Page 01 of 17 VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POWER STATION UNIT NO. 1 1986 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT EDDY CURRENT EXAMINATION During 1986 the steam. generator tubes were examined once. This examination occurred during the June refueling outage. Tubes in "A", "B",
and "c" steam generators were examined during the outage. The material that follows presents the results of the examinations. These results include the number and extent of the tubes examined, the location and percent of wall-thickness penetration for each indication of an imperfection, and the identification of the tubes that were plugged. Also included are a "Tubesheet Cross Section Plot" (Figure 1) and "Tube Support Plate/Tubesheet Nomenclature" (Figure 2).
,.-----~--------- -
8708180133 870812 PDR ADOCK 05000280
'I G PDR I
J e e Page 02 of 17 REFUELING OUTAGE - JUNE 1986 UNIT 1 STEAM GENERATOR "A" EXAMINATION
SUMMARY
In "A" Steam Generator there were 3339 tube examinations from the inlet side. There was one tube examined to* the seventh support plate on the inlet side, 469 tubes were examined to the seventh support plate on the outlet side, and 2869 tubes were examined full length (tubesheet-to-tubesheet). This is approximately 100 percent of the available tubes. The tubes examined were found to have a total of 120 indications that are less than 20% through wall, and 24 indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.
%TWD Location Row-Column Remarks
<20 2H R01C56
<20 1H-2H R01C84
<20 3H-4H R02C18
<20 2H-3H R02C86
<20 BH-lH R03C91
<20* 1H-2H RCJ"4C30
<20 2H-3H R04C51 I*
<20 6H-7H .R04C63
<20 1H R05C80
<20 HTS-BR R06C14
<20 sc R07C47
<20 1C-2C R07C77
<20 4C R08C48
<20 2H-3H R08C69
<20 6H-7H *R09C10 23 6H-7H ~'.R09C10
<20 2H-3H R09C36
<20 BC ~'.R1QC16
<20 SC *RlOC16
<20 lC R10C69
<20 CTS-BC RllC55
<20 2G R12C34
<20 2H-3H Rl2C40
<20 2H-3H 7*Rl2C61
<20 2H-3H ~'.R12C61
<20 BC R12C92
<20 6C-7C R13C33
<20 7C-4AVB R13C69
<20 5H-6H Rl4C19
e e Page 03 of 17
%TWD Location Row-Column Remarks
<20 7C *'*R14C90
<20 SH-6H *'*R14C90
<20 1H-2H R1SC20
<20 6H-7H R15C23
<20 HTS-BH Rl5C28
<20 4C-SC R15CS9
<20 2C-3C R16CSO
<20 4H-SH *'*Rl6C67
<20 1H-2H >'*R16C67
<20 6H-7H >'*R16C86
<20 SH-6H *R16C86
<20 6H-7H _ R17C61
<20 7H R19C63
<20 2C-3C Rl9C88
<20 4H-SH R20Cl8
<20 1H-2H R20C31
<20 2AVB R20C87
<20 BH-lH R20C89
<20 1C-2C R21C2S
