(2 intermediate revisions by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML060950069 | | | number = ML060950069 |
| | issue date = 04/04/2006 | | | issue date = 04/04/2006 |
| | title = 03/22/2006 Public Meeting Summary of Meeting with Detroit Edison Company Fermi Plant Performance Annual Assessment | | | title = Public Meeting Summary of Meeting with Detroit Edison Company Fermi Plant Performance Annual Assessment |
| | author name = Kozak T J | | | author name = Kozak T |
| | author affiliation = NRC/RGN-III/DRP/TSS | | | author affiliation = NRC/RGN-III/DRP/TSS |
| | addressee name = | | | addressee name = |
Line 15: |
Line 15: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:April 4, 2006LICENSEE:Detroit Edison CompanyFACILITY:Fermi Nuclear Power Plant, Unit 2 | | {{#Wiki_filter:April 4, 2006 LICENSEE: Detroit Edison Company FACILITY: Fermi Nuclear Power Plant, Unit 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MARCH 22, 2006, PUBLIC MEETING TO DISCUSS THE FERMI 2 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On March 22, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioner's Chambers in Monroe, Michigan. The meeting was | | OF THE MARCH 22, 2006, PUBLIC MEETING TO DISCUSS THE FERMI 2 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On March 22, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company (DECo) management to discuss the NRCs assessment of Fermi 2s safety performance for the period from January 1 through December 31, 2005. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML060660193 and ML060940707, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure. |
| | | The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP), |
| between NRC Region III management and Detroit Edison Company (DECo) management to discuss the NRC's assessment of Fermi 2's safety performance for the period from January 1 | | national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Fermi 2s performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. As part of this regulatory performance meeting, DECo briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and DECo representatives. |
| | | /RA/ |
| through December 31, 2005. The meeting notice and NRC presentation can be found in the | | Thomas J. Kozak, Chief Technical Support Staff Division of Reactor Projects Docket No. 50-341 License No. NPF-43 |
| | |
| Agencywide Documents Access and Managem ent System (ADAMS) as ML060660193 and ML060940707, respectively. A list of principal NRC and licensee meeting participants can be | |
| | |
| found in the attached Enclosure. | |
| The NRC began the meeting with an overview of the NRC's Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the | |
| | |
| NRC's assessment of Fermi 2's performance in calendar year 2005, which was documented in
| |
| | |
| the March 2, 2006, end-of-cycle assessment letter. As part of this regulatory performance | |
| | |
| meeting, DECo briefly responded to the NRC's assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and DECo | |
| | |
| representatives. | |
| /RA/Thomas J. Kozak, Chief Technical Support Staff | |
| | |
| Division of Reactor Projects Docket No. 50-341 License No. NPF-43 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As Stated | | As Stated DISTRIBUTION: |
| | See next page April 4, 2006 |
|
| |
|
| DISTRIBUTION:
| | LICENSEE: Detroit Edison Company FACILITY: Fermi Nuclear Power Plant, Unit 2 |
| See next page April 4, 2006 LICENSEE:Detroit Edison CompanyFACILITY:Fermi Nuclear Power Plant, Unit 2
| |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF THE MARCH 22, 2006, PUBLIC MEETING TO DISCUSS THE FERMI 2 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On March 22, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioner's Chambers in Monroe, Michigan. The meeting was | | OF THE MARCH 22, 2006, PUBLIC MEETING TO DISCUSS THE FERMI 2 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On March 22, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company (DECo) management to discuss the NRCs assessment of Fermi 2s safety performance for the period from January 1 through December 31, 2005. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML060660193 and ML060940707, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure. |
| | | The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP), |
