=Text=
=Text=
{{#Wiki_filter:CONTAINMENT SYSTEMS CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1 The containl'lent isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed. APPLICABILITY:
{{#Wiki_filter:CONTAINMENT SYSTEMS CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1   The containl'lent isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed.
MODES 1, 2, 3 and 4 ACTION: Hith one or rrore of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either: a. Maintain at least one isolation valve.OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours, or b. Isolate each affected penetration within 4 hours by use of at least one deactivated automatic_
APPLICABILITY:     MODES 1, 2, 3 and 4 ACTION:
valve secured in the isolation position, or c. Isolate each affected penetration within 4 hours by use of at least one closed manual valve, or a blank flange, or d. Be in at least HOT STANDBY within the next 6 hours and in COLD SHUTffi5WN within the following 30 hours. SURVEILLANCE REQJIREMENTS The isolation.valves specified in Table 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associated actuator, control or power circuit by perforl'lance of a cycling test and verification of isolation time.
Hith one or rrore of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either:
* SALEM -UN IT 1 3/4 6-12  
: a. Maintain at least one isolation valve.OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours, or
; 8512110248 851127 II PDR ADOCK 05000272 p PDR Ul t'i l::t:l I c VALVE* NUMBER z H 8 A. PHASE 11 A II ISOLATION I-' 1. 1 PR 17* 2. 1 PR 18* 3. 1 NT 25* 4. 1 WR 80* 5. 1 CV 3 6. 1 CV 4 7. 1 CV 5 8. 1 CV 7 9. 1 CV 68## 10. 1 CV 69## 11. 1 CV 284 w 12. 1 CV 116 ..........  
: b. Isolate each affected penetration within 4 hours by use of at least one deactivated automatic_ valve secured in the isolation position, or
'h.,. 13. 1 cc 215 O'I 14. 1 cc 113 I 15. 1 WL 96* I-' ""' 16. 1 WL 97* 17. 1 WL 98* 18. 1 WL 99* 19. 1 WL 108* 20. 1 WL 12* 21. 1 WL 13* 22. 1 NT 32* 23. 1 SJ 123* 24. 1 SJ 60* 25. 1 SJ 53* 26. 1 SS 103* 27. 1 SS 27* 28. 1 SS 104* 29. 1 SS 33* TABLE 3.6-1 CONTAINMENT 1SOLATION VALVES FUNCTION Pressurizer Relief Tk.-Gas Analyzer Conn. Pressurizer Relief Tk.-Gas Analyzer Conn. Pressurizer Relief Tk.-N2 Connection*
: c. Isolate each affected penetration within 4 hours by use of at least one closed manual valve, or a blank flange, or
Pressurizer Relief Tk.-Primary Water Conn. CVCS -Letdown Line CVCS -Letdown Line CVCS -Letdown Line CVCS -Letdown Line CVCS -Charging line CVCS -Charging Line eves -RCP Seals CVCS -RCP Seals Comp. Cooling to Excess Letdown Hx Comp. Cooling to Excess Letdown Hx RC Drain Tk. Gas. Analyzer Conn. RC Drain Tk. -Gas Analyzer Conn. RC Drain Tk. -Vent Header Conn. RC Drain Tk. -Vent Header Conn. RC Drain. Tk. -N2 Connection RC Drain Tank Pumps RC Drain Tank Pumps Accumulator N2 Connection SI Test Line SI Test Line SI Test Line Accumulator Sampling Accumulator Sampling RC Sampling RC Sampling ISOLATION TIME (Seconds)
: d. Be in at least HOT STANDBY within the next 6 hours and in COLD SHUTffi5WN within the following 30 hours.
,<lOSec. <10 Sec. < 10
SURVEILLANCE REQJIREMENTS 4.6.3~1.1  The isolation.valves specified in Table 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associated actuator, control or power circuit by perforl'lance of a cycling test and verification of isolation time.
< 10 Sec. <1,1 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. . <10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. (IO Se,c. < *10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec.
* SALEM - UN IT 1                     3/4 6-12
Ul tc:l s: I c z H 1-3 A. B. c. VALVE NUMBER PHASE 11 A II ISOLATION (Cont<l.)
      ~~~~~~-=::;:--~~~.,
: 30. 1 SS 107* 31. 1 SS 49* 32. 1 SS 110* 33. 1 SS 64* 34. 1 vc 7 35. 1 vc 8 36. 1 vc 11 37. 1 vc 12 38. 11 CA 330 39. 12 CA 330 40. 1 DR 29 41. 1 16 42. 1 WL 17 43. 1 FP 147* PHASE 11 B II ISOLATION
; 8512110248 851127               II PDR ADOCK 05000272 p               PDR
: 1. 1 cc 118tt 2. 1 cc 117tt 3. 1 cc 187 4. 1 cc 136 5. 1 cc 190 6. 1 cc 131 MAIN STEAM ISOLATION
 
: 1. 11 MS 7# 2. 12 MS 7# 3. 13 MS 7# 4. 13 MS 7# 5. 13 MS 7# 6. 12 MS 18# 7. 13 MS 18# 8. 14 MS 18# TABLt 3.6-1 (Contd.) CONTAINMENT ISOLATION VALVES FUNCTION Pressurizer Liquid Sampling Pressurizer Sampling Pressurizer Steam Sampling Pressurizer Steam Sampling Containment Radiation Sampling Containment Radiation Sampling Containment Radiation Sampling Containment Radiation Sampling Instrument.
TABLE 3.6-1 Ul
Air Supply Instrument Air Supply Demineralized Water Containment Sump Discharge Containment Sump Discharge Fire Protection System Component Cooling to Component Cool i n*g to Component Cooling to Component Cooling to Component Cooling to. Component Cooling to Main Steam Drain
    ~                                            CONTAINMENT 1SOLATION VALVES t'i l::t:l
* Main Steam Drain Main Steam Drain Main Steam Drain Main Steam Bypass Main Steam Bypass Main Steam Bypass Main Steam Bypass* RCP RCP RCP RCP RCP RCP ISOLATION TIME (Seconds)
    ~
< 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. .< 10 Sec. A < 10 Sec. ,.,. <10 Sec. < 10 Sec. < 10 Sec. < 10 sec. <10 Sec. < 10 Sec. <10 Sec. < 10 Sec. < 10 Sec. (10 Sec. < 10 Sec. (10 Sec. < 10 Sec.* <10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. e I c z H 1-3 w '-.. "'" O'I I I-' Ul VALVE NUMBER D. FEEDWATER ISOLATION
I c             VALVE* NUMBER                         FUNCTION                ISOLATION TIME (Seconds) z H
: 1. 11 BF 19# 2. 12 BF 19# 3. 13 BF 19# 4. 14 BF 19# 5. 11 BF 40# 6. 12 BF 40# 7. 13 BF 40# 8. 14 BF 40# E. STEAM GENERATOR BLOWDOWN 1. 11 GB 4# 2. 12 GB 4# 3. 13 GB 4# 4. 14 GB 4# 5. 11 SS 94# 6. 12 SS 94# 7. 13 SS 94# 8. 14 SS 94# F. CONTAINMENT PURGE Main Main Main Main Main Main Main Main ISOLATION TABLE 3.6-1 '(Contd.)
8 A. PHASE   11 AII ISOLATION I-'
CONTAINMENT ISOLATION VALVES FUNCTI'ON Feed\-Jater I s0 lat ion Feedwater I so 1 at ion Feedwater I so 1 at ion Feedwater Isolation Feeclwater
: 1. 1   PR 17*       Pressurizer Relief Tk.-Gas Analyzer Conn.        ,<lOSec.
*1 sol at ion Feedwater Isolation Feedwater I sol at ion Feedwater Isolation
: 2. 1   PR 18*       Pressurizer Relief Tk.-Gas Analyzer Conn.          <10 Sec.
*steam Generator Blowaown Steam Generator Blowdown
: 3. 1    NT 25*        Pressurizer Relief Tk.-N2 Connection*               < 10  Sec~
* Stearn Generator Blowclown Stearn Generator Blowdown SG Blowdown Sampling SG Blowdown Sampling SG Blowdown Sampling SG Blowdown Samplyng AND PRESSURE-VACUUM RELIEF 1. 1 vc 1 Purge Supply 2. 1 vc 2 Purge Supply 3. 1 vc 3 Purge Exhaust 4 .* 1 vc 4 Purge Exhaust 5. 1 vc 5* Pressure-Vacuum Relief 6. 1 vc 6* Pressure-Vacuum Relief ISOLATION TIME (Seconcts)
: 4. 1   WR 80*       Pressurizer Relief Tk.-Primary Water Conn.          < 10 Sec.
< 8 Sec. -< 8 Sec. -< 8 Sec. < 8 Sec. -< 8 Sec. -< 8 Sec. < 8 Sec. -< 8 Sec-. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 2 Sec. -< 2 Sec. < 2 Sec. < 2 Sec. < 2 Sec. < 2 Sec. 
: 5. 1   CV 3         CVCS - Letdown Line                                <1,1 Sec.
., (/) TABLE 3.6-1 (Contd.) :t::' t'i CONTAINMENT ISOLATION VALVES t:Ij :3:: c:: z VALVE NUMBER FUNCTION I SOLA TI ON TI ME (Seconds)
: 6. 1   CV 4         CVCS - Letdown Line                                < 10  Sec.
H 8 G. MANUAL I-' 1. 1 SS 900# Pressurizer Dead-Weight Calibrator Not Applicable
: 7. 1   CV 5         CVCS - Letdown Line                                < 10  Sec.
: 2. 1 SS 901# Pressurizer Dead-Weight Calibrator Not Applicable
: 8. 1   CV 7         CVCS - Letdown Line                                < 10  Sec.
: 3. 11 CV 98# eves -RCP seals Not Applicable
: 9. 1    CV 68##       CVCS - Charging line                                < 10  Sec.
-4. 12 CV 98# CVCS -RCP Seals Not Applicable
: 10. 1   CV 69##       CVCS - Charging Line                                < 10  Sec.
: 5. 13 CV 98# eves -RCP Seals Not Applicable
: 11. 1   CV 284       eves - RCP Seals                                    < 10  Sec.
: 6. 14 CV 98# eves -RCP Seals Not Applicable
w
: 7. 1 SJ 71# CVCS Flushing Connection Not Applicable
: 12. 1    CV 116       CVCS - RCP Seals                                    < 10  Sec.
: 8. 1 SA 118 Compressed Air Supply
'h.,.         13. 1   cc 215       Comp. Cooling to Excess Letdown Hx                  < 10  Sec.
* Not Applicable
O'I         14. 1   cc 113       Comp. Cooling to Excess Letdown Hx                  < 10  Sec.
: 9. 1 WL 190 Refueling Canal Supply Not Applicable
I-'
: 10. 1 SF 36 Refueling Canal Supply Not Applicable w 11. 1 WL 191 Refueling Canal Discharge Not Applicable  
I         15. 1   WL 96*       RC Drain Tk. Gas. Analyzer Conn.              . <10  Sec.
.........
  ""'         16. 1   WL 97*       RC Drain Tk. - Gas Analyzer Conn.                  < 10  Sec.
: 12. 1 SF 22 Refueling Canal Discharge Not Applicable ii':> 13. 1 vc 9* Containment Radiation Sampling Not Applicable O"I 14. 1 vc 10* Containment Radiation Sampling Not Applicable I I-' 15. 1 vc 13* Containment Radiation Sampling Not Applicable O"I 16. 1 vc 14* Containment Radiation Sampling Not Applicable
: 17. 1    WL 98*       RC Drain Tk. - Vent Header Conn.                    < 10  Sec.
: 17. # Fuel Transfer Tube Not Applicable
: 18. 1   WL 99*       RC Drain Tk. - Vent Header Conn.                    < 10  Sec.
: 18. 1 cs 900 Containment Instrumentation Fi 11 Conn. Not Applicable
: 19. 1   WL 108*       RC Drain. Tk. - N2 Connection                      (IO  Se,c.
: 19. 1 cs 901 Containment Instrumentation Fil 1 Conn. Not Applicable
: 20. 1   WL 12*        RC Drain Tank Pumps                                < *10 Sec.
: 20. 1 cs 902 Containment Instrumentation Fill Conn. Not Applicable e 21. 1 cs 903 Containment Instrumentation Fil 1 Conn. Not Applicable
: 21. 1   WL 13*       RC Drain Tank Pumps                                < 10  Sec.
: 22. 1 SA 262 Containment Pressure Test Conn. Not Applicable
: 22. 1   NT 32*       Accumulator N2 Connection                          < 10  Sec.
: 23. 1 SA 2n4 Co n t a i n me n t Pres s u re Te st Co n n * , Not Applicable
: 23. 1   SJ 123*       SI Test Line                                        < 10  Sec.
: 24. 1 SA 265 Containment Pressure Test Conn. Not Applicable
: 24. 1   SJ 60*       SI Test Line                                        < 10  Sec.
: 25. 1 SA 267 Containment Pressure Test Conn. Not Applicable
: 25. 1    SJ 53*        SI Test Line                                        < 10  Sec.
: 26. 1 SA 268 Containment Pressure Test Conn. Not Appl i cah 1 e 27. 1 SA 270 Containment Pressure Test Conn. Not Applicable
: 26. 1    SS 103*      Accumulator Sampling                                < 10  Sec.
: 28. 1 CA 1714 Containment Air Lock Instrument Conn. Not Applicable
: 27. 1    SS 27*       Accumulator Sampling                                < 10  Sec.
: 29. 1 CA 1715 Containment Air* Lock Instrument Conn. Not Applicable TABLE 3.6-1 (Contd.) [fl CONTAINMENT ISOLATION VALVES t"i l:rj VALVE NUMBER FUNCTION ISOLATION TIME (Seconds) d z G. MANUAL H 1-3 f-' 30. 11 SS 181* Post LOCA Sampling Not Applicable
: 28. 1    SS 104*      RC Sampling                                        < 10  Sec.
: 31. 11 SS 182* Post LOCA Sampling Not Applicable
: 29. 1    SS 33*        RC Sampling                                        < 10  Sec.
: 32. 11 SS 188* Post LOCA Sampling Not Applicable
 
