| issue date = 09/16/1980
| issue date = 09/16/1980
| title = Corrected Monthly Operating Rept for Apr 1980
| title = Corrected Monthly Operating Rept for Apr 1980
| author name = DUNN S D
| author name = Dunn S
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:.... I '-.,\ VIRGINIA ELECTRIC Af.l"D POWER COMPAlN SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 80-09 SEPTEMBER, 1980 APPROVED:
{{#Wiki_filter:....
Section Operating Data Report -Unit #1 CONTENTS Operating Data Report -Unit #1 (APRIL CORRECTED REPORT) Operating Data Report -Unit #1 (MARCH CORRECTED REPORT) Operating Data Report -Unit #2 Unit Shutdowns and Power Reductions  
I   '-.,\
-Unit #1 Unit Shutdowns and Power Reductions  
VIRGINIA ELECTRIC Af.l"D POWER COMPAlN SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 80-09 SEPTEMBER, 1980 APPROVED:
-Unit #2 Load Reductions Due to Environmental Restrictions  
 
-Unit #1 Load Reductions Due to Environmental Restrictions Unit #2 Average Daily Unit Power Level -Unit #1 Average Daily Unit Power Level -Unit #2 Summary of Operating Experience .Amendments to Facility License or Technical Specifications Facility Changes Requiring NRC Approval Facility Changes That Did Not Require NRC Approval Tests and Experiments Requiring NRC Approval Test and Experiments That Did Not Require NRG Approval Other Changes, Tests and Experiments Chemistry Report Description of All Instances Where Thermal Discharge Lim.its Were Exceeded Fuel Handling Procedure Revisions That Changed The Operating Mode Described In The FSAR Description of Periodic Tests Which Were Not Completed Within The Time Lim.its Specified In Technical Specifications Inservice Inspection Reportable Occurrences Pertaining to Any Outage or Power Reductions Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -Mechanical Maintenance  
                                      -i-                                      ...
... ' Page* l 2 3 4 5 6 8 9 10 11 12 14 15 15 16 16 17 18 19 20 22 23 24 26 27 31 1** .. ...... ' ..... Section ii CONTENTS Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Engineering Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #1 -Instrument Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power Periods -Unit #2 -Instrument Maintenance Heal th Physics Procedure Deviations Reviewed By Station Nuclear Safety and Operating Committee After Time Limits Specified In Technical Specifications 33 35 37 39 41 43 44 
CONTENTS                                        '
' OPERATING DATA REP'JRT OPERATING STATUS 1. UNIT NAME 2. REPORTING PERI'JD D'JCKET NO. 50-280 DATE 09 OC:T 80 C'JMPLETED BY SUE D. DUNN TELEPHONE 804-357-3184 SURRY UNIT 1 090180 T'J 093080 3. LIC:ENSED THERMAL PJ'rr'ER (M'l'IT) 2441 ,----------------------1  
Section                                                                   Page*
: 4. NAMEPLATE RATING (GROSS MwE) 5. DESIGN ELECTRICAL RATING (NET l&E) 6. MAXIMUM DEPENDABLE  
Operating Data Report - Unit #1                                             l Operating Data Report - Unit #1 (APRIL CORRECTED REPORT)                     2 Operating Data Report - Unit #1 (MARCH CORRECTED REPORT)                     3 Operating Data Report - Unit #2                                             4 Unit Shutdowns and Power Reductions - Unit #1                               5 Unit Shutdowns and Power Reductions - Unit #2                               6 Load Reductions Due to Environmental Restrictions - Unit #1                 8 Load Reductions Due to Environmental Restrictions   Unit #2                 9 Average Daily Unit Power Level - Unit #1                                   10 Average Daily Unit Power Level - Unit #2                                   11 Summary of Operating Experience                                           12
':APACITY (GR'JSS MWE) 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) . 8. IF CHANGES 'JCCUR IN CAPACITY RATINGS (ITEMS 3 TH.ROUGH 7) SINCE LAST REPORT. GIVE REAS'JNS 847.5 !NOTES I 822 I I 740 704 NIA 9. POWER LEVEL T'J RESTP.ICTED.
.Amendments to Facility License or Technical Specifications               14 Facility Changes Requiring NRC Approval                                   15
IF ANY NIA (NET MwE) 10. REAS'JNS F'JR RESTRICTI'JflS.
                                                                                  .'*fi~.~t~ ~
IF ANY NIA 11. HOURS IN REP'JRTING PEP.IOD 12. NUMBER OF HOURS REACT'JR WAS CRITICAL -13. REACT'JR RESERVE SHUTDOWN HOURS 14. HOURS GENERATOR  
Facility Changes That Did Not Require NRC Approval                         15 Tests and Experiments Requiring NRC Approval                               16 Test and Experiments That Did Not Require NRG Approval                     16 Other Changes, Tests and Experiments                                       17 Chemistry Report                                                           18 Description of All Instances Where Thermal Discharge Lim.its Were Exceeded 19 Fuel Handling                                                             20 Procedure Revisions That Changed The Operating Mode Described In The FSAR   22 Description of Periodic Tests Which Were Not Completed Within The Time     23 Lim.its Specified In Technical Specifications Inservice Inspection                                                       24 Reportable Occurrences Pertaining to Any Outage or Power Reductions       26 Maintenance of Safety Related Systems During Outage or Reduced Power       27 Periods - Unit #1 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power       31 Periods - Unit #2 - Mechanical Maintenance
!JN-LINE 15. UNIT RESERVE SHUTD'Yr/N H'JURS 16. GROSS THERNAL ENERGY GENERATED  
 
