ML17264A713: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(6 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:AttachmentIIMarkedUpCopyofR.E.GinnaNuclearPowerPlantTechnicalSpecificationsIncludedPages:3.3-27B3.3-95*B3.3-96*ThesebasespagesarebeingprovidedforinformationonlytoshowthechangesRG&EintendstomakefollowingNRCapprovaloftheI.AR.ThebasesareunderRGREcontrolforallchangesinaccordancewithSpecification5.5.13.'P6i03fOi229hi029PDRADOCK05000244PDR~l ESFASInstrumentation3.3.2Table3.3.2-1(page3of3)EngineeredSafetyFeatureActuationSystemInstrINIcntationFUNCTIONAPPLICABLEHOOESOROTHERSPECIFIEDCOHOITIONSREQUIREDCHANNELSSURVEILLANCEALLOWABLECOHOITIONSREQUIREKENTSVALUETRIPSETPOIHT5.FeedIIaterIsolationa.AutomaticActuationLogicandActuationRelays1,2(c)3(c)2trainsE,GSR3.3.2.7NAb.SGMaterLevel-High1,2(c),3()3perSGF,GSR3.3.2.1s94XSR3.3.2.2SR3.3.2.5s85Xc.SafetyInjectionRefertoFunction1(SafetyInjection)forallinitiationfunctionsandrequirements.6.AuxiliaryFeedIIatcr(AF'W)a.HanualInitiationAFWStandbyAFM1,2,31,2,31perpump1pcrpumpSR3.3.2.4SR3.3.2.4HANANAb.AutomaticActuationLogicandActuationRelays1,2,32trainsE,GSR3.3.2.7c.SGMaterLevel-LouLou1,2,3F3perSG~GSR3.3.2~1216XSR3.3.2.2SR3.3.2.5z17Xd.SafetyInjection(HotordrivenpImpsonly)RefertoFunction1(SafetyInjection)forallinitiationfunctionsandrequirements.e.Undervoltagc-Bus11Aand11B(Turbinedrivenpunponly)1,2,32pcI'usD,GSR3.3.2.3SR3.3.2.5~2450V~2579Vuiths3.6withs3.6sectimesectimedelaydelayf.TripofBothHainFeedIIaterPImps(Hotordrivenpumpsonly)1,22pclHFMpumpB,CSR3.3.2.4HA(c)ExceptIIhenallHainFecdIIatcrRegulatingandassociatedbypassvalvesareclosedanddc-activatedorisolatedbyaclosedmanualvalve.R.E.GinnaNuclearPowerPlant3.3-27AmendmentNo.Q,63 ESFASInstrumentationB3.3.2BASESACTIONS(continued)D.lCondition0appliestothefollowingESFASFunctions:~ManualInitiationofSI;~HanualInitiationofSteamLineIsolation;n~AFW-Undervoltage-Bus11AandllB.Ifachannelisinoperable,48hoursisallowedtorestoreittoOPERABLEstatus.ThespecifiedCompletionTimeof48hoursisreasonableconsideringthattherearetwoautomaticactuationtrainsandanothermanualinitiationchannelOPERABLEforeachmanualinitiation,Fun'ctionadditionalAFWactuationchannelsavailablebesidestheUndervoltage-Bus11Aand118AFWInitiationunctions,andthelowprobabilityofaneventoccurringduringthisinterval.E.1ConditionEappliestotheautomaticactuationlogicandactuationrelaysforthefollowingESFASFunctions:~SteamLineIsolation;~FeedwaterIsolation;and~AFW.ConditionEaddressesthetrainorientationoftheprotectionsystemandthemasterandslaverelays.Ifonetrainisinoperable,aCompletionTimeof6hoursisallowedtorestorethetraintoOPERABLEstatus.ThisCompletionTimeisreasonableconsideringthatthereisanothertrainOPERABLE,andthelowprobabilityofaneventoccurringduringthistimeinterval.TheCompletionTimeof6hoursisconsistentwithReference7.(continued)R.E.GinnaNuclearPowerPlantB3.3-95Revision0 ESFASInstrumentationB3.3.2BASESACTIONS(continued)F.1ConditionFappliestothefollowingFunctions:~SteamLineIsolation-ContainmentPressure-HighHigh;~SteamLineIsolation-HighSteamFlowCoincidentWithSafetyInjectionandCoincidentWithT.,-Low;~SteamLineIsolation-High-HighSteamFlowCoincidentWithSafetyInjection;n~FeedwaterIsolation-SGWaterLevel-High,ConditionFappliestoFunctionsthattypicallyoperateontwo-out-of-threelogic.Therefore,failureofonechannelplacestheFunctioninatwo-out-of-twoconfiguration.OnechannelmustbetrippedtoplacetheFunctioninaone-out-of-twoconfigurationthatsatisfiesredundancyrequirements.Ifonechannelisinoperable,aCompletionTimeof6hoursisallowedtorestorethechanneltoOPERABLEstatusortoplaceitinthetrippedcondition.Placingthechannelinthetrippedconditionconservativelycompensatesfortheinoperability,restorescapabilitytoaccommodateasinglefailure,andallowsoperationtocontinue.TheRequiredActionsaremodifiedbyaNotethatallowstheinoperablechanneltobebypassedforupto4hoursforsurveillancetestingofotherchannels.This4hoursappliestoeachoftheremainingOPERABLEchannels.TheCompletionTimeof6hoursallowedtorestorethechanneltoOPERABLEstatusortoplacetheinoperablechannelinthetrippedcondition,andthe4hoursallowedfortesting,arejustifiedinReference7.(continued)R.E.GinnaNuclearPowerPlant83.3-96Revision0 h
{{#Wiki_filter:Attachment  II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:
AttachmentIIIProposedTechnicalSpecificationsIncludedPages:3.3-27 0ESFASInstrumentation3.3.2Table3.3.2-1(page3of3)EngineeredSafetyFeatureActuationSystemInstrumentationFUNCTIONAPPLICABLEMODESOROTHERSPECIFIEDCONDITIONSREQUIREDCHANNELSSURVEILLANCEALLOMABLETRIPCONDITIOHSREQUIREMENTSVALUESETPOINT5.FeedwaterIsolationa.AutomaticActuationLogicandActuationRelays1,232trainsE,GSR3.3.2.7HANAb.SGMaterLevel-High1i2(c)3(c)3perSGFiGSR3321i947,SR3.3'.2SR3.3.2.5s85Kc.SafetyInjectionRefertoFunction1(SafetyInjection)forallinitiationfunctionsandrequirements.6.AuxiliaryFeedwater(AFM)a.ManualInitiationAFMStandbyAFM1,2,31,2,31perpwp1pcl'R3.3.2.4SR3.3.2.4NAHAb.AutomaticActuationLogicandActuationRelays1,2,32trainsE,GSR3.3.2.7NAc.SGMaterLevel-LowLow1,2,33perSGF,G'R3.3.2.1SR3.3.2.2SR3.3.2.5a16'17Xd.SafetyInjection(Motordrivenpumpsonly)RefertoFunction1(SafetyInjection)forallinitiationfunctionsandrequirements.e.Undervoltage-Bus11Aand11B(Turbinedrivenpumponly)1,2,32perbusD,GSR3.3.2.3?2450Va2579Vwiths3.6withs3.6sectimesectimedelaydelayf.TripofBothMainFeedwaterPumps(Motordrivenpumpsonly)1,22perMFMpunpB,CSR3.3.2.4HANA(c)ExceptwhenallMainFeedwaterRegulatingandassociatedbypassvalvesareclosedandde-activatedorisolatedbyaclosedmanualvalve.R.E.GinnaNuclearPowerPlant3.3-27AmendmentNo.g,Q AttachmentIVNUREG-1431Includedpages:3.3-243.3-37 OESFASInstrumentation3.3.2ACTIONScontinuedCONDITIONREQUIREDACTIONCOMPLETIONTIMEC.Onetraininoperable.C.l----NOTE-----Onetrainmaybebypassedforupto[4]hoursforsurveillancetestingprovidedtheothertrainisOPERABLE.ORRestoretraintoOPERABLEstatus.6hoursC.2.1BeinMODE3.ANDC.2.2BeinMODE5.12hours42hoursD.Onechannelinoperable.S~a.t+<~~%,C4+ui~cL~prov0.1----NOTE-----Theinoperablechannelmaybebypassedforupto[4]hoursfor.surveillancetestingofotherchannels.ORPlacechannelintrip.6hours+<M&clQt+g~$~@+a~G.h~kG.WD.2.1BeinMODE3.AND0.2.2BeinMODE4.12hours18hour(continued)WOGSTS3.3-24Rev1,04/07/95  
3.3-27 B 3.3-95*
~-s~ESFASInstrumentation3.3.2Table3.3.2-1(page6of8)EngineeredSafetyFeatureActuationSystemInstruncntationRNCTIONAPPLICABLEKCOESOROTHERSPECIFIEDCONDITIONSREOUIREDCHANNELSSURVEILLANCEALLOMABLECONDI'TIOHSREQUIREKENTSVALUETRIPSETPOIHT<'>5.TurbineTripandFeedwaterIsolationa.AutomaticActuationLogicandActuationRelays12(j)[3)(j)2trainsH[G]SR3.3.2.2SR3.3.2.4SR3.3.2.6NAb.SGMaterLevel-HighNigh(P-14)1,2<j>,[3)<j)[3]perSG1[D)'R3.3.2.1<[84.2]XSR3.3.2.5SR3.3.2.9SR3.3.2.10[82.4)X'.SafetyInjectionRefertoFmction1(SafetyInjection)forallinitiationfunctionsandrequirements.6.AuxiliaryFeedwatera.AutomaticActuationLogicandActuationRelays(SolidStateProtectionSystem)1,2,32trainsSR3.3.2.2SR3.3.2.4SR3.3.2.6b.AutomaticActuationLogicandActuationRelays(BalanceofPlantESFAS)1,2,32trainsSR3.3.2-3NAZ~cled(i<vme~ACkdAC,'.~c.SGMaterLevel-LowLow1,2,3[3]perSGSR3.3-2.1>[30.4)XIQ2.2]XSR3.3.2.5SR3.3.2.9SR3.3.2.1D(continued)(a)Reviewer'sNote:UnitspecificimplementationsmaycontainonlyAllowableValuedependingonSetpointStudymethodologyusedbytheunit.(j)ExceptwhenallKFIVs,KFRVs,[andassociatedbypassvalves)areclosedand[de-activated][orisolatedbyaclosedmanualvalve].WOGSTS3~337Rev1,04/07/95 0ETJ
B 3.3-96*
}}
These bases pages are being provided for information only to show the changes RG&E intends to make following NRC approval of the I.AR. The bases are under RGRE control for all changes in accordance with Specification 5.5.13.
'P6i03fOi22 9hi029 PDR    ADOCK    05000244 PDR  ~l
 
