{{#Wiki_filter:e ATTACHMENT 1 VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POWER STATION UNIT NO. 1 -----8903090153 890301 PDR ADOCK 05000280 Q PDC 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT \
{{#Wiki_filter:e ATTACHMENT 1 VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POWER STATION UNIT NO. 1 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT 8903090153 890301      \
----------------------------------------
PDR ADOCK 05000280 Q              PDC
VIRGINIA ELECTRIC AND POWER COMPANY SURRY UNIT NO. I 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT EDDY CURRENT EXAMINATION During 1988 the steam generator tubes were examined once. This examination occurred during the May refueling outage. Tubes in 11 8 11 and "C" steam generators were examined during the outage. The material that follows presents the results of the examinations.
 
These results include the number and extent of the tubes examined, the location and percent of wall-thickness penetration for each indication of an imperfection, and the identification of the tubes that were plugged. Also included are a "Tubesheet Cross Section Plot" (Figure 1) and ''Tube Support Plate/Tubesheet Nomenclature" (Figure 2). In addition, those tubes reported as having distorted indications or undefined signals are insignificant indications that are either< 20% through wall or were judged to be non-relevant based upon the 1986 tube pull and examination.
VIRGINIA ELECTRIC AND POWER COMPANY SURRY UNIT NO. I 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT EDDY CURRENT EXAMINATION During 1988 the steam generator tubes were examined once.         This examination occurred during the May refueling outage. Tubes in 11 811 and "C" steam generators were examined during the outage. The material that follows presents the results of the examinations. These results include the number and extent of the tubes examined, the location and percent of wall-thickness penetration for each indication of an imperfection, and the identification of the tubes that were plugged. Also included are a "Tubesheet Cross Section Plot" (Figure 1) and ''Tube Support Plate/Tubesheet Nomenclature" (Figure 2).
These indications along with minor denting have been included in this report for future tracking and trending purposes and will be reexamined for further analysis at a later date.
In addition, those tubes reported as having distorted indications or undefined signals are insignificant indications that are either< 20% through wall or were judged to be non-relevant based upon the 1986 tube pull and examination. These indications along with minor denting have been included in this report for future tracking and trending purposes and will be reexamined for further analysis at a later date.
REFUELING OUTAGE -MAY 1988 UNIT 1 STEAM GENERATOR "B" EXAMINATION  
 
REFUELING OUTAGE - MAY 1988 UNIT 1 STEAM GENERATOR "B" EXAMINATION  


==SUMMARY==
==SUMMARY==
In "B" Steam Generator there were 894 tube examinations from the inlet side. There were 106 tubes examined to the seventh support plate on the outlet side, and 788 tubes were examined full length (tubesheet-to-tubesheet).
 
This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 83 indications that are less than 20% through wall, and four indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details. %TWO Location Row-Column Remarks <20 4H-SH Rl0Cl3 <20 4C-SC R10C26 <20 SC RIOC26 <20 1H-2H Rl1C33 <20 2C Rl1C43 <20 4C-SC Rl1C45 <20 6C-7C R11C4S <20 6C-7C Rl1C46 <20 SH Rl1C92 <20 1H-2H R12COS <20 lAVB R12C92 <20 3H-4H Rl3C43 <20 6C-7C Rl3C84 <20 6C-7C R13C90 <20 6H-7H R14C3S <20 4C-SC R1SC24 <20 1C-2C RISC32 <20 6C-7C R1SC3S <20 6H-7H R16C33 <20 3AVB Rl6C43 <20 7C R17C10 <20 2H-3H R17C24 <20 6H-7H R18COS <20 6H-7H Rl8COS <20 6H-7H Rl8COS <20 6H-7H Rl8C44 <20 6C-7C R18C46 <20 7H RI8C90 <20 6H-7H R19C07 <20 6C-7C R19C20 <20 4H-SH R19C41 <20 2H-3H R20C87 <20 SC-6C R22Cll <20 6H-7H R22Cll <20 6H-7H R22C36 <20 3AVB R24C40
In "B" Steam Generator there were 894 tube examinations from the inlet side.
%TWO Location Row-Column Remarks <20 1H-2H R24C46 <20 3AVB R24C87 <20 6H-7H R25C31 <20 6H-7H R25C46 <20 6H-7H R26C28 <20 6C-7C R26C85 <20 CTS-BC R27Cl5 <20 2H-3H R27C36 <20 2C-3C R28C83 <20 CTS-BC R29Cl2 <20 2C-3C R30C23 <20 7H R30C23 <20 6C-7C R31Cl4 <20 6H-7H R31Cl4 <20 4C-5C R31Cl7 <20 7H R31C31 <20 SC R31C40 <20 6C-7C R31C47 <20 4AVB-7C R34Cl6 <20 5H-6H R34C36 <20 BC-IC R35C22 <20 4AVB-7C R36C38 <20 IAVB R38C21 <20 6C R38C39 <20 6H-7H R39C29 <20 1C-2C R39C32 <20 7H-1AVB R39C43 <20 7H ' R39C44 <20 CTS-BC R40C52 <20 7C R40C63 <20 5H-6H R41C29 <20 5C R41C47 <20 7C R41C47 <20 2AVB R43C31 <20 7H-1AVB R43C37 <20 5C-6C R43C45 <20 7H-1AVB R43C48 <20 7H R43C59 <20 4AVB-7C R44C34 <20 7C R44C34 <20 2AVB-3AVB R44C42 <20 1H-2H R44C45 <20 4AVB-7C R44C47 <20 1C-2C R45C47 <20 3C-4C R45C55 <20 5C-6C R46C52 <20 6C-7C R46C52 23 5C-6C RllC43 31 5C-6C R36C38 32 5C-6C Rl7C23 33 CTS R45C48 REFUELING OUTAGE -MAY 1988 UNIT 1 STEAM GENERATOR "C" EXAMINATION  
There were 106 tubes examined to the seventh support plate on the outlet side, and 788 tubes were examined full length (tubesheet-to-tubesheet).       This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 83 indications that are less than 20% through wall, and four indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.
      %TWO           Location             Row-Column           Remarks
      <20           4H-SH                 Rl0Cl3
      <20           4C-SC                 R10C26
      <20             SC                   RIOC26
      <20             1H-2H               Rl1C33
      <20           2C                   Rl1C43
      <20           4C-SC                 Rl1C45
      <20           6C-7C                 R11C4S
      <20           6C-7C                 Rl1C46
      <20             SH                   Rl1C92
      <20             1H-2H               R12COS
      <20             lAVB                 R12C92
      <20           3H-4H                 Rl3C43
      <20           6C-7C                 Rl3C84
      <20           6C-7C                 R13C90
      <20           6H-7H                 R14C3S
      <20           4C-SC                 R1SC24
      <20             1C-2C               RISC32
      <20           6C-7C                 R1SC3S
      <20           6H-7H                 R16C33
      <20           3AVB                 Rl6C43
      <20           7C                   R17C10
      <20           2H-3H                 R17C24
      <20           6H-7H                 R18COS
      <20           6H-7H                 Rl8COS
      <20           6H-7H                 Rl8COS
      <20           6H-7H                 Rl8C44
      <20           6C-7C                 R18C46
      <20           7H                   RI8C90
      <20           6H-7H                 R19C07
      <20           6C-7C                 R19C20
      <20           4H-SH                 R19C41
      <20           2H-3H                 R20C87
      <20           SC-6C                 R22Cll
      <20           6H-7H                 R22Cll
      <20           6H-7H                 R22C36
      <20           3AVB                 R24C40
 
