ML18107A460: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued)
{{#Wiki_filter:ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued)
C) Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on  
C)     Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on *ignal.             n .
*ignal. n .
: 7.   ...------------~
: 7. Verifying the dieael generator opera tea :for at leaat 24 houra*. During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator  
Verifying the dieael generator opera tea :for at leaat 24 houra*.
*hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency  
During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator *hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency *hall be maintained at ~ 3910 and S 4580 volt* and 60 +/- 1.2 Hz during thia teat.
*hall be maintained at 3910 and S 4580 volt* and 60 +/- 1.2 Hz during thia teat. 8. Verifying that the auto-connected loada to each di***l generator do not exceed the two hour rati.nq of 2860 kw. 9. Verifying that with th* di***l generator operatinq in a teat mode (connected to it* bua), a aimulated aatety injecti.on aignal override*
: 8. Verifying that the auto-connected loada to each di***l generator do not exceed the two hour rati.nq of 2860 kw.
the teat mode by (1) returning th* di***l generator to atandby operati.on and (2) automatically energizinq th* Cllllergency loada with ottaite power. e. At leaat once per 10 year* or attar any modificati.ona which could diesel generator interdependence by atarti.ng all di.***l generator*
: 9. Verifying that with th* di***l generator operatinq in a teat mode (connected to it* bua), a aimulated aatety injecti.on aignal override* the teat mode by (1) returning th* di***l generator to atandby operati.on and (2) automatically energizinq th* Cllllergency loada with ottaite power.
simultaneoualy*, during ahutdown, and verifyinq that all dieael generator*
: e. At leaat once per 10 year* or attar any modificati.ona which could ~feet diesel generator interdependence by atarti.ng all di.***l generator*
accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda. t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**: Veri:fyinq th* di***l generator atarta and achiev.a 3910 volt* and > 58.8 Hz 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@ '\ J o:f 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz. j.::ttJSl:.(l\
simultaneoualy*, during ahutdown, and verifyinq that all dieael generator* accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda.
A 4.8.1.1.3 Th* di***l :fuel oil atoraqe and trana:fer ayatea ahall be demonatrated OPERABI.S:
: t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**:
: a. At l ... t once per 31 day* by: 1. Veri:fyi.nq th* level in each the above required :fuel atorage tank*. 2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer
Veri:fyinq th* di***l generator atarta and achiev.a ~ 3910 volt* and
:fuel :froa the :fuel atoraqe tank* to the day tank*. SALKM -UNIT 2 ,/ 9907300106 990723 PDR ADOCK 05000272 p PDR 3/4 8-5 Amendment No. 200
                    > 58.8 Hz in~ 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@
. il;u:r:'l'Rlc:AL PO!!Zl\ SYSTIMS --:s c) Verifying that all noneesant:ial automatic di***l generator t:ips (i.e., other than engine ovarspeed, lube oil pressure low, 4 XV bus and g.nerator d.ifferantial) , uw automaQe&lll" bypa**ed upon lo** of voltaqe on the vital bua c:onc:u::ant with a injection actuation signal..
'j.::ttJSl:.(l\
the d.;i.eeal operate* for at leaat 24 hours*. During th* ti:st 2 hour* t:hi.* te*t, t:he di.eael generator ehall be loaded to 2760-2850 kw.** During-the 22 hour* ot this te*t, th* di***l generator  
\              A J   o:f ~ 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz.
*hall be loaded to 2500-2600 kw**. The steady *tat* voltage and :frequency shall be uintained at 3g10 and S 4!80 volt* and 60 +/- 1.2 Hz durinq thi 8. Verifyinq that the auto-connec:ted lo&da to each diesel 9911e:ato:
                      ~
do not e.c.ed the tvo bou: ratinq of 2860 kv. 51. V*ri:tying that *i th th* diaael qezie::at:or in a teet aode (connected ta it* bus),* sillNiatad safety injection  
4.8.1.1.3 Th* di***l :fuel oil atoraqe and trana:fer ayatea ahall be demonatrated OPERABI.S:
*iqnal override*
: a. At l . . . t once per 31 day* by:
th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey with ottait. power. e. At l-*t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel. 9enerator*
: 1. Veri:fyi.nq th* level in each   o~ the above required :fuel atorage tank*.
acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda.
: 2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer :fuel :froa the :fuel atoraqe tank* to the day tank*.
: f. At leaet once ll acnt:he, the tollowinq te*t *hall. be pe::fonzed vi thin s ml.nut** of' dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**: Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz. . a .1 3 'l'he c:U.ea.i tuel oil atoraq. and b:anster *ir*t-*hall b9 demonstrated ODMllLI: a. At least once per 31 day* by: 1 . Vuif'yinq the l.v.l in Neb the above reqgired tuel *torage t.mka. 2. Ve:ifyin11 that: :fu.l uan.f'e&-pmipa can 0. start!Kl and tran*f*r !'u*l :frca th.e !'uel *torage tanks to th* day bulks. SALEM -UNZ'l' 1 l/4 1!1-5 Aaendmen t No. 222
SALKM - UNIT 2                           3/4 8-5                 Amendment No. 200
* El&'S'llRISAL PgWE! SYS'l'!iMS  
    ,/    9907300106 990723 PDR ADOCK 05000272 p                  PDR
-----b. At l***t onc:e pez-92 daya by that
 
