(One intermediate revision by the same user not shown) |
Line 2: |
Line 2: |
| | number = ML080600260 | | | number = ML080600260 |
| | issue date = 03/03/2008 | | | issue date = 03/03/2008 |
| | title = 03/03/08, Byron, EOC Annual Assessment Letter (Report 05000454-08-001 and 05000455-08-001) | | | title = Byron, EOC Annual Assessment Letter (Report 05000454-08-001 and 05000455-08-001) |
| | author name = Pederson C | | | author name = Pederson C |
| | author affiliation = NRC/RGN-III/DRP | | | author affiliation = NRC/RGN-III/DRP |
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:March 3, 2008 | | {{#Wiki_filter:rch 3, 2008 |
|
| |
|
| Mr. Charles Chief Nuclear Officer and Senior Vice President Exelon Nuclear Exelon Generation Company, LLC
| | ==SUBJECT:== |
| | | ANNUAL ASSESSMENT LETTER - BYRON STATION, UNITS 1 AND 2 05000454/2008001 AND 05000455/2008001 |
| 4300 Winfield Road
| |
| | |
| Warrenville, IL 60555 SUBJECT: ANNUAL ASSESSMENT LETTER - BYRON STATION, UNITS 1 AND 2 05000454/2008001 AND 05000455/2008001
| |
|
| |
|
| ==Dear Mr. Pardee:== | | ==Dear Mr. Pardee:== |
| On February 13, 2008, the NRC staff completed its performance review of Byron Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan. Overall, Byron Station, Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Unit 1 performance for the most recent quarter | | On February 13, 2008, the NRC staff completed its performance review of Byron Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility. |
|
| |
|
| was within the Licensee Response column of the NRC's Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. Although Unit 1 performance was within the Licensee Response column, the significance of the degradation of the Essential Service Water (SX) risers is still under review as part of the Significance Determination Process which, when finalized, may change our assessment of your plants'
| | This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan. |
|
| |
|
| safety performance. Unit 2 performance for the most recent quarter was within the Regulatory Response column of the NRC's Action Matrix, based on a White Mitigating System Performance Index, Heat Removal Systems PI originating in the second quarter of CY 2006. Although Unit 2 performance was within the Regulatory Response column, the degradation of the Essential Service Water (SX) risers is still under review as part of the Significance Determination Process which, when finalized, may change our assessment of your plants' safety performance. On January 10, 2007, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the White Mitigating System Performance Index, Heat Removal Systems performance indicator. We conducted supplemental inspection procedure 95001 during the week of February 5, 2007. Based on the results of this inspection, no findings of significance were identified. Therefore, pending the outcome of the significance determination of the SX riser issue, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. | | Overall, Byron Station, Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Unit 1 performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. Although Unit 1 performance was within the Licensee Response column, the significance of the degradation of the Essential Service Water (SX) risers is still under review as part of the Significance Determination Process which, when finalized, may change our assessment of your plants safety performance. |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
| | Unit 2 performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix, based on a White Mitigating System Performance Index, Heat Removal Systems PI originating in the second quarter of CY 2006. Although Unit 2 performance was within the Regulatory Response column, the degradation of the Essential Service Water (SX) risers is still under review as part of the Significance Determination Process which, when finalized, may change our assessment of your plants safety performance. On January 10, 2007, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the White Mitigating System Performance Index, Heat Removal Systems performance indicator. We conducted supplemental inspection procedure 95001 during the week of February 5, 2007. Based on the results of this inspection, no findings of significance were identified. Therefore, pending the outcome of the significance determination of the SX riser issue, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. |
|
| |
|
| Sincerely,
| | The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review. |
| /RA/ Cynthia D. Pederson, Director
| |
|
| |
|
| Division of Reactor Projects Docket Nos. 50-454; 50-455
| | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| License Nos. NPF-37; NPF-66
| | If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan. |
|
| |
|
| Enclosure: Byron Inspection/Activity Plan DISTRIBUTION See next page | | Sincerely, |
| | /RA/ |
| | Cynthia D. Pederson, Director Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Enclosure: Byron Inspection/Activity Plan DISTRIBUTION See next page |
| }} | | }} |
Similar Documents at Byron |
---|
Category:Inspection Plan
