ML081130732: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML081130732
| number = ML081130732
| issue date = 04/22/2008
| issue date = 04/22/2008
| title = 04/16/2008 Summary of Annual Assessment Meeting with PPL Corporation and Susquehanna Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station (Susquehanna) for Calendar Year 2007
| title = Summary of Annual Assessment Meeting with PPL Corporation and Susquehanna Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station (Susquehanna) for Calendar Year 2007
| author name = Krohn P G
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000387, 05000388
| docket = 05000387, 05000388
| license number = NPF-014, NPF-022
| license number = NPF-014, NPF-022
| contact person = KROHN P G, RI/DRP/PB4/610-337-5120
| contact person = KROHN P, RI/DRP/PB4/610-337-5120
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 1
| page count = 1
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:April 22, 2008  
{{#Wiki_filter:April 22, 2008 MEETING  
 
MEETING  


==SUMMARY==
==SUMMARY==


LICENSEE: PPL SUSQUEHANNA FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND UNIT 2  
LICENSEE:       PPL SUSQUEHANNA FACILITY:     SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND UNIT 2


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF APRIL 16, 2008, ANNUAL ASSESSMENT MEETING WITH PPL CORPORATION On April 16, 2008, at 2:30 p.m., an Annual Assessment Meeting was conducted at the Susquehanna Energy Information Center between the Nuclear Regulatory Commission (NRC) and PPL. The NRC requested the meeting with PPL management to discuss the NRC's assessment of the safety performance of the Susquehanna Steam Electric Station (Susquehanna) for calendar year 2007.
OF APRIL 16, 2008, ANNUAL ASSESSMENT MEETING WITH PPL CORPORATION On April 16, 2008, at 2:30 p.m., an Annual Assessment Meeting was conducted at the Susquehanna Energy Information Center between the Nuclear Regulatory Commission (NRC) and PPL. The NRC requested the meeting with PPL management to discuss the NRCs assessment of the safety performance of the Susquehanna Steam Electric Station (Susquehanna) for calendar year 2007.
The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, inspection activities at Susquehanna during 2007, and performance assessment results. As part of the annual assessment meeting, PPL presented an overview of their performance and initiatives in selected areas.
The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, inspection activities at Susquehanna during 2007, and performance assessment results. As part of the annual assessment meeting, PPL presented an overview of their performance and initiatives in selected areas.
The public observed the meeting and were offered the opportunity to communicate with the NRC regarding PPL's performance at Susquehanna and the role of the agency in ensuring safe plant operations. The meeting notice with attached meeting agenda can be located in ADAMS under Accession Number ML080850867. The slides for the meetings can be found in ADAMS under Accession Number ML081120627.
The public observed the meeting and were offered the opportunity to communicate with the NRC regarding PPLs performance at Susquehanna and the role of the agency in ensuring safe plant operations. The meeting notice with attached meeting agenda can be located in ADAMS under Accession Number ML080850867. The slides for the meetings can be found in ADAMS under Accession Number ML081120627.
Sincerely,     /RA/   Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects  
Sincerely,
                                                /RA/
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects


April 22, 2008  
April 22, 2008 MEETING  
 
MEETING  


==SUMMARY==
==SUMMARY==


LICENSEE: PPL SUSQUEHANNA  
LICENSEE:               PPL SUSQUEHANNA FACILITY:             SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND UNIT 2
 
FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND UNIT 2  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF APRIL 16, 2008, ANNUAL ASSESSMENT MEETING WITH PPL CORPORATION  
OF APRIL 16, 2008, ANNUAL ASSESSMENT MEETING WITH PPL CORPORATION On April 16, 2008, at 2:30 p.m., an Annual Assessment Meeting was conducted at the Susquehanna Energy Information Center between the Nuclear Regulatory Commission (NRC) and PPL. The NRC requested the meeting with PPL management to discuss the NRCs assessment of the safety performance of the Susquehanna Steam Electric Station (Susquehanna) for calendar year 2007.
 
On April 16, 2008, at 2:30 p.m., an Annual Assessment Meeting was conducted at the Susquehanna Energy Information Center between the Nuclear Regulatory Commission (NRC) and PPL. The NRC requested the meeting with PPL management to discuss the NRC's assessment of the safety performance of the Susquehanna Steam Electric Station (Susquehanna) for calendar year 2007.  
 
The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, inspection activities at Susquehanna during 2007, and performance assessment results. As part of the annual assessment meeting, PPL presented an overview of their performance and initiatives in selected areas.
The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, inspection activities at Susquehanna during 2007, and performance assessment results. As part of the annual assessment meeting, PPL presented an overview of their performance and initiatives in selected areas.
The public observed the meeting and were offered the opportunity to communicate with the NRC regarding PPL's performance at Susquehanna and the role of the agency in ensuring safe plant operations. The meeting notice with attached meeting agenda can be located in ADAMS under Accession Number ML080850867. The slides for the meetings can be found in ADAMS under Accession Number ML081120627           .
The public observed the meeting and were offered the opportunity to communicate with the NRC regarding PPLs performance at Susquehanna and the role of the agency in ensuring safe plant operations. The meeting notice with attached meeting agenda can be located in ADAMS under Accession Number ML080850867. The slides for the meetings can be found in ADAMS under Accession Number ML081120627                                         .
Sincerely,   /RA/ Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution:
Sincerely,
P. Krohn, DRP R. Fuhrmeister, DRP T. Setzer, DRP F. Jaxheimer, DRP G. Ottenberg, DRP S. Farrell, DRP, OA B. Vaidya, NRR  
                                                                        /RA/
 
Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution:
SUNSI Review Complete:       PGK                      (Reviewer's Initials) DOCUMENT NAME:   G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 7 EOC\2007 AAM MEETING NOTICES AND SUMMARIES\SUSQUEHANNA\SSES 4_16_08 AAM MEETING  
P. Krohn, DRP R. Fuhrmeister, DRP T. Setzer, DRP F. Jaxheimer, DRP G. Ottenberg, DRP S. Farrell, DRP, OA B. Vaidya, NRR SUNSI Review Complete:                 PGK                      (Reviewers Initials)
DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 7 EOC\2007 AAM MEETING NOTICES AND SUMMARIES\SUSQUEHANNA\SSES 4_16_08 AAM MEETING  


==SUMMARY==
==SUMMARY==
.DOC ML081130732 After declaring this document "An Official Agency Record" it will be released to the Public.
.DOC ML081130732 After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box:  
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" Copy with attachment/enclosure "N" = No copy OFFICE           RI / DRP                     RI / DRP NAME             RFuhrmeister/RF             PKrohn/pgk DATE             04/22/08                     04/22/08 OFFICIAL RECORD COPY}}
" C" = Copy without attachment/enclosure " E" Copy with attachment/enclosure " N" = No copy OFFICE RI / DRP RI / DRP NAME RFuhrmeister/RF PKrohn/pgk DATE 04/22/08 04/22/08 OFFICIAL RECORD COPY}}

Latest revision as of 08:12, 7 December 2019

Summary of Annual Assessment Meeting with PPL Corporation and Susquehanna Nrc'S Assessment of the Safety Performance of the Susquehanna Steam Electric Station (Susquehanna) for Calendar Year 2007
ML081130732
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/22/2008
From: Paul Krohn
Reactor Projects Region 1 Branch 4
To:
Susquehanna
KROHN P, RI/DRP/PB4/610-337-5120
References
Download: ML081130732 (1)


Text

April 22, 2008 MEETING

SUMMARY

LICENSEE: PPL SUSQUEHANNA FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND UNIT 2

SUBJECT:

SUMMARY

OF APRIL 16, 2008, ANNUAL ASSESSMENT MEETING WITH PPL CORPORATION On April 16, 2008, at 2:30 p.m., an Annual Assessment Meeting was conducted at the Susquehanna Energy Information Center between the Nuclear Regulatory Commission (NRC) and PPL. The NRC requested the meeting with PPL management to discuss the NRCs assessment of the safety performance of the Susquehanna Steam Electric Station (Susquehanna) for calendar year 2007.

The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, inspection activities at Susquehanna during 2007, and performance assessment results. As part of the annual assessment meeting, PPL presented an overview of their performance and initiatives in selected areas.

The public observed the meeting and were offered the opportunity to communicate with the NRC regarding PPLs performance at Susquehanna and the role of the agency in ensuring safe plant operations. The meeting notice with attached meeting agenda can be located in ADAMS under Accession Number ML080850867. The slides for the meetings can be found in ADAMS under Accession Number ML081120627.

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects

April 22, 2008 MEETING

SUMMARY

LICENSEE: PPL SUSQUEHANNA FACILITY: SUSQUEHANNA STEAM ELECTRIC STATION, UNIT 1 AND UNIT 2

SUBJECT:

SUMMARY

OF APRIL 16, 2008, ANNUAL ASSESSMENT MEETING WITH PPL CORPORATION On April 16, 2008, at 2:30 p.m., an Annual Assessment Meeting was conducted at the Susquehanna Energy Information Center between the Nuclear Regulatory Commission (NRC) and PPL. The NRC requested the meeting with PPL management to discuss the NRCs assessment of the safety performance of the Susquehanna Steam Electric Station (Susquehanna) for calendar year 2007.

The NRC presented and discussed its assessment of the safety performance of Susquehanna Units 1 and 2 for the period between January 1 through December 31, 2007. The NRC presentations included a discussion of the Reactor Oversight Process, inspection activities at Susquehanna during 2007, and performance assessment results. As part of the annual assessment meeting, PPL presented an overview of their performance and initiatives in selected areas.

The public observed the meeting and were offered the opportunity to communicate with the NRC regarding PPLs performance at Susquehanna and the role of the agency in ensuring safe plant operations. The meeting notice with attached meeting agenda can be located in ADAMS under Accession Number ML080850867. The slides for the meetings can be found in ADAMS under Accession Number ML081120627 .

Sincerely,

/RA/

Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution:

P. Krohn, DRP R. Fuhrmeister, DRP T. Setzer, DRP F. Jaxheimer, DRP G. Ottenberg, DRP S. Farrell, DRP, OA B. Vaidya, NRR SUNSI Review Complete: PGK (Reviewers Initials)

DOCUMENT NAME: G:\DRP\BRANCH4\ASSESSMENT (EOC, MC)\ROP 7 EOC\2007 AAM MEETING NOTICES AND SUMMARIES\SUSQUEHANNA\SSES 4_16_08 AAM MEETING

SUMMARY

.DOC ML081130732 After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" Copy with attachment/enclosure "N" = No copy OFFICE RI / DRP RI / DRP NAME RFuhrmeister/RF PKrohn/pgk DATE 04/22/08 04/22/08 OFFICIAL RECORD COPY