(."fwH) 17. GR'JSS ELECTRICAL ENERGY GENERATED (Ml'IH) 18. NET ELECTRIC:AL ENERGY GENERATED (l.fn'H) 19. UNIT SERVICE FACT'JR 20. UNIT AVAILABILITY FACTOR 21. UNIT CAPAt;ITY FACTOR (USING MDC NET) 22. UNIT CAPACITY FACT:JR (USING DER NET) 23. UNIT FORCED 'JUTAGE RATE 24. SHUTD'JWNS SCHEDULED  
ii
.'JVER NEXT 6 M'JNTHS (TYPE.DATE.AND DURATI')N JF EACH) 2 5. IF SHUT D 'JYI N AT END .'JF REP'JRT PERI OD. ESTIMATE DATE OF STARTUP 26. UllITS IN TEST STATUS (PRI'JR TJ COMMERCIAL OPERATION)
    ......                                 CONTENTS
INITIAL CRITICALITY INITIAL ELECTRICITY C'JMMERC:IAL  
  . . . Section Maintenance of Safety Related Systems During Outage or Reduced Power   33 Periods - Unit #1 - Engineering Maintenance of Safety Related Systems During Outage or Reduced Power 35 Periods - Unit #1 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power 37 Periods - Unit #2 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power 39 Periods - Unit #1 - Instrument Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power 41 Periods - Unit #2 - Instrument Maintenance Heal th Physics                                                       43 Procedure Deviations Reviewed By Station Nuclear Safety and Operating 44 Committee After Time Limits Specified In Technical Specifications
'JPERATI'JN THIS MONTH YR-TO-DATE CUMULATIVE 720.0 6575.0 68159.0 324.2 3786.9 42538.S o.o 182.6 3731. 5 323.7 3763.8 41668.8 o.o 183.6 3736.2 618659.0 8674529.0 963891+01.
 
