| issue date = 09/16/1980
| issue date = 09/16/1980
| title = Deficiency Rept Re Large Diameter Piping Found to Have Less than ASME Code Required Min Wall Thickness.Caused by Overgrinding While Preparing Weld Profiles for ASME Section 11 Inservice Insp.Contractors to Revise Procedures
| title = Deficiency Rept Re Large Diameter Piping Found to Have Less than ASME Code Required Min Wall Thickness.Caused by Overgrinding While Preparing Weld Profiles for ASME Section 11 Inservice Insp.Contractors to Revise Procedures
| author name = RENBERGER D L
| author name = Renberger D
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| author affiliation = WASHINGTON PUBLIC POWER SUPPLY SYSTEM
| addressee name =  
| addressee name =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:REGULATORY
{{#Wiki_filter:REGULATORY   'IFORMATION DISTRIBUTION SY                     EM (RIDS)
'IFORMATION DISTRIBUTION SY EM (RIDS)ACCESSION NBR:8009240465 DOC~DATE!80/09/16 NOTARIZ D!NO DOCKET FACIL:50-397 NPPSS Nuclear Projects Unit 2<Washington Public Powe 05000397 AUTH'AME AUTHOR AFFIL'I ATION REMBERGER.D/;/
ACCESSION NBR:8009240465                   DOC ~ DATE! 80/09/16   NOTARIZ D!                 NO           DOCKET FACIL:50-397             NPPSS   Nuclear Projects Unit 2< Washington Public Powe                           05000397 AUTH'AME                       AUTHOR AFFIL'I ATION REMBERGER.D/;/                 Washington Public Power Supply System RECIP.NAME                     RECIPIENT AFFILiI'ATION
Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILiI'ATION


==SUBJECT:==
==SUBJECT:==
Deficiency than ASME'" overgrindj 11 inservi DISTRIBUTION CODE!TITLE: NOTES:PM: 2 comics rept re large dtaaeter pIptng tound to have leap+code required min wall thickoess~Caused by ng while pr coal ring weld profiles for ASME section ce insp.Cbntractors to revise procedures'019S COPIES RECEIVED!LTR~%ENCL,~SIZE: Constr uction Def iciency Repor t (10CFR50e5SE) 05000397 of all material.RECIPIENT ID CODE/NAME'CTION e A/D LiICENSNG 04 RUSHBROOKiM.
Deficiency rept re large dtaaeter pIptng tound to have leap+
06 INTERNAL: AD/RC I/IE'7 ASLBP/J.HARD DIRr HUM FAC Si'0 EQUIP QUAl)BR11 l8E 09 MPA 20 OELD 21 QA BR 14 RUTHERFORDiN
than ASME'" code required min wall thickoess Caused by                     ~
~IE COPIES LjTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME YOUNGBLOODiB 05 LYNCHiD~07 AEOD 18 D/DIR HUM FAC15 EDO 8 STAFF 19 HYD/GEO BR 22 LIC'UAL'R 12 NRC PDR 02 P REV~13 EG F 01 ST DRDS DE V 21 COPIES LTTR ENCLI 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 EXTERNAL: ACRS NSIC 16 08 16 16 1 1 LPDR 03 1 1 SEP 2 s)gsp TOTAL NUMBER OFt COPIES REQUIRED: LTTR 4Q ENCL' 1<<e!I II'<<lt<<f~<""'r C, f fI<<,1.~1 li I'0<<f fii<<1 f/,<<3 1!I I!l a<<w i P~/T I i li'', ll I t1~II l!'ff J l Washington Public Power Supply System A JOINT OPERATING AGENCY'.o.Box Q58 3000 Gco.w*sHiNorov wAv RicvLANo, w>IHwcroN QQ352 p~oNc (50Q)375 5000 September 16, 1980 G02-80-202 Hr.R.H.Engelken, Director Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1900 N.California Blvd.Walnut Creek, California 94596  
overgrindj ng while pr coal ring weld profiles for ASME section 11 inservi ce insp.Cbntractors               to revise   procedures'019S DISTRIBUTION CODE!                        COPIES RECEIVED! LTR   ~%   ENCL, ~                 SIZE:
TITLE: Constr uction Def iciency Repor t (10CFR50e5SE)
NOTES:PM: 2 comics                of all material.                                                         05000397 RECIPIENT                    COPIES            RECIPIENT                         COPIES ID                              LjTTR ENCL      ID CODE/NAME                      LTTR ENCLI YOUNGBLOODiB 05 CODE/NAME'CTION e   A/D LiICENSNG 04                   1    1                                            1    1 RUSHBROOKiM. 06                     1    1    LYNCHiD~                      07      1    1 INTERNAL: AD/RC ASLBP/J.HARD I/IE'7            1 1
1 1
AEOD D/DIR HUM   FAC15 18 1
1 1
DIRr HUM FAC Si'0                  1    1    EDO 8 STAFF                   19       1    1 EQUIP QUAl) BR11                    1    1    HYD/GEO BR                     22       1    1 l8E                        09      2    2    LIC'UAL'R 12                           1    1 MPA                        20      1    1    NRC PDR                       02       1    1 OELD                        21      1    1    P         REV~ 13                     1    1 QA BR                      14      1            EG F                         01       1    1 RUTHERFORDiN ~              IE      1    1    ST   DRDS DE V               21       1     1 EXTERNAL: ACRS                         16     16   16     LPDR                          03      1     1 NSIC                        08      1     1 SEP 2 s )gsp TOTAL NUMBER OFt COPIES               REQUIRED: LTTR     4Q   ENCL'
 
