a system providing for records to be maintained which indicate the complete status of all items, under the calibration system including the maintenance, calibration results, abnormalities, and last and future calibration dates; and a system controlling the purchase requirements of new equipment to be entered into the calibration and control system including require-ments for accuracy, stability, and repeatability under normal use conditions. In the event a measuring instrument (i.e. shop or field standard) is found out of calibration, an investigation is conducted, to determine the validity of previous measurements.

The Plant Manager, Ginna Station is responsible for the procedures and program required to assure control and cali-bration of measuring and test equipment at Ginna" Station in accordance with the above requirements. Instruments specified in Section 4.l, Technical Specifications, are included in the program. Tools, gauges, and instruments necessary for maintenance, inspection, and test are cali-brated and controlled in accordance with station procedures.

Measuring, test or inspection equipment used by Nuclear Assurance Quality Control is included in the program.

The Manager, Materials Engineering and Inspection Services and, Department Superintendent, Electrical Laboratory and Telecommunicati'ons are responsible for establishing a program and the preparation of procedures for the control and calibration of measuring and test equipment used by their respective organizations.

Handlin Stora e and Shi in Ginna Station Supervision is responsible for developing and implementing procedures for the handling, storage, shipping, preservation, and cleaning of material and equipment delivered to or located at Ginna Station. Electric Transmission and Distribution, and Materials Engineering and Inspection Services are responsible for preparing and implementing procedures for the handling, storage, shipping, preservation, and .cleaning of material and equipment delivered to or located in their work areas. In addition, the Manager, Materials Engineering and Inspection Services is responsible for preparing and implementing procedures for the routine maintenance and inspection of lifting and Revision 17 December, 1991

handling equipment. Under normal circumstances, manufac-turer's specific written instructions and recomme'ndations and purchase specification requirements are invoked for cleanliness, preservation, special ha'ndling, and storage with respect to environmental requirements. In the absence of, or in addition to, specific manufacturer requirements, the management may invoke additional requirements in

'accordance with department procedures.

The, Department Manager, Nuclear Engineering Services is responsible for specifying in procurement documents and in engineering specifications that written procedures be used, as appropriate, for the handling, shipping, storage, clean-ing, and preservation of materials and equipment procured for major modifications. These. procedures are prepared by contractors, by the station staff, or by staff members of.

Electric Transmission and Distribution as appropriate.

Rochester Gas and Electric procedures are reviewed and approved as described in Section 6.

In the preparation of procurement documents, department procedures, and contractor procedures, consideration of handling, shipping, storage, cleanliness, and preservation is given to all material and equipment throughout various stages'of manufacturing and installation prior to operational acceptance.

P Quality Performance is responsible for review of engineering speci'fications to assure that proper handling, storing, and shipping requirements have been specified. Quality Performance is responsible for examination of handling, storage, and shipping activities by suppliers, Rochester Gas and Electric personnel, and contractors.

Ins ection 'est and 0 eratin Status Equipment or systems not ready for normal service are

'clearly identified by use of tags, control logs, and other suitable means to indicate the status in a positive manner.

The identification is sufficient to positively indicate the status of the particular equipment or system being isolated.

The. Plant Manager, Ginna Station is responsible for indicat-ing the status of operating equipment or systems to be removed from service for maintenance, repair, or modifica-tion in accordance with the approved Electric System Operating Rules. The Plant Manager designates personnel who have station holding authority.

Revision 17 December, 1991

Personnel who have station holding authority are responsible for directing the status change of equipment and systems in accordance with the approved station holding procedures.

System status is indicated through the use of hold tags, block tags and corresponding control logs.

Equipment or system inspection and test status are indicated by use of test tags, .labels, or work inspection and test status sheets. Written procedures control the use of hold tags, test tags, and labels.

I Systems, components," and equipment which are found to be unacceptable during or after testing are clearly identified.

Fuel handling operations involving fuel assemblies or other radioactive sources are identified and,controlled by the use of tags, stamps, or other suitable means.

Maintenance, repair, or modification of components, systems, or structures utilizes procedures, travelers, data sheets, instructions or checklists to indicate status of the work, inspections or tests and corresponding acceptance or rejec-tion for a particular component, system, or structure.

These job control forms are prepared by the job supervisor and reviewed by Nuclear Assurance Quality Control personnel and maintained at a designated control location to indicate the status and the completion of required inspections and tests.

Quality Performance monitors the status change of Ginna Station activities for their implementation of approved procedures and assures that inspection results are properly documented. Material Engineering and Inspection Services establishes the procedures for implementing the inspection, status sheets utilized during inservice inspection.

Nonconformin Materials Parts and Com onents Procedures are established for the control, evaluation and disposition of deficient material, parts, and components.