: 33. 11 SS 189* Fbst LOCA Sampling Not Applicable
TABLt 3.6-1 (Contd.)
: 34. 13 SS 181* Post LOCA Sampling Not Applicable
CONTAINMENT ISOLATION VALVES Ul
: 35. 13 SS 182* Post LOCA Sampling Not Appl i cable 36. 13 SS 184* Post LOCA Sampling Not Applicable
~                                                                              ISOLATION TIME (Seconds) tc:l        VALVE NUMBER                                    FUNCTION s:I c    A. PHASE 11 AII ISOLATION (Cont<l.)
: 37. 13 SS 185* Post LOCA Sampling Not Appl i cab l e 38. 11 vc 17* Post LOCA Sampling Not Applicable
z H
: 39. 11 vc 18* Post LOCA Sampling No t Appl i cab l e 40. 11 vc 19* Post LOCA Sampling Not Applicable w 41. 11 SF 20* Post LOCA Sampling Not Applicable
1-3
..........
: 30. 1 SS 107*                    Pressurizer Liquid Sampling                    < 10 Sec.
""' 42. 12 vc 17* Post LOCA Safllpling Not Applicable CJ'\ 43. 12 vc 18* Post LOCA Sampling Not Appl i cahl e I 44. 12 vc 19* *Post LOCA Sampling Not Applicable f-' .....J 45. 12 vc 20* Post LOCA Sampling Not Appl i cab l e 46. 11 cs 2t Containment Spray Not Applicable
: 31. 1 SS 49*                    Pressurizer Liqui~ Sampling                    < 10 Sec.
: 47. 12 cs 2t Spray Not Applicable H. CHECK I --1. 1 CV 74 CVCS-Charging Line Not Applicable
: 32. 1 SS 110*                    Pressurizer Steam Sampling                      < 10 Sec.
: 2. 1 CV 296 CVCS-RCP Seals Not Applicable 3 *. 1 cc 119 Component Cooling to RCP Not Applicable
: 33. 1 SS 64*                    Pressurizer Steam Sampling                      < 10 Sec.
: 4. 1 cc 186 Component Cooling to RCP Not Applicable
: 34. 1 vc 7                      Containment Radiation Sampling                .< 10 Sec.       A
: 5. 1 cc 208 Component Cooling to RCP Not Applicable
: 35. 1 vc 8                      Containment Radiation Sampling                  < 10 Sec.      ,.,.
: 6. 11 cs 48 Containment Spray Not Applicable
: 36. 1 vc 11                      Containment Radiation Sampling                  <10 Sec.
: 7. 12 cs 48 Containment Spray No t App l i ca bl e 8. 1 DR 30 Demineralized Water System Not Applicable
: 37. 1 vc 12                      Containment Radiation Sampling                  < 10 Sec.
: 9. 1 FP 148 Fire Protection System Not Applicable
: 38. 11 CA 330                    Instrument. Air Supply                          < 10 Sec.
: 10. 1 NT 26 Pressurizer Relief Tk.--Nitrogen Conn. Not Applicable
: 39. 12 CA 330                    Instrument Air Supply                          < 10 sec.
: 11. 1 NT 34 Accumulator Nitrogen Supply Not Applicable
: 40. 1 DR 29                      Demineralized Water Sup~ly                      <10 Sec.
: 12. 1 SA 119 Compressed Air Supply Not Applicable TABLE 3.6-1 (Contd.) CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)
: 41. 1 ~JL 16                    Containment Sump Discharge                      < 10 Sec.
H. CHECK (Contd.) 13. 1 WR 81 14. 11 CA 360 15. 12 CA 360 Pressurizer Relief Tk.-Primary Water Conn. Instrument Air Supply Instrument Air *May be opened on an intermittent basis under administrative control. #Not subject to Type C leakage tests. * ##Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.
: 42. 1 WL 17                      Containment Sump Discharge                      <10 Sec.
tNormally closed rmtor operated containment isolation valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE.
: 43. 1 FP 147*                    Fire Protection System                          < 10 Sec.
Not Applicable Not Applicable Not Applicable l
B. PHASE 11 B II ISOLATION
REVISED PAGES -UNIT NO. 2 
: 1. 1 cc  118tt              Component  Cooling    to  RCP                  < 10 Sec.
.. > CONTAINMENT*SYSTEMS CONTAINMENT ISOLATION VALV-ES . LIMITING CONDITION FOR OPERATION 3 .6 .3 The containment isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed. APPLICABILITY:
: 2. 1 cc  117tt              Component  Cool i n*g to  RCP                  (10   Sec.
MODES 1, 2, 3 and 4 ACTION: With one or more of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either: a. Maintain at least one isolation valve OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours, or b. Isolate each affected penetration within 4 hours by use of at least one deactivated automatic valve secured in the isolation position, or c. Isolate each affected penetration within 4 hours by use of at least one closed manual valve, or a blank flange, or d. Be in at least HOT STANDBY within the next 6 hours and in COLD within the following 30 hours. SURVEILLANCE REQJIREMENTS
: 3. 1 cc  187                Component  Cooling    to  RCP                  < 10 Sec.
.4.6.3.1 The isolation val'ves specified in "'Fable 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associ a't;ed actuator, control or power circuit by performance of a cycling test and verificatio*n of isolation time. SALEM -UN IT 2 3/4 6-14 CJ) 1:-1 tx:l :s: VALVE NUMBER c:: A. PHASE 11 A 11 ISOLATION z H f-:3 1. 2 PR 17* N 2. 2 PR 18* 3. 2 NT 25* 4. 2 WR 80* 5. 2 CV 3 6. 2 CV 4 7. 2 CV 5 8. 2 CV 7 9. 2 CV 68## 10. 2 CV 69## 11. 2 CV 284 12. 2 CV 116 w 13. 2 cc 215 .........
: 4. 1 cc  136                Component  Cooling    to  RCP                  (10   Sec.
: 14. 2 cc 113 "'" &deg;' 15. 2 WL 96* I 16. 2* WL 97* I-' 17. 2 WL 98* &deg;' 18. 2 WL 99* 19. 2 WL 108* 20. 2 WL 12* 21. 2 WL 13* 22. 2 NT 32* 23. 2 SJ 123* 24. 2 SJ 60* 25. 2 SJ 53* 26. 2 SS 103* 27. 2 SS 27* 28. 2 SS 104* 29. 2 SS 33* TABLE CONTAINMENT ISOLATION VALVES FUNCTION Pressurizer Relief Tk.-Gas Analyzer Conn. Pressurizer Relief Tk.-Gas Analyzer Conn. Pressurizer Relief Tk.-N2 Connection Pressurizer Relief Tk. -Primary Water Conn. CVCS -Let<lown Line CVCS -Let<lown Line CVCS -Letdown Line CVCS -Letdown Line CVCS -Charging Line CVCS -Charging Line CVCS -RCP Seals eves -RC P Seals Comp. Cooling to Excess Letdown Hx Comp. Coo 1 i ng to Excess Letdown Hx RC Drain Tk. -Gas Analyzer Conn. RC Drain Tk. -Gas Analyzer Conn. RC Drain Tk. -Vent HeaCler Conn. RC Drain Tk. -Vent Header Conn. RC Drain Tk. -N2 Connection RC Drain Tank Pumps RC Drain Tank Pumps Accumulator N2 Connection*
                                                                                        < 10 5.
SI Test Line SI Test Line SI Test Line Accumulator Sampling Accumulator Sampling RC Sampling RC .Sampling ISOLATION TIME (Seconds)
6.
< 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 sec. <10 Sec. < 10 Sec. <.io Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. <10 Sec. < 10 Sec. <10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. <10 Sec. . i VALVE NUMBER A. PHASE "A" ISOLATION
1 1
: 30. 2 SS 107* 31. 2 SS 49* 32. 2 SS 110* 33. 2 SS 64* 34. 2 vc 7 35. 2 vc 8 36. 2 vc 11 37. 2 vc 12 38. 21 CA 330 39. 22 CA 330 40. 2 DR 29 41. 2 WL 16 42. 2 WL 17 43. 2 FP 147* B. PHASE "B II ISOLATION
cc cc 190 131 Component Component Cooling Cooling to.
: 1. 2 cc 118tt 2. 2 cc 117tt 3. 2 cc 187 4. 2 cc 136 5. 2 cc 190 6. 2 cc 131 c. MAIN STEAM ISOLATION
to RCP RCP Sec.*
: 1. 21 MS 7# 2. 22 MS 7# 3. 23 MS 7# 4. 23 MS 7# 5. 23 MS 7# 6. 22 MS 18# 7. 23 MS 18# 8. 24 MS 18# (Contd.) TABLE 3.6-1 (Contd.) CONTAINMENT ISOLATION VALVES FUNCTION Pressurizer Liquid Sampling Pressurizer Liquid Sampling Pressurizer Steam Sampli&deg;ng Pressurizer Steam Sampling Containment Radiation Sampling Containment Radiation Sampling Containment Radiation Sampling Containment Radiation Sampling Instrument Air Supply Instrument Air Supply Demineralized Water Supply Containment Sump Discharge Containment Sump Discharge Fire Protection System Component Cooiing Component Cooling Compbnent Cooling Component Cooling Component Cooling Component Cooling Main Steam Drain Main Steam Drain Main Steam Drain Main Steam Drain Main Steam Bypass Main Bypass Main Steam Bypass Main Steam Bypass to RCP to RCP to RCP to RCP to. RCP to RCP ISOLATION TIME (Seconds)
                                                                                        <10 Sec.       e
< 10 See. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. <10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10.Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. <10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. ., ] e H t-3 N O'I I I-' -...) VALVE NUMBER D. FEEDWATER ISOLATION
: c. MAIN STEAM ISOLATION
: 1. 21 BF 19# 2. 22 BF 19# 3. 23 BF 19# 4. 24 BF 19# 5. 21 BF 40# 6 *. 22 BF 40# 7. 23 BF 40# 8. 24 BF 40# Main Main Main Main Main Main Main Main TARLE 3.6-1 {Contd.) CONTAINMENT ISOLATION VALVES FUNCTION Feedwater I so 1 at ion Feedwater Isolation Feedw.ater I sol at ion Feenwater Isolation Feedwater I sol at ion Feedwater I sol at ion Feedwater Isolation Feedwater Isolation E. STEAM GENERATOR BLOWDOWN ISOLATION
: 1. 11  MS  7#                Main  Steam  Drain *                            < 10 Sec.
: 1. 21 GB 4# 2. 22 GB 4# 3.23GB4# 4. 24 GB 4# 5. 21 SS 94# 6. 22 SS 94# 7. 23 SS 94# 8. 24 SS 94# F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF 1. 2 vc 1 2. 2 vc 2 3. 2 vc 3 4. 2 vc 4 5. 2 vc 5* 6. 2 vc 6* Steam Generator Blowdown Steam Generator Blowdown Steam Generator Blowdown Steam Generator Blowdown SG Blowdown Sampling SG Blowdown Sampling SG Blowdown Sampling SG Blowdown Sampling Purge Supply Purge Supply Purge Exhaust* Purge Exhaust Pressure-Vacuum Relief Pressure-Vacuum Relief ., .. ISOLATION TIME (Seconds)
: 2. 12 MS  7#                Main  Steam  Drain                              < 10 Sec.
< 5 Sec. -< 5 Sec. < 5 Sec. -< 5 Sec. < 5 Sec. : < 5 Sec. <* 5 Sec. -< 5 Sec. < lf) Sec. < 10 Sec. < 10 Sec. < 10 Sec. < 10 Sec. < Hl Sec. < 10 Sec. < 10 Sec. < 2 Sec. < 2 Sec. < 2 Sec. < 2 Sec. -< 2 Sec. < 2 Sec. e
: 3. 13 MS  7#                Main  Steam  Drain                              < 10 Sec.
(/) t;i tr::! :s: d .z G. H 8 '"' w ..........
: 4. 13 MS  7#                Main  Steam  Drain                              < 10 Sec.
""' "' I t--' OJ VALVE NUMBER MANUAL 1. 2 SS 900# 2. 2 SS 901# 3. 21 CV 98# 4. 22 CV 98# 5. 23 CV 98# 6. 24 CV 98# 7. 2 SJ 71# 8. 2 SA 118 9. 2 WL 190 10. 2 SF 36 11. 2 WL 191 12. 2 SF 22 13. 2 vc 9* 14. 2 vc 10* 15. 2 vc 13* 16. 2 vc 14* 17. # 18. 2 cs 900 19. 2 cs 901 20. 2 cs 902 21. 2 cs 903 22. 2 SA 262 23. 2 SA 264 24. 2 SA 265 25. 2 SA 267 26. 2 SA 208 27. 2 SA 270 28. 2 CA 1714 29. 2 CA 1715 TABL[ 3.6-1 (Contd.) .CONTAINMENT ISOLATION VALVES FUNCTION Pressurizer Dead-Weight Calibrator Pressurizer Dearl-Weight Calibrator eves -RCP Seals CVCS -RCP Seals eves -RCP Seals eves -RCP Seals CVCS Flushing Connection Cornpresserl Air Supply Refueling Canal Supply Refueling Canal Supply Refueling Canal Discharge Refueling Canal* Discharge Containment Radiation Sampling Containment Sampling Containment Rarliation Sampling Containment Radiation Sampling Fuel Transfer Tube Containment Instrumentation Fill Conn. Containment Instrumentation Fill Conn. Containment Instrumentation Fill Conn. Containment Instrumentation Fill Conn. Containment Pressure Test Conn. Containment Pressure Test Conn. Containment Pressure Test Conn *. Containment Pressure Test Conn. Containment Pressure Test Conn. Containment Pressure Test Conn. Containment Air Lock Instrument Conn. Containrnent Air Lock Instrument Conn. ISOLATION TIME (Seconds)
: 5. 13 MS  7#                Main  Steam  Bypass                            < 10 Sec.
Not Applicable Not Applicahle Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable*
: 6. 12  MS  18#                Main  Steam  Bypass                            < 10  Sec.
Not Applicahle Not Applicable Not Applicable Not Applicable Not Applicable NO't Applicable Not Applicable Not Applicable Not Applicahle Not Applicable Not Applicable Not Appl i cable Not Applical>le Not Appl i cahl e Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable Not Applicable 
: 7. 13  MS  18#                Main  Steam  Bypass                            < 10  Sec.
'11 TABLE 3.6-1 {Contd.) (/) CONTAINMENT ISOLATION VALVES :i:.-ti 1:7:1 :s: VALVE NUMBER FUNCTION ISOLATION TIME (Seco.nds) c::: z G. H MANUAL t-3 N 30. 21 SS 181* Post LOCA Sampling Not
: 8. 14  MS  18#                Main  Steam  Bypass*                           < 10  Sec.
: 31. 21 SS 182* Post LOCA Sampling Not Applicable
 
