414 Nicollet Mall Minneapohs Minnesota $54011927 Telephone (612) 530 5500 l
414 Nicollet Mall Minneapohs Minnesota $54011927 Telephone (612) 530 5500 l
December 11, 1989                                            10 CFR Part 50
December 11, 1989                                            10 CFR Part 50
:                                                                        Section 50.73
:                                                                        Section 50.73 Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT            e-Docket Nos. 50 282 License Nos. DPR 42 50 306              DPR-60 Automatic Control Room Isolations and Starts of Control Room Cleanun Fans Due to Failures of Chlorine Gas Monitors The Licensee Event Report for these occurrences is attached.
  !-
  ,
Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission
  !
Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT            e-Docket Nos. 50 282 License Nos. DPR 42 50 306              DPR-60 Automatic Control Room Isolations and Starts of Control Room Cleanun Fans Due to Failures of Chlorine Gas Monitors The Licensee Event Report for these occurrences is attached.
These events were reported via the Emergency Notification System in accordance with 10 CFR Part 50, Section 50.72, on November 9,      1989, November 17, 1989, November 20, 1989, November 23, 1989, December 1, 1989, and December 8, 1989.
These events were reported via the Emergency Notification System in accordance with 10 CFR Part 50, Section 50.72, on November 9,      1989, November 17, 1989, November 20, 1989, November 23, 1989, December 1, 1989, and December 8, 1989.
Please contact us if you require additional information related to these events, y                  -
Please contact us if you require additional information related to these events, y                  -
Thomas M Parker Manager Nuclear Support Services c: Regional Administrator - Region III, NRC NRR Project Manager, NRC Senior Resident Inspector, NRC MPCA Attn: Dr J W Ferman I
Thomas M Parker Manager Nuclear Support Services c: Regional Administrator - Region III, NRC NRR Project Manager, NRC Senior Resident Inspector, NRC MPCA Attn: Dr J W Ferman I
l            Attachment L              8912180070 891211                                                                    gs
l            Attachment L              8912180070 891211                                                                    gs PDR    ADOCK 05000282 I
'
PDR    ADOCK 05000282 I
g                  PDC                                                                ,
g                  PDC                                                                ,
L
L