* suiple of cb.enl fu*l :!rma each o:! the above requj.red
          . il;u:r:'l'Rlc:AL   PO!!Zl\ SYSTIMS
:!uel *toi:a9e i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 AS'l'M D!J7S-77 when for visco*ity, water and *ediment.
                                                                                                        --:s c)     Verifying that all noneesant:ial automatic di***l generator t:ips (i.e., other than engine ovarspeed, lube oil pressure low, 4 XV bus diff'e~tial and g.nerator d.ifferantial) , uw automaQe&lll" bypa**ed upon lo** of voltaqe on the vital bua c:onc:u::ant with a *~*tl" injection actuation signal..
4.8.1.1.4 R!p9rt1 -NOT USl:D
7.***ver~:fyin9      the d.;i.eeal ~&tor operate* for at leaat 24 hours*.
* Sur.r.illance te* ti.119 may be conductec:l iii  
During th* ti:st 2 hour* o~ t:hi.* te*t, t:he di.eael generator ehall be loaded to 2760-2850 kw.** During- the :cmai.~9 22 hour* ot this te*t, th* di***l generator *hall be loaded to 2500-2600 kw**. The steady *tat* voltage and :frequency shall be uintained at ~ 3g10 and S 4!80 volt* and 60 +/- 1.2 Hz durinq thi
*i th th* manufacturer'*  
: 8. Verifyinq that the auto-connec:ted lo&da to each diesel 9911e:ato: do not e.c.ed the tvo bou: ratinq of 2860 kv.
;c-*commendatioftl
: 51. V*ri:tying that *i th th* diaael qezie::at:or opera~ in a teet aode (connected ta it* bus),* sillNiatad safety injection *iqnal override* th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby o~atiol'l and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey l~ with ottait. power.
:eq&Z"ding-anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ... Atl). 0 Thie bmid is meant aa CJUidAnce to rautine o:! th* di**el g911erator aaziufac:turer'*
: e.       At l -
design ratinqa. Loma in uceas of thi* .band :!or apecj,aJ.
* t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator int.:d~ce by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel.
teetinq oz-moanta:y due to c:han11inljJ bu1 loada shall not invalidate th* t.st.
9enerator* acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda.
* A one-ti.me eate1Uion to thi* aurveillanc.
: f.         At leaet once       ~    ll acnt:he, the tollowinq te*t *hall. be pe::fonzed   vi thin s   ml.nut** of'   dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**:
requirement is dU%'inq fue.l eycl* thirteen -.llowing Unit 1 operation*
Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in ~ 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ ~ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz.
to continue to th* thirteenth refu.liftlJ outaq* (1Jll13).  
@tJ.S~il\ ~4 . a.1~l. 3         'l'he c:U.ea.i tuel oil atoraq. and b:anster     *ir*t- *hall b9 demonstrated ODMllLI:
'l'h* surveillomce i1 to be completed ae the app;c-opriate time during-th* 1R13 outage, prio;c-to the unit to )lode 4 upon outage complet.:i.on.
: a. At least once per 31 day* by:
SALEM -UNI'!' 1 3/4 8-!a Aamidmen t No. 222 -}}
: 1.     Vuif'yinq the l.v.l in Neb       o~ the above reqgired tuel *torage t.mka.
: 2.     Ve:ifyin11 that: bo~ :fu.l uan.f'e&- pmipa can 0. start!Kl and tran*f*r !'u*l :frca th.e !'uel *torage tanks to th* day bulks.
SALEM - UNZ'l' 1                                 l/4 1!1-5                 Aaendmen t No. 222
* El&'S'llRISAL PgWE! SYS'l'!iMS b.
At l***t onc:e pez- 92 daya by v*z-i~yin'iJ that
* suiple of cb.enl fu*l
:!rma each o:! the above requj.red :!uel *toi:a9e ~ i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 o~ AS'l'M D!J7S-77 when che~ed for visco*ity, water and *ediment.
4.8.1.1.4     R!p9rt1 - NOT USl:D
* Sur.r.illance te* ti.119 may be conductec:l iii acco~ee    *i th th*
manufacturer'* ;c-*commendatioftl :eq&Z"ding- anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ~r...Atl).
0       Thie bmid is meant aa CJUidAnce to ~clwie rautine e~c** o:! th*
di**el g911erator aaziufac:turer'* design ratinqa. Loma in uceas of thi*
        .band :!or apecj,aJ. teetinq oz- moanta:y v~ialion1 due to c:han11inljJ bu1 loada shall not invalidate th* t.st.
* A one-ti.me eate1Uion to thi* aurveillanc. requirement is ~ant:ad dU%'inq fue.l eycl* thirteen -.llowing Unit 1 operation* to continue to th*
thirteenth refu.liftlJ outaq* (1Jll13). 'l'h* surveillomce i1   to be completed ae the app;c-opriate time during- th* 1R13 outage, prio;c- to the unit retu~inq to )lode 4 upon outage complet.:i.on.
SALEM - UNI'!' 1                           3/4 8-!a                   Aamidmen t No. 222}}

