{{#Wiki_filter:Attachment II Marked Up Ginna Station Technical Specifications Included pages (note that not all pages are changed): 3.9-4 3.9-5 B3.9-10 83.9-11 B3.9-12 B3.9-13 B3.9-14 B3.9-15 9602i30336 960209 PDR ADQCK 05000244 P PDR ontainment Penetrations 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 The containment penetrations shall be in the following status: a.The equipment hatch shall be either: 1.bolted in place with at least one access door closed, or>gc Q.gvwv+~QplJc'.
{{#Wiki_filter:Attachment II Marked Up Ginna Station Technical Specifications Included pages (note that not all pages are changed):
isolated by a closure.plat that restricts air flow from containment; b.One door in the personnel air lock shall be closed;and c~Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be either: 1.closed by a manual or automatic isolation valve, blind flange, or equivalent, or 2.capable of being closed by an OPERABLE Containment Ventilation Isolation System.APPLICABILITY:
3.9-4 3.9-5 B3.9-10 83.9-11 B3.9-12 B3.9-13 B3.9-14 B3.9-15 9602i30336 960209 PDR     ADQCK   05000244 P                     PDR
Dur ing CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.
 
ACTIONS CONDITION RE(VIREO ACTION COMPLETION TINE A.One or more containment penetrations not in required status.A.1 Suspend CORE ALTERATIONS.
ontainment Penetrations 3.9.3
AND Immediately A.2 Suspend movement of irradiated fuel assemblies within containment.
: 3. 9 REFUELING OPERATIONS 3.9.3   Containment Penetrations LCO   3.9.3         The containment     penetrations shall     be in the following status:
Immediately R.E.Ginna Nuclear Power Plant<3.9-4 Amendment No.61 ontainment Penetrations 3.9.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FRE(UENCY SR 3.9.3.1 Verify each required containment penetration is in the required status.7 days SR 3.9.3.2 Verify each required containment purge and exhaust valve actuates to the isolation position on an actual or simulated actuation signal.24 months R.E.Ginna Nuclear Power Plant 3.9-5 Amendment No.61 Containment Penetrations 8 3.9.3 B 3.9 REFUELING OPERATIONS B 3.9.3 Containment Penetrations BASES BACKGROUND During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, a release of fission product radioactivity within containment will be restricted from escaping to the environment when the LCO requirements are met.In MODES 1, 2, 3, and 4, this is accomplished by maintaining containment OPERABLE as described in LCO 3.6.1,"Containment." In MODE 5, there are no accidents of concern which require containment.
: a. The equipment hatch       shall be either:
In MODE 6, the potential for containment pressurization as a result of an accident is not likely;therefore, requirements to isolate the containment from the outside atmosphere can be less stringent.
: 1. bolted in place with at least one access door closed, or
The LCO requirements are referred to as"containment closure" rather than"containment OPERABILITY." Containment closure means that all potential escape paths are closed or capable of being closed.Since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required.L The containment serves to contain fission product radioactivity that may be released from the reactor core following an accident, such that offsite radiation exposures are maintained within the requirements of 10 CFR 100.Additionally, the containment provides radiation shielding from the fission products that may be present in the containment atmosphere following accident conditions.
                                                                      > gc Q.gvwv+~QplJc'.
The containment equipment hatch, which is part of the containment pressure boundary, provides a means for moving large equipment and components into and out of containment.
isolated   by a closure   .plat   that restricts air flow from containment;
During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, the equipment hatch must be bolted in place.Good engineering practice dictates that a minimum of 4 bolts be used to hold the equipment hatch in place and that the bolts be approximately e uall s aced.As an alternative, the equipment hatch can e isolated by a closure plate that restricts air flow from containment.
: b. One door in the personnel       air lock shall                   be closed; and c ~   Each   penetration providing direct access from the containment atmosphere to the outside atmosphere shall be either:
~~4u~~~viva.X~);~(.<,g.~nba,Q.
: 1. closed by   a manual   or automatic isolation valve, blind flange,     or equivalent, or
4ec.(continued)
: 2. capable of being closed by an         OPERABLE                 Containment Ventilation Isolation System.
R.E.Ginna Nuclear Power Plant B 3.9-10 Revision 0 Containment Penetrations B 3.9.3 BASES BACKGROUND (continued) aw 0-g<iso X~SC.C C'<cA The containment equipment and personnel air locks, which are also part of the containment pressure boundary, provide a means for personnel access during MODES 1, 2, 3;and 4 in accordance with LCO 3.6.2,"Containment Air Locks." Each air lock has a door at both ends.The doors are normally interlocked to prevent simultaneous opening when containment OPERABILITY is required.During periods of plant shutdown when containment closure is not required, the door interlock mechanism may be disabled, allowing both doors of an air lock to remain open for extended periods when frequent containment entry is necessary.
APPLICABILITY:     Dur ing CORE ALTERATIONS, During movement of irradiated fuel assemblies                           within containment.
During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, containment closure is required;therefore, the door interlock mechanism may remain disabled, but one air lock door must always remain closed in the personnel and equipment hatch (unless the equipment hatch is isolated by a closure plate).The requirements for containment penetration closure ensure that a release of fission product radioactivity within containment will be restricted from escaping to the environment.
ACTIONS CONDITION                       RE(VIREO ACTION                       COMPLETION TINE A. One or more                 A. 1       Suspend CORE                   Immediately containment                            ALTERATIONS.
The closure restrictions are sufficient to restrict fission product radioactivity release from containment due to a fuel handling accident during refueling.
penetrations not in required status.            AND A.2       Suspend movement of           Immediately irradiated fuel assemblies within containment.
The Containment Purge and Exhaust System includes two subsystems.
R.E. Ginna Nuclear Power Plant           <   3.9-4                                     Amendment No. 61
The Shutdown Purge System includes a 36 inch purge penetration and a 36 inch exhaust penetration.
 
The second subsystem, a Mini-Purge System, includes a 6 inch purge penetration and a 6 inch exhaust penetration.
ontainment Penetrations 3.9.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                             FRE(UENCY SR 3.9.3. 1   Verify each required containment               7 days penetration is in the required status.
During MODES 1, 2, 3, and 4, the shutdown purge and exhaust penetrations are isolated by a blind flange with two 0-rings that provide the necessary boundary.The two air operated valves in each of the two mini-purge penetrations can be opened intermittently, but are closed automatically by the Containment Ventilation Isolation Instrumentation System.Neither of the subsystems is subject to a Specification in MODE 5.(continued)
SR 3.9.3.2   Verify each required containment purge and     24 months exhaust valve actuates   to the isolation position on an actual or simulated actuation signal.
R.E.Ginna Nuclear Power Plant B 3.9-11 Revision 0 Containment Penetrations B 3.9.3 BASES" BACKGROUND (continued)
R.E. Ginna Nuclear Power Plant       3.9-5                     Amendment No. 61
In NODE 6, large air exchangers are used to support refueling operations.
 
The normal 36 inch Shutdown Purge System is used for this purpose, and each air operated valve is closed by the Containment Ventilation Isolation Instrumentation in accordance with LCO 3.3.5,"Containment Ventilation Isolation Instrumentation." The Mini-Purge System also remains operational in MODE 6, and all four valves are also closed by the Containment Ventilation Isolation Instrumentation.
Containment Penetrations 8 3.9.3 B 3.9   REFUELING OPERATIONS B 3.9.3   Containment Penetrations BASES BACKGROUND         During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, a release of fission product radioactivity within containment will be restricted from escaping to the environment when the LCO requirements are met. In MODES 1, 2, 3, and 4, this is accomplished by maintaining containment OPERABLE as described in LCO 3.6. 1, "Containment." In MODE 5, there are no accidents of concern which require containment.     In MODE 6, the potential for containment pressurization as a result of an accident is not likely; therefore, requirements to isolate the containment from the outside atmosphere can be less stringent. The LCO requirements are referred to as "containment closure" rather than "containment OPERABILITY." Containment closure means that all potential escape paths are closed or capable of being closed. Since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required.
The other containment penetrations that provide direct access from containment atmosphere to outside atmosphere must be isolated on at least one side.Isolation may be achieved by an OPERABLE automatic isolation valve, or by a manual isolation valve, blind flange, or equivalent.
L The containment serves to contain   fission product radioactivity that   may be released from the reactor core following an accident, such that offsite radiation exposures are maintained within the requirements of 10 CFR 100.
Additionally, the containment provides radiation shielding from the fission products that may be present in the containment atmosphere following accident conditions.
The containment equipment hatch, which is part of the containment pressure boundary, provides a means for moving large equipment and components into and out of containment.
During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, the equipment hatch must be bolted in place. Good engineering practice dictates that a minimum of 4 bolts be used to hold the equipment hatch in place and that the bolts be approximately e uall s aced.
As an alternative, the equipment hatch can e isolated by a closure plate that restricts air flow from containment.
                                        )
                                          ~~ 4u ~   ~~viva.X~
                                              ;~ (.<,g.~nba,Q. 4ec.
(continued)
R.E. Ginna Nuclear Power Plant       B   3.9-10                           Revision 0
 
Containment Penetrations B 3.9.3 BASES BACKGROUND       The containment equipment and personnel air locks, which are (continued)    also part of the containment pressure boundary, provide a means for personnel access during MODES 1, 2, 3; and 4 in accordance with LCO 3.6.2, "Containment Air Locks." Each air lock has a door at both ends. The doors are normally interlocked to prevent simultaneous opening when containment OPERABILITY is required.       During periods of plant shutdown when containment   closure   is not required, the door interlock mechanism may   be disabled,   allowing both doors of an air lock to remain open for extended periods when frequent containment entry is necessary.       During CORE ALTERATIONS or movement of   irradiated   fuel   assemblies within containment, containment closure is required; therefore, the door interlock mechanism may remain disabled, but one air lock door must always remain closed in the personnel and aw 0-g< iso X~
SC.C C'<cA equipment hatch (unless the equipment hatch is isolated by a closure plate).
The requirements for containment penetration closure ensure that a release of fission product radioactivity within containment will be restricted from escaping to the environment. The closure restrictions are sufficient to restrict fission product radioactivity release from containment due to a fuel handling accident during refueling.
The Containment Purge and Exhaust System includes two subsystems. The Shutdown Purge System includes a 36 inch purge penetration and a 36 inch exhaust penetration.         The second subsystem, a Mini-Purge System, includes a 6 inch purge penetration and a 6 inch exhaust penetration.         During MODES 1, 2, 3, and 4, the shutdown purge and exhaust penetrations are isolated by a blind flange with two 0-rings that provide the necessary boundary. The two air operated valves in each of the two mini-purge penetrations can be opened intermittently, but are closed automatically by the Containment Ventilation Isolation Instrumentation System.
Neither of the subsystems is subject to a Specification in MODE 5.
(continued)
R.E. Ginna Nuclear Power Plant       B 3.9-11                             Revision 0
 
Containment Penetrations B 3.9.3 BASES BACKGROUND       In NODE 6, large air exchangers are used to support (continued)    refueling operations. The normal 36 inch Shutdown Purge System is used for this purpose, and each air operated valve is closed by the Containment Ventilation Isolation Instrumentation in accordance with LCO 3.3.5, "Containment Ventilation Isolation Instrumentation."
The Mini-Purge System also remains operational in MODE 6, and all four valves are also closed by the Containment Ventilation Isolation Instrumentation.
The other containment penetrations that provide direct access from containment atmosphere to outside atmosphere must be isolated on at least one side. Isolation may be achieved by an OPERABLE automatic isolation valve, or by   a manual isolation valve, blind flange, or equivalent.
Equivalent isolation methods may include use of a material that can-provide a temporary, atmospheric pressure, ventilation barrier for the other containment penetrations during fuel movements.
Equivalent isolation methods may include use of a material that can-provide a temporary, atmospheric pressure, ventilation barrier for the other containment penetrations during fuel movements.
APPLICABLE SAFETY ANALYSES During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, the most severe radiological consequences result from a fuel handling accident.The fuel handling accident is a postulated event that involves damage to irradiated fuel (Ref.1).Fuel handling accidents, analyzed using the criteria of Reference 2, include dropping a single irradiated fuel assembly and handling tool or a heavy object onto other irradiated fuel assemblies.
APPLICABLE       During CORE ALTERATIONS or movement of irradiated fuel SAFETY ANALYSES  assemblies within containment, the most severe radiological consequences result from a fuel handling accident. The fuel handling accident is a postulated event that involves damage to irradiated fuel (Ref. 1). Fuel handling accidents, analyzed using the criteria of Reference 2, include dropping a single irradiated fuel assembly and handling tool or a heavy object onto other irradiated fuel assemblies. The requirements of LCO 3.9.6, "Refueling Cavity Water Level,"
The requirements of LCO 3.9.6,"Refueling Cavity Water Level," and the minimum decay time of.100 hours prior to CORE ALTERATIONS ensure that the release of fission product radioactivity, subsequent to a fuel handling accident, results in doses that are within the guideline values specified in 10 CFR 100.Standard Review Plan (SRP), Section 15.7.4, Rev.1 (Ref.2), requires containment closure even though this is not an assumption of the accident analyses.The acceptance limits for offsite radiation exposure is 96 rem (Ref.3).Containment penetrations satisfy Criterion 3 of the NRC Policy Statement since these are assumed in the SRP.R.E.Ginna Nuclear Power Plant B 3.9-12 (continued)
and the minimum decay time of .100 hours prior to CORE ALTERATIONS ensure that the release of fission product radioactivity, subsequent to a fuel handling accident, results in doses that are within the guideline values specified in 10 CFR 100. Standard Review Plan (SRP),
Revision 0 Containment Penetrations B 3.9.3 BASES (continued)
Section 15.7.4, Rev. 1 (Ref. 2), requires containment closure even though this is not an assumption of the accident analyses. The acceptance limits for offsite radiation exposure is 96 rem (Ref. 3).
LCO This LCO limits the consequences of a fuel handling accident in containment by limiting the potential escape paths for fission product radioactivity released within containment.
Containment penetrations satisfy Criterion 3 of the   NRC Policy Statement since these are assumed in the SRP.
The LCO requires any penetration providing direct access from the containment atmosphere to the outside atmosphere to be closed except for the OPERABLE containment purge and exhaust penetrations.
(continued)
For the OPERABLE containment purge and exhaust penetrations, this LCO ensures that at least one valve in each of these penetrations is isolable by the Containment Ventilation Isolation System.APPLICABILITY The co'ntainment penetration requirements are applicable during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment because this is when there is a potential for a fuel handling accident.In MODES I, 2, 3, and 4, containment penetration requirements are addressed by LCO 3.6.1.In MODES 5 and 6, when CORE ALTERATIONS or movement of irradiated fuel assemblies within containment are not being conducted, the potential for a fuel handling accident does not exist.Therefore, under these conditions, no requirements are placed on containment penetration status.ACTIONS A.1 and A.2~>~go i vaK~If the containment equipment hatch (or its closure plate , air lock doors, or any containment penetration that provides direct access from the containment atmosphere to the outside atmosphere is not in the required status, including the Containment Ventilation Isolation System not capable of automatic actuation when the purge and exhaust valves are open, the plant must be placed in a condition where the isolation function is not needed.This is accomplished by immediately suspending CORE ALTERATIONS and movement of irradiated fuel assemblies within containment.
R.E. Ginna Nuclear Power Plant       B 3.9-12                         Revision   0
Performance of these actions shall not preclude completion of movement of a component to a safe position.R,E.Ginna Nuclear Power Plant 8 3.9-13 (continued)
 