%TWO Location   Row-Column Remarks
<20 1H-2H       R24C46
<20 3AVB       R24C87
<20 6H-7H       R25C31
<20 6H-7H       R25C46
<20 6H-7H       R26C28
<20 6C-7C       R26C85
<20 CTS-BC     R27Cl5
<20 2H-3H       R27C36
<20 2C-3C       R28C83
<20 CTS-BC     R29Cl2
<20 2C-3C       R30C23
<20 7H         R30C23
<20 6C-7C       R31Cl4
<20 6H-7H       R31Cl4
<20 4C-5C       R31Cl7
<20 7H         R31C31
<20 SC         R31C40
<20 6C-7C       R31C47
<20 4AVB-7C     R34Cl6
<20 5H-6H       R34C36
<20 BC-IC       R35C22
<20 4AVB-7C     R36C38
<20 IAVB       R38C21
<20 6C         R38C39
<20 6H-7H       R39C29
<20 1C-2C       R39C32
<20 7H-1AVB     R39C43
<20 7H       ' R39C44
<20 CTS-BC     R40C52
<20 7C         R40C63
<20 5H-6H       R41C29
<20 5C         R41C47
<20 7C         R41C47
<20 2AVB       R43C31
<20 7H-1AVB     R43C37
<20 5C-6C       R43C45
<20 7H-1AVB     R43C48
<20 7H         R43C59
<20 4AVB-7C     R44C34
<20 7C         R44C34
<20 2AVB-3AVB   R44C42
<20 1H-2H       R44C45
<20 4AVB-7C     R44C47
<20 1C-2C       R45C47
<20 3C-4C       R45C55
<20 5C-6C       R46C52
<20 6C-7C       R46C52 23 5C-6C       RllC43 31 5C-6C       R36C38 32 5C-6C       Rl7C23 33 CTS         R45C48
 
REFUELING OUTAGE - MAY 1988 UNIT 1 STEAM GENERATOR "C" EXAMINATION  


==SUMMARY==
==SUMMARY==
In "C" Steam Generator there were 895 tube examinations from the inlet side. There were 107 tubes examined to the seventh support plate on the outlet side, and 788 tubes were examined full length {tubesheet-to-tubesheet).
 
