REACTIVITY CONTRC~YSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION

===============================================----===========

3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN.

APPLICABILITY: MODES 1*, and 2*#~

ACTION:

With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:

a. FuL!.'.l, WITIIDRAW~ .'the rod, or,
b. Declare the rod to be inoperable and apply Specification 3.1.3.1.

SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position indicator~~OP

a. Within 15 minutes prior to withdrawal of any rods in control' banks A, B, C, or D during an approach to reactor critieally, and co..li*~y b* At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
    • For power levels one hour thermal *"soak time" i's permitted.**

During this soak time, the absolute value of rod motion is limited to six .I ste s. '

With Keff greater than or equal to 1.0 I

@Surveillance 4.1.3.4.a is applicable prior to withdrawing control banks in preparation for startup (Mode 2).

SALEM - UNIT 1 3/4 1-22 Amendment No. 73 8905310127 890522 PDR ADOCK 05000272 p PNU  ;

REACTIVITY CONTR~YSTEMS POSITION.INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.

APPLICABILITY: MODES 1*, and 2*#

ACTION:

With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:

a. Restore the control banks to within the limits within two hours, or
b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank positionusingthe-above-figures, or
c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS

=====~==========================***-

4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicator~except during I

time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the indiv-idual rod-positions at least once per 4 hour~AOP

  • See -Special Test Exceptions* 3 .10. 2 and 3 .10. 3 * ., ..,
    • For power eve s elow
  • one hour thermal "soak time", is_ permitted.

,4P~: During this soak time, the absolute value of rod motion is*-liinited to six steps.

  1. With Keff greater than or equal to 1.0
  • SALEM - UNIT 1 3/4 1-23 Amendment No. 73 L_

REACTIVITY CONTR~YSTEMS .e

,.POSITION INDICATION SYSTEM SHUTDOWN

  • LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn.

APPLICABILITY: MODES 1*, and 2*#@

ACTION:

With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:

a. Fully withdraw the rod,~,
b. Declare the rod to be inoper_able and apply Specification 3 .1. 3 .1.

SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use the group ~d counters, and verified by the analog- rod position::--- - ..

indicator~

,w~*..

a. Within 15 minutes prior to withdrawal of any rods in control banks A,. B, C, or D during an approach to reactor criti~, .and co.1'1ty b* At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> therea~ter.
    • For power eve s e ow 50% one hour thermal 11 soak time is permitted.

A-00! During this soak time, the absolute value of rod motion is limited to steps-.

@Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2).

  1. With Keff greater than or equal to 1.0
  • SALEM - UNIT 2 3/4 1-19 Amendment No. 48

REACTIVITY CONTR-fYSTEMS

'. POSITION INDICATION SYSTEM SIUJTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.

APPLICABILITY: MODES 1*, and 2*#

ACTION:

With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:

a. Restore the control banks to within the limits within two hours, or
b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS 4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators~except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify

  • the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s~

ADP~ - -

  • See S ecial Test Exceptions 3*.10. 2 and 3 .10. 3
    • For power levels below 50% one hour thermal "soak time" is permitted.

During this soak time, the absolute value of rod motion is limited to steps.

  1. With Keff greater than or equal to 1.0
      • SALEM -*UNIT 2 '3/41-20 Amendment No. 48

REACTIVITY CONTROI~'STEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION

============================================================

3.1.3.4 All shutdown rods shall be FULLY WITHDRAWN.

APPLICABILITY: MODES 1*, and 2*#@

ACTION:

With a maximum of one shutdown rod not FULLY WITHDRAWN, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:

a. FULLY WITHDRAW the rod, or,
b. Declare the rod to be inoperable and apply Specification 3.1.3.1.

SURVEILLANCE REQUIREMENTS

============================================================

4.1.3.4 Each shutdown rod shall be determined to be FULLY WITHDRAWN by use of the group demand counters, and verified by the analog rod position indicators~d::

a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criticality, and
b. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
  • See Special Test Exceptions 3.10.2 and 3.10.3

~*'*For power levels below 50% one hour thermal "soak time" is permitted.

During this soak time, the absolute value of rod motion is limited to six steps.

  1. With Keff greater than or equal to 1.0

@Surveillance 4.1.3.4.a is applicable prior tu withdrawing control banks in preparation for startup (Mode 2).

SALEM - UNIT 1 3/4 1-22 Amendment No.

  • REACTIVITY CONTRO~YSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION
============================================================

3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.

APPLICABILITY: MODES l'°', and 2*11 ACTION:

With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:

a. Restore the control banks to within the limits within two hours, or
b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
c. Be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS

======================~=================================================-

4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators** except during time intervals when the Rod Insertion Limit Monitor is inoperable, then verify the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s*'1'.

  • See Special Test Exceptions 3.10.2 and 3.10.3

)'d'For power levels below 50% one hour thermal "soak time" is permitted.

During this soak time, the absolute value of rod motion is limited to six steps.

UWith Keff greater than or equal to 1.0 SALEM - UNIT 1 3/4 1-23 Amendment No.

REACTIVITY CONTROL~STEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION 3.1.3.4 All shutdown rods shall be fully withdrawn.

APPLICABILITY: MODES 1*, and 2*U@

ACTION:

With a maximum of one shutdown rod not fully withdrawn, except for surveillance testing pursuant to Specification 4.1.3.1.2, within one hour either:

a. Fully withdraw the rod, or,
b. Declare the rod to be inoperable and apply Specification 3.1.3.1.

SURVEILLANCE REQUIREMENTS 4.1.3.4 Each shutdown rod shall be determined to be fully withdrawn by use of the group demand counters, and verified by the analog rod position indicators1dc:

a. Within 15 minutes prior to withdrawal of any rods in control banks A, B, C, or D during an approach to reactor criti*cality, and
b. At least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter.
  • See Special Test Exceptions 3.10.2 and 3.10.3 1c1cFor power levels below 50% one hour thermal "soak time" is permitted.

During this soak time, the absolute value of rod motion is limited to six steps.

@Surveillance 4.1.3.4.a is applicable prior to withdrawing any control banks in preparation for startup (Mode 2).

UWith Keff greater than or equal to 1.0 SALEM - UNIT 2 3/4 1-19 Amendment No.

REACTIVITY CONTRO liYSTEMS POSITION INDICATION SYSTEM SHUTDOWN LIMITING CONDITION FOR OPERATION

=============================================================

3.1.3.5 The control banks shall be limited in physical insertion as shown in Figures 3.1-1 and 3.1-2.

APPLICABILITY: MODES P, and 2*kf1 ACTION:

With the control banks inserted beyond the above insertion limits, except for surveillance testing pursuant to Specification 4.1.3.1.2, either:

a. Restore the control banks to within the limits within two hours, or
b. Reduce THERMAL POWER within two hours to less than or equal to that fraction of RATED THERMAL POWER which is allowed by the bank position using the above figures, or
c. Be in at least HOT STANDBiY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

SURVEILLANCE REQUIREMENTS

=============================================================

4.1.3.5 The position of each control bank shall be determined to be within the insertion limits at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by use of the group demand counters and verified by the analog rod position indicators** except during time intervals when the Rod Insertion Li.mit Monitor is inoperable, then verify the individual rod positions at least once per 4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />s***

  • See Special Test Exceptions 3.10.2 and 3.10.3 id'For power levels below 50% one hour thermal "soak time" is permitted.

During this soak time, the absolute value of rod motion is limited to six steps.

  1. With Keff greater than or equal to 1.0 I

I I

SALEM - UNIT 2 3/4 1-20 Amendment No. I I

I I