Revision 0 Containment Penetrations B 3.9.3 BASES (continued)
Containment Penetrations B   3.9.3 BASES   (continued)
SURVEILLANCE RE(UIREMENTS SR 3.9.3.1 This SR demonstrates that each of the containment penetrations required to be in its closed position is in that position.The Surveillance on the open purge and exhaust valves will demonstrate that the valves are not blocked or otherwise prevented From closing (e.g., solenoid unable to vent).The Surveillance is performed every 7 days during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment.
LCO                 This LCO limits the consequences of a fuel handling accident in containment by limiting the potential escape paths for fission product radioactivity released within containment.
The Surveillance interval is selected to be commensurate with the normal duration of time to complete fuel handling operations.
The LCO requires any penetration providing direct access from the containment atmosphere to the outside atmosphere to be closed except for the OPERABLE containment purge and exhaust penetrations. For the OPERABLE containment purge and exhaust penetrations, this LCO ensures that at least one valve in each of these penetrations is isolable by the Containment Ventilation Isolation System.
As such, this Surveillance ensures that a postulated fuel handling accident that releases fission product radioactivity within the containment will not result in a release of fission product radioactivity to the environment.
APPLICABILITY       The co'ntainment penetration requirements are applicable during CORE ALTERATIONS   or movement of irradiated fuel assemblies within containment because this is when there is a potential for a fuel handling accident.     In MODES I, 2, 3, and 4, containment penetration requirements are addressed by LCO 3.6. 1. In MODES 5 and 6, when CORE ALTERATIONS or movement of irradiated fuel assemblies within containment are not being conducted, the potential for a fuel handling accident does not exist. Therefore, under these conditions, no requirements are placed on containment penetration status.
SR 3.9.3.2 This SR demonstrates that each containment purge and exhaust valve actuates to its isolation position on manual initiation or on an actual or simulated high radiation signal.The 24 month Frequency maintains consistency with other similar instrumentation and valve testing requirements.
ACTIONS             A. 1 and A.2                                             ~ > ~go i vaK ~
In LCO 3.3.5, the Containment Ventilation Isolation instrumentation requires a CHANNEL CHECK every 12 hours and a COT every 92 days to ensure the channel OPERABILITY during refueling operations.
If the containment equipment hatch (or its closure plate ,
Every 24 months an ACTUATION LOGIC TEST and CHANNEL CALIBRATION is performed.
air lock doors, or any containment penetration that provides direct access from the containment atmosphere to the outside atmosphere is not in the required status, including the Containment Ventilation Isolation System not capable of automatic actuation when the purge and exhaust valves are open, the plant must be placed in a condition where the isolation function is not needed. This is accomplished by immediately suspending CORE ALTERATIONS and movement of irradiated fuel assemblies within containment. Performance of these actions shall not preclude completion of movement of a component to a safe position.
(continued)
R,E. Ginna Nuclear Power Plant         8 3.9-13                           Revision   0
 
Containment Penetrations B 3.9.3 BASES   (continued)
SURVEILLANCE       SR   3.9.3.1 RE(UIREMENTS This SR demonstrates   that each of the containment penetrations required to be in its closed position is in that position. The Surveillance on the open purge and exhaust valves will demonstrate that the valves are not blocked or otherwise prevented From closing (e.g., solenoid unable to vent).
The Surveillance is performed every 7 days during CORE ALTERATIONS   or movement of irradiated fuel assemblies within containment. The Surveillance interval is selected to be commensurate with the normal duration of time to complete fuel handling operations. As such, this Surveillance ensures that a postulated fuel handling accident that releases fission product radioactivity within the containment will not result in a release of fission product radioactivity to the environment.
SR   3.9.3.2 This SR demonstrates that each containment purge and exhaust valve actuates to its isolation position on manual initiation or on an actual or simulated high radiation signal. The 24 month Frequency maintains consistency with other similar instrumentation and valve testing requirements. In LCO 3.3.5, the Containment Ventilation Isolation instrumentation requires a CHANNEL CHECK every 12 hours and a COT every 92 days to ensure the channel OPERABILITY during refueling operations.     Every 24 months an ACTUATION LOGIC TEST and CHANNEL CALIBRATION is performed.
These Surveillances will ensure that the valves are capable of closing after a postulated fuel handling accident to limit a release of fission, product radioactivity from the containment.
These Surveillances will ensure that the valves are capable of closing after a postulated fuel handling accident to limit a release of fission, product radioactivity from the containment.
R.E.Ginna Nuclear Power Plant B 3.9-14 (continued)
(continued)
Revision 0 ontainment Penetrations B 3.9.3 BASES (continued)
R.E. Ginna Nuclear Power Plant         B 3.9-14                           Revision 0
REFERENCES 1.UFSAR, Section 15.7.2.NUREG-800, Section 15.7.4, Rev.1, July 1981.3.Letter from D.N.Crutchfield, NRC, to J.Haier, RGLE,  
 
ontainment Penetrations B 3.9.3 BASES   (continued)
REFERENCES         1. UFSAR, Section 15.7.
: 2. NUREG-800,   Section 15.7.4, Rev. 1, July 1981.
: 3. Letter from   D. N. Crutchfield, NRC, to J. Haier,   RGLE,


==Subject:==
==Subject:==
"Fuel Handling Accident Inside Containment," dated October 7, 1981.R.E.Ginna Nuclear Power Plant B 3.9-15 Revision 0  
  "Fuel Handling Accident Inside Containment,"
dated October 7, 1981.
R.E. Ginna Nuclear Power Plant       B 3.9-15                           Revision   0
 
Attachment  III Proposed Technical Specifications Included pages (note that not all pages are changed):
3.9-4 3.9-5 B3.9-10 B3.9-11 B3.9-12 B3.9-13 B3.9-14 B3.9-15
 
ontainment Penetrations 3.9.3
: 3. 9  REFUELING OPERATIONS 3.9.3  Containment Penetrations LCO  3.9.3        The containment    penetrations shall    be in the following status:
: a. The equipment hatch    shall  be  either:
: 1. bolted in place with at least one access door closed, or
: 2. isolated  by a closure    plate, or equivalent, that restricts air flow    from containment;
: b. One  door in the personnel      air lock shall  be  closed;  and c ~  Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be either:
: 1. closed by  a manual  or automatic isolation valve, blind flange, or equivalent, or 2.'apable of      being closed by an    OPERABLE  Containment Ventilation Isolation      System.
APPLICABILITY:      During CORE ALTERATIONS, During movement of irradiated fuel assemblies        within containment.
ACTIONS CONDITION                      REQUIRED ACTION              COMPLETION TIME A. One or more                  A.l      Suspend  CORE              Immediately containment                          ALTERATIONS.
penetrations not in required status.            AND A.2      Suspend  movement of        Immediately i}radiated fuel assemblies within containment.
R.E. Ginna Nuclear Power lPlant            3.9-1                        Amendment No. g
 
Containment Penetrations 3.9.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE                              FREQUENCY SR  3.9.3. 1    Verify  each required containment                7 days penetration is in the required status.
SR  3.9.3.2    Verify  each required containment purge and      24 months exhaust valve actuates  to the isolation position on  an actual or simulated actuation signal.
R.E. Ginna Nuclear Power Plant        3.9-5                      Amendment No. 61
 
j 4                                                            ontainment Penetrations B  3.9.3 B 3.9  REFUELING OPERATIONS 8 3.9.3  Containment Penetrations BASES BACKGROUND        During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, a release of fission product radioactivity within containment will be restricted from escaping to the environment when the LCO requirements are met. In MODES 1, 2, 3, and 4, this is accomplished by maintaining containment OPERABLE as described in LCO 3.6. 1, "Containment." In MODE 5, there are no accidents of concern which require containment.      In MODE 6, the potential for containment pressurization as a result of an accident is not likely; therefore, requirements to isolate the containment from the outside atmosphere can be less stringent. The LCO requirements are referred to as "containment closure" rather than "containment OPERABILITY." Containment closure means that all potential escape paths are closed or capable of being closed. Since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required.
The containment  serves to contain  fission product radioactivity that    may be released  from the reactor core following  an accident, such that offsite radiation exposures are maintained within the requirements of 10 CFR 100.
Additionally, the containment provides radiation shielding from the fission products that may be present in the containment atmosphere following accident conditions.
The containment  equipment hatch, which is part of the containment pressure boundary, provides a means for moving large equipment and components into and out of containment.
During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, the equipment hatch must be bolted in place. Good engineering practice dictates that a minimum of 4 bolts be used to hold the equipment hatch in place and that the bolts be approximately equally spaced.
As an alternative, the equipment hatch opening can be isolated  by a closure plate, or by an equivalent isolation barrier (e.g.,  over head door assembly), that restricts air flow from containment.
(continued)
R.E. Ginna Nuclear Power Plant        B 3.9-1                            Revision  P
 
ll h
t
 
ontainment Penetrations B  3.9.3 BASES BACKGROUND        The containment  equipment and personnel  air locks,  which are (continued)    also part of the containment pressure boundary, provide a means for personnel access during MODES I, 2, 3, and 4 in accordance with LCO 3.6.2, "Containment Air Locks." Each air lock has a door at both ends. The doors are normally interlocked to prevent simultaneous opening when containment OPERABILITY is required. During periods of plant shutdown when containment closure is not required, the door interlock mechanism may be disabled, allowing both doors of an air lock to remain open for extended periods when frequent containment entry is necessary. During CORE ALTERATIONS or movement of irr adiated fuel assemblies within containment, containment closure is required; therefore, the door interlock mechanism may remain disabled, but one air lock door must always remain closed in the personnel and equipment hatch (unless the equipment hatch is isolated by a closure plate or equivalent barrier).
The  requirements for containment penetration closure ensure that  a release of fission product radioactivity within containment will be restricted from escaping to the environment. The closure restrictions are sufficient to restrict fission product radioactivity release from containment due to a fuel handling accident during refueling.
The Containment Purge and Exhaust System includes two subsystems. The Shutdown Purge System includes a 36 inch purge penetration and a 36 inch exhaust penetration.      The second subsystem,  a  Mini-Purge System, includes a 6 inch purge penetration  and a 6  inch exhaust penetration. During MODES I, 2, 3, and 4, the shutdown purge and exhaust penetrations are isolated by a blind flange with two 0-rings that provide the necessary boundary. The two air operated valves in each of the two mini-purge penetrations can be opened intermittently, but are closed automatically by the Containment Ventilation Isolation Instrumentation System.
Neither of the subsystems is subject to a Specification in MODE 5.
(continued)
R.E. Ginna Nuclear Power Plant      8  3.9-2                            Revision  P