This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 184 indications that are less than 20% through wall, and 10 indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details. %TWO Location Row-Column Remarks <20 5H-6H R01C08 <20 1H-2H R02C64 <20 HTS-BH R03C46 <20 6C-7C R04C34 <20 2H-3H R05C23 <20 5H-6H R06C12 <20 5H-6H R06C12 <20 2H R06C60 <20 lH R06C69 <20 5H-6H R07C03 <20 5H-6H R07C03 <20 6C-7C R07C38 <20 2H-3H R07C42 <20 2H-3H R07C43 <20 2H-3H R07C45 <20 CTS-BC R07C90 <20 5H-6H R08C24 <20 2H-3H R08C46 <20 5C-6C R09Cll <20 6C R09Cl2 <20 5H-6H R09C72 <20 4H-5H R09C83 <20 6C-7C R10C04 <20 7H-1AVB RlOCll <20 6C-7C R10C52 <20 6C-7C R10C52 <20 6C-7C RlOC56 <20 7H-1AVB R10C56 <20 6C-7C R10C58 <20 6C-7C R10C58 <20 2C R10C61 <20 6C-7C R10C61 <20 2C R10C63 <20 7H R10C73 <20 4AVB-7C Rl1C03 <20 5C-6C Rl1C09
In "C" Steam Generator there were 895 tube examinations from the inlet side.
%TWO Location Row-Column Remarks <20 HTS-BH Rl1C43 <20 1C-2C Rl1C55 <20 CTS Rl1C55 <20 CTS Rl1C55 <20 6C-7C Rl1C68 <20 6C RllC91 <20 2H R12C07 <20 2H R12C10 <20 7H Rl2C51 <20 4C-5C R12C61 <20 7H R12C74 <20 CTS R12C92 <20 CTS-BC R12C92 <20 5C-6C R13C49 <20 1C-2C RI3C73 <20 6C-7C RI3C92 <20 6H-7H RI4C44 <20 6C-7C RI4C52 <20 6C-7C RI4C52 <20 3H-4H RI4C82 <20 7H RI5C44 <20 6H-7H RI5C70 <20 IC-2C RI5C71 <20 6H-7H RI6CIO <20 2H RI6C37 <20 7H-IAVB RI6C47 <20 7H-IAVB RI6C48 <20 2H-3H RI6C68 <20 3H-4H RI7C67 <20 BC-IC RI7C72 <20 6H-7H RI7C76 <20 6C-7C RI8C4I <20 IC RI8C52 <20 BC-IC RI8C71 <20 2C-3C RI9C78 <20 HTS-BH R20C3I <20 3H R20C43 <20 6H-7H R20C49 <20 4AVB-7C R20C52 <20 7H R20C89 <20 3C-4C R21C57 <20 5H-6H R21C66 <20 4C-5C R21C72 <20 IH-2H R22C19 <20 IH-2H R22CI9 <20 3H-4H R22C30 <20 IC-2C R22C70 <20 CTS R23C88 <20 3H-4H R24C29 <20 4AVB-7C R24C42 <20 4C-5C R24C46 e %TWD Location Row-Column Remarks <20 SH-6H R24CS6 <20 6H-7H R24C71 <20 1C-2C R2SC32 <20 1C-2C R2SC32 <20 6H-7H R2SC66 <20 2H R2SC83 <20 4C-SC R2SC86 <20 6C-7C R26C39 <20 SH R27C77 <20 2C-3C R28C33 <20 2H-3H R28CSS <20 6C-7C R28CS7 <20 1H-2H R28C74 <20 3H-4H R28C81 <20 CTS R30C12 <20 2H R30C16 <20 4H-SH R31C27 <20 SH-6H R31C27 <20 SH R31C27 <20 2C-3C R31C30 <20 BH-lH R31C38 <20 4AVB-7C R31C43 <20 6H-7H R31C43 <20 BH R31CS3 <20 HTS R31CSS <20 6H-7H R31C74 <20 1H-2H R31C81 <20 SC-6C R32C24 <20 HTS-BH R32CS3 <20 HTS R32CS3 <20 BC-IC R32C80 <20 4C-5C R32C81 <20 CTS-BC I R33C37 <20 7C R33C41 <20 3C-4C R33C44 <20 BH-lH R33C48 <20 2C-3C R33C71 <20 2C-3C R33C71 <20 4AVB R34C18 <20 5H-6H R34C33 <20 6H R34C45 <20 6H-7H R34C45 <20 3H-4H R34C46 <20 2C-3C R34C49 <20 BC-IC R35CI7 <20 4H-SH R3SC18 <20 CTS-BC -R3SC32 <20 3C-4C R3SC44 <20 SC R3SC47 <20 4AVB-7C R36C40 <20 1AVB-2AVB R36C61
There were 107 tubes examined to the seventh support plate on the outlet side, and 788 tubes were examined full length {tubesheet-to-tubesheet).       This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 184 indications that are less than 20% through wall, and 10 indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.
%TWD Location Row-Column Remarks <20 7H R37C48 <20 SC R38C22 <20 SH-6H R38C22 <20 6H-7H R38C44 <20 4AVB-7C R39C38 <20 6H-7H R39C44 <20 4H-SH R39C6I <20 2H-3H R40C36 <20 3AVB-4AVB R40CS2 <20 BC-IC R40CSS <20 7H R4IC36 <20 IH-2H R4ICS2 <20 IH R4ICS8 <20 6C-7C R4ICS9 <20 IAVB R42C29 <20 4AVB-7C R42CS2 <20 4AVB-7C R42CSS <20 4AVB-7C R42CS6 <20 4AVB-7C R42CS7 <20 4AVB-7C R42C60 <20 4AVB-7C R42C63 <20 2C R42C66 <20 4AVB-7C R43C3I <20 SC R43C32 <20 2C-3C R43C3S <20 IC-2C R43C40 <20 3C-4C R43C43 <20 4H-SH R43C43 <20 6H-7H R43C44 <20 2H-3H R43C46 <20 6C-7C R43CS9 <20 7C R43C60 <20 7C R43C6I <20 7C R43C63 <20 6H R44C38 <20 2C-3C R44C44 <20 4C-SC R44C44 <20 6H-7H R44C44 <20 4AVB-7C R44CS7 <20 7C R44CS7 <20 SH-6H R44CS8 <20 7C R44CS9 <20 6H R4SC38 <20 7C R4SCS7 <20 BH R4SCS7 <20 7C R4SCS8 24 SC-6C RlOCS2 26 SH-6H RI6C37 26 IH-2H R24CS3 29 IC RI3C92 30 IC-2C R26C22 e %TWO Location Row-Column Remarks 31 IC R25Cll 31 5H-6H R39C40 38 3H-4H R23C59 38 4AVB-7C R25C36 39 1C-2C R08C73 DI 5H-6H R31C42 Distorted Indication DI 5H-6H R37C40 Distorted Indication DI 2C-3C R42C43 Distorted Indication UDS 4AVB-7C R42C51 Undefined Signal e e ATTACHMENT 2 VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POWER STATION UNIT NO. 2 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT VIRGINIA ELECTRIC AND POWER COMPANY SURRY UN IT NO. 2 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT EDDY CURRENT EXAMINATION During 1988 the steam generator tubes were examined once. This examination occurred during the September refueling outage. Tubes in "A" and "C" steam generators were examined during the outage. The materi a 1 that fo 11 ows presents the results of the examinations.
      %TWO           Location             Row-Column           Remarks
These results include the number and extent of the tubes examined, the location and percent of wall-thickness penetration for each indication of an imperfection, and the identification of the tubes that were plugged. Also included are a "Tubesheet Cross Section Plot" (Figure 1) and ''Tube Support Plate/Tubesheet Nomenclature" (Figure 2). In addition, those tubes reported as having distorted indications or undefined signals are insignificant indications that are either< 20% through wall or were judged to be non-relevant based upon the 1986 tube pull and examination.
      <20             5H-6H               R01C08
These indications along with minor denting have been included in this report for future tracking and trending purposes and will be reexamined for further analysis at a later date.
      <20             1H-2H               R02C64
e REFUELING OUTAGE -MAY 1988 UNIT 2 STEAM GENERATOR "A" EXAMINATION  
      <20           HTS-BH               R03C46
      <20           6C-7C                 R04C34
      <20             2H-3H               R05C23
      <20             5H-6H               R06C12
      <20             5H-6H               R06C12
      <20             2H                   R06C60
      <20             lH                   R06C69
      <20             5H-6H               R07C03
      <20             5H-6H               R07C03
      <20           6C-7C                 R07C38
      <20             2H-3H               R07C42
      <20             2H-3H               R07C43
      <20             2H-3H               R07C45
      <20           CTS-BC               R07C90
      <20             5H-6H               R08C24
      <20           2H-3H                 R08C46
      <20             5C-6C               R09Cll
      <20           6C                   R09Cl2
      <20           5H-6H                 R09C72
      <20           4H-5H                 R09C83
      <20           6C-7C                 R10C04
      <20           7H-1AVB               RlOCll
      <20           6C-7C                 R10C52
      <20           6C-7C                 R10C52
      <20           6C-7C                 RlOC56
      <20           7H-1AVB               R10C56
      <20           6C-7C                 R10C58
      <20           6C-7C                 R10C58
      <20           2C                   R10C61
      <20           6C-7C                 R10C61
      <20           2C                   R10C63
      <20           7H                   R10C73
      <20           4AVB-7C               Rl1C03
      <20           5C-6C                 Rl1C09
 
%TWO Location Row-Column Remarks
<20 HTS-BH   Rl1C43
<20 1C-2C   Rl1C55
<20 CTS     Rl1C55
<20 CTS     Rl1C55
<20 6C-7C   Rl1C68
<20 6C       RllC91
<20 2H       R12C07
<20 2H       R12C10
<20 7H       Rl2C51
<20 4C-5C   R12C61
<20 7H       R12C74
<20 CTS     R12C92
<20 CTS-BC   R12C92
<20 5C-6C   R13C49
<20 1C-2C   RI3C73
<20 6C-7C   RI3C92
<20 6H-7H   RI4C44
<20 6C-7C   RI4C52
<20 6C-7C   RI4C52
<20 3H-4H   RI4C82
<20 7H       RI5C44
<20 6H-7H   RI5C70
<20 IC-2C   RI5C71
<20 6H-7H   RI6CIO
<20 2H       RI6C37
<20 7H-IAVB RI6C47
<20 7H-IAVB RI6C48
<20 2H-3H   RI6C68
<20 3H-4H   RI7C67
<20 BC-IC   RI7C72
<20 6H-7H   RI7C76
<20 6C-7C   RI8C4I
<20 IC       RI8C52
<20 BC-IC   RI8C71
<20 2C-3C   RI9C78
<20 HTS-BH   R20C3I
<20 3H       R20C43
<20 6H-7H   R20C49
<20 4AVB-7C R20C52
<20 7H       R20C89
<20 3C-4C   R21C57
<20 5H-6H   R21C66
<20 4C-5C   R21C72
<20 IH-2H   R22C19
<20 IH-2H   R22CI9
<20 3H-4H   R22C30
<20 IC-2C   R22C70
<20 CTS     R23C88
<20 3H-4H   R24C29
<20 4AVB-7C R24C42
<20 4C-5C   R24C46
 
