|
|
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:}} | | {{#Wiki_filter:Paqe 1II Richard Emch - SEIS Reference Millstone SEIS Emch - Millstone Reference Page 1 1 From: <NancyBurtonEsq @aol.com> |
| | To: <rle~nrc.gov> |
| | Date: Sun, Mar 13, 2005 8:00 PM |
| | |
| | ==Subject:== |
| | Millstone SEIS Reference |
| | |
| | ==Dear Mr. Emch:== |
| | |
| | In Section 4.10 of the Millstone SEIS, you reference the following source: |
| | Adams, E.E. 2001. Thermal Plume Analysis for Millstone Power Station, Units 2-3. Massachusetts Institute of Technology, Cambridge MA. |
| | We would appreciate the opportunity to review this study but have not been able to locate it. At your convenience, please provide a copy. We will gladly reimburse the NRC for copying and mailing charges. |
| | Thank you. |
| | Nancy Burton 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952 |
| | |
| | 1 c,\temp\GW)00001.TMP c:t.pGWQO .TM Paged11 P.g 1 .I...... |
| | .... |
| | Mail Envelope Properties (4234E223.30C:10:17164) |
| | |
| | ==Subject:== |
| | Millstone SEIS Reference Creation Date: Sun, Mar 13, 2005 7:59 PM From: <NancyBurtonEsq @aol.com> |
| | Created By: NancyBurtonEsq@aol.com Recipients nrc.gov OWGWPOO2.HQGWDOO1 RLE (Richard Emch) |
| | Post Office Route OWGWPO02.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 534 Sunday, March 13, 2005 7:59 PM TEXT.htm 1137 Mime.822 1 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed |
| | |
| | ==Subject:== |
| | No Security: Standard}} |
Revision as of 22:46, 22 December 2019
|
---|
Category:E-Mail
MONTHYEARML24213A2602024-07-31031 July 2024 Request for Additional Information LAR to Support Implementation of Framatome Gaia Fuel ML24116A0112024-04-25025 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-13 Regarding Steam Generator Channel Head Drain Modification ML24115A2622024-04-24024 April 2024 Acceptance Review Determination for Proposed Alternative Request IR-4-14 Regarding Pressurizer and Steam Generator Pressure-Retaining Welds and Full-Penetration Welded Nozzles ML24114A3192024-04-23023 April 2024 Acceptance Review Determination LAR to Extend Inspection Interval for Reactor Coolant Pump Flywheels (TSTF-421) Using the CLIIP ML24113A2502024-04-22022 April 2024 Request for Additional Information (e-mail 4/22/2024) License Renewal Commitment for Aging Management Program of Alloy 600 Components ML24092A1082024-04-0101 April 2024 3R22 RFO ISI Owners Activity Report Extension - NRC Staff Acknowledgement Email (4/1/2024) ML24065A3112024-03-0505 March 2024 Request for Additional Information (Redacted) (03/05/2025 E-mail from R. Guzman to S. Sinha) Framatome Gaia Fuel LOCA LAR ML24058A2322024-02-27027 February 2024 2/27/2024 E-mail from S. Sinha to R. Guzman P-8 Instrument Uncertainty in Support of LAR Framatome Gaia Fuel ML24032A4702024-02-0101 February 2024 Change in Estimated Review Schedule Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML24024A2452024-01-24024 January 2024 1/24/2024 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in SE for Amendment No. 288 - Revision to Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML24024A0202024-01-24024 January 2024 Correction to Safety Evaluation Associated Wit Amendment No. 288 - Revision to Applicability Term for RCS Heat-Up and Cooldown Pressure-Temperature Limitations Figures ML23326A0132023-11-22022 November 2023 Acceptance Review Determination LAR to Support Implementation of Framatome Gaia Fuel ML23318A0952023-11-14014 November 2023 Request for Additional Information (E-mail Dated 11/14/2023) LAR to Revise TSs Related to Framatome Gaia Fuel ML23317A0732023-11-13013 November 2023 Acceptance Review Determination - License Amendment Request Modification of TS SR 4.3.6.a ML23297A2312023-10-24024 October 2023 E-mail to File - Summary of September 13, 2023, Meeting with Dominion to Discuss Proposed LAR to Support Cycle Reloads Using