Attachment III Proposed Technical Specifications Included pages (note that not all pages are changed): 3.9-4 3.9-5 B3.9-10 B3.9-11 B3.9-12 B3.9-13 B3.9-14 B3.9-15 ontainment Penetrations 3.9.3 3.9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 The containment penetrations shall be in the following status: a.The equipment hatch shall be either: 1.bolted in place with at least one access door closed, or 2.isolated by a closure plate, or equivalent, that restricts air flow from containment; b.One door in the personnel air lock shall be closed;and c~Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be either: 1.closed by a manual or automatic isolation valve, blind flange, or equivalent, or 2.'apable of being closed by an OPERABLE Containment Ventilation Isolation System.APPLICABILITY:
ontainment Penetrations B 3.9.3 BASES BACKGROUND         In HODE 6, large air exchangers are used to support (continued)    refueling operations. The normal 36 inch Shutdown Purge System is used for this purpose, and each air operated valve is closed by the Containment Ventilation Isolation Instrumentation in accordance with LCO 3.3.5, "Containment Ventilation Isolation Instrumentation."
During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.
The   Hini-Purge System also remains operational in HODE 6, and   all four valves are also closed by the Containment Ventilation Isolation Instrumentation.
ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.One or more containment penetrations not in required status.A.l Suspend CORE ALTERATIONS.
The   other containment penetrations that provide direct access from containment atmosphere to outside atmosphere must be isolated on at, least one side.     Isolation may be achieved by an OPERABLE. automatic isolation valve, or by a manual   isolation valve, blind flange, or equivalent.
AND A.2 Suspend movement of i}radiated fuel assemblies within containment.
Immediately Immediately R.E.Ginna Nuclear Power Plant l 3.9-1 Amendment No.g Containment Penetrations 3.9.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.3.1 Verify each required containment penetration is in the required status.7 days SR 3.9.3.2 Verify each required containment purge and exhaust valve actuates to the isolation position on an actual or simulated actuation signal.24 months R.E.Ginna Nuclear Power Plant 3.9-5 Amendment No.61 j 4 ontainment Penetrations B 3.9.3 B 3.9 REFUELING OPERATIONS 8 3.9.3 Containment Penetrations BASES BACKGROUND During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, a release of fission product radioactivity within containment will be restricted from escaping to the environment when the LCO requirements are met.In MODES 1, 2, 3, and 4, this is accomplished by maintaining containment OPERABLE as described in LCO 3.6.1,"Containment." In MODE 5, there are no accidents of concern which require containment.
In MODE 6, the potential for containment pressurization as a result of an accident is not likely;therefore, requirements to isolate the containment from the outside atmosphere can be less stringent.
The LCO requirements are referred to as"containment closure" rather than"containment OPERABILITY." Containment closure means that all potential escape paths are closed or capable of being closed.Since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required.The containment serves to contain fission product radioactivity that may be released from the reactor core following an accident, such that offsite radiation exposures are maintained within the requirements of 10 CFR 100.Additionally, the containment provides radiation shielding from the fission products that may be present in the containment atmosphere following accident conditions.
The containment equipment hatch, which is part of the containment pressure boundary, provides a means for moving large equipment and components into and out of containment.
During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, the equipment hatch must be bolted in place.Good engineering practice dictates that a minimum of 4 bolts be used to hold the equipment hatch in place and that the bolts be approximately equally spaced.As an alternative, the equipment hatch opening can be isolated by a closure plate, or by an equivalent isolation barrier (e.g., over head door assembly), that restricts air flow from containment.(continued)
R.E.Ginna Nuclear Power Plant B 3.9-1 Revision P ll h t ontainment Penetrations B 3.9.3 BASES BACKGROUND (continued)
The containment equipment and personnel air locks, which are also part of the containment pressure boundary, provide a means for personnel access during MODES I, 2, 3, and 4 in accordance with LCO 3.6.2,"Containment Air Locks." Each air lock has a door at both ends.The doors are normally interlocked to prevent simultaneous opening when containment OPERABILITY is required.During periods of plant shutdown when containment closure is not required, the door interlock mechanism may be disabled, allowing both doors of an air lock to remain open for extended periods when frequent containment entry is necessary.
During CORE ALTERATIONS or movement of irr adiated fuel assemblies within containment, containment closure is required;therefore, the door interlock mechanism may remain disabled, but one air lock door must always remain closed in the personnel and equipment hatch (unless the equipment hatch is isolated by a closure plate or equivalent barrier).The requirements for containment penetration closure ensure that a release of fission product radioactivity within containment will be restricted from escaping to the environment.
The closure restrictions are sufficient to restrict fission product radioactivity release from containment due to a fuel handling accident during refueling.
The Containment Purge and Exhaust System includes two subsystems.
The Shutdown Purge System includes a 36 inch purge penetration and a 36 inch exhaust penetration.
The second subsystem, a Mini-Purge System, includes a 6 inch purge penetration and a 6 inch exhaust penetration.
During MODES I, 2, 3, and 4, the shutdown purge and exhaust penetrations are isolated by a blind flange with two 0-rings that provide the necessary boundary.The two air operated valves in each of the two mini-purge penetrations can be opened intermittently, but are closed automatically by the Containment Ventilation Isolation Instrumentation System.Neither of the subsystems is subject to a Specification in MODE 5.(continued)
R.E.Ginna Nuclear Power Plant 8 3.9-2 Revision P ontainment Penetrations B 3.9.3 BASES BACKGROUND (continued)
In HODE 6, large air exchangers are used to support refueling operations.
The normal 36 inch Shutdown Purge System is used for this purpose, and each air operated valve is closed by the Containment Ventilation Isolation Instrumentation in accordance with LCO 3.3.5,"Containment Ventilation Isolation Instrumentation." The Hini-Purge System also remains operational in HODE 6, and all four valves are also closed by the Containment Ventilation Isolation Instrumentation.
The other containment penetrations that provide direct access from containment atmosphere to outside atmosphere must be isolated on at, least one side.Isolation may be achieved by an OPERABLE.automatic isolation valve, or by a manual isolation valve, blind flange, or equivalent.
Equivalent isolation methods may include use of a material that can provide a temporary, atmospheric pressure, ventilation barrier for the other containment penetrations during fuel'movements.
Equivalent isolation methods may include use of a material that can provide a temporary, atmospheric pressure, ventilation barrier for the other containment penetrations during fuel'movements.
APPLICABLE SAFETY ANALYSES During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, the most severe radiological consequences result from a fuel handling accident.The fuel handling accident is a postulated event that involves damage to irradiated, fuel (Ref.1).Fuel handling accidents, analyzed using the criteria of Reference 2, include dropping a single irradiated fuel assembly and handling tool or a heavy object onto other irradiated fuel assemblies.
APPLICABLE       During CORE ALTERATIONS or movement of irradiated fuel SAFETY ANALYSES  assemblies within containment, the most severe radiological consequences result from a fuel handling accident.       The fuel handling accident is a postulated     event that involves   damage to irradiated, fuel (Ref. 1). Fuel handling accidents, analyzed using the criteria of Reference 2, include dropping a single irradiated fuel assembly and handling tool or a heavy object onto other irradiated fuel assemblies.         The requirements of LCO 3.9.6, "Refueling Cavity Water Level,"
The requirements of LCO 3.9.6,"Refueling Cavity Water Level," and the minimum decay time of 100 hours prior to CORE ALTERATIONS ensure that the release of fission product radioactivity, subsequent to a fuel handling accident, results in doses that are within the guideline values specified in 10 CFR 100.'tandard Review Plan (SRP), Section 15.7.4, Rev.1 (Ref.2), requires containment closure even though this is not an assumption of the accident analyses.The acceptance limits for offsite radiation exposure is 96 rem (Ref.3).Containment penetrations satisfy Criterion 3 of the NRC Policy Statement since these are assumed in the SRP.R.E.Ginna Nuclear Power Plant B 3.9-3 (continued)
and the minimum decay time of 100 hours prior to CORE ALTERATIONS ensure that the release of fission product radioactivity, subsequent to a fuel handling accident, results in doses that are within the guideline values specified in   10 CFR 100.'tandard   Review Plan (SRP),
Revision 0 ontainment Penetrations 8 3.9.3 BASES (continued)
Section 15.7.4, Rev. 1 (Ref. 2), requires containment closure even though this is not an assumption of the accident analyses. The acceptance limits for offsite radiation exposure is 96 rem (Ref. 3).
LCO This LCO limits the consequences of a fuel handling accident in containment by limiting the potential escape paths for fission product radioactivity released within containment.
Containment penetrations satisfy Criterion 3 of the       NRC Policy Statement since these are assumed in the SRP.
The LCO requires any penetration providing direct access from the containment atmosphere to the outside atmosphere to be closed except for the OPERABLE containment purge and exhaust penetrations.
(continued)
For the OPERABLE containment purge and exhaust penetrations, this LCO ensures that at least one valve in each of these penetrations is isolable by the Containment Ventilation Isolation System.APPLICABILITY The containment penetration requirements are applicable during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment because this is when there is a potential for a fuel handling accident.In NODES I, 2, 3, and 4, containment penetration requirements are addressed by LCO 3.6.1.In NODES 5 and 6, when CORE ALTERATIONS or movement of irradiated fuel assemblies within containment are not being conducted, the potential for a fuel handling accident does not exist.Therefore, under these conditions, no requirements are placed on containment penetration status.ACTIONS A.l and A.2 If the containment equipment hatch (or its closure plate or equivalent), air lock doors, or any containment penetration that provides direct access from the containment atmosphere to the outside atmosphere is not in the required status, including the Containment Ventilation Isolation System not capable of automatic actuation when the purge and exhaust valves are open, the plant must be placed in a condition where the isolation function is not needed.This is accomplished by immediately suspending CORE ALTERATIONS and movement of irradiated fuel assemblies within containment.
R.E. Ginna Nuclear Power Plant         B 3.9-3                           Revision     0
Performance of these actions shall not preclude completion of movement of a component to a safe position.R.E.Ginna Nuclear Power Plant B 3.9-4 (continued)
 
Revision P 0 0'(~d h T I 0 t Containment Penetrations 8 3.9.3 BASES (continued)
ontainment Penetrations 8 3.9.3 BASES   (continued)
SURVEILLANCE RE(UIREHENTS SR,3.9.3.1 This SR demonstrates that each of the containment penetrations required to be in its closed position is in that position.The Surveillance on the open purge and exhaust valves will demonstrate that the valves are not blocked or otherwise prevented from closing (e.g., solenoid unable to vent).The Surveillance is performed every 7 days during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment.
LCO                 This LCO limits the consequences of a fuel handling accident in containment by limiting the potential escape paths for fission product radioactivity released within containment.
The Surveillance interval is selected to be commensurate with the normal duration of time to complete fuel handling operations.
The LCO requires any penetration providing direct access from the containment atmosphere to the outside atmosphere to be closed except for the OPERABLE containment purge and exhaust penetrations. For the OPERABLE containment purge and exhaust penetrations, this LCO ensures that at least one valve in each of these penetrations is isolable by the Containment Ventilation Isolation System.
As such, this Surveillance ensures'that a postulated fuel handling accident that releases fission product radioactivity within the containment will not result in a release of fission product radioactivity to the environment.
APPLICABILITY       The containment penetration requirements are applicable during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment because this is when there is a potential for a fuel handling accident. In NODES I, 2, 3, and 4, containment penetration requirements are addressed by LCO 3.6. 1. In NODES 5 and 6, when CORE ALTERATIONS or movement of irradiated fuel assemblies within containment are not being conducted, the potential for a fuel handling accident does not exist. Therefore, under these conditions, no requirements are placed on containment penetration status.
SR 3.9.3.2 This SR demonstrates that each containment purge and exhaust valve actuates.to its isolation position.on manual initiation or on an actual or simulated high radiation signal.The 24 month Frequency maintains consistency with other similar instrumentation and valve testing requirements.
ACTIONS             A.l and A.2 If the containment equipment hatch (or its closure plate or equivalent), air lock doors, or any containment penetration that provides direct access from the containment atmosphere to the outside atmosphere is not in the required status, including the Containment Ventilation Isolation System not capable of automatic actuation when the purge and exhaust valves are open, the plant must be placed in a condition where the isolation function is not needed. This is accomplished by immediately suspending CORE ALTERATIONS and movement of irradiated fuel assemblies within containment.
In LCO 3.3.5, the Containment Ventilation Isolation instrumentation requires a CHANNEL CHECK every 12 hours and a COT every 92 days to ensure the channel OPERABILITY during refueling operations.
Performance of these actions shall not preclude completion of movement of a component to a safe position.
Every 24 months an ACTUATION LOGIC TEST and CHANNEL CALIBRATION is performed.
(continued)
R.E. Ginna Nuclear Power Plant         B 3.9-4                           Revision P
 
0           0
    '( ~
d h
T I
 
0                                   tContainment Penetrations 8 3.9.3 BASES   (continued)
SURVEILLANCE       SR,3.9.3.1 RE(UIREHENTS This SR demonstrates that each of the containment penetrations required to be in its closed position is in that position. The Surveillance on the open purge and exhaust valves will demonstrate that the valves are not blocked or otherwise prevented from closing (e.g., solenoid unable to vent).
The Surveillance is performed every 7 days during CORE ALTERATIONS   or movement of irradiated fuel assemblies within containment. The Surveillance interval is selected to be commensurate with the normal duration of time to complete fuel handling operations. As such, this Surveillance ensures 'that a postulated fuel handling accident that releases fission product radioactivity within the containment will not result in a release of fission product radioactivity to the environment.
SR   3.9.3.2 This SR demonstrates that each containment purge and exhaust valve actuates.to its isolation position. on manual initiation or on an actual or simulated high radiation signal. The 24 month Frequency maintains consistency with other similar instrumentation and valve testing requirements. In LCO 3.3.5, the Containment Ventilation Isolation instrumentation requires a CHANNEL CHECK every 12 hours and a COT every 92 days to ensure the channel OPERABILITY during refueling operations.     Every 24 months an ACTUATION LOGIC TEST and CHANNEL CALIBRATION is performed.
These Surveillances will ensure that the valves are capable of closing after a postulated fuel handling accident to limit a release of fission product radioactivity from the containment.
These Surveillances will ensure that the valves are capable of closing after a postulated fuel handling accident to limit a release of fission product radioactivity from the containment.
R.E.Ginna Nuclear Power Plant B 3.9-5 (continued)
(continued)
Revision 0 ontainment Penetrations B 3.9.3 BASES (continued)
R.E. Ginna Nuclear Power Plant         B 3.9-5                           Revision 0
REFERENCES 1.UFSAR, Section 15.7.2.NUREG-800, Section 15.7.4, Rev.1, July 1981.3.Letter from D.H.Crutchfi el d, NRC, to J.Hai er, RGLE,  
 
ontainment Penetrations B 3.9.3 BASES   (continued)
REFERENCES         1. UFSAR, Section 15.7.
: 2. NUREG-800,   Section 15.7.4, Rev. 1, July 1981.
: 3. Letter from   D. H. Crutchfi el d, NRC, to J. Hai er, RGLE,