MONTHYEARIR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML23297A2352023-10-26026 October 2023 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection IR 05000454/20230052023-08-30030 August 2023 Updated Inspection Plan for Byron Station (Report 05000454/2023005 and 05000455/2023005) ML23157A2832023-06-0606 June 2023 Notification of NRC Baseline Inspection and Request for Information IR 05000454/20220062023-03-0101 March 2023 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2022006 and 05000454/2022006) ML23026A3272023-01-26026 January 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000454/2023001 ML22333A7712022-11-29029 November 2022 Request for Information for an NRC Post Approval Site Inspection for License Renewal Inspection Report 05000454/2023010 IR 05000454/20220052022-08-24024 August 2022 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2022005; 05000455/2022005) IR 05000454/20210062022-03-0202 March 2022 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2021006 and 05000455/2021006) ML22040A1442022-02-0909 February 2022 Notification of NRC Baseline Inspection and Request for Information Inspection Report 05000455/2022003 ML21273A3312021-10-0404 October 2021 Information Request to Support Upcoming Biennial Problem Identification and Resolution (Pi&R) Inspection at Byron Station IR 05000454/20210052021-09-0101 September 2021 Updated Inspection Plan for Byron Station Units 1 and 2 (05000454/2021005 and 05000455/2021005) ML21159A1382021-06-0909 June 2021 Notification of NRC Baseline Inspection and Request for Information, Inspection Report 05000454/2021003 IR 05000454/20200062021-03-0404 March 2021 Annual Assessment Letter for Byron Station (Report 05000454/2020006 and 05000455/2020006) ML21007A1222021-01-0707 January 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Teams); Inspection Report 05000454/2021011; 05000455/2021011 ML20329A4852020-11-24024 November 2020 Notification of NRC Fire Protection Team Inspection Request for Information IR 05000454/20200052020-09-0101 September 2020 Updated Inspection Plan for Byron Station Units 1 and 2 (Report 05000454/2020005 and 05000455/2020005) ML20174A5672020-06-22022 June 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000455/2020003 ML20162A0962020-06-10010 June 2020 Information Request for NRC Triennial Evaluations of Changes, Tests, and Experiments (50.59) Baseline Inspection; Inspection Report 05000454/2020011; 05000455/2020011 IR 05000454/20190062020-03-0303 March 2020 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2019006 and 05000455/2019006) IR 05000454/20190052019-08-28028 August 2019 Updated Inspection Plan for Byron Station, Units 1 and 2 (Report 05000454/2019005; 05000455/2019005) ML19172A2772019-06-21021 June 2019 Information Request to Support Upcoming Problem Identification and Resolution Inspection at Byron Station, Units 1 and 2 ML19136A1852019-05-15015 May 2019 Byron Station, Clinton Power Station, Dresden Nuclear Power Station, LaSalle County Station, and Quad Cities Nuclear Power Station-Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency ML19123A0362019-05-0303 May 2019 Ltr. 05/03/19 Byron Station, Units 1 and 2 - Request for Information for an NRC Design Bases Assurance Inspection (Program): Implementation of the Environmental Qualification Program Inspection Report 05000454/2019012; 05000455/2019012 (DRS ML19065A2982019-03-0505 March 2019 Ltr. 03/05/19 Byron Station, Units 1 and 2 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000454/2019003 and 05000455/2019003 (DRS-L.Rodriguez) IR 05000454/20180062019-03-0404 March 2019 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2018006 and 05000455/2018006) ML18354A7012018-12-19019 December 2018 Ltr. 12/19/18 Byron Generating Station, Units 1 and 2 - Notification of NRC Triennial Fire Protection Baseline Inspection and Request for Information 05000454/2019011; 05000455/2019011 (DRS-A.Shaikh) IR 05000454/20180052018-08-28028 August 2018 Updated Inspection Plan for Byron Station, Units 1 and 2 (Report 05000454/2018005 and 05000455/2018005) ML18170A1742018-06-19019 June 2018 Notification of NRC Inspection and Request for Information (DRS-J.Bozga) IR 05000454/20170062018-03-0202 March 2018 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2017006 and 05000455/2017006) IR 05000454/20170052017-08-28028 August 2017 Updated Inspection Plan for Byron Station, Units 1 and 2 (Report 05000454/2017005 and 05000455/2017005) ML17158B1462017-06-0606 June 2017 Information Request to Support Upcoming Problem Identification at and Resolution Inspection at Byron, Units 1 and 2 ML17146A7262017-05-11011 May 2017 Inspection Plan for Byron Station, Units 1 and 2, for Evaluation of Changes, Tests, and Experiments (Triennial Review) Inspection Report 2017009 (Dxs) IR 05000454/20160062017-03-0101 March 2017 Annual Assessment Letter for Byron Station Units 1 and 2 (Report 05000454/2016006 and 05000455/2016006) IR 05000454/20160052016-08-31031 August 2016 Mid-Cycle Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2016005; 05000455/2016005) ML16225A4222016-07-29029 July 2016 Inspection Plan - Byron Station, Units 1 and 2, Triennial Fire Protection Baseline Inspection 2016 007 (Dxs) ML16091A4402016-03-31031 