e
%TWD Location     Row-Column   Remarks
<20 SH-6H         R24CS6
<20 6H-7H         R24C71
<20 1C-2C         R2SC32
<20 1C-2C         R2SC32
<20 6H-7H         R2SC66
<20 2H           R2SC83
<20 4C-SC         R2SC86
<20 6C-7C         R26C39
<20 SH           R27C77
<20 2C-3C         R28C33
<20 2H-3H         R28CSS
<20 6C-7C         R28CS7
<20 1H-2H         R28C74
<20 3H-4H         R28C81
<20 CTS           R30C12
<20 2H           R30C16
<20 4H-SH         R31C27
<20 SH-6H         R31C27
<20 SH           R31C27
<20 2C-3C         R31C30
<20 BH-lH         R31C38
<20 4AVB-7C       R31C43
<20 6H-7H         R31C43
<20 BH           R31CS3
<20 HTS           R31CSS
<20 6H-7H         R31C74
<20 1H-2H         R31C81
<20 SC-6C         R32C24
<20 HTS-BH       R32CS3
<20 HTS           R32CS3
<20 BC-IC         R32C80
<20 4C-5C         R32C81
<20 CTS-BC   I R33C37
<20 7C           R33C41
<20 3C-4C         R33C44
<20 BH-lH         R33C48
<20 2C-3C         R33C71
<20 2C-3C         R33C71
<20 4AVB         R34C18
<20 5H-6H         R34C33
<20 6H           R34C45
<20 6H-7H         R34C45
<20 3H-4H         R34C46
<20 2C-3C         R34C49
<20 BC-IC         R35CI7
<20 4H-SH         R3SC18
<20 CTS-BC     - R3SC32
<20 3C-4C         R3SC44
<20 SC           R3SC47
<20 4AVB-7C       R36C40
<20 1AVB-2AVB     R36C61
 
%TWD Location Row-Column Remarks
<20 7H       R37C48
<20 SC       R38C22
<20 SH-6H     R38C22
<20 6H-7H     R38C44
<20 4AVB-7C   R39C38
<20 6H-7H     R39C44
<20 4H-SH     R39C6I
<20 2H-3H     R40C36
<20 3AVB-4AVB R40CS2
<20 BC-IC     R40CSS
<20 7H       R4IC36
<20 IH-2H     R4ICS2
<20 IH       R4ICS8
<20 6C-7C     R4ICS9
<20 IAVB     R42C29
<20 4AVB-7C   R42CS2
<20 4AVB-7C   R42CSS
<20 4AVB-7C   R42CS6
<20 4AVB-7C   R42CS7
<20 4AVB-7C   R42C60
<20 4AVB-7C   R42C63
<20 2C       R42C66
<20 4AVB-7C   R43C3I
<20 SC       R43C32
<20 2C-3C     R43C3S
<20 IC-2C     R43C40
<20 3C-4C     R43C43
<20 4H-SH     R43C43
<20 6H-7H     R43C44
<20 2H-3H     R43C46
<20 6C-7C     R43CS9
<20 7C       R43C60
<20 7C       R43C6I
<20 7C       R43C63
<20 6H       R44C38
<20 2C-3C     R44C44
<20 4C-SC     R44C44
<20 6H-7H     R44C44
<20 4AVB-7C   R44CS7
<20 7C       R44CS7
<20 SH-6H     R44CS8
<20 7C       R44CS9
<20 6H       R4SC38
<20 7C       R4SCS7
<20 BH       R4SCS7
<20 7C       R4SCS8 24 SC-6C     RlOCS2 26 SH-6H     RI6C37 26 IH-2H     R24CS3 29 IC       RI3C92 30 IC-2C     R26C22
 
e
%TWO Location Row-Column   Remarks 31 IC       R25Cll 31 5H-6H   R39C40 38 3H-4H   R23C59 38 4AVB-7C R25C36 39 1C-2C   R08C73 DI 5H-6H   R31C42       Distorted Indication DI 5H-6H   R37C40       Distorted Indication DI 2C-3C   R42C43       Distorted Indication UDS 4AVB-7C R42C51       Undefined Signal
 
e                               e ATTACHMENT 2 VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POWER STATION UNIT NO. 2 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT
 
VIRGINIA ELECTRIC AND POWER COMPANY SURRY UN IT NO. 2 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT EDDY CURRENT EXAMINATION During 1988 the steam generator tubes were examined once.       This examination occurred during the September refueling outage. Tubes in "A" and "C" steam generators were examined during the outage. The materi a1 that fo 11 ows presents the results of the examinations. These results include the number and extent of the tubes examined, the location and percent of wall-thickness penetration for each indication of an imperfection, and the identification of the tubes that were plugged. Also included are a "Tubesheet Cross Section Plot" (Figure 1) and ''Tube Support Plate/Tubesheet Nomenclature" (Figure 2).
In addition, those tubes reported as having distorted indications or undefined signals are insignificant indications that are either< 20% through wall or were judged to be non-relevant based upon the 1986 tube pull and examination. These indications along with minor denting have been included in this report for future tracking and trending purposes and will be reexamined for further analysis at a later date.
 
e REFUELING OUTAGE - MAY 1988 UNIT 2 STEAM GENERATOR "A" EXAMINATION  


==SUMMARY==
==SUMMARY==
In "A" Steam Generator there were 893 tube examinations from the inlet side. There were 97 tubes examined to the seventh support on the outlet side, 10 tubes were examined to the sixth support plate on the outlet side, and 786 tubes were examined full length (tubesheet-to-tubesheet).
 