,
4 n                                      '
4
              .
  ,
n                                      '
,
     ..c ,0,i.              ,
     ..c ,0,i.              ,
                                                                                   ,,uveamuvuTav co                iuiON                    ,.,,,,0,4 0 0v$        ,,,,,,
                                                                                   ,,uveamuvuTav co                iuiON                    ,.,,,,0,4 0 0v$        ,,,,,,
                '
( RPihtt 4%12 tstiuatto DVhetN Pth ht1PONit          TO C0V*Lv wiu        Twit
( RPihtt 4%12 tstiuatto DVhetN Pth ht1PONit          TO C0V*Lv wiu        Twit
't
't LICENSEE EVENT REPORT (LER)                                                          Te7*i ANO .6 ,T,'U.c.'A.'0,fo'R"NT 0.Y    ANActo                      .. ANe i noi. v i kvCa A at Tet CvLaT0hv      C0vuttsiON peptanD>n *topCTiON            W ASM'NGTON en0 JECT    t3tt0ciosi Opp OCeC4 70665. AND 08 M ANAGlWINT AND tv0GET,WA&MINCTON,0C 20603
                                                                                                                                    "''        *"            *                          "*'*
LICENSEE EVENT REPORT (LER)                                                          Te7*i ANO .6 ,T,'U.c.'A.'0,fo'R"NT 0.Y    ANActo                      .. ANe i noi. v i kvCa A at Tet CvLaT0hv      C0vuttsiON peptanD>n *topCTiON            W ASM'NGTON en0 JECT    t3tt0ciosi Opp OCeC4 70665. AND 08 M ANAGlWINT AND tv0GET,WA&MINCTON,0C 20603
                                                                                                                                       ~00 cal? Numtt4 421                            '865 4
                                                                                                                                       ~00 cal? Numtt4 421                            '865 4
     # ACILITY haut ul .
     # ACILITY haut ul .
PRAIRIE ISLAND NUC1'dAR GENERATING PLANT UNIT 1                                                        0 l5 !0 l0 t o1 pig l2                  1l0Fl0 %
PRAIRIE ISLAND NUC1'dAR GENERATING PLANT UNIT 1                                                        0 l5 !0 l0 t o1 pig l2                  1l0Fl0 %
* UTH
* UTH
* Automatic Control Room Isolations and Starts of Control Room Cleanup Tans Due to Failures of Chlorine Gas Monitors
* Automatic Control Room Isolations and Starts of Control Room Cleanup Tans Due to Failures of Chlorine Gas Monitors tyt2T Daf t 191                        LO R kvutt 9i Ill                    StPORT DAf f 17                          OTHth 8 AciLitits INv0Lvt0101 vtan    vien          II,0      *A6      as a      MONTH      Dev    vtAR                #AC.tifv =Awas                    00CRt? Nvwstals:
* tyt2T Daf t 191                        LO R kvutt 9i Ill                    StPORT DAf f 17                          OTHth 8 AciLitits INv0Lvt0101 vtan    vien          II,0      *A6      as a      MONTH      Dev    vtAR                #AC.tifv =Awas                    00CRt? Nvwstals:
M0%T h    lOAv                                          ,
M0%T h    lOAv                                          ,
Prairie Island Unit 2                          015t0t010 1310 16
Prairie Island Unit 2                          015t0t010 1310 16
Line 62: Line 44:
1l1        0l 8      8 9    8l9            0l 2l0              0l0      1l 2 1l1        8 l9                                                    0 isl0 1 0 iot ; i Twis at*0nf it sveuiTttD evasvaint to tal nioviatutNTs 0, io cem 6              <ca.,. . ., ,. .,,a.      u    ,, sisi
1l1        0l 8      8 9    8l9            0l 2l0              0l0      1l 2 1l1        8 l9                                                    0 isl0 1 0 iot ; i Twis at*0nf it sveuiTttD evasvaint to tal nioviatutNTs 0, io cem 6              <ca.,. . ., ,. .,,a.      u    ,, sisi
           ,,, 3. , ,,,0 "00' *i              N      30 0:iti
           ,,, 3. , ,,,0 "00' *i              N      30 0:iti
_
                                                                                     . i.,                        g    teni,H:H ,
                                                                                     . i.,                        g    teni,H:H ,
_
                                                                                                                                                                   ,3,uw r0 easi.Huni                            tomiim                              te vs.H H.)                              t s.ni.
                                                                                                                                                                   ,3,uw r0 easi.Huni                            tomiim                              te vs.H H.)                              t s.ni.
_                                      _                                    _                                        _
1 l 01 0        ** ***
1 l 01 0        ** ***
* HH W                            $' m
* HH W                            $' m
* H8'                          to '8*H8"'ai                              S.T.".f
* H8'                          to '8*H8"'ai                              S.T.".f noi                                                              -                                    -                                        -      .. . a '.8=r.d'.*
                                                                                                                                                                                      **
noi                                                              -                                    -                                        -      .. . a '.8=r.d'.*
                                                                                                                                                                                   .. Na o'*.',
                                                                                                                                                                                   .. Na o'*.',
70 entiaH1 Hell                          90,13 sH3Hij                        to.73tel:3H.mHal                          Jo6AJ
70 entiaH1 Hell                          90,13 sH3Hij                        to.73tel:3H.mHal                          Jo6AJ 30 entielltHeel                          60,13talt2 Hi6)                      to ?$seH2HomHti 30 ecstaH11tel                          to 734sH2 Hull                      to 73aeHtHal LICIN8s t CONT ACT FOR THIS Lim titt N, ug                                                                                                                                                TELt' HONE Nuweth Amt A C0pt Arne A Hunstad, Staff Enrineer                                                                                            6Ill? 3 I BI 8 l- Il I ! f? 11 CouPLef t Okt LINE 80A S ACM COMPONENT tastutt Ot scaiato IN Tutt etPORT 113
_
30 entielltHeel                          60,13talt2 Hi6)                      to ?$seH2HomHti 30 ecstaH11tel                          to 734sH2 Hull                      to 73aeHtHal LICIN8s t CONT ACT FOR THIS Lim titt N, ug                                                                                                                                                TELt' HONE Nuweth Amt A C0pt Arne A Hunstad, Staff Enrineer                                                                                            6Ill? 3 I BI 8 l- Il I ! f? 11 CouPLef t Okt LINE 80A S ACM COMPONENT tastutt Ot scaiato IN Tutt etPORT 113
                                                   ""                                                                                        "                Ri8 Ciuft      SYl?tu      Cow *0NINT                , $0'    TOesem05                            CAV85  Sv titW    C0p*0NtNT                glC        t0    .'a i          l i i              i i i                                                        i        i i 3            ! i i l        l ! l              l l l                                                        1        l l I            I I l uoNYn      cay      vtAm Sv *LiutNTAL SiPontanPECit0 nai Sv6MattiON vti l!99.e e. ment. lR9tCT10 Sves,153,0N 0e th                                      NO                                                                        l        l        l
                                                   ""                                                                                        "                Ri8 Ciuft      SYl?tu      Cow *0NINT                , $0'    TOesem05                            CAV85  Sv titW    C0p*0NtNT                glC        t0    .'a i          l i i              i i i                                                        i        i i 3            ! i i l        l ! l              l l l                                                        1        l l I            I I l uoNYn      cay      vtAm Sv *LiutNTAL SiPontanPECit0 nai Sv6MattiON vti l!99.e e. ment. lR9tCT10 Sves,153,0N 0e th                                      NO                                                                        l        l        l
                               .oo                                  ,,. .-. ,,      . . , n ei Atsi . Ac r    ,t-,              . . . .,,,..      , A, This event consists of six similar occurrences. On November 8, 1989, November 17, 1989, November 20, 1989, November 23, 1989, December 1, 1989, and December 8, 1989, automatic isolation of the control room supply and exhaust occurred.
                               .oo                                  ,,. .-. ,,      . . , n ei Atsi . Ac r    ,t-,              . . . .,,,..      , A, This event consists of six similar occurrences. On November 8, 1989, November 17, 1989, November 20, 1989, November 23, 1989, December 1, 1989, and December 8, 1989, automatic isolation of the control room supply and exhaust occurred.
Line 83: Line 58:
1 ue on m. ien
1 ue on m. ien