Materials, parts, or components which do not conform to the drawing or specification requirements are identified and reported. RG&E personnel are responsible for initiating nonconformance reports and initiating dispositions. Nuclear Assurance Quality Control personnel are responsible for inspecting and approving closeout of nonconformance reports.

Revision 17 December, 1991

Prior to installation or use, nonconforming items generally remain in a hold area until an approved disposition has been implemented. Nonconforming items may be released for installation to meet critical fabrication schedules provided controls are established to'revent inadvertent use prior to implementing the nonconformance-,disposition. After installation or use, nonconforming items .are identified and controlled until approved disposition has been implemented.

Nonconformances identified at a supplier's facility and reported to RG6E, which have supplier recommended dispositions of use-as-is, or repair, are normally processed by the department originating the procurement.

Organizations which specify the requirement being dispositioned are responsible for reviewing and approving the supplier recommended disposition.

Items are repaired and reworked in accordance with approved procedures and current drawings. The repair or rework must be verified as acceptable by an inspection of the affected item or process which is at least equal to the original inspection method.

Items which are accepted "use-as-is" are fully documented with the drawing or specification requirement and technical justification for acceptance. All such items are approved prior to use by the cognizant organization having responsi-bility for the requirement. In addition, those "use-as-is" nonconformances which also deviate from a Design Criteria requirement shall require additional approval of the Senior Vice President, Production and Engineering.

Nuclear Assurance Quality Control personnel provide nonconformance status information periodically. Quality Performance and other organizations analyze nonconformance r'eport data for adverse 'trends and process periodic reports to management. Adverse trends form a basis for supplier re-.,

evaluation or for other corrective action.

16. Corrective Action Significant conditions adverse to quality such as failures, malfunctions, deficiencies, deviations, defective material and equipment, and nonconformances are reported and documented. Significant conditions adverse to quality include conditions affecting safety, conditions which could result in plant shutdown, high maintenance items, and operating procedure deficiencies. Once identified, the Revision 17 December, 1991

condition, the cause of the condition, and the corrective action taken shall be documented.

Significant conditions adverse to quality may be identified by anyone noting the condition and reported to Ginna Station

'for review and, if appropriate, the initiation of an appropriate corrective action report.

When a significant condition adverse to quality at Ginna Station is identified, Quality Performance,evaluates the effect of continuing the activity. If continuing the activity would obscure or preclude -identification and correction of the deficiency, continuing the activity would increase the extent of the deficiency or lead to an unsafe condition, stop work action is taken. Quality Performance Supervision has authority to stop work on, maintenance, repair, inservice inspection, refueling, modification, testing or inspection deficiencies at Ginna Station, as well as other locations. Quality Performance may recommend stop work action to the Plant Manager, Ginna Station on operating deficiencies.

The Manager, Quality Assurance has the authority to stop work for conditions identified in Purchasing, Nuclear Engine'ering Services, Materials Engineering and Inspection Services, Electric Transmission and Distribution or cognizant suppl'ier associations.

The Plant Operations Review Committee reviews all Corrective Action Reports initiated at Ginna Station and may recommend additional corrective action if the action does not result in adequate resolution. Corrective action report committees of aff'ected RG&E management, review initiated reports to determine cause and to develop a corrective action plans, resolve the identified concern and to preclude recurrence.

Conditions adverse to quality which involve design defi-ciencies or a recommended corrective action which involves a design change are reviewed by Ginna Station or Engineering as applicable. The cognizant organization determines the cause of the condition and recommends corrective action to preclude repetition.

Quality Assurance reviews all corrective action reports to assure that the cause of the condition has been determined and that corrective action has been taken to preclude repe-tition.

Revision 17 December, 1991

Corrective action summary reports are submitted to departmental supervision to keep them aware of significant

~

conditions adverse to quality, related causes and corrective action being taken. Senior Management is advised of the causes and actions of the more significant Corrective Action Reports.

17. ualit Assurance Records Quality Assurance is responsible for establishing the basic requirements for quality assurance record retention and maintenance. Production and Engineering Systems, as directed by the Division Manager, Technical Services and Chief Engineer, is responsible for the retention and maintenance of records. Quality Performance, Purchasing, Research and Science, and Electric Transmission and Distribution departments are responsible for assuring the maintenance and retention of records which they originate.

This may be accomplished either by retaining the records in their department, or by forwarding. them to the appropriate Production and Engineering Systems record retention locations. Each organization retaining records is responsible for 'preparation, review, app'roval, and implementation of specific quality assurance record procedures for their areas of responsibility in accordance

'with these requirements. The records which fall within quality assurance record requirements include those records required by Section 6.10 of the Technical Specifications and the Quality Assurance Program. All records associated with the operation, maintenance, repair, inservice inspection, refueling, modification, inspection and testing of structures, systems, and components covered -by the quality assurance program are included.