This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 29 indications that are less than 20% through wall, and three indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details. %TWD Location Row-Column Remarks <20 7H R01C29 <20 HTS-lH R01C33 <20 4H-5H R09C24 <20 7C R09C73 <20 HTS-lH R11C36 <20 1H-2H R12C88 <20 HTS-lH R12C88 <20 6H-7H R15C36 <20 6H-7H R17C54 <20 2C-3C R20C87 <20 6H-7H R22C47 <20 6C-7C R23C86 <20 1H-2H R27C26 <20 3C-4C R27C26 <20 3H-4H R27C26 <20 5C-6C R27C26 <20 5H-6H R27C26 <20 7H R27C83 <20 4C-5C R35C70 <20 1H-2H R37C22 <20 6H R37C45 <20 5H-6H R38C26 <20 CTS R39C23 <20 6H-7H R39C43 <20 CTS R40C25 <20 2H R40C37 <20 4C-5C R40C68 <20 6C-7C R41C32 <20 6H-7H R41C32 27 CTS R06C38 32 6C-7C R12C39 33 1C-2C R12C92 D HTS-lH R01C33 Dent e %TWO Location Row-Column Remarks UDS 7H R12C63 Undefined Signal UDS 1C-2C Rl2C87 Undefined Signal UDS 6C-7C R12C87 Undefined Signal UDS 4AVB-7C R22C07 Undefined Signal UDS 4AVB-7C R32C79 Undefined Signal UDS 3C-4C R36C51 Undefined Signal UDS SC R36C51 Undefined Si gna 1 UDS 5C-6C R36C51 Undefined Signal UDS 6C-7C R36C51 Undefined Signal UDS 7C R42C34 Undefined Signal UDS 6C-7C R45C47 Undefined Signal UDS 6H-7H R45C47 Undefined Signal REFUELING OUTAGE -MAY 1988 UNIT 2 STEAM GENERATOR "C" EXAMINATION  
In "A" Steam Generator there were 893 tube examinations from the inlet side.
There were 97 tubes examined to the seventh support on the outlet side, 10 tubes were examined to the sixth support plate on the outlet side, and 786 tubes were examined full length (tubesheet-to-tubesheet). This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 29 indications that are less than 20% through wall, and three indications that are between 20% and 40% through wall.       No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.
      %TWD           Location             Row-Column           Remarks
      <20             7H                   R01C29
      <20             HTS-lH               R01C33
      <20             4H-5H                 R09C24
      <20             7C                   R09C73
      <20             HTS-lH               R11C36
      <20             1H-2H                 R12C88
      <20             HTS-lH               R12C88
      <20             6H-7H                 R15C36
      <20             6H-7H                 R17C54
      <20             2C-3C                 R20C87
      <20             6H-7H                 R22C47
      <20             6C-7C                 R23C86
      <20             1H-2H                 R27C26
      <20             3C-4C                 R27C26
      <20             3H-4H                 R27C26
      <20             5C-6C                 R27C26
      <20             5H-6H                 R27C26
      <20             7H                   R27C83
      <20             4C-5C                 R35C70
      <20             1H-2H                 R37C22
      <20             6H                   R37C45
      <20             5H-6H                 R38C26
      <20             CTS                   R39C23
      <20             6H-7H                 R39C43
      <20             CTS                   R40C25
      <20             2H                   R40C37
      <20             4C-5C                 R40C68
      <20             6C-7C                 R41C32
      <20             6H-7H                 R41C32 27             CTS                   R06C38 32             6C-7C                 R12C39 33             1C-2C                 R12C92 D             HTS-lH               R01C33               Dent
 
e
%TWO Location Row-Column   Remarks UDS 7H       R12C63       Undefined Signal UDS 1C-2C   Rl2C87       Undefined Signal UDS 6C-7C   R12C87       Undefined Signal UDS 4AVB-7C R22C07       Undefined Signal UDS 4AVB-7C R32C79       Undefined Signal UDS 3C-4C   R36C51       Undefined Signal UDS SC       R36C51       Undefined Si gna 1 UDS 5C-6C   R36C51       Undefined Signal UDS 6C-7C   R36C51       Undefined Signal UDS 7C       R42C34       Undefined Signal UDS 6C-7C   R45C47       Undefined Signal UDS 6H-7H   R45C47       Undefined Signal
 
l I
REFUELING OUTAGE - MAY 1988 UNIT 2 STEAM GENERATOR "C" EXAMINATION  


==SUMMARY==
==SUMMARY==
In "C" Steam Generator there were 891 tube examinations from the inlet side. There was one tube examined to the seventh support on the inlet side, 27 tubes were examined to the seventh support p 1 ate on the outlet side, 81 tubes were examined to the sixth support plate on the outlet side, one tube was examined to the fifth support p 1 ate on the out 1 et side, and 781 tubes were examined ful 1 length (tubesheet-to-tubesheet).
 
This is approximately 27 percent of the *available tubes. The tubes examined were found to have a total of 42 indications that are less than 20% through wall, and seven indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details. %TWO Location Row-Column Remarks <20 3AVB R40C63 <20 4AVB R40C63 <20 3AVB R43C31 <20 1C-2C R42C31 <20 IC R42C35 <20 1H-2H R29Cl2 <20 1H-2H R21C18 <20 1H-2H R40C36 <20 1H-2H R45C41 <20 1H-2H R11C90 <20 2AVB Rl3C06 <20 2C-3C R45C40 <20 2H-3H R23C23 <20 2H-3H Rl5C88 <20 3C-4C R29C12 <20 3C-4C Rl7Cl9 <20 3C-4C R11C55 <20 3C-4C RlOC61 <20 3C-4C R29C83 <20 3C-4C R29C83 <20 3C-4C Rl4C88 <20 3H-4H R36C73 <20 3H-4H Rl3C92 <20 4AVB-7C R22C48 <20 4C-5C R14C91 <20 4H-5H R32C26 <20 5C-6C R44C59 <20 6C-7C R39C42 <20 6C-7C R33C73 <20 6H-7H R27CI3 <20 6H-7H R25C14 <20 6H-7H R34C16 <20 6H-7H R31C20 <20 6H-7H R42C41 l I 
In "C" Steam Generator there were 891 tube examinations from the inlet side.
%TWO Location Row-Column Remarks <20 6H-7H R42C59 <20 6H-7H R29C71 <20 7C R44C55 <20 7H-1AVB R45C53 <20 BH-lH R25Cl2 <20 HTS-BH R04C28 <20 HTS-BH R39C60 <20 CTS R41C42 24 4AVB R28C49 25 4AVB R43C31 35 5C-6C R27C41 36 4H-5H R27C41 37 4C-5C R27C41 39 3C-4C R41C59 39 3H-4H R24C86 D 7C R27Cl0 Dent D 7C R44C59 Dent I I _J I 8 ID <-NOZZLE Figure I Tubesheet Cross Section Plot PLANT: SURRY TU.BE LOCATIONS PER GENERATOR:
There was one tube examined to the seventh support on the inlet side, 27 tubes were examined to the seventh support p1ate on the outlet side, 81 tubes were examined to the sixth support plate on the outlet side, one tube was examined to the fifth support p1ate on the out 1et side, and 781 tubes were examined ful 1 length (tubesheet-to-tubesheet).     This is approximately 27 percent of the
3354 0 .. ID .. 0 CII -Westinghouse Series 51-F 0 ... ID ... " I* MAHWAY --> . --40 35 --ao 20 ---10 B 
*available tubes. The tubes examined were found to have a total of 42 indications that are less than 20% through wall, and seven indications that are between 20%
.... . . . e FIGURE 2 -Tub.e Support Plate/Tubesheet Nomenclature  
and 40% through wall. No tubes were found to have indications greater than 40%
,,. 2AVB 1AVB SH ------5H---4H---3H---2H---1H BH 3AVB 4AVB t---7C :----SC ---5C ....................
through wall. No tubes were plugged. Refer to the table below for details.
_ ----4C -----3C -----2C --1c --~ ..... ...,H--~----BC 1'-----CTS}}
      %TWO           Location             Row-Column             Remarks
      <20           3AVB                 R40C63
      <20           4AVB                 R40C63
      <20           3AVB                 R43C31
      <20           1C-2C               R42C31
      <20           IC                   R42C35
      <20           1H-2H               R29Cl2
      <20           1H-2H               R21C18
      <20           1H-2H               R40C36
      <20           1H-2H               R45C41
      <20           1H-2H               R11C90
      <20           2AVB                 Rl3C06
      <20           2C-3C               R45C40
      <20           2H-3H               R23C23
      <20           2H-3H               Rl5C88
      <20           3C-4C               R29C12
      <20           3C-4C               Rl7Cl9
      <20           3C-4C               R11C55
      <20           3C-4C               RlOC61
      <20           3C-4C               R29C83
      <20           3C-4C               R29C83
      <20           3C-4C               Rl4C88
      <20           3H-4H               R36C73
      <20           3H-4H               Rl3C92
      <20           4AVB-7C             R22C48
      <20           4C-5C               R14C91
      <20           4H-5H               R32C26
      <20           5C-6C               R44C59
      <20           6C-7C               R39C42
      <20           6C-7C               R33C73
      <20           6H-7H               R27CI3
      <20           6H-7H               R25C14
      <20           6H-7H               R34C16
      <20           6H-7H               R31C20
      <20           6H-7H               R42C41
 
