{{#Wiki_filter: | {{#Wiki_filter:REACTIVITY CONTRC~YSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION | ||
=====================================================----================= | =====================================================----================= | ||
3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN. | 3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN. | ||
APPLICABILITY: | APPLICABILITY: MODES 1*, and 2*#~ | ||
MODES 1*, and ACTION: With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either: a. FuL!.'.l, | ACTION: | ||
.'the rod, or, b. Declare the rod to be inoperable and apply Specification 3.1.3.1. SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position | With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either: | ||
: a. | : a. FuL!.'.l, WITIIDRAW~ .'the rod, or, | ||
: b. Declare the rod to be inoperable and apply Specification 3.1.3.1. | |||
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position indicator~~OP | |||
**For power levels one hour thermal *"soak time" i's permitted.** | : a. Within 15 minutes prior to withdrawal of any rods in control' banks A, B, C, or D during an approach to reactor critieally, and co..li*~y b* At least once per 12 hours thereafter. | ||
**For power levels one hour thermal *"soak time" i's permitted.** | |||
During this soak time, the absolute value of rod motion is limited to six .I ste s. ' | |||
With Keff greater than or equal to 1.0 I | |||
MODES 1*, and 2*# ACTION: With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either: a. Restore the control banks to within the limits within two hours, or b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank positionusingthe-above-figures, or c. Be in at least HOT STANDBY within 6 hours. SURVEILLANCE REQUIREMENTS 4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours by use of the group demand | @Surveillance 4.1.3.4.a is applicable prior to withdrawing control banks in preparation for startup (Mode 2). | ||
*See -Special Test Exceptions* | SALEM - UNIT 1 3/4 1-22 Amendment No. 73 8905310127 890522 PDR ADOCK 05000272 p PNU ; | ||
3 .10. 2 and 3 .10. 3 * ., . ., **For power eve s elow | |||
REACTIVITY CONTR~YSTEMS POSITION.INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2. | |||
APPLICABILITY: MODES 1*, and 2*# | |||
ACTION: | |||
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either: | |||
: a. Restore the control banks to within the limits within two hours, or | |||
: b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank positionusingthe-above-figures, or | |||
: c. Be in at least HOT STANDBY within 6 hours. | |||
SURVEILLANCE REQUIREMENTS | |||
=====~==========================***- | |||
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours by use of the group demand counters and verified by the analog rod position indicator~except during I | |||
time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the indiv-idual rod-positions at least once per 4 hour~AOP | |||
*See -Special Test Exceptions* 3 .10. 2 and 3 .10. 3 * ., .., | |||
**For power eve s elow | |||
* one hour thermal "soak time", is_ permitted. | * one hour thermal "soak time", is_ permitted. | ||
During this soak time, the absolute value of rod motion is*-liinited to six steps. #With Keff greater than or equal to 1.0 SALEM -UNIT 1 3/4 1-23 Amendment No. 73 | ,4P~: During this soak time, the absolute value of rod motion is*-liinited to six steps. | ||
#With Keff greater than or equal to 1.0 | |||
* SALEM - UNIT 1 3/4 1-23 Amendment No. 73 L_ | |||
APPLICABILITY: | REACTIVITY CONTR~YSTEMS .e | ||
MODES 1*, and 2*#@ ACTION: With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either: a. Fully withdraw the | ,.POSITION INDICATION SYSTEM SHUTDOWN | ||
: b. Declare the rod to be inoper_able and apply Specification 3 .1. 3 .1. SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use the group counters, and verified by the analog-rod position::--- | * LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn. | ||
-.. | APPLICABILITY: MODES 1*, and 2*#@ | ||
.. a. Within 15 minutes prior to withdrawal of any rods in control banks A,. B, C, or D during an approach to reactor .and co.1'1ty b | ACTION: | ||
* At least once per 12 hours | With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either: | ||
**For power eve s e ow 50% one hour thermal 11 soak time is permitted. | : a. Fully withdraw the rod,~, | ||
During this soak time, the absolute value of rod motion is limited to steps-. @Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2). #With Keff greater than or equal to 1.0 SALEM -UNIT 2 3/4 1-19 Amendment No. 48 | : b. Declare the rod to be inoper_able and apply Specification 3 .1. 3 .1. | ||