ESFAS  Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)
Engineered Safety Feature Actuation System InstrINIcntation APPLICABLE HOOES OR OTHER SPECIFIED        REQUIRED                          SURVEILLANCE    ALLOWABLE      TRIP FUNCTION              COHO I T IONS    CHANNELS          COHOITIONS    REQUIREKENTS      VALUE      SETPOIHT
: 5. FeedIIater  Isolation
: a. Automatic              1,2(c) 3(c)       2  trains            E,G      SR  3.3.2.7          NA Actuation Logic and Actuation Relays
: b. SG Mater                1,2(c),3( )       3 per        SG        F,G      SR  3.3.2.1        s 94X      s 85X Level -High                                                                SR  3.3.2.2 SR  3.3.2.5
: c. Safety Injection      Refer to Function 1 (Safety Injection)             for all initiation functions and requirements.
: 6. Auxiliary FeedIIatcr (AF'W)
: a. Hanual  Initiation AFW                        1,2,3            1  per                        SR  3.3.2.4          HA          NA pump Standby  AFM              1,2,3            1  pcr                        SR  3.3.2.4                      NA pump
: b. Automatic                  1,2,3          2  trains              E,G      SR  3.3.2.7 Actuation Logic and Actuation Relays F
: c. SG  Mater                  1,2,3        3  per      SG        ~G        SR  3.3.2 1
                                                                                                    ~       2 16X      z 17X Level -Lou Lou                                                              SR  3.3.2.2 SR  3.3.2.5
: d. Safety Injection          Refer to Function          1  (Safety Injection) for  all (Hotor driven                    initiation functions          and requirements.
pImps  only)
: e. Undervoltagc -Bus          1,2,3            2  pcI'us D,G      SR 3.3.2.3        ~ 2450 V    ~ 2579 V 11A and 11B                                                                SR 3.3.2.5       uith s 3.6  with s 3.6 (Turbine driven                                                                              sec time    sec time punp  only)                                                                                   delay      delay
: f. Trip of Both Hain            1,2            2 pcl                B,C      SR 3.3.2.4          HA FeedIIater PImps                          HFM pump (Hotor driven pumps  only)
(c) Except IIhen all Hain FecdIIatcr Regulating        and associated        bypass valves are closed and dc-activated or isolated by a closed manual valve.
R.E. Ginna Nuclear Power Plant                                  3.3-27                            Amendment No. Q,     63
 