Framatome Gaia Fuel ML23265A2302023-09-22022 September 2023 Acceptance Review Determination - License Amendment Request Revision to TS Design Features Section to Remove the Nine Mile Point Unit 3 Nuclear Project, LLC ML23258A0552023-08-31031 August 2023 Setup of Online Reference Portal and Audit Plan for the NRC Staffs Review of LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies (08/31/2023 e-mail) ML23199A2832023-07-18018 July 2023 Request for Additional Information (E-mail Dated 7/18/2023) LAR to Revise the Pressure-Temperature Limits ML23172A0752023-06-21021 June 2023 Acceptance Review Determination LAR to Revise TSs for Reactor Core Safety Limits, Fuel Assemblies, and COLR Related to Framatome Gaia Fuel ML23171B0522023-06-20020 June 2023 NRR E-mail Capture - RAI for Review of Appendix F to DOM-NAF-2-P (Redacted) ML23145A0052023-05-25025 May 2023 Acceptance Review Determination Exemption to Use Framatome Gaia Fuel Assemblies Containing Fuel Rods Fabricated with M5 Fuel Rod Cladding ML23145A0042023-05-25025 May 2023 Acceptance Review Determination LAR to Use Framatome Small Break and Realistic Large Break LOCA Methodologies ML23115A3022023-04-24024 April 2023 4/24/2023 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Issuance of Amendments Adoption of TSTF-359, Increase Flexibility in Mode Restraints ML23089A1882023-03-29029 March 2023 Request for Additional Information (E-mail Dated 3/29/2023) Spring 2022 Steam Generator Tube Inspection Report ML23067A2162023-03-0707 March 2023 NRR E-mail Capture - RAI for North Anna, 1 & 2, Surry 1 & 2, Millstone, 2 & 3, Request for Approval of App. F Fleet Report DOM-NAF-2-P, Qual of the Framatome ORFEO-GAIA and ORFEO-NMGRID CHF Correlations in the Dominion VIPRE-D Computer Code ML23038A0152023-02-0707 February 2023 Acceptance Review Determination LAR to Revise the Applicability Term for RCS Heatup and Cooldown Pressure-Temperature Limitations Figures ML23024A1522023-01-24024 January 2023 Acceptance Review Determination LAR to Supplement Burnup Credit of Criticality Safety Analysis ML23018A0352023-01-17017 January 2023 NRR E-mail Capture - Acceptance Review for Fleet Report Re Appendix F of DOM-NAF-2-P (L-2022-LLT-0003) ML22320A5752022-11-16016 November 2022 E-mail to File - Summary of October 18, 2022, Meeting with Dominion to Discuss Requested Actions for Implementing Framatome Gaia Fuel ML22298A2052022-10-25025 October 2022 Acceptance Review Determination for Alternative Request for Extension of Examination Interval for Reactor Pressure Vessel Head Penetration Nozzles ML22292A3212022-10-19019 October 2022 Acceptance Review Determination for Alternative Request for Containment RSS Pump Periodic Verification Testing Program ML22297A1802022-10-0707 October 2022 Email Acknowledgement to Dominion Energy Nuclear Decommissioning Trust Fund Disbursement 30 Day Notification for Millstone Power Station Unit 1: Docket No 50-245 ML22278A0932022-10-0505 October 2022 E-mail to File - Summary of September 7, 2022, Meeting with Dominion to Discuss Proposed Supplement to the Spent Fuel Pool Criticality Safety Analysis (EPID L-2022-LRM-0059 ML22272A0332022-09-29029 September 2022 Memo E-mail to File - Summary of August 29, 2022, Meeting with Dominion to Discuss Proposed Alternative Request Post-peening follow-up Volumetric Exam of RPV Head Penetration Nozzle ML22252A1772022-09-0909 September 2022 Memo E-mail to File - Summary of August 9, 2022, Meeting with Dominion to Discuss Proposed Alternative Reqeust Recirculation Spray Pump Flow Testing (EPID L:2022-LRM-0057) ML22242A0452022-08-23023 August 2022 NRR E-mail Capture - Dominion GL 04-02 Response Draft RAIs (L-2017-LRC-0000) ML22174A3552022-06-23023 June 2022 NRR E-mail Capture - Acceptance Review for Dominion Fleet LAR to Implement TSTF-554 (L-2022-LLA-0078) ML22123A0812022-05-0303 May 2022 Acceptance Review Determination for Proposed LAR for TS Change