: 32. 21 SS 188* Post LOCA Sampling Not Applicable e 33. 21 SS 189* Post LOCA Sampling Not Applicable
TABLE 3.6-1 '(Contd.)
: 34. 23 SS 181* Post LOCA Sampling Not Applicable
CONTAINMENT ISOLATION VALVES VALVE NUMBER                                    FUNCTI'ON        ISOLATION TIME (Seconcts) c    D. FEEDWATER ISOLATION z
: 35. 23 SS 182* Post LOCA Sampling Not Applicable
H
: 36. 23 SS 184* Post LOCA Sampling Not Applicable
                                                                                        -< 8 Sec.
: 37. 23 SS 185* Post LOCA Sampling Not Applicable
1-3
: 38. 21 vc 17* Post LOCA Sampling Not Applicable
: 1. 11 BF 19#                  Main  Feed\-Jater  I s0 lat ion
: 39. 21 vc 18* Post LOCA Sampling Not Applicable
: 2. 12 BF  19#                Main  Feedwater    I so 1at ion                -
: 40. 21 vc 19* Post LOCA Sampling Not Applicable
                                                                                        < 8 Sec.
: 41. 21 SF 20* Post LOCA Sampling Not Applicable
: 3. 13  BF  19#                Main  Feedwater    I so 1at ion                < 8 Sec.
: 42. 22 vc 1&deg;7* Post LOCA Sampling Not Applicable*
: 4. 14  BF  19#                Main  Feedwater    Isolation                  -< 88 Sec.
w 43. 22 vc 18* *Post LOCA Sampling Not Applicable
Sec.
..........
: 5. 11 BF  40#               Main  Feeclwater  *1 sol at ion                -<
""' 44. 22 vc 19* Post LOCA Sampling Not Applicable
: 6. 12 BF  40#               Main  Feedwater    Isolation                    < 8 Sec.
: 0) 45. 22 vc 20* Post LOCA Sampling Not Applicable I 46. 21 cs 2t Containment Spray Not Applicable I-' w 47. 22 cs 2t Containment Spray Not Applicable H. CHECK 1. 2 CV 74 CVCS-Charging Line Not Applicable
: 7. 13 BF  40#               Main  Feedwater    I sol at ion                -< 8 Sec.
: 2. 2 CV 296 CVCS-RCP Seals Not Applicable
: 8. 14  BF  40#               Main  Feedwater    Isolation                    < 8 Sec-.
: 3. 2 cc 119 Component Cooling to RCP Not Applicable
E. STEAM GENERATOR BLOWDOWN ISOLATION
: 4. 2 cc 186 Component Cooling to RCP Not Applicable
: 1. 11 GB 4#                  *steam Generator Blowaown                        < 10 Sec.
: 5. 2 cc 208 *component Coo 1 i ng to RCP Not Applicahle
w
: 6. 21 cs 48 Containment Spray Not Applicable
'-..      2. 12  GB  4#                Steam Generator *Blowdown                      < 10 Sec.
'. 7. 22 cs 48 Contain111ent Spray Not Applicable
"'"      3. 13  GB  4#                Stearn Generator Blowclown                      < 10 Sec.
: 8. 2 DR 30 Demineralized Water System Not
O'I
: 9. 2 F P 148 Fire P'rotection System Not Applicable
: 4. 14  GB  4#                Stearn Generator Blowdown                      < 10 Sec.
: 10. 2 NT 26 Pressurizer Relief Tk. -Nitrogen Conn. Not Applicable
I I-'      5. 11  SS  94#                SG Blowdown Sampling                            < 10 Sec.
: 11. 2 NT 34 Accumulator Nitrogen Supply Not Applicable
Ul
: 12. 2 SA 119 Compressed Air Supply Not Applicable VALVE NUMBER TABLE 3.6-1 (Contd.) CONTAINMENT ISOLATION VALVES FUNCTION ISOLATION TIME (Seconds) c: H. CHECK (Contd.} 8 N &deg;' I N 0 13. 2 WR 81 14. 21 CA 360 15. 22 CA 360 Pressurizer Relief Tk.-Primary Water Conn. Instrument Air Supply Instrurrent Air *May be opened on an intermfttent basis under administrative control. #Not subject to Type C leakage tests. Not Applicable Not Applicable Not Applicable
: 6. 12  SS  94#                SG Blowdown Sampling                            < 10 Sec.
: 7. 13  SS  94#                SG Blowdown Sampling                            < 10 Sec.
: 8. 14  SS  94#                SG Blowdown Samplyng                            < 10 Sec.
F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF
: 1. 1 vc  1                  Purge Supply                                    -<
Sec.
: 2. 1 vc  2                  Purge Supply                                    < Sec.
: 3. 1 vc  3                  Purge Exhaust                                  < 2  Sec.
4.*  1 vc  4                  Purge Exhaust                                  < Sec.
: 5. 1  vc 5*                 Pressure-Vacuum Relief                          < 2 Sec.
: 6. 1  vc  6*                Pressure-Vacuum Relief                          < Sec.
 