| between NRC Region III management and Detroit Edison Company (DECo) management to discuss the NRC's assessment of Fermi 2's safety performance for the period from January 1 | | national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Fermi 2s performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. As part of this regulatory performance meeting, DECo briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and DECo representatives. |
| | | /RA/ |
| through December 31, 2005. The meeting notice and NRC presentation can be found in the | | Thomas J. Kozak, Chief Technical Support Staff Division of Reactor Projects Docket No. 50-341 License No. NPF-43 |
| | |
| Agencywide Documents Access and Managem ent System (ADAMS) as ML060660193 and ML060940707, respectively. A list of principal NRC and licensee meeting participants can be | |
| | |
| found in the attached Enclosure. | |
| The NRC began the meeting with an overview of the NRC's Reactor Oversight Program (ROP), national ROP results, and the Action Matrix in general. This was followed by a discussion of the | |
| | |
| NRC's assessment of Fermi 2's performance in calendar year 2005, which was documented in
| |
| | |
| the March 2, 2006, end-of-cycle assessment letter. As part of this regulatory performance | |
| | |
| meeting, DECo briefly responded to the NRC's assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and DECo | |
| | |
| representatives. | |
| /RA/Thomas J. Kozak, Chief Technical Support Staff | |
| | |
| Division of Reactor Projects Docket No. 50-341 License No. NPF-43 | |
|
| |
|
| ==Enclosure:== | | ==Enclosure:== |
| As Stated | | As Stated DISTRIBUTION: |
| | | See next page DOCUMENT NAME: C:\MyFiles\Copies\Fermi 2 EOC Mtg Summary CY 2005.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME TKozak for MPhillips:sls TKozak DATE 04/04/06 04/04/06 OFFICIAL RECORD COPY |
| DISTRIBUTION: | |
| See next pageDOCUMENT NAME: C:\MyFiles\Copies\Fermi 2 EOC Mtg Summary CY 2005.wpdTo receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copyOFFICERIIIRIIINAMETKozak for MPhillips:slsTKozakDATE04/04/0604/04/06 OFFICIAL RECORD COPY Detroit Edison Company-2-cc w/encl:R. Gatson, Manager, Nuclear Licensing D. Pettinari, Legal Department | |
| | |
| Michigan Department of Environmental Quality
| |
| | |
| Waste and Hazardous Materials Division
| |
| | |
| M. Yudasz, Jr., Director, Monroe County
| |
| | |
| Emergency Management Division
| |
| | |
| Supervisor - Electric Operators
| |
| | |
| Wayne County Emergency Management Division Detroit Edison Company ADAMS Distribution
| |
| :LXR1 DHJ RidsNrrDirsIrib
| |
| | |
| GEG KGO RMM3 CAA1 DRPIII DRSIII PLB1 JRK1 Enclosure Meeting Participants NRC T. Kozak, Chief, Technical Support Staff, Division of Reactor Projects R. Michael Moris, Senior Resident Inspector, Fermi
| |
| | |
| T. Steadham, Resident Inspector, Fermi
| |
|
| |
|
| A. Wilson, Nuclear Safety Professional Development Program Participant
| | Detroit Edison Company cc w/encl: R. Gatson, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management Division |
|
| |
|
| M. Kamprath, Fermi Office Assistant Detroit Edison Company Donald Cobb, Director, Assistant Vice President, Nuclear GenerationPeter Smith, Director, Nuclear Assessment
| | Detroit Edison Company ADAMS Distribution: |
| | LXR1 DHJ RidsNrrDirsIrib GEG KGO RMM3 CAA1 DRPIII DRSIII PLB1 JRK1 |
|
| |
|
| Rick Libra, Director, Nuclear Engineering}} | | Meeting Participants NRC T. Kozak, Chief, Technical Support Staff, Division of Reactor Projects R. Michael Moris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi A. Wilson, Nuclear Safety Professional Development Program Participant M. Kamprath, Fermi Office Assistant Detroit Edison Company Donald Cobb, Director, Assistant Vice President, Nuclear Generation Peter Smith, Director, Nuclear Assessment Rick Libra, Director, Nuclear Engineering Enclosure}} |
Public Meeting Summary of Meeting with Detroit Edison Company Fermi Plant Performance Annual AssessmentML060950069 |
Person / Time |
---|
Site: |
Fermi ![DTE Energy icon.png](/w/images/5/5b/DTE_Energy_icon.png) |
---|
Issue date: |
04/04/2006 |
---|
From: |
Kozak T NRC/RGN-III/DRP/TSS |
---|
To: |
|
---|
References |
---|
Download: ML060950069 (5) |
|
Similar Documents at Fermi |
---|
Category:Meeting Summary