%TWO Location Row-Column Remarks
<20 6H-7H   R42C59
<20 6H-7H   R29C71
<20 7C       R44C55
<20 7H-1AVB R45C53
<20 BH-lH   R25Cl2
<20 HTS-BH   R04C28
<20 HTS-BH   R39C60
<20 CTS     R41C42 24 4AVB     R28C49 25 4AVB     R43C31 35 5C-6C   R27C41 36 4H-5H   R27C41 37 4C-5C   R27C41 39 3C-4C   R41C59 39 3H-4H   R24C86 D 7C       R27Cl0     Dent D 7C       R44C59     Dent
 
Figure I Tubesheet Cross Section Plot           Westinghouse Series 51-F PLANT: SURRY TU.BE LOCATIONS PER GENERATOR: 3354
                                                                                              -40
                                                                        ~
                                                                                              -35
              ~                                                                              -ao
                                                                                              -25 I                                                                          "
                                                                                              -20 I                                                                                            -10 B
I*
_J 8
I ID      .
0 ID               0 CII                         ...
0 ID MAHWAY --> .
<- NOZZLE
 
. ...~                  e     FIGURE 2             -
Tub.e Support Plate/Tubesheet Nomenclature 2AVB                                         3AVB 1AVB                                         4AVB t---7C SH - - - - - -                       :----SC 5H---                               ---5C 4H---         ...................._ ----4C 3H---                              -----3C 2H---                              -----2C
                                                  --1c 1H BH
                            --~........,H-- ~----BC 1'-----CTS}}

Latest revision as of 22:58, 2 February 2020

1988 Annual Steam Generator Inservice Insp Rept.
ML18153B625
Person / Time
Site: Surry  Dominion icon.png
Issue date: 03/01/1989
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18153B624 List:
References
NUDOCS 8903090153
Download: ML18153B625 (17)


Text

e ATTACHMENT 1 VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POWER STATION UNIT NO. 1 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT 8903090153 890301 \

PDR ADOCK 05000280 Q PDC

VIRGINIA ELECTRIC AND POWER COMPANY SURRY UNIT NO. I 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT EDDY CURRENT EXAMINATION During 1988 the steam generator tubes were examined once. This examination occurred during the May refueling outage. Tubes in 11 811 and "C" steam generators were examined during the outage. The material that follows presents the results of the examinations. These results include the number and extent of the tubes examined, the location and percent of wall-thickness penetration for each indication of an imperfection, and the identification of the tubes that were plugged. Also included are a "Tubesheet Cross Section Plot" (Figure 1) and Tube Support Plate/Tubesheet Nomenclature" (Figure 2).

In addition, those tubes reported as having distorted indications or undefined signals are insignificant indications that are either< 20% through wall or were judged to be non-relevant based upon the 1986 tube pull and examination. These indications along with minor denting have been included in this report for future tracking and trending purposes and will be reexamined for further analysis at a later date.

REFUELING OUTAGE - MAY 1988 UNIT 1 STEAM GENERATOR "B" EXAMINATION

SUMMARY

In "B" Steam Generator there were 894 tube examinations from the inlet side.

There were 106 tubes examined to the seventh support plate on the outlet side, and 788 tubes were examined full length (tubesheet-to-tubesheet). This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 83 indications that are less than 20% through wall, and four indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.

%TWO Location Row-Column Remarks

<20 4H-SH Rl0Cl3

<20 4C-SC R10C26

<20 SC RIOC26

<20 1H-2H Rl1C33

<20 2C Rl1C43

<20 4C-SC Rl1C45

<20 6C-7C R11C4S

<20 6C-7C Rl1C46

<20 SH Rl1C92

<20 1H-2H R12COS

<20 lAVB R12C92

<20 3H-4H Rl3C43

<20 6C-7C Rl3C84

<20 6C-7C R13C90

<20 6H-7H R14C3S

<20 4C-SC R1SC24

<20 1C-2C RISC32

<20 6C-7C R1SC3S

<20 6H-7H R16C33

<20 3AVB Rl6C43

<20 7C R17C10

<20 2H-3H R17C24

<20 6H-7H R18COS

<20 6H-7H Rl8COS

<20 6H-7H Rl8COS

<20 6H-7H Rl8C44

<20 6C-7C R18C46

<20 7H RI8C90

<20 6H-7H R19C07

<20 6C-7C R19C20

<20 4H-SH R19C41

<20 2H-3H R20C87

<20 SC-6C R22Cll

<20 6H-7H R22Cll

<20 6H-7H R22C36

<20 3AVB R24C40

%TWO Location Row-Column Remarks

<20 1H-2H R24C46

<20 3AVB R24C87

<20 6H-7H R25C31

<20 6H-7H R25C46

<20 6H-7H R26C28

<20 6C-7C R26C85

<20 CTS-BC R27Cl5

<20 2H-3H R27C36

<20 2C-3C R28C83

<20 CTS-BC R29Cl2

<20 2C-3C R30C23

<20 7H R30C23

<20 6C-7C R31Cl4

<20 6H-7H R31Cl4

<20 4C-5C R31Cl7

<20 7H R31C31

<20 SC R31C40

<20 6C-7C R31C47

<20 4AVB-7C R34Cl6

<20 5H-6H R34C36

<20 BC-IC R35C22

<20 4AVB-7C R36C38

<20 IAVB R38C21

<20 6C R38C39

<20 6H-7H R39C29

<20 1C-2C R39C32

<20 7H-1AVB R39C43

<20 7H ' R39C44

<20 CTS-BC R40C52

<20 7C R40C63

<20 5H-6H R41C29

<20 5C R41C47

<20 7C R41C47

<20 2AVB R43C31

<20 7H-1AVB R43C37

<20 5C-6C R43C45

<20 7H-1AVB R43C48

<20 7H R43C59

<20 4AVB-7C R44C34

<20 7C R44C34

<20 2AVB-3AVB R44C42

<20 1H-2H R44C45

<20 4AVB-7C R44C47

<20 1C-2C R45C47

<20 3C-4C R45C55

<20 5C-6C R46C52

<20 6C-7C R46C52 23 5C-6C RllC43 31 5C-6C R36C38 32 5C-6C Rl7C23 33 CTS R45C48

REFUELING OUTAGE - MAY 1988 UNIT 1 STEAM GENERATOR "C" EXAMINATION

SUMMARY

In "C" Steam Generator there were 895 tube examinations from the inlet side.

