ML070780529: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Enfwgy 1 CONDITION REPORT Originator: | {{#Wiki_filter:Enfwgy 1 CONDITION REPORT CR-PNP-2001-09403 1 | ||
CONVERTED DATA Originator Group: CONVERTED DATA Supervisor Name: CONVERTED DATA Discovered Date: | Originator: CONVERTED DATA Originator Phone: 0 Originator Group: CONVERTED DATA Operability Required: N Reportability Required: N Supervisor Name: CONVERTED DATA Discovered Date: 04/27/2001 0O:OO Initiated Date: 04/27/2001 0O:OO Condition | ||
04/27/2001 0O:OO | |||
04/27/ | |||
== Description:== | == Description:== | ||
LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. | LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8. 12-D-9 Immediate Action | ||
FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8. 12-D-9 Immediate Action | |||
== Description:== | == Description:== | ||
Line 35: | Line 30: | ||
EQUIPMENT: | EQUIPMENT: | ||
Tag Name Tag Suffi Name Component Code Process System Code 33 REFERENCE ITEMS: Tvpe Code Description CONVERTED PR PR.01.9403 TRENDING (For Reference Purposes Only): Trend Tvpe Trend Code KEYWORDS MAINT RULE 5 | Tag Name Tag Suffi Name Component Code Process System Code 33 REFERENCE ITEMS: | ||
B - APCA Closed by: SHATAS, A. 5/4/200 1 0:OO Summary | Tvpe Code Description CONVERTED PR PR.01.9403 TRENDING (For Reference Purposes Only): | ||
Trend Tvpe Trend Code KEYWORDS MAINT RULE | |||
5 | |||
~ ~ | |||
I I I E--w I ADMIN CR-PNP-2001-09403 I | |||
Initiated Date: 4/27/2001 0:OO Owner Group :Eng DE Mech Civil Struct Staff Current | |||
==Contact:== | |||
SHATAS, A. | |||
Current Significance: B - APCA Closed by: SHATAS, A. 5/4/200 1 0:OO Summary | |||
== Description:== | == Description:== | ||
LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. | |||
FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8, 12-D-9 Remarks | LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8, 12-D-9 Remarks | ||
== Description:== | == Description:== | ||
Line 49: | Line 54: | ||
SEE EVALUATION RESPONSE. | SEE EVALUATION RESPONSE. | ||
Ent43g-y ASSIGNMENTS CR-PNP-2001-09403 Version: 1 Significance Code: B - APCA Classification Code: NON-SIGNIFICANT Owner Group: Eng DE Mech Civil Struct Staff Performed By: Manning,James L 06/08/2001 0O:OO Assignment | |||
== Description:== | == Description:== | ||
CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121. CR-PNP-2001-09403 | CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121. | ||
NONE CA | |||
I I CR-PNP-2001-09403 I | |||
Enferpv I CORRECTIVE ACTION CA Number: 1 | |||
. -- - .- - "_ll _. | |||
I i- ----- | |||
I - 1- I_ | |||
I ---- | |||
Group Name Assigned By: Eng Design Mgmt PACE, R. | |||
Assigned To: Eng DE Mech Civil Struct Staff Manning,JamesL Subassigned To : | |||
Originated By: PACE, R. 4/27/2001 0O:OO:OO Performed By: MANNING, J. 5/24/200 1 0O:OO:OO Subperformed By: | |||
Approved By: | |||
Closed By: PACE, R. 5/24/2001 0O:OO:OO Current Due Date: 08/08/2001 Initial Due Date: 08/08/2001 CA Type: GENERAL Plant Constraint: NONE CA | |||
== Description:== | == Description:== | ||
CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121. Response | CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121. | ||
Subresponse | |||
===Response=== | |||
PROBLEM REPORT 1.OProblem | CONVERTED DATA Subresponse : | ||
Closure Comments: | |||
COMPLETE DIRECT CAUSE ANALYSIS PER PNPS 1.3.121. | |||
PROBLEM REPORT PROBLEM REPORT NO.01-9403 1.OProblem | |||
== Description:== | == Description:== | ||
Large leak reported in the vicinity of AOG building. | Large leak reported in the vicinity of AOG building. Fire system has broken pipe between 12-D-8 and 12-D-9. | ||
Fire system has broken pipe between 12-D-8 and 12-D-9. | : 2. ODirect Cause: Minor fabrication anomalies .Possibly compounded by improper pipe bedding material and placement. See SUDDSRF# 01-64. | ||
: 2. ODirect Cause: Minor fabrication anomalies . Possibly compounded by improper pipe bedding material and placement. | 3.@EquipmentPerformance Issues: System Number -33 Component Number OComponent Type or Description UMaintenance Rule Functional Failure: NO | ||