Records, initiated at Ginna Station include operating logs; the results of inspections, tests, and the monitoring of plant activities; drawings, procurement documents and material analyses; calibration procedures and reports; and Nonconformance and Corrective Action Reports. Records of the qualification of personnel, procedures, and equipment for special processes and the results of reviews are maintained at the appropriate Production and Engineering, Systems record retention location.

Inspection and test records contain a description of the type of test or inspection activity, evidence of completion of the activity, results, the name of the inspector or data Revision 17 December, 1991

recorder, the acceptance or rejection of the activity, and a record of any nonconformances.

The requirements and responsibilities for record accessibility and,transmittal are described in the Quality Assurance Manual sections as appropriate. Requirements,and responsibilities for preparation, inspection, identification, review, storage, retrieval, maintenance, and the retention'f quality assurance records are in accordance with applicable quality assurance record procedures, codes, standards, and procurement documents. Records are available

~

to authorized personnel.

-Removal of records from storage is documented and accountability is maintained by, the responsible record control activity.

Records are either stored in record storage facilities which are designed to prevent destruction of records due to fire, flooding, theft, and deterioration by temperature or humidity conditions; or, duplicate records are kept in two separate storage locations in separate buildings which are physically isolated from each other.

Record keeping procedures provide for receiving, classifying, indexing, labeling, and preparing records for storage. The procedures establish retention requirements, accessibility, control of obsolete record destruction, and control for issuance and return of all records.

Production and Engineering Systems is responsible for maintaining plant operating records as required in Section 6.10, Technical Specifications.

Production and Engineering Systems is also responsible for maintaining off-site prepared design records, such as specifications, drawings, design review reports, and design control documentationI quality assurance records, such as audit reports and surveillance reports; purchasing records, such as supplier qualifications, bid evaluations, and purchase orders.

Audits Compliance with all aspects of the Quality Assurance Program and the effectiveness of the program is determined by audits and surveillances of all organizations performing quality affecting activities. Quality Assurance is responsible for Revision 17 December, 1991

conducting audits of those organizations and activities involved in the quality assurance program on a planned, periodic basis. Audit intervals are based on the status and safety importance of activities being performed, as well as group performance. and related management concerns.

Table 18-1 is a list of the activities to be examined by audit in each of the audits. Frequencies are based .on the level of activity in each area. Audit schedules are estab-lished to assure that each of the activities are audited at the frequency specified in Section 6.0. Technical Speci-fications. Additional audits or surveillances are conducted as required by special conditions, circumstances or to address management concerns.

Each audit .requires the development of an audit plan to provide information about the audit; such as the functional areas to be audited, the names, of those who will perform, the audit, the scheduling arrangements, and the method of reporting findings and recommendations. Audit planning and performance utilize performance based techniques that will facilitate effectivenes's assessments as well as compliance verification. The audits are performed in accor'dance with written procedures or checklists by appropriately trained personnel not having direct responsibilities in the areas being audited.

Audit, results are documented and reported to the division head having responsibility in the area audited supervisor'nd and the Nuclear Safety Audit and Review Board. Within a specified period of time, the person having supervisory responsibi'lity in the area audited is required to review the audit results, take necessary action to correct the" deficiencies identified by the audit, and document and report the'orrective action.

Quality Assurance is responsible for developing audit plans and audit checklists, designating and,training audit personnel, and conducting audits.

Audits may be conducted by Quality Assurance engineers or other qualified personnel, such as technical specialists from other company departments and outside consultants.

Audits of major contractors, subcontractors, and suppliers are conducted during the early stages of design and procure-ment, as required, to evaluate their quality assurance Revision 17 December, 1991

pxogram for compliance with all aspects of the procurement documents. Audits are conducted, as required, to assure that major contractors, subcontractors, and suppliers are auditing their suppliers'uality assurance programs in accordance with procurement documents. During the additional audits are performed, as required, to assure all quality assurance program requirements are properly imple-mented in accordance with procurement documents.

Quality Performance performs regular analyses of audit and Quality Assurance surveillance results to evaluate quality trends. Results of these analyses are provided to management for their regular review.