There were 107 tubes examined to the seventh support plate on the outlet side, and 788 tubes were examined full length {tubesheet-to-tubesheet). This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 184 indications that are less than 20% through wall, and 10 indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.

%TWO Location Row-Column Remarks

<20 5H-6H R01C08

<20 1H-2H R02C64

<20 HTS-BH R03C46

<20 6C-7C R04C34

<20 2H-3H R05C23

<20 5H-6H R06C12

<20 5H-6H R06C12

<20 2H R06C60

<20 lH R06C69

<20 5H-6H R07C03

<20 5H-6H R07C03

<20 6C-7C R07C38

<20 2H-3H R07C42

<20 2H-3H R07C43

<20 2H-3H R07C45

<20 CTS-BC R07C90

<20 5H-6H R08C24

<20 2H-3H R08C46

<20 5C-6C R09Cll

<20 6C R09Cl2

<20 5H-6H R09C72

<20 4H-5H R09C83

<20 6C-7C R10C04

<20 7H-1AVB RlOCll

<20 6C-7C R10C52

<20 6C-7C R10C52

<20 6C-7C RlOC56

<20 7H-1AVB R10C56

<20 6C-7C R10C58

<20 6C-7C R10C58

<20 2C R10C61

<20 6C-7C R10C61

<20 2C R10C63

<20 7H R10C73

<20 4AVB-7C Rl1C03

<20 5C-6C Rl1C09

%TWO Location Row-Column Remarks

<20 HTS-BH Rl1C43

<20 1C-2C Rl1C55

<20 CTS Rl1C55

<20 CTS Rl1C55

<20 6C-7C Rl1C68

<20 6C RllC91

<20 2H R12C07

<20 2H R12C10

<20 7H Rl2C51

<20 4C-5C R12C61

<20 7H R12C74

<20 CTS R12C92

<20 CTS-BC R12C92

<20 5C-6C R13C49

<20 1C-2C RI3C73

<20 6C-7C RI3C92

<20 6H-7H RI4C44

<20 6C-7C RI4C52

<20 6C-7C RI4C52

<20 3H-4H RI4C82

<20 7H RI5C44

<20 6H-7H RI5C70

<20 IC-2C RI5C71

<20 6H-7H RI6CIO

<20 2H RI6C37

<20 7H-IAVB RI6C47

<20 7H-IAVB RI6C48

<20 2H-3H RI6C68

<20 3H-4H RI7C67

<20 BC-IC RI7C72

<20 6H-7H RI7C76

<20 6C-7C RI8C4I

<20 IC RI8C52

<20 BC-IC RI8C71

<20 2C-3C RI9C78

<20 HTS-BH R20C3I

<20 3H R20C43

<20 6H-7H R20C49

<20 4AVB-7C R20C52

<20 7H R20C89

<20 3C-4C R21C57

<20 5H-6H R21C66

<20 4C-5C R21C72

<20 IH-2H R22C19

<20 IH-2H R22CI9

<20 3H-4H R22C30

<20 IC-2C R22C70

<20 CTS R23C88

<20 3H-4H R24C29

<20 4AVB-7C R24C42

<20 4C-5C R24C46

e

%TWD Location Row-Column Remarks

<20 SH-6H R24CS6

<20 6H-7H R24C71

<20 1C-2C R2SC32

<20 1C-2C R2SC32

<20 6H-7H R2SC66

<20 2H R2SC83

<20 4C-SC R2SC86

<20 6C-7C R26C39

<20 SH R27C77

<20 2C-3C R28C33

<20 2H-3H R28CSS

<20 6C-7C R28CS7

<20 1H-2H R28C74

<20 3H-4H R28C81

<20 CTS R30C12

<20 2H R30C16

<20 4H-SH R31C27

<20 SH-6H R31C27

<20 SH R31C27

<20 2C-3C R31C30

<20 BH-lH R31C38

<20 4AVB-7C R31C43

<20 6H-7H R31C43

<20 BH R31CS3

<20 HTS R31CSS

<20 6H-7H R31C74

<20 1H-2H R31C81

<20 SC-6C R32C24

<20 HTS-BH R32CS3

<20 HTS R32CS3

<20 BC-IC R32C80

<20 4C-5C R32C81

<20 CTS-BC I R33C37

<20 7C R33C41

<20 3C-4C R33C44

<20 BH-lH R33C48

<20 2C-3C R33C71

<20 2C-3C R33C71

<20 4AVB R34C18

<20 5H-6H R34C33

<20 6H R34C45

<20 6H-7H R34C45

<20 3H-4H R34C46

<20 2C-3C R34C49

<20 BC-IC R35CI7

<20 4H-SH R3SC18

<20 CTS-BC - R3SC32

<20 3C-4C R3SC44

<20 SC R3SC47

<20 4AVB-7C R36C40

<20 1AVB-2AVB R36C61

%TWD Location Row-Column Remarks

<20 7H R37C48

<20 SC R38C22

<20 SH-6H R38C22

<20 6H-7H R38C44

<20 4AVB-7C R39C38

<20 6H-7H R39C44

<20 4H-SH R39C6I

<20 2H-3H R40C36

<20 3AVB-4AVB R40CS2

<20 BC-IC R40CSS

<20 7H R4IC36

<20 IH-2H R4ICS2

<20 IH R4ICS8

<20 6C-7C R4ICS9

<20 IAVB R42C29

<20 4AVB-7C R42CS2

<20 4AVB-7C R42CSS

<20 4AVB-7C R42CS6

<20 4AVB-7C R42CS7

<20 4AVB-7C R42C60

<20 4AVB-7C R42C63

<20 2C R42C66

<20 4AVB-7C R43C3I

<20 SC R43C32

<20 2C-3C R43C3S

<20 IC-2C R43C40

<20 3C-4C R43C43

<20 4H-SH R43C43

<20 6H-7H R43C44

<20 2H-3H R43C46

<20 6C-7C R43CS9

<20 7C R43C60

<20 7C R43C6I

<20 7C R43C63

<20 6H R44C38

<20 2C-3C R44C44

<20 4C-SC R44C44

<20 6H-7H R44C44

<20 4AVB-7C R44CS7

<20 7C R44CS7

<20 SH-6H R44CS8

<20 7C R44CS9

<20 6H R4SC38

<20 7C R4SCS7

<20 BH R4SCS7

<20 7C R4SCS8 24 SC-6C RlOCS2 26 SH-6H RI6C37 26 IH-2H R24CS3 29 IC RI3C92 30 IC-2C R26C22

e

%TWO Location Row-Column Remarks 31 IC R25Cll 31 5H-6H R39C40 38 3H-4H R23C59 38 4AVB-7C R25C36 39 1C-2C R08C73 DI 5H-6H R31C42 Distorted Indication DI 5H-6H R37C40 Distorted Indication DI 2C-3C R42C43 Distorted Indication UDS 4AVB-7C R42C51 Undefined Signal

e e ATTACHMENT 2 VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POWER STATION UNIT NO. 2 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT

VIRGINIA ELECTRIC AND POWER COMPANY SURRY UN IT NO. 2 1988 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT EDDY CURRENT EXAMINATION During 1988 the steam generator tubes were examined once. This examination occurred during the September refueling outage. Tubes in "A" and "C" steam generators were examined during the outage. The materi a1 that fo 11 ows presents the results of the examinations. These results include the number and extent of the tubes examined, the location and percent of wall-thickness penetration for each indication of an imperfection, and the identification of the tubes that were plugged. Also included are a "Tubesheet Cross Section Plot" (Figure 1) and Tube Support Plate/Tubesheet Nomenclature" (Figure 2).

In addition, those tubes reported as having distorted indications or undefined signals are insignificant indications that are either< 20% through wall or were judged to be non-relevant based upon the 1986 tube pull and examination. These indications along with minor denting have been included in this report for future tracking and trending purposes and will be reexamined for further analysis at a later date.

e REFUELING OUTAGE - MAY 1988 UNIT 2 STEAM GENERATOR "A" EXAMINATION

SUMMARY

In "A" Steam Generator there were 893 tube examinations from the inlet side.

There were 97 tubes examined to the seventh support on the outlet side, 10 tubes were examined to the sixth support plate on the outlet side, and 786 tubes were examined full length (tubesheet-to-tubesheet). This is approximately 27 percent of the available tubes. The tubes examined were found to have a total of 29 indications that are less than 20% through wall, and three indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.

%TWD Location Row-Column Remarks

<20 7H R01C29

<20 HTS-lH R01C33

<20 4H-5H R09C24

<20 7C R09C73

<20 HTS-lH R11C36

<20 1H-2H R12C88

<20 HTS-lH R12C88

<20 6H-7H R15C36

<20 6H-7H R17C54

<20 2C-3C R20C87

<20 6H-7H R22C47

<20 6C-7C R23C86

<20 1H-2H R27C26

<20 3C-4C R27C26

<20 3H-4H R27C26

<20 5C-6C R27C26

<20 5H-6H R27C26

<20 7H R27C83

<20 4C-5C R35C70

<20 1H-2H R37C22

<20 6H R37C45

<20 5H-6H R38C26

<20 CTS R39C23

<20 6H-7H R39C43

<20 CTS R40C25

<20 2H R40C37

<20 4C-5C R40C68

<20 6C-7C R41C32

<20 6H-7H R41C32 27 CTS R06C38 32 6C-7C R12C39 33 1C-2C R12C92 D HTS-lH R01C33 Dent

e

%TWO Location Row-Column Remarks UDS 7H R12C63 Undefined Signal UDS 1C-2C Rl2C87 Undefined Signal UDS 6C-7C R12C87 Undefined Signal UDS 4AVB-7C R22C07 Undefined Signal UDS 4AVB-7C R32C79 Undefined Signal UDS 3C-4C R36C51 Undefined Signal UDS SC R36C51 Undefined Si gna 1 UDS 5C-6C R36C51 Undefined Signal UDS 6C-7C R36C51 Undefined Signal UDS 7C R42C34 Undefined Signal UDS 6C-7C R45C47 Undefined Signal UDS 6H-7H R45C47 Undefined Signal

l I

REFUELING OUTAGE - MAY 1988 UNIT 2 STEAM GENERATOR "C" EXAMINATION

SUMMARY

In "C" Steam Generator there were 891 tube examinations from the inlet side.

There was one tube examined to the seventh support on the inlet side, 27 tubes were examined to the seventh support p1ate on the outlet side, 81 tubes were examined to the sixth support plate on the outlet side, one tube was examined to the fifth support p1ate on the out 1et side, and 781 tubes were examined ful 1 length (tubesheet-to-tubesheet). This is approximately 27 percent of the

  • available tubes. The tubes examined were found to have a total of 42 indications that are less than 20% through wall, and seven indications that are between 20%

and 40% through wall. No tubes were found to have indications greater than 40%

through wall. No tubes were plugged. Refer to the table below for details.

%TWO Location Row-Column Remarks

<20 3AVB R40C63

<20 4AVB R40C63

<20 3AVB R43C31

<20 1C-2C R42C31

<20 IC R42C35

<20 1H-2H R29Cl2

<20 1H-2H R21C18

<20 1H-2H R40C36

<20 1H-2H R45C41

<20 1H-2H R11C90

<20 2AVB Rl3C06

<20 2C-3C R45C40

<20 2H-3H R23C23

<20 2H-3H Rl5C88

<20 3C-4C R29C12

<20 3C-4C Rl7Cl9

<20 3C-4C R11C55

<20 3C-4C RlOC61

<20 3C-4C R29C83

<20 3C-4C R29C83

<20 3C-4C Rl4C88

<20 3H-4H R36C73

<20 3H-4H Rl3C92

<20 4AVB-7C R22C48

<20 4C-5C R14C91

<20 4H-5H R32C26

<20 5C-6C R44C59

<20 6C-7C R39C42

<20 6C-7C R33C73

<20 6H-7H R27CI3

<20 6H-7H R25C14

<20 6H-7H R34C16

<20 6H-7H R31C20

<20 6H-7H R42C41

%TWO Location Row-Column Remarks

<20 6H-7H R42C59

<20 6H-7H R29C71

<20 7C R44C55

<20 7H-1AVB R45C53

<20 BH-lH R25Cl2

<20 HTS-BH R04C28

<20 HTS-BH R39C60

<20 CTS R41C42 24 4AVB R28C49 25 4AVB R43C31 35 5C-6C R27C41 36 4H-5H R27C41 37 4C-5C R27C41 39 3C-4C R41C59 39 3H-4H R24C86 D 7C R27Cl0 Dent D 7C R44C59 Dent

Figure I Tubesheet Cross Section Plot Westinghouse Series 51-F PLANT: SURRY TU.BE LOCATIONS PER GENERATOR: 3354

-40

~

-35

~ -ao

-25 I "

-20 I -10 B

I*

_J 8

I ID .

0 ID 0 CII ...

0 ID MAHWAY --> .

<- NOZZLE

. ...~ e FIGURE 2 -

Tub.e Support Plate/Tubesheet Nomenclature 2AVB 3AVB 1AVB 4AVB t---7C SH - - - - - -  :----SC 5H--- ---5C 4H--- ...................._ ----4C 3H--- -----3C 2H--- -----2C

--1c 1H BH

--~........,H-- ~----BC 1'-----CTS