MONTHYEARML23187A4562023-07-0606 July 2023 June 21, 2023, Summary of the Public Outreach to Discuss the NRC 2022 End of Cycle Plant Performance Assessment of Fermi Nuclear Power Plant Unit 2 ML22307A1252022-11-0909 November 2022 Summary of October 19, 2022, Teleconference Meeting with DTE Electric Company Regarding Proposed License Amendment Pertaining to the Emergency Core Cooling System Strainer Performance Evaluation for Fermi 2 ML22144A1052022-05-24024 May 2022 Summary of Public Outreach to Discuss the NRC 2021 End of Cycle Plant Performance Assessment of Fermi ML21187A1662021-07-0606 July 2021 Summary of the June 24, 2021, Public Webinar to Discuss the NRC 2020 End-of-Cycle Plant Performance Assessment of the Fermi Power Plant, Unit 2 ML20244A3432020-08-31031 August 2020 Summary of the August 27, 2020 Public Webinar to Discuss the NRC 2019 End-of-Cycle Plant Performance Assessment of Fermi 2 Nuclear Power Plant ML19127A0532019-05-0606 May 2019 Summary of the April 30, 2019 Public Outreach to Discuss the NRC 2018 End-Of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML18344A0652018-12-17017 December 2018 Summary of Meeting with DTE Electric Company Regarding Upcoming License Amendment Request to Transition from an 18 Month Fuel Cycle to a 24 Month Fuel Cycle. ML18194A5402018-07-16016 July 2018 Summary of Public Meeting with DTE Electric Company Regarding Upcoming License Amendment Request to Revise a License Condition Related to Boraflex Storage Racks ML18151A9502018-05-31031 May 2018 Summary of Public Outreach to Discuss the NRC 2017 End-Of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML17237B9672017-08-25025 August 2017 Summary of the July 10, 2017, Open House to Discuss the 2016 End-Of-Cycle Plant Performance Assessment of Fermi, Unit 2 ML17067A2712017-03-13013 March 2017 February 9, 2017 Summary of Public Meeting with Dte Electric Company to Discuss the Potential Upcoming Exigent License Amendment Request Regarding TS 3.3.5.1 Emergency Core Cooling System ML16187A1792016-06-30030 June 2016 Enclosure 2 - Summary of Telecon Held on June 9, 2016, Revision 1 ML16187A1732016-06-30030 June 2016 Enclosure 1 - List of Attendees for Telecon Held on June 9, 2016 ML16166A2012016-06-13013 June 2016 Summary of the June 2, 2016, Open House Public Meeting to Discuss NRC Activities, Nuclear Power Issues, and 2015 End-Of-Cycle Performance Assessment of Fermi, Unit 2 ML16131A0662016-05-10010 May 2016 Summary of Telephone Conference Calls Held on February 10 and 25, 2016, Between U.S. Nuclear Regulatory Commission and DTE Electric Company Concerning Response to RAI 4.3.3-3a Pertaining to Fermi License Renewal Application ML15341A2612015-12-11011 December 2015 Summary of Telephone Conference Calls Held on August 4 And18, 2015, Between the U.S. NRC and DTE Electric Company Concerning the Boraflex Monitoring Program Pertaining to Fermi 2 LRA ML15175A0622015-07-0606 July 2015 Summary of Telephone Conference Call Held on May 18, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15175A0392015-07-0606 July 2015 Summary of Telephone Conference Calls Held on April 29 and May 4, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Co. Concerning RAIs Pertaining to Fermi 2 LRA ML15175A0202015-07-0606 July 2015 Summary of Telephone Conference Call Held on January 14, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA (TAC No ML15182A3292015-07-0101 July 2015 June 18, 2015, Summary of Public Open House Meeting to Discuss the NRC 2014 End-Of-Cycle Plant Performance Assessment of Fermi Power Plant, Unit 2 ML15139A5192015-06-11011 June 2015 Summary of Telephone Conference Call Held on May 13, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning Rais Pertaining to the Fermi 2 LRA ML15133A1382015-06-11011 June 2015 Summary of Telephone Conference Calls Held on December 16, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15132A3362015-06-11011 June 2015 Summary of Telephone Conference Call Held on May 5, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAI Pertaining to the Fermi 2 LRA ML15134A1222015-06-0909 June 2015 Summary of Telephone Conference Call Held on December 17, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15119A0582015-05-26026 May 2015 Summary of Telephone Conference Calls Held on December 5, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA (Tac No. Mf 4222) ML15092A2242015-05-26026 May 2015 Summary of Telephone Conference Call Held on March 4, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company ML15104A3032015-05-20020 May 2015 Summary of Telephone Conference Calls Held on April 8, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LAR ML15132A4272015-05-18018 May 2015 March 27, 2015 Summary of Telephone Conference Call Held Between the U.S. NRC and DTE Electric Company Concerning Requests for Additional Information Pertaining to the Severe Accident Mitigation Alternatives Review of the Fermi, Unit 2 ML15104A6322015-05-15015 May 2015 Summary of Telephone Conference Call Held on November 17, 2014 Between NRC and DTE Electric Co Re Requests for Additional Information on Fermi 2 License Renewal Application ML15104A3882015-05-13013 May 2015 Summary of Telephone Conference Call Held on March 25, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15113A1982015-05-13013 May 2015 Summary of Telephone Conference Call Held on December 8, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15098A3022015-05-13013 May 2015 Summary of Telephone Conference Call Held on April 7,2015, Between the U.S.Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15098A1752015-05-13013 May 2015 Summary of Telephone Conference Call Held on March 17,2015, Between the Us Nuclear Regulatory Commission ML15117A5642015-05-13013 May 2015 Summary of Telephone Conference Call Held on April 10, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15104A5142015-05-0101 May 2015 Summary of Telephone Conference Call Held on November 25, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning RAIs Pertaining to the Fermi 2 LRA ML15082A1882015-04-27027 April 2015 Summary of Conference Call Held on March 16, 2015, Between the U.S. NRC and DTE Electric Company, Concerning Requests for Additional Information, Set 27 Pertaining to the Fermi 2 License Renewal Application ML15072A2032015-04-27027 April 2015 Summary of Teleconference March 6, 2015 Between the U.S. NRC and DTE Electric Company, Concerning RAI Pertaining to the Fermi 2 License Renewal Application ML15076A4682015-04-22022 April 2015 Summary of Telephone Conference Call Held on February 13, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company ML15054A1342015-03-19019 March 2015 Summary of Telephone Conference Call Held on January 22, 2015, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning Requests for Additional Information Pertaining to the Fermi 2 License Renewal Application ML15051A5072015-03-19019 March 2015 Summary of Telecom Drai Sets 4, 5 and 6 - November 14 2014 ML15069A6152015-03-18018 March 2015 February 25, 2015, Summary of Pre-Application Teleconference with DTE Electric Company for a Proposed Relief Request Regarding the Core Spray System Pumps (Tac No. MF5700) ML15051A5092015-03-11011 March 2015 Summary of Telecon Drai Set 24 - February 9, 2015 ML15027A3552015-02-11011 February 2015 Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning RAIs Pertaining to the Fermi, Unit 2 LRA SAMA Review ML15005A5382015-01-12012 January 2015 121814, Summary of Telephone Conference Call Between NRC and DTE Electric Company Concerning Responses to RAIs Pertaining to the Fermi 2 LRA Environmental Review ML14330A2632014-12-15015 December 2014 Summary of Telephone Conference Call Held on November 17, 2014, Between the U.S. Nuclear Regulatory Commission and DTE Electric Company, Concerning Requests for Additional Information Pertaining to the Fermi 2 License Renewal Application En ML14308A5982014-11-20020 November 2014 10/20/2014, Summary of Telephone Conference Call Held Between NRC and DTE Electric Co., Concerning Requests for Additional Information Pertaining to Fermi, Unit 2 License Renewal Application ML14308A5302014-11-20020 November 2014 Summary of Phone Call Between the NRC and DTE Electric Co, Concerning RAIs Pertaining to the Fermi 2 LRA Environmental Review ML14233A4502014-09-18018 September 2014 Public Meeting to Discuss the License Renewal Process and Environmental Scoping Process for Fermi, Unit 2 ML14254A4652014-07-24024 July 2014 Scoping Meeting Afternoon Trancript ML13133A3672013-06-0606 June 2013 4/16/2013 - Summary of Meeting with the U.S. EPR Design Center Working Group 2023-07-06
[Table view] |
Text
April 4, 2006 LICENSEE: Detroit Edison Company FACILITY: Fermi Nuclear Power Plant, Unit 2
SUBJECT:
SUMMARY
OF THE MARCH 22, 2006, PUBLIC MEETING TO DISCUSS THE FERMI 2 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On March 22, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company (DECo) management to discuss the NRCs assessment of Fermi 2s safety performance for the period from January 1 through December 31, 2005. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML060660193 and ML060940707, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Fermi 2s performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. As part of this regulatory performance meeting, DECo briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and DECo representatives.