_
            *
    ..    .
                  .
      .
;                                                      . .ucst...t.o m o. .. - oh
;                                                      . .ucst...t.o m o. .. - oh
       .g. , .                                                                                          ,,,,,,,, ,,,,,, ,,,,,,,,
       .g. , .                                                                                          ,,,,,,,, ,,,,,, ,,,,,,,,
                                                                                                                                                  '
ERPI.88 40012 LICENSEE EVENT REPORT (LER)                          '''s,
ERPI.88 40012 LICENSEE EVENT REPORT (LER)                          '''s,
                                                                                         ,    ','.','c',,v"[,RJyo * ' 5;gli,'',,'f"'J,' ,'7.",'"% [
                                                                                         ,    ','.','c',,v"[,RJyo * ' 5;gli,'',,'f"'J,' ,'7.",'"% [
                                                                                              "*
TEXT CONTINUATlON                                  *?",".'t,'o',,l"'",    nim!Mf/M,'M ;"s' *$%D! .
TEXT CONTINUATlON                                  *?",".'t,'o',,l"'",    nim!Mf/M,'M ;"s' *$%D! .
                                                                                                                    '
Mi"t.','a".'J ".*a'Ji,",c*h    M";iM*of.*d M f,H 07 WAh&GEMthf AhD BUDGET w&SMiNG,0N.DC 20603.
Mi"t.','a".'J ".*a'Ji,",c*h    M";iM*of.*d M f,H 07 WAh&GEMthf AhD BUDGET w&SMiNG,0N.DC 20603.
       # ace 6at, na.6,,e                                  DoCEtt huutt. tal                    Lth kuutta tel                    tact (31
       # ace 6at, na.6,,e                                  DoCEtt huutt. tal                    Lth kuutta tel                    tact (31
'                                                                                    ''**          "kMV."      %*y Prairie Island Nuclear Gen Plant                0 l6 l 0 l 0 l 0 l 218 l 2    I9  -
'                                                                                    ''**          "kMV."      %*y Prairie Island Nuclear Gen Plant                0 l6 l 0 l 0 l 0 l 218 l 2    I9  -
0l2l0    -
0l2l0    -
010      0I?      M 0 14 rint u          .  = =,    . c , mmmim
010      0I?      M 0 14 rint u          .  = =,    . c , mmmim EVENT DESCRIPTION                              .
                                                                                                                                                .
EVENT DESCRIPTION                              .
On November 9, 1989, the " chlorine gas present" alarm came in, the 121 control room cleanup filter fan (EIIS Component Code Identifier: FAN) started, and the outside air to the control room automatically isolated.                        An operator was sent to investigate.      It.was determined that there was no chlorine present and 111                                      ;
On November 9, 1989, the " chlorine gas present" alarm came in, the 121 control room cleanup filter fan (EIIS Component Code Identifier: FAN) started, and the outside air to the control room automatically isolated.                        An operator was sent to investigate.      It.was determined that there was no chlorine present and 111                                      ;
chlorine monitor (EIIS Component Code Identifier: MON) was placed in bypass,                                            t The chlorine sensitive tape was torn, it was replaced and the monitor was tested, and the monitor was returned to service November 16, 1989                                                                '
chlorine monitor (EIIS Component Code Identifier: MON) was placed in bypass,                                            t The chlorine sensitive tape was torn, it was replaced and the monitor was tested, and the monitor was returned to service November 16, 1989                                                                '
On November 17, 1989, the " chlorine gas present" alarm came in, the 111 control room cleanup filter fan started, and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined
On November 17, 1989, the " chlorine gas present" alarm came in, the 111 control room cleanup filter fan started, and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined that there was no chlorine present and 111 chlorine monitor was placed in bypass.
                                                                                                                                                ,
that there was no chlorine present and 111 chlorine monitor was placed in bypass.
An alarm card capacitor was replaced and the card contacts were cleaned. The monitor was tested and then it was returned to service November 22, 1989.
An alarm card capacitor was replaced and the card contacts were cleaned. The monitor was tested and then it was returned to service November 22, 1989.
                                                                                                                                                ,
On November 20, 1989, the " chlorine gas present" alarm came in and the outside air to the control room automatically isolated.                      An operator was sent to investigate.      It was determined that there was no chlorine present and 112 chlorine monitor was placed in bypass. The optics block was cleaned and replaced and the monitor was tested and returned to service November 22, 1989.