(/)                                            TABLE 3.6-1 (Contd.)
:t::'
t'i t:Ij                                      CONTAINMENT ISOLATION VALVES
:3::
c::            VALVE NUMBER                         FUNCTION            I SOLATI ON TI ME (Seconds) z H
8        G. MANUAL I-'
: 1. 1 SS 900#   Pressurizer Dead-Weight Calibrator                Not  Applicable
: 2. 1 SS 901#   Pressurizer Dead-Weight Calibrator                Not  Applicable
: 3. 11 CV 98#   eves - RCP seals                                  Not  Applicable
: 4. 12 CV 98#   CVCS - RCP Seals                                  Not  Applicable
: 5. 13 CV 98#   eves - RCP Seals                                  Not  Applicable
: 6. 14 CV 98#   eves - RCP Seals                                  Not  Applicable
: 7. 1 SJ 71#   CVCS Flushing Connection                          Not  Applicable
: 8. 1 SA 118    Compressed Air Supply
* Not  Applicable
: 9. 1 WL 190    Refueling Canal Supply                            Not  Applicable
: 10. 1 SF 36    Refueling Canal Supply                            Not  Applicable w          11. 1 WL 191    Refueling Canal Discharge                        Not  Applicable ii':>
: 12. 1 SF 22    Refueling Canal Discharge                        Not  Applicable
: 13. 1 vc 9*    Containment Radiation Sampling                    Not  Applicable O"I I        14. 1 vc 10*    Containment Radiation Sampling                    Not  Applicable I-'
O"I
: 15. 1 vc 13*    Containment Radiation Sampling                    Not  Applicable
: 16. 1 vc 14*    Containment Radiation Sampling                    Not  Applicable
: 17.         #  Fuel Transfer Tube                                Not  Applicable
: 18. 1 cs 900    Containment Instrumentation Fi 11 Conn.          Not  Applicable
: 19. 1 cs 901    Containment Instrumentation Fil 1 Conn.          Not  Applicable cs 20.
21.
22.
1 1
1 cs SA 902 903 262 Containment Instrumentation Fill Conn.
Containment Instrumentation Fil 1 Conn.
Containment Pressure Test Conn.
Not Not Not Applicable Applicable Applicable e
: 23. 1 SA 2n4    Co nt a i nme nt Pres s ure Te st Co nn * ,      Not  Applicable
: 24. 1 SA 265    Containment Pressure Test Conn.                   Not  Applicable
: 25. 1 SA 267    Containment Pressure Test Conn.                   Not  Applicable
: 26. 1 SA 268    Containment Pressure Test Conn.                   Not  Appl i cah 1e
: 27. 1 SA 270    Containment Pressure Test Conn.                   Not  Applicable
: 28. 1 CA 1714  Containment Air Lock Instrument Conn.             Not  Applicable
: 29. 1 CA 1715  Containment Air* Lock Instrument Conn.           Not  Applicable
 
TABLE 3.6-1 (Contd.)
[fl
  ~                                        CONTAINMENT ISOLATION VALVES t"i l:rj
  ~
VALVE NUMBER                     FUNCTION           ISOLATION TIME (Seconds) d z        G. MANUAL H
1-3 f-'         30. 11 SS 181*    Post LOCA Sampling                          Not Applicable
: 31. 11 SS 182*    Post LOCA Sampling                          Not Applicable
: 32. 11 SS 188*    Post LOCA Sampling                          Not Applicable
: 33. 11 SS 189*    Fbst LOCA Sampling                          Not Applicable
: 34. 13 SS 181*    Post LOCA Sampling                          Not Applicable
: 35. 13 SS 182*    Post LOCA Sampling                          Not Appl i cable
: 36. 13 SS 184*   Post LOCA Sampling                          Not Applicable
: 37. 13 SS 185*    Post LOCA Sampling                          Not Appl i cab l e
: 38. 11 vc 17*    Post LOCA Sampling                          Not Applicable
: 39. 11 vc 18*    Post LOCA Sampling                          No t Appl i cab l e
: 40. 11 vc 19*     Post LOCA Sampling                         Not Applicable w          41. 11 SF 20*     Post LOCA Sampling                         Not Applicable
  ""'         42. 12 vc 17*     Post LOCA Safllpling                        Not Applicable CJ'\        43. 12 vc 18*     Post LOCA Sampling                         Not Appl i cahl e I
f-'        44. 12 vc 19*    *Post LOCA Sampling                          Not Applicable
  .....J      45. 12 vc 20*    Post LOCA Sampling                          Not Appl i cab l e
: 46. 11 cs 2t      Containment Spray                          Not Applicable
: 47. 12 cs 2t      Containme~t Spray                          Not Applicable H. CHECK 1.
2.
3 *.
1 1
1 CV 74 CV 296 cc 119 CVCS-Charging Line CVCS-RCP Seals Component Cooling to RCP Not Not Not Applicable Applicable Applicable I
: 4. 1 cc 186    Component Cooling to RCP                    Not Applicable
: 5. 1 cc 208    Component Cooling to RCP                    Not Applicable
: 6. 11 cs 48      Containment Spray                          Not  Applicable
: 7. 12 cs 48      Containment Spray                          No t App l i ca bl e
: 8. 1 DR 30      Demineralized Water System                  Not Applicable
: 9. 1 FP 148    Fire Protection System                      Not Applicable
: 10. 1 NT 26      Pressurizer Relief Tk.--Nitrogen Conn.     Not Applicable
: 11. 1 NT 34      Accumulator Nitrogen Supply                Not  Applicable
: 12. 1 SA 119    Compressed Air Supply                      Not  Applicable
 
TABLE 3.6-1 (Contd.)
CONTAINMENT ISOLATION VALVES VALVE NUMBER                                 FUNCTION                         ISOLATION TIME (Seconds)
H. CHECK (Contd.)
: 13. 1 WR  81                    Pressurizer Relief Tk.-Primary Water Conn.             Not Applicable
: 14. 11 CA 360                    Instrument Air Supply                                  Not Applicable
: 15. 12 CA 360                    Instrument Air                                          Not Applicable
*May be opened on an intermittent basis under administrative control.
#Not subject to Type C leakage tests.                       *
##Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.
##Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.
tNormally closed rTDtor operated containment isolatio*n valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE.  
tNormally closed rmtor operated containment isolation valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE.                                                                 l
... .. '}}
 
REVISED PAGES - UNIT NO. 2 CONTAINMENT*SYSTEMS CONTAINMENT ISOLATION VALV-ES .
LIMITING CONDITION FOR OPERATION 3 .6 .3      The containment isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed.
APPLICABILITY:        MODES 1, 2, 3 and 4 ACTION:
With one or more of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either:
: a. Maintain at least one isolation valve OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours, or
: b. Isolate each affected penetration within 4 hours by use of at least one deactivated automatic valve secured in the isolation position, or
: c.      Isolate each affected penetration within 4 hours by use of at least one closed manual valve, or a blank flange, or
: d. Be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDO~ within the following 30 hours.
SURVEILLANCE REQJIREMENTS
    .4.6.3.1 The isolation val'ves specified in "'Fable 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associ a't;ed actuator, control or power circuit by performance of a cycling test and verificatio*n of isolation time.
SALEM - UN IT 2                      3/4 6-14
 