Revision 17 December, 1991

Table 1-1 Quality Assurance Program Procedures Subject Listing Appendix B ualit Assurance ualit Control Procedures Criteria Indoctrination of Quality Assurance/Quality Control and Supervisory Personnel Training of Quality Assurance/Quality Control Personnel Management Review of the Quality Assurance Program Periodic Review of Quality Assurance/Quality Control Procedures Quality Assurance/Qu'ality Control Group Organization and Responsibilities Quality Assurance Review of Rochester Gas and IIX Electric Design Criteria Quality Assurance Review of Rochester Gas and Electric Engineering Specifications Quality Assurance Review of Architect/Engineer's . XIX Design Documents

~

Preparation, Review and Approval of Computer Software

~ ~

Production Evaluations

~ ~

Requisitioning Quality Assurance/Quality Control XV Services Quality Review of Rochester Gas and IV Electric Procurement Documents Preparation, Review and Approval of Rochester Gas and Electric Q.A. Specifications Preparation, Review and Approval of Ginna Station Quality Assurance Manual Preparation,, Review and Approval of Quality Assurance/Quality Control Procedures Preparation, Review and Approval of the Quality Control group Verification Inspection Program Procedures Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B ualit Assurance ualit Control Procedures Criteria=

Review of Departmental Procedures VI'.

Preparation, Review and Approval of Procedure Deviation Requests by Quality Assurance/Quality Control Evaluation 'of Suppliers by Quality Assurance Supplier Surveillance VII Control of Supplier Performance VII Quality Assurance Evaluation of Bids VII Conducting Commercial Grade Supplier Surveys VII Document Deficiency Reports VII Inspection and Surveillance Activities Qualification of Surveillance and Inspection Personnel Quality Assurance Review of Nonconformance Reports Preparation, Review and Processing of Corrective Action Reports by Quality Assurance Qualification of Auditing Personnel XVIII Audit Scheduling and Planning XVIII Performance of Quality Assurance Audits XVIII Reporting and Follow-Up of Audit. Findings XVIII Conduct of Quality Assurance During and in XVIII Follow-Up of USNRC and Management Audits Response to Audits and Surveillances XVIII Qualifications of Surveillance Personnel XVIII Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B ualit Assurance ualit Control Procedures Criteria

, Quality Performance Surveillance Program XVIII Qualification of Commercial Grade Supplier Survey Personnel XVIII Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B Materials En ineerin Ins ection Services Criteria Indoctrination and Training Materials Engineering and Inspection Services Organization and Responsibilities Preparation, Review and Approval of Purchase IV Requisitions and Related Procurement Documents Quality Materials Engineering and Inspection Services Procedures Quality Materials'ngineering and Inspection Services Procedure Deviation Request Preparation, Review and Approval of Material Handling Equipment Instructions Control and Distribution of Documents Regulating VI Safety Related Activities

~ ~ ~

\

Receipt and Acceptance of Purchased Materials VII Preparation, Review and Approval of Supplier

~ ~

VII Evaluation Welding Procedure Preparation Review and Approval IX Welding Procedure Qualification ~

IX Heat Treating Procedures IX Welder Qualification and Currency IX Nondestructive Examination Procedures IX Nondestructive Examination Procedures Manual IX Nondestructive Examination Personnel Qualification IX Inservice Inspection Program and Plans X Revision 17 December, 1991

0 Table 1-1 (cont'd)

Appendix B Materials En ineerin and Ins ection Services Criteria Incorporating, Ginna Modificat'ions into Inservice X Inspection Program Test Control XI Test Personnel Qualifications XI Calibration and Control of Nondestructive XII Examination Instruments Inspection and Maintenance of Material Handling XIII Equipment Overhead and Gantry Cranes XIII Inspection and Maintenance of Portable Lifting XIII and Handling Equipment Underhung Cranes, Jib Cranes and Monorail Systems XIII Slings and-Related Apparatus XIII.

Classification and Training of Material Handling XIII Equipment Personnel Mobile Hydraulic Cranes XIII Inspection and Maintenance of Jacks XIII Forklift Loading Forks XIII Training and Qualification- of Crane Operators XIII Lifting Devices in the Containment Vessel XIII Control and Disposition of Nonconforming Material, Parts and Components Corrective Action at Materials Engineering and XVI Inspection Services Quality Materials Engineering Services Records and Inspection XVII

-4 1-Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Materials Engineering and Inspection Services XVIII Response to Internal Audits Ginna Quality Assurance Program Implementation, Training of Ginna Personnel Ginna Administrative and Engineering Staff Responsibilities Ginna Modification Project Organization Plant Operations Review Committee Operating Procedure Control of Station Modification Station Modification Installation Acceptance and Completion Preparation, Review and Approval of Design Documents Preparation, Review and Approval of Minor Modification Safety Analysis Control of Procurement Documents for Purchased Materials, Parts, Components and Services IV Requisition Services from General Maintenance IV Plant Procedures Plant -Procedure Control and Distribution VI Control of Engineering Documents VI Vendor Manual Control VI Receipt and Acceptance of Purchased Materials VII Supplier Qualification Technical Evaluation VII Control of Purchased Services VII Control of Accepted Material, Parts and Components 'III Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Identification and Marking of Material VIII Control of Welding, Heat Treating and IX Nondestructive Examination Welding Equipment Performance Verification IX Nondestructive Examination IX Preventive Maintenance Programs for Electrical, Mechanical and Valves Inservice Inspection. X, XIV Environmentally Qualified Equipment Maintenance X Program Performance of Tests XI Qualification of Test Personnel XI Test, Status Control XIV Calibration and Control of Measuring and Test Equipmentg