==Subject:==
==Subject:==
"Fuel Handling Accident Inside Containment," dated October 7, 1981.R.E.Ginna Nuclear Power Plant B 3.9-6'evision 0 Attachment IV I"uel Handling Accident Inside Containment Dose Consequence Analysis for Ginna Station Fuel Handling Accident Inside Containment Dose Consequence Analysis for Ginna Station  
  "Fuel Handling Accident Inside Containment,"
dated October 7, 1981.
R.E. Ginna Nuclear Power Plant       B 3.9-6 'evision                             0
 
Attachment IV I"uel Handling Accident Inside Containment Dose Consequence Analysis for Ginna Station
 
Fuel Handling Accident Inside Containment Dose Consequence Analysis for Ginna Station
 
==1.0    BACKGROUND==
 
The Ginna Station Technical Specifications require that containment "closure" be in effect during movement of irradiated fuel assemblies within containment and during core alterations.
Containment "closure" is defined in LCO 3.9.3 as isolating, or providing automatic isolation capability, for all penetrations which provide direct access from the containment atmosphere to the outside atmosphere. Specific requirements are provided for the personnel and equipment air locks in that at least one door in the associated air lock must be closed. A closure plate which restricts air flow from containment can also be used in place of the equipment hatch and its associated air lock dooi'.
These technical specification requirements are provided even though containment closure is not credited in the fuel handling accident dose consequences as described in the technical specification bases. Standard Review Plan (SRP) 15.7.4 states that ifa "fuel handling accident will occur only when the containment is isolated, no radiological consequences need be calculated." The SRP further states that if "containment will be open during fuel handling operations, as with a containment purge exhaust system" it should be verified that the resulting doses are "well within" 10 CFR Part 100 limits (i.e., 75 rem for the thyroid and 6 rem for the whole-body). Since Ginna Station was designed and built prior to the SRP, it does not (and is not required to) meet these limits.
As such, the fuel handling accident within containment for Ginna Station shows an offsite dose of 96 rem thyroid which has been previously accepted by the NRC as being "well within" 10 CFR Part 100 limits (UFSAR Section 15.7.3.3.2.2).
In support of the upcoming steam generator replacement outage, RG&;E is requesting to revise the existing technical specification requirements related to the equipment hatch to allow use of an installed overhead door assembly to isolate the equipment hatch opening. This overhead door assembly is similar to those used in BWR containments and in the Ginna Station Auxiliary Building (which also has technical specification requirements associated with it during movement of irradiated fuel assemblies within the Auxiliary Building). With the use of the overhead door assembly, containment "closure" is essentially maintained since the bases for LCO 3.9.3 specifically state that "since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required" for the isolation devices used to meet this LCO. However, it is recognized that the overhead door assembly could create a larger release path from containment than from other penetrations due to its size and the small gaps which exist between the door and equipment hatch opening. Therefore, the purpose of this analysis is to calculate whole body and thyroid doses in the control room and for the exclusion area boundary (EAB) with the equipment hatch opening isolated using the installed overhead door assembly in place of the current options provided in technical specifications.
 
In performing this analysis, several issues must be addressed. These are briefly discussed below:
The Ginna Station UFSAR (Section 2.3.4.2) provides an atmospheric dispersion factor (i.e.,
X/Q) value of 4.8E-4 sec/m'or the EAB during the first 2 hours of an accident. The X/Q value for the control room is provided in UFSAR Table 6.4-1 as 1.9E-4 sec/m~. This value is less than that for the EAB even though the control room is closer to the release source.
Therefore, this analysis must determine an appropriate value to use in order to calculate control room doses.
A leakage  rate from containment via the overhead door assembly must be determined during the two hour release following the fuel handling accident. This includes consideration of leakage from other available pathways (e.g., purge lines which may be opened).
The analysis must be performed using the higher enrichment fuel with higher peaking factors that is being used for the upcoming fuel cycle.
These issues are evaluated in detail below.
2.0    DETERMINATIONOF X/Q VALUES The basic equation used for the spatial distribution  of materials released under the influence of the building wake is:
X/Q = K/AU where:
K is the nondimensional concentration coefficient which is a function of the configuration of nearby structures, the release and intake locations, and the wind location; A is the reference building area;  and U is the wind velocity at the top of the reference building.
The plant configuration is shown in Figure 1. The critical features as shown on this figure is that the control room intake source is on top of the control room building.
The K values used in the above equation for the purpose of this analysis are from Dr. J. Halitsky based on field and wind tunnel experiments (see Chapter 5 of Meteorology and Atomic Energy, 1968, TID-24190). Table 1 provides the K values for each wind direction for the release configuration being evaluated at Ginna.


==1.0 BACKGROUND==
The Table    1 K values and the control building area of 2,964  m'ere    input in the above equation and processed through 3 years of hourly averaged weather data from the Ginna site weather tower (1992 - 1994). The resulting X/Q values at the control room intake on top of the control building structure were then plotted in Figure 2. As shown by this figure, the 5% probable value of X/Q is 3.0E-4 sec/m'.
The above calculated value is larger than the control room X/Q value provided in UFSAR Table 6.4-1, but smaller than the X/Q value provided in the Ginna Station UFSAR for the EAB. The value calculated for the EAB is based on generic (i.e., conservative) assumptions which ifwere similarly evaluated using plant specific considerations would be lowered (see UFSAR Section 2.3.4.2.2).
Therefore, the UFSAR X/Q value for the EAB will be conservatively used in this analysis for both the EAB and the control room.
3.0     DETERMINATIONOF CONTAINMENTLEAKAGERATES The existing UFSAR analysis for fuel handling accidents assumes that containment is not isolated at the time of the event. However, for the purpose of this analysis, containment will be in the configuration required by technical specifications. Therefore, a leakage rate from containment must be determined as discussed below:
3.1        ini-Pur e and    hu down P r e Pen      r  i n These penetrations may be opened during fuel movement provided that they are capable of being closed by an OPERABLE Containment Ventilation Isolation Signal. The isolation valves for these penetrations are designed to close within 2 seconds from the time a signal is generated or a total of 5 seconds following the event (see UFSAR Table 6.2-15). This time limit is consistent with Branch Technical Position CSB 6-4 to ensure that the impact on dose analyses is minimized. Therefore, leakage through these pathways is considered negligible and ignored for the purpose of this analysis.
3.2      E ui men H ch            nin The installed overhead door assembly has small gaps between the door and the equipment hatch opening. These gaps create the potential for a release path from containment. As such, the leak rate through these gaps must be determined.
The first step is to estimate the size of the gaps. An estimate of a 1/4 inch gap for the entire 88 feet circumference of the opening is used. This results in a leakage area of 1.83 ft~. It should be noted that this 1/4" gap is indicative of the type of containment barrier which the overhead door assembly is intended to provide and not an acceptance limit for its operability due to the other conservatisms used in this analysis. The next step is to determine the leakage through this area. As discussed in the bases for LCO 3.9.3, containment pressurization is not assumed for a fuel handling accident.
However, some pressure differential must be assumed to create a leakage path to the outside environment. For conservatism, two sources of pressure differential were considered as shown below:


The Ginna Station Technical Specifications require that containment"closure" be in effect during movement of irradiated fuel assemblies within containment and during core alterations.
For the first three minutes following the fuel handling accident, containment is assumed to be pressurized by 0.5 psig above the outside atmosphere. This 3 minutes is the time it takes for the containment free volume to equalize with the outside atmosphere through the 1.83 ft~ gap. This equates to a leakage rate of 8240 cfm.
Containment"closure" is defined in LCO 3.9.3 as isolating, or providing automatic isolation capability, for all penetrations which provide direct access from the containment atmosphere to the outside atmosphere.
: b.     For the remaining two hour duration, a leakage rate based on the maximum temperature difference between containment (120'F) and the outside atmosphere (-2'F) is assumed. This equates to a leakage rate. of 320 cfm.
Specific requirements are provided for the personnel and equipment air locks in that at least one door in the associated air lock must be closed.A closure plate which restricts air flow from containment can also be used in place of the equipment hatch and its associated air lock dooi'.These technical specification requirements are provided even though containment closure is not credited in the fuel handling accident dose consequences as described in the technical specification bases.Standard Review Plan (SRP)15.7.4 states that if a"fuel handling accident will occur only when the containment is isolated, no radiological consequences need be calculated." The SRP further states that if"containment will be open during fuel handling operations, as with a containment purge exhaust system" it should be verified that the resulting doses are"well within" 10 CFR Part 100 limits (i.e., 75 rem for the thyroid and 6 rem for the whole-body).
3.3       ther   on inmen Pene r   i ns The remaining containment penetrations which provide direct access from containment to the outside environment must be closed by a manual or automatic isolation valve, blind flange, or equivalent per technical specifications. As discussed in the bases for LCO 3.9.3, these isolation devices do not have to meet 10 CFR 50, Appendix J leakage requirements such that leakage through these penetrations can exist.
Since Ginna Station was designed and built prior to the SRP, it does not (and is not required to)meet these limits.As such, the fuel handling accident within containment for Ginna Station shows an offsite dose of 96 rem thyroid which has been previously accepted by the NRC as being"well within" 10 CFR Part 100 limits (UFSAR Section 15.7.3.3.2.2).
At Ginna   Station, most penetrations which provide direct access to the outside environment do not have isolation capability other than the installed containment isolation valves. Therefore, LCO 3.9.3 is typically met through the use of these installed containment isolation valves. In addition, due to the conservative assumptions for the equipment hatch, leakage through these paths was ignored.
In support of the upcoming steam generator replacement outage, RG&;E is requesting to revise the existing technical specification requirements related to the equipment hatch to allow use of an installed overhead door assembly to isolate the equipment hatch opening.This overhead door assembly is similar to those used in BWR containments and in the Ginna Station Auxiliary Building (which also has technical specification requirements associated with it during movement of irradiated fuel assemblies within the Auxiliary Building).
4.0     DOSE CALCULATIONS The source of fission products released from the fuel after 100 hours decay and the assumptions for iodine form and removal are based on Regulatory Guide 1.25. This analysis assumes that the fission product inventory from the highest rated assembly was released to the reactor cavity water. Table 2 shows the assumed source term for each isotope.
With the use of the overhead door assembly, containment"closure" is essentially maintained since the bases for LCO 3.9.3 specifically state that"since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required" for the isolation devices used to meet this LCO.However, it is recognized that the overhead door assembly could create a larger release path from containment than from other penetrations due to its size and the small gaps which exist between the door and equipment hatch opening.Therefore, the purpose of this analysis is to calculate whole body and thyroid doses in the control room and for the exclusion area boundary (EAB)with the equipment hatch opening isolated using the installed overhead door assembly in place of the current options provided in technical specifications.
The whole body dose calculations were made using the following relations and dose factors from Tables 3 and 4.
In performing this analysis, several issues must be addressed.
where:
These are briefly discussed below: The Ginna Station UFSAR (Section 2.3.4.2)provides an atmospheric dispersion factor (i.e., X/Q)value of 4.8E-4 sec/m'or the EAB during the first 2 hours of an accident.The X/Q value for the control room is provided in UFSAR Table 6.4-1 as 1.9E-4 sec/m~.This value is less than that for the EAB even though the control room is closer to the release source.Therefore, this analysis must determine an appropriate value to use in order to calculate control room doses.A leakage rate from containment via the overhead door assembly must be determined during the two hour release following the fuel handling accident.This includes consideration of leakage from other available pathways (e.g., purge lines which may be opened).The analysis must be performed using the higher enrichment fuel with higher peaking factors that is being used for the upcoming fuel cycle.These issues are evaluated in detail below.2.0 DETERMINATION OF X/Q VALUES The basic equation used for the spatial distribution of materials released under the influence of the building wake is: X/Q=K/AU where: K is the nondimensional concentration coefficient which is a function of the configuration of nearby structures, the release and intake locations, and the wind location;A is the reference building area;and U is the wind velocity at the top of the reference building.The plant configuration is shown in Figure 1.The critical features as shown on this figure is that the control room intake source is on top of the control room building.The K values used in the above equation for the purpose of this analysis are from Dr.J.Halitsky based on field and wind tunnel experiments (see Chapter 5 of Meteorology and Atomic Energy, 1968, TID-24190).
fii~ is the active breathing rate (assumed to be 3.47E-4 m'/sec);
Table 1 provides the K values for each wind direction for the release configuration being evaluated at Ginna.
f is    the average relative concentration in the control room based on the in-leakage, filtration, and total volume of the control room (see Table 3);
The Table 1 K values and the control building area of 2,964 m'ere input in the above equation and processed through 3 years of hourly averaged weather data from the Ginna site weather tower (1992-1994).The resulting X/Q values at the control room intake on top of the control building structure were then plotted in Figure 2.As shown by this figure, the 5%probable value of X/Q is 3.0E-4 sec/m'.The above calculated value is larger than the control room X/Q value provided in UFSAR Table 6.4-1, but smaller than the X/Q value provided in the Ginna Station UFSAR for the EAB.The value calculated for the EAB is based on generic (i.e., conservative) assumptions which if were similarly evaluated using plant specific considerations would be lowered (see UFSAR Section 2.3.4.2.2).
Q; is the curie quantity in the containment available   for leakage;
Therefore, the UFSAR X/Q value for the EAB will be conservatively used in this analysis for both the EAB and the control room.3.0 DETERMINATION OF CONTAINMENT LEAKAGE RATES The existing UFSAR analysis for fuel handling accidents assumes that containment is not isolated at the time of the event.However, for the purpose of this analysis, containment will be in the configuration required by technical specifications.
 