ESFAS Instrumentation B 3.3.2 BASES ACTIONS            D.l (continued)
Condition  0 applies to the following      ESFAS  Functions:
                  ~     Manual Initiation of SI;
                  ~     Hanual Initiation of Steam    Line Isolation; n
                  ~     AFW- Undervoltage Bus 11A and      llB.
If a channel is inoperable,     48 hours    is allowed to restore it to OPERABLE status. The      specified Completion Time of 48 hours is reasonable considering that there are two automatic actuation trains and another manual initiation channel OPERABLE for each manual initiation, Fun'ction additional AFW actuation channels available besides the Undervoltage Bus  11A and 118 AFW    Initiation unctions, and the low probability of      an event  occurring during this interval.
E.1 Condition E applies to the automatic actuation logic and actuation relays for the following ESFAS Functions:
                  ~     Steam Line  Isolation;
                  ~     Feedwater  Isolation; and
                  ~     AFW.
Condition    E addresses  the train orientation of the protection system and the master and slave relays. If one train is inoperable, a Completion Time of 6 hours is allowed to restore the train to OPERABLE status. This Completion Time is reasonable considering that there is another train OPERABLE, and the low probability of an event occurring during this time interval. The Completion Time of 6 hours is consistent with Reference 7.
(continued)
R.E. Ginna Nuclear Power Plant        B  3.3-95                              Revision  0
 