~ ~

XII Installed Plant Instruments and Equipment Maintenance and Inspection of Material Handling XIII Equipment Control of Material Handling and Handling Equipment XIII Storage and Preservation of Materials XIII Control of Heavy Loads at Ginna XIII Electric System Operating Rules XIV Bypass of Safety Function or Jumper'Control XIV Control of Temporary Modifications XIV Control and Disposition of Nonconforming Materials Issue of Nonconformance Reports Revision 17-.

December, 1991

Table 1-1 (cont'd)

Appendix B Ginna Procedures Criteria Conditions Adverse to Quality

) Work Control System Ginna Records XVII Record Storage Facility and Equipment XVII I

Maintenance and.History Program XVI I Ginna Station Response to Internal Audits XVIII Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B En ineerin Procedures Criteria Indoctrination and Training Engineering Department Organization and Responsibilities Preparation, Review and Approval of Design Input Documents Preparation, Review and Approval of Design Analyses Preparation, Review and Approval of Engineering'rawings III Preparati'on, Review and Approval of Specifications.

Design Verification Preparation, Review and Approval of Safety Analyses Review and Approval of Architect Engineer or Consultant Design Documents Preparation, Review and Approval of Field Change Requests Purchase Requisition IV Engineering Procedures Engineering Procedure Deviation Request Distribution and Control o'f Documents by VX the Control Number Method Control of Documents by the List of VX Current Revisions Method Distribution of Documents by the List of Correspondence Procedures VI Receipt, Control and Distribution of Drawings and Aperture Cards VX Supplier Evaluation VXI Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B En ineerin Procedures Criteria Preparation, Reviev and Approval of Bid Requests, VXI Bid Evaluations and Recommendations for Avard Engineering Reviev of Nonconforming Materials, Parts or Components Initiating and Responding to Corrective Action Reports Records XVIX Engineering Response to Audits XVIII Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B Purchasin Procedures Criteria Periodic Review of Purchasing Procedures Indoctrination and Training of Purchasing Personnel Purchasing Department Organization and Responsibilities Preparation, Review, Approval and Issuance of IV Purchase Orders and Changes to Purchase Orders Requests for Bids and Bid Evaluation IV Purchasing Procedures Purchasing Procedure Deviation Request Supplier Evaluation VII Establishment and Maintenance of Qualified VII Suppliers List Supplier, Nonconformance Report Processing Purchasing Department Response to Corrective XVI Action Reports and Corrective Action Reporting Purchasing Records XVII Purchasing Response to Audits XVIII Revision 17 December, 1991

Table 1-1 (cont'd)

Appendix B Production Division Trainin Procedures Criteria The Production Division Training Procedures Manual is currently under development. In the interim they are using .

appropriate Ginna Station Procedures. The Ginna Station Procedures will be replaced by Production Division Training Procedures as these procedures are approved and issued. QA Program sections applying to Production Division Training are 1~ 2~ 5g 6/ 8~ 13'6~ 17'8

'48-Revision 17 December, 1991

Table 1-1 (cont'd)

Electric Transmission Procedures and Distribution Appendix B Procedures Criteria Quality Assurance Program Implementation for I Electric Transmission and Distribution Department Training of Electric Transmission and Distribution Personnel Electric Transmission and Distribution Organization Design/Modification Activities Control Control of Procurement Documents for Purchased IU Parts, Components and Services Preparation, Review, and Approval of Electric Transmission and Distribution and Laboratory Procedures V

Control of Electric Transmission and Distribution VI ..

Procedures, Schedules and Test Form Books Supplier Qualification Technical Evaluation VII Receipt and Acceptance of Instrumentation and VII Standards Equipment Control of Purchased Services for Electric Meter and Lab VII Identification and Control of Materials, Parts and VIII Components Performance of Tests at Ginna Station XI Performance of Tests at the Electrical Laboratory XI Qualification of Test Personnel XI Calibration and Control of test Instruments XII

.Handling, Storage and Shipping XIII I

Inspection and Test Status at Electric Meter and XIV Laboratory Revision 17 December, 1991

Table 1-1 (cont'd)

Electric Transmission and Distribution Appendix B Procedures Criteria Control and Disposition of Nonconforming Parts and XV Components Initiating and Processing of Corrective Action Reports Control of Quality Assurance Records XVII Response to Audits XVIII Revision 17 December, 1991