                                                                                                        .i TABLE 3~6-1 CJ)                                          CONTAINMENT ISOLATION VALVES
~
1:-1 tx:l
:s:                                                    FUNCTION                ISOLATION TIME (Seconds)
VALVE NUMBER c::      A. PHASE 11 A11 ISOLATION z
H f-:3                                                                                    < 10 Sec.
: 1. 2 PR  17*      Pressurizer Relief Tk.-Gas Analyzer Conn.
N
: 2. 2 PR  18*      Pressurizer Relief Tk.-Gas Analyzer Conn.          < 10 Sec.
: 3. 2 NT  25*      Pressurizer Relief Tk.-N2 Connection                < 10 Sec.
: 4. 2 WR  80*      Pressurizer Relief Tk. -Primary Water Conn.        < 10 Sec.
: 5. 2 CV  3        CVCS - Let<lown Line                                < 10 Sec.
: 6. 2 CV  4        CVCS - Let<lown Line                                < 10 Sec.
: 7. 2 CV  5        CVCS - Letdown Line                                < 10 Sec.
: 8. 2 CV  7        CVCS - Letdown Line                                < 10 Sec.
: 9. 2 CV  68##      CVCS - Charging Line                                < 10 Sec.
: 10. 2 CV  69##      CVCS - Charging Line                                < 10 Sec.
: 11. 2 CV  284      CVCS - RCP Seals                                    < 10 Sec.
: 12. 2 CV    116      eves - RC P Seals                                  < 10 Sec.
w          13. 2 cc  215      Comp. Cooling to Excess Letdown Hx                  < 10 Sec.
: 14. 2 cc  113      Comp. Coo 1 i ng to Excess Letdown Hx              < 10 sec.
"'"        15. 2 WL  96*      RC Drain Tk. - Gas Analyzer Conn.                    <10 Sec.
  &deg;'I        16. 2* WL  97*      RC Drain Tk. - Gas Analyzer Conn.                    < 10 Sec.
I-'
: 17. 2 WL  98*      RC Drain Tk. - Vent HeaCler Conn.                    <.io Sec.
  &deg;'        18. 2 WL  99*      RC Drain Tk. - Vent Header Conn.                    < 10 Sec.
: 19. 2 WL  108*      RC Drain Tk. - N2 Connection                        < 10 Sec.
: 20. 2 WL    12*      RC Drain Tank Pumps                                  < 10 Sec.
: 21. 2 WL  13*      RC Drain Tank Pumps                                  < 10 Sec.
: 22. 2 NT    32*      Accumulator N2 Connection*                          < 10 Sec.
: 23. 2 SJ    123*    SI Test Line                                        <10  Sec.
: 24. 2 SJ  60*      SI Test Line                                        < 10 Sec.
: 25. 2 SJ  53*      SI Test Line                                        <10  Sec.
: 26. 2 SS  103*    Accumulator Sampling                                < 10 Sec.
: 27. 2 SS  27*      Accumulator Sampling                                < 10 Sec.
: 28. 2 SS  104*      RC Sampling                                        < 10 Sec.
: 29. 2 SS  33*      RC .Sampling                                        <10  Sec.
 
                                                                                                ., ]
TABLE 3.6-1 (Contd.)
CONTAINMENT ISOLATION VALVES VALVE NUMBER                                FUNCTION            ISOLATION TIME (Seconds)
A. PHASE "A" ISOLATION (Contd.)
: 30. 2 SS 107*                Pressurizer Liquid Sampling                    < 10 See.
: 31. 2 SS 49*                Pressurizer Liquid Sampling                    < 10  Sec.
: 32. 2 SS 110*                Pressurizer Steam Sampli&deg;ng                    < 10  Sec.
: 33. 2 SS 64*                Pressurizer Steam Sampling                    < 10  Sec.
: 34. 2 vc 7                  Containment Radiation Sampling                < 10  Sec.
: 35. 2 vc 8                  Containment Radiation Sampling                < 10  Sec.
: 36. 2 vc 11                  Containment Radiation Sampling                < 10  Sec.
: 37. 2 vc 12                  Containment Radiation Sampling                < 10  Sec.
: 38. 21 CA 330                Instrument Air Supply                          < 10  Sec.
: 39. 22 CA 330                Instrument Air Supply                          < 10  Sec.
: 40. 2 DR 29                  Demineralized Water Supply                    < 10  Sec.
: 41. 2 WL 16                  Containment Sump Discharge                    < 10  Sec.
: 42. 2 WL 17                  Containment Sump Discharge                    <10  Sec.
: 43. 2 FP 147*                Fire Protection System                        < 10  Sec.
B. PHASE "B II ISOLATION
: 1. 2  cc  118tt            Component  Cooiing  to RCP                      < 10 Sec.
: 2. 2 cc  117tt            Component  Cooling  to RCP                    < 10 Sec.
: 3. 2  cc  187              Compbnent  Cooling  to RCP                    < 10 Sec.
: 4. 2 cc  136              Component  Cooling  to RCP                    < 10.Sec.
cc                                                                  < 10 Sec.
5.
6.
2 2 cc 190 131 Component Component Cooling Cooling to. RCP to RCP                    < 10 Sec.        e
: c. MAIN STEAM ISOLATION
: 1. 21 MS 7#                Main  Steam Drain                              < 10 Sec.
: 2. 22 MS  7#              Main  Steam Drain                              < 10  Sec.
: 3. 23  MS  7#              Main  Steam Drain                              <10  Sec.
: 4. 23 MS  7#              Main  Steam Drain                              < 10  Sec.
: 5. 23 MS  7#              Main  Steam Bypass                            < 10  Sec.
: 6. 22 MS  18#              Main  Stea~ Bypass                            < 10  Sec.
: 7. 23 MS  18#              Main  Steam Bypass                            < 10  Sec.
: 8. 24 MS  18#              Main  Steam Bypass                            < 10  Sec.
 
TARLE 3.6-1 {Contd.)                          ..
CONTAINMENT ISOLATION VALVES VALVE NUMBER                                  FUNCTION          ISOLATION TIME (Seconds)
~
H t-3    D. FEEDWATER ISOLATION N
: 1. 21 BF 19#                  Main  Feedwater  I so 1at ion                  -< 55 Sec.
Sec.
: 2. 22 BF 19#                  Main  Feedwater  Isolation                      <
: 3. 23 BF 19#
: 4. 24 BF 19#
: 5. 21 BF 40#
Main Main Main Feedw.ater Feenwater Feedwater I sol at ion Isolation I sol at ion
                                                                                          <  5 Sec.
                                                                                          < 5 Sec.
                                                                                          < 5 Sec. :
e 6 *. 22 BF 40#                Main  Feedwater  I sol at ion                  < 5 Sec.
: 7. 23 BF 40#                  Main  Feedwater  Isolation                    -
                                                                                          <* 5 Sec.
: 8. 24 BF 40#                  Main  Feedwater  Isolation                      < 5 Sec.
E. STEAM GENERATOR BLOWDOWN ISOLATION
: 1. 21 GB 4#                    Steam Generator Blowdown                        < lf) Sec.
O'I        2. 22 GB 4#                    Steam Generator Blowdown                        < 10  Sec.
I I-'        3.23GB4#                      Steam Generator Blowdown                        < 10  Sec.
-...)
: 4. 24 GB 4#                    Steam Generator Blowdown                        < 10  Sec.
: 5. 21 SS 94#                  SG Blowdown Sampling                            < 10  Sec.
: 6. 22 SS 94#                  SG Blowdown Sampling                            < Hl  Sec.
: 7. 23 SS 94#                  SG Blowdown Sampling                            < 10  Sec.
: 8. 24 SS 94#                  SG Blowdown Sampling                            < 10  Sec.
F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF
: 1. 2 vc 1                  Purge Supply                                      <  2 Sec.
: 2. 2 vc 2                      Purge Supply                                    <  2 Sec.
: 3. 2 vc 3                      Purge Exhaust*                                    <  2 Sec.
: 4. 2 vc 4                      Purge Exhaust                                    -<  2 Sec.
: 5. 2 vc 5*                      Pressure-Vacuum Relief                          <  2 Sec.
: 6. 2 vc 6*                    Pressure-Vacuum Relief                            <  2 Sec.
 
TABL[ 3.6-1 (Contd.)
(/)
~
                                          .CONTAINMENT ISOLATION VALVES t;i tr::!
:s:                                                                      ISOLATION TIME (Seconds)
VALVE NUMBER                  FUNCTION d
.z          G. MANUAL H
8                                                                            Not Applicable
: 1. 2 SS  900#  Pressurizer Dead-Weight Calibrator Not Applicahle
  '"'            2. 2 SS  901#  Pressurizer Dearl-Weight Calibrator Not Applicable
: 3. 21 CV  98#  eves - RCP Seals                            Not Applicable
: 4. 22 CV  98#  CVCS - RCP Seals                            Not Applicable
: 5. 23 CV  98#  eves - RCP Seals                              Not Applicable
: 6. 24 CV  98#  eves - RCP Seals                              Not Applicable
: 7. 2 SJ  71#  CVCS Flushing Connection Cornpresserl Air Supply                      Not Applicable
: 8. 2 SA 118                                                Not Applicable*
: 9. 2 WL 190  Refueling Canal Supply Refueling Canal Supply                        Not Applicahle
: 10. 2 SF 36                                                  Not Applicable
: 11. 2 WL 191  Refueling Canal Discharge w                            Refueling Canal* Discharge                    Not Applicable
  .......... 12. 2 SF 22                                                  Not Applicable
    ""'          13. 2 vc  9*  Containment Radiation Sampling Containment ~adiation Sampling              Not Applicable
    "'t--'I      14. 2 vc 10*                                                NO't Applicable
: 15. 2 vc  13*  Containment Rarliation Sampling Containment Radiation Sampling              Not Applicable 2 vc OJ
: 16.        14*                                                Not Applicable
: 17.            #  Fuel Transfer Tube Containment Instrumentation Fill Conn.      Not Applicahle
: 18. 2 cs  900 Containment Instrumentation Fill Conn.      Not Applicable
: 19. 2 cs 901                                                  Not Applicable
: 20. 2 cs 902      Containment Instrumentation Fill Conn.
Containment Instrumentation Fill Conn.      Not Appl i cable
: 21. 2 cs 903                                                  Not Applical>le
: 22. 2 SA 262      Containment Pressure Test Conn.
Containment Pressure Test Conn.              Not Appl i cahl e
: 23. 2 SA 264                                                    Not Applicable
: 24. 2 SA 265      Containment Pressure Test Conn *.
Containment Pressure Test Conn.              Not Applicable
: 25. 2 SA 267                                                    Not Applicable
: 26. 2 SA 208    Containment Pressure Test Conn.
Containment Pressure Test Conn.              Not Applicable
: 27. 2 SA 270                                                  Not Applicable
: 28. 2 CA 1714    Containment Air Lock Instrument Conn.
Containrnent Air Lock Instrument Conn.        Not Applicable
: 29. 2 CA 1715
 