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use the group ~d counters, and verified by the analog- rod position::--- - .. | |||
MODES 1*, and 2*# ACTION: With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either: a. Restore the control banks to within the limits within two hours, or b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or c. Be in at least HOT STANDBY within 6 hours. SURVEILLANCE REQUIREMENTS 4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours by use of the group demand counters and verified by the analog rod position during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the individual rod positions at least once per 4 --*See S ecial Test Exceptions 3*.10. 2 and 3 .10. 3 **For power levels below 50% one hour thermal "soak time" is permitted. | indicator~ | ||
During this soak time, the absolute value of rod motion is limited to steps. #With Keff greater than or equal to 1.0 SALEM -*UNIT 2 '3/41-20 Amendment No. 48 REACTIVITY POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION | ,w~*.. | ||
: a. Within 15 minutes prior to withdrawal of any rods in control banks A,. B, C, or D during an approach to reactor criti~, .and co.1'1ty b* At least once per 12 hours therea~ter. | |||
**For power eve s e ow 50% one hour thermal 11 soak time is permitted. | |||
A-00! During this soak time, the absolute value of rod motion is limited to steps-. | |||
@Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2). | |||
#With Keff greater than or equal to 1.0 | |||
* SALEM - UNIT 2 3/4 1-19 Amendment No. 48 | |||
REACTIVITY CONTR-fYSTEMS | |||
'. POSITION INDICATION SYSTEM SIUJTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2. | |||
APPLICABILITY: MODES 1*, and 2*# | |||
ACTION: | |||
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either: | |||
: a. Restore the control banks to within the limits within two hours, or | |||
: b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or | |||
: c. Be in at least HOT STANDBY within 6 hours. | |||
SURVEILLANCE REQUIREMENTS 4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours by use of the group demand counters and verified by the analog rod position indicators~except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify | |||
* the individual rod positions at least once per 4 hours~ | |||
ADP~ - - | |||
*See S ecial Test Exceptions 3*.10. 2 and 3 .10. 3 | |||
**For power levels below 50% one hour thermal "soak time" is permitted. | |||
During this soak time, the absolute value of rod motion is limited to steps. | |||
#With Keff greater than or equal to 1.0 | |||
*** SALEM -*UNIT 2 '3/41-20 Amendment No. 48 | |||
REACTIVITY CONTROI~'STEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION | |||
======================================================================== | ======================================================================== | ||
3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN. | 3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN. | ||
APPLICABILITY: | APPLICABILITY: MODES 1*, and 2*#@ | ||
MODES 1*, and 2*#@ ACTION: With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either: a. FULLY WITHDRAW the rod, or, b. Declare the rod to be inoperable and apply Specification 3.1.3.1. SURVEILLANCE REQUIREMENTS | ACTION: | ||
With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either: | |||
: a. FULLY WITHDRAW the rod, or, | |||
: b. Declare the rod to be inoperable and apply Specification 3.1.3.1. | |||
SURVEILLANCE REQUIREMENTS | |||
======================================================================== | ======================================================================== | ||
4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position | 4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position indicators~d:: | ||
: a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criticality, and b. At least once per 12 hours thereafter. | : a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criticality, and | ||
*See Special Test Exceptions 3.10.2 and 3.10.3 power levels below 50% one hour thermal "soak time" is permitted. | : b. At least once per 12 hours thereafter. | ||
During this soak time, the absolute value of rod motion is limited to six steps. #With Keff greater than or equal to 1.0 @Surveillance 4.1.3.4.a is applicable prior tu withdrawing control banks in preparation for startup (Mode 2). SALEM -UNIT 1 3/4 1-22 Amendment No. * | *See Special Test Exceptions 3.10.2 and 3.10.3 | ||