TABLE 4-1 Procurement Document Re uirements Items to be considered for inclusion in procurement documents include:

1. Sco e of Work Detailed statement of the work to be performed.

2 ~ Technical Re uirements by reference to specific drawings, specifications, codes, regulations, procedures or instructions, including revisions, that describe the items or services to be furnished. Also identified. shall be test, inspection and acceptance requirements, and any special requirements for such activities as designing, identification, fabrication, cleaning, erecting, packaging, handling, shipping, extended storage and shelf life.

ualit Assurance Pro ram Re uirements which require the supplier to have a documented quality assurance program that implements portions or all of 10CFR50 Appendix B as well as applicable quality assurance program requirements of other nationally recognized codes and standards. Also included shall be the requirement that the supplier incorporate appropriate quality assurance program requirements in subtier

" procurement documents.

Ri ht of Access - to include the facilities and records of the supplier. for source inspection and audit by the Purchaser or parties designated by the purchaser. Also included shall be provisions for the identification of witness and hold points and the minimum time of advance notice.

  • 5. Documentation Re uirements Submittal approval and retention requirements for documents such as quality assurance manuals, special process and test procedures, materials records, calculations and analyses.
  • 6. Nonconformance Requirements for reporting and disposition of nonconformance to procurement requirements.

I '

Items reviewed by Quality Assurance or Quality Control.

Revision 17 December, 1991

0 Table 18-1 Audit List Audit Title Audit To ic Areas Corrective Action Corrective Action associated with deficiencies occurring in facility, equipment, structures, systems or methods. of operation.

Operational Assessment Nonconformance Control

  • Outage Activities Refueling and Special Nuclear Material ISI Implementation IST Program and Implementation Surveillance Test and LCOs Maintenance Modification Installation Safety Security Radiation Protection and ALARA
  • Health Physics, Chemistry and

~ ~

Radwaste Shipping and Process Radwaste Control Program and implementing procedures Radioactive Effluents and Offsite Dose Calculation Manual and implementing procedures Radiation Protection and ALARA HP/Chemistry Measuring and Text Equipment Chemistry Program Radiological Environmental Monitoring Program

  • Fire and Safety Fire Protection Program and r implementing procedures Fire Protection and Loss Prevention Program Revision 17 December, 1991

Table 18-1 (con't)

Audit List Audit Title Audit To ic Areas Independent Inspecti'ons and Audits Fire Systems Fire Surveillance Fire Brigade Training Fire Brigade Equipment Safety Program Housekeeping Instructions, Procedures, Drawing Control and, Document Control Vendor Manual Control Procedure Control Records Control Security Security Plan and Implementing procedures Guard Training and Qualification Fitness for Duty Program

  • Operations Limiting Conditions for Operation Surveillance Testing Operator Performance Operations Administration PORC Activities NSARB Activities Materials Engineering and ISX Program Inspection 'Services NDE Qualifications Welding Qualifications MHE Program Miscellaneous QA Controls
  • Maintenance and Testing Preventive Maintenance Program Planning and Scheduling Work Order Implementation Post-Maintenance Testing Work Order Closeout and Equipment History Control of Measuring and Test Equipment Revision 17 December, 1991

Table 18-1 (con't)

Audit List Audit Title Audit To ic Areas Technical Specification Surveillance Nuclear Emergency Response Plan Nuclear Emergency Response Plan and Procedures Offsite Agency Interface Response Personnel Training Emergency Information Plan Training/performance and. Licensed Operator qualifications of the Auxiliary Operator operating and technical staff Chemistry Technician Maintenance Radiation Protection Technician Results and Test Technician QC Inspector Shift Technical Advisor Technical Staff and Managers Engineering Department Training General Employee Training Procurement Procurement Evaluations Procurement Document Control Control of Purchased Items and Services Handling, Storage, and Shipping Hazardous Material Control Pr'ogram Configuration Control Major Modification Design Minor Modification Design Installation Planning Control of As-Built Configuration Licensing Activities Temporary Modifications Revision 17 December, 1991

Table 18-1 (con't)

Audit Title Audit To ic Areas Electric Transmission Electric Mater and Laboratory and Distribution Electric Substations

  • Noted audits will also address relevant activities to verify of facility operation to all provisions contained in 'onformance Technical Specifications and applicable license conditions.