0 173010.0 2621245.0 31301743.0 160829.0 2473025.0 29699924.0 45.0 olo 57.2 olo 61.1 o /o 45.0 o lo 60.0 olo 66.6 olo 31. 7 olo 53.4 o lo 61.9 olo 27.2 o lo 45.8 olo 53.0 olo 0.0 olo 39.1 r>I<> 26.4 olc-September 1, 1981 F'JRECAST ACHIEVED ..... . .. '}}
OPERATING DATA REP'JRT D'JCKET NO. 50-280 DATE 09 OC:T 80 C'JMPLETED BY   SUE D. DUNN TELEPHONE   804-357-3184 OPERATING STATUS
: 1. UNIT NAME                                        SURRY UNIT 1
: 2. REPORTING PERI'JD                                090180 T'J 093080
: 3. LIC:ENSED THERMAL PJ'rr'ER (M'l'IT)               2441   ,----------------------1
: 4. NAMEPLATE RATING (GROSS MwE)                     847.5 !NOTES                        I
: 5. DESIGN ELECTRICAL RATING (NET l&E)               822    I                            I
: 6. MAXIMUM DEPENDABLE ':APACITY (GR'JSS MWE)         740
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE)           704
    . 8. IF CHANGES 'JCCUR IN CAPACITY RATINGS           NIA (ITEMS 3 TH.ROUGH 7) SINCE LAST REPORT. GIVE REAS'JNS
: 9. POWER LEVEL T'J   ~'HICH RESTP.ICTED. IF ANY NIA (NET MwE)
: 10. REAS'JNS F'JR RESTRICTI'JflS. IF ANY             NIA THIS MONTH YR-TO-DATE CUMULATIVE
: 11. HOURS IN REP'JRTING PEP.IOD                             720.0      6575.0    68159.0
~~*  12. NUMBER OF HOURS REACT'JR WAS CRITICAL                   324.2      3786.9    42538.S
    -13. REACT'JR RESERVE SHUTDOWN HOURS                             o.o      182.6      3731. 5
: 14. HOURS GENERATOR !JN-LINE                                 323.7      3763.8    41668.8
: 15. UNIT RESERVE SHUTD'Yr/N H'JURS                             o.o      183.6      3736.2
: 16. GROSS THERNAL ENERGY GENERATED (."fwH)               618659.0    8674529.0 963891+01. 0
: 17. GR'JSS ELECTRICAL ENERGY GENERATED (Ml'IH)           173010.0    2621245.0 31301743.0
: 18. NET ELECTRIC:AL ENERGY GENERATED (l.fn'H)           160829.0    2473025.0 29699924.0
: 19. UNIT SERVICE FACT'JR                                 45.0 olo    57.2 olo    61.1 o /o
: 20. UNIT AVAILABILITY FACTOR                             45.0 o lo    60.0 olo    66.6 olo
: 21. UNIT CAPAt;ITY FACTOR (USING MDC NET)               31. 7 olo    53.4 o lo  61.9 olo
: 22. UNIT CAPACITY FACT:JR (USING DER NET)               27.2 o lo    45.8  olo  53.0 olo
: 23. UNIT FORCED 'JUTAGE RATE                             0.0 olo      39.1 r>I<>  26.4 olc-
: 24. SHUTD'JWNS SCHEDULED .'JVER NEXT 6 M'JNTHS (TYPE.DATE.AND DURATI')N JF EACH) 2 5. IF SHUT D'JYI N AT END .'JF REP'JRT PERI OD.       September 1, 1981 ESTIMATE DATE OF STARTUP
: 26. UllITS IN TEST STATUS                                   F'JRECAST    ACHIEVED (PRI'JR TJ COMMERCIAL OPERATION)
INITIAL CRITICALITY INITIAL ELECTRICITY C'JMMERC:IAL 'JPERATI'JN}}

Latest revision as of 01:23, 3 February 2020

Corrected Monthly Operating Rept for Apr 1980
ML18139A598
Person / Time
Site: Surry Dominion icon.png
Issue date: 09/16/1980
From: Dunn S
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139A597 List:
References
NUDOCS 8010200392
Download: ML18139A598 (4)


Text

....

I '-.,\

VIRGINIA ELECTRIC Af.l"D POWER COMPAlN SURRY POWER STATION MONTHLY OPERATING REPORT REPORT NO. 80-09 SEPTEMBER, 1980 APPROVED:

-i- ...

CONTENTS '

Section Page*

Operating Data Report - Unit #1 l Operating Data Report - Unit #1 (APRIL CORRECTED REPORT) 2 Operating Data Report - Unit #1 (MARCH CORRECTED REPORT) 3 Operating Data Report - Unit #2 4 Unit Shutdowns and Power Reductions - Unit #1 5 Unit Shutdowns and Power Reductions - Unit #2 6 Load Reductions Due to Environmental Restrictions - Unit #1 8 Load Reductions Due to Environmental Restrictions Unit #2 9 Average Daily Unit Power Level - Unit #1 10 Average Daily Unit Power Level - Unit #2 11 Summary of Operating Experience 12

.Amendments to Facility License or Technical Specifications 14 Facility Changes Requiring NRC Approval 15