ESFAS Instrumentation B 3.3.2 BASES ACTIONS            F.1 (continued)
Condition  F applies to the following Functions:
                  ~   Steam  Line Isolation Containment Pressure High High;
                  ~   Steam  Line Isolation High Steam Flow Coincident With Safety Injection and Coincident With T., Low;
                  ~     Steam Line  Isolation High -High   Steam Flow  Coincident With Safety Injection; n
                  ~     Feedwater  Isolation SG  Water Level High, Condition  F applies to Functions that typically operate on two-out-of-three logic. Therefore, failure of one channel places the Function in a two-out-of-two configuration. One channel must be tripped to place the Function in a one-out-of-two configuration that satisfies redundancy requirements.
If one channel is inoperable, a Completion Time of 6 hours is allowed to restore the channel to OPERABLE status or to place it in the tripped condition. Placing the channel in the tripped condition conservatively compensates for the inoperability, restores capability to accommodate a single failure, and allows operation to continue.
The Required    Actions are modified by a Note that allows the inoperable channel to be bypassed for up to 4 hours for surveillance testing of other channels. This 4 hours applies to each of the remaining OPERABLE channels.
The Completion Time    of 6 hours allowed to restore the channel to OPERABLE status or to place the inoperable channel in the tripped condition, and the 4 hour s allowed for testing, are justified in Reference 7.
(continued)
R.E. Ginna Nuclear Power Plant        8 3.3-96                            Revision  0
 