<20 1C-2C R21C28
<20 4C-SC >':R21CS1
<20 4C-SC *R21CS1
<20 2AVB-3AVB *R21C64
<20 7C-4AVB *R21C64
<20 SC *R21C87
<20 7C *R21C87
<20 7C R22C28
<20 7H R22C36
<20 7H R22C37
<20 1C-2C R23C08
<20 4H-SH R23C33
<20 6C-7C R23C4S
<20 4H-SH R23C47
<20 1H-2H R24C44
<20 6C-7C R24C80
<20 1C-2C R24C83
<20 6C-7C R24C86
<20 4H-SH R2SC13
<20 7C R2SC4S
<20 3C-4C *R2SC6S
<20 SC *R25C65
<20 SH-6H *R26C46 21 SH *R26C46
<20 2H-3H >':R27C60
<20 3C-4C *R27C60
<20 7H *R28C42
<20 6C-7C *R28C42
<20 7H R28C43
<20 2C-3C R28C45
e*
Page 04 of 17
%TWD Location Row-Column Remarks
<20 7C-4AVB R28C70
<20 7C R28C78
<20 BH-lH R29C38
<20 7H R29C4S
<20 7H R29C69
<20 BC ,':R30C83
<20 BC-lC *R30C83
<20 3C-4C R31C29
<20 6H-7H R31CS1
<20 SH-6H R31C69
<20 6H-7H i:R31C70
<20 7C '"'R31C70
<20 4C-SC R32C81
<20 3H-4H R33C18
<20 4H-SH '"'R34C37
<20 1H *R34C37
<20 6C-7C R34C38
<20 7C-4AVB R34CS9
<20 7C-4AVB R34C60
<20 SC-6C *R34C76
<20 SC-6C i:R34C76
<20 4C-SC R3SCS7
<20 4c*-sc R3SC71
<20 3H-4H R36C4S
<20 SC-6C R40C48
<20 2AVB-3AVB R40C6S
<20 3H R40C66
<20 3C-4C R41C44
<20 6C-7C R41CS7
<20 3H R41CS8
<20 SH R41C64
<20 SH-6H R42C31
<20 4H R42C6S
<20 6H-7H R43C32
<20 SH R43CS6
<20 1H-2H R44C38
<20 7C R44C42
<20 6H *R44CS8
<20 3H *R44CS8
<20 4H *R44CS8
<20 7C R44CS9
<20 7C R44C61
<20 7C R4SC47
<20 7C R4SCS7 20 7H-1AVB R13C73 20 6H-7H *R36C42 21 4H-SH *R36C42 20 4H-SH R36CS6
e Page 05 of 17
%TWD Location Row-Column Remarks 21 3H 7*R19C21 34 1H-2H ,',R19C21 21 7C R38C61 22 4AVB R28C41 23 5C-6C R41C50 24 5H-6H R16C30 24 2H-3H R31C67 25 lAVB R46C44 26 2C-3C R29C12 26 2H-3H *R13C61 26 2H-3H *'*R13C61 28 1C-2C . R21C46 28 lAVB R46C45 34 7C-4AVB R13C68 34 7C-4AVB R31C79 35 CTS R0.7C90 36 6C-7C R31C73 39 7C R13C67
- Denotes tube with multiple indications.
e e Page 06 of 17 REFUELING OUTAGE - JUNE 1986 UNIT 1 STEAM GENERATOR "B" EXAMINATION
SUMMARY
In "B" Steam Generator there were 1608 tube examinations from the inlet side. 55 tubes were examined to the seventh support plate on the outlet side and 1553 tubes were examined full length (tubesheet-to-tubesheet).
This is approximately 48 percent of the available tubes. The tubes examined were found to have a total of 52 indications that are less than 20% through wall, 24 indications that are between 20% and 40% through wall and two indications that are greater than 40% through wall. Two tubes were plugged. Refer to the table below for details.