March 2016 Request for Information for Inservice Inspection 2016 002 (Msh) IR 05000454/20150062016-03-0202 March 2016 Annual Assessment Letter for Byron Station, Units 1 and 2 (Inspection Report 05000454/2015006 and 05000455/2015006) IR 05000454/20150052015-09-0101 September 2015 Mid-Cycle Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2015005; 05000455/2015005) IR 05000454/20140012015-03-0404 March 2015 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2014001; 05000455/2014001) ML15029A1672015-01-28028 January 2015 CDBI Request for Information ML14245A0922014-09-0202 September 2014 Mid-Cycle Assessment Letter for Byron Station, Unit 1 and 2 IR 05000454/20130012014-03-0404 March 2014 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2013001; 05000455/2013001) ML13246A1982013-09-0303 September 2013 2013 Byron MOC Letter Combined IR 05000454/20120012013-03-0404 March 2013 Annual Assessment Letter - Byron Station, Units 1 and 2, 05000454/2012001 and 05000455/2012001 ML12248A3312012-09-0404 September 2012 Mid-Cycle Assessment Letter for Byron Station Units 1 and 2 ML12179A1962012-06-26026 June 2012 ISI Request for Information- Baseline Inspection IR 05000454/20110072012-03-0505 March 2012 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000454/2011007 and 05000455/2011007) 2024-08-28
[Table view] Category:Letter
MONTHYEARML24263A1272024-09-23023 September 2024 – Request for Additional Information (EPID 2023-LLA-0136) - Non-Proprietary BYRON 2024-0046, Cycle 27 Core Operating Limits Report2024-09-19019 September 2024 Cycle 27 Core Operating Limits Report RS-24-088, Relief Requests Associated with the Fifth Inservice Inspection Interval2024-09-13013 September 2024 Relief Requests Associated with the Fifth Inservice Inspection Interval ML24250A1182024-09-0606 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information 05000454/LER-2024-001, Both Trains of Control Room Ventilation Temperature Control System Inoperable2024-09-0505 September 2024 Both Trains of Control Room Ventilation Temperature Control System Inoperable ML24227A0522024-08-29029 August 2024 Audit Plan for LAR to Remove ATWS Mtc Limit IR 05000454/20240052024-08-28028 August 2024 Updated Inspection Plan and Assessment Follow-Up Letter for Byron Station, Units 1 and 2 (Report 05000455/2024005 and 05000454/2024005) ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition IR 05000454/20240112024-08-0808 August 2024 Phase 2 Post- Approval License Renewal Report 05000454/2024011 IR 05000454/20240022024-07-26026 July 2024 Integrated Inspection Report 05000454/2024002 and 05000455/2024002, and Exercise of Enforcement Discretion ML24179A3262024-07-23023 July 2024 LTR - Constellation - SG Welds and Nozzles (L-2023-LLR-0053, L-2023-LLR-0054, L-2023-LLR-0055, L-2023-LLR-0056) RS-24-064, Nuclear Radiological Emergency Plan Document Revisions2024-06-28028 June 2024 Nuclear Radiological Emergency Plan Document Revisions RS-24-066, Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller2024-06-25025 June 2024 Inservice Testing Interval Extension for Essential Service Water Valves Due to Required Use of Containment Chiller ML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations RS-24-044, License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed2024-05-28028 May 2024 License Amendment to Transition to Framatome Gaia Fuel and Exemptions to 10 CFR 50.46 and 10 CFR 50 Appendix K. Attachments 1 to 11 Enclosed RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications2024-05-24024 May 2024 Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 ML24142A3352024-05-21021 May 2024 Quad Cities—Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report BYRON 2024-0031, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-05-16016 May 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation IR 05000454/20240012024-05-10010 May 2024 Integrated Inspection Report 05000454/2024001; 05000455/2024001 and 07200068/2024001 BYRON 2024-0028, Annual Radiological Environmental Operating Report (AREOR)2024-05-0909 May 2024 Annual Radiological Environmental Operating Report (AREOR) BYRON 2024-0022, 2023 Regulatory Commitment Change Summary Report2024-05-0202 May 2024 2023 Regulatory Commitment Change Summary Report RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests RS-24-026, License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR)2024-04-25025 April 2024 License Amendment to Braidwood Station, Units 1 and 2, and Byron Station, Units 1 and 2, Technical Specifications 5.6.5, Core Operating Limits Report (COLR) ML24116A1192024-04-25025 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) ML24113A1272024-04-22022 April 2024 Audit Plan in Support of Review of LAR Revision of TS 3.7.15, 3.7.16, and 4.3.1 (EPID: L-2023-LLA-0136) (Non-Proprietary) ML24113A2892024-04-22022 April 2024 Notification of NRC Baseline Inspection and Request for Information BYRON 2024-0020, Annual Dose Report for 20232024-04-18018 April 2024 Annual Dose Report for 2023 ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition BYRON 2024-0021, Registration of Use of Cask to Store Spent Fuel2024-04-11011 April 2024 Registration of Use of Cask to Store Spent Fuel