Latest revision as of 04:42, 3 February 2020

Proposed Tech Specs Pages Changing TS Surveillance Requirement 4.8.1.1.2 D 7 by Removing Restriction to Perform Test Every 18 Months During Shutdown
ML18107A460
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/23/1999
From:
TENNESSEE VALLEY AUTHORITY
To:
Shared Package
ML18107A459 List:
References
NUDOCS 9907300106
Download: ML18107A460 (3)


Text

ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMBNTS (Conti.nued)

C) Verifying that all noneaaential automati.c dieael generator trip* (i.e., other than engine overapeed, lube oil preaaura low, 4 KV Bua di:fterenti.al and generator ditterenti.al) are automati.cally bypaaaed upon lo** ot voltage on th* vital bua concurrent with a *af*ty inj*cti.on actuati.on *ignal. n .

7. ...------------~

Verifying the dieael generator opera tea :for at leaat 24 houra*.

During the ti.rat 2 hour* of thia teat, the di***l generator shall be loaded to 2760-2860 k**** During the remaining 22 hour* of thi.a teat, th* di***l generator *hall be loaded to 2500-2600 kw*** The steady atat* voltage and frequency *hall be maintained at ~ 3910 and S 4580 volt* and 60 +/- 1.2 Hz during thia teat.

8. Verifying that the auto-connected loada to each di***l generator do not exceed the two hour rati.nq of 2860 kw.
9. Verifying that with th* di***l generator operatinq in a teat mode (connected to it* bua), a aimulated aatety injecti.on aignal override* the teat mode by (1) returning th* di***l generator to atandby operati.on and (2) automatically energizinq th* Cllllergency loada with ottaite power.
e. At leaat once per 10 year* or attar any modificati.ona which could ~feet diesel generator interdependence by atarti.ng all di.***l generator*

simultaneoualy*, during ahutdown, and verifyinq that all dieael generator* accelerate to at leaat 58.8 Hz in l*** than or equal to 13 seconda.

t. At leaat once per 18 montha, the :followinq teat ahall be per:formed within 5 minute* o:f dieael ahutdown a:fter the di***l haa operated tor at leaat two houra at 2500-2600 tw**:

Veri:fyinq th* di***l generator atarta and achiev.a ~ 3910 volt* and

> 58.8 Hz in~ 13 aecond9, iWd aubaoaquantl.y cchi=v=c =steady et2.te volb.q@

'j.::ttJSl:.(l\

\ A J o:f ~ 3910 and S 4400 volta and :frequency o:f 60 +/- 1.2 Hz.

~

4.8.1.1.3 Th* di***l :fuel oil atoraqe and trana:fer ayatea ahall be demonatrated OPERABI.S:

a. At l . . . t once per 31 day* by:
1. Veri:fyi.nq th* level in each o~ the above required :fuel atorage tank*.
2. Veri:fyinq that both :fuel trana:fer pump* can be atarted and trana:fer :fuel :froa the :fuel atoraqe tank* to the day tank*.

SALKM - UNIT 2 3/4 8-5 Amendment No. 200

,/ 9907300106 990723 PDR ADOCK 05000272 p PDR

. il;u:r:'l'Rlc:AL PO!!Zl\ SYSTIMS

--:s c) Verifying that all noneesant:ial automatic di***l generator t:ips (i.e., other than engine ovarspeed, lube oil pressure low, 4 XV bus diff'e~tial and g.nerator d.ifferantial) , uw automaQe&lll" bypa**ed upon lo** of voltaqe on the vital bua c:onc:u::ant with a *~*tl" injection actuation signal..