Revision 17 December, 1991

I R.E. GINNA NUCLEAR POWER PLANT MANAGEMENT ORGANIZATION CHART CHAIRNAN OF THE BOARD, LINES OF SUPKRVISIOM AND ASllNISTRATION PRESIDENT AND CHIEF EXECUTIVE OFFICER LINES Of'OJddJNICATIOM SENIOR SENIOR VICE PRESIDENT SOII OR VICE PRESIDENT PRODUCTION d ENGINEERING VICE PRESIDENT>

CAS d ELEC'fRIC CONTROLLER d DISTRIBUTION CHIEF FINANCIAL AND CUSTOMER OFFICER SERVICES VICE PRESIDENT VICE PRESIDENT ~

VICE PRESIDENT CINMA SECRETARY AJC KJPLOYEE RELATIONS, NUCLEAR PRODUCTION TREASURER PUBLIC AFFAIRS AND MATERIAL WNAGIKNT DIVISION WJIAGER DIVISION HANACER ~ ~ ~ I C ~ ~ DEPARAKNt ELECTRIC TECHNICAL SERVICES MANAGER DKPAR TITAN t TRANSMISSION OEPARtEENT MANAGER ANO CHIEF ENGINEER RISK MANAGER AND d DISTRIBUTION OJALITY WNAGEJM:Nt PI%CHASING PERFORMANCE AGENT MATERIALS WMAGKJKNT DIRECtOR OF SECURITY DEPARTJKNT DEPARTIKNT IlANAGKR MANAGER DEPARTJCITT DEPARTIKNT DEPARTlCNT DEPARllCNT nW W~ S'fATfON

..~PORC SXKR INTENOENT QUEER INTENDENT ~ DUALITY MATERIALS MANAGER IlANAGER WJJACER MANAGER CINMA ELECTRIC LAB ELKCTRIC ASSURANCE ENGINEERING RESEARCH PRODUCTION d NUCLEAR I PROJNM:T ON JJC TELE- QSSTAT TONS d INSPECTION d SCIKNCE ENGINEERING EIJG I NEER INC DIVISION I

COJ4ANJ I CAT ONS DIVISION SERVICES SYSTEMS SERVICES TRAINING PROC JWOKNT %TER DESIGN. DUALITY MATERIALS KNVIROSCNTJL RECORDS DESIGN, TRAINING STATION SKKRVISOR SERVICES CAI.I BRAT ION TECH 5&PNT, ASSURANCE KNGIJlECR INC, SCIENCE d HAMACEJKMT, CONSTRUCTION, SERVICES OPERATIONS. NUCLEAR d MAINTENANCE ROTATING PROCÃKJKNT, NOE, LABORATORY TECNICAL L I CDJS INC, MAINTENANCE, SECURITY AJN KLECTRIC KOUIPSKNT AIRJIT d ISI d CHEMISTRY INFORMATION FlKL HP d LAB SERVICKS HAINTKNANCK~ QNJVE ILLANCK ldlK INSP SERVICES, CENTER. CHIS. AMAAGKJENT d CJMMSTRY UQ RELAY TEST d CONSTRUC'f ION SERVICES SERVICES RESEARCH d DEVKLOPJKNT IMFORllATION SERVICES, TECHNICAL SUPPORt DIRECTOR CORPORATE CONTROL, TECHNICAL ftf ftf EWLOYEK SERVICES DIVISION SKRVICES RADIATION IVOR(, SECIWITY 0 4 RELATIONS SYSTDlS PROTECTION TESTING, SERVICES ftf V. MANAGER MATERIAL O'.fff NUCLEAR ASSJJRANCE SUPERVISOR PRO%ET

~ CORPORATE WC.TH CONTROL, PROCUREJENT, LIASON ftf 0 WNAGDEMT DEPARTMENT PHYSICS AJNI ENCI NEER INC, SERVICES SUPERINTENDENT NUCLEAR FIRE GENERAL DKRGKNCY PROTEC'tIOJI QUALITY HAINTEMANCK PLANNING a SAFETY.

CONTROL AND OPERATIONAL DUALITY DUALITY ASSESQKNT,

'LO ENGINKRINC SERVICES, COINER LKJ SERVICES PRJLMCT FIELD d SHOP SYSTEMS WMAGGKNT FABRICATION SERVICES. SERVICES AINJIN. SERV.,

BUDGET d COST Figure 2-1

QUALITY PERFORMANCE ORGANIZATION DEPARTMENT MANAGER QUALITY PERFORMANCE I

MANAGER MANAGER MANAGER SENIOR ANALYST I

QUALITY NUCLEAR MATERIALS ENGINEERIHG QUALITY PERFORMANCE ASSURANCE ASSURANCE CI IHSPECTIOH SERVICES ANALYSES AHD PROGRAM SUPPORT QUALITY QUALITY QUALITY MATERIAL 5 ASSURANCE CONTROL CONTROL MATERIAL HAHDLING STAFF ENGINEERS ENGINEERS FOREMAN ENGINEERS 5 FOREMEN am ID ID 0 4 ID I ~