~*'*For power levels below 50% one hour thermal "soak time" is permitted. | |||
======================================================================== | During this soak time, the absolute value of rod motion is limited to six steps. | ||
3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2. APPLICABILITY: | #With Keff greater than or equal to 1.0 | ||
MODES l'°', and 2*11 ACTION: With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either: a. Restore the control banks to within the limits within two hours, or b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or c. Be in at least HOT STANDBY within 6 hours. SURVEILLANCE REQUIREMENTS 4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours by use of the group demand counters and verified by the analog rod position indicators** | @Surveillance 4.1.3.4.a is applicable prior tu withdrawing control banks in preparation for startup (Mode 2). | ||
except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the individual rod positions at least once per 4 hours*'1'. | SALEM - UNIT 1 3/4 1-22 Amendment No. | ||
*See Special Test Exceptions 3.10.2 and 3.10.3 )'d'For power levels below 50% one hour thermal "soak time" is permitted. | * REACTIVITY CONTRO~YSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION | ||
During this soak time, the absolute value of rod motion is limited to six steps. UWith Keff greater than or equal to 1.0 SALEM -UNIT 1 3/4 1-23 Amendment No. | ======================================================================== | ||
REACTIVITY POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn. | 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2. | ||
APPLICABILITY: | APPLICABILITY: MODES l'°', and 2*11 ACTION: | ||
MODES 1*, and 2*U@ ACTION: With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either: a. Fully withdraw the rod, or, b. Declare the rod to be inoperable and apply Specification 3.1.3.1. SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use of the group demand counters, and verified by the analog rod position indicators1dc: | With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either: | ||
: a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criti*cality, and b. At least once per 12 hours thereafter. | : a. Restore the control banks to within the limits within two hours, or | ||
*See Special Test Exceptions 3.10.2 and 3.10.3 1c1cFor power levels below 50% one hour thermal "soak time" is permitted. | : b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or | ||
During this soak time, the absolute value of rod motion is limited to six steps. @Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2). UWith Keff greater than or equal to 1.0 SALEM -UNIT 2 3/4 1-19 Amendment No. | : c. Be in at least HOT STANDBY within 6 hours. | ||
SURVEILLANCE REQUIREMENTS | |||
========================================================================= | ======================~=================================================- | ||
3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2. APPLICABILITY: | 4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours by use of the group demand counters and verified by the analog rod position indicators** except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the individual rod positions at least once per 4 hours*'1'. | ||
MODES P'', and 2*kf1 ACTION: With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either: a. Restore the control banks to within the limits within two hours, or b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or c. Be in at least HOT STANDBiY within 6 hours. SURVEILLANCE REQUIREMENTS | *See Special Test Exceptions 3.10.2 and 3.10.3 | ||
========================================================================= | )'d'For power levels below 50% one hour thermal "soak time" is permitted. | ||
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours by use of the group demand counters and verified by the analog rod position indicators** | During this soak time, the absolute value of rod motion is limited to six steps. | ||
except during time intervals when the Rod Insertion Li.mit Monitor is inoperable, then verify the individual rod positions at least once per 4 hours*** *See Special Test Exceptions 3.10.2 and 3.10.3 id'For power levels below 50% one hour thermal "soak time" is permitted. | UWith Keff greater than or equal to 1.0 SALEM - UNIT 1 3/4 1-23 Amendment No. | ||
During this soak time, the absolute value of rod motion is limited to six steps. #With Keff greater than or equal to 1.0 SALEM -UNIT 2 3/4 1-20 Amendment No. I I | |||
REACTIVITY CONTROL~STEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn. | |||