I                    II 1
e lt<<         I' f ~<"   "'r                         0 <<f fii C, f fI <<,1.   ~     1 li                                 <<
1 f/,
1                      I
      <<3                                   !                           I!
l a                       <<                     w li'',
i P               ~/ T                 I i ll I
t1                                       ~   II l! 'ff                                                   l J
 
Washington Public Power Supply System A JOINT OPERATING AGENCY 3000 Gco. w*sHiNorov wAv   RicvLANo, w>IHwcroN QQ352 p~oNc (50Q) 375 5000
: o. Box Q58 September 16, 1980 G02-80-202 Hr. R. H. Engelken, Director Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1900 N. California Blvd.
Walnut Creek,   California       94596


==Subject:==
==Subject:==
MPPSS NUCLEAR PROJECT NO.2 Docket No.50-397.CPPR-93 Re ortable Deficienc-10CFR50.55 e)
MPPSS NUCLEAR PROJECT       NO. 2 Docket No. 50-397. CPPR-93 Re ortable Deficienc       - 10CFR50.55 e)
 
==Dear Hr. Engelken:==
 
In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on August 12, 1980, of a reportable deficiency relative to violation of the minimum ASHE Code wall thickness on large bore pipe.
Attached is our report on        this deficiency.
Please contact us      if you  have  additional questions.
Very  truly yours, D. L. Renberger Assistant D';rector, Technology DLR/RPS/im Attachment cc: JR Lewis,    BPA w/1 ND Lewis,    EFSEC, Olympia    w/1 RE Snaith,    BRR w/1 V. Stello,  NRC  w/1 AD Toth, NRC w/1 JJ Verderber, BIER w/1 B. Wood, NUS Corp. w/1 WNP-2  Files 3 QOQQgo A)5'
 
                    ~
V H
(, ~>(p Qg Q 3
 
REPORTABLE DEFICIENCY AND CORRECTIVE ACTION WPPSS NUCLEAR PROJECT NO. 2 LARGE BORE ASME PIPING WITH LESS THAN RE UIRED MINIMUM WALL WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397
                          ~ LICENSE NO. CPPR-93 Descri  tion of Deficienc:
Large diameter piping has tqen found to have less than the ASME Code required minimum wall 'thickness. This underwall condition was caused by over-grinding while preparing weld profiles for ASME Section XI In Service Inspection (ISI) .
Safet  Si  nificance:
a If the  underwall condition were. to be left uncorrected,  it could result in the violation of piping pressure bounderies. This could adversely affect personnel safety and the safe operation of the plant.
Corrective Action:
Project Engineering Directive, PED-215-M-3337, has been issued to our mechanical    contractor, which controls grinding, assures that wall thickness measurements    are performed on all blended areas and directs the mechanical contractor to revise appropriate procedures accordingly.
A  separate  contract'issued to Lambert, McGill and Thomas Co. (C14402) directs  them  to measure the remaining wall thickness .of all previously blended  ISI areas and to report the results to WNP2 Engineering. This data is  being evaluated to determine the scope of the problem. Subsequent to this  evaluation, individual areas will be repaired, as required, to conform  to the ASME Code.
Completion of the physical re-work is estimated to be September, 1981.
This date is contingent upon the resolution of the current labor negotiations and the lifting of the Stop Work Orders effecting guality Class 1 work at  WNP-2.