On November 20, 1989, the " chlorine gas present" alarm came in and the outside air to the control room automatically isolated.                      An operator was sent to investigate.      It was determined that there was no chlorine present and 112 chlorine monitor was placed in bypass. The optics block was cleaned and replaced and the monitor was tested and returned to service November 22, 1989.
On November 23, 1989, the " chlorine gas present" alarm came in and the outside air to the control room automatically isolated.                      An operator was sent to investigate.      It was determined that there was no chlorine present and 112 chlorine monitor was placed in bypass. The sample pump motor was found burned out. The pump problem may have been caused by debris entering the pump through the sample line.        The sample line was cleaned out and the pump was replaced.
On November 23, 1989, the " chlorine gas present" alarm came in and the outside air to the control room automatically isolated.                      An operator was sent to investigate.      It was determined that there was no chlorine present and 112 chlorine monitor was placed in bypass. The sample pump motor was found burned out. The pump problem may have been caused by debris entering the pump through the sample line.        The sample line was cleaned out and the pump was replaced.
Line 115: Line 77:
On December 1, 1989, the " chlorine gas present" alarm came in, the 122 control room cleanup filter fan started and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined that there was no chlorine present and 122 chlorine monitor was placed in bypass.
On December 1, 1989, the " chlorine gas present" alarm came in, the 122 control room cleanup filter fan started and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined that there was no chlorine present and 122 chlorine monitor was placed in bypass.
The optics block was cleaned and replaced and the monitor was tested and returned to service December 5, 1989.
The optics block was cleaned and replaced and the monitor was tested and returned to service December 5, 1989.
          .
: i.    .
: i.    .
  ,
                .
      ..-        ,
1.. . o ....
1.. . o ....
       .g,                                        . ca.. .t o us                                ,,,,,,,,,,,,,,,,,,,,,,
       .g,                                        . ca.. .t o us                                ,,,,,,,,,,,,,,,,,,,,,,
n ,.. . . .,m t
n ,.. . . .,m t
LICEN$EE EVENT REPORT (LER)                        ',','" ^7,%',,v"8R,3*o*82l8*'i,''.!!':*.7,*o't.1"%
LICEN$EE EVENT REPORT (LER)                        ',','" ^7,%',,v"8R,3*o*82l8*'i,''.!!':*.7,*o't.1"%
                                                                                        .
                                                                                          ""
TEXT CONTINUATION                                !*J"'i,y,  !*^.",@3i *f"f!* !!,'e'.". ','!JN"' OR**!
TEXT CONTINUATION                                !*J"'i,y,  !*^.",@3i *f"f!* !!,'e'.". ','!JN"' OR**!
                                                                                         ..,s.wo      .t    t oh    !I    to          ONIN O' Mat.AGlut NT AND tuCGif.WASMlWGTON DC 20603.
                                                                                         ..,s.wo      .t    t oh    !I    to          ONIN O' Mat.AGlut NT AND tuCGif.WASMlWGTON DC 20603.
Line 140: Line 95:
The purpose of this isolation is to protect control room personnel from chlorine leaks. Since none of these occurrences was triggered by the presence of chlorine in the atmosphere, there was no threat to the operation of the plant. In all occurrences, the affected chlorine monitor failed to the safe condition.
The purpose of this isolation is to protect control room personnel from chlorine leaks. Since none of these occurrences was triggered by the presence of chlorine in the atmosphere, there was no threat to the operation of the plant. In all occurrences, the affected chlorine monitor failed to the safe condition.
Therefore, this event did not affect the health and safety of the public.
Therefore, this event did not affect the health and safety of the public.
1
1 CORRFCTIVE ACTIONS l
,
CORRFCTIVE ACTIONS l
l                    The three chlorine detectors were repaired and returned to service as noted.
l                    The three chlorine detectors were repaired and returned to service as noted.
l l                    The logic is designed such that a spurious high chlorine signal on any one of the four detectors will actuate engineered safety features.                                  An interim modification to the mor.itoring system logic, including the installation of 2 additional detectors, is currently being made to reduce the probability of spurious actuation of these engineered safety features.                      The details of this logic change were reported in LER 1 89 15.
l l                    The logic is designed such that a spurious high chlorine signal on any one of the four detectors will actuate engineered safety features.                                  An interim modification to the mor.itoring system logic, including the installation of 2 additional detectors, is currently being made to reduce the probability of spurious actuation of these engineered safety features.                      The details of this logic change were reported in LER 1 89 15.
Line 148: Line 101:


Et      ,                                                                                                                                      j
Et      ,                                                                                                                                      j
        .
   ~
   ~
e                                                                                                                                    l b
e                                                                                                                                    l b
Line 155: Line 107:
Nk Pa[tawoIntNhteow              ! t'3 f0 l' th 0F uahacauth? Aho ovDcit,.aSHINotoN.Dc 39603.
Nk Pa[tawoIntNhteow              ! t'3 f0 l' th 0F uahacauth? Aho ovDcit,.aSHINotoN.Dc 39603.
,  Taciuty haut sie                                    DocRET hvMeth67                        Lth huutta (6)                    PA08 (31
,  Taciuty haut sie                                    DocRET hvMeth67                        Lth huutta (6)                    PA08 (31
                                                                                       'I'"          '         *
                                                                                       'I'"          '
                                                                                                  '
* w's e      'me weIo
w's e      'me weIo
                                                                                                                                                  .
       . Prairie Island Nuclear Gen Plant                o l5 l0 lo lo l2 l8 l 2 8l9          -
       . Prairie Island Nuclear Gen Plant                o l5 l0 lo lo l2 l8 l 2 8l9          -
0l2 l0      -
0l2 l0      -
Line 167: Line 117:
Investigate the removal of the onsite liquid / gas chlorine source and determine the effect of that change on the necessity of chlorine detection capability.
Investigate the removal of the onsite liquid / gas chlorine source and determine the effect of that change on the necessity of chlorine detection capability.
Investigate the availability of qualified detectors with higher reliability than those presently installed.                                                                                        ,
Investigate the availability of qualified detectors with higher reliability than those presently installed.                                                                                        ,
                                                                                                                                                  ,
Investigate the installation of a system which is capable of sampling chlorine from either #121 or #122 control room ventilation system trains.
Investigate the installation of a system which is capable of sampling chlorine from either #121 or #122 control room ventilation system trains.
This would allow the use of only four detectors and a 2 out of 4 logic.                                                  '
This would allow the use of only four detectors and a 2 out of 4 logic.                                                  '