                                                                                                    '11 TABLE 3.6-1 {Contd.)
(/)
:i:.-                                    CONTAINMENT ISOLATION VALVES ti 1:7:1
:s:
VALVE NUMBER                      FUNCTION          ISOLATION TIME (Seco.nds) c:::
z        G. MANUAL H
t-3 N            30. 21 SS 181*    Post LOCA Sampling                          Not  ~pplicable
: 31. 21 SS 182*    Post LOCA Sampling                          Not  Applicable
: 32. 21 SS 188*    Post LOCA Sampling                          Not  Applicable 33.
34.
21 23 SS SS 189*
181*
Post LOCA Sampling Post LOCA Sampling Not Not Applicable Applicable e
: 35. 23 SS 182*    Post LOCA Sampling                          Not  Applicable
: 36. 23 SS 184*    Post LOCA Sampling                          Not  Applicable
: 37. 23 SS 185*    Post LOCA Sampling                          Not  Applicable
: 38. 21 vc 17*      Post LOCA Sampling                          Not  Applicable
: 39. 21 vc 18*      Post LOCA Sampling                          Not  Applicable
: 40. 21 vc 19*      Post LOCA Sampling                          Not  Applicable
: 41. 21 SF 20*      Post LOCA Sampling                          Not  Applicable
: 42. 22 vc 1&deg;7*    Post LOCA Sampling                          Not  Applicable*
w          43. 22 vc 18*    *Post LOCA Sampling                          Not  Applicable
: 44. 22 vc 19*      Post LOCA Sampling                          Not  Applicable
: 0)          45. 22 vc 20*      Post LOCA Sampling                          Not  Applicable I
I-'
: 46. 21 cs 2t      Containment Spray                            Not  Applicable w          47. 22 cs 2t      Containment Spray                            Not  Applicable H. CHECK
: 1. 2 CV 74      CVCS-Charging Line                          Not  Applicable
: 2. 2 CV 296      CVCS-RCP Seals                              Not  Applicable
: 3. 2 cc 119      Component Cooling to RCP                    Not  Applicable
: 4. 2 cc 186      Component Cooling to RCP                    Not  Applicable
: 5. 2 cc 208      *component Coo 1 i ng to RCP                Not  Applicahle
: 6. 21 cs 48      Containment Spray                            Not  Applicable      '.
: 7. 22 cs 48      Contain111ent Spray                          Not Applicable
: 8. 2 DR 30        Demineralized Water System                  Not Applicahl~
: 9. 2 FP 148      Fire P'rotection System                      Not Applicable
: 10. 2 NT 26        Pressurizer Relief Tk. -Nitrogen Conn.      Not Applicable
: 11. 2 NT 34        Accumulator Nitrogen Supply                  Not Applicable
: 12. 2 SA 119      Compressed Air Supply                        Not Applicable
 
TABLE 3.6-1 (Contd.)
CONTAINMENT ISOLATION VALVES VALVE NUMBER                                  FUNCTION                        ISOLATION TIME (Seconds) c:
~      H. CHECK (Contd.}
8
: 13. 2 WR 81                    Pressurizer Relief Tk.-Primary Water Conn.              Not Applicable N
: 14. 21 CA 360                    Instrument Air Supply                                  Not Applicable
: 15. 22 CA 360                    Instrurrent Air                                        Not Applicable
&deg;'NI 0
      *May be opened on an intermfttent basis under administrative control.
      #Not subject to Type C leakage tests.
    ##Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.
tNormally closed rTDtor operated containment isolatio*n valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE.}}

Latest revision as of 08:09, 3 February 2020

Proposed Tech Specs Re Containment Isolation Valves
ML18092A920
Person / Time
Site: Salem  PSEG icon.png
Issue date: 11/27/1985
From:
Public Service Enterprise Group
To:
Shared Package
ML18092A919 List:
References
NUDOCS 8512110248
Download: ML18092A920 (15)


Text

CONTAINMENT SYSTEMS CONTAINMENT ISOLATION VALVES LIMITING CONDITION FOR OPERATION 3.6.3.1 The containl'lent isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed.

APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:

Hith one or rrore of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either:

a. Maintain at least one isolation valve.OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or
b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic_ valve secured in the isolation position, or
c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve, or a blank flange, or
d. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTffi5WN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQJIREMENTS 4.6.3~1.1 The isolation.valves specified in Table 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associated actuator, control or power circuit by perforl'lance of a cycling test and verification of isolation time.