/RA/
Thomas J. Kozak, Chief Technical Support Staff Division of Reactor Projects Docket No. 50-341 License No. NPF-43
Enclosure:
As Stated DISTRIBUTION:
See next page April 4, 2006
LICENSEE: Detroit Edison Company FACILITY: Fermi Nuclear Power Plant, Unit 2
SUBJECT:
SUMMARY
OF THE MARCH 22, 2006, PUBLIC MEETING TO DISCUSS THE FERMI 2 END-OF-CYCLE PLANT PERFORMANCE ASSESSMENT On March 22, 2006, the Nuclear Regulatory Commission (NRC) held a public meeting at the Monroe County Board of Commissioners Chambers in Monroe, Michigan. The meeting was between NRC Region III management and Detroit Edison Company (DECo) management to discuss the NRCs assessment of Fermi 2s safety performance for the period from January 1 through December 31, 2005. The meeting notice and NRC presentation can be found in the Agencywide Documents Access and Management System (ADAMS) as ML060660193 and ML060940707, respectively. A list of principal NRC and licensee meeting participants can be found in the attached Enclosure.
The NRC began the meeting with an overview of the NRCs Reactor Oversight Program (ROP),
national ROP results, and the Action Matrix in general. This was followed by a discussion of the NRCs assessment of Fermi 2s performance in calendar year 2005, which was documented in the March 2, 2006, end-of-cycle assessment letter. As part of this regulatory performance meeting, DECo briefly responded to the NRCs assessment. At the end of the meeting, members of the public were given the opportunity to ask questions of NRC officials and DECo representatives.
/RA/
Thomas J. Kozak, Chief Technical Support Staff Division of Reactor Projects Docket No. 50-341 License No. NPF-43
Enclosure:
As Stated DISTRIBUTION:
See next page DOCUMENT NAME: C:\MyFiles\Copies\Fermi 2 EOC Mtg Summary CY 2005.wpd To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RIII RIII NAME TKozak for MPhillips:sls TKozak DATE 04/04/06 04/04/06 OFFICIAL RECORD COPY
Detroit Edison Company cc w/encl: R. Gatson, Manager, Nuclear Licensing D. Pettinari, Legal Department Michigan Department of Environmental Quality Waste and Hazardous Materials Division M. Yudasz, Jr., Director, Monroe County Emergency Management Division Supervisor - Electric Operators Wayne County Emergency Management Division
Detroit Edison Company ADAMS Distribution:
LXR1 DHJ RidsNrrDirsIrib GEG KGO RMM3 CAA1 DRPIII DRSIII PLB1 JRK1
Meeting Participants NRC T. Kozak, Chief, Technical Support Staff, Division of Reactor Projects R. Michael Moris, Senior Resident Inspector, Fermi T. Steadham, Resident Inspector, Fermi A. Wilson, Nuclear Safety Professional Development Program Participant M. Kamprath, Fermi Office Assistant Detroit Edison Company Donald Cobb, Director, Assistant Vice President, Nuclear Generation Peter Smith, Director, Nuclear Assessment Rick Libra, Director, Nuclear Engineering Enclosure