h Attachment III Proposed Technical Specifications Included Pages:
3.3-27
 
0                                                            ESFAS    Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)
Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED        REQUIRED                      SURVEILLANCE    ALLOMABLE      TRIP FUNCTION                CONDITIONS        CHANNELS        COND  IT IOHS  REQUIREMENTS        VALUE    SETPOINT
: 5. Feedwater  Isolation
: a. Automatic                1,2      3      2  trains            E,G      SR  3.3.2.7          HA          NA Actuation Logic and Actuation Relays
: b. SG Mater Level -High 1i2(c) 3(c)       3 per    SG          FiG      SR SR 3 3 2 3.3 '.2 1      i  947,    s 85K SR  3.3.2.5
: c. Safety Injection        Refer to Function 1 (Safety Injection)           for all initiation functions and requirements.
: 6. Auxiliary Feedwater (AFM)
: a. Manual  Initiation AFM Standby  AFM 1,2,3 1,2,3 1
1 pcl'R per pwp SR 3.3.2.4 3.3.2.4 NA HA
: b. Automatic                    1,2,3        2  trains            E,G      SR  3.3.2.7          NA Actuation Logic and Actuation Relays
: c. SG Mater                    1,2,3        3  per  SG          F,G     'R    3.3.2.1        a  16'        17X Level -Low Low                                                            SR  3.3.2.2 SR  3.3.2.5
: d. Safety Injection            Refer to Function      1  (Safety Injection) for    all (Motor driven                    initiation functions      and requirements.
pumps  only)
: e. Under vol tage Bus          1,2,3          2  per            D,G        SR 3.3.2.3       ? 2450 V    a 2579 V 11A and 11B                                    bus                                        with s 3.6  with s 3.6 (Turbine driven                                                                            sec time    sec time pump  only)                                                                                   delay      delay
: f. Trip of Both Main            1,2            2  per            B,C      SR 3.3.2.4            HA          NA Feedwater Pumps                            MFM  punp (Motor driven pumps  only)
(c) Except when    all  Main Feedwater Regulating and associated bypass valves are closed and de-activated or isolated by  a  closed manual valve.
R.E. Ginna Nuclear Power Plant                                3.3-27                                Amendment No. g,   Q
 
Attachment IV NUREG-1431 Included pages:
3.3-24 3.3-37
 
O ESFAS  Instrumentation 3.3.2 ACTIONS      continued CONDITION                REQUIRED ACTION              COMPLETION TIME C. One  train inoperable. C.l     NOTE One  train  may be bypassed  for  up to
[4] hours for surveillance testing provided the other train is  OPERABLE.
Restore  train to        6  hours OPERABLE    status.
OR C.2.1    Be  in MODE  3.           12  hours AND C.2.2    Be  in MODE  5.          42 hours
            ~prov D. One  channel          0.1      NOTE inoperable.                     The  inoperable channel may be bypassed for up    to S~ a.t
            +<~~%,   C4+ui~cL
[4] hours for.
surveillance testing of other channels.
Place channel in          6  hours trip.
OR D.2.1    Be  in  MODE  3.           12  hours
              +<M&cl  Qt+g~$       AND
              ~@+a~     G.h
              ~k G.W          0.2.2   Be  in  MODE  4.           18  hour (continued)
WOG  STS                              3.3-24                          Rev 1, 04/07/95
 