Latest revision as of 00:09, 31 January 2020

LER 89-020-00:on 891108,17,20,23,1201 & 08,automatic Isolation of Control Room Supply & Exhaust Occurred.Caused by Malfunctions of Chlorine Gas Detectors.Addl Monitors Installed & Actuation Logic modified.W/891211 Ltr
ML19351A468
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 12/11/1989
From: Hunstad A, Parker T
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-89-020, LER-89-20, NUDOCS 8912180070
Download: ML19351A468 (5)


Text

.-

o A i .

y __

414 Nicollet Mall Minneapohs Minnesota $54011927 Telephone (612) 530 5500 l

December 11, 1989 10 CFR Part 50

Section 50.73 Director of Nuclear Reactor Regulation U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLANT e-Docket Nos. 50 282 License Nos. DPR 42 50 306 DPR-60 Automatic Control Room Isolations and Starts of Control Room Cleanun Fans Due to Failures of Chlorine Gas Monitors The Licensee Event Report for these occurrences is attached.

These events were reported via the Emergency Notification System in accordance with 10 CFR Part 50, Section 50.72, on November 9, 1989, November 17, 1989, November 20, 1989, November 23, 1989, December 1, 1989, and December 8, 1989.

Please contact us if you require additional information related to these events, y -

Thomas M Parker Manager Nuclear Support Services c: Regional Administrator - Region III, NRC NRR Project Manager, NRC Senior Resident Inspector, NRC MPCA Attn: Dr J W Ferman I

l Attachment L 8912180070 891211 gs PDR ADOCK 05000282 I

g PDC ,

L

4 n '

..c ,0,i. ,

,,uveamuvuTav co iuiON ,.,,,,0,4 0 0v$ ,,,,,,

( RPihtt 4%12 tstiuatto DVhetN Pth ht1PONit TO C0V*Lv wiu Twit

't LICENSEE EVENT REPORT (LER) Te7*i ANO .6 ,T,'U.c.'A.'0,fo'R"NT 0.Y ANActo .. ANe i noi. v i kvCa A at Tet CvLaT0hv C0vuttsiON peptanD>n *topCTiON W ASM'NGTON en0 JECT t3tt0ciosi Opp OCeC4 70665. AND 08 M ANAGlWINT AND tv0GET,WA&MINCTON,0C 20603

~00 cal? Numtt4 421 '865 4

  1. ACILITY haut ul .

PRAIRIE ISLAND NUC1'dAR GENERATING PLANT UNIT 1 0 l5 !0 l0 t o1 pig l2 1l0Fl0 %

  • UTH
  • Automatic Control Room Isolations and Starts of Control Room Cleanup Tans Due to Failures of Chlorine Gas Monitors tyt2T Daf t 191 LO R kvutt 9i Ill StPORT DAf f 17 OTHth 8 AciLitits INv0Lvt0101 vtan vien II,0 *A6 as a MONTH Dev vtAR #AC.tifv =Awas 00CRt? Nvwstals:

M0%T h lOAv ,

Prairie Island Unit 2 015t0t010 1310 16

~ ~

1l1 0l 8 8 9 8l9 0l 2l0 0l0 1l 2 1l1 8 l9 0 isl0 1 0 iot ; i Twis at*0nf it sveuiTttD evasvaint to tal nioviatutNTs 0, io cem 6 <ca.,. . ., ,. .,,a. u ,, sisi

,,, 3. , ,,,0 "00' *i N 30 0:iti

. i., g teni,H:H ,

,3,uw r0 easi.Huni tomiim te vs.H H.) t s.ni.