Therefore, a leakage rate from containment must be determined as discussed below: 3.1 ini-Pur e and hu down P r e Pen r i n These penetrations may be opened during fuel movement provided that they are capable of being closed by an OPERABLE Containment Ventilation Isolation Signal.The isolation valves for these penetrations are designed to close within 2 seconds from the time a signal is generated or a total of 5 seconds following the event (see UFSAR Table 6.2-15).This time limit is consistent with Branch Technical Position CSB 6-4 to ensure that the impact on dose analyses is minimized.
'w f>>; is the adult thyroid inhalation   dose factor for the isotope; and n is the number   of iodine isotopes.
Therefore, leakage through these pathways is considered negligible and ignored for the purpose of this analysis.3.2 E ui men H ch nin The installed overhead door assembly has small gaps between the door and the equipment hatch opening.These gaps create the potential for a release path from containment.
The whole body dose conservatively combines both the gamma and beta contributions in the following relationship for a semi-infinite plume:
As such, the leak rate through these gaps must be determined.
tl                   n D b
The first step is to estimate the size of the gaps.An estimate of a 1/4 inch gap for the entire 88 feet circumference of the opening is used.This results in a leakage area of 1.83 ft~.It should be noted that this 1/4" gap is indicative of the type of containment barrier which the overhead door assembly is intended to provide and not an acceptance limit for its operability due to the other conservatisms used in this analysis.The next step is to determine the leakage through this area.As discussed in the bases for LCO 3.9.3, containment pressurization is not assumed for a fuel handling accident.However, some pressure differential must be assumed to create a leakage path to the outside environment.
                                  = Xlg   [0 23   Q   g   Bp '   25 Q     g B ]
For conservatism, two sources of pressure differential were considered as shown below:
ll                   ll where B and B, are the average beta and gamma energies in units       of mev per disintegration. Values for these parameters are given in Table 4.
For the first three minutes following the fuel handling accident, containment is assumed to be pressurized by 0.5 psig above the outside atmosphere.
5.0     RESULTS The results of the analysis for the various combinations are provided in Table 3. The three cases which were run are described below with the differences between the three cases strictly due to assumptions with respect to the control room ventilation configurations:
This 3 minutes is the time it takes for the containment free volume to equalize with the outside atmosphere through the 1.83 ft~gap.This equates to a leakage rate of 8240 cfm.b.For the remaining two hour duration, a leakage rate based on the maximum temperature difference between containment (120'F)and the outside atmosphere
5.1     Qase   1 The control room was assumed to be in the normal configuration at the time of the fuel handling accident. This results in 2000 cfm of unfiltered air being taken into the control room for the first 30 seconds following the fuel handling accident until the control room is isolated and the system switches to emergency recirculation mode with air being forced through a charcoal system.
(-2'F)is assumed.This equates to a leakage rate.of 320 cfm.3.3 ther on inmen Pene r i ns The remaining containment penetrations which provide direct access from containment to the outside environment must be closed by a manual or automatic isolation valve, blind flange, or equivalent per technical specifications.
5.2     Qgse 2 The control room was assumed to be isolated prior to the fuel handling accident and subsequently placed in the recirculation mode.
As discussed in the bases for LCO 3.9.3, these isolation devices do not have to meet 10 CFR 50, Appendix J leakage requirements such that leakage through these penetrations can exist.At Ginna Station, most penetrations which provide direct access to the outside environment do not have isolation capability other than the installed containment isolation valves.Therefore, LCO 3.9.3 is typically met through the use of these installed containment isolation valves.In addition, due to the conservative assumptions for the equipment hatch, leakage through these paths was ignored.4.0 DOSE CALCULATIONS The source of fission products released from the fuel after 100 hours decay and the assumptions for iodine form and removal are based on Regulatory Guide 1.25.This analysis assumes that the fission product inventory from the highest rated assembly was released to the reactor cavity water.Table 2 shows the assumed source term for each isotope.The whole body dose calculations were made using the following relations and dose factors from Tables 3 and 4.where: fii~is the active breathing rate (assumed to be 3.47E-4 m'/sec);fis the average relative concentration in the control room based on the in-leakage, filtration, and total volume of the control room (see Table 3);Q;is the curie quantity in the containment available for leakage;  
5.3     ~se   3 The control room was assumed to be isolated prior to the fuel handling accident with the recirculation mode unavailable.
'w f>>;is the adult thyroid inhalation dose factor for the isotope;and n is the number of iodine isotopes.The whole body dose conservatively combines both the gamma and beta contributions in the following relationship for a semi-infinite plume: tl n D b=Xlg[0 23 Q g Bp'25 Q g B]ll ll where B and B, are the average beta and gamma energies in units of mev per disintegration.
Values for these parameters are given in Table 4.5.0 RESULTS The results of the analysis for the various combinations are provided in Table 3.The three cases which were run are described below with the differences between the three cases strictly due to assumptions with respect to the control room ventilation configurations:
5.1 Qase 1 The control room was assumed to be in the normal configuration at the time of the fuel handling accident.This results in 2000 cfm of unfiltered air being taken into the control room for the first 30 seconds following the fuel handling accident until the control room is isolated and the system switches to emergency recirculation mode with air being forced through a charcoal system.5.2 Qgse 2 The control room was assumed to be isolated prior to the fuel handling accident and subsequently placed in the recirculation mode.5.3~se 3 The control room was assumed to be isolated prior to the fuel handling accident with the recirculation mode unavailable.
The results from each of these cases demonstrate that the EAB doses remain far below the SRP requirements of 75 rem at the thyroid and that the control room doses remain far below the limits of General Design Criteria 19 of 30 rem thyroid.
The results from each of these cases demonstrate that the EAB doses remain far below the SRP requirements of 75 rem at the thyroid and that the control room doses remain far below the limits of General Design Criteria 19 of 30 rem thyroid.
TABLE 1.CONCENTRATION COEFFICIENTS (K)VALUES FOR GINNA CONTROL ROOM GIVEN A RELEASE AT THE EQUIPMENT HATCH WIND DIRECTION, 8 INDS FRO 3.0 22.5 45 67.5 90 112.5 135 157.5 180 202.5 225 247.5 270 292.5 315 337.5 Reference Area, A=2964 m'eference Height for Wind=36m AGL 4.5 0.0 0.0 0.0 0.0 0.0 0.0 0.375 2.25 4.5 2.25 1.5 0.75 0.375 0.0 TABLE 2.FUEL GAP INVENTORY RELEASED AT TIME OF GINNA FUEL HANDLING ACCIDENT (100 Hours After Shutdown)ISOTOPE I-131 I-132 I-133 I-134 I-135 Kr-85m Kr-85 Kr-87 Kr-88 Xe-131m Xe-133m Xe-133 Xe-135m Xe-135 Xe-138 CURIES RELEASED TO REACTOR CAVITY OR SPENT FUEL POOL WATER 5.16E+04 Negligible 4.50E+03 Negligible 3.22E+00 3.12E-03 1.72E+03 Negligible Negligible 6.35E+02 1.55E+03 , 8.33E+04 5.16E-01 1.56E+02 Negligible CURIES RELEASED TO CONTAINMENT ATMOSPHERE 5.16E+02 Negligible 4.50E+01 Negligible 3.22E-02 3.12E-03 1.72E+03 Negligible Negligible 6.35E+02 1.55E+03 8.33E+04 5.16E-01 1.56E+02 Negligible 4$'.l ai Cl TABLE 3.ASSUMPTIONS FOR GINNA FUEL HANDLING ACCIDENT INSIDE CONTAINMENT CASE 1 CASE 2 CASE 3 Containment Volume (ft')Containment Leak Rate During First 3 min (cfm)Containment Leak Rate During Last 117 min (cfm)Control Room In-Leakage (cfm)Control Room Volume (ft)Control Room Recirculation Rate (cfm)1.0E6 1.0E6 1.0E6 8240 8240 8240 320 320 320 46 46 46 45,784 45,784 45,784 2000 2000 0 Iodine Filter Efficiency
 
-elemental (rem)-organic (rem)0.9 0.7 0.9 0.7 0.9 0.7 Fraction of Iodine that is-elemental (rem)-organic (rem)Initial (30 sec)Control Room Flow (cfm)Breathing Rate (m'/sec)EAB X/Q (sec/m')Control Room Intake X/Q (sec/m')Whole Body Dose (P+y)-EAB (rem)-Control Room (rem)Thyroid Dose-EAB (rem)-'ontrol Room (rem)0.75 0.75 0.75 0.25 0.25 0.25 2000 0 3.47E-4 3.47E-4 3.47E-4 4.8E-4 4.8E-4 4.8E-4 4.8E-4 4.8E-4 4.8E-4 0.12 0.12 0.12 0.05 0.007 0.007 8.1 8.1 8.1 0.79 0.16 0.53 8 TABLE 4.ISOTOPIC DATA FOR FUEL HANDLING ACCIDENT ISOTOPE I-131 I-132 I-133 I-134 I-135 Kr-85m Kr-85 Kr-87 Kr-88 Xe-131m Xe-133m Xe-133 Xe-135m Xe-135 Xe-138 Ep V/DIS 1.91E-1 4.90E-1 4.09E-1 6.08E-1 3.69E-1 2.70E-1 2.70E-l 1.42EO 4.00E-1 1.50E-1 2.00E-1 1.40E-1 1.00E-l 3.40E-1 6.50E-1 EV/DIS 3.80E-1 2.29EO 6.07E-1 2.63EO 1.57EO 1.56E-1 2.20E-3 7.84E-1 1.93EO 1.98E-2 4.16E-2 4.48E-2 4.28E-1 2.44E-1 1.17EO THYROID DOSE FACTOR M/C 1.48E6 5.35E4 4.05ES 2.50E4 1.24E5
TABLE 1. CONCENTRATION COEFFICIENTS (K) VALUES FOR GINNA CONTROL ROOM GIVEN A RELEASE AT THE EQUIPMENT HATCH WIND DIRECTION, 8 INDS FRO 3.0 22.5                           4.5 45                            0.0 67.5                           0.0 90                            0.0 112.5                            0.0 135                            0.0 157.5                            0.0 180                          0.375 202.5                          2.25 225                            4.5 247.5                          2.25 270                            1.5 292.5                          0.75 315                          0.375 337.5                            0.0 Reference Area, A = 2964 Height for Wind = 36m AGL m'eference
~roe' Ig~~rrmm , T;r Qo e i~~t g~~mvurre C Figure 2-X/Q Using 1992-1994 Meteorological Data 100.00 10.00 aA<<9'.A: F>"::: (C,.:X CC a:XC'?>?X,!.YFX XX'<<A<<F'!X C CX CC>>2 C AX.'>>.::8"X(2>.XXXXX
 
'XXCC>.0 c 50 1.00 CX j>X"..A":!>2 A.n XC>XX X''f (F".C Q?";".~: '.XX C!X C fP!X>X>n~a'2!hV AF D XXX>2>>>C!'9:X XXXX: 9ax jxax f<<C:22: X:f i>x!3 j?A: 9, vj>3 c>;X3 Cj X<<R!332$2'X X jj?2'9(:>X C B 2 C: c.(ac>'aA c F!>>".c'fi!3!P X: 2 9%2 C 29: 2 29C X: 0.10 322 C'AX'A CX::CC f.F'A'F<<9>2>A">.222>Cf>2 9 3>'i2'>MA>,>9!22!A..'N (>>>F>>2 XC 1.00E-06 1.00E-05 1.00E-04 X/Q sec/m~1.00E-03 1.00E-02 1/1 5/96 25851 hours 36 m release}}
TABLE 2. FUEL GAP INVENTORYRELEASED AT TIME OF GINNAFUEL HANDLINGACCIDENT (100 Hours After Shutdown)
ISOTOPE           CURIES RELEASED TO        CURIES RELEASED TO REACTOR CAVITYOR            CONTAINMENT SPENT FUEL POOL           ATMOSPHERE WATER I-131                    5.16E+04               5.16E+02 I-132                    Negligible             Negligible I-133                    4.50E+03               4.50E+01 I-134                    Negligible            Negligible I-135                    3.22E+00               3.22E-02 Kr-85m                    3.12E-03               3.12E-03 Kr-85                    1.72E+03                1.72E+03 Kr-87                    Negligible             Negligible Kr-88                    Negligible            Negligible Xe-131m                    6.35E+02               6.35E+02 Xe-133m                    1.55E+03               1.55E+03 Xe-133                  , 8.33E+04               8.33E+04 Xe-135m                    5.16E-01               5.16E-01 Xe-135                    1.56E+02               1.56E+02 Xe-138                    Negligible             Negligible
 