        ~-s ~
ESFAS  Instrumentation 3.3.2 Table 3.3.2-1 (page 6 of 8)
Engineered Safety Feature Actuation System Instruncntation APPLICABLE KCOES OR OTHER SPECIFIED      REOUI RED                    SURVEILLANCE    ALLOMABLE      TRIP RNCT I ON            CONDITIONS      CHANNELS      CONDI'TIOHS  REQUIREKENTS      VALUE    SETPOIHT<'>
: 5. Turbine Trip and Feedwater  Isolation
: a. Automatic                1  2(j)       2  trains          H[G]     SR  3.3.2.2        NA Actuation Logic                                                        3.3.2.4
[3) (j)
SR and Actuation                                                      SR  3.3.2.6 Relays
: b. SG Mater Level -High Nigh 1,2<j>,       [3] per SG 1[D)   'RSR 3.3.2.1 3.3.2.5
                                                                                                                < [84.2]X    [82.4)
(P-14)                    [3)<j)                                  SR  3.3.2.9                          X'.
SR  3.3.2.10 Safety Injection    Refer to Fmction 1 (Safety Injection)         for all initiation functions and requirements.
: 6. Auxiliary Feedwater
: a. Automatic                  1,2,3      2  trains                    SR  3.3.2.2 Actuation Logic                                                    SR  3.3.2.4 and Actuation                                                      SR  3.3.2.6 Relays  (Solid State Protection System)
: b. Automatic                  1,2,3      2  trains                    SR  3.3.2-3                    NA Actuation Logic and Actuation Relays (Balance of Plant  ESFAS)
Z~
(i <v me cled      ~   c. SG Mater Level Low Low 1,2,3       [3] per SG SR SR 3.3-2.1 3.3.2.5
                                                                                                                > [30.4)X  I Q2.2]X
~ACkdA                                                                                          SR  3.3.2.9 SR  3.3.2.1D C,'.
(continued)
(a)   Reviewer's Note: Unit specific implementations may contain only Allowable Value depending on Setpoint Study methodology used by the unit.
(j)   Except when all KFIVs, KFRVs, [and associated bypass valves) are closed and [de-activated] [or isolated by a closed manual valve].
WOG      STS                                              3 ~ 3 37                              Rev 1, 04/07/95
 
0 E T
J}}

Latest revision as of 10:22, 4 February 2020

Proposed Tech Specs Re Actions for Inoperable Channels Associated with Auxiliary Feedwater Pump
ML17264A713
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/29/1996
From:
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17264A711 List:
References
NUDOCS 9610310122
Download: ML17264A713 (11)


Text

Attachment II Marked Up Copy of R.E. Ginna Nuclear Power Plant Technical Specifications Included Pages:

3.3-27 B 3.3-95*

B 3.3-96*

These bases pages are being provided for information only to show the changes RG&E intends to make following NRC approval of the I.AR. The bases are under RGRE control for all changes in accordance with Specification 5.5.13.

'P6i03fOi22 9hi029 PDR ADOCK 05000244 PDR ~l

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)

Engineered Safety Feature Actuation System InstrINIcntation APPLICABLE HOOES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE TRIP FUNCTION COHO I T IONS CHANNELS COHOITIONS REQUIREKENTS VALUE SETPOIHT

5. FeedIIater Isolation
a. Automatic 1,2(c) 3(c) 2 trains E,G SR 3.3.2.7 NA Actuation Logic and Actuation Relays
b. SG Mater 1,2(c),3( ) 3 per SG F,G SR 3.3.2.1 s 94X s 85X Level -High SR 3.3.2.2 SR 3.3.2.5
c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
6. Auxiliary FeedIIatcr (AF'W)
a. Hanual Initiation AFW 1,2,3 1 per SR 3.3.2.4 HA NA pump Standby AFM 1,2,3 1 pcr SR 3.3.2.4 NA pump
b. Automatic 1,2,3 2 trains E,G SR 3.3.2.7 Actuation Logic and Actuation Relays F
c. SG Mater 1,2,3 3 per SG ~G SR 3.3.2 1

~ 2 16X z 17X Level -Lou Lou SR 3.3.2.2 SR 3.3.2.5

d. Safety Injection Refer to Function 1 (Safety Injection) for all (Hotor driven initiation functions and requirements.

pImps only)

e. Undervoltagc -Bus 1,2,3 2 pcI'us D,G SR 3.3.2.3 ~ 2450 V ~ 2579 V 11A and 11B SR 3.3.2.5 uith s 3.6 with s 3.6 (Turbine driven sec time sec time punp only) delay delay
f. Trip of Both Hain 1,2 2 pcl B,C SR 3.3.2.4 HA FeedIIater PImps HFM pump (Hotor driven pumps only)

(c) Except IIhen all Hain FecdIIatcr Regulating and associated bypass valves are closed and dc-activated or isolated by a closed manual valve.