Applicable to TSTF-359, Increase Flexibility in Mode Restraints ML22069A7192022-03-10010 March 2022 E-mail from R. Guzman to S. Sinha - Millstone Unit 3 Steam Generator Outage Conference Call ML22020A4122022-01-11011 January 2022 1/11/2022 State Consultation E-mail, R. Guzman to J. Semancik Millstone Power Station, Unit 3 Planned Issuance of Amendment to Clarify Shutdown Bank TS and Add Alternate Control Rod Position Monitoring Requirements ML21348A7392021-12-14014 December 2021 E-mail - Acceptance Review Determination Alternative Request IR-4-09 for Use Alternative Brazed Joint Assessment Methodology for Class 3 Moderate Energy Piping ML21347A9412021-12-13013 December 2021 E-mail from R.Guzman to S.Sinha - Acknowledgement of Error in Safety Evaluation for Amendment No. 280 Measurement Uncertainy Recapture Power Uprate ML21334A1922021-11-30030 November 2021 NRR E-mail Capture - Audit Plan for Reactor Core Thermal-Hydraulics Using the VIPRE-D Appendix E Review ML21326A1502021-11-22022 November 2021 NRR E-mail Capture - Acceptance Review for Relocation of Unit Staff Requirements to the QAPD LAR (L-2021-LLA-0195) ML21306A3302021-11-0202 November 2021 NRR E-mail Capture - Acceptance Review for TSTF-569 LAR ML21297A0072021-10-19019 October 2021 E-mail from R. Guzman to S. Sinha - Acknowledgemnt of Error in SE for Millstone Power Station, Unit 3, Amendment No. 279 Addition of Analytical Methodology to the COLR for LBLOCA ML21286A7372021-10-13013 October 2021 Additional Element Included in the Implementation Plan for the Surry Fuel Melt Safety Limit (SL) LAR ML21223A3042021-08-11011 August 2021 Request for Withholding Information from Public Disclosure Proposed LAR to Add an Analytical Methodology to the COLR for a Large Break LOCA ML21200A2562021-07-19019 July 2021 7/19/2021 E-mail Pressurizer Steam Space Line Classification ML21195A2442021-07-13013 July 2021 NRR E-mail Capture - Draft RAI Appendix E to Topical Report DOM-NAF-2 Qualification of the Framatome BWU-I CHF Correlation in the Dominion Energy VIPRE-D Computer Code 2024-07-31
[Table view] Category:Environmental Impact Statement
MONTHYEARML0513301372005-04-14014 April 2005 Email from Nancy Burton Millstone Relicensing ML0513301252005-04-0808 April 2005 e-mail from Nancy Burton Connecticut Coalition Against Millstone/Acrs Comments ML0513301192005-03-30030 March 2005 Email from Nancy Burton Cancer Survey - Seabreeze Drive, Waterford ML0513301132005-03-30030 March 2005 Millstone'S Degrading Conditions ML0513300902005-03-30030 March 2005 e-mail to Nancy Burton Millstone'S Degrading Conditions ML0513301072005-03-30030 March 2005 E-mail from Nancy Burton Millstone'S Degrading Conditions ML0513300792005-03-28028 March 2005 Jordan Cove Study ML0513300892005-03-28028 March 2005 e-mail from Nancy Burton Millstone Draft EIS ML0513301002005-03-28028 March 2005 DEP Waiver of Jurisdiction ML0513301032005-03-28028 March 2005 e-mail from Nancy Burton Strontium-90 ML0513300632005-03-28028 March 2005 E-mail to Nancy Burton Comment Period Closed ML0513300752005-03-27027 March 2005 Your Millstone Site Audit Summary ML0513300922005-03-21021 March 2005 E-mail from Nancy Burton Millstone - Notice of Intent to Sue ML0513300822005-03-16016 March 2005 e-mail from Nancy Burton Millstone SEIS - Ccam Written Comments ML0513300502005-03-15015 March 2005 E-mail from Richard Emch to Nancy Burton Regarding Millstone SEIS Reference ML0513300882005-03-14014 March 2005 E-mail from Nancy Burton Regarding Millstone Draft Environmental Impact Statement Comments ML0513300952005-03-13013 March 2005 E-mail from Nancy Burton Millstone SEIS Reference ML0513300972005-03-12012 March 2005 E-mail from Nancy Burton Boy'S Cancer Blamed on Millstone (Hartford Courant) ML0513301102005-03-11011 March 2005 E-mail from Nancy Burton Do Heed This Message and Circulate Widely within the NRC ML0513301182005-03-11011 March 2005 E-mail from