==Dear Hr.Engelken:==
In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on August 12, 1980, of a reportable deficiency relative to violation of the minimum ASHE Code wall thickness on large bore pipe.Attached is our report on this deficiency.
Please contact us if you have additional questions.
Very truly yours, D.L.Renberger Assistant D';rector, Technology DLR/RPS/im Attachment cc: JR Lewis, BPA w/1 ND Lewis, EFSEC, Olympia w/1 RE Snaith, BRR w/1 V.Stello, NRC w/1 AD Toth, NRC w/1 JJ Verderber, BIER w/1 B.Wood, NUS Corp.w/1 WNP-2 Files 3 QOQQgo A)5'
~-V H(,~>(p Qg Q 3 REPORTABLE DEFICIENCY AND CORRECTIVE ACTION WPPSS NUCLEAR PROJECT NO.2 LARGE BORE ASME PIPING WITH LESS THAN RE UIRED MINIMUM WALL WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO.50-397~LICENSE NO.CPPR-93 Descri tion of Deficienc:
Large diameter piping has tqen found to have less than the ASME Code required minimum wall'thickness.
This underwall condition was caused by over-grinding while preparing weld profiles for ASME Section XI In Service Inspection (ISI).Safet Si nificance:
a If the underwall condition were.to be left uncorrected, it could result in the violation of piping pressure bounderies.
This could adversely affect personnel safety and the safe operation of the plant.Corrective Action: Project Engineering Directive, PED-215-M-3337, has been issued to our mechanical contractor, which controls grinding, assures that wall thickness measurements are performed on all blended areas and directs the mechanical contractor to revise appropriate procedures accordingly.
A separate contract'issued to Lambert, McGill and Thomas Co.(C14402)directs them to measure the remaining wall thickness.of all previously blended ISI areas and to report the results to WNP2 Engineering.
This data is being evaluated to determine the scope of the problem.Subsequent to this evaluation, individual areas will be repaired, as required, to conform to the ASME Code.Completion of the physical re-work is estimated to be September, 1981.This date is contingent upon the resolution of the current labor negotiations and the lifting of the Stop Work Orders effecting guality Class 1 work at WNP-2.
4 C}}
4 C}}

Latest revision as of 09:31, 4 February 2020

Deficiency Rept Re Large Diameter Piping Found to Have Less than ASME Code Required Min Wall Thickness.Caused by Overgrinding While Preparing Weld Profiles for ASME Section 11 Inservice Insp.Contractors to Revise Procedures
ML17275A607
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 09/16/1980
From: Renberger D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To:
References
10CFR-050.55E, 10CFR-50.55E, G2-80-202, GO2-80-202, NUDOCS 8009240465
Download: ML17275A607 (6)


Text

REGULATORY 'IFORMATION DISTRIBUTION SY EM (RIDS)

ACCESSION NBR:8009240465 DOC ~ DATE! 80/09/16 NOTARIZ D! NO DOCKET FACIL:50-397 NPPSS Nuclear Projects Unit 2< Washington Public Powe 05000397 AUTH'AME AUTHOR AFFIL'I ATION REMBERGER.D/;/ Washington Public Power Supply System RECIP.NAME RECIPIENT AFFILiI'ATION

SUBJECT:

Deficiency rept re large dtaaeter pIptng tound to have leap+

than ASME'" code required min wall thickoess Caused by ~

overgrindj ng while pr coal ring weld profiles for ASME section 11 inservi ce insp.Cbntractors to revise procedures'019S DISTRIBUTION CODE! COPIES RECEIVED! LTR ~% ENCL, ~ SIZE:

TITLE: Constr uction Def iciency Repor t (10CFR50e5SE)