4$ '.l ai Cl
 
TABLE 3. ASSUMPTIONS FOR GINNA FUEL HANDLINGACCIDENT INSIDE CONTAINMENT CASE   1 CASE 2 CASE   3 Containment Volume (ft')                             1.0E6    1.0E6  1.0E6 Containment Leak Rate During First 3 min (cfm)       8240      8240    8240 Containment Leak Rate During Last 117 min (cfm)       320      320    320 Control Room In-Leakage (cfm)                         46        46      46 Control Room Volume       (ft)                       45,784   45,784 45,784 Control Room Recirculation Rate (cfm)                2000     2000   0 Iodine Filter Efficiency - elemental (rem)           0.9       0.9    0.9
                                  - organic (rem)    0.7       0.7    0.7 Fraction of Iodine that is - elemental (rem)         0.75      0.75    0.75
                                    - organic (rem)   0.25      0.25    0.25 Initial (30 sec) Control Room Flow (cfm)             2000      0 Breathing Rate (m'/sec)                               3.47E-4   3.47E-4 3.47E-4 EAB X/Q (sec/m')                                      4.8E-4   4.8E-4 4.8E-4 Control Room Intake X/Q (sec/m')                      4.8E-4   4.8E-4 4.8E-4 Whole Body Dose (P + y) - EAB (rem)                  0.12     0.12   0.12
                              - Control Room (rem)    0.05     0.007   0.007 Thyroid Dose - EAB (rem)                              8.1       8.1     8.1
                -'ontrol Room      (rem)              0.79     0.16   0.53 8
 
TABLE 4. ISOTOPIC DATAFOR FUEL HANDLINGACCIDENT ISOTOPE                 Ep               E      THYROID DOSE V/DIS           V/DIS  FACTOR      M/C I-131            1.91E-1         3.80E-1        1.48E6 I-132            4.90E-1         2.29EO        5.35E4 I-133            4.09E-1         6.07E-1       4.05ES I-134            6.08E-1         2.63EO        2.50E4 I-135            3.69E-1         1.57EO        1.24E5 Kr-85m              2.70E-1         1.56E-1 Kr-85              2.70E-l         2.20E-3 Kr-87              1.42EO        7.84E-1 Kr-88              4.00E-1         1.93EO Xe-131m            1.50E-1         1.98E-2 Xe-133m            2.00E-1        4.16E-2 Xe-133            1.40E-1        4.48E-2 Xe-135m              1.00E-l        4.28E-1 Xe-135            3.40E-1        2.44E-1 Xe-138            6.50E-1         1.17EO
 
~ roe' Ig
  ~ ~rrmm                     , T
;r Qo
                      ~    ~
e i     t g ~   ~
mvurre       C
 
Figure 2 - X/Q Using 1992-1994 Meteorological Data 100.00 aA<<9 '. A                                                       a
:8"X(2>.XXXXX' XXCC>
C
                                                                                                                    <<F'!
:XC 0
X                                       CX
: F>
XX'<<A
                                                                                              '?>?X,!
                                                                                              .YFX                                                               CC >
                                                                                                                                                                  >2   C
                                            "::: (C,.:X   CC AX 10.00 A .n                                                                                        n  ~    a c     50                                     CX XX C!X XC>XX                                                                C j>X "..                                                                                                 !X> X>
X''f                                               fP A                                                                    (F                                               '2!  hV
                                                                                                                ".C Q? ";".~: '.
                                            ": !>2                                                                                                                 AF 1.00 C                        <<                                                          c . (ac>   '       aA c f<<C:22: X:f
                              !'9:X XXXX i>x!3 j?A: 9,   vj >3 R!332 $2'X Xjj?                                                                               "
F!>>
                                                                                                            >X   C                                                         X:  2 XXX>2>>>                                                                                      B 2                                                   9%  2 c>;X3    Cj                                                              C:
:  9ax jxax                                                    2'9(:                                                                      C 29:  2 X                                                                                                    .c'fi!3!P           29C                          X:
D 322      C' 0.10 AX'A                                                                                                             'i2'>MA >, >9!22 !A   ..'N (>>> F>>
CX::CC                                                                  222>          2 F'A'F                                                        Cf >
XC
: f.                                  <<9>2>A " >.                          9 3>
2 1.00E-06                                 1.00E-05                                                     1.00E-04                                               1.00E-03                           1.00E-02 X/Q sec/m~
25851 hours 1/1 5/96                                                                                                                                                                                                   36 m release}}

Latest revision as of 09:25, 4 February 2020

Proposed Tech Specs Containment Requirements During Mode 6 Cost Beneficial Licensing Action
ML17264A334
Person / Time
Site: Ginna Constellation icon.png
Issue date: 02/09/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A332 List:
References
NUDOCS 9602130336
Download: ML17264A334 (35)


Text

Attachment II Marked Up Ginna Station Technical Specifications Included pages (note that not all pages are changed):

3.9-4 3.9-5 B3.9-10 83.9-11 B3.9-12 B3.9-13 B3.9-14 B3.9-15 9602i30336 960209 PDR ADQCK 05000244 P PDR

ontainment Penetrations 3.9.3

3. 9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 The containment penetrations shall be in the following status:
a. The equipment hatch shall be either:
1. bolted in place with at least one access door closed, or

> gc Q.gvwv+~QplJc'.

isolated by a closure .plat that restricts air flow from containment;

b. One door in the personnel air lock shall be closed; and c ~ Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be either:
1. closed by a manual or automatic isolation valve, blind flange, or equivalent, or
2. capable of being closed by an OPERABLE Containment Ventilation Isolation System.

APPLICABILITY: Dur ing CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION RE(VIREO ACTION COMPLETION TINE A. One or more A. 1 Suspend CORE Immediately containment ALTERATIONS.

penetrations not in required status. AND A.2 Suspend movement of Immediately irradiated fuel assemblies within containment.

R.E. Ginna Nuclear Power Plant < 3.9-4 Amendment No. 61

ontainment Penetrations 3.9.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FRE(UENCY SR 3.9.3. 1 Verify each required containment 7 days penetration is in the required status.

SR 3.9.3.2 Verify each required containment purge and 24 months exhaust valve actuates to the isolation position on an actual or simulated actuation signal.

R.E. Ginna Nuclear Power Plant 3.9-5 Amendment No. 61

Containment Penetrations 8 3.9.3 B 3.9 REFUELING OPERATIONS B 3.9.3 Containment Penetrations BASES BACKGROUND During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, a release of fission product radioactivity within containment will be restricted from escaping to the environment when the LCO requirements are met. In MODES 1, 2, 3, and 4, this is accomplished by maintaining containment OPERABLE as described in LCO 3.6. 1, "Containment." In MODE 5, there are no accidents of concern which require containment. In MODE 6, the potential for containment pressurization as a result of an accident is not likely; therefore, requirements to isolate the containment from the outside atmosphere can be less stringent. The LCO requirements are referred to as "containment closure" rather than "containment OPERABILITY." Containment closure means that all potential escape paths are closed or capable of being closed. Since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required.

L The containment serves to contain fission product radioactivity that may be released from the reactor core following an accident, such that offsite radiation exposures are maintained within the requirements of 10 CFR 100.

Additionally, the containment provides radiation shielding from the fission products that may be present in the containment atmosphere following accident conditions.

The containment equipment hatch, which is part of the containment pressure boundary, provides a means for moving large equipment and components into and out of containment.

During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, the equipment hatch must be bolted in place. Good engineering practice dictates that a minimum of 4 bolts be used to hold the equipment hatch in place and that the bolts be approximately e uall s aced.

As an alternative, the equipment hatch can e isolated by a closure plate that restricts air flow from containment.

)

~~ 4u ~ ~~viva.X~

~ (.<,g.~nba,Q. 4ec.

(continued)

R.E. Ginna Nuclear Power Plant B 3.9-10 Revision 0

Containment Penetrations B 3.9.3 BASES BACKGROUND The containment equipment and personnel air locks, which are (continued) also part of the containment pressure boundary, provide a means for personnel access during MODES 1, 2, 3; and 4 in accordance with LCO 3.6.2, "Containment Air Locks." Each air lock has a door at both ends. The doors are normally interlocked to prevent simultaneous opening when containment OPERABILITY is required. During periods of plant shutdown when containment closure is not required, the door interlock mechanism may be disabled, allowing both doors of an air lock to remain open for extended periods when frequent containment entry is necessary. During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, containment closure is required; therefore, the door interlock mechanism may remain disabled, but one air lock door must always remain closed in the personnel and aw 0-g< iso X~

SC.C C'<cA equipment hatch (unless the equipment hatch is isolated by a closure plate).

The requirements for containment penetration closure ensure that a release of fission product radioactivity within containment will be restricted from escaping to the environment. The closure restrictions are sufficient to restrict fission product radioactivity release from containment due to a fuel handling accident during refueling.

The Containment Purge and Exhaust System includes two subsystems. The Shutdown Purge System includes a 36 inch purge penetration and a 36 inch exhaust penetration. The second subsystem, a Mini-Purge System, includes a 6 inch purge penetration and a 6 inch exhaust penetration. During MODES 1, 2, 3, and 4, the shutdown purge and exhaust penetrations are isolated by a blind flange with two 0-rings that provide the necessary boundary. The two air operated valves in each of the two mini-purge penetrations can be opened intermittently, but are closed automatically by the Containment Ventilation Isolation Instrumentation System.

Neither of the subsystems is subject to a Specification in MODE 5.

(continued)

R.E. Ginna Nuclear Power Plant B 3.9-11 Revision 0

Containment Penetrations B 3.9.3 BASES BACKGROUND In NODE 6, large air exchangers are used to support (continued) refueling operations. The normal 36 inch Shutdown Purge System is used for this purpose, and each air operated valve is closed by the Containment Ventilation Isolation Instrumentation in accordance with LCO 3.3.5, "Containment Ventilation Isolation Instrumentation."

The Mini-Purge System also remains operational in MODE 6, and all four valves are also closed by the Containment Ventilation Isolation Instrumentation.

The other containment penetrations that provide direct access from containment atmosphere to outside atmosphere must be isolated on at least one side. Isolation may be achieved by an OPERABLE automatic isolation valve, or by a manual isolation valve, blind flange, or equivalent.

Equivalent isolation methods may include use of a material that can-provide a temporary, atmospheric pressure, ventilation barrier for the other containment penetrations during fuel movements.

APPLICABLE During CORE ALTERATIONS or movement of irradiated fuel SAFETY ANALYSES assemblies within containment, the most severe radiological consequences result from a fuel handling accident. The fuel handling accident is a postulated event that involves damage to irradiated fuel (Ref. 1). Fuel handling accidents, analyzed using the criteria of Reference 2, include dropping a single irradiated fuel assembly and handling tool or a heavy object onto other irradiated fuel assemblies. The requirements of LCO 3.9.6, "Refueling Cavity Water Level,"

and the minimum decay time of .100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to CORE ALTERATIONS ensure that the release of fission product radioactivity, subsequent to a fuel handling accident, results in doses that are within the guideline values specified in 10 CFR 100. Standard Review Plan (SRP),

Section 15.7.4, Rev. 1 (Ref. 2), requires containment closure even though this is not an assumption of the accident analyses. The acceptance limits for offsite radiation exposure is 96 rem (Ref. 3).

Containment penetrations satisfy Criterion 3 of the NRC Policy Statement since these are assumed in the SRP.

(continued)

R.E. Ginna Nuclear Power Plant B 3.9-12 Revision 0

Containment Penetrations B 3.9.3 BASES (continued)

LCO This LCO limits the consequences of a fuel handling accident in containment by limiting the potential escape paths for fission product radioactivity released within containment.

The LCO requires any penetration providing direct access from the containment atmosphere to the outside atmosphere to be closed except for the OPERABLE containment purge and exhaust penetrations. For the OPERABLE containment purge and exhaust penetrations, this LCO ensures that at least one valve in each of these penetrations is isolable by the Containment Ventilation Isolation System.

APPLICABILITY The co'ntainment penetration requirements are applicable during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment because this is when there is a potential for a fuel handling accident. In MODES I, 2, 3, and 4, containment penetration requirements are addressed by LCO 3.6. 1. In MODES 5 and 6, when CORE ALTERATIONS or movement of irradiated fuel assemblies within containment are not being conducted, the potential for a fuel handling accident does not exist. Therefore, under these conditions, no requirements are placed on containment penetration status.

ACTIONS A. 1 and A.2 ~ > ~go i vaK ~

If the containment equipment hatch (or its closure plate ,

air lock doors, or any containment penetration that provides direct access from the containment atmosphere to the outside atmosphere is not in the required status, including the Containment Ventilation Isolation System not capable of automatic actuation when the purge and exhaust valves are open, the plant must be placed in a condition where the isolation function is not needed. This is accomplished by immediately suspending CORE ALTERATIONS and movement of irradiated fuel assemblies within containment. Performance of these actions shall not preclude completion of movement of a component to a safe position.