RS-24-034, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors2024-04-10010 April 2024 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors IR 05000454/20244012024-04-0303 April 2024 Cyber Security Inspection Report 05000454/2024401 and 05000455/2024401 (Public) RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report BYRON 2024-0019, Registration of Use of Cask to Store Spent Fuel2024-03-28028 March 2024 Registration of Use of Cask to Store Spent Fuel RS-24-024, Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds2024-03-22022 March 2024 Response to Request for Additional Information Regarding Proposed Alternative for Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds IR 05000454/20230112024-03-20020 March 2024 Fire Protection Team Inspection Report 05000454/2023011 and 05000455/2023011 IR 05000454/20240102024-03-15015 March 2024 Comprehensive Engineering Team Inspection Report 05000454/2024010 and 05000455/2024010 IR 05000454/20230062024-02-28028 February 2024 Annual Assessment Letter for Byron Station, Units 1 and 2 (Report 05000455/2023006 and 05000454/2023006) IR 05000454/20230042024-02-0202 February 2024 Integrated Inspection Report 05000454/2023004 and 05000455/2023004 ML24022A2722024-01-23023 January 2024 Request for Information for an NRC Post-Approval Site Inspection for License Renewal Inspection Report 05000454/2024011 ML24018A0362024-01-17017 January 2024 Paragon Energy Solutions, Defect with Detroit Diesel/Mtu Fuel Injectors P/N R5229660 Cat Id 0001390618 ML23320A1762023-12-13013 December 2023 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0027 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23277A0032023-12-11011 December 2023 Issuance of Amendments Regarding Adoption of TSTF-370 ML23318A5102023-12-0101 December 2023 Relief from the Requirements of the ASME Code IR 05000454/20233012023-11-27027 November 2023 NRC Initial License Examination Report 05000454/2023301 and 05000455/2023301 BYRON 2023-0065, Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline2023-11-17017 November 2023 Unit 2 - Notification of Deviation from Electric Power Research Institute (EPRI) Topical Report MRP-227, Revision 1-A, Materials Reliability Program: Pressurized Water Reactor Internals Inspection and Evaluation Guideline BYRON 2023-0063, Day Inservice Inspection Report for Interval 4, Period 3, (B2R24)2023-11-16016 November 2023 Day Inservice Inspection Report for Interval 4, Period 3, (B2R24) IR 05000454/20230032023-11-13013 November 2023 Integrated Inspection Report 05000454/2023003 and 05000455/2023003 and Exercise of Enforcement Discretion 2024-09-06
[Table view] |
Inspection Report - Byron - 2008001 |
---|
|
|
Text
rch 3, 2008
SUBJECT:
ANNUAL ASSESSMENT LETTER - BYRON STATION, UNITS 1 AND 2 05000454/2008001 AND 05000455/2008001
Dear Mr. Pardee:
On February 13, 2008, the NRC staff completed its performance review of Byron Station, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2007. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Related Information" will include the security cornerstone review and resultant inspection plan.
Overall, Byron Station, Units 1 and 2 operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Unit 1 performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility. Although Unit 1 performance was within the Licensee Response column, the significance of the degradation of the Essential Service Water (SX) risers is still under review as part of the Significance Determination Process which, when finalized, may change our assessment of your plants safety performance.
Unit 2 performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix, based on a White Mitigating System Performance Index, Heat Removal Systems PI originating in the second quarter of CY 2006. Although Unit 2 performance was within the Regulatory Response column, the degradation of the Essential Service Water (SX) risers is still under review as part of the Significance Determination Process which, when finalized, may change our assessment of your plants safety performance. On January 10, 2007, we were notified by your staff of your readiness for the NRC to conduct a supplemental inspection to review the actions taken to address the White Mitigating System Performance Index, Heat Removal Systems performance indicator. We conducted supplemental inspection procedure 95001 during the week of February 5, 2007. Based on the results of this inspection, no findings of significance were identified. Therefore, pending the outcome of the significance determination of the SX riser issue, we plan to conduct reactor oversight process (ROP) baseline inspections at your facility.
The enclosed inspection plan details the inspections, including baseline and other infrequently conducted inspections, less those related to security, scheduled through June 30, 2009. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the mid-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Richard Skokowski at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA/
Cynthia D. Pederson, Director Division of Reactor Projects Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 Enclosure: Byron Inspection/Activity Plan DISTRIBUTION See next page