1 l 01 0 ** ***

  • HH W $' m
  • H8' to '8*H8"'ai S.T.".f noi - - - .. . a '.8=r.d'.*

.. Na o'*.',

70 entiaH1 Hell 90,13 sH3Hij to.73tel:3H.mHal Jo6AJ 30 entielltHeel 60,13talt2 Hi6) to ?$seH2HomHti 30 ecstaH11tel to 734sH2 Hull to 73aeHtHal LICIN8s t CONT ACT FOR THIS Lim titt N, ug TELt' HONE Nuweth Amt A C0pt Arne A Hunstad, Staff Enrineer 6Ill? 3 I BI 8 l- Il I ! f? 11 CouPLef t Okt LINE 80A S ACM COMPONENT tastutt Ot scaiato IN Tutt etPORT 113

"" " Ri8 Ciuft SYl?tu Cow *0NINT , $0' TOesem05 CAV85 Sv titW C0p*0NtNT glC t0 .'a i l i i i i i i i i 3  ! i i l l ! l l l l 1 l l I I I l uoNYn cay vtAm Sv *LiutNTAL SiPontanPECit0 nai Sv6MattiON vti l!99.e e. ment. lR9tCT10 Sves,153,0N 0e th NO l l l

.oo ,,. .-. ,, . . , n ei Atsi . Ac r ,t-, . . . .,,,.. , A, This event consists of six similar occurrences. On November 8, 1989, November 17, 1989, November 20, 1989, November 23, 1989, December 1, 1989, and December 8, 1989, automatic isolation of the control room supply and exhaust occurred.

Each isolation was caused by malfunctions of chlorine gas detectors. Three different detectors malfunctioned, each causing a spurious high chlorine signal.

Corrective action to be taken include the installation of additional monitors and a modification of the actuation logic which initiates the automatic actuation.

The control room ventilation system entered its safeguards mode of operation as designed.

1 ue on m. ien

. .ucst...t.o m o. .. - oh

.g. , . ,,,,,,,, ,,,,,, ,,,,,,,,

ERPI.88 40012 LICENSEE EVENT REPORT (LER) s,

, ','.','c',,v"[,RJyo * ' 5;gli,,,'f"'J,' ,'7.",'"% [

TEXT CONTINUATlON *?",".'t,'o',,l"'", nim!Mf/M,'M ;"s' *$%D! .

Mi"t.','a".'J ".*a'Ji,",c*h M";iM*of.*d M f,H 07 WAh&GEMthf AhD BUDGET w&SMiNG,0N.DC 20603.

  1. ace 6at, na.6,,e DoCEtt huutt. tal Lth kuutta tel tact (31

' ** "kMV."  %*y Prairie Island Nuclear Gen Plant 0 l6 l 0 l 0 l 0 l 218 l 2 I9 -

0l2l0 -

010 0I? M 0 14 rint u . = =, . c , mmmim EVENT DESCRIPTION .

On November 9, 1989, the " chlorine gas present" alarm came in, the 121 control room cleanup filter fan (EIIS Component Code Identifier: FAN) started, and the outside air to the control room automatically isolated. An operator was sent to investigate. It.was determined that there was no chlorine present and 111  ;

chlorine monitor (EIIS Component Code Identifier: MON) was placed in bypass, t The chlorine sensitive tape was torn, it was replaced and the monitor was tested, and the monitor was returned to service November 16, 1989 '

On November 17, 1989, the " chlorine gas present" alarm came in, the 111 control room cleanup filter fan started, and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined that there was no chlorine present and 111 chlorine monitor was placed in bypass.

An alarm card capacitor was replaced and the card contacts were cleaned. The monitor was tested and then it was returned to service November 22, 1989.

On November 20, 1989, the " chlorine gas present" alarm came in and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined that there was no chlorine present and 112 chlorine monitor was placed in bypass. The optics block was cleaned and replaced and the monitor was tested and returned to service November 22, 1989.

On November 23, 1989, the " chlorine gas present" alarm came in and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined that there was no chlorine present and 112 chlorine monitor was placed in bypass. The sample pump motor was found burned out. The pump problem may have been caused by debris entering the pump through the sample line. The sample line was cleaned out and the pump was replaced.

The monitor was tested and returned to service November 27, 1989.

On December 1, 1989, the " chlorine gas present" alarm came in, the 122 control room cleanup filter fan started and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined that there was no chlorine present and 122 chlorine monitor was placed in bypass.

The optics block was cleaned and replaced and the monitor was tested and returned to service December 5, 1989.

i. .