R.E. Ginna Nuclear Power Plant 3.3-27 Amendment No. Q, 63

ESFAS Instrumentation B 3.3.2 BASES ACTIONS D.l (continued)

Condition 0 applies to the following ESFAS Functions:

~ Manual Initiation of SI;

~ Hanual Initiation of Steam Line Isolation; n

~ AFW- Undervoltage Bus 11A and llB.

If a channel is inoperable, 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is allowed to restore it to OPERABLE status. The specified Completion Time of 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> is reasonable considering that there are two automatic actuation trains and another manual initiation channel OPERABLE for each manual initiation, Fun'ction additional AFW actuation channels available besides the Undervoltage Bus 11A and 118 AFW Initiation unctions, and the low probability of an event occurring during this interval.

E.1 Condition E applies to the automatic actuation logic and actuation relays for the following ESFAS Functions:

~ Steam Line Isolation;

~ Feedwater Isolation; and

~ AFW.

Condition E addresses the train orientation of the protection system and the master and slave relays. If one train is inoperable, a Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is allowed to restore the train to OPERABLE status. This Completion Time is reasonable considering that there is another train OPERABLE, and the low probability of an event occurring during this time interval. The Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is consistent with Reference 7.

(continued)

R.E. Ginna Nuclear Power Plant B 3.3-95 Revision 0

ESFAS Instrumentation B 3.3.2 BASES ACTIONS F.1 (continued)

Condition F applies to the following Functions:

~ Steam Line Isolation Containment Pressure High High;

~ Steam Line Isolation High Steam Flow Coincident With Safety Injection and Coincident With T., Low;

~ Steam Line Isolation High -High Steam Flow Coincident With Safety Injection; n

~ Feedwater Isolation SG Water Level High, Condition F applies to Functions that typically operate on two-out-of-three logic. Therefore, failure of one channel places the Function in a two-out-of-two configuration. One channel must be tripped to place the Function in a one-out-of-two configuration that satisfies redundancy requirements.

If one channel is inoperable, a Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> is allowed to restore the channel to OPERABLE status or to place it in the tripped condition. Placing the channel in the tripped condition conservatively compensates for the inoperability, restores capability to accommodate a single failure, and allows operation to continue.

The Required Actions are modified by a Note that allows the inoperable channel to be bypassed for up to 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> for surveillance testing of other channels. This 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> applies to each of the remaining OPERABLE channels.

The Completion Time of 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> allowed to restore the channel to OPERABLE status or to place the inoperable channel in the tripped condition, and the 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> s allowed for testing, are justified in Reference 7.

(continued)

R.E. Ginna Nuclear Power Plant 8 3.3-96 Revision 0

h Attachment III Proposed Technical Specifications Included Pages:

3.3-27

0 ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 3 of 3)

Engineered Safety Feature Actuation System Instrumentation APPLICABLE MODES OR OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOMABLE TRIP FUNCTION CONDITIONS CHANNELS COND IT IOHS REQUIREMENTS VALUE SETPOINT

5. Feedwater Isolation
a. Automatic 1,2 3 2 trains E,G SR 3.3.2.7 HA NA Actuation Logic and Actuation Relays
b. SG Mater Level -High 1i2(c) 3(c) 3 per SG FiG SR SR 3 3 2 3.3 '.2 1 i 947, s 85K SR 3.3.2.5
c. Safety Injection Refer to Function 1 (Safety Injection) for all initiation functions and requirements.
6. Auxiliary Feedwater (AFM)
a. Manual Initiation AFM Standby AFM 1,2,3 1,2,3 1

1 pcl'R per pwp SR 3.3.2.4 3.3.2.4 NA HA

b. Automatic 1,2,3 2 trains E,G SR 3.3.2.7 NA Actuation Logic and Actuation Relays
c. SG Mater 1,2,3 3 per SG F,G 'R 3.3.2.1 a 16' 17X Level -Low Low SR 3.3.2.2 SR 3.3.2.5
d. Safety Injection Refer to Function 1 (Safety Injection) for all (Motor driven initiation functions and requirements.