(continued)

R,E. Ginna Nuclear Power Plant 8 3.9-13 Revision 0

Containment Penetrations B 3.9.3 BASES (continued)

SURVEILLANCE SR 3.9.3.1 RE(UIREMENTS This SR demonstrates that each of the containment penetrations required to be in its closed position is in that position. The Surveillance on the open purge and exhaust valves will demonstrate that the valves are not blocked or otherwise prevented From closing (e.g., solenoid unable to vent).

The Surveillance is performed every 7 days during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment. The Surveillance interval is selected to be commensurate with the normal duration of time to complete fuel handling operations. As such, this Surveillance ensures that a postulated fuel handling accident that releases fission product radioactivity within the containment will not result in a release of fission product radioactivity to the environment.

SR 3.9.3.2 This SR demonstrates that each containment purge and exhaust valve actuates to its isolation position on manual initiation or on an actual or simulated high radiation signal. The 24 month Frequency maintains consistency with other similar instrumentation and valve testing requirements. In LCO 3.3.5, the Containment Ventilation Isolation instrumentation requires a CHANNEL CHECK every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and a COT every 92 days to ensure the channel OPERABILITY during refueling operations. Every 24 months an ACTUATION LOGIC TEST and CHANNEL CALIBRATION is performed.

These Surveillances will ensure that the valves are capable of closing after a postulated fuel handling accident to limit a release of fission, product radioactivity from the containment.

(continued)

R.E. Ginna Nuclear Power Plant B 3.9-14 Revision 0

ontainment Penetrations B 3.9.3 BASES (continued)

REFERENCES 1. UFSAR, Section 15.7.

2. NUREG-800, Section 15.7.4, Rev. 1, July 1981.
3. Letter from D. N. Crutchfield, NRC, to J. Haier, RGLE,

Subject:

"Fuel Handling Accident Inside Containment,"

dated October 7, 1981.

R.E. Ginna Nuclear Power Plant B 3.9-15 Revision 0

Attachment III Proposed Technical Specifications Included pages (note that not all pages are changed):

3.9-4 3.9-5 B3.9-10 B3.9-11 B3.9-12 B3.9-13 B3.9-14 B3.9-15

ontainment Penetrations 3.9.3

3. 9 REFUELING OPERATIONS 3.9.3 Containment Penetrations LCO 3.9.3 The containment penetrations shall be in the following status:
a. The equipment hatch shall be either:
1. bolted in place with at least one access door closed, or
2. isolated by a closure plate, or equivalent, that restricts air flow from containment;
b. One door in the personnel air lock shall be closed; and c ~ Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be either:
1. closed by a manual or automatic isolation valve, blind flange, or equivalent, or 2.'apable of being closed by an OPERABLE Containment Ventilation Isolation System.

APPLICABILITY: During CORE ALTERATIONS, During movement of irradiated fuel assemblies within containment.

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A. One or more A.l Suspend CORE Immediately containment ALTERATIONS.

penetrations not in required status. AND A.2 Suspend movement of Immediately i}radiated fuel assemblies within containment.

R.E. Ginna Nuclear Power lPlant 3.9-1 Amendment No. g

Containment Penetrations 3.9.3 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.9.3. 1 Verify each required containment 7 days penetration is in the required status.

SR 3.9.3.2 Verify each required containment purge and 24 months exhaust valve actuates to the isolation position on an actual or simulated actuation signal.

R.E. Ginna Nuclear Power Plant 3.9-5 Amendment No. 61

j 4 ontainment Penetrations B 3.9.3 B 3.9 REFUELING OPERATIONS 8 3.9.3 Containment Penetrations BASES BACKGROUND During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, a release of fission product radioactivity within containment will be restricted from escaping to the environment when the LCO requirements are met. In MODES 1, 2, 3, and 4, this is accomplished by maintaining containment OPERABLE as described in LCO 3.6. 1, "Containment." In MODE 5, there are no accidents of concern which require containment. In MODE 6, the potential for containment pressurization as a result of an accident is not likely; therefore, requirements to isolate the containment from the outside atmosphere can be less stringent. The LCO requirements are referred to as "containment closure" rather than "containment OPERABILITY." Containment closure means that all potential escape paths are closed or capable of being closed. Since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required.

The containment serves to contain fission product radioactivity that may be released from the reactor core following an accident, such that offsite radiation exposures are maintained within the requirements of 10 CFR 100.

Additionally, the containment provides radiation shielding from the fission products that may be present in the containment atmosphere following accident conditions.

The containment equipment hatch, which is part of the containment pressure boundary, provides a means for moving large equipment and components into and out of containment.

During CORE ALTERATIONS or movement of irradiated fuel assemblies within containment, the equipment hatch must be bolted in place. Good engineering practice dictates that a minimum of 4 bolts be used to hold the equipment hatch in place and that the bolts be approximately equally spaced.

As an alternative, the equipment hatch opening can be isolated by a closure plate, or by an equivalent isolation barrier (e.g., over head door assembly), that restricts air flow from containment.

(continued)

R.E. Ginna Nuclear Power Plant B 3.9-1 Revision P

ll h

t

ontainment Penetrations B 3.9.3 BASES BACKGROUND The containment equipment and personnel air locks, which are (continued) also part of the containment pressure boundary, provide a means for personnel access during MODES I, 2, 3, and 4 in accordance with LCO 3.6.2, "Containment Air Locks." Each air lock has a door at both ends. The doors are normally interlocked to prevent simultaneous opening when containment OPERABILITY is required. During periods of plant shutdown when containment closure is not required, the door interlock mechanism may be disabled, allowing both doors of an air lock to remain open for extended periods when frequent containment entry is necessary. During CORE ALTERATIONS or movement of irr adiated fuel assemblies within containment, containment closure is required; therefore, the door interlock mechanism may remain disabled, but one air lock door must always remain closed in the personnel and equipment hatch (unless the equipment hatch is isolated by a closure plate or equivalent barrier).

The requirements for containment penetration closure ensure that a release of fission product radioactivity within containment will be restricted from escaping to the environment. The closure restrictions are sufficient to restrict fission product radioactivity release from containment due to a fuel handling accident during refueling.

The Containment Purge and Exhaust System includes two subsystems. The Shutdown Purge System includes a 36 inch purge penetration and a 36 inch exhaust penetration. The second subsystem, a Mini-Purge System, includes a 6 inch purge penetration and a 6 inch exhaust penetration. During MODES I, 2, 3, and 4, the shutdown purge and exhaust penetrations are isolated by a blind flange with two 0-rings that provide the necessary boundary. The two air operated valves in each of the two mini-purge penetrations can be opened intermittently, but are closed automatically by the Containment Ventilation Isolation Instrumentation System.

Neither of the subsystems is subject to a Specification in MODE 5.

(continued)

R.E. Ginna Nuclear Power Plant 8 3.9-2 Revision P

ontainment Penetrations B 3.9.3 BASES BACKGROUND In HODE 6, large air exchangers are used to support (continued) refueling operations. The normal 36 inch Shutdown Purge System is used for this purpose, and each air operated valve is closed by the Containment Ventilation Isolation Instrumentation in accordance with LCO 3.3.5, "Containment Ventilation Isolation Instrumentation."

The Hini-Purge System also remains operational in HODE 6, and all four valves are also closed by the Containment Ventilation Isolation Instrumentation.

The other containment penetrations that provide direct access from containment atmosphere to outside atmosphere must be isolated on at, least one side. Isolation may be achieved by an OPERABLE. automatic isolation valve, or by a manual isolation valve, blind flange, or equivalent.

Equivalent isolation methods may include use of a material that can provide a temporary, atmospheric pressure, ventilation barrier for the other containment penetrations during fuel'movements.

APPLICABLE During CORE ALTERATIONS or movement of irradiated fuel SAFETY ANALYSES assemblies within containment, the most severe radiological consequences result from a fuel handling accident. The fuel handling accident is a postulated event that involves damage to irradiated, fuel (Ref. 1). Fuel handling accidents, analyzed using the criteria of Reference 2, include dropping a single irradiated fuel assembly and handling tool or a heavy object onto other irradiated fuel assemblies. The requirements of LCO 3.9.6, "Refueling Cavity Water Level,"

and the minimum decay time of 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to CORE ALTERATIONS ensure that the release of fission product radioactivity, subsequent to a fuel handling accident, results in doses that are within the guideline values specified in 10 CFR 100.'tandard Review Plan (SRP),

Section 15.7.4, Rev. 1 (Ref. 2), requires containment closure even though this is not an assumption of the accident analyses. The acceptance limits for offsite radiation exposure is 96 rem (Ref. 3).

Containment penetrations satisfy Criterion 3 of the NRC Policy Statement since these are assumed in the SRP.

(continued)

R.E. Ginna Nuclear Power Plant B 3.9-3 Revision 0

ontainment Penetrations 8 3.9.3 BASES (continued)

LCO This LCO limits the consequences of a fuel handling accident in containment by limiting the potential escape paths for fission product radioactivity released within containment.

The LCO requires any penetration providing direct access from the containment atmosphere to the outside atmosphere to be closed except for the OPERABLE containment purge and exhaust penetrations. For the OPERABLE containment purge and exhaust penetrations, this LCO ensures that at least one valve in each of these penetrations is isolable by the Containment Ventilation Isolation System.

APPLICABILITY The containment penetration requirements are applicable during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment because this is when there is a potential for a fuel handling accident. In NODES I, 2, 3, and 4, containment penetration requirements are addressed by LCO 3.6. 1. In NODES 5 and 6, when CORE ALTERATIONS or movement of irradiated fuel assemblies within containment are not being conducted, the potential for a fuel handling accident does not exist. Therefore, under these conditions, no requirements are placed on containment penetration status.

ACTIONS A.l and A.2 If the containment equipment hatch (or its closure plate or equivalent), air lock doors, or any containment penetration that provides direct access from the containment atmosphere to the outside atmosphere is not in the required status, including the Containment Ventilation Isolation System not capable of automatic actuation when the purge and exhaust valves are open, the plant must be placed in a condition where the isolation function is not needed. This is accomplished by immediately suspending CORE ALTERATIONS and movement of irradiated fuel assemblies within containment.

Performance of these actions shall not preclude completion of movement of a component to a safe position.

(continued)

R.E. Ginna Nuclear Power Plant B 3.9-4 Revision P

0 0

'( ~

d h

T I

0 tContainment Penetrations 8 3.9.3 BASES (continued)

SURVEILLANCE SR,3.9.3.1 RE(UIREHENTS This SR demonstrates that each of the containment penetrations required to be in its closed position is in that position. The Surveillance on the open purge and exhaust valves will demonstrate that the valves are not blocked or otherwise prevented from closing (e.g., solenoid unable to vent).

The Surveillance is performed every 7 days during CORE ALTERATIONS or movement of irradiated fuel assemblies within containment. The Surveillance interval is selected to be commensurate with the normal duration of time to complete fuel handling operations. As such, this Surveillance ensures 'that a postulated fuel handling accident that releases fission product radioactivity within the containment will not result in a release of fission product radioactivity to the environment.

SR 3.9.3.2 This SR demonstrates that each containment purge and exhaust valve actuates.to its isolation position. on manual initiation or on an actual or simulated high radiation signal. The 24 month Frequency maintains consistency with other similar instrumentation and valve testing requirements. In LCO 3.3.5, the Containment Ventilation Isolation instrumentation requires a CHANNEL CHECK every 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and a COT every 92 days to ensure the channel OPERABILITY during refueling operations. Every 24 months an ACTUATION LOGIC TEST and CHANNEL CALIBRATION is performed.

These Surveillances will ensure that the valves are capable of closing after a postulated fuel handling accident to limit a release of fission product radioactivity from the containment.

(continued)

R.E. Ginna Nuclear Power Plant B 3.9-5 Revision 0

ontainment Penetrations B 3.9.3 BASES (continued)

REFERENCES 1. UFSAR, Section 15.7.

2. NUREG-800, Section 15.7.4, Rev. 1, July 1981.
3. Letter from D. H. Crutchfi el d, NRC, to J. Hai er, RGLE,

Subject:

"Fuel Handling Accident Inside Containment,"

dated October 7, 1981.

R.E. Ginna Nuclear Power Plant B 3.9-6 'evision 0

Attachment IV I"uel Handling Accident Inside Containment Dose Consequence Analysis for Ginna Station

Fuel Handling Accident Inside Containment Dose Consequence Analysis for Ginna Station

1.0 BACKGROUND

The Ginna Station Technical Specifications require that containment "closure" be in effect during movement of irradiated fuel assemblies within containment and during core alterations.

Containment "closure" is defined in LCO 3.9.3 as isolating, or providing automatic isolation capability, for all penetrations which provide direct access from the containment atmosphere to the outside atmosphere. Specific requirements are provided for the personnel and equipment air locks in that at least one door in the associated air lock must be closed. A closure plate which restricts air flow from containment can also be used in place of the equipment hatch and its associated air lock dooi'.

These technical specification requirements are provided even though containment closure is not credited in the fuel handling accident dose consequences as described in the technical specification bases. Standard Review Plan (SRP) 15.7.4 states that ifa "fuel handling accident will occur only when the containment is isolated, no radiological consequences need be calculated." The SRP further states that if "containment will be open during fuel handling operations, as with a containment purge exhaust system" it should be verified that the resulting doses are "well within" 10 CFR Part 100 limits (i.e., 75 rem for the thyroid and 6 rem for the whole-body). Since Ginna Station was designed and built prior to the SRP, it does not (and is not required to) meet these limits.

As such, the fuel handling accident within containment for Ginna Station shows an offsite dose of 96 rem thyroid which has been previously accepted by the NRC as being "well within" 10 CFR Part 100 limits (UFSAR Section 15.7.3.3.2.2).