APPLICABILITY: MODES 1*, and 2*U@ | |||
ACTION: | |||
With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either: | |||
: a. Fully withdraw the rod, or, | |||
: b. Declare the rod to be inoperable and apply Specification 3.1.3.1. | |||
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use of the group demand counters, and verified by the analog rod position indicators1dc: | |||
: a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criti*cality, and | |||
: b. At least once per 12 hours thereafter. | |||
*See Special Test Exceptions 3.10.2 and 3.10.3 1c1cFor power levels below 50% one hour thermal "soak time" is permitted. | |||
During this soak time, the absolute value of rod motion is limited to six steps. | |||
@Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2). | |||
UWith Keff greater than or equal to 1.0 SALEM - UNIT 2 3/4 1-19 Amendment No. | |||
REACTIVITY CONTRO liYSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION | |||
========================================================================= | |||
3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2. | |||
APPLICABILITY: MODES P'', and 2*kf1 ACTION: | |||
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either: | |||
: a. Restore the control banks to within the limits within two hours, or | |||
: b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or | |||
: c. Be in at least HOT STANDBiY within 6 hours. | |||
SURVEILLANCE REQUIREMENTS | |||
========================================================================= | |||
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours by use of the group demand counters and verified by the analog rod position indicators** except during time intervals when the Rod Insertion Li.mit Monitor is inoperable, then verify the individual rod positions at least once per 4 hours*** | |||
*See Special Test Exceptions 3.10.2 and 3.10.3 id'For power levels below 50% one hour thermal "soak time" is permitted. | |||
During this soak time, the absolute value of rod motion is limited to six steps. | |||
#With Keff greater than or equal to 1.0 I | |||
I I | |||
SALEM - UNIT 2 3/4 1-20 Amendment No. I I | |||
I I}} |
Latest revision as of 06:19, 3 February 2020
ML18094A449 | |
Person / Time | |
---|---|
Site: | Salem |
Issue date: | 05/22/1989 |
From: | Public Service Enterprise Group |
To: | |
Shared Package | |
ML18094A448 | List: |
References | |
NUDOCS 8905310127 | |
Download: ML18094A449 (8) | |
Text
REACTIVITY CONTRC~YSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
===============================================----===========
3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN.
APPLICABILITY: MODES 1*, and 2*#~
ACTION:
With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
- a. FuL!.'.l, WITIIDRAW~ .'the rod, or,
- b. Declare the rod to be inoperable and apply Specification 3.1.3.1.
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position indicator~~OP
- a. Within 15 minutes prior to withdrawal of any rods in control' banks A, B, C, or D during an approach to reactor critieally, and co..li*~y b* At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
- For power levels one hour thermal *"soak time" i's permitted.**
During this soak time, the absolute value of rod motion is limited to six .I ste s. '
With Keff greater than or equal to 1.0 I
@Surveillance 4.1.3.4.a is applicable prior to withdrawing control banks in preparation for startup (Mode 2).
SALEM - UNIT 1 3/4 1-22 Amendment No. 73 8905310127 890522 PDR ADOCK 05000272 p PNU ;
REACTIVITY CONTR~YSTEMS POSITION.INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.
APPLICABILITY: MODES 1*, and 2*#
ACTION:
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
- a. Restore the control banks to within the limits within two hours, or
- b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank positionusingthe-above-figures, or
- c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS
=====~==========================***-
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicator~except during I
time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the indiv-idual rod-positions at least once per 4 hour~AOP
- See -Special Test Exceptions* 3 .10. 2 and 3 .10. 3 * ., ..,
- For power eve s elow
- one hour thermal "soak time", is_ permitted.
,4P~: During this soak time, the absolute value of rod motion is*-liinited to six steps.
- With Keff greater than or equal to 1.0
- SALEM - UNIT 1 3/4 1-23 Amendment No. 73 L_
REACTIVITY CONTR~YSTEMS .e
,.POSITION INDICATION SYSTEM SHUTDOWN
- LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn.