pumps only)

e. Under vol tage Bus 1,2,3 2 per D,G SR 3.3.2.3  ? 2450 V a 2579 V 11A and 11B bus with s 3.6 with s 3.6 (Turbine driven sec time sec time pump only) delay delay
f. Trip of Both Main 1,2 2 per B,C SR 3.3.2.4 HA NA Feedwater Pumps MFM punp (Motor driven pumps only)

(c) Except when all Main Feedwater Regulating and associated bypass valves are closed and de-activated or isolated by a closed manual valve.

R.E. Ginna Nuclear Power Plant 3.3-27 Amendment No. g, Q

Attachment IV NUREG-1431 Included pages:

3.3-24 3.3-37

O ESFAS Instrumentation 3.3.2 ACTIONS continued CONDITION REQUIRED ACTION COMPLETION TIME C. One train inoperable. C.l NOTE One train may be bypassed for up to

[4] hours for surveillance testing provided the other train is OPERABLE.

Restore train to 6 hours OPERABLE status.

OR C.2.1 Be in MODE 3. 12 hours AND C.2.2 Be in MODE 5. 42 hours4.861111e-4 days <br />0.0117 hours <br />6.944444e-5 weeks <br />1.5981e-5 months <br />

~prov D. One channel 0.1 NOTE inoperable. The inoperable channel may be bypassed for up to S~ a.t

+<~~%, C4+ui~cL

[4] hours for.

surveillance testing of other channels.

Place channel in 6 hours trip.

OR D.2.1 Be in MODE 3. 12 hours

+<M&cl Qt+g~$ AND

~@+a~ G.h

~k G.W 0.2.2 Be in MODE 4. 18 hour (continued)

WOG STS 3.3-24 Rev 1, 04/07/95

~-s ~

ESFAS Instrumentation 3.3.2 Table 3.3.2-1 (page 6 of 8)

Engineered Safety Feature Actuation System Instruncntation APPLICABLE KCOES OR OTHER SPECIFIED REOUI RED SURVEILLANCE ALLOMABLE TRIP RNCT I ON CONDITIONS CHANNELS CONDI'TIOHS REQUIREKENTS VALUE SETPOIHT<'>

5. Turbine Trip and Feedwater Isolation
a. Automatic 1 2(j) 2 trains H[G] SR 3.3.2.2 NA Actuation Logic 3.3.2.4

[3) (j)

SR and Actuation SR 3.3.2.6 Relays

b. SG Mater Level -High Nigh 1,2<j>, [3] per SG 1[D) 'RSR 3.3.2.1 3.3.2.5

< [84.2]X [82.4)

(P-14) [3)<j) SR 3.3.2.9 X'.

SR 3.3.2.10 Safety Injection Refer to Fmction 1 (Safety Injection) for all initiation functions and requirements.

6. Auxiliary Feedwater
a. Automatic 1,2,3 2 trains SR 3.3.2.2 Actuation Logic SR 3.3.2.4 and Actuation SR 3.3.2.6 Relays (Solid State Protection System)
b. Automatic 1,2,3 2 trains SR 3.3.2-3 NA Actuation Logic and Actuation Relays (Balance of Plant ESFAS)

Z~

(i <v me cled ~ c. SG Mater Level Low Low 1,2,3 [3] per SG SR SR 3.3-2.1 3.3.2.5

> [30.4)X I Q2.2]X

~ACkdA SR 3.3.2.9 SR 3.3.2.1D C,'.

(continued)

(a) Reviewer's Note: Unit specific implementations may contain only Allowable Value depending on Setpoint Study methodology used by the unit.

(j) Except when all KFIVs, KFRVs, [and associated bypass valves) are closed and [de-activated] [or isolated by a closed manual valve].

WOG STS 3 ~ 3 37 Rev 1, 04/07/95

0 E T

J