~~TWD Location Row-Column Remarks
<20 4H-5H R10C13
<20 SC *"RlOC26 20 SC ,':R1QC26
<20 1H-2H R11C33
<20 2C ,':Rl1C43 37 6C-7C >':Rl1C43
<20 6C-7C R11C45
<20 SH Rl1C92
<20 lAVB R12C92
<20 6C-7C R13C84
<20 2C R13C88
<20 6H-7H Rl4C35
<20 4C-5C R15C24
<20 2C R15C32
<20 6C-7C Rl5C35
<20 6H-7H Rl6C33
<20 3AVB R16C43
<20 7C R17C10
<20 CTS-BC R17C23
<20 2H-3H R17C24
<20 6H-7H *"R18C05
<20 7H >':R18C05
<20 6H-7H R18C44
<20 7H R18C90
<20 6H-7H R19C07
<20 4H-5H R19C41
<20 6H-7H *R22Cll
<20 5C-6C *R22Cll
<20 6H-7H R22C36
<20 2H R24C46
Page 07 of 17
%TWD Location Row-Column Remarks
<20 3AVB R24C87
<20 6H-7H R26C28
<20 CTS-BC R29C12
<20 7H R30C23
<20 7H 0'<R31C14
<20 7C 0'<R31C14
<20 4C-SC R31C17
<20 SH-6H R34C36
<20 7C-4AVB o'<R36C38 36 6C-7C 7<R36C38
<20 lAVB 0'<R38C21
<20 lAVB *'<R38C21
<20 6C R38C39
<20 7H R39C29
<20 1C-2C R39C32
<20 7C R40C63
<20 SH-6H R41C29
<20 7C 0'<R41C47
<20 SC *'<R41C47
<20 7H-1AVB R43C48
<20 7H R43CS9
<20 1H-2H R44C45
<20 1C-2C R4SC47
<20 3C-.4C R4SCSS
<20 6C-7C R46CS2 21 2H R12COS 21 2AVB R43C31 21 BC-lC R3SC22 22 6C-7C R13C90 24 6H-7H R2SC46 25 6C-7C R31C47 26 CTS-BC R40C52 26 2C R13C83 27 7H-1AVB R39C43 27 SC R31C40 29 6H-7H R2SC31 31 6C-7C R19C20 31 6C-7C R18C46 32 7C-4AVB 0'<R44C34 38 7C *R44C34 33 3H-4H *""R11C14 Plugged 34 3H-4H *R11C14 Plugged 53 2H-3H *R11C14 Plugged 34 CTS-BC R27C15 36 7H R39C44 36 6C-7C R26C85 38 3AVB R24C40 59 2C R33C43. Plugged
- Denotes tube with multiple indications.
Page 08 of 17 REFUELING OUTAGE - JUNE 1986 UNIT 1 STEAM GENERATOR "C" EXAMINATION
SUMMARY
In "C" Steam Generator there were 3342 tube examinations from the inlet side. One tube was examined to the seventh support plate on the inlet side, 467 tubes were examined to the seventh support plate on the outlet side, and 2874 tubes were examined full length (tubesheet-to-tubesheet).
This is approximately 100 percent of the available tubes. The tubes examined were found to have a total of 98 indications that are less than 20% through wall and 39 indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. Two tubes were plugged (one for a restriction and one for indication evaluation and testing). Refer to the table below for details.
%TWD Location Row-Column Remarks
<20 5H-6H R01C08 Restricted R02C07 Plugged
<20 1H-2H R02C64
<20 6C-7C R04C34
<20 2H R06C60
<20 lH R06C69
<20 5H-6H ,':R07C03 32 5H-6H *R07C03
<20 6C-7C R07C38
<20 CTS-BC R07C90
<20 2H-3H R08C46
<20 6C R09C12
<20 5H-6H R09C72
<20 4H-5H R09C83
<20 6C-7C R10C04
<20 6C-7C RlOC56
<20 6C-7C R10C58
<20 2C RlOC63
<20 4C-5C RlOC87
<20 5C-6C Rl1C09
<20 CTS *R11C55 22 CTS 1:R11C55
<20 6C-7C R11C68
<20 6C R11C91
<20 2H R12C07
<20 7H R12C51
<20 4C-5C R12C61
<20 CTS-BC *R12C92 33 CTS 1:R12C92
e Page 09 of 17
~~TWD Location . Row-Column Remarks
<20 5C-6C Rl3C49
<20 6C-7C ~*:R13C92 35 2C ~*:R13C92
<20 4H R14C82
<20 6H-7H Rl5C70
<20 1C-2C Rl5C71
<20 6H-7H R16C10
<20 2H i:R16C37 30 6H-7H i:Rl6C37
<20 2H-3H Rl6C68