APPLICABILITY: MODES 1*, and 2*#@
ACTION:
With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
- a. Fully withdraw the rod,~,
- b. Declare the rod to be inoper_able and apply Specification 3 .1. 3 .1.
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use the group ~d counters, and verified by the analog- rod position::--- - ..
indicator~
,w~*..
- a. Within 15 minutes prior to withdrawal of any rods in control banks A,. B, C, or D during an approach to reactor criti~, .and co.1'1ty b* At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> therea~ter.
- For power eve s e ow 50% one hour thermal 11 soak time is permitted.
A-00! During this soak time, the absolute value of rod motion is limited to steps-.
@Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2).
- With Keff greater than or equal to 1.0
- SALEM - UNIT 2 3/4 1-19 Amendment No. 48
REACTIVITY CONTR-fYSTEMS
'. POSITION INDICATION SYSTEM SIUJTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.
APPLICABILITY: MODES 1*, and 2*#
ACTION:
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
- a. Restore the control banks to within the limits within two hours, or
- b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
- c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators~except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify
- the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s~
ADP~ - -
- See S ecial Test Exceptions 3*.10. 2 and 3 .10. 3
- For power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to steps.
- With Keff greater than or equal to 1.0
- SALEM -*UNIT 2 '3/41-20 Amendment No. 48
REACTIVITY CONTROI~'STEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
============================================================
3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN.
APPLICABILITY: MODES 1*, and 2*#@
ACTION:
With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
- a. FULLY WITHDRAW the rod, or,
- b. Declare the rod to be inoperable and apply Specification 3.1.3.1.
SURVEILLANCE REQUIREMENTS
============================================================
4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position indicators~d::
- a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criticality, and
- b. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
- See Special Test Exceptions 3.10.2 and 3.10.3
~*'*For power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to six steps.
- With Keff greater than or equal to 1.0
@Surveillance 4.1.3.4.a is applicable prior tu withdrawing control banks in preparation for startup (Mode 2).
SALEM - UNIT 1 3/4 1-22 Amendment No.
- REACTIVITY CONTRO~YSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
============================================================
3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.
APPLICABILITY: MODES l'°', and 2*11 ACTION:
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
- a. Restore the control banks to within the limits within two hours, or
- b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
- c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS
======================~=================================================-
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators** except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s*'1'.
- See Special Test Exceptions 3.10.2 and 3.10.3
)'d'For power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to six steps.
UWith Keff greater than or equal to 1.0 SALEM - UNIT 1 3/4 1-23 Amendment No.
REACTIVITY CONTROL~STEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn.
APPLICABILITY: MODES 1*, and 2*U@
ACTION:
With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:
- a. Fully withdraw the rod, or,
- b. Declare the rod to be inoperable and apply Specification 3.1.3.1.
SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use of the group demand counters, and verified by the analog rod position indicators1dc:
- a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criti*cality, and
- b. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
- See Special Test Exceptions 3.10.2 and 3.10.3 1c1cFor power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to six steps.
@Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2).
UWith Keff greater than or equal to 1.0 SALEM - UNIT 2 3/4 1-19 Amendment No.
REACTIVITY CONTRO liYSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
=============================================================
3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.
APPLICABILITY: MODES P, and 2*kf1 ACTION:
With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:
- a. Restore the control banks to within the limits within two hours, or
- b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
- c. Be in at least HOT STANDBiY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS
=============================================================
4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators** except during time intervals when the Rod Insertion Li.mit Monitor is inoperable, then verify the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s***
- See Special Test Exceptions 3.10.2 and 3.10.3 id'For power levels below 50% one hour thermal "soak time" is permitted.
During this soak time, the absolute value of rod motion is limited to six steps.
- With Keff greater than or equal to 1.0 I
I I
SALEM - UNIT 2 3/4 1-20 Amendment No. I I
I I