1.. . o ....

.g, . ca.. .t o us ,,,,,,,,,,,,,,,,,,,,,,

n ,.. . . .,m t

LICEN$EE EVENT REPORT (LER) ',','" ^7,%',,v"8R,3*o*82l8*'i,.!!':*.7,*o't.1"%

TEXT CONTINUATION  !*J"'i,y,  !*^.",@3i *f"f!* !!,'e'.". ','!JN"' OR**!

..,s.wo .t t oh !I to ONIN O' Mat.AGlut NT AND tuCGif.WASMlWGTON DC 20603.

  1. acitet, h.mt na DDckti hpMelR G8 Lim .sumeth 161 * * *
  • l'8

,8.. p a g1; . o OJ.n Prcirie Island Nucicar Gen Plant c ]s jo j o lo ]2 ]8 l 2 8 l9 -

0l2l0 -

Ol0 0I3 M 0 14 rariu . w. =c w =awnn 1

On December 8, 1989, the " chlorine gas present" alarm came in, the 121 control room cicanup filter fan started, and the outside air to the control room automatically isolated. An operator was sent to investigate. It was determined that there was no chlorine present and 111 chlorine monitor was placed in bypass.

The chlorine sensitive tape was jammed in the optics block. The tape was replaced, the monitor was tested, and it was returned to service December 11, 1989.

CAUSE OF THE EVENTS The automatic control room ventiletion isolations and starts of cleanup fans were caused in each case by a malfunction of one of the chlorine gas monitors. The system logic is such that virtually any malfunction of any of these monitors will cause the conservative action of isolating the control room from outside air.

ANALYSIS OF THE EVENTS The functional response of the automatic actuation of the control room clean up fan and isolation of the outside air to the control room was according to design.

The purpose of this isolation is to protect control room personnel from chlorine leaks. Since none of these occurrences was triggered by the presence of chlorine in the atmosphere, there was no threat to the operation of the plant. In all occurrences, the affected chlorine monitor failed to the safe condition.

Therefore, this event did not affect the health and safety of the public.

1 CORRFCTIVE ACTIONS l

l The three chlorine detectors were repaired and returned to service as noted.

l l The logic is designed such that a spurious high chlorine signal on any one of the four detectors will actuate engineered safety features. An interim modification to the mor.itoring system logic, including the installation of 2 additional detectors, is currently being made to reduce the probability of spurious actuation of these engineered safety features. The details of this logic change were reported in LER 1 89 15.

1

Et , j

~

e l b

,4 v.s,. wuc61An atsv6Atonv conomissioN , ,

ma Pome sesa tapiata s'3043 LICENSEE EVENT REPORT (LERI fSs*,!,%',,u;l,ta t 3"o"'!3"n,.!?"'y ,T".1"'s TEXT CONTINUATION  !*J"/i "/o',"l*,'."nti 'r#!!!!,'e',", '/!3;f' ;"l'" Miff! >

Nk Pa[tawoIntNhteow  ! t'3 f0 l' th 0F uahacauth? Aho ovDcit,.aSHINotoN.Dc 39603.

, Taciuty haut sie DocRET hvMeth67 Lth huutta (6) PA08 (31

'I'" '

  • w's e 'me weIo

. Prairie Island Nuclear Gen Plant o l5 l0 lo lo l2 l8 l 2 8l9 -

0l2 l0 -

0l0 01 4 0F, O l 4  ;

tanta . m. m ec m maann f

To improve the reliability of the chlorine detection system for the long term, >

the following investigations are underway:

Investigate the removal of the onsite liquid / gas chlorine source and determine the effect of that change on the necessity of chlorine detection capability.

Investigate the availability of qualified detectors with higher reliability than those presently installed. ,

Investigate the installation of a system which is capable of sampling chlorine from either #121 or #122 control room ventilation system trains.

This would allow the use of only four detectors and a 2 out of 4 logic. '

This requires reanalysis of the response times involved to insure timely isolation of the control room.

COMPONENT TDENTIFICATION MDA Scientific Chlorine Detection System, Model 7040 FAN PREVIOUS SIMIIAR EVENTS Previous similar events were reported as Unit 1 LERS 89 006,89-009, 89 012, and 89 015.