In support of the upcoming steam generator replacement outage, RG&;E is requesting to revise the existing technical specification requirements related to the equipment hatch to allow use of an installed overhead door assembly to isolate the equipment hatch opening. This overhead door assembly is similar to those used in BWR containments and in the Ginna Station Auxiliary Building (which also has technical specification requirements associated with it during movement of irradiated fuel assemblies within the Auxiliary Building). With the use of the overhead door assembly, containment "closure" is essentially maintained since the bases for LCO 3.9.3 specifically state that "since there is no potential for containment pressurization, the Appendix J leakage criteria and tests are not required" for the isolation devices used to meet this LCO. However, it is recognized that the overhead door assembly could create a larger release path from containment than from other penetrations due to its size and the small gaps which exist between the door and equipment hatch opening. Therefore, the purpose of this analysis is to calculate whole body and thyroid doses in the control room and for the exclusion area boundary (EAB) with the equipment hatch opening isolated using the installed overhead door assembly in place of the current options provided in technical specifications.

In performing this analysis, several issues must be addressed. These are briefly discussed below:

The Ginna Station UFSAR (Section 2.3.4.2) provides an atmospheric dispersion factor (i.e.,

X/Q) value of 4.8E-4 sec/m'or the EAB during the first 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of an accident. The X/Q value for the control room is provided in UFSAR Table 6.4-1 as 1.9E-4 sec/m~. This value is less than that for the EAB even though the control room is closer to the release source.

Therefore, this analysis must determine an appropriate value to use in order to calculate control room doses.

A leakage rate from containment via the overhead door assembly must be determined during the two hour release following the fuel handling accident. This includes consideration of leakage from other available pathways (e.g., purge lines which may be opened).

The analysis must be performed using the higher enrichment fuel with higher peaking factors that is being used for the upcoming fuel cycle.

These issues are evaluated in detail below.

2.0 DETERMINATIONOF X/Q VALUES The basic equation used for the spatial distribution of materials released under the influence of the building wake is:

X/Q = K/AU where:

K is the nondimensional concentration coefficient which is a function of the configuration of nearby structures, the release and intake locations, and the wind location; A is the reference building area; and U is the wind velocity at the top of the reference building.

The plant configuration is shown in Figure 1. The critical features as shown on this figure is that the control room intake source is on top of the control room building.

The K values used in the above equation for the purpose of this analysis are from Dr. J. Halitsky based on field and wind tunnel experiments (see Chapter 5 of Meteorology and Atomic Energy, 1968, TID-24190). Table 1 provides the K values for each wind direction for the release configuration being evaluated at Ginna.

The Table 1 K values and the control building area of 2,964 m'ere input in the above equation and processed through 3 years of hourly averaged weather data from the Ginna site weather tower (1992 - 1994). The resulting X/Q values at the control room intake on top of the control building structure were then plotted in Figure 2. As shown by this figure, the 5% probable value of X/Q is 3.0E-4 sec/m'.

The above calculated value is larger than the control room X/Q value provided in UFSAR Table 6.4-1, but smaller than the X/Q value provided in the Ginna Station UFSAR for the EAB. The value calculated for the EAB is based on generic (i.e., conservative) assumptions which ifwere similarly evaluated using plant specific considerations would be lowered (see UFSAR Section 2.3.4.2.2).

Therefore, the UFSAR X/Q value for the EAB will be conservatively used in this analysis for both the EAB and the control room.

3.0 DETERMINATIONOF CONTAINMENTLEAKAGERATES The existing UFSAR analysis for fuel handling accidents assumes that containment is not isolated at the time of the event. However, for the purpose of this analysis, containment will be in the configuration required by technical specifications. Therefore, a leakage rate from containment must be determined as discussed below:

3.1 ini-Pur e and hu down P r e Pen r i n These penetrations may be opened during fuel movement provided that they are capable of being closed by an OPERABLE Containment Ventilation Isolation Signal. The isolation valves for these penetrations are designed to close within 2 seconds from the time a signal is generated or a total of 5 seconds following the event (see UFSAR Table 6.2-15). This time limit is consistent with Branch Technical Position CSB 6-4 to ensure that the impact on dose analyses is minimized. Therefore, leakage through these pathways is considered negligible and ignored for the purpose of this analysis.

3.2 E ui men H ch nin The installed overhead door assembly has small gaps between the door and the equipment hatch opening. These gaps create the potential for a release path from containment. As such, the leak rate through these gaps must be determined.

The first step is to estimate the size of the gaps. An estimate of a 1/4 inch gap for the entire 88 feet circumference of the opening is used. This results in a leakage area of 1.83 ft~. It should be noted that this 1/4" gap is indicative of the type of containment barrier which the overhead door assembly is intended to provide and not an acceptance limit for its operability due to the other conservatisms used in this analysis. The next step is to determine the leakage through this area. As discussed in the bases for LCO 3.9.3, containment pressurization is not assumed for a fuel handling accident.

However, some pressure differential must be assumed to create a leakage path to the outside environment. For conservatism, two sources of pressure differential were considered as shown below:

For the first three minutes following the fuel handling accident, containment is assumed to be pressurized by 0.5 psig above the outside atmosphere. This 3 minutes is the time it takes for the containment free volume to equalize with the outside atmosphere through the 1.83 ft~ gap. This equates to a leakage rate of 8240 cfm.

b. For the remaining two hour duration, a leakage rate based on the maximum temperature difference between containment (120'F) and the outside atmosphere (-2'F) is assumed. This equates to a leakage rate. of 320 cfm.

3.3 ther on inmen Pene r i ns The remaining containment penetrations which provide direct access from containment to the outside environment must be closed by a manual or automatic isolation valve, blind flange, or equivalent per technical specifications. As discussed in the bases for LCO 3.9.3, these isolation devices do not have to meet 10 CFR 50, Appendix J leakage requirements such that leakage through these penetrations can exist.

At Ginna Station, most penetrations which provide direct access to the outside environment do not have isolation capability other than the installed containment isolation valves. Therefore, LCO 3.9.3 is typically met through the use of these installed containment isolation valves. In addition, due to the conservative assumptions for the equipment hatch, leakage through these paths was ignored.

4.0 DOSE CALCULATIONS The source of fission products released from the fuel after 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> decay and the assumptions for iodine form and removal are based on Regulatory Guide 1.25. This analysis assumes that the fission product inventory from the highest rated assembly was released to the reactor cavity water. Table 2 shows the assumed source term for each isotope.

The whole body dose calculations were made using the following relations and dose factors from Tables 3 and 4.

where:

fii~ is the active breathing rate (assumed to be 3.47E-4 m'/sec);

f is the average relative concentration in the control room based on the in-leakage, filtration, and total volume of the control room (see Table 3);

Q; is the curie quantity in the containment available for leakage;

'w f>>; is the adult thyroid inhalation dose factor for the isotope; and n is the number of iodine isotopes.

The whole body dose conservatively combines both the gamma and beta contributions in the following relationship for a semi-infinite plume:

tl n D b

= Xlg [0 23 Q g Bp ' 25 Q g B ]

ll ll where B and B, are the average beta and gamma energies in units of mev per disintegration. Values for these parameters are given in Table 4.

5.0 RESULTS The results of the analysis for the various combinations are provided in Table 3. The three cases which were run are described below with the differences between the three cases strictly due to assumptions with respect to the control room ventilation configurations:

5.1 Qase 1 The control room was assumed to be in the normal configuration at the time of the fuel handling accident. This results in 2000 cfm of unfiltered air being taken into the control room for the first 30 seconds following the fuel handling accident until the control room is isolated and the system switches to emergency recirculation mode with air being forced through a charcoal system.

5.2 Qgse 2 The control room was assumed to be isolated prior to the fuel handling accident and subsequently placed in the recirculation mode.

5.3 ~se 3 The control room was assumed to be isolated prior to the fuel handling accident with the recirculation mode unavailable.

The results from each of these cases demonstrate that the EAB doses remain far below the SRP requirements of 75 rem at the thyroid and that the control room doses remain far below the limits of General Design Criteria 19 of 30 rem thyroid.

TABLE 1. CONCENTRATION COEFFICIENTS (K) VALUES FOR GINNA CONTROL ROOM GIVEN A RELEASE AT THE EQUIPMENT HATCH WIND DIRECTION, 8 INDS FRO 3.0 22.5 4.5 45 0.0 67.5 0.0 90 0.0 112.5 0.0 135 0.0 157.5 0.0 180 0.375 202.5 2.25 225 4.5 247.5 2.25 270 1.5 292.5 0.75 315 0.375 337.5 0.0 Reference Area, A = 2964 Height for Wind = 36m AGL m'eference

TABLE 2. FUEL GAP INVENTORYRELEASED AT TIME OF GINNAFUEL HANDLINGACCIDENT (100 Hours After Shutdown)

ISOTOPE CURIES RELEASED TO CURIES RELEASED TO REACTOR CAVITYOR CONTAINMENT SPENT FUEL POOL ATMOSPHERE WATER I-131 5.16E+04 5.16E+02 I-132 Negligible Negligible I-133 4.50E+03 4.50E+01 I-134 Negligible Negligible I-135 3.22E+00 3.22E-02 Kr-85m 3.12E-03 3.12E-03 Kr-85 1.72E+03 1.72E+03 Kr-87 Negligible Negligible Kr-88 Negligible Negligible Xe-131m 6.35E+02 6.35E+02 Xe-133m 1.55E+03 1.55E+03 Xe-133 , 8.33E+04 8.33E+04 Xe-135m 5.16E-01 5.16E-01 Xe-135 1.56E+02 1.56E+02 Xe-138 Negligible Negligible

4$ '.l ai Cl

TABLE 3. ASSUMPTIONS FOR GINNA FUEL HANDLINGACCIDENT INSIDE CONTAINMENT CASE 1 CASE 2 CASE 3 Containment Volume (ft') 1.0E6 1.0E6 1.0E6 Containment Leak Rate During First 3 min (cfm) 8240 8240 8240 Containment Leak Rate During Last 117 min (cfm) 320 320 320 Control Room In-Leakage (cfm) 46 46 46 Control Room Volume (ft) 45,784 45,784 45,784 Control Room Recirculation Rate (cfm) 2000 2000 0 Iodine Filter Efficiency - elemental (rem) 0.9 0.9 0.9

- organic (rem) 0.7 0.7 0.7 Fraction of Iodine that is - elemental (rem) 0.75 0.75 0.75

- organic (rem) 0.25 0.25 0.25 Initial (30 sec) Control Room Flow (cfm) 2000 0 Breathing Rate (m'/sec) 3.47E-4 3.47E-4 3.47E-4 EAB X/Q (sec/m') 4.8E-4 4.8E-4 4.8E-4 Control Room Intake X/Q (sec/m') 4.8E-4 4.8E-4 4.8E-4 Whole Body Dose (P + y) - EAB (rem) 0.12 0.12 0.12

- Control Room (rem) 0.05 0.007 0.007 Thyroid Dose - EAB (rem) 8.1 8.1 8.1

-'ontrol Room (rem) 0.79 0.16 0.53 8

TABLE 4. ISOTOPIC DATAFOR FUEL HANDLINGACCIDENT ISOTOPE Ep E THYROID DOSE V/DIS V/DIS FACTOR M/C I-131 1.91E-1 3.80E-1 1.48E6 I-132 4.90E-1 2.29EO 5.35E4 I-133 4.09E-1 6.07E-1 4.05ES I-134 6.08E-1 2.63EO 2.50E4 I-135 3.69E-1 1.57EO 1.24E5 Kr-85m 2.70E-1 1.56E-1 Kr-85 2.70E-l 2.20E-3 Kr-87 1.42EO 7.84E-1 Kr-88 4.00E-1 1.93EO Xe-131m 1.50E-1 1.98E-2 Xe-133m 2.00E-1 4.16E-2 Xe-133 1.40E-1 4.48E-2 Xe-135m 1.00E-l 4.28E-1 Xe-135 3.40E-1 2.44E-1 Xe-138 6.50E-1 1.17EO

~ roe' Ig

~ ~rrmm , T

r Qo

~ ~

e i t g ~ ~

mvurre C

Figure 2 - X/Q Using 1992-1994 Meteorological Data 100.00 aA<<9 '. A a

8"X(2>.XXXXX' XXCC>

C

<<F'!

XC 0

X CX

F>

XX'<<A

'?>?X,!

.YFX CC >

>2 C

"::: (C,.:X CC AX 10.00 A .n n ~ a c 50 CX XX C!X XC>XX C j>X ".. !X> X>

Xf fP A (F '2! hV

".C Q? ";".~: '.

": !>2 AF 1.00 C << c . (ac> ' aA c f<<C:22: X:f

!'9:X XXXX i>x!3 j?A: 9, vj >3 R!332 $2'X Xjj? "

F!>>

>X C X: 2 XXX>2>>> B 2 9% 2 c>;X3 Cj C:

9ax jxax 2'9(: C 29: 2 X .c'fi!3!P 29C X:

D 322 C' 0.10 AX'A 'i2'>MA >, >9!22 !A ..'N (>>> F>>

CX::CC 222> 2 F'A'F Cf >

XC

f. <<9>2>A " >. 9 3>

2 1.00E-06 1.00E-05 1.00E-04 1.00E-03 1.00E-02 X/Q sec/m~

25851 hours 1/1 5/96 36 m release