NOTES:PM: 2 comics of all material. 05000397 RECIPIENT COPIES RECIPIENT COPIES ID LjTTR ENCL ID CODE/NAME LTTR ENCLI YOUNGBLOODiB 05 CODE/NAME'CTION e A/D LiICENSNG 04 1 1 1 1 RUSHBROOKiM. 06 1 1 LYNCHiD~ 07 1 1 INTERNAL: AD/RC ASLBP/J.HARD I/IE'7 1 1

1 1

AEOD D/DIR HUM FAC15 18 1

1 1

DIRr HUM FAC Si'0 1 1 EDO 8 STAFF 19 1 1 EQUIP QUAl) BR11 1 1 HYD/GEO BR 22 1 1 l8E 09 2 2 LIC'UAL'R 12 1 1 MPA 20 1 1 NRC PDR 02 1 1 OELD 21 1 1 P REV~ 13 1 1 QA BR 14 1 EG F 01 1 1 RUTHERFORDiN ~ IE 1 1 ST DRDS DE V 21 1 1 EXTERNAL: ACRS 16 16 16 LPDR 03 1 1 NSIC 08 1 1 SEP 2 s )gsp TOTAL NUMBER OFt COPIES REQUIRED: LTTR 4Q ENCL'

I II 1

e lt<< I' f ~<" "'r 0 <<f fii C, f fI <<,1. ~ 1 li <<

1 f/,

1 I

<<3  ! I!

l a << w li,

i P ~/ T I i ll I

t1 ~ II l! 'ff l J

Washington Public Power Supply System A JOINT OPERATING AGENCY 3000 Gco. w*sHiNorov wAv RicvLANo, w>IHwcroN QQ352 p~oNc (50Q) 375 5000

o. Box Q58 September 16, 1980 G02-80-202 Hr. R. H. Engelken, Director Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1900 N. California Blvd.

Walnut Creek, California 94596

Subject:

MPPSS NUCLEAR PROJECT NO. 2 Docket No. 50-397. CPPR-93 Re ortable Deficienc - 10CFR50.55 e)

Dear Hr. Engelken:

In accordance with the provisions of 10CFR50.55(e), your staff was informed by telephone on August 12, 1980, of a reportable deficiency relative to violation of the minimum ASHE Code wall thickness on large bore pipe.

Attached is our report on this deficiency.

Please contact us if you have additional questions.

Very truly yours, D. L. Renberger Assistant D';rector, Technology DLR/RPS/im Attachment cc: JR Lewis, BPA w/1 ND Lewis, EFSEC, Olympia w/1 RE Snaith, BRR w/1 V. Stello, NRC w/1 AD Toth, NRC w/1 JJ Verderber, BIER w/1 B. Wood, NUS Corp. w/1 WNP-2 Files 3 QOQQgo A)5'

~

V H

(, ~>(p Qg Q 3

REPORTABLE DEFICIENCY AND CORRECTIVE ACTION WPPSS NUCLEAR PROJECT NO. 2 LARGE BORE ASME PIPING WITH LESS THAN RE UIRED MINIMUM WALL WASHINGTON PUBLIC POWER SUPPLY SYSTEM DOCKET NO. 50-397

~ LICENSE NO. CPPR-93 Descri tion of Deficienc:

Large diameter piping has tqen found to have less than the ASME Code required minimum wall 'thickness. This underwall condition was caused by over-grinding while preparing weld profiles for ASME Section XI In Service Inspection (ISI) .

Safet Si nificance:

a If the underwall condition were. to be left uncorrected, it could result in the violation of piping pressure bounderies. This could adversely affect personnel safety and the safe operation of the plant.

Corrective Action:

Project Engineering Directive, PED-215-M-3337, has been issued to our mechanical contractor, which controls grinding, assures that wall thickness measurements are performed on all blended areas and directs the mechanical contractor to revise appropriate procedures accordingly.

A separate contract'issued to Lambert, McGill and Thomas Co. (C14402) directs them to measure the remaining wall thickness .of all previously blended ISI areas and to report the results to WNP2 Engineering. This data is being evaluated to determine the scope of the problem. Subsequent to this evaluation, individual areas will be repaired, as required, to conform to the ASME Code.

Completion of the physical re-work is estimated to be September, 1981.

This date is contingent upon the resolution of the current labor negotiations and the lifting of the Stop Work Orders effecting guality Class 1 work at WNP-2.