Nancy Burton Boy'S Cancer Blamed on Millstone (Hartford Courant) ML0513301152005-03-11011 March 2005 E-mail from Nancy Burton Group: Plant Pollution May Have Sickened Boy (Norwich CT Bulletin) ML0513301322005-03-0909 March 2005 e-mail from Nancy Burton Millstone Draft Environmental Impact Statement ML0513301262005-03-0909 March 2005 E-mail from Nancy Burton You Are All Invited ML0513301432005-03-0909 March 2005 E-mail to Nancy Burton Millstone Draft Environmental Impact Statement ML0513300802005-03-0101 March 2005 e-mail to Nancy Burton Millstone Draft Environmental Impact Statement ML0513301352005-02-28028 February 2005 E-mail from Nancy Burton Millstone - Please Forward to Commissioners ML0513301382005-02-24024 February 2005 E-mail from Nancy Burton Millstone Draft EIS Comments ML0513300832005-02-24024 February 2005 e-mail to Nancy Burton Millstone Draft EIS Comments ML0513301412005-02-24024 February 2005 E-mail from Nancy Burton Millstone Draft EIS Comments ML0513303492005-02-24024 February 2005 Draft Environmental Impact Statement ML0513300772005-02-23023 February 2005 E-mail from Richard Emch to Nancy Burton Regarding Millstone Draft EIS - Correction ML0513303522005-02-21021 February 2005 E-mail from Nancy Burton ;Millstone Draft Environmental Impact Statement ML0513302862005-02-18018 February 2005 E-mail from Nancy Burton Millstone 1/11/05 Transcript ML0513300342005-02-18018 February 2005 01/11/05 Transcript ML0513302902005-02-15015 February 2005 E-mail from Nancy Burton Re Millstone Draft EIS ML0513302932005-02-10010 February 2005 E-Mail from Nancy Burton Re Millstone Draft EIS Inquiry ML0513302972005-02-10010 February 2005 E-Mail from Nancy Burton Re Millstone Draft EIS ML0513302852005-02-0808 February 2005 E-mail from Nancy Burton Millstone Draft Environmental Impact Statement ML0513302922005-02-0404 February 2005 E-mail from Nancy Burton Millstone EIS ML0513302962005-02-0202 February 2005 E-mail from Nancy Burton Re Millstone Draft EIS ML0513302982005-01-31031 January 2005 E-Mail from Nancy Burton Re Millstone Draft EIS ML0513303002005-01-23023 January 2005 E-Mail from Nancy Burton Re Millstone Draft Environmental Impact Statement ML0513303012005-01-11011 January 2005 RAIs ML0424005432004-08-27027 August 2004 Issuance of Environmental Scoping Summary Report Associated with Staff'S Review of Applications by Dominion Nuclear Connecticut, Inc. for Renewal of Operating Licenses for Millstone Power Station, Units 2 and 3 ML0336000692003-12-11011 December 2003 Excerpt from Final EIS, Chapter 2, 2.3.1.3 High-Level Radioactive Waste. 2005-04-08
[Table view] |
Text
Paqe 1II Richard Emch - SEIS Reference Millstone SEIS Emch - Millstone Reference Page 1 1 From: <NancyBurtonEsq @aol.com>
To: <rle~nrc.gov>
Date: Sun, Mar 13, 2005 8:00 PM
Subject:
Millstone SEIS Reference
Dear Mr. Emch:
In Section 4.10 of the Millstone SEIS, you reference the following source:
Adams, E.E. 2001. Thermal Plume Analysis for Millstone Power Station, Units 2-3. Massachusetts Institute of Technology, Cambridge MA.
We would appreciate the opportunity to review this study but have not been able to locate it. At your convenience, please provide a copy. We will gladly reimburse the NRC for copying and mailing charges.
Thank you.
Nancy Burton 147 Cross Highway Redding Ridge CT 06876 Tel. 203-938-3952
1 c,\temp\GW)00001.TMP c:t.pGWQO .TM Paged11 P.g 1 .I......
....
Mail Envelope Properties (4234E223.30C:10:17164)
Subject:
Millstone SEIS Reference Creation Date: Sun, Mar 13, 2005 7:59 PM From: <NancyBurtonEsq @aol.com>
Created By: NancyBurtonEsq@aol.com Recipients nrc.gov OWGWPOO2.HQGWDOO1 RLE (Richard Emch)
Post Office Route OWGWPO02.HQGWDO01 nrc.gov Files Size Date & Time MESSAGE 534 Sunday, March 13, 2005 7:59 PM TEXT.htm 1137 Mime.822 1 Options Expiration Date: None Priority: Standard Reply Requested: No Return Notification: None Concealed
Subject:
No Security: Standard