7.***ver~:fyin9 the d.;i.eeal ~&tor operate* for at leaat 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s*.

During th* ti:st 2 hour* o~ t:hi.* te*t, t:he di.eael generator ehall be loaded to 2760-2850 kw.** During- the :cmai.~9 22 hour* ot this te*t, th* di***l generator *hall be loaded to 2500-2600 kw**. The steady *tat* voltage and :frequency shall be uintained at ~ 3g10 and S 4!80 volt* and 60 +/- 1.2 Hz durinq thi

8. Verifyinq that the auto-connec:ted lo&da to each diesel 9911e:ato: do not e.c.ed the tvo bou: ratinq of 2860 kv.
51. V*ri:tying that *i th th* diaael qezie::at:or opera~ in a teet aode (connected ta it* bus),* sillNiatad safety injection *iqnal override* th* teet mode l:ly (1) returning th* di.***l gem1:at:or to standby o~atiol'l and (2) autoaab.cal.ly en.::9:Lzinq th* UM1rCJeftey l~ with ottait. power.
e. At l -
  • t one* per ta years or dter any modifications which c:ould affect d:i.e**l 9eD8%ator int.:d~ce by ata::ting" all di*s*l C)9ft*rators eimultaneou*ly*, during ehut:doq, and vwrifyinq that all diesel.

9enerator* acc::ele::ate to at l9iUt 58.8 H* in le** than or equal to 13 aec:onda.

f. At leaet once ~ ll acnt:he, the tollowinq te*t *hall. be pe::fonzed vi thin s ml.nut** of' dieael shutdotrn after the dieael haa operated for at leaat two hour* at 2!00-2600 kw**:

Ve:rieyinq tiSli cti.***l ;enuator ata:t* and achiwves 2: 3910 volt. and 2: 58.8 Hz in ~ 13 *econda, and *ul:l*equeiitly achine* steady atat* voltage 0£ ~ 3910 and S 4400 volts and trequenc:y ot 50 :t 1.2 Hz.

@tJ.S~il\ ~4 . a.1~l. 3 'l'he c:U.ea.i tuel oil atoraq. and b:anster *ir*t- *hall b9 demonstrated ODMllLI:

a. At least once per 31 day* by:
1. Vuif'yinq the l.v.l in Neb o~ the above reqgired tuel *torage t.mka.
2. Ve:ifyin11 that: bo~ :fu.l uan.f'e&- pmipa can 0. start!Kl and tran*f*r !'u*l :frca th.e !'uel *torage tanks to th* day bulks.

SALEM - UNZ'l' 1 l/4 1!1-5 Aaendmen t No. 222

  • El&'S'llRISAL PgWE! SYS'l'!iMS b.

At l***t onc:e pez- 92 daya by v*z-i~yin'iJ that

  • suiple of cb.enl fu*l
!rma each o:! the above requj.red :!uel *toi:a9e ~ i* with.in the acceptat>le lillit* *pecifi.:1 in Table 1 o~ AS'l'M D!J7S-77 when che~ed for visco*ity, water and *ediment.

4.8.1.1.4 R!p9rt1 - NOT USl:D

  • Sur.r.illance te* ti.119 may be conductec:l iii acco~ee *i th th*

manufacturer'* ;c-*commendatioftl :eq&Z"ding- anqine p:elube. *ani-up and loaclinq (unl*** loadin9 time* are *:peci:!ied in th* :individual Surveillanc:e ~r...Atl).

0 Thie bmid is meant aa CJUidAnce to ~clwie rautine e~c** o:! th*

di**el g911erator aaziufac:turer'* design ratinqa. Loma in uceas of thi*

.band  :!or apecj,aJ. teetinq oz- moanta:y v~ialion1 due to c:han11inljJ bu1 loada shall not invalidate th* t.st.

  • A one-ti.me eate1Uion to thi* aurveillanc. requirement is ~ant:ad dU%'inq fue.l eycl* thirteen -.llowing Unit 1 operation* to continue to th*

thirteenth refu.liftlJ outaq* (1Jll13). 'l'h* surveillomce i1 to be completed ae the app;c-opriate time during- th* 1R13 outage, prio;c- to the unit retu~inq to )lode 4 upon outage complet.:i.on.

SALEM - UNI'!' 1 3/4 8-!a Aamidmen t No. 222