5 DI mr.

ID 0 STAFF TECHNICIANS STAFF

& INSPECTORS I

Figure 2-2

GINNA NUCLEAR PRODUCTION ORGANIZATION VICE PRESIDENT GINNA NUCLEAR PRODUCTIOH PLANT MANAGER DEPARTMENT DEPARTMENT MANAGER GINNA STATION MANAGER NUCLEAR PRODUCTION ENGINEERING DIVISION TRAINING SERVICES DIRECTOR SUPERINTENDENT CORRECTIVE SUPERINTENDENT CORPORATE GINHA PRODUCTION ACTION GINNA SUPPORT INITIAL LICENSED DESIGH I RADIATION SERVICES OPERATOR Vl PROTECTION SAFETY CONSTRUCTION (0

I OPERATOR REQUAL OPERATIONS* OUTAGE MECHANICAL LICENSIKG PLANNIHG MAINTENANCE AUX OPERATOR CORPORATE HEALTH PHYSICS 8 FUEL MANAGEMENT HEALTH CHEMISTRY MATERIALS & ELECTRICAL STA INITIAL PHYSICS PROCUREMENT AND l&C TECHHI CAL TECHNICAL MAINTENAHCE STA REQUAL SUPPORT SERVICES NUCLEAR ENGINEERING~

EMERGENCY MAINTENANCE CHEMISTRY TECH PLANNING OPERATIONAL PLANNING &

ASSESSMENT SCHEDULIHG RAD PROTECTIOH TECHNICIAN UQ COMPUTER SYSTEMS FIRE PROTECTION COHTRACT, 6

(

ID ID 0 v.

I MOOI F CATION RADIATION TECH SUPPORT ELECTRICAL MAINT.

0

  • HNEH RCS AVERAGE TEMPERATURE > 200 F MECHANICAL MAINT.

AN STA AND COHTROL ROOM FOREMAN ARE ADDED'O THE REQUIRED COHTROL ROOM SHIFT COMPLEMENT I&C TECHNICIAN R&T TECHNICIAN TECH STAFF AHD MANAGERS TRAINING COURSES

ELECTRIC, TRANSMISSION AND DISTRIBUTION DIVISION D I VIS IOH HAHAGER ELECTRIC TRANSHISSIOH 5 DISTRIBUTION DEPARTHENT GAS 8 ELECTRIC DEPARTHENT SUPERINTENDENT HETER SUPERINTENDEHT I

Ul ELECTRIC LABORATORY 8 OPERATIONS ELECTRIC SUBSTATIOHS TELECOHHUNICAT IOHS I

LABORATORY QUALITY CONSTRUCTION HAHAGER HAHAGER SERVICES SERVICES ENGINEER IHG SUBSTATION COORDINATOR RELAY TEST HAIHTENANCE ax TD (D 0 4 ID r- ENGINEERING 5 ID HAIHTEHAHCE TD 0 NOTE: Chart is abbreviated to show only AND TEST key positions involved in implementing QA program and therfore, does not show QUALITY TRAVELING LO all positions in the division. SERVICES OPERATORS Figure 2-4

TECHNICAL SERVICES DIVISION ORGANIZATION DIVISION MAHAGER TECHNICAL SERVICES AHD CHIEF ENGINEER I

O I

DEPARTMENT DEPARTMENT MANAGER DEPARTMENT DEPARTMENT MANAGER SUPERVISOR SUPERINTENDENT PRODUCTION AHD MANAGER GEHERAL PROJECT GENERAL ENGINEERING RESEARCH 4 ENGINEERING MANAGEMEHT MAINTEHANCE SYSTEMS SCIENCE SERVICES SERVICES Manager Division Manager Fossil Budget and Cost Shop Operations Systems Environmental Engineering Science Project Manager Records Hydro Management Field Service Management Manager Engineering Services Ug ID ID Operat i ons Chemistry neI ID ~ Manager Fossil/Hydro systems Services Facility Engineering Docwent Preparation R 55' IJI Achinistrative Supervisor Secretarial

~

Services Technical Enviroanental Real Estate Services ID 0 and Project Information Laboratory Management Planning Center Duality Senior Services Manager Envirormental Inspection/Lend Analyst Survey and Research &,

I Building Development Services Program Figure 2-5

GZNNA STATION REVIEW AND AUDIT FUNCTIONS NSARB QUALITY PERFORMANCE PORC

~ ~ 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ t~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 0 ~ ~ ~ ~ ~

MATERIALS ELECTRIC PRODUCTION ENGINEERING TRANSMISSION PURCHASING DIVISION ENGINEERING GINNA STATION AND INSPECTION AND TRAINING SERVICES DISTRIBUTION REVIEW o ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ AUDITS Figure 2-6.