<20 3H-4H Rl7C67
<20 6H-7H R17C76
<20 6C-7C R18C41
<20 BC-lC Rl8C71
<20 2C-3C R19C78
<20 6H-7H R20C49
<20 7H R20C89
<20 5H-6H R21C66
<20 1C-2C R22C70
<20 CTS R23C88
<20 3H-4H R24C29
<20 4C-5C R24C46
<20 6H-7H R25C66
<20 2H R25C83
<20 6C-7C R26C39
<20 5H R27C77
<20 2C-3C R28C33
<20 3H-4H R28C81
<20 SH ~\-R31C27 31 SH-6H *R31C27
<20 2C-3C R31C30
<20 7H *R31C43 33 7C-4AVB i:R31C43
<20 BH R31C53
<20 6H-7H R31C74
<20 1H-2H R31C81
<20 4C-SC R32C81
<20 CTS-BC R33C37
<20 7C R33C41
<20 3C-4C R33C44
<20 BH-lH R33C48
<20 2C-3C R33C71
<20 4AVB R34C19
<20 2C-3C R34C49
<20 BC-lC R3SC17
<20 3C-4C R35C44
<20 SC R3SC47
<20 1AVB-2AVB R36C61
<20 7H R37C48
Page 10 of 17
%TWD Location Row-Column Remarks
<20 5H-6H *'*R38C22
<20 SC >'*R38C22
<20 3H R40C36
<20 BC-IC R40C55
<20 1H-2H R41C52
<20 1H R41C58
<20 7C R41C59
<20 lAVB R42C29
<20 SC R43C32
<20 1C-2C R43C40
<20 4H-5H *'*R43C43
<20 3C-4C *'*R43C43
<20 2H-3H R43C46
<20 6C-7C R43C59
<20 7C R43C60
<20 7C R43C61
<20 7C R43C63
<20 6H R44C38
<20 CTS *'*R44C44
<20 2C-3C "'*R44C44
<20 4C-5C *R44C44 38 7H >',R44C44
<20 7C. R44C57
<20 7C-4AVB R44C57
<20 7C R44C59
<20 6H R45C38
<2Q BH >'<R45C57
<20 7C >',R45C5 7
<20 7C R45C58 20 2C R42C66 21 lC R18C52 21 HTS R31C55 24 CTS R30Cl2 24 6H-7H *R34C45 38 6H >'<R34C45 24 BC-IC R32C80 25 BC-lC Rl7C72 26 2H R05C23 27 7H R43C44 28 2H-3H R12Cl0 28 7C-4AVB R20C52 28 4H-5H R23C59 28 2C RlOC61 28 7H R40C70 Pulled/Plugged 29 7C-4AVB R36C40 29 5H-6H *'<R06C12 39 . 5H-6H *R06Cl2 33 7C-4AVB R43C31 33 7H-1AVB R16C48
Page 11 of 17
~~TWD Location Row-Column Remarks 35 2C-3C R26C22 36 4C-5C R25C86 36 6H-7H R38C44 36 2C-3C R08C73 37 6H-7H R31C42 37 7H-1AVB R16C47 38 2H-3H R07C42 38 2H-3H R24C53 39 7C-4AVB R25C36 39 2C R25Cll 39 3C-4C R42C43
- Denotes tube with multiple indications.
e Page 12 of 17 VIRGINIA ELECTRIC AND POWER COMPANY SURRY NUCLEAR POWER STATION UNIT NO. 2 1986 ANNUAL STEAM GENERATOR INSERVICE INSPECTION REPORT EDDY CURRENT EXAMINATION During 1986 the steam generator tubes were examined once. This examination occurred during the October refueling outage. Only tubes in "B" and "c" steam generators were examined during the outage. Tubes in "A" steam generator were not examined. The material that follows presents the results of the examinations. These results include the number and extent of the tubes inspected, the location and percent of wall-thickness penetration for each indication of an imperfection, and the identification of the tubes that were plugged. Also included are a "Tubesheet Cross Section Plot" (Figure 1) and "Tube Support
- Plate/Tubesheet Nomenclature" (Figure 2).
t Page 13 of 17 REFUELING OUTAGE - OCTOBER 1986 UNIT 2 STEAM GENERATOR "B" EXAMINATION
SUMMARY
In "B" Steam Generator there were 721 tube examinations from the inlet side. 135 tubes were examined to the seventh support plate on the outlet side and 586 tubes were examined full length (tubesheet-to- tubesheet).