: 4. OCorrective Actions Completed (include Dates if possible) Damaged pipe removal and replacement completed on May 18, 200 1. | |||
5.OCorrective Actions Required (if not required, check "N/R") X N/R 6.0Trend Data for Apparent Cause (check " N R ' if analysis deals with equipment performance only) N R NO TREND DUE AGE. PIPING WAS INSTALLED APPROXIMATELY 30 YEARS AGO. | |||
Damaged pipe removal and replacement completed on May 18, 200 1. 5.OCorrective Actions Required (if not required, check "N/R") X N/R 6.0Trend Data for Apparent Cause (check " | 7.0The significance should: Remain the Same 0 | ||
Completed By: J. MANNINGODate: 005/24/01 0 OEvaluatorMentor Approved By: R. PACE ODate: 005/24/01 0 0Manager}} | |||
J. MANNINGODate: | |||
005/24/01 0 OEvaluatorMentor Approved By: R. PACE |
Latest revision as of 14:25, 7 December 2019
ML070780529 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 04/21/2001 |
From: | Entergy Operations |
To: | Office of Nuclear Reactor Regulation |
References | |
CR-PNP-2001-09403 | |
Download: ML070780529 (4) | |
Text
Enfwgy 1 CONDITION REPORT CR-PNP-2001-09403 1
Originator: CONVERTED DATA Originator Phone: 0 Originator Group: CONVERTED DATA Operability Required: N Reportability Required: N Supervisor Name: CONVERTED DATA Discovered Date: 04/27/2001 0O:OO Initiated Date: 04/27/2001 0O:OO Condition
Description:
LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8. 12-D-9 Immediate Action
Description:
Suggested Action
Description:
EQUIPMENT:
Tag Name Tag Suffi Name Component Code Process System Code 33 REFERENCE ITEMS:
Tvpe Code Description CONVERTED PR PR.01.9403 TRENDING (For Reference Purposes Only):
Trend Tvpe Trend Code KEYWORDS MAINT RULE
5
~ ~
I I I E--w I ADMIN CR-PNP-2001-09403 I
Initiated Date: 4/27/2001 0:OO Owner Group :Eng DE Mech Civil Struct Staff Current
Contact:
SHATAS, A.
Current Significance: B - APCA Closed by: SHATAS, A. 5/4/200 1 0:OO Summary
Description:
LARGE LEAK REPORTED IN THE VINCINITY OF AOG BUILDING. FIRE SYSTEM HAS BROKEN PIPE BETWEEN 12-D-8, 12-D-9 Remarks
Description:
PR=EF 2.4.54 FIRE PROTECTION AOG MROl107828 MCDONNELL Closure
Description:
SEE EVALUATION RESPONSE.
Ent43g-y ASSIGNMENTS CR-PNP-2001-09403 Version: 1 Significance Code: B - APCA Classification Code: NON-SIGNIFICANT Owner Group: Eng DE Mech Civil Struct Staff Performed By: Manning,James L 06/08/2001 0O:OO Assignment
Description:
CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.
I I CR-PNP-2001-09403 I
Enferpv I CORRECTIVE ACTION CA Number: 1
. -- - .- - "_ll _.
I i- -----
I - 1- I_
I ----
Group Name Assigned By: Eng Design Mgmt PACE, R.
Assigned To: Eng DE Mech Civil Struct Staff Manning,JamesL Subassigned To :
Originated By: PACE, R. 4/27/2001 0O:OO:OO Performed By: MANNING, J. 5/24/200 1 0O:OO:OO Subperformed By:
Approved By:
Closed By: PACE, R. 5/24/2001 0O:OO:OO Current Due Date: 08/08/2001 Initial Due Date: 08/08/2001 CA Type: GENERAL Plant Constraint: NONE CA
Description:
CONDUCT A DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.
Response
CONVERTED DATA Subresponse :
Closure Comments:
COMPLETE DIRECT CAUSE ANALYSIS PER PNPS 1.3.121.
PROBLEM REPORT PROBLEM REPORT NO.01-9403 1.OProblem
Description:
Large leak reported in the vicinity of AOG building. Fire system has broken pipe between 12-D-8 and 12-D-9.
- 2. ODirect Cause: Minor fabrication anomalies .Possibly compounded by improper pipe bedding material and placement. See SUDDSRF# 01-64.
3.@EquipmentPerformance Issues: System Number -33 Component Number OComponent Type or Description UMaintenance Rule Functional Failure: NO
- 4. OCorrective Actions Completed (include Dates if possible) Damaged pipe removal and replacement completed on May 18, 200 1.
5.OCorrective Actions Required (if not required, check "N/R") X N/R 6.0Trend Data for Apparent Cause (check " N R ' if analysis deals with equipment performance only) N R NO TREND DUE AGE. PIPING WAS INSTALLED APPROXIMATELY 30 YEARS AGO.
7.0The significance should: Remain the Same 0
Completed By: J. MANNINGODate: 005/24/01 0 OEvaluatorMentor Approved By: R. PACE ODate: 005/24/01 0 0Manager