.'*fi~.~t~ ~

Facility Changes That Did Not Require NRC Approval 15 Tests and Experiments Requiring NRC Approval 16 Test and Experiments That Did Not Require NRG Approval 16 Other Changes, Tests and Experiments 17 Chemistry Report 18 Description of All Instances Where Thermal Discharge Lim.its Were Exceeded 19 Fuel Handling 20 Procedure Revisions That Changed The Operating Mode Described In The FSAR 22 Description of Periodic Tests Which Were Not Completed Within The Time 23 Lim.its Specified In Technical Specifications Inservice Inspection 24 Reportable Occurrences Pertaining to Any Outage or Power Reductions 26 Maintenance of Safety Related Systems During Outage or Reduced Power 27 Periods - Unit #1 - Mechanical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power 31 Periods - Unit #2 - Mechanical Maintenance

ii

...... CONTENTS

. . . Section Maintenance of Safety Related Systems During Outage or Reduced Power 33 Periods - Unit #1 - Engineering Maintenance of Safety Related Systems During Outage or Reduced Power 35 Periods - Unit #1 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power 37 Periods - Unit #2 - Electrical Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power 39 Periods - Unit #1 - Instrument Maintenance Maintenance of Safety Related Systems During Outage or Reduced Power 41 Periods - Unit #2 - Instrument Maintenance Heal th Physics 43 Procedure Deviations Reviewed By Station Nuclear Safety and Operating 44 Committee After Time Limits Specified In Technical Specifications

OPERATING DATA REP'JRT D'JCKET NO. 50-280 DATE 09 OC:T 80 C'JMPLETED BY SUE D. DUNN TELEPHONE 804-357-3184 OPERATING STATUS

1. UNIT NAME SURRY UNIT 1
2. REPORTING PERI'JD 090180 T'J 093080
3. LIC:ENSED THERMAL PJ'rr'ER (M'l'IT) 2441 ,----------------------1
4. NAMEPLATE RATING (GROSS MwE) 847.5 !NOTES I
5. DESIGN ELECTRICAL RATING (NET l&E) 822 I I
6. MAXIMUM DEPENDABLE ':APACITY (GR'JSS MWE) 740
7. MAXIMUM DEPENDABLE CAPACITY (NET MWE) 704

. 8. IF CHANGES 'JCCUR IN CAPACITY RATINGS NIA (ITEMS 3 TH.ROUGH 7) SINCE LAST REPORT. GIVE REAS'JNS

9. POWER LEVEL T'J ~'HICH RESTP.ICTED. IF ANY NIA (NET MwE)
10. REAS'JNS F'JR RESTRICTI'JflS. IF ANY NIA THIS MONTH YR-TO-DATE CUMULATIVE
11. HOURS IN REP'JRTING PEP.IOD 720.0 6575.0 68159.0

~~* 12. NUMBER OF HOURS REACT'JR WAS CRITICAL 324.2 3786.9 42538.S

-13. REACT'JR RESERVE SHUTDOWN HOURS o.o 182.6 3731. 5

14. HOURS GENERATOR !JN-LINE 323.7 3763.8 41668.8
15. UNIT RESERVE SHUTD'Yr/N H'JURS o.o 183.6 3736.2
16. GROSS THERNAL ENERGY GENERATED (."fwH) 618659.0 8674529.0 963891+01. 0
17. GR'JSS ELECTRICAL ENERGY GENERATED (Ml'IH) 173010.0 2621245.0 31301743.0
18. NET ELECTRIC:AL ENERGY GENERATED (l.fn'H) 160829.0 2473025.0 29699924.0
19. UNIT SERVICE FACT'JR 45.0 olo 57.2 olo 61.1 o /o
20. UNIT AVAILABILITY FACTOR 45.0 o lo 60.0 olo 66.6 olo
21. UNIT CAPAt;ITY FACTOR (USING MDC NET) 31. 7 olo 53.4 o lo 61.9 olo
22. UNIT CAPACITY FACT:JR (USING DER NET) 27.2 o lo 45.8 olo 53.0 olo
23. UNIT FORCED 'JUTAGE RATE 0.0 olo 39.1 r>I<> 26.4 olc-
24. SHUTD'JWNS SCHEDULED .'JVER NEXT 6 M'JNTHS (TYPE.DATE.AND DURATI')N JF EACH) 2 5. IF SHUT D'JYI N AT END .'JF REP'JRT PERI OD. September 1, 1981 ESTIMATE DATE OF STARTUP
26. UllITS IN TEST STATUS F'JRECAST ACHIEVED (PRI'JR TJ COMMERCIAL OPERATION)

INITIAL CRITICALITY INITIAL ELECTRICITY C'JMMERC:IAL 'JPERATI'JN