This is approximately 22 percent of the available tubes. The tubes examined were found to have a total of 11 indications that are less than 20% through wall and one indication that is between 20% and 40% through wall. No tubes were foµnd to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.
%TWD Location Row-Column Remarks
<20 1H-2H R01C63
<20 6H-7H R02C56
<20 6H-7H *R13C05
<20 1H-2H '"R13C05
<20 4C-5C R15C31
<20 2C-3C R17C49
<20 5H-6H R30C15
<20 5H-6H *R15C57
<20 2C-3C '"R15C57
<20 3C-4C *R15C57
<20 6C '"R15C57 24 5C-6C ~"R15C57
- Denotes tube with multiple indications.
Page 14 of 17 REFUELING OUTAGE - OCTOBER 1986 UNIT 2 STEAM GENERATOR "C" EXAMINATION
SUMMARY
In "c" Steam Generator there were 718 tube examinations from the inlet side. There were 4 tubes examined.to the seventh support plate on the inlet side, 134 tubes were examined to the seventh support plate on the outlet side and 580 tubes were examined full length (tubesheet-to-tubesheet). This is approximately 22 percent of the available tubes.
The tubes examined were found to have a total of 25 indications that are less than 20% through wall and seven indications that are between 20% and 40% through wall. No tubes were found to have indications greater than 40% through wall. No tubes were plugged. Refer to the table below for details.
%TWD .Location Row-Column Remarks
<20 3H-4H R02C80
<20 .3C-4C RlOC61
<20 1H":'2H RllC90
<20 3H-4H R13C92
<20 3C-4C Rl4C88
<20 1H-2H R21Cl8
<20 BH-lH R25C12
<20 6H-7H R27Cl3
<20 2AVB R27Cl0
<20 1H-2H ~':R29Cl2
<20 3C-4C *R29Cl2
<20 7H R29C71
<20 3C-4C R29C83
<20 6C-7C R39C42
<20 1C-2C R42C31
. <20 lC R42C35
<20 7H R42C41
<20 3AVB *R43C31
<20 4AVB *R43C31
<20 lAVB R45C37
<20 2C-3C R45C40.
<20 3AVB *R40C63
<20 4AVB ~':R40C63
<20 6C-7C R33C73
<20 3H-4H R36C73 22 2H-3H R23C23 23 HTS-BH R04C28 23 6H-7H R25Cl4 23 7H R34C16
Page 15 of 17
%TWD Location Row-Column Remarks 24 6H-7H R31C20 24 1H-2H R40C36 27 4AVB R28C49
- Denotes tube with multiple indications.
Figure 1 Tubesheet cross Section Plot Westinghouse Series 51-F PLANT: SURRY TUBE LOCATIONS PER GENERATOR: 3354 ROW
~
~
- ~
~ *
~
4 ~
-30 I
f i;\
\
-25
-20
-115 e
I -10
_J I 8 ., ...
0 .,... 0 Pl II II ll 0 UJ II .,
l'J UJ
<- NOZZLE MANIIAY ->
.* Tube e FIGURE 2 e Page 17 of 17 Support Plate/Tubesheet Nomenclature
-2AVB 3AVB 1AVB 4AVB
--1C
~---6C S H - - - ................~ -----SC 4 H - - - _..............~ -----4C 3H--- ---3C 2H--- ---2C
~-1c 1H BH
--I-HI. . . ._.,+-- -----BC
---CTS