  • SALEM - UN IT 1 3/4 6-12

~~~~~~-=::;:--~~~.,

8512110248 851127 II PDR ADOCK 05000272 p PDR

TABLE 3.6-1 Ul

~ CONTAINMENT 1SOLATION VALVES t'i l::t:l

~

I c VALVE* NUMBER FUNCTION ISOLATION TIME (Seconds) z H

8 A. PHASE 11 AII ISOLATION I-'

1. 1 PR 17* Pressurizer Relief Tk.-Gas Analyzer Conn. ,<lOSec.
2. 1 PR 18* Pressurizer Relief Tk.-Gas Analyzer Conn. <10 Sec.
3. 1 NT 25* Pressurizer Relief Tk.-N2 Connection* < 10 Sec~
4. 1 WR 80* Pressurizer Relief Tk.-Primary Water Conn. < 10 Sec.
5. 1 CV 3 CVCS - Letdown Line <1,1 Sec.
6. 1 CV 4 CVCS - Letdown Line < 10 Sec.
7. 1 CV 5 CVCS - Letdown Line < 10 Sec.
8. 1 CV 7 CVCS - Letdown Line < 10 Sec.
9. 1 CV 68## CVCS - Charging line < 10 Sec.
10. 1 CV 69## CVCS - Charging Line < 10 Sec.
11. 1 CV 284 eves - RCP Seals < 10 Sec.

w

12. 1 CV 116 CVCS - RCP Seals < 10 Sec.

'h.,. 13. 1 cc 215 Comp. Cooling to Excess Letdown Hx < 10 Sec.

O'I 14. 1 cc 113 Comp. Cooling to Excess Letdown Hx < 10 Sec.

I-'

I 15. 1 WL 96* RC Drain Tk. Gas. Analyzer Conn. . <10 Sec.

""' 16. 1 WL 97* RC Drain Tk. - Gas Analyzer Conn. < 10 Sec.

17. 1 WL 98* RC Drain Tk. - Vent Header Conn. < 10 Sec.
18. 1 WL 99* RC Drain Tk. - Vent Header Conn. < 10 Sec.
19. 1 WL 108* RC Drain. Tk. - N2 Connection (IO Se,c.
20. 1 WL 12* RC Drain Tank Pumps < *10 Sec.
21. 1 WL 13* RC Drain Tank Pumps < 10 Sec.
22. 1 NT 32* Accumulator N2 Connection < 10 Sec.
23. 1 SJ 123* SI Test Line < 10 Sec.
24. 1 SJ 60* SI Test Line < 10 Sec.
25. 1 SJ 53* SI Test Line < 10 Sec.
26. 1 SS 103* Accumulator Sampling < 10 Sec.
27. 1 SS 27* Accumulator Sampling < 10 Sec.
28. 1 SS 104* RC Sampling < 10 Sec.
29. 1 SS 33* RC Sampling < 10 Sec.

TABLt 3.6-1 (Contd.)

CONTAINMENT ISOLATION VALVES Ul

~ ISOLATION TIME (Seconds) tc:l VALVE NUMBER FUNCTION s:I c A. PHASE 11 AII ISOLATION (Cont<l.)

z H

1-3

30. 1 SS 107* Pressurizer Liquid Sampling < 10 Sec.
31. 1 SS 49* Pressurizer Liqui~ Sampling < 10 Sec.
32. 1 SS 110* Pressurizer Steam Sampling < 10 Sec.
33. 1 SS 64* Pressurizer Steam Sampling < 10 Sec.
34. 1 vc 7 Containment Radiation Sampling .< 10 Sec. A
35. 1 vc 8 Containment Radiation Sampling < 10 Sec. ,.,.
36. 1 vc 11 Containment Radiation Sampling <10 Sec.
37. 1 vc 12 Containment Radiation Sampling < 10 Sec.
38. 11 CA 330 Instrument. Air Supply < 10 Sec.
39. 12 CA 330 Instrument Air Supply < 10 sec.
40. 1 DR 29 Demineralized Water Sup~ly <10 Sec.
41. 1 ~JL 16 Containment Sump Discharge < 10 Sec.
42. 1 WL 17 Containment Sump Discharge <10 Sec.
43. 1 FP 147* Fire Protection System < 10 Sec.

B. PHASE 11 B II ISOLATION

1. 1 cc 118tt Component Cooling to RCP < 10 Sec.
2. 1 cc 117tt Component Cool i n*g to RCP (10 Sec.
3. 1 cc 187 Component Cooling to RCP < 10 Sec.
4. 1 cc 136 Component Cooling to RCP (10 Sec.

< 10 5.

6.

1 1

cc cc 190 131 Component Component Cooling Cooling to.

to RCP RCP Sec.*

<10 Sec. e

c. MAIN STEAM ISOLATION
1. 11 MS 7# Main Steam Drain * < 10 Sec.
2. 12 MS 7# Main Steam Drain < 10 Sec.
3. 13 MS 7# Main Steam Drain < 10 Sec.
4. 13 MS 7# Main Steam Drain < 10 Sec.
5. 13 MS 7# Main Steam Bypass < 10 Sec.
6. 12 MS 18# Main Steam Bypass < 10 Sec.
7. 13 MS 18# Main Steam Bypass < 10 Sec.
8. 14 MS 18# Main Steam Bypass* < 10 Sec.

TABLE 3.6-1 '(Contd.)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTI'ON ISOLATION TIME (Seconcts) c D. FEEDWATER ISOLATION z

H

-< 8 Sec.

1-3

1. 11 BF 19# Main Feed\-Jater I s0 lat ion
2. 12 BF 19# Main Feedwater I so 1at ion -

< 8 Sec.

3. 13 BF 19# Main Feedwater I so 1at ion < 8 Sec.
4. 14 BF 19# Main Feedwater Isolation -< 88 Sec.

Sec.

5. 11 BF 40# Main Feeclwater *1 sol at ion -<
6. 12 BF 40# Main Feedwater Isolation < 8 Sec.
7. 13 BF 40# Main Feedwater I sol at ion -< 8 Sec.
8. 14 BF 40# Main Feedwater Isolation < 8 Sec-.

E. STEAM GENERATOR BLOWDOWN ISOLATION

1. 11 GB 4# *steam Generator Blowaown < 10 Sec.

w

'-.. 2. 12 GB 4# Steam Generator *Blowdown < 10 Sec.

"'" 3. 13 GB 4# Stearn Generator Blowclown < 10 Sec.

O'I

4. 14 GB 4# Stearn Generator Blowdown < 10 Sec.

I I-' 5. 11 SS 94# SG Blowdown Sampling < 10 Sec.

Ul

6. 12 SS 94# SG Blowdown Sampling < 10 Sec.
7. 13 SS 94# SG Blowdown Sampling < 10 Sec.
8. 14 SS 94# SG Blowdown Samplyng < 10 Sec.

F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF

1. 1 vc 1 Purge Supply -<

2 Sec.

2. 1 vc 2 Purge Supply < 2 Sec.
3. 1 vc 3 Purge Exhaust < 2 Sec.

4.* 1 vc 4 Purge Exhaust < 2 Sec.

5. 1 vc 5* Pressure-Vacuum Relief < 2 Sec.
6. 1 vc 6* Pressure-Vacuum Relief < 2 Sec.

(/) TABLE 3.6-1 (Contd.)

t::'

t'i t:Ij CONTAINMENT ISOLATION VALVES

3::

c:: VALVE NUMBER FUNCTION I SOLATI ON TI ME (Seconds) z H

8 G. MANUAL I-'

1. 1 SS 900# Pressurizer Dead-Weight Calibrator Not Applicable
2. 1 SS 901# Pressurizer Dead-Weight Calibrator Not Applicable
3. 11 CV 98# eves - RCP seals Not Applicable
4. 12 CV 98# CVCS - RCP Seals Not Applicable
5. 13 CV 98# eves - RCP Seals Not Applicable
6. 14 CV 98# eves - RCP Seals Not Applicable
7. 1 SJ 71# CVCS Flushing Connection Not Applicable
8. 1 SA 118 Compressed Air Supply
  • Not Applicable
9. 1 WL 190 Refueling Canal Supply Not Applicable
10. 1 SF 36 Refueling Canal Supply Not Applicable w 11. 1 WL 191 Refueling Canal Discharge Not Applicable ii':>
12. 1 SF 22 Refueling Canal Discharge Not Applicable
13. 1 vc 9* Containment Radiation Sampling Not Applicable O"I I 14. 1 vc 10* Containment Radiation Sampling Not Applicable I-'

O"I

15. 1 vc 13* Containment Radiation Sampling Not Applicable
16. 1 vc 14* Containment Radiation Sampling Not Applicable
17. # Fuel Transfer Tube Not Applicable
18. 1 cs 900 Containment Instrumentation Fi 11 Conn. Not Applicable
19. 1 cs 901 Containment Instrumentation Fil 1 Conn. Not Applicable cs 20.

21.

22.

1 1

1 cs SA 902 903 262 Containment Instrumentation Fill Conn.

Containment Instrumentation Fil 1 Conn.

Containment Pressure Test Conn.

Not Not Not Applicable Applicable Applicable e

23. 1 SA 2n4 Co nt a i nme nt Pres s ure Te st Co nn * , Not Applicable
24. 1 SA 265 Containment Pressure Test Conn. Not Applicable
25. 1 SA 267 Containment Pressure Test Conn. Not Applicable
26. 1 SA 268 Containment Pressure Test Conn. Not Appl i cah 1e
27. 1 SA 270 Containment Pressure Test Conn. Not Applicable
28. 1 CA 1714 Containment Air Lock Instrument Conn. Not Applicable
29. 1 CA 1715 Containment Air* Lock Instrument Conn. Not Applicable

TABLE 3.6-1 (Contd.)

[fl

~ CONTAINMENT ISOLATION VALVES t"i l:rj

~

VALVE NUMBER FUNCTION ISOLATION TIME (Seconds) d z G. MANUAL H

1-3 f-' 30. 11 SS 181* Post LOCA Sampling Not Applicable

31. 11 SS 182* Post LOCA Sampling Not Applicable
32. 11 SS 188* Post LOCA Sampling Not Applicable
33. 11 SS 189* Fbst LOCA Sampling Not Applicable
34. 13 SS 181* Post LOCA Sampling Not Applicable
35. 13 SS 182* Post LOCA Sampling Not Appl i cable
36. 13 SS 184* Post LOCA Sampling Not Applicable
37. 13 SS 185* Post LOCA Sampling Not Appl i cab l e
38. 11 vc 17* Post LOCA Sampling Not Applicable
39. 11 vc 18* Post LOCA Sampling No t Appl i cab l e
40. 11 vc 19* Post LOCA Sampling Not Applicable w 41. 11 SF 20* Post LOCA Sampling Not Applicable

""' 42. 12 vc 17* Post LOCA Safllpling Not Applicable CJ'\ 43. 12 vc 18* Post LOCA Sampling Not Appl i cahl e I

f-' 44. 12 vc 19* *Post LOCA Sampling Not Applicable

.....J 45. 12 vc 20* Post LOCA Sampling Not Appl i cab l e

46. 11 cs 2t Containment Spray Not Applicable
47. 12 cs 2t Containme~t Spray Not Applicable H. CHECK 1.

2.

3 *.

1 1

1 CV 74 CV 296 cc 119 CVCS-Charging Line CVCS-RCP Seals Component Cooling to RCP Not Not Not Applicable Applicable Applicable I

4. 1 cc 186 Component Cooling to RCP Not Applicable
5. 1 cc 208 Component Cooling to RCP Not Applicable
6. 11 cs 48 Containment Spray Not Applicable
7. 12 cs 48 Containment Spray No t App l i ca bl e
8. 1 DR 30 Demineralized Water System Not Applicable
9. 1 FP 148 Fire Protection System Not Applicable
10. 1 NT 26 Pressurizer Relief Tk.--Nitrogen Conn. Not Applicable
11. 1 NT 34 Accumulator Nitrogen Supply Not Applicable
12. 1 SA 119 Compressed Air Supply Not Applicable

TABLE 3.6-1 (Contd.)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)

H. CHECK (Contd.)

13. 1 WR 81 Pressurizer Relief Tk.-Primary Water Conn. Not Applicable
14. 11 CA 360 Instrument Air Supply Not Applicable
15. 12 CA 360 Instrument Air Not Applicable
  • May be opened on an intermittent basis under administrative control.
  1. Not subject to Type C leakage tests. *
    1. Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.

tNormally closed rmtor operated containment isolation valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE. l

REVISED PAGES - UNIT NO. 2 CONTAINMENT*SYSTEMS CONTAINMENT ISOLATION VALV-ES .

LIMITING CONDITION FOR OPERATION 3 .6 .3 The containment isolation valves specified in Table 3.6-1 shall be either OPERABLE with isolation times as shown in Table 3.6-1 or administratively maintained closed.

APPLICABILITY: MODES 1, 2, 3 and 4 ACTION:

With one or more of the isolation valve(s) specified in Table 3.6-1 inoperable in the open position, either:

a. Maintain at least one isolation valve OPERABLE in each affected penetration that is open and restore the inoperable valve(s) to OPERABLE status within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />, or
b. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one deactivated automatic valve secured in the isolation position, or
c. Isolate each affected penetration within 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> by use of at least one closed manual valve, or a blank flange, or
d. Be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDO~ within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQJIREMENTS

.4.6.3.1 The isolation val'ves specified in "'Fable 3.6-1 shall be demonstrated OPERABLE prior to returning the valve to service after maintenance, repair, or replacement work is performed on the valve or its associ a't;ed actuator, control or power circuit by performance of a cycling test and verificatio*n of isolation time.

SALEM - UN IT 2 3/4 6-14

.i TABLE 3~6-1 CJ) CONTAINMENT ISOLATION VALVES

~

1:-1 tx:l

s: FUNCTION ISOLATION TIME (Seconds)

VALVE NUMBER c:: A. PHASE 11 A11 ISOLATION z

H f-:3 < 10 Sec.

1. 2 PR 17* Pressurizer Relief Tk.-Gas Analyzer Conn.

N

2. 2 PR 18* Pressurizer Relief Tk.-Gas Analyzer Conn. < 10 Sec.
3. 2 NT 25* Pressurizer Relief Tk.-N2 Connection < 10 Sec.
4. 2 WR 80* Pressurizer Relief Tk. -Primary Water Conn. < 10 Sec.
5. 2 CV 3 CVCS - Let<lown Line < 10 Sec.
6. 2 CV 4 CVCS - Let<lown Line < 10 Sec.
7. 2 CV 5 CVCS - Letdown Line < 10 Sec.
8. 2 CV 7 CVCS - Letdown Line < 10 Sec.
9. 2 CV 68## CVCS - Charging Line < 10 Sec.
10. 2 CV 69## CVCS - Charging Line < 10 Sec.
11. 2 CV 284 CVCS - RCP Seals < 10 Sec.
12. 2 CV 116 eves - RC P Seals < 10 Sec.

w 13. 2 cc 215 Comp. Cooling to Excess Letdown Hx < 10 Sec.

14. 2 cc 113 Comp. Coo 1 i ng to Excess Letdown Hx < 10 sec.

"'" 15. 2 WL 96* RC Drain Tk. - Gas Analyzer Conn. <10 Sec.

°'I 16. 2* WL 97* RC Drain Tk. - Gas Analyzer Conn. < 10 Sec.

I-'

17. 2 WL 98* RC Drain Tk. - Vent HeaCler Conn. <.io Sec.

°' 18. 2 WL 99* RC Drain Tk. - Vent Header Conn. < 10 Sec.

19. 2 WL 108* RC Drain Tk. - N2 Connection < 10 Sec.
20. 2 WL 12* RC Drain Tank Pumps < 10 Sec.
21. 2 WL 13* RC Drain Tank Pumps < 10 Sec.
22. 2 NT 32* Accumulator N2 Connection* < 10 Sec.
23. 2 SJ 123* SI Test Line <10 Sec.
24. 2 SJ 60* SI Test Line < 10 Sec.
25. 2 SJ 53* SI Test Line <10 Sec.
26. 2 SS 103* Accumulator Sampling < 10 Sec.
27. 2 SS 27* Accumulator Sampling < 10 Sec.
28. 2 SS 104* RC Sampling < 10 Sec.
29. 2 SS 33* RC .Sampling <10 Sec.

., ]

TABLE 3.6-1 (Contd.)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)

A. PHASE "A" ISOLATION (Contd.)

30. 2 SS 107* Pressurizer Liquid Sampling < 10 See.
31. 2 SS 49* Pressurizer Liquid Sampling < 10 Sec.
32. 2 SS 110* Pressurizer Steam Sampli°ng < 10 Sec.
33. 2 SS 64* Pressurizer Steam Sampling < 10 Sec.
34. 2 vc 7 Containment Radiation Sampling < 10 Sec.
35. 2 vc 8 Containment Radiation Sampling < 10 Sec.
36. 2 vc 11 Containment Radiation Sampling < 10 Sec.
37. 2 vc 12 Containment Radiation Sampling < 10 Sec.
38. 21 CA 330 Instrument Air Supply < 10 Sec.
39. 22 CA 330 Instrument Air Supply < 10 Sec.
40. 2 DR 29 Demineralized Water Supply < 10 Sec.
41. 2 WL 16 Containment Sump Discharge < 10 Sec.
42. 2 WL 17 Containment Sump Discharge <10 Sec.
43. 2 FP 147* Fire Protection System < 10 Sec.

B. PHASE "B II ISOLATION

1. 2 cc 118tt Component Cooiing to RCP < 10 Sec.
2. 2 cc 117tt Component Cooling to RCP < 10 Sec.
3. 2 cc 187 Compbnent Cooling to RCP < 10 Sec.
4. 2 cc 136 Component Cooling to RCP < 10.Sec.

cc < 10 Sec.

5.

6.

2 2 cc 190 131 Component Component Cooling Cooling to. RCP to RCP < 10 Sec. e

c. MAIN STEAM ISOLATION
1. 21 MS 7# Main Steam Drain < 10 Sec.
2. 22 MS 7# Main Steam Drain < 10 Sec.
3. 23 MS 7# Main Steam Drain <10 Sec.
4. 23 MS 7# Main Steam Drain < 10 Sec.
5. 23 MS 7# Main Steam Bypass < 10 Sec.
6. 22 MS 18# Main Stea~ Bypass < 10 Sec.
7. 23 MS 18# Main Steam Bypass < 10 Sec.
8. 24 MS 18# Main Steam Bypass < 10 Sec.

TARLE 3.6-1 {Contd.) ..

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds)

~

H t-3 D. FEEDWATER ISOLATION N

1. 21 BF 19# Main Feedwater I so 1at ion -< 55 Sec.

Sec.

2. 22 BF 19# Main Feedwater Isolation <
3. 23 BF 19#
4. 24 BF 19#
5. 21 BF 40#

Main Main Main Feedw.ater Feenwater Feedwater I sol at ion Isolation I sol at ion

< 5 Sec.

< 5 Sec.

< 5 Sec. :

e 6 *. 22 BF 40# Main Feedwater I sol at ion < 5 Sec.

7. 23 BF 40# Main Feedwater Isolation -

<* 5 Sec.

8. 24 BF 40# Main Feedwater Isolation < 5 Sec.

E. STEAM GENERATOR BLOWDOWN ISOLATION

1. 21 GB 4# Steam Generator Blowdown < lf) Sec.

O'I 2. 22 GB 4# Steam Generator Blowdown < 10 Sec.

I I-' 3.23GB4# Steam Generator Blowdown < 10 Sec.

-...)

4. 24 GB 4# Steam Generator Blowdown < 10 Sec.
5. 21 SS 94# SG Blowdown Sampling < 10 Sec.
6. 22 SS 94# SG Blowdown Sampling < Hl Sec.
7. 23 SS 94# SG Blowdown Sampling < 10 Sec.
8. 24 SS 94# SG Blowdown Sampling < 10 Sec.

F. CONTAINMENT PURGE AND PRESSURE-VACUUM RELIEF

1. 2 vc 1 Purge Supply < 2 Sec.
2. 2 vc 2 Purge Supply < 2 Sec.
3. 2 vc 3 Purge Exhaust* < 2 Sec.
4. 2 vc 4 Purge Exhaust -< 2 Sec.
5. 2 vc 5* Pressure-Vacuum Relief < 2 Sec.
6. 2 vc 6* Pressure-Vacuum Relief < 2 Sec.

TABL[ 3.6-1 (Contd.)

(/)

~

.CONTAINMENT ISOLATION VALVES t;i tr::!

s: ISOLATION TIME (Seconds)

VALVE NUMBER FUNCTION d

.z G. MANUAL H

8 Not Applicable

1. 2 SS 900# Pressurizer Dead-Weight Calibrator Not Applicahle

'"' 2. 2 SS 901# Pressurizer Dearl-Weight Calibrator Not Applicable

3. 21 CV 98# eves - RCP Seals Not Applicable
4. 22 CV 98# CVCS - RCP Seals Not Applicable
5. 23 CV 98# eves - RCP Seals Not Applicable
6. 24 CV 98# eves - RCP Seals Not Applicable
7. 2 SJ 71# CVCS Flushing Connection Cornpresserl Air Supply Not Applicable
8. 2 SA 118 Not Applicable*
9. 2 WL 190 Refueling Canal Supply Refueling Canal Supply Not Applicahle
10. 2 SF 36 Not Applicable
11. 2 WL 191 Refueling Canal Discharge w Refueling Canal* Discharge Not Applicable

.......... 12. 2 SF 22 Not Applicable

""' 13. 2 vc 9* Containment Radiation Sampling Containment ~adiation Sampling Not Applicable

"'t--'I 14. 2 vc 10* NO't Applicable

15. 2 vc 13* Containment Rarliation Sampling Containment Radiation Sampling Not Applicable 2 vc OJ
16. 14* Not Applicable
17. # Fuel Transfer Tube Containment Instrumentation Fill Conn. Not Applicahle
18. 2 cs 900 Containment Instrumentation Fill Conn. Not Applicable
19. 2 cs 901 Not Applicable
20. 2 cs 902 Containment Instrumentation Fill Conn.

Containment Instrumentation Fill Conn. Not Appl i cable

21. 2 cs 903 Not Applical>le
22. 2 SA 262 Containment Pressure Test Conn.

Containment Pressure Test Conn. Not Appl i cahl e

23. 2 SA 264 Not Applicable
24. 2 SA 265 Containment Pressure Test Conn *.

Containment Pressure Test Conn. Not Applicable

25. 2 SA 267 Not Applicable
26. 2 SA 208 Containment Pressure Test Conn.

Containment Pressure Test Conn. Not Applicable

27. 2 SA 270 Not Applicable
28. 2 CA 1714 Containment Air Lock Instrument Conn.

Containrnent Air Lock Instrument Conn. Not Applicable

29. 2 CA 1715

'11 TABLE 3.6-1 {Contd.)

(/)

i:.- CONTAINMENT ISOLATION VALVES ti 1:7:1
s:

VALVE NUMBER FUNCTION ISOLATION TIME (Seco.nds) c:::

z G. MANUAL H

t-3 N 30. 21 SS 181* Post LOCA Sampling Not ~pplicable

31. 21 SS 182* Post LOCA Sampling Not Applicable
32. 21 SS 188* Post LOCA Sampling Not Applicable 33.

34.

21 23 SS SS 189*

181*

Post LOCA Sampling Post LOCA Sampling Not Not Applicable Applicable e

35. 23 SS 182* Post LOCA Sampling Not Applicable
36. 23 SS 184* Post LOCA Sampling Not Applicable
37. 23 SS 185* Post LOCA Sampling Not Applicable
38. 21 vc 17* Post LOCA Sampling Not Applicable
39. 21 vc 18* Post LOCA Sampling Not Applicable
40. 21 vc 19* Post LOCA Sampling Not Applicable
41. 21 SF 20* Post LOCA Sampling Not Applicable
42. 22 vc 1°7* Post LOCA Sampling Not Applicable*

w 43. 22 vc 18* *Post LOCA Sampling Not Applicable

44. 22 vc 19* Post LOCA Sampling Not Applicable
0) 45. 22 vc 20* Post LOCA Sampling Not Applicable I

I-'

46. 21 cs 2t Containment Spray Not Applicable w 47. 22 cs 2t Containment Spray Not Applicable H. CHECK
1. 2 CV 74 CVCS-Charging Line Not Applicable
2. 2 CV 296 CVCS-RCP Seals Not Applicable
3. 2 cc 119 Component Cooling to RCP Not Applicable
4. 2 cc 186 Component Cooling to RCP Not Applicable
5. 2 cc 208 *component Coo 1 i ng to RCP Not Applicahle
6. 21 cs 48 Containment Spray Not Applicable '.
7. 22 cs 48 Contain111ent Spray Not Applicable
8. 2 DR 30 Demineralized Water System Not Applicahl~
9. 2 FP 148 Fire P'rotection System Not Applicable
10. 2 NT 26 Pressurizer Relief Tk. -Nitrogen Conn. Not Applicable
11. 2 NT 34 Accumulator Nitrogen Supply Not Applicable
12. 2 SA 119 Compressed Air Supply Not Applicable

TABLE 3.6-1 (Contd.)

CONTAINMENT ISOLATION VALVES VALVE NUMBER FUNCTION ISOLATION TIME (Seconds) c:

~ H. CHECK (Contd.}

8

13. 2 WR 81 Pressurizer Relief Tk.-Primary Water Conn. Not Applicable N
14. 21 CA 360 Instrument Air Supply Not Applicable
15. 22 CA 360 Instrurrent Air Not Applicable

°'NI 0

  • May be opened on an intermfttent basis under administrative control.
  1. Not subject to Type C leakage tests.
    1. Either valve 1 CV 68 or 1 CV 69 must be OPERABLE.

tNormally closed rTDtor operated containment isolatio*n valve. Valve opens on Phase B isolation ttEither Valve 